[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Conference asdg::cmp

Title:CMP
Notice:Welcome to the CMP notesfile
Moderator:FABSIX::B_TOWERLLE
Created:Tue Oct 31 1995
Last Modified:Fri Jun 06 1997
Last Successful Update:Fri Jun 06 1997
Number of topics:94
Total number of notes:6381

62.0. "Process Excursion (PEX) for CMP" by SUBPAC::SADIN (Freedom isn't free.) Thu Nov 09 1995 10:34

    
    
    	This note is for Process Excursion entries (PEX) for CMP.
T.RTitleUserPersonal
Name
DateLines
62.1Pex XA0233Q for high tox at incoming 3127 THK_CMPASDG::CULLEYSun Nov 12 1995 06:5718
Subj:	PEX for XL0305 at 3127 THK_CMP 14 THK_ILD3_PRE 3, MVOU 11/07/95 
QUANTITY:      18
MACHINE:       THICKNESS.A5         
DATE:          Nov 07  B-Shift

PROBLEM:       Thickness a little high at incoming:
               ***UCL=33500
               

              THK_ME       40336.000
              THK_RG         978.000

DISPOSITION:   Lot moved on.  
               ***some lots will be coming in with a tox 39000.


CORRECTIVE
ACTION         None, added remark to operation.
62.2PEX-XD0263 for high tox and range at 3127 THK_CMPASDG::CULLEYSun Nov 12 1995 06:5918
Subj:	PEX for XD0263 at 3053 THK_CMP, 10 THK_ILD2_PRE 3, MVOU 10/24/95 04:03

QUANTITY:      24
MACHINE:       THICKNESS.A4         
DATE:          Oct 23  B-Shift

PROBLEM:       Thickness and range high reading at 20119 and 1189
               Thickness UCL = 19900    Range UCL = 1000
                          CL = 19000           CL = 500
                         LCL = 18100          LCL = 0

               THK_ME       XD0263                  20119.000
               THK_RG       XD0263                   1189.000

DISPOSITION:   Lot moved on. Looks like these are coming in higher and higher.

CORRECTIVE
ACTION         None, added remark to operation.
62.3PEX-XD0273 high tox at 2951 THK_CMP 2ASDG::CULLEYSun Nov 12 1995 07:0119
Subj:	PEX for XD0273 at 2951 THK_CMP 2, THK_PMD_PRE, 3 MVOU 10/21/95 22:12 

QUANTITY:      24
MACHINE:       THICKNESS.A5         
DATE:          Oct 21  B-Shift

PROBLEM:       Thickness high reading at 11252
               UCL=11150
                CL=10500
               LCL= 9850

               THK_ME    11252.000
               THK_RG      531.000

DISPOSITION:   Lot moved on.  Last few lots have been in this upper portion
               of the SPC.   

CORRECTIVE
ACTION         None, added remark to operation.
62.4PEX-XD0280-XD0284 high tox at oper #3079ASDG::CULLEYSun Nov 12 1995 07:0221
Subj:	PEX for XD0280 and XD0284 at operation #3079

QUANTITY:      18 , 22
MACHINE:       THICKNESS.A4         
DATE:          Oct 31  B-Shift

PROBLEM:       Thickness high reading: XD0280=19990.000
               Range reading:          XD0280=976.000
               Thickness high reading: XD0284=20157.000
               Range reading:          XD0284=644.000

               Thickness UCL = 19900    Range UCL = 1000
                          CL = 19000           CL = 500
                         LCL = 18100          LCL = 0


DISPOSITION:   Lot moved on. Looks like these are coming in a little high.
               Checked 1050's with Eric and all looked ok.

CORRECTIVE
ACTION         None, added remark to operation.
62.5PEX-XL0260 at 3120 THK_CMP 10 high uniformityASDG::CULLEYSun Nov 12 1995 07:0519
Subj:	PEX for XD0260 at 3120 THK_CMP 10, THK_ILD2_PRE 3 MVOU 10/23/95 21:11

QUANTITY:      17
MACHINE:       THICKNESS.A4         
DATE:          Oct 23  B-Shift

PROBLEM:       Thickness uniformity reading at 1077
               UCL=1000
                CL=500
               LCL=0

               THK_ME       XL0260                  19200.000
               THK_RG       XL0260                   1077.000

DISPOSITION:   Lot moved on. Looks like these are coming in higher lately.  

CORRECTIVE
ACTION         None, added remark to operation.
62.6PEX-XL0297 high tox at incoming 3361 THK_L_CMP2ASDG::CULLEYSun Nov 12 1995 07:0819
Subj:	PEX for XL0297 at 3361 THK_L_CMP2 THK_L_PMDPRE 3, MVOU 11/06/95 04:49 

QUANTITY:      24
MACHINE:       THICKNESS.A4         
DATE:          Nov 06  B-Shift

PROBLEM:       Thickness high at cmp incoming:
               UCL=11150
                CL=10500
               LCL= 9850

               THK_ME    11429.000
               THK_RG      581.000

DISPOSITION:   Lot moved on.  Last few lots have been in this upper portion
               of the SPC.   

CORRECTIVE
ACTION         None, added remark to operation.
62.7PEX-XL0305 high tox at 3361 THK_L_CMP2ASDG::CULLEYSun Nov 12 1995 07:0919
Subj:	PEX for XL0305 at 3361 THK_L_CMP2 THK_L_PMDPRE 3 , MVOU 11/06/95 00:22

QUANTITY:      24
MACHINE:       THICKNESS.A4         
DATE:          Nov 06  B-Shift

PROBLEM:       Thickness a little high at incoming:
               UCL=11150
                CL=10500
               LCL= 9850

              THK_ME       11345.000
              THK_RG         500.000

DISPOSITION:   Lot moved on.  Last few lots have been in this upper portion
               of the SPC.   

CORRECTIVE
ACTION         None, added remark to operation.
62.8XA0234Q for cmp visual at incomingASDG::CULLEYSun Nov 12 1995 07:1033
Subj:	CMP inspection at incoming @ 3127 THK_CMP 14, THK_ILD3_PRE



        ***************  PEX FOR CMP *************
                                                      
							

PROCESS: Visual inspection

OPERATION #:3127

PROCESS DATE & TIME:  11/12/95  3:38 AM

SHIFT:  B

LOT(S) AFFECTED:  XA0234Q

DEVICE TYPE:  TM0055-005-AA-8C

PROBLEM DESCRIPTION:  Metal Spiking at edges of wafers.

CORRECTIVE ACTION:  Sent lot to Wet Lab for SRD rinse.

DISPOSITION:  Prior to this operation, TN spikes where noticed on the wafers
              by ops techs. After inspecting the lot with Metals PSS, we 
              decided the best thing to do was to send the lot to wet-lab 
              for a SRD cycle.
              When wet lab brought the lot back, ops inspected the lot again
              and accepted it.
              Good observation by CMP ops.


62.9PEX FOR INCOMING PMD ON PROFILER.A1 TOO LOWSUBPAC::SMARTINWed Nov 15 1995 04:4119
 EQUIPMENT:INCOMING STEP HEIGHT
 
 PROCESS  DATE: 11/15/95
 
 PROCESS LEVEL: PMD

 OPERATION:1978

 DEVICE TYPE: TM36 

 LOTS :  XD0274

 PROBLEMS:INCOMING STEP HEIGHT TOO LOW .      READING 2000  LCL=3000

 DISPOSITION:LOT WAS REMARKED.           
               
 CORRECTIVE ACTION:NONE 

62.11PEX for Xd0299 at incomingASDG::CULLEYMon Nov 20 1995 06:1717
Subj:	PEX for XD0299 at 3023 THK_CMP 6, THK_ILD1_PRE 3


LOT:           XD0299   TM3636
MACHINE:       THICKNESS.A5      
DATE:          Nov 19  B-Shift
QUANTITY:      24
PROBLEM:       Thickness high at cmp incoming:
               UCL=19900
               
               THK_ME    20017.000
               THK_RG      469.000

DISPOSITION:   Lot moved on.  Lot slightly over spec.

CORRECTIVE
ACTION         None, added remark to operation.
62.12pex for XL0314 at 3362, low step height but uniformASDG::CULLEYTue Nov 21 1995 07:0238
        ***************  PEX FOR CMP POST MEASUREMENT RANGE *************
                                                      (THICKNESS)
                                                      (STEP HEIGHT)
							

PROCESS: 3362 STP_L_CMP1 STEP_L_PMD   2      MVOU 11/21/95 06:16 

OPERATION #:3362

POLISHER(CMP.A1, A2, B1, B2): NA

PROCESS DATE & TIME:  11/3/95  1:00PM

SHIFT:  B

LOT(S) AFFECTED:  XL0314

DEVICE TYPE:  TM0055

PROBLEM DESCRIPTION: Step low, SPC LCL = 3000
  
   HEIGHT_ME    WAFER #1 CENTER          2708.000
                WAFER #1 EDGE            2423.000  11/21/95 06:16:52
                WAFER #2 CENTER          2605.000
                WAFER #2 EDGE            2465.000

 

CORRECTIVE ACTION: none, low steps but uniformity reasonable.


DISPOSITION:    Moved lot on to CMP.
                 




62.13PEX ILD2 INCOMING THK HIGHSUBPAC::SMARTINWed Nov 29 1995 03:2718
PEX for XD0299 at 3053  THK_ILD2_PRE 3


LOT:           XD0299   TM3636
MACHINE:       THICKNESS.A5      
DATE:          Nov 29  D-Shift
QUANTITY:      18
PROBLEM:       Thickness high at cmp incoming:
               UCL=19900
               
               THK_ME    20000.000
             

DISPOSITION:   Lot moved on.  Lot slightly over spec.

CORRECTIVE
ACTION         None, added remark to operation.

62.14PEX lot XD0301 Over PolishSUBPAC::JWOOLSEYFri Dec 01 1995 09:4132
        ***************  PEX FOR CMP POLISH ILD3 *************

PROCESS: CMP POLISH ILD3

POLISHER(CMP.A1, A2, B1, B2):  CMP.B1

PROCESS DATE:  11/27/95

SHIFT:  A and B

LOT(S) AFFECTED:  XD0301

DEVICE TYPE:  TM35

PROBLEM DESCRIPTION:  Lot was over polished. 6 wafers polished down to metal.
		      These 6 wafers were scrapped out of lot

CORRECTIVE   	Rest of lot was depped to a extra 5000� to bring it to
ACTION:		target thickness. No clear reason as to why lot was over
		polished. Another lot was run supposedly in conjunction
		with this lot and there was no mistakes made with this lot.
		There may have been a confusion with passing the lot from
		one shift to another. 


DISPOSITION:    When lots are passed to another shift a through passdown must
		take place. If there are any questions on the lot the wafers
		should all be measured. Person on off going shift should not 
		leave until they are sure on coming shift understands passdown


    
62.15PEX FOR LOT XA0162, WAFER BREAKAGESUBPAC::SMARTINSat Dec 02 1995 01:4135
LOT:           XA0162
MACHINE:       CMP.B1      
DATE:          DEC 1  D-Shift
QUANTITY:      18
PROBLEM:       Broke wafers twice tonight. No alarms.
                                Didn't know wafers broke until they were
                                unloading. First break was noticed when
                                tool alarmed because unload flipper could
                                not pick up wafer, chunk was missing.
                                Second break happened after running 50
                                break in wafers and the tool was about to  
                                unload the last MQC wafer, it to was
                                missing a chunk in the unload cup.
                                BROKE 1 WAFER AND TOOK OUT 4
                                OTHER WAFERS. TOTAL LOSS 5 WAFERS

                                           

DISPOSITION:   Lot moved on.  

CORRECTIVE ACTION:
   
 CMP.B1 WILL NOT BE TURNED OVER TO MFG UNTIL WE UNDERSTAND THE CAUSE OF
 WAFER BREAKAGE. EEG WILL PERFORM THE FOLLOWING CHECKS AND CALS:

  * Because the wafer crack had been polished, the crack must have 
    occurred early on in the polish step, maybe at touch down, or during 
    loading.

 1) CHECK AND ADJUST AS REQUIRED ALL LOAD CUP SPEEDS.
 2) CHECK AND ADJUST AS REQUIRED ALL LOAD CUP HEIGHTS AND ALIGNMENT.
 3) CHECK ALL RECIPE FOR CENTER OF PAD TOUCH DOWN.
 4) CHECK TOUCH DOWN SEQUENCE, IE VACUUM OFF, INITIAL RAMP, ETC.

62.16PEX FOR XD0318 THK_RGSUBPAC::SMARTINSat Dec 02 1995 01:5118
PEX for XD0318 at 3023  THK_RG   ILD1_PRE 


LOT:           XD0318
MACHINE:       THICKNESS.A5      
DATE:          DEC 2  D-Shift
QUANTITY:      18
PROBLEM:       Thickness RANGE high at cmp incoming:
               UCL=1000
               
               THK_RG=  1393
               THK_ME=  19675

DISPOSITION:   Lot moved on.  Lot slightly over spec.

CORRECTIVE
ACTION         None, added remark to operation.

62.17JDOO44 PRE CMP STEP HEIGHT AT PMDSUBPAC::MCCALLIGMon Dec 04 1995 04:3340

        *************** PEX FOR PRE CMP STEP HEIGHT AT PMD *************
                                                                      
							

PROCESS: PRE CMP STEP HEIGHT AT PMD

OPERATION #: 3078

POLISHER(CMP.A1, A2, B1, B2): PROFILER.A2

PROCESS DATE & TIME:  12/03/95  9:25 PM

SHIFT:  B

LOT(S) AFFECTED:  JD0044

DEVICE TYPE:  DC1026

PROBLEM DESCRIPTION: Average pre cmp step height for the pmd layer was below 
                     the lcl.
                     Wafer 1 center   2574 Angstroms
                     Wafer 1 edge     2638 
                     Wafer 2 center   2801 
                     Wafer 2 edge     2988

                     4 point average  2750 Angstroms
                     lcl              3000

CORRECTIVE ACTION:   None at this time.  Pre cmp thickness measurements for 
      		     PMD were within spec.


DISPOSITION:         Lot moved on for polish.
                 




62.18JD0035 pre CMP thickness at PMDSUBPAC::MCCALLIGTue Dec 05 1995 06:4632
        *************** PEX FOR PRE CMP THICKNESS AT PMD *************
                                                                      
							

PROCESS: PRE CMP THICKNESS AT PMD

OPERATION #: 2951

POLISHER(CMP.A1, A2, B1, B2): THICKNESS.A5

PROCESS DATE & TIME:  12/05/95  4:26 AM

SHIFT:  B

LOT(S) AFFECTED:  JD0035

DEVICE TYPE:  DC1026

PROBLEM DESCRIPTION: Pre CMP thickness range out of spec at PMD.
                     THK_ME   JD0035   12119.000                     
                     THK_RG   JD0035    2061.000

                     Range UCL=1000 Angstroms

CORRECTIVE ACTION:   None at this time.  Pre CMP range is very far out of spec;
                     lot will need attention from first shift engineering
                     during polish.   
      		     


DISPOSITION:         Lot held for first shift engineering.
                 
62.19PEX FOR JD0047 HEIGHT_ME INCOMING TO CMPSUBPAC::SMARTINSat Dec 09 1995 06:2117
PEX for JD0047  HEIGHT_ME


LOT:           JD0047
MACHINE:       PPROFILER.A2      
DATE:          DEC 9  D-Shift
QUANTITY:      
PROBLEM:       HEIGHT MEAN TOO LOW at cmp incoming:
               LCL=3000
              HEIGHT=2415-2590 
               
              
DISPOSITION:   Lot moved on.  Lot slightly under spec.

CORRECTIVE
ACTION         None, added remark to operation.

62.20XA0215 pre-CMP thickness at PMDSUBPAC::MCCALLIGSun Dec 10 1995 06:2837
        *************** PEX FOR PRE CMP THICKNESS AT PMD *************
                                                                      
							

PROCESS: PRE CMP THICKNESS AT PMD

OPERATION #: 3104

POLISHER(CMP.A1, A2, B1, B2): THICKNESS.A5

PROCESS DATE & TIME:  12/09/95  10:45 PM

SHIFT:  B

LOT(S) AFFECTED:  XA0215

DEVICE TYPE:  TM55

PROBLEM DESCRIPTION: Pre CMP thickness out of spec low at PMD.

                     PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
                     THK_ME       XA0215                  10130.000
                     THK_RG       XA0215                    571.000      

                     THK_ME SPC limits:
                     LCL: 10850
                     

CORRECTIVE ACTION:   None at this time. Thickness was only slightly low, and
                     range and step height values looked good.
                     Step height pre CMP= 131 Angstroms.
                     Pre thickness problem may be related to the fact that we
                     haven't been running many TM55 lots lately.
                     

DISPOSITION:         Lot passed on.
                 
62.21XD0275 pre CMP planarity at ILD3SUBPAC::MCCALLIGTue Dec 12 1995 00:4543
        *************** PEX FOR PRE CMP STEP HEIGHT AT ILD3 *************
                                                                      
							

PROCESS: PRE CMP STEP HEIGHT AT ILD3

OPERATION #: 3081

POLISHER(CMP.A1, A2, B1, B2): PROFILER A2

PROCESS DATE & TIME:  12/12/95  12:00 AM

SHIFT:  B

LOT(S) AFFECTED:  XD0275

DEVICE TYPE:  TM3636

PROBLEM DESCRIPTION: Pre CMP step height high at ILD3.

                      PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
                      RUN_ID_1     XD0275               23
                      HEIGHT_ME    WAFER #1 CENTER         22120.000
                                   WAFER #1 EDGE           23910.000  
                                   WAFER #2 CENTER         21960.000
                                   WAFER #2 EDGE           22260.000

                      UCL = 20000
                       CL = 18500
                      LCL = 17000      

CORRECTIVE ACTION:  None.  ILD3 pre CMP thickness values for this lot:
         
                    PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
                    THK_ME       XD0275                  39741.000
                    THK_RG       XD0275                   1194.000

                    Thickness is within spec.  Post CMP thickness target
                    is 10000A, so we should be able to polish 23000A step
                    height.         

DISPOSITION:        Lot passed on.
                 
62.22PEX FOR JD0036 AT 3064/FOR RANGEASDG::CULLEYThu Dec 14 1995 04:3919
Subj:	PEX for JD0036 at 3064 THK_ILD3_PST 

QUANTITY:      12
MACHINE:       CMP.B1         
DATE:          Dec.14/95  B-Shift

PROBLEM:       Range high at operation 3064 THK_ILD3_PST
               UCL=4500

     ENTITY THICKNESS.A5
     actual:   THK_ME       10009.000
               THK_RG        5465.000 

DISPOSITION:   Lot moved on.  Mean and height where excellant.

CORRECTIVE
ACTION         MQC was done to make sure machine was performing 
               in spec. MQC came out good.
62.23PEX FOR XD0323 AT THK_ILD2_PRE/RANGEASDG::CULLEYThu Dec 14 1995 05:2919
Subj:	PEX for XD0323 at 3053 THK_ILD2_PRE 

QUANTITY:      19
MACHINE:       THICKNESS.A4         
DATE:          Dec.14/95  B-Shift

PROBLEM:       Range high at operation 3053 THK_ILD2_PRE
               UCL=1000

     ENTITY THICKNESS.A4
     actual:   THK_ME       18749.000
               THK_RG        1118.000

DISPOSITION:   Lot moved on.  Mean and height where good.

CORRECTIVE
ACTION         None,118 over spec is workable. This lot also 
               had many splits at metal.
62.24PEX for JD0049 at 3023 THK_ILD1_PRE/low toxASDG::CULLEYFri Dec 15 1995 06:0818
Subj:	PEX for JD0049 at 3023 THK_ILD1_PRE

QUANTITY:      12
MACHINE:       THICKNESS.A4         
DATE:          Dec.15/95  D-Shift

PROBLEM:       Low incoming tox, at operation 3023 THK_ILD1_PRE
               LCL=18100

     ENTITY THICKNESS.A4
     actual:   THK_ME       18081.000
               THK_RG         711.000 

DISPOSITION:   Lot moved on.  Mean only 19A' low

CORRECTIVE
ACTION         none, note this is a hot lot.
62.25XL0338 pre CMP thickness at PMDSUBPAC::MCCALLIGSun Dec 17 1995 22:2834
        *************** PEX FOR PRE CMP THICKNESS AT PMD *************
                                                                      
							

PROCESS: PRE CMP THICKNESS AT PMD

OPERATION #: 3361

POLISHER(CMP.A1, A2, B1, B2): THICKNESS A5

PROCESS DATE & TIME:  12/17/95  2:20 AM

SHIFT:  B

LOT(S) AFFECTED:  XL0338

DEVICE TYPE:  TM55

PROBLEM DESCRIPTION: Pre CMP thickness low at PMD.

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME       XL0338                  10790.000
              THK_RG       XL0338                    657.000   

              UCL= 12150
               CL= 11500
              LCL= 10850  


CORRECTIVE ACTION:  None.  Thickness only slightly low; step heights look 
                    good.  Lot should polish without a problem. 

DISPOSITION:        Lot passed on.
                 
62.26Xd0316 high range pre CMP at ILD1SUBPAC::MCCALLIGSun Dec 17 1995 22:4735
        *************** PEX FOR PRE CMP RANGE AT ILD1 *************
                                                                      
							

PROCESS: PRE CMP RANGE AT ILD1

OPERATION #: 3023

POLISHER(CMP.A1, A2, B1, B2): THICKNESS A4

PROCESS DATE & TIME:  12/16/95  8:50 PM

SHIFT:  B

LOT(S) AFFECTED:  XD0316

DEVICE TYPE:  TM3636

PROBLEM DESCRIPTION: Pre CMP thickness range high at ILD1.

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME       XD0316                  19675.000
              THK_RG       XD0316                   1174.000

              UCL= 1000
               CL= 500
              LCL= 0 


CORRECTIVE ACTION:  None.  Thickness is within spec, and range is only
                    slightly high.  Lot should polish without a problem.
                    High range could be a measurement problem.

DISPOSITION:        Lot passed on.
                 
62.27JD0055 pre CMP thickness at PMDSUBPAC::MCCALLIGMon Dec 18 1995 03:3835
        *************** PEX FOR PRE CMP THICKNESS AT PMD *************
                                                                      
							

PROCESS: PRE CMP THICKNESS AT PMD

OPERATION #: 2951

POLISHER(CMP.A1, A2, B1, B2): THICKNESS A4

PROCESS DATE & TIME:  12/18/95  2:25 AM

SHIFT:  B

LOT(S) AFFECTED:  JD0055

DEVICE TYPE:  DC1026

PROBLEM DESCRIPTION: Pre CMP thickness low at PMD.

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME       JD0055                  10625.000
              THK_RG       JD0055                    623.000

              UCL= 12150
               CL= 11500
              LCL= 10850         

CORRECTIVE ACTION:  None.  Step heights are in spec, thickness is only 
                    slightly low.  Should have no trouble covering the
                    step height with this thickness.
                    Lot was remarked by films after dielectric deposition.

DISPOSITION:        Lot passed on.
                 
62.28JD0054 pre CMP planarity at PMDSUBPAC::MCCALLIGTue Dec 19 1995 00:2834
        *************** PEX FOR PRE CMP STEP HEIGHT AT PMD *************
                                                                      
							

PROCESS: PRE CMP STEP HEIGHT AT PMD

OPERATION #: 3078

POLISHER(CMP.A1, A2, B1, B2): PROFILER A2

PROCESS DATE & TIME:  12/19/95  12:10 AM

SHIFT:  B

LOT(S) AFFECTED:  JD0054

DEVICE TYPE:  DC1026

PROBLEM DESCRIPTION: Pre CMP step height low at PMD.

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              RUN_ID_1     JD0054               12
              HEIGHT_ME    WAFER #1 CENTER          2534.000
                           WAFER #1 EDGE            2629.000 
                           WAFER #2 CENTER          2456.000
                           WAFER #2 EDGE            2290.000
              UCL= 4200
               CL= 3600
              LCL= 3000         

CORRECTIVE ACTION:  None.

DISPOSITION:        Lot passed on.
                 
62.29XL0338 thickness at ILD1 incomingSUBPAC::MCCALLIGTue Dec 19 1995 23:0834
        *************** PEX FOR PRE CMP THICKNESS AT ILD1 *************
                                                                      
							

PROCESS: PRE CMP THICKNESS AT ILD1

OPERATION #: 3112

POLISHER(CMP.A1, A2, B1, B2): THICKNESS.A4

PROCESS DATE & TIME:  12/19/95  10:00 PM

SHIFT:  B

LOT(S) AFFECTED:  XL0338

DEVICE TYPE:  TM55

PROBLEM DESCRIPTION: Pre CMP thickness low at ILD1.

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME       XL0338                  17721.000
              THK_RG       XL0338                    810.000

              UCL= 19900
               CL= 19000
              LCL= 18100            

CORRECTIVE ACTION:  None.  Step heights are OK.  Thickness is only slightly
                    low; this lot should polish without a problem.  Lot was
                    also slighlty thin at incoming PMD.

DISPOSITION:        Lot passed on.
                 
62.30PEX FOR XL0338 (SCRATCHES)SUBPAC::SMARTINWed Dec 20 1995 16:5733

LOT:    XL0338

MACHINE: CMP.B1

OPER#:1992

PROCESS LEVEL: ILD1
            
DATE:    12/20/95

SHIFT: A-SHIFT

QUANTITY:  24    

PROBLEM:      SCRATCHES ON 4 WAFERS               
              
DISPOSITION: DRG INSPECTED THE LOT AND FOUND  4 WAFERS THAT ARE
             SCRATCHED. THEY HAVE DECIDED TO KEEP THE WAFERS WITH THE LOT DUE
             TO ALL THE PREVIOUS SPLITS THAT THE LOT HAS BEEN THRU. 


CORRECTIVE ACTION:      LOT XL0338 HAD SCRATCHES OBSERVED ON IT.                
                        PARTICLE CHECK PERFORMED/.B1 FAILED FOR                 
                        SCRATCHES/PARTICLES ALL INFO LOGED INTO WORK-           
                        STREAM. CHANGING PAD AND CHECKING CARRIERS     

 1) CMP.B1,2 - PRIOR TO EVERY MQC, THE SYSTEMS NEED TO BE CLEANED OF DRIED
   SLURRY. ON B2 MAKE SURE THE SLURRY DELIVERY FOUNTAIN IS SCRUBBED AND
   THE SIDES OF THE CARRIERS. The current configuration does not scrub the
   carriers. Dried slurry causes scratches.

62.31Pex for jd0051 at incoming ild1_preASDG::CULLEYSat Dec 23 1995 01:3618
Subj:	PEX for JD0051 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      10
MACHINE:       THICKNESS.A4         
DATE:          Dec 23  D-Shift

PROBLEM:       Thickness high at cmp incoming:
               UCL=19900
                CL=19000
               LCL=18100

               THK_ME    17911.000  12/23/95 01:14:05
               THK_RG      784.000

DISPOSITION:   Lot moved on.  Slightly low, which can be considered good.

CORRECTIVE
ACTION         None, added remark to operation.
62.32XL0338 pre-CMP step height at ILD2SUBPAC::MCCALLIGWed Jan 03 1996 05:4737
        *************** PEX FOR PRE CMP STEP HEIGHT AT ILD2 *************
                                                                      
							

PROCESS: PRE CMP STEP HEIGHT AT ILD2

OPERATION #: 3194

POLISHER(CMP.A1, A2, B1, B2): PROFILER.A2

PROCESS DATE & TIME:  1/02/96  8:30 PM

SHIFT:  B

LOT(S) AFFECTED:  XL0338

DEVICE TYPE:  TM55

PROBLEM DESCRIPTION: Pre CMP average planarity high at ILD 2.

             PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              RUN_ID_1     XL0338               20
              HEIGHT_ME    WAFER #1 CENTER          9521.000
                           WAFER #1 EDGE            9505.000 
                           WAFER #2 CENTER          9983.000
                           WAFER #2 EDGE            9888.000
                           4 POINT AVERAGE          9724
              UCL= 9600
               CL= 8400
              LCL= 7200           

CORRECTIVE ACTION:  None.  Should be able to polish these steps without a 
                    problem.  This lot was thin at PMD and ILD1, these factors
                    could be contributing to the out of spec step heights.

DISPOSITION:        Lot passed on.
                 
62.33pre_3 tox low but ok for xd0315ASDG::CULLEYThu Jan 04 1996 05:4618
Subj:	PEX for XD0315 at 3058  THK_ILD3_PRE 

QUANTITY:      15
MACHINE:       THICKNESS.A4         
DATE:          Jan. 04/96  B-Shift

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

ENTITY THICKNESS.A4
               THK_ME       36875.000
               THK_RG        2266.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None.
62.34JD0043 pre CMP thickness low at ILD3SUBPAC::MCCALLIGMon Jan 08 1996 02:0634
        *************** PEX FOR PRE CMP THICKNESS AT ILD3 *************
                                                                      
							

PROCESS: PRE CMP THICKNESS AT ILD3

OPERATION #: 3058

POLISHER(CMP.A1, A2, B1, B2): THICKNESS A4

PROCESS DATE & TIME:  01/06/96  4:00 PM

SHIFT:  C

LOT(S) AFFECTED:  JD0043

DEVICE TYPE:  DC1026

PROBLEM DESCRIPTION: Pre CMP thickness low at ILD3.

             PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME       JD0043                  35558.000

              UCL= 40950
               CL= 39000
              LCL= 37050         

CORRECTIVE ACTION:  None.  Step heights are in spec, thickness is only 
                    slightly low.  Should have no trouble covering the
                    step height with this thickness.
                    Lot was remarked in workstream.

DISPOSITION:        Lot passed on.
                 
62.35PEX JD0058 Incoming THKSUBPAC::BODENSIECKThu Jan 11 1996 08:4131
        ***************  PEX FOR CMP PRE MEASUREMENT MEAN *************

PROCESS: PRE CMP THICKNESS MEAN ILD3

POLISHER(CMP.A1, A2, B1, B2):     B1

PROCESS DATE:  1/10/96

SHIFT:  C

LOT(S) AFFECTED:  JD0058

DEVICE TYPE:  DC1026

PROBLEM DESCRIPTION: INCOMINING THICKNESS 36,875 �. TARGET INCOMING THICKNESS
		IS 39,000� +- (1950)   

CORRECTIVE ACTION:   LOT WILL BE POLISHED AS STANDARD PROCESS. ATTENTION WILL
		BE PAID TO POST STEP HEIGHT TO VERIFY PLANAR WAFERS AFTER
		POLISH. 


DISPOSITION:    CURVE FITTING WILL BE REDONE ON ILD3 LEVELS TO IMPROVE
		THE MEASUREMENT CORRELATIONS BETWEEN FILMS AND CMP. CMP
		USE A ENHANCED STANDARD THICKNESS AND FILMS USES A SCATTERING
		ALGORITHIM TO CALCULATE THICKNESS. THESE MEASUREMENTS 
		DO NOT ALWAYS CORRESPOND.  
 
         

62.36PEX JD0061 Incoming Step HeightSUBPAC::BODENSIECKThu Jan 11 1996 08:4225
        ***************  PEX FOR CMP PRE STEP HEIGHT *************

PROCESS: PRE STEP HEIGHT PMD

POLISHER(CMP.A1, A2, B1, B2):     A1

PROCESS DATE:  1/10/96

SHIFT:  C

LOT(S) AFFECTED:  JD0061

DEVICE TYPE:  DC1026

PROBLEM DESCRIPTION:  MEAN STEP HEIGHT FOR LOT WAS 4263

CORRECTIVE ACTION:  NO CORRECTIVE ACTION TAKEN 

DISPOSITION: 	IN COMING STEP HEIGHT WAS OVER SPC CHART LIMITS. LOT WILL
		BE CHECKED FOR POST STEP HEIGHTS. OPERATIONS WILL PAY SPECIAL
		ATTENTION TO OUT GOING STEP HEIGHT TO ENSURE PLANARITY.     



62.37pex for xd0344 at idl1_pre, high rangeASDG::CULLEYSat Jan 13 1996 06:5318
Subj:	PEX for XD0344 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      19
MACHINE:       THICKNESS.A4         
DATE:          01/12/96  D-Shift

PROBLEM:       Range high at operation 3023 THK_ILD1_PRE
               UCL=1000

     ENTITY THICKNESS.A4
     actual:   THK_ME       18492.000
               THK_RG        1320.000

DISPOSITION:   Hot Lot moved on.  Mean and height where good.

CORRECTIVE
ACTION         None.
62.38pex for jd0061 at ild1_pre, tox low,range highASDG::CULLEYSat Jan 13 1996 07:1120
Subj:	PEX for JD0061 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      23
MACHINE:       THICKNESS.A4         
DATE:          01/13/96  D-Shift

PROBLEM:       Thickness low and range high at cmp incoming:
               UCL=19900    UCL for range is 1000.000
                CL=19000
               LCL=18100

               THK_ME    17335.000
               THK_RG     1158.000

DISPOSITION:   Hot Lot moved on.  Slightly low tox ok,
               which can be considered good.
               Range is a litle high.

CORRECTIVE
ACTION         None, added remark to operation.
62.39XL0327 pre-CMP thickness at ILD3SUBPAC::MCCALLIGTue Jan 16 1996 03:5235
        *************** PEX FOR PRE CMP THICKNESS AT ILD3 *************
                                                                      
							

PROCESS: PRE CMP THICKNESS AT ILD3

OPERATION #: 3127

POLISHER(CMP.A1, A2, B1, B2): THICKNESS.A5

PROCESS DATE & TIME:  1/15/96  7:00 AM

SHIFT:  B

LOT(S) AFFECTED:  XL0327

DEVICE TYPE:  TM55

PROBLEM DESCRIPTION: Pre CMP mean thickness high at ILD 3.

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME       XL0327                  41424.000
              THK_RG       XL0327                   3875.000

              UCL= 40950
               CL= 39000
              LCL= 37050          

CORRECTIVE ACTION:  None.  Pre-polish step heights are in spec.  Should be
                    able to polish this lot without a problem. 
                    Greater thickness will require more polish
                    time, but should not affect planarity.

DISPOSITION:        Lot passed on.
                 
62.40PEX JD0061 PRE STEP HIEGHT IS HIGHSUBPAC::SMARTINWed Jan 17 1996 17:5827

LOT:JD0061

MACHINE: PROFILER.A2

OPER#:3080

PROCESS LEVEL: ILD2
            
DATE:    1/17/96

SHIFT: A-SHIFT

QUANTITY:  24    

PROBLEM:     PRE STEP HIEGHT READING WAS HIGH.
             RUN_ID_1     JD0061               N/A                            
              HEIGHT_ME    WAFER #1 CENTER         10900.000
                           WAFER #1 EDGE           10230.000  
                           WAFER #2 CENTER          9875.000                   
                           WAFER #2 EDGE            9847.000   
 SPEC LIMIT=9600
              
DISPOSITION: LOT WAS REMARKED AND MOVED ON.

CORRECTIVE ACTION:     NONE
62.41Pex for JD0061 at ild2_pst, wafers 1 & 10 low toxASDG::CULLEYThu Jan 18 1996 04:0019
Subj:	PEX for JD0061 at 3066 THK_CMP 11 THK_ILD2_PST

QUANTITY:      23
MACHINE:       THICKNESS.A4         
DATE:          01/17/96  D-Shift

PROBLEM:       Two wafers, #1, and #10 where measured for tox and where low
               at ILD2_PST. This prompted cmp ops to 100% measurements.
               JD0061-01 AT 4591A'.
               JD0061-10 AT 2545A'.
               Rest of lot was middle of spec.
               Spec is 5500A' +- 300A'     

DISPOSITION:   Hot Lot moved on WITH all wafers. Previous remark showed
               that incoming was low out of spec.

CORRECTIVE
ACTION         None, added remark to operation.
               Note, this lot was started by day shift and finished on D.
62.42Pex for Xd0344 at il2_pre thickness, LOWASDG::CULLEYThu Jan 18 1996 06:5218
Subj:	PEX for XD0344 at 3053 THK_CMP 10 THK_ILD2_PRE 

QUANTITY:      19
MACHINE:       THICKNESS.A5         
DATE:          01/18/96  D-Shift

PROBLEM:       Thickness low at operation 3053 THK_ILD2_PRE
               LCL=18100

     ENTITY THICKNESS.A5
     actual:   THK_ME       18003.000
               THK_RG         462.000

DISPOSITION:   Hot Lot moved on.  Range and height where good.

CORRECTIVE
ACTION         None.
62.43Pex for XD0334 at THK_ILD1_PREASDG::CULLEYSat Jan 20 1996 09:1822
Subj:	PEX forXD0334 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      20
MACHINE:       THICKNESS.A4         
DATE:          01/20/96  D-Shift

PROBLEM:       Thickness is very high and range is normal at incoming:
               UCL=19900    UCL for range is 1000.000
                CL=19000
               LCL=18100

               THK_ME    31266.000
               THK_RG      713.000

DISPOSITION:   Lot is still being worked on. Taking the better part of
               8 hours to polish.

CORRECTIVE
ACTION         None, added remark to operation.
               Remark at metal told of the overdeped wafers but the 
               remark was put in 3019 and should of also been put in
               3053..Ed.
62.44Pex for JD0062 at THK_PMD_PREASDG::CULLEYSat Jan 20 1996 09:1920
Subj:	PEX for JD0062 at 2951 THK_CMP 2  THK_PMD_PRE

QUANTITY:      21
MACHINE:       THICKNESS.A4         
DATE:          01-20-96  D-Shift

PROBLEM:       Very high range at incoming.

     ENTITY THICKNESS.A4
     actual:   THK_GM    ok middle of spec.         
               THK_RG        4984.000  UCL=1000  

DISPOSITION:   Lot moved on.  

CORRECTIVE
ACTION         none. 
               Lately for this week, incoming lots have been all
               over the place. Metal engs should be looking at 
               our pexs.  
62.45Pex for JD0067 at THK_ILD1_PREASDG::CULLEYSat Jan 20 1996 09:1920
Subj:	PEX for JD0067 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      24
MACHINE:       THICKNESS.A2         
DATE:          01/20/96  D-Shift

PROBLEM:       Thickness low and range high at cmp incoming:
               UCL=19900    UCL for range is 1000.000
                CL=19000
               LCL=18100

               THK_ME    17100.000
               THK_RG     1146.000

DISPOSITION:   Hot Lot moved on.  Slightly low tox ok,
               which can be considered good.
               Range is a litle high.

CORRECTIVE
ACTION         None, added remark to operation.
62.46Pex for XD0335 at THK_ILD1_PREYIELD::PHESTERSat Jan 20 1996 13:1214

Subj:	PEX forXD0335 at 3014  THK_ILD1_PRE

QUANTITY:      24
MACHINE:       THICKNESS.A5         
DATE:          01/17/96  A-Shift

PROBLEM:      Low incoming thickness at 18004@�.  LCL is 18100�

DISPOSITION:  Lot moved on.

CORRECTIVE
ACTION         None, comment entered in workstream.
62.47JD0065 high range at pre-CMP PMDSUBPAC::MCCALLIGSun Jan 21 1996 02:3132
        *************** PEX FOR PRE CMP RANGE AT PMD *************
                                                                      
							

PROCESS: PRE CMP RANGE AT PMD

OPERATION #: 2951

POLISHER(CMP.A1, A2, B1, B2): THICKNESS A5

PROCESS DATE & TIME:  1/20/96  9:45 PM

SHIFT:  B

LOT(S) AFFECTED:  JD0065

DEVICE TYPE:  DC1026

PROBLEM DESCRIPTION: Pre CMP range high at PMD.

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME       JD0065                  11291.000
              THK_RG       JD0065                   1190.000

              UCL= 1000
               CL=  500
              LCL=    0      

CORRECTIVE ACTION:  None.  Thickness mean is in spec.  Lot should polish OK.

DISPOSITION:        Lot passed on.
                 
62.48PEX FOR JD0061 INCOMMINGTHICKNESS TOO LOW FROM FILMS AGAINSUBPAC::SMARTINSun Jan 21 1996 14:3028
  

LOT:JD0061

MACHINE: PROFILER.A2

OPER#:3058

PROCESS LEVEL: ILD3
            
DATE:    1/21/96

SHIFT: A-SHIFT

QUANTITY:  24    

MACHINE: THICKNESS.A4

PROBLEM: INCOMMING PREREADINGS TOO LOW ON ILD3 FROM FILMS GROUP 
         PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME       JD0061                  36417.000                   
              THK_RG         "                      1149.000

           SPC LCL=37050.000  
              
DISPOSITION: LOT WAS  MOVED ON.

CORRECTIVE ACTION:     NONE
62.49XL0346 pre thickness low at ILD1SUBPAC::MCCALLIGSun Jan 21 1996 23:2734
        *************** PEX FOR PRE CMP THICKNESS AT ILD1 *************
                                                                      
							

PROCESS: PRE CMP THICKNESS AT ILD1

OPERATION #: 3112

POLISHER(CMP.A1, A2, B1, B2): THICKNESS.A4

PROCESS DATE & TIME:  1/21/96  4:00 AM

SHIFT:  B

LOT(S) AFFECTED:  XL0346

DEVICE TYPE:  TM55

PROBLEM DESCRIPTION: Pre CMP thickness low at ILD1.

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME       XL0346                  17464.000
              THK_RG       XL0346                    608.000

              UCL= 19900
               CL= 19000
              LCL= 18100

CORRECTIVE ACTION:  None.  Range and step heights are OK, thickness is only
                    slightly low.  Lot should polish without a problem.
                    Pre-CMP thicknesses at ILD1 have been trending down.

DISPOSITION:        Lot passed on.
                 
62.50XD0341 pre thickness low at ILD1SUBPAC::MCCALLIGSun Jan 21 1996 23:3835
        *************** PEX FOR PRE CMP THICKNESS AT ILD1 *************
                                                                      
							

PROCESS: PRE CMP THICKNESS AT ILD1

OPERATION #: 3023

POLISHER(CMP.A1, A2, B1, B2): THICKNESS.A5

PROCESS DATE & TIME:  1/21/96  4:00 AM

SHIFT:  B

LOT(S) AFFECTED:  XD0341

DEVICE TYPE:  TM3636

PROBLEM DESCRIPTION: Pre CMP thickness low at ILD1.

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME       XL0341                  17884.000
              THK_RG       XL0341                    675.000

              UCL= 19900
               CL= 19000
              LCL= 18100

CORRECTIVE ACTION:  None.  Range and step heights are OK; thickness is only
                    slightly low.  Lot should polish without a problem.
                    Pre-CMP CMOS 6 thicknesses at ILD1 have been trending down.
                    Could be a measurement issue between films and CMP.

DISPOSITION:        Lot passed on.
                 
62.51XD0356 pre CMP range at ILD1SUBPAC::MCCALLIGMon Jan 22 1996 01:5132
        *************** PEX FOR PRE CMP RANGE AT ILD1 *************
                                                                      
							

PROCESS: PRE CMP RANGE AT ILD1

OPERATION #: 3023

POLISHER(CMP.A1, A2, B1, B2): THICKNESS.A5

PROCESS DATE & TIME:  1/22/96  1:00 AM

SHIFT:  B

LOT(S) AFFECTED:  XD0356

DEVICE TYPE:  TM3636

PROBLEM DESCRIPTION: Pre CMP thickness range high at ILD1.

              THK_ME       XD0356                  18464.000   
              THK_RG       XD0356                   1390.000

              UCL= 1000
               CL= 500
              LCL= 0        

CORRECTIVE ACTION:  None.  Thickness mean for this lot is in spec.  Should
                    be able to polish.

DISPOSITION:        Lot passed on.
                 
62.52JD0070 overpolished at PMDSUBPAC::MCCALLIGMon Jan 22 1996 05:0764
        *************** JD0070 OVERPOLISHED AT PMD *************
                                                                      
							

PROCESS: CMOS 6 CMP POLISH AT PMD

OPERATION #: 1978

POLISHER(CMP.A1, A2, B1, B2): B1

PROCESS DATE & TIME:  1/22/96  4:00 AM

SHIFT:  B

LOT(S) AFFECTED:  JD0070

DEVICE TYPE:  DC1026

PROBLEM DESCRIPTION: Post CMP average thickness low due to overpolish.

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              RUN_ID_1     JD0070               24
              THK_ME       JD0070                   6011.000
              THK_RG       JD0070                   1571.000             

              UCL= 6800
               CL= 6500
              LCL= 6200

              Lot was measured 100% for thickness:
 
              SLOT        THICKNESS (Angstroms)
              2           6498
              3           5993
              4           5357
              5           6155
              6           5273
              7           6135
              8           6492
              9           5816
              10          4995
              11          5995
              12          6261
              13          5859
              14          4961
              15          5779
              16          6243
              17          5996
              18          4927
              19          6009
              20          6165
              21          5813
              22          5116
              23          5939
              24          6122
              25          6132

DISPOSITION:  Lot was passed on with a remark for films to deposit an extra
              1000 Angstroms at DEP_PMD 2 (operation 2127) on the following
              wafers: 4, 6, 10, 14, 18, 22.  Other wafers look OK.

CORRECTIVE ACTION:  May need to follow up with films when the lot reaches
                    DEP_PMD 2.
                 
62.53JD0052 pre-thickness low at ILD3SUBPAC::MCCALLIGMon Jan 22 1996 05:5133
        *************** PEX FOR PRE THICKNESS AT ILD3 *************
                                                                      
							

PROCESS: PRE CMP THICKNESS AT ILD3

OPERATION #: 3058

POLISHER(CMP.A1, A2, B1, B2): THICKNESS A5

PROCESS DATE & TIME:  1/22/96  4:00 AM

SHIFT:  B

LOT(S) AFFECTED:  JD0052

DEVICE TYPE:  DC1026

PROBLEM DESCRIPTION: Pre CMP thickness low at ILD3.

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME       JD0052                  36456.000
              THK_RG       JD0052                    967.000              

              UCL=  40950
               CL=  39000
              LCL=  37050

CORRECTIVE ACTION:  None.  Lot should polish OK.  Pre thicknesses are
                    trending down.

DISPOSITION:        Lot passed on.
                 
62.54XL0347 HIGH RANGESUBPAC::SMARTINMon Jan 22 1996 18:5328
  

LOT:XL0347

MACHINE: THICKNESS.A5

OPER#:3114

PROCESS LEVEL: ILD1
            
DATE:    1/22/96

SHIFT: A-SHIFT

QUANTITY:  24    

PRODUCT..TM0055-006-AD-8C  

PROBLEM: HIGH RANGE ON POST CMP ILD1.
       
              THK_ME    5380.000  
              THK_RG    3884.000      SPC UCL=34000.000  
              


DISPOSITION: LOT WAS  MOVED ON.

CORRECTIVE ACTION:     NONE
62.55Pex for JD0073 at 3078 STEP_CMP 1 STEP_PMDASDG::CULLEYWed Jan 24 1996 03:5720
Subj:	PEX for JD0073 at 3078 STEP_CMP 1 STEP_PMD   2 


QUANTITY:      24,   DC1026-000-AC-8G
MACHINE:       PROFILER.A2         
DATE:          01/24/96  D-Shift

PROBLEM:       STP_PMD_PRE low at cmp incoming:
               LCL=3000   Ave 2683.25

              HEIGHT_ME    WAFER #1 CENTER          2428.000
                           WAFER #1 EDGE            3010.000   
                           WAFER #2 CENTER          2413.000
                           WAFER #2 EDGE            2882.000
               
DISPOSITION:   Lot moved on. Slightly low, ok.

CORRECTIVE
ACTION         None, added remark to operation.
               Graph and data sheet provided.
62.56Pex for Xd0352 at THK_ILD1_PRE, low readsASDG::CULLEYWed Jan 24 1996 07:1818
Subj:	PEX for XD0352 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      19
MACHINE:       THICKNESS.A5         
DATE:          01/24/96  D-Shift

PROBLEM:       thickness low at operation 3023 THK_ILD1_PRE
               LCL = 18100

     ENTITY THICKNESS.A5
               THK_ME       17914.000
               THK_RG         514.000

DISPOSITION:   Lot moved on, range on center.

CORRECTIVE
ACTION         None. Remarks added.
62.57Pex for XD0342 at 3054 cmp ild1 pst, low toxASDG::CULLEYThu Jan 25 1996 05:2625
Subj:	PEX for XD0342 at 3054 THK_CMP 8  THK_ILD1_PST

QUANTITY:      21
MACHINE:       THICKNESS.A4         
DATE:          01/24/96  D-Shift
SYSTEM:        B-2


PROBLEM:       thickness low on 12 wafers, other 9 wafers in spec. 
               LCL = 5200A'

     Post thickness measured on THICKNESS.A4:
     #  tox      #  tox
     5  5056A'   18 5129A'
     6  4429     19 5014
     7  3351     20 3948
     11 5008     22 4111
     12 5101     24 4382
     14 4038 

DISPOSITION:   Lot moved on.

CORRECTIVE
ACTION         None. Remarks added at operation 3054.
               NOTE: This is the SOI lot for Grula.
62.58Lot JD0054 PEX @ILD3...YIELD::PHESTERThu Jan 25 1996 10:5128

LOT:JD0054

MACHINE: THICKNESS.A5

OPER#: 3064

PROCESS LEVEL: ILD3
            
DATE:    1/24/96

SHIFT: C-SHIFT

QUANTITY:  12    

PRODUCT..DC1026-000-AA-8G  

PROBLEM: HIGH RANGE ON POST CMP ILD1.
       
              THK_RG    7739�       SPC UCL=   4500�
              


DISPOSITION: LOT WAS  MOVED ON.

CORRECTIVE ACTION:     NONE

62.59XD0334 PEX @ILD3YIELD::PHESTERThu Jan 25 1996 18:4219
Subj:	PEX for XD0334 at 3024  THK_ILD3_PRE

QUANTITY:      6
MACHINE:       THICKNESS.A4         
DATE:          01/25/96  C-Shift

PROBLEM:       thickness low at operation 3023 THK_ILD3_PRE
               LCL = 37050�

     ENTITY THICKNESS.A4

               THK_ILD_PRE 36966�
              
DISPOSITION:   Lot moved on.

CORRECTIVE
ACTION         None. Remarks added.

62.60Xl0314 PEX at ILD2YIELD::PHESTERThu Jan 25 1996 18:4919
Subj:	PEX for Xl0314 at 3120  THK_ILD2_PRE

QUANTITY:      17
MACHINE:       THICKNESS.A5         
DATE:          01/25/96  C-Shift

PROBLEM:       thickness low at operation 3120  THK_ILD2_PRE
               LCL = 18100�

     ENTITY THICKNESS.A5

               THK_ILD2_PRE 17519�
              
DISPOSITION:   Lot moved on.

CORRECTIVE
ACTION         None. Remarks added.

62.61Pex for JD0063B at cmp ild1ASDG::CULLEYFri Jan 26 1996 05:2119
Subj:	PEX for JD0063B at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      11
MACHINE:       THICKNESS.A4         
DATE:          01-26-96  D-Shift

PROBLEM:       high THK_ME at incoming.
               LCL = 18100

     ENTITY THICKNESS.A4
     actual:   THK_ME  17832.000
               THK_RG    726.000

DISPOSITION:   Lot moved on.  

CORRECTIVE
ACTION         none. 
               
62.62JD0063 pre thickness low at ILD2SUBPAC::MCCALLIGSun Jan 28 1996 04:4034
        *************** PEX FOR PRE CMP THICKNESS AT ILD2 *************
                                                                      
							

PROCESS: PRE CMP THICKNESS AT ILD2

OPERATION #: 3053

POLISHER(CMP.A1, A2, B1, B2): THICKNESS.A5

PROCESS DATE & TIME:  1/28/96  1:00 AM

SHIFT:  B

LOT(S) AFFECTED:  JD0063

DEVICE TYPE:  DC1035

PROBLEM DESCRIPTION: Pre CMP thickness low at ILD 2.

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME       JD0063                  17851.000
              THK_RG       JD0063                    573.000

              UCL= 19900
               CL= 19000
              LCL= 18100           

CORRECTIVE ACTION:  None.  Thickness is only slightly low, and range and 
                    step heights are in spec.  Lot should polish without
                    any problems.

DISPOSITION:        Lot passed on.
                 
62.63XD0356 post-CMP thickness low at ILD2SUBPAC::MCCALLIGSun Jan 28 1996 22:3844
        *************** PEX FOR POST CMP THICKNESS AT ILD2 *************
                                                                      
							

PROCESS: POST CMP THICKNESS AT ILD2

OPERATION #: 3066

POLISHER(CMP.A1, A2, B1, B2): B1

PROCESS DATE & TIME:  1/28/96  10:00 PM

SHIFT:  B

LOT(S) AFFECTED:  XD0356

DEVICE TYPE:  TM3636

PROBLEM DESCRIPTION: Post CMP thickness low at ILD2.  Lot was polished on A
                     shift and measured on B shift.

              THK_ME       XD0356                   4539.000   
              THK_RG       XD0356                   1209.000

              UCL= 5800
               CL= 5500
              LCL= 5200

              Post CMP range and step heights at this operation look
              normal.

               HEIGHT_ME    WAFER #1 CENTER           115.000
                            WAFER #1 EDGE             106.000
                            WAFER #2 CENTER           116.000
                            WAFER #2 EDGE             138.000

CORRECTIVE ACTION:  Thickness is only slightly low. Lot was remarked for
                    films to deposit an extra
                    1000 angstroms at the next ILD2 deposition operation;
                    1000 angstroms extra dielectric should bring the ILD2
                    thickness to within spec.
                    
DISPOSITION:        Lot passed on.
                 
62.64JD0068 pre-CMP thickness at ILD1SUBPAC::MCCALLIGMon Jan 29 1996 05:2334
        *************** PEX FOR PRE CMP THICKNESS AT ILD1 *************
                                                                      
							

PROCESS: PRE CMP THICKNESS AT ILD1

OPERATION #: 3023

POLISHER(CMP.A1, A2, B1, B2): A1

PROCESS DATE & TIME:  1/29/96  5:00 AM

SHIFT:  B

LOT(S) AFFECTED:  JD0068

DEVICE TYPE:  DC1026

PROBLEM DESCRIPTION: Pre CMP thickness low at ILD1.

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME       JD0068                  17446.000
              THK_RG       JD0068                    623.000             

              UCL= 19900
               CL= 19000
              LCL= 18100

CORRECTIVE ACTION:  None.  Range and step heights are OK, thickness is only
                    slightly low.  Lot should polish without a problem.
                    Pre-CMP thicknesses at ILD1 have been trending down.

DISPOSITION:        Lot passed on.
                 
62.65YD0355 PEX AT ILD2YIELD::PHESTERThu Feb 01 1996 16:0718

Subj:	PEX for YD0335 at 3053  THK_ILD2_PRE THK_RG

QUANTITY:      22
MACHINE:       THICKNESS.A4         
DATE:          02/01/96  C-Shift

PROBLEM:      HIGH IMCOMING RANGE.   UCL is 1000�

              RANGE WAS 1411

DISPOSITION:  Lot moved on.

CORRECTIVE
ACTION         NONE, LOT REMARKED


62.66PEX FOR JD0072 AT ILD1_PREASDG::CULLEYFri Feb 02 1996 20:2717
Subj:	PEX for JD0072 at 3023 THK_CMP 6  THK_ILD1_PRE 3 2/02/96 01:05

QUANTITY:      24
MACHINE:       THICKNESS.A4         
DATE:          02-02-96  D-Shift

PROBLEM:       Low tox at incoming.

     ENTITY THICKNESS.A4
     actual:   THK_GM        17432.000  LCL=18,100
               THK_RG          535.000  UCL= 1,000  

DISPOSITION:   Lot moved on.  

CORRECTIVE
ACTION         none. Graph provided for eng.
62.67PEX FOR JD0070 AT ILD2_PRE, LOW THICKNESSASDG::CULLEYFri Feb 02 1996 20:2819
Subj:	PEX for JD0070 at 3053 THK_CMP 10 THK_ILD2_PRE 3  2/02/96 04:31

QUANTITY:      23 Hot lot, DC1026-000-AC-8G

MACHINE:       THICKNESS.A4
         
DATE:          02-02-96  D-Shift

PROBLEM:       Low tox at incoming.

     ENTITY THICKNESS.A4
     actual:   THK_GM        17632.000  LCL=18,100
               THK_RG          855.000  UCL= 1,000  

DISPOSITION:   Lot moved on.  

CORRECTIVE
ACTION         none. Graph provided for eng.
62.68PEX JD0062 PRE ILD 2 READING WAS LOWSUBPAC::SMARTINSun Feb 04 1996 18:2730
  

LOT:JD0062

MACHINE: THICKNESS.A4

OPER#:3080

PROCESS LEVEL: ILD2
            
DATE:    2/4/96

SHIFT: A-SHIFT

QUANTITY:  10    

PRODUCT..DC1026-000-AC-8G
  

PROBLEM:  PRE ILD 2 THICKNESS WAS SLIGHTLY LOW.
           
              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME       JD0062                  17880.000                   
              THK_RG       "                         730.000     
                           SPC LCL=18000            


DISPOSITION: LOT WAS  MOVED ON.

CORRECTIVE ACTION:     NONE
62.69JD0063B LOW INCOMING THICKNESSSUBPAC::SMARTINMon Feb 05 1996 11:5737
  

LOT:JD0063b

MACHINE: THICKNESS.A5

OPER#:3053

PROCESS LEVEL: ILD2
            
DATE:    2/5/96

SHIFT: A-SHIFT

QUANTITY:  11    

PRODUCT..DC1035-000-CA-8T 

  

PROBLEM:  PRE ILD 2 THICKNESS WAS SLIGHTLY LOW.
           
          PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME       JD0063B                 18010.000                   
              THK_RG       JD0063B                   675.000           
                                     spc lcl=18100

 Same wafers from films had the following readings:

          PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                19127.000                   
                           WAFER #2                19149.000    


DISPOSITION: LOT WAS  MOVED ON.

CORRECTIVE ACTION:     NONE
62.70Pex for JD0082 at ILD1_pre, low thicknessASDG::CULLEYFri Feb 09 1996 06:5418
Subj:	PEX for JD0082 (hot lot) at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      24
MACHINE:       THICKNESS.A4         
DATE:          02-09-96  D-Shift

PROBLEM:       Slightly  low thickness at incoming.

     ENTITY THICKNESS.A4
     actual:   THK_GM        17892.000    LCL = 18100     
               THK_RG          709.000

DISPOSITION:   Lot moved on.  

CORRECTIVE
ACTION         None. Little lower thickness should be alright. 
               
62.71pex for JD0075 for low thickness at ild1_preASDG::CULLEYSat Feb 10 1996 07:0917
Subj:	PEX for JD0075 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      24
MACHINE:       THICKNESS.A4         
DATE:          02-10-96  D-Shift

PROBLEM:       Low tox at incoming.

     ENTITY THICKNESS.A4
     actual:   THK_GM        18079.000  LCL=18,100
               THK_RG          529.000  UCL= 1,000  

DISPOSITION:   Lot moved on.  

CORRECTIVE
ACTION         none. Graph provided for eng.
62.72XL0346 PEX AT ILD3YIELD::PHESTERSat Feb 10 1996 13:4418

Subj:	PEX for XL0346 at 3127  THK_ILD3_PRE

QUANTITY:      21
MACHINE:       THICKNESS.A4         
DATE:          02/10/96  C-Shift

PROBLEM:      LOW INCOMING THICKNESS  LCL IS 37050�

              THICKNESS WAS 36589

DISPOSITION:  Lot moved on.

CORRECTIVE
ACTION         NONE, LOT REMARKED


62.73XD0362 post-CMP thin at ILD1SUBPAC::MCCALLIGSun Feb 11 1996 23:4568
        *************** PEX FOR POST CMP THICKNESS AT ILD1 *************
                                                                      
							

PROCESS: POST CMP THICKNESS AT ILD1

OPERATION #: 3054

POLISHER(CMP.A1, A2, B1, B2): CMP.B2

PROCESS DATE & TIME:  2/11/96  10:30 AM

SHIFT:  A

LOT(S) AFFECTED:  XD0362

DEVICE TYPE:  TM3636

PROBLEM DESCRIPTION: Initial measurements indicated POST-CMP thickness low
                     on this lot at ILD1.  As a result, lot was measured
                     100% for thickness on the UV1050 during B shift 2-11.

                     WAFER SLOT       THICKNESS MEAN   THICKNESS RANGE
                     1                3687             2022
                     2                3761             2522
                     3                2951             1426
                     4                4130             1407
                     5                2853             2365
                     6                4011             2106
                     7                2676             1317
                     8                3812             1338
                     9                2982             1359
                     10               2950             2004
                     11               3502             2433
                     12               2877             1449
                     13               3211             1093
                     14               3288             1245
                     15               2827             1308
                     16               3938             1627
                     17               3668              754
                     18               4107             1141
                     19               3415             1551
                     20               3721             2169
                     21               2734             1108
                     22               4860             1618
                     23               4693              903
                     24               3105             1489

                     UCL= 5800
                      CL= 5500
                     LCL= 5200

                     Thickness ranges are in spec.

CORRECTIVE ACTION:  None at this time.

DISPOSITION:  This is one of the lots designated for the CMP one pass 
              polishing study.  Lot recieved original 240 second polish on
              B shift 2-10.  Touch up times were calculated after this
              polish, and the lot was touched up on A shift 2-11.
              While all wafers were thin after touch up, some were close
              to spec while others were very thin.  This data could suggest 
              that certain heads were removing much faster than others.

              First shift engineering was notified of this data during A
              shift 2-11, and the decision was made to place the lot on
              hold until it could be evaluated by first shift.      
                 
62.74XD0348, JD0071 post CMP thickness low ILD2SUBPAC::MCCALLIGMon Feb 12 1996 05:3535
        *************** PEX FOR POST CMP THICKNESS AT ILD2 *************
                                                                      
							

PROCESS: POST CMP THICKNESS AT ILD2

OPERATION #: 3066

POLISHER(CMP.A1, A2, B1, B2): CMP.B1

PROCESS DATE & TIME:  2/12/96  4:00 AM

SHIFT:  B

LOT(S) AFFECTED:  XD0348, JD0071

DEVICE TYPE:  TM3636, DC1026

PROBLEM DESCRIPTION: Post CMP thickness low at ILD1.

              THK_ME       JD0071                   5153.000   
              THK_RG       JD0071                   1195.000 

              THK_ME       XD0348                   5086.000
              THK_RG       XD0348                   1496.000           

              UCL= 5800
               CL= 5500
              LCL= 5200

CORRECTIVE ACTION:  None.  Range and step heights are OK, thickness is only
                    slightly low. Lots should continue without a problem.

DISPOSITION:        Lots passed on.
                 
62.75JD0072 OVER POLISH ON ILD2,5 WAFERS SCRAPEDSUBPAC::SMARTINMon Feb 12 1996 10:5534
  

LOT:JD0072

MACHINE: CMP.B2

OPER#:1985

PROCESS LEVEL: ILD2
            
DATE:    2/12/96

SHIFT: B-SHIFT

QUANTITY:  20    

PRODUCT....DC1026-000-AC-8G  

LOT:JD0072

PROBLEM: OVER POLISH ON ILD2,  5 WAFERS FROM THE LOT WILL HAVE TO BE SCRAPED DUE
         TO THE OVER POLISH.  OPS USED POLISH TIME FOR ILD3 INSTEAD OF ILD2.

           WAFER#     THK READING
            #6  =           675
            #10 =          2235
            #11 =          2233
            #15 =          3041
            #16            2036

DISPOSITION:  THE REMAINING WAFERS WILL HAVE TO GET EXTRA DEP DUE TO THE OVER
              POLISH

CORRECTIVE ACTION:    OPS MUST BE AWARE OF WHAT LEVEL THEY ARE POLISHING.
62.76JD0080SUBPAC::SMARTINMon Feb 12 1996 11:0831
  

LOT:JD0080

MACHINE: THICKNESS.A5

OPER#:1981

PROCESS LEVEL: ILD1
            
DATE:    2/12/96

SHIFT: A-SHIFT

QUANTITY:  24    

PRODUCT..DC1026-000-AC-8G
  

PROBLEM:  PRE ILD 1 THICKNESS WAS SLIGHTLY LOW.
           
         PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME       JD0080                  17431.000                   
              THK_RG       "                         640.000 

                           SPC LCL=18000            


DISPOSITION: LOT WAS  MOVED ON.

CORRECTIVE ACTION:     NONE
62.77JD0074 pre-thickness low at ILD2SUBPAC::MCCALLIGWed Feb 14 1996 07:0133
        *************** PEX FOR PRE CMP THICKNESS AT ILD2 *************
                                                                      
							

PROCESS: PRE CMP THICKNESS AT ILD2

OPERATION #: 3053

POLISHER(CMP.A1, A2, B1, B2): THICKNESS.A5

PROCESS DATE & TIME:  2/14/96  7:00 AM

SHIFT:  B

LOT(S) AFFECTED:  JD0074

DEVICE TYPE:  DC1026

PROBLEM DESCRIPTION: Pre CMP thickness low at ILD2.

              THK_ME       JD0074                  17500.000  
              THK_RG       JD0074                    351.000             

              UCL= 19900
               CL= 19000
              LCL= 18100

CORRECTIVE ACTION:  None.  Range and step heights are OK, thickness is only
                    slightly low.  Lot should polish without a problem.
         

DISPOSITION:        Lot passed on.
                 
62.78Scubber up/down travelFABSIX::R_GEEWed Feb 14 1996 07:1226
	* The scrubber up / down travel wasn't working properly.
          
		Using Digital output #63 the scrubber would travel
		up and down normally. In auto it would go up and 
		down at the beginning of the travel inward. It would 
		stay down during the clean step and go up after the 
		brushes stopped. An error would appear "timeout waiting
		for scrubber at home".
	
		Found the two air lines going to the up / down air
		cylinder backwards. We swapped the lines and
		verified the repair, it's working correctly now.

	* The flex hose that houses the two air lines and the down travel
	  sensor line was full of water.
		
		Removed the water and siliconed the hole.


	Also, the pad was replaced.
	
				B shift


	   

62.79Pex for xd0368 at ild1_pre, 3023 high rangeASDG::CULLEYThu Feb 15 1996 00:2918
Subj:	PEX for XD0368 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      23 eng
MACHINE:       THICKNESS.A5         
DATE:          02/14/96  D-Shift

PROBLEM:    Range high at operation 3023 THK_ILD1_PRE
               UCL = 1000

     ENTITY THICKNESS.A5
               THK_ME       18226.000
               THK_RG        1086.000

DISPOSITION:   Lot moved on.

CORRECTIVE
ACTION         None. Remark added at 3023.
62.80Pex for JD0065 at oper 3058, THK_ILD3_PRE, low thicknessASDG::CULLEYThu Feb 15 1996 01:0718
Subj:	PEX for JD0065 at 3058  THK_ILD3_PRE 

QUANTITY:      23
MACHINE:       THICKNESS.A4         
DATE:          FEB. 14/96  D-Shift

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

ENTITY THICKNESS.A5
               THK_ME       36320.000
               THK_RG         978.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None.
62.81JD0065 HIGH OUTGOING RANGE AT ILD3YIELD::PHESTERThu Feb 15 1996 18:5820

Subj:	PEX for JD0065   at 3385  THK_ILD3_POST

QUANTITY:      23

MACHINE:       CMP.B1  THICKNESS.A5

DATE:          02/15/96  C-Shift

PROBLEM:       HIGH OUTGOING RANGE  UCL IS 4500�

               RANGE WAS 5491

DISPOSITION:  Lot moved on.

CORRECTIVE
ACTION         NONE, LOT REMARKED


62.82Pex for JD0081 at ILD1_Pst, high rangeASDG::CULLEYFri Feb 16 1996 01:1021
Subj:	PEX for JD0081 at 3054 THK_CMP 8  THK_ILD1_PST

QUANTITY:      24,  DC1026-000-AC-8G
MACHINE:       THICKNESS.A5         
DATE:          02/15/96   D-Shift 2/15/96 22:09
SYSTEM:        CMP.A1


PROBLEM:       RANGE is high out of spec. 
               LCL = 3400A'

     Post thickness measured on THICKNESS.A5:
     THK_ME       JD0081     5637.000
     THK_RG       JD0081     4108.000

DISPOSITION:   Lot moved on.

CORRECTIVE
ACTION         None. Remarks added at operation 3054.
                             
 
62.83Pex for XD0384 at 3078 STEP_CMP 1 STEP_PMD, lowASDG::CULLEYSat Feb 17 1996 04:1618
Subj:	PEX for XD0384 at 3078 STEP_CMP 1 STEP_PMD

QUANTITY:      23
MACHINE:       PROFILER.A2         
DATE:          Feb 16'96    D-Shift

PROBLEM:       Step-height low reading at oper #3078
               LCL= 3000

              HEIGHT_ME    WAFER #1 CENTER          2794.000
                           WAFER #1 EDGE            2747.000
                           WAFER #2 CENTER          2754.000
                           WAFER #2 EDGE            2802.000

DISPOSITION:   Lot moved on.  .   

CORRECTIVE
ACTION         None, added remark to operation.
62.84JD0088 pre-thickness low at ILD1SUBPAC::MCCALLIGTue Feb 20 1996 02:1033
        *************** PEX FOR PRE CMP THICKNESS AT ILD1 *************
                                                                      
							

PROCESS: PRE CMP THICKNESS AT ILD1

OPERATION #: 3023

POLISHER(CMP.A1, A2, B1, B2): CMP.A1

PROCESS DATE & TIME:  2/19/96  9:20 PM

SHIFT:  B

LOT(S) AFFECTED:  JD0088

DEVICE TYPE:  DC1026

PROBLEM DESCRIPTION: Pre CMP thickness low at ILD1.

              THK_ME       JD0088                  18013.000
              THK_RG       JD0088                    360.000              

              UCL= 19900
               CL= 19000
              LCL= 18100

CORRECTIVE ACTION:  None.  Range and step heights are OK, thickness is only
                    slightly low.  Lot should polish without a problem.
         

DISPOSITION:        Lot passed on.
                 
62.85JD0084 HIGH THK AND HIGH RGSUBPAC::SMARTINTue Feb 20 1996 17:1330
  

LOT:JD0084

MACHINE: CMP.A1

OPER#:1982

PROCESS LEVEL: ILD1
            
DATE:    2/20/96

SHIFT: A-SHIFT

QUANTITY:  23    

PRODUCT..DC1026-000-AC-8G
  

PROBLEM: THICKNESS  AND RANGE WERE OUT OF SPEC.
              THK_ME       JD0084                   6600.000   2/20/96 16:38:12
              THK_RG       JD0084                   5500.000  
       

                       SPC THK_ME UCL=5800
                       SPC THK_RG UCL=3400

DISPOSITION: LOT WAS  MOVED ON WITH REMARKS

CORRECTIVE ACTION:     NONE
62.86pex for Xd0348, THK_ILD3_PRE, lowASDG::CULLEYWed Feb 21 1996 04:3617
Subj:	PEX for XD0348 at 3058  THK_ILD3_PRE, low 

QUANTITY:      21
MACHINE:       THICKNESS.A5         
DATE:          02/20/96  D-Shift

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

ENTITY THICKNESS.A4
               THK_ME       36899.000
               THK_RG        1870.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None. Graph and data to eng.
62.87Pex for JD0103, STEP_PMD_PRE, lowASDG::CULLEYWed Feb 21 1996 04:3720
Subj:	PEX for JD0103 at 3078 STEP_CMP 1 STEP_PMD   2 


QUANTITY:      20,   DC1026-000-AC-8G
MACHINE:       PROFILER.A2         
DATE:          02/20/96  D-Shift

PROBLEM:       STP_PMD_PRE low at cmp incoming:
               LCL=3000   

              HEIGHT_ME    WAFER #1 CENTER          2772.000
                           WAFER #1 EDGE            2798.000   
                           WAFER #2 CENTER          2744.000
                           WAFER #2 EDGE            2700.000
               
DISPOSITION:   Lot moved on. Slightly low, ok.

CORRECTIVE
ACTION         None, added remark to operation.
               Graph and data sheet provided.
62.88Pex for XL0365 at cmp THK_ILD2_PST 2, high rangeASDG::CULLEYThu Feb 22 1996 04:1017
Subj:	PEX for XL0365 at 3274 THK_CMP 12 THK_ILD2_PST 2

QUANTITY:      24
MACHINE:       THICKNESS.A5         
DATE:          02/22/96  D-Shift

PROBLEM:       Range is out of spec. high.
               UCL=3400

               THK_ME  XL0365  5567.000
               THK_RG  XL0365  5671.000

DISPOSITION:   Lot moved on.

CORRECTIVE
ACTION         None, added remark to operation.
               
62.89Pex for JD0087 at THK_ILD3_PRE, low thxASDG::CULLEYThu Feb 22 1996 06:5018
Subj:	PEX for JD0087 at 3058  THK_ILD3_PRE 

QUANTITY:      23
MACHINE:       THICKNESS.A4         
DATE:          FEB. 22/96  D-Shift

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

ENTITY THICKNESS.A5
               THK_ME       36085.000
               THK_RG        1063.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None. 
62.90Pex for XD0403 at THK_ILD1_PST, scrapped waferASDG::CULLEYFri Feb 23 1996 05:3617
Subj:	PEX for XD0403 at 3054 THK_CMP 8  THK_ILD1_PST

QUANTITY:      23
MACHINE:       THICKNESS.A4         
DATE:          02/23/96  D-Shift
SYSTEM:        CMP-A2


PROBLEM:       thickness low on  wafer # 24 @1000A'
               LCL = 5200A'
               Wafer #24 Scrapped.
     
DISPOSITION:   Lot moved on.

CORRECTIVE
ACTION         None. Remarks added at operation 3054.
               Wafer was saved for CMP engineering.
62.91Pex for Xd0402 at STP_PMD_PRE, height lowASDG::CULLEYSat Feb 24 1996 08:2118
Subj:	PEX for XD0402 at 3078 STEP_CMP 1 STEP_PMD

QUANTITY:      24
MACHINE:       PROFILER.A2         
DATE:          Feb 23'96    D-Shift

PROBLEM:       Step-height low reading at oper #3078
               LCL= 3000

              HEIGHT_ME    WAFER #1 CENTER          2877.000
                           WAFER #1 EDGE            2802.000
                           WAFER #2 CENTER          2776.000
                           WAFER #2 EDGE            2810.000

DISPOSITION:   Lot moved on.  .   

CORRECTIVE
ACTION         None, added remark to operation.
62.92JD0083 LOW INCOMING AT ILD3YIELD::PHESTERSat Feb 24 1996 09:2820

Subj:	PEX for JD0083   at 3058  THK_ILD3_PRE

QUANTITY:      17

MACHINE:       THICKNESS.A5

DATE:          02/24/96  C-Shift

PROBLEM:       LOW INCOMING THICKNESS   LCL IS 37050

               INCOMING THICKNESS WAS 36311

DISPOSITION:   LOT MOVED ON

CORRECTIVE
ACTION         NONE, LOT REMARKED


62.93XD0380 PEX AT ILD1 OUTGOINGYIELD::PHESTERSat Feb 24 1996 18:1022
                     

Subj:	PEX for XD0380   at 3054  THK_ILD1_PST

QUANTITY:      24

MACHINE:       THICKNESS.A5

DATE:          02/24/96  C-Shift

PROBLEM:       LOW OUTGOING THICKNESS   LCL IS 5200

               OUTGOING THICKNESS WAS 5156

DISPOSITION:   LOT MOVED ON

CORRECTIVE
ACTION         NONE, LOT REMARKED WITH PROPER OUTGOING THICKNESS FOR CAPPING
               PURPOSES.


62.94XD0373 high range at ILD2SUBPAC::MCCALLIGMon Feb 26 1996 03:2451
        *************** PEX FOR POST CMP RANGE AT ILD2 *************
                                                                      
							

PROCESS: POST CMP RANGE AT ILD2

OPERATION #: 1985

POLISHER(CMP.A1, A2, B1, B2): CMP.A1

PROCESS DATE & TIME:  2/25/96  11:00 PM

SHIFT:  B

LOT(S) AFFECTED:  XD0373

DEVICE TYPE:  TM3636

PROBLEM DESCRIPTION: Lot held for high range at ILD2 polish.  Lot was 
                     measured 100% on Thickness.A5.

    
  WAFER SLOT    MEAN      RANGE
  1             5939      2625      
  2             6230      3376
  3             7913      2939
  4             7790      2393
  5             8273      2659
  6             7855      2337
  7             8141      2740
  8             7920      2998
  9             5499      4399
  10            6148      3342
  11            4145      3845
  12            3811      4975
  13            4244      4266
  14            4132      4143
  15            4635      4165
  16            4500      3857
  17            4559      4268
  18            4047      3869
  19            4307      4241
  20            4354      3945
  21            5074      5372

CORRECTIVE ACTION:  Based on the data above, the lot was released from hold.
                    We have successfully moved lots in the past with worse
                    uniformity than this.

DISPOSITION:        Lot passed on.
                 
62.95PEX FOR XD0358,RANGE SLIGHTLY HIGHSUBPAC::SMARTINWed Feb 28 1996 18:4929
  

LOT:XD0358

MACHINE: CMP.B2

OPER#:1989

PROCESS LEVEL: ILD3
            
DATE:    2/28/96

SHIFT: A-SHIFT

QUANTITY:  12    

PRODUCT..TM3636-001-EA-8C

  

PROBLEM:  RANGE WAS SLIGHTLY OUT OF SPEC.
             PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              RUN_ID_1     XD0358               N/A                            
              THK_ME       "                       10207.000                   
              THK_RG       :                        4282.000 SPC UCL=4000    

DISPOSITION: LOT WAS  MOVED ON

CORRECTIVE ACTION:     NONE
62.96JD0085 PEX @ ILD2YIELD::PHESTERFri Mar 01 1996 10:2422
                     

Subj:	PEX for JD0085  at 3054  THK_ILD2_PST

QUANTITY:      24

MACHINE:       CMP.A2 / THICKNESS.A5

DATE:          02/29/96  C-Shift

PROBLEM:       HIGH RANGE/LOW THICKNESS  POST CMP

               POST THICKNESS WAS 4954   LCL IS 5200
        
               POST RANGE WAS 6834   UCL IS 4000

DISPOSITION:   LOT MOVED ON

CORRECTIVE
ACTION         NONE,  LOT HAD SEVERE OVERPOLISH ON EDGE OF WAFERS.
               POLISHER SUBSEQUENTLY WENT DOWN FOR A PAD CHANGE.
62.97JD0078 PEX @ILD3YIELD::PHESTERFri Mar 01 1996 10:3619
                     

Subj:	PEX for JD0078  at 3064  THK_ILD3_PST FOR ENTITY CMP.B2

QUANTITY:      21

MACHINE:       THICKNESS.A5

DATE:          02/29/96  C-Shift

PROBLEM:       HIGH OUTGOING RANGE @ILD3

               OUTGOING RANGE WAS 4932   UCL IS 4500
        
DISPOSITION:   LOT MOVED ON

CORRECTIVE
ACTION         LOT REMARKED
62.98JD0075 PEX @ILD3YIELD::PHESTERFri Mar 01 1996 10:3819
                     

Subj:	PEX for JD0075  at 3058  STP_ILD3_PRE

QUANTITY:      24

MACHINE:       THICKNESS.A5

DATE:          02/29/96  C-Shift

PROBLEM:       LOW INCOMING THICKNESS @ILD3

               INCOMING THICKNESS WAS 36425   LCL IS 37050
        
DISPOSITION:   LOT MOVED ON

CORRECTIVE
ACTION         LOT REMARKED
62.99pex for xd0406 at STEP_PMDASDG::CULLEYSat Mar 02 1996 03:1018
Subj:	PEX for XD0406 at 3078 STEP_CMP 1 STEP_PMD

QUANTITY:      24
MACHINE:       PROFILER.A2         
DATE:          Mar 02'96    D-Shift

PROBLEM:       Step-height low reading at oper #3078
               LCL= 3000

              HEIGHT_ME    WAFER #1 CENTER          2837.000
                           WAFER #1 EDGE            2921.000
                           WAFER #2 CENTER          2968.000
                           WAFER #2 EDGE            2875.000

DISPOSITION:   Lot moved on.  .   

CORRECTIVE
ACTION         None, added remark to operation.
62.100YD0140 pre-thickness low at ILD3SUBPAC::MCCALLIGSun Mar 03 1996 00:0235
        *************** PEX FOR PRE CMP THICKNESS AT ILD3 *************
                                                                      
							

PROCESS: PRE CMP THICKNESS AT ILD3

OPERATION #: 3058

POLISHER(CMP.A1, A2, B1, B2): CMP.B1

PROCESS DATE & TIME:  3/02/96  10:00 PM

SHIFT:  B

LOT(S) AFFECTED:  YD0140

DEVICE TYPE:  TM3636

PROBLEM DESCRIPTION: Pre CMP thickness low at ILD3.

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME       YD0140                  36889.000
              THK_RG       YD0140                   1535.000

              UCL= 40950
               CL= 39000
              LCL= 37050

CORRECTIVE ACTION:  None.  Range and step heights are OK, thickness is only
                    slightly low.  Lot should polish without a problem.
                    According to remarks, all wafers should have gotten the
                    standard POR ILD3 dep.
 
DISPOSITION:        Lot passed on.
                 
62.101JD0080 PRE CMP THICKNESS LOW ILD3SUBPAC::SMARTINSun Mar 03 1996 12:3737
  

LOT:JD0080

MACHINE: THICKNESS.A5

OPER#:3058

PROCESS LEVEL: ILD3
            
DATE:    3/3/96

SHIFT: A-SHIFT

QUANTITY:  24    

PRODUCT.....DC1026-000-AC-8G


PROBLEM:  Pre CMP thickness low at ILD3.

          PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME       JD0080                  36550.000                   
              THK_RG       JD0080                    855.000 

                                
              UCL= 40950
               CL= 39000
              LCL= 37050



DISPOSITION: None.  Range and step heights are OK, thickness is slightly
             low.  Lot should polish without a problem.


CORRECTIVE ACTION:     NONE, LOT WAS MOVED ON.
62.102JD0102 range high at ILD1SUBPAC::MCCALLIGMon Mar 04 1996 04:3757
        *************** PEX FOR POST CMP RANGE AT ILD1 *************
                                                                      
							

PROCESS: POST CMP RANGE AT ILD1

OPERATION #: 3054

POLISHER(CMP.A1, A2, B1, B2): A2

PROCESS DATE & TIME:  3/04/96  1:00 AM

SHIFT:  B

LOT(S) AFFECTED:  JD0102

DEVICE TYPE:  DC1026

PROBLEM DESCRIPTION:  Post CMP range slightly high at ILD1.

              THK_ME       JD0102                   5763.000
              THK_RG       JD0102                   3606.000
             
              UCL= 3400
               CL= 1500
              LCL= 0

CORRECTIVE ACTION:  The lot was measured 100% for thickness/range.

                    SLOT #    THICK/RANGE
                    1         5215/3604
                    2         5640/3491
                    3         5894/3362
                    4         5889/4614
                    5         5929/3373
                    6         5747/3606
                    7         5946/2997
                    8         5726/4575
                    9         5990/3526
                    10        5782/3519
                    11        5250/3827
                    12        5554/5172
                    13        5945/3434
                    14        5925/3929
                    15        5993/3215
                    16        5728/3064
                    17        5839/4402
                    18        5765/3247
                    19        5900/4021
                    20        5543/3616

                    Step heights were in spec.

DISPOSITION:        Based on the above data, decision was made to pass the lot
                    on.  Although the thickness is slightly high, no further
                    polish will be done because of the high range.
                 
62.103JD0111 pre step height at pmdSUBPAC::MCCALLIGTue Mar 05 1996 05:4135
        *************** PEX FOR PRE CMP STEP HEIGHT AT PMD *************
                                                                      
							

PROCESS: PRE CMP STEP HEIGHT AT PMD

OPERATION #: 3078

POLISHER(CMP.A1, A2, B1, B2): A2

PROCESS DATE & TIME:  3/05/96  4:00 AM

SHIFT:  B

LOT(S) AFFECTED:  JD0111

DEVICE TYPE:  DC1035

PROBLEM DESCRIPTION: Pre CMP step height low at PMD.

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              RUN_ID_1     JD0111               11
              HEIGHT_ME    WAFER #1 CENTER          3023.000
                           WAFER #1 EDGE            2831.000   
                           WAFER #2 CENTER          3069.000
                           WAFER #2 EDGE            2842.000    
          
              UCL= 4200
               CL= 3600
              LCL= 3000

CORRECTIVE ACTION:  None.  Thickness in spec.

DISPOSITION:        Lot passed on.
                 
62.104pex for XL0365, wafer 15 scrappedASDG::CULLEYWed Mar 06 1996 07:3426
Subj:	CMP inspection at incoming @ 3127 THK_CMP 14, THK_ILD3_PRE

        ***************  PEX FOR CMP *************
                                                      
							

PROCESS: Visual inspection

OPERATION #:3127

PROCESS DATE & TIME:  3/06/96  @3 AM

SHIFT:  D

LOT(S) AFFECTED:  XL0365

DEVICE TYPE:  

PROBLEM DESCRIPTION:  wafer 15 looks to be either oxidized or half-deped.
                      When measuring this wafer it showed to be in the 50K's.

CORRECTIVE ACTION:  Scrapped wafer 15.

DISPOSITION:  Remarks did not show anything hear, so we scrapped.


62.105LOT XD0409 PEX @ STEP PMDYIELD::PHESTERWed Mar 06 1996 19:0224
                              CMP PEX REPORT                     

LOT #          XD0409

QUANTITY:      23

OPERATION #    3078 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          03/6/96  C-Shift

PROBLEM:       LOW INCOMING STEP ....PMD

               LOT INCOMING STEP AVG= 2844�  LCL@ 3000�
        
DISPOSITION:   MOVED LOT ON

CORRECTIVE     NONE
ACTION         

62.106LOT JD0076 LOW INCOMING THICKNESS A ILD3YIELD::PHESTERThu Mar 07 1996 13:3427
                            PE PEX NOTIFICATION
                     

LOT #          JD0076

QUANTITY:      23

OPERATION #    3058   THK_ILD3_PRE
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     Thickness.A4

DATE:          03/7/96  C-Shift

PROBLEM:       LOW INCOMING THICKNESS   ILD_3

               LOT INCOMING THICKNESS 36072�

               LCL@ 37105�
        
DISPOSITION:   LOT MOVE ON

CORRECTIVE     ADDED REMARK AT OPERATION 3058
ACTION:         
62.107Pex @3078 step height, lowASDG::CULLEYFri Mar 08 1996 01:2218
Subj:	PEX for XD0408 at 3078 STEP_CMP 1 STEP_PMD

QUANTITY:      24
MACHINE:       PROFILER.A2         
DATE:          Mar 08'96    D-Shift

PROBLEM:       Step-height low reading at oper #3078
               LCL= 3000

              HEIGHT_ME    WAFER #1 CENTER          2616.000
                           WAFER #1 EDGE            2556.000
                           WAFER #2 CENTER          2603.000
                           WAFER #2 EDGE            2659.000

DISPOSITION:   Lot moved on.  .   

CORRECTIVE
ACTION         None, did pex, reported to eng.
62.108Pex for XD0381 @3053 Range high.ASDG::CULLEYFri Mar 08 1996 01:2317
Subj:	PEX for XD0381 at 3053  THK_ILD2_PRE 

QUANTITY:      20
MACHINE:       THICKNESS.A4         
DATE:          03/08/96  D-Shift

PROBLEM:       Range high at operation 3053 THK_ILD2_PRE
               UCL=1000

ENTITY THICKNESS.A4
               THK_ME       19674.000 In spec
               THK_RG        3329.000 out of spec

DISPOSITION:   Problem at dep, can still be polished.

CORRECTIVE
ACTION         None, pex written. 
62.109JD0106 LOW INCOMING @ILD3YIELD::PHESTERFri Mar 08 1996 17:1325
                                    CMP PEX 
                     

LOT #          JD0106

QUANTITY:      23

OPERATION #    3058  THK_ILD3_PRE
/DESC  R.

POLISHER:      N/A
   
EVAL TOOL:     THICKNESS.A5

DATE:          03/08/96  C-Shift

PROBLEM:       LOW INCOMING THICKNESS  @ILD3

               INCOMING THICKNESS WAS 36237   UCL IS 37050
        
DISPOSITION:   LOT MOVED ON FOR POLISHING

CORRECTIVE     NONE.  LOT REMARKED
ACTION         
62.110pex for XD0402 Thickness low at operation 3058ASDG::CULLEYSat Mar 09 1996 08:5517
Subj:	PEX for XD0402 at 3058  THK_ILD3_PRE, low 

QUANTITY:      23
MACHINE:       THICKNESS.A5         
DATE:          03/08/96  D-Shift

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

ENTITY THICKNESS.A4
               THK_ME       36912.000 *out low
               THK_RG        1189.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None. Graph and data to eng.
62.111XD0375 LOW INCOMING THICKNESS ILD3YIELD::PHESTERSat Mar 09 1996 17:3123
                               CMP PEX                     

LOT #          XD0375

QUANTITY:      24

OPERATION #    3058 THICK_CMP
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          03/9/96  C-Shift

PROBLEM:       LOW INCOMING  THICKNESS....ILD3

               LOT INCOMING THICKNESS AVG= 36699�  LCL@ 37050�
        
DISPOSITION:   LOT REMARKED AND MOVED ON

CORRECTIVE     NONE
ACTION         
62.112XD0357 LOW INCOMING @ILD3YIELD::PHESTERSat Mar 09 1996 17:3723
                               CMP PEX                     

LOT #          XD0357

QUANTITY:      18

OPERATION #    3058   THK_ILD3_PRE 
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          03/9/96  C-Shift

PROBLEM:       LOW INCOMING  THICKNESS....ILD3

               LOW INCOMING THICKNESS AVG= 36905�  LCL@ 37050�
        
DISPOSITION:   LOT REMARKED AND MOVED ON

CORRECTIVE     NONE
ACTION         
62.113Pex for Xd0414 at 3078 STEP_CMP, lowASDG::CULLEYThu Mar 14 1996 04:5618
Subj:	PEX for XD0414 at 3078 STEP_CMP 1 STEP_PMD

QUANTITY:      23
MACHINE:       PROFILER.A2         
DATE:          Mar 13'96    D-Shift

PROBLEM:       Step-height low reading at oper #3078
               LCL= 3000

              HEIGHT_ME    WAFER #1 CENTER          2972.000
                           WAFER #1 EDGE            2791.000
                           WAFER #2 CENTER          2941.000
                           WAFER #2 EDGE            2836.000

DISPOSITION:   Lot moved on.  .   

CORRECTIVE
ACTION         None, did pex, reported to eng.
62.114JD0091 LOW INCOMING @ILD3YIELD::PHESTERThu Mar 14 1996 18:1625
                                   CMP PEX
                     

LOT #          JD0091

QUANTITY:      20

OPERATION #    3058 THICK_CMP
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          03/14/96  C-Shift

PROBLEM:       LOW INCOMING  THICKNESS....ILD3

               LOT INCOMING THICKNESS AVG= 36485�  LCL@ 37050�
        
DISPOSITION:   LOT POLISHED AND MOVED ON

CORRECTIVE     NONE.  LOT REMARKED
ACTION         
62.115JD0133 Low incoming step height @PMDYIELD::SHONGFri Mar 15 1996 01:4025
                                   CMP PEX
                     

LOT #          JD0133

QUANTITY:      20

OPERATION #    3078 STEP_CMP
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          03/14/96  D-Shift

PROBLEM:       LOW INCOMING STEP HEIGHT....PMD

               LOT INCOMING STEP HEIGHT= ~2850�  LCL@ 3000�
        
DISPOSITION:   LOT REMARKED AT THAT OPERATION AND MOVED ON.

CORRECTIVE     NONE.  LOT REMARKED
ACTION         
62.116LOT JD0089 LOW INCOMING @ILD3YIELD::PHESTERFri Mar 15 1996 19:1327
                              CMP PEX
                     

LOT #:          JD0089
           
QUANTITY:       24 

OPERATION #/    3058    THK_ILD3_PRE
DESCRIPTION

POLISHER:       N/A
      
EVAL TOOL:      THICKNESS.A4

DATE:           5/1596

PROBLEM:           LOW INCOMING THICKNESS

                   MEAN THICKNESS WAS 36378

                   LCL IS  37050
  
DISPOSITION:    LOT REMARKED AND MOVED TO POLISH

CORRECTIVE      NONE
ACTION:         
62.117XD0396 LOW INCOMINGYIELD::PHESTERSat Mar 16 1996 18:1526
                            PE PEX NOTIFICATION
                     

LOT #          XD03     96

QUANTITY:      22

OPERATION #    3058 THICK_CMP
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          03/16/96  C-Shift

PROBLEM:       LOW INCOMING  THICKNESS....ILD3

               LOT INCOMING THICKNESS AVG= 36898�  LCL@ 37050�
           
 	       TM3636

DISPOSITION:   REMARK WAS ADDED TO WORKSTREAM AND LOT WAS PASSED ON.

CORRECTIVE     NONE
ACTION         
62.118YIELD::PHESTERSat Mar 16 1996 18:5924
                                CMP PEX
                     

LOT #          YD0152 

QUANTITY:      23

OPERATION #    3066 ILD2
/DESCR.             

POLISHER:      POST READINGS

EVAL TOOL:     PROFILER.A2

DATE:          03/16/96 C-Shift

PROBLEM:       LOW POST THICKNESS       

               LOT THICKNESS MEAN..5103�  LCL...5200�  
        
DISPOSITION:   LOT REMARKED AND MOVED ON

CORRECTIVE     NONE
ACTION         
62.119YD0152 Low outgoing At ILD2YIELD::PHESTERSat Mar 16 1996 19:0324
                                CMP PEX
                     

LOT #          YD0152 

QUANTITY:      23

OPERATION #    3066 ILD2
/DESCR.             

POLISHER:      POST READINGS

EVAL TOOL:     PROFILER.A2

DATE:          03/16/96 C-Shift

PROBLEM:       LOW POST THICKNESS       

               LOT THICKNESS MEAN..5103�  LCL...5200�  
        
DISPOSITION:   LOT REMARKED AND MOVED ON

CORRECTIVE     NONE
ACTION         
62.120PEX for JD0102 at 3058 THK_ILD3_PRE, low thkASDG::CULLEYWed Mar 20 1996 05:0017
Subj:	PEX for JD0102 at 3058  THK_ILD3_PRE, low 

QUANTITY:      22
MACHINE:       THICKNESS.A4         
DATE:          03/20/96  D-Shift

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

ENTITY THICKNESS.A4
               THK_ME       36327.000 *out low
               THK_RG        1531.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None. Graph and data to eng.
62.121PEX for XD0390 at 3058 THK_ILD3_PRE, low thicknessASDG::CULLEYThu Mar 21 1996 04:2517
Subj:	PEX for XD0390 at 3058  THK_ILD3_PRE, low 

QUANTITY:      20
MACHINE:       THICKNESS.A5         
DATE:          03/20/96  D-Shift

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

ENTITY THICKNESS.A4
               THK_ME       36947.000 *out low
               THK_RG        1585.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None. Graph and data to eng.
62.122Thickness low at operation 3058 THK_ILD3_PREASDG::CULLEYFri Mar 22 1996 07:0117
Subj:	PEX for JD0135 at 3058  THK_ILD3_PRE, low 

QUANTITY:      19
MACHINE:       THICKNESS.A5         
DATE:          03/22/96  D-Shift

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

ENTITY THICKNESS.A4
               THK_ME       36125.000 *out low
               THK_RG        1157.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None. Graph and data to eng.
62.123Thickness low at operation 3058 THK_ILD3_PREASDG::CULLEYFri Mar 22 1996 07:1117
Subj:	PEX for JD01304 at 3058  THK_ILD3_PRE, low 

QUANTITY:      24
MACHINE:       THICKNESS.A4         
DATE:          03/22/96  D-Shift

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

ENTITY THICKNESS.A4
               THK_ME       36060.000 *out low
               THK_RG        1007.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None. Graph and data to eng.
62.124XD0410 LOW INCOMING AT ILD3YIELD::PHESTERSat Mar 23 1996 18:3426
                            CMP PEX
                     

LOT #:         XD0410
           
QUANTITY:      22
 
OPERATION #    3058 THK_ILD3_PRE

POLISHER:      CMP.B2

EVAL TOOL:     THICKNESS.A4

DATE:          3/23/96

PROBLEM:       LOW INCOMING THICKNESS

               INCOMING THICKNESS MEAN    37044�

               LCL IS  37050�

DISPOSITION:   LOT REMARKED AND MOVED TO POLISH

CORRECTIVE
ACTION:        NONE
62.125XD0423 OVER POLISHED AT ILD1SUBPAC::SMARTINMon Mar 25 1996 18:1434
  

LOT:     XD0423
MACHINE: THICKNESS.A5
OPER#:   3054
PROCESS  LEVEL: ILD1
DATE:    3/25/96
SHIFT:   A-SHIFT
QUANTITY:  24    
PRODUCT.....TM3636-032-KA-8C

PROBLEM:  15 wafers were over polished in this lot.
         PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              RUN_ID_1     XD0423               N/A      
              THK_ME       "                        5036.000   3/25/96 17:20:33
              THK_RG       "                        1477.000  

        PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              RUN_ID_1     XD0423               N/A                            
              HEIGHT_ME    WAFER #1 CENTER            33.000                   
                           WAFER #1 EDGE              31.000                   
                           WAFER #2 CENTER            43.000                   
                           WAFER #2 EDGE              26.000      

        

DISPOSITION: Note:                                                                    |
    Wafers #'s 1- 3- 4- 5- 10- 13- 20- 22- and 23 hit the desired target    
    at CMP. The remaining wafer need and additional deposition of 700�      
    at operation 2130.

            Lot was remarked and moved on

CORRECTIVE ACTION:     NONE, LOT WAS MOVED ON.
62.126XD0395 low thickness at ILD2SUBPAC::MCCALLIGWed Mar 27 1996 04:3633
            *************** PEX FOR POST CMP THICKNESS AT ILD2 *************
                                                                      
							

PROCESS: POST CMP THICKNESS AT ILD2

OPERATION #: 3384

POLISHER(CMP.A1, A2, B1, B2): CMP.A2

PROCESS DATE & TIME:  3/26/96  B SHIFT

SHIFT:  B

LOT(S) AFFECTED:  XD0395

DEVICE TYPE:  TM3636

PROBLEM DESCRIPTION: Post CMP thickness low on three wafers.

              WAFER #   THICKNESS
              06        2701
              03        2914
              17        2836
               
              UCL= 5800
               CL= 5500
              LCL= 5200

CORRECTIVE ACTION:  None.  Rest of lot was polished to spec.
 
DISPOSITION:        These three wafers were scrapped from the lot.
                 
62.127thickness low at operation 3023 THK_ILD1_PREASDG::CULLEYThu Mar 28 1996 00:0817
Subj:	PEX for JD0150 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      24
MACHINE:       THICKNESS.A4         
DATE:          03/27/96  D-Shift

PROBLEM:       thickness low at operation 3023 THK_ILD1_PRE
               LCL = 18100

     ENTITY THICKNESS.A5
               THK_ME       18097.000
               THK_RG         445.000

DISPOSITION:   Lot moved on.

CORRECTIVE
ACTION         None. Remarks added.
62.128JD0114 High incoming @ILD3YIELD::PHESTERFri Mar 29 1996 19:2929
                                   CMP PEX
                      

LOT #          JD0114

QUANTITY:      22

OPERATION #    3058 THK-CMP 14
/DESCR.

POLISHER:      PRE THICKNESS

EVAL TOOL:     THICKNESS.A5

DATE:          03/29/96 C-Shift

PROBLEM:       HIGH INCOMING THICKNESS  

               HIGH INCOMING THICKNESS UCL=33500 LCL=30500
               LOT MEASURED 36477


        
DISPOSITION:   LOT WAS POLISHED AND MOVED ON.  

CORRECTIVE     NONE

ACTION         
62.129JD0110 low incoming @ILD3YIELD::PHESTERFri Mar 29 1996 19:3725
                                CMP PEX 
                     

LOT #:         JD0110           

QUANTITY:      20 

OPERATION #    3058  thickness before ILD3
POLISHER:      cmp.b2

EVAL TOOL:     Thickness.a4

DATE:          3/29/96

PROBLEM:       Low incoming thickness 

               Thickness:  36426�

               LCL         37050�

DISPOSITION:   Lot moved to polish.

CORRECTIVE     None
ACTION:         
62.130XD0440 LOW STEP INCOMING @PMDYIELD::PHESTERSat Mar 30 1996 17:4924
                               CMP PEX 
                     

LOT #:             XD0440           

QUANTITY:          23 

OPERATION #        3078  STEP HEIGHT BEFORE PMD

POLISHER:          CMP.A2

EVAL TOOL:         PROFILER.A2 

DATE:              3/30/96

PROBLEM:           STEP HEIGHT WAS 2808

                   LCL IS 3000  

DISPOSITION:       LOT MOVED TO POLISH

CORRECTIVE
ACTION:            NONE
62.131LOW INCOMING THICKNESS XD0395SUBPAC::SMARTINMon Apr 01 1996 16:1319
  

LOT:     XD0395
MACHINE: THICKNESS.A4
OPER#:   3058
PROCESS  LEVEL: ILD3
DATE:    4/1/96
SHIFT:   A-SHIFT
QUANTITY:  17    
PRODUCT.....TM3636-004-KA-8C 

PROBLEM: PRETHICKNESS LOW INCOMING TO CMP
              THK_ME       XD0395                  37020.000   4/01/96 14:04:38
              THK_RG       "                        1648.000
                                     LCL=37050.0

DISPOSITION: Lot was remarked and moved on

CORRECTIVE ACTION:     NONE, LOT WAS MOVED ON.
62.132Step-height low reading at oper #3078ASDG::CULLEYWed Apr 03 1996 07:1718
Subj:	PEX for XD044 at 3078 STEP_CMP 1 STEP_PMD

QUANTITY:      24
MACHINE:       PROFILER.A2  4/02/96 21:39:41       
DATE:          Apr 02'96    D-Shift

PROBLEM:       Step-height low reading at oper #3078
               LCL= 3000

               HEIGHT_ME    WAFER #1 CENTER          2967.000
                            WAFER #1 EDGE            2933.000
                            WAFER #2 CENTER          2989.000
                            WAFER #2 EDGE            2952.000

DISPOSITION:   Lot moved on.  

CORRECTIVE
ACTION         None, did pex, reported to eng.
62.133JD0144A1 LOW INCOMING @ILD2YIELD::PHESTERWed Apr 03 1996 20:3427
                                  CMP PEX 
                     

LOT #         JD0144A1

QUANTITY:      9 

OPERATION #    3023 PRE THICKNESS  ILD2
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS .A4

DATE:          04/03/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS   

               LOT INCOMING THICKNESS AVG=18001 @        
                                      UCL=19900�
                                      LCL=18100�
DISPOSITION:   LOT MOVED TO POLISH                     


CORRECTIVE     NONE
ACTION         
62.134Pex for JD0139, low thickness at THK_ILD3_PREASDG::CULLEYThu Apr 04 1996 07:3917
Subj:	PEX for JD0139 at 3058  THK_ILD3_PRE, low thickness. 

QUANTITY:      20
MACHINE:       THICKNESS.A5         
DATE:          04/04/96  D-Shift

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

ENTITY THICKNESS.A4
               THK_ME       36769.000 *out low
               THK_RG        1186.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None. Graph and data to eng.
62.135YDO154 LOW OUTGOING @ILD3YIELD::PHESTERThu Apr 04 1996 14:2625
                                 CMP PEX 
                     

LOT #          YD0154

QUANTITY:      21

OPERATION #    3442 THICK_CMP
/DESCR.

POLISHER:      POST READINGS  CMP.B2

EVAL TOOL:     THICKNESS.A4

DATE:          04/04/96  C-Shift

PROBLEM:       LOW OUTGOING  THICKNESS....ILD3

               LOT OUTGOING THICKNESS AVG= 8873�  LCL@ 9500�
        
DISPOSITION:   LOT WAS MOVED ON

CORRECTIVE
ACTION:        LOT WAS REMARKED FOR EXTRA 1300� DEP. AT OPER#2244 DP_ILD25 3
62.136XD0406 LOW OUTGOING @ILD3YIELD::PHESTERThu Apr 04 1996 14:2625
                                CMP PEX 
                     

LOT #          XD0406

QUANTITY:      21

OPERATION #    3064 THICK_CMP
/DESCR.

POLISHER:      POST READINGS  CMP.B2

EVAL TOOL:     THICKNESS.A5

DATE:          04/04/96  C-Shift

PROBLEM:       LOW OUTGOING  THICKNESS....ILD3

               LOT OUTGOING THICKNESS AVG= 9163�  LCL@ 9500�
        
DISPOSITION:   LOT MOVED ON

CORRECTIVE
ACTION:        LOT WAS REMARKED FOR EXTRA 1000� DEP. AT OPER#2136 DEP_ILD3 3
62.137JD0158 low incoming @PMDYIELD::PHESTERThu Apr 04 1996 20:0827
                              CMP PEX 
                     

LOT #:             JD0158  
        
QUANTITY:          24
 
OPERATION #        2951  THK_CMP 2  PMD

POLISHER:          INCOMING

EVAL TOOL:         THICKNESS.A4
 
DATE:              04/04/96

PROBLEM:           LOW INCOMING THICKNESS

                   INCOMING THICKNESS WAS  10833�

                   LCL IS  10850�

DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:            NONE. LOT POLISHED ACCORDINGLY.   

62.138THK_ILD1_PST, thickness low on whole lot @5100A'ASDG::CULLEYFri Apr 05 1996 06:1317
Subj:	PEX for JD0111A  at 3054 THK_CMP 8  THK_ILD1_PST

QUANTITY:      13
MACHINE:       THICKNESS.A4         
DATE:          04/05/96  D-Shift
SYSTEM:        CMP-A2


PROBLEM:       thickness low on whole lot @5100A'
               LCL = 5200A'
             
     
DISPOSITION:   Lot moved on.

CORRECTIVE
ACTION         None. Remarks added at operation 2130.
               Add on 300A'.
62.139JL0162 High Incoming Step @PMDYIELD::PHESTERFri Apr 05 1996 19:3127
                              CMP PEX 
                     

LOT #:             JL0162         

QUANTITY:          12 

OPERATION #        3362 STEP_L_PMD

POLISHER:          INCOMING

EVAL TOOL:         Profiler.A2 

DATE:              04/05/96

PROBLEM:           HIGH STEP HEIGHT ABOVE UCL.                

                   STEP HEIGHT WAS 4257�

                   UCL IS 4200�

DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:            NONE. LOT POLISHED ACCORDINGLY.   

62.140XD0442 Low incoming step @PMDYIELD::PHESTERFri Apr 05 1996 19:4227
                              CMP PEX 
                     

LOT #:             XD0442         

QUANTITY:          24 

OPERATION #        3078 STEP_CMP 1  (PMD)

POLISHER:          INCOMING

EVAL TOOL:         Profiler.A2 

DATE:              04/05/96

PROBLEM:           LOW INCOMING STEP HEIGHT

                   INCOMING STEP HEIGHT WAS 2852�

                   LCL IS 3000�                

DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:            NONE. LOT POLISHED ACCORDINGLY.   

62.141JD0127 Low incoming @ILD3YIELD::PHESTERFri Apr 05 1996 19:4527
                                 CMP PEX 
                     

LOT #          JD0127

QUANTITY:      23

OPERATION #    3058 PRE THICKNESS
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS .A4

DATE:          04/5/96  C-Shift

PROBLEM:       LOW INCOMING THICKNESS  ILD-3

               LOT INCOMING THICKNESS 36715�

               LCL@ 37050�
        
DISPOSITION:   LOT MOVED TO POLISH 

CORRECTIVE     LOT POLISHED ACCORDINGLY
ACTION         
62.142LD0150 low incoming @ILD3YIELD::PHESTERSat Apr 06 1996 15:3625
                                 CMP PEX 
                     

LOT #          JD0150

QUANTITY:      22

OPERATION #    3058 THICK_CMP
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          04/06/96  C-Shift

PROBLEM:       LOW INCOMING  THICKNESS....ILD3

               LOT INCOMING THICKNESS AVG= 36532�  LCL@ 37050�
        
DISPOSITION:   REMARKED ADD TO LOT OPER# 3058 AND PASSED ON.

CORRECTIVE     NONE. LOT POLISHED ACCORDINGLY.
ACTION         
62.143Pex for XL0428FABSIX::S_SHONGSat Apr 13 1996 05:1225
                                 CMP PEX 
                     

LOT #          XL0428

QUANTITY:      18

OPERATION #    3120 THICK_CMP
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          04/13/96  D-Shift

PROBLEM:       LOW INCOMING  THICKNESS....ILD2

               LOT INCOMING THICKNESS AVG= 17902�  LCL@ 18200�
        
DISPOSITION:   REMARKED ADD TO LOT OPER# 3120 AND PASSED ON.

CORRECTIVE     NONE. LOT POLISHED ACCORDINGLY.
ACTION         
62.144JD0142 high range outgoing @ILD2YIELD::PHESTERSat Apr 13 1996 10:3023
                              CMP PEX                      

LOT #:             JD0142         

QUANTITY:          21 

OPERATION #        3066 THK_ILD2_PST

POLISHER:          CMP.A1

EVAL TOOL:         THICKNESS A4

DATE:              04/11/96

PROBLEM:           RANGE WAS 3638�     UCL IS 3400                

DISPOSITION:       LOT MOVED TO DIFF
   
CORRECTIVE      
ACTION:            NONE
   

62.145XD0443 low incoming @ILD1YIELD::PHESTERSat Apr 13 1996 10:4523
   
                              CMP PEX 
                     

LOT #:             XD0443         

QUANTITY:          24 

OPERATION #        3023  THICK11  PRE THICKNESS

POLISHER:          INCOMING

EVAL TOOL:         THICKNESS.A4

DATE:              04/12/96

PROBLEM:           THICKNESS WAS 18090�    LCL IS  18100�

DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE         NONE
ACTION:            

62.146JD0144A1 Low incoming @ILD2YIELD::PHESTERSat Apr 13 1996 10:5326
                                 CMP PEX 
                     

LOT #          JD0144A1

QUANTITY:      9 

OPERATION #    3053 PRE THICKNESS  ILD2
/DESCR.

POLISHER:      PRE THCKNESS

EVAL TOOL:     THICKNESS .A4

DATE:          04/12/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS   

               LOT INCOMING THICKNESS AVG-18092�      LCL=18100�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE     NONE
ACTION         
                                                           
62.147XD0443 low outgoing @ILD1YIELD::PHESTERSat Apr 13 1996 11:0824
    
                              CMP PEX 
                     

LOT #:             XD0443         

QUANTITY:          24 

OPERATION #        3054 POST THICKNESS  ILD1

POLISHER:          CMP.A1

EVAL TOOL:         THICKNESS.A5

DATE:              04/12/96

PROBLEM:           THICKNESS WAS 5165�.    LCL IS 5200�                

DISPOSITION:       LOT MOVED TO furnace.
   
CORRECTIVE         NONE
ACTION:            

62.148JD0166 low incoming @ILD2YIELD::PHESTERSat Apr 13 1996 11:2025
                                CMP PEX
                     

LOT #          JD0166

QUANTITY:      20

OPERATION #    3053 THICKNESS PRE   ILD2
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          04/12/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS   ILD-2

               LOT INCOMING THICKNESS AVG=17644�  LCL=18100�
        
DISPOSITION:   LOT POLISHED ACCORDINGLY

CORRECTIVE     NONE
ACTION         
62.149XD0410 LOW INCOMING @ILD3 an old PEX I missedYIELD::PHESTERSun Apr 14 1996 16:1724
                                  CMP PEX 
                     

LOT #:             XD0410           

QUANTITY:          22 

OPERATION #        3058  THICKNESS BEFORE ILD3

POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A4

DATE:              3/23/96

PROBLEM:           INCOMING THICKNESS WAS 37044�

                   LCL IS  37050A

DISPOSITION:       LOT MOVED TO POLISH

CORRECTIVE        
ACTION:            LOT POLISHED ACCORDINGLY
62.150JD0160 LOW INCOMING @ILD1YIELD::PHESTERSun Apr 14 1996 16:5026
                                CMP PEX
                     

LOT #          JD0160

QUANTITY:      24

OPERATION #    3023 PRE THICKNESS
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          04/13/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS   ILD1

               LOT INCOMING THICKNESS 17369� LCL@ 18100�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY
 
62.151JD0146 was over polished at IDL3FABSIX::P_POZORSKITue Apr 16 1996 17:3621
LOT:     XD0146
MACHINE: CMP.B2
OPER#:   1989
PROCESS  LEVEL: ILD3
DATE:    4/16/96
SHIFT:   A-SHIFT
QUANTITY:  23    
PRODUCT.....DC1026-000-AC-8G 

PROBLEM:  Wafers 2,3,5,6,7,8,9,10,12,13,14,15,16,17,18,20,21,22,23,24 were
          over polished at CMP IDL3.   
     

DISPOSITION: Lot was remarked at operation 2136 DEP_IDLE3 3 to receive an extra
             dep due to the over polish.

CORRECTIVE ACTION:   Ops must be aware of the touch up times and if there is 
                     any questions about this then they need to contact 
                     Engineering.

62.152Thickness low at 3120ASDG::CULLEYWed Apr 17 1996 01:5917
Subj:	PEX for XD0432A at 3120 THK_CMP 10, THK_ILD2_PRE 3 

QUANTITY:      12
MACHINE:       THICKNESS.A4         
DATE:          4/16/96  D-Shift 4/16/96 20:28:42

PROBLEM:       Thickness low at 3120
               ME_LCL=18100
               RG_UCL= 1000
                       
               THK_ME       XL0432A                 17936.000*low
               THK_RG       XL0432A                   414.000

DISPOSITION:   Lot moved on.   

CORRECTIVE
ACTION         None, added remark to operation.
62.153thickness low at operation 3023ASDG::CULLEYWed Apr 17 1996 07:0718
Subj:	PEX for JD0161 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      23
MACHINE:       THICKNESS.A3         
DATE:          04/17/96  D-Shift  4/17/96 03:18:29

PROBLEM:       thickness low at operation 3023 THK_ILD1_PRE
               LCL_ME = 18100
               UCL_RG =  1000

     ENTITY THICKNESS.A5
               THK_ME       17706.000
               THK_RG         677.000

DISPOSITION:   Lot moved on, range on center.

CORRECTIVE
ACTION         None. Remarks added.
62.154Thickness low at operation 3053ASDG::CULLEYWed Apr 17 1996 07:1317
Subj:	PEX for JD0155 at 3053 THK_CMP 10 THK_ILD2_PRE 

QUANTITY:      19
MACHINE:       THICKNESS.A4         
DATE:          04/17/96  D-Shift 4/17/96 04:23:08

PROBLEM:       Thickness low at operation 3053 THK_ILD2_PRE
               LCL=18100

     ENTITY THICKNESS.A4
     actual:   THK_ME       17802.000
               THK_RG         651.000

DISPOSITION:  Lot moved on.  

CORRECTIVE
ACTION         None. Remark added.
62.155ZD0111 High incoming @ILD3YIELD::PHESTERWed Apr 17 1996 20:2225
                                  CMP PEX 
                     

LOT #          ZD0111

QUANTITY:      24

OPERATION #    3058 PRE THICKNESS
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          04/17/96 C-Shift

PROBLEM:       HIGH INCOMING THICKNESS..ILD3

               LOT INCOMING THICKNESS AVG=36683�     UCL=33500�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY         
62.156Thickness low at 3120ASDG::CULLEYThu Apr 18 1996 03:5417
Subj:	PEX for XL0427A at 3120 THK_CMP 10, THK_ILD2_PRE 3 

QUANTITY:      05
MACHINE:       THICKNESS.A4         
DATE:          4/17/96  D-Shift 4/17/96 21:56:58

PROBLEM:       Thickness low at 3120
               ME_LCL=18100
               RG_UCL= 1000
                       
               THK_ME       XL0427A                 17792.000*low
               THK_RG       XL0427A                   387.000

DISPOSITION:   Lot moved on.   

CORRECTIVE
ACTION         None, added remark to operation.
62.157Thickness low at 3120ASDG::CULLEYThu Apr 18 1996 04:1417
Subj:	PEX for XL0433A at 3120 THK_CMP 10, THK_ILD2_PRE 3 

QUANTITY:      12
MACHINE:       THICKNESS.A4         
DATE:          4/18/96  D-Shift 4/18/96 00:30:58

PROBLEM:       Thickness low at 3120
               ME_LCL=18100
               RG_UCL= 1000
                       
               THK_ME       XL0433A                 17932.000*low
               THK_RG       XL0433A                   475.000

DISPOSITION:   Lot moved on.   

CORRECTIVE
ACTION         None, added remark to operation.
62.158Thickness low at operation 3023ASDG::CULLEYThu Apr 18 1996 04:2817
Subj:	PEX for JD0170 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      24
MACHINE:       THICKNESS.A4
DATE:          04/18/96  D-Shift 4/18/96 00:10:32

PROBLEM:       Thickness low at operation 3023 THK_ILD1_PRE
               LCL = 18100

               ENTITY THICKNESS.A4
               THK_ME       17711.000
               THK_RG         626.000

DISPOSITION:   Lot moved on, range on center.

CORRECTIVE
ACTION         None. Remarks added.
62.159thickness low at operation 3023ASDG::CULLEYThu Apr 18 1996 07:5417
Subj:	PEX for hot lot XD0452 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      20
MACHINE:       THICKNESS.A4         
DATE:          4/18/96  D-Shift 4/18/96 06:32:26

PROBLEM:       thickness low at operation 3023 THK_ILD1_PRE
               LCL = 18100

               ENTITY THICKNESS.A4
               THK_ME       17923.000
               THK_RG         659.000

DISPOSITION:   Lot moved on, range on center.

CORRECTIVE
ACTION         None. Remarks added.
62.160Thickness low at operation 3058ASDG::CULLEYFri Apr 19 1996 02:0117
Subj:	PEX for XD0451 at 3058  THK_ILD3_PRE, low 

QUANTITY:      22
MACHINE:       THICKNESS.A4         
DATE:          04/19/96  D-Shift  4/19/96 00:42:50

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

               ENTITY THICKNESS.A4
               THK_ME       36850.000
               THK_RG        1618.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None. Graph and data to eng.
62.161Thickness low at operation 3053ASDG::CULLEYFri Apr 19 1996 07:3317
Subj:	PEX for JD0156 at 3053 THK_CMP 10 THK_ILD2_PRE 

QUANTITY:      24
MACHINE:       THICKNESS.A4         
DATE:          04/19/96  D-Shift 4/19/96 06:15:02

PROBLEM:       Thickness low at operation 3053 THK_ILD2_PRE
               LCL=18100

     ENTITY THICKNESS.A4
     actual:   THK_ME       17797.000
               THK_RG         547.000

DISPOSITION:  Lot moved on.  

CORRECTIVE
ACTION         None. Remark added.
62.162JD0207 LOW INCOMING @ILD1YIELD::PHESTERFri Apr 19 1996 12:2523
                              CMP PEX 
                     

LOT #:             JD0207         

QUANTITY:          10 

OPERATION #        3023 PRE THICKNESS ILD1
POLISHER:           
EVAL TOOL:         THICKNESS.A4

DATE:              04/17/96

PROBLEM:           INCOMING THICKNESS WAS 17472�

                   LCL IS  1810�

DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:            LOT POLISHED ACCORDINGLY

62.163JD0145 LOW INCOMING @ILD1YIELD::PHESTERFri Apr 19 1996 12:2624
                              CMP PEX 
                     

LOT #:             JD0145         

QUANTITY:          16 

OPERATION #        3053  PRE THICKNESS ILD1
POLISHER:           
EVAL TOOL:         THICKNESS.A4

DATE:              04/18/96

PROBLEM:           INCOMING THICKNESS WAS 17896�

                   LCL IS 1810�

DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:            LOT POLISHED ACCORDINGLY


62.164XL0433 LOW INCOMING ILD2YIELD::PHESTERFri Apr 19 1996 12:2725
                                  CMP PEX 
                     

LOT #          XL0433

QUANTITY:      12

OPERATION #    3121 THICK_CMP  PRE THICKNESS ILD2
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          04/18/96  C-Shift

PROBLEM:       LOT INCOMING THICKNESS AVG = 17951� 

               LCL IS 18100�
        
DISPOSITION:   LOT MOVED TO POLISH 

CORRECTIVE
ACTION:	       LOT POLISHED ACCORDINGLY         
62.165JL0162 LOW INCOMING @ILD1YIELD::PHESTERFri Apr 19 1996 12:2726
                                CMP PEX 
                     

LOT #          JL0162

QUANTITY:      11

OPERATION #    3112 PRE THICKNESS ILD1
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          04/18/96 C-Shift

PROBLEM:       LOT INCOMING THICKNESS AVG WAS 17668� 

               LCL IS 18100�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY

62.166JD0173 LOW INCOMING @ILD3YIELD::PHESTERFri Apr 19 1996 12:2827
                                 CMP PEX 
                     

LOT #          JD0173

QUANTITY:      23

OPERATION #    3058 PRE THICKNESS ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          04/18/96 C-Shift

PROBLEM:       LOT INCOMING THICKNESS WAS 36175� 

               LCL IS 37050�

        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY
         
62.167JD0142 LOW INCOMING @ILD3YIELD::PHESTERFri Apr 19 1996 12:2825
                                CMP PEX 
                     

LOT #          JD0142

QUANTITY:      21

OPERATION #    3058 PRE THICKNESS ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          04/19/96 C-Shift

PROBLEM:       LOT INCOMING THICKNESS WAS 36683� 

               LCL IS 37050�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY         
62.168XL0428 LOW INCOMING @ILD3YIELD::PHESTERFri Apr 19 1996 12:2926
                                 CMP PEX 
                     

LOT #          XL0428

QUANTITY:      18

OPERATION #    3127 PRE-THICKNESS  ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          04/19/96 C-Shift

PROBLEM:       INCOMING THICKINESS WAS 36937�

               LCL 37050�

        
DISPOSITION:   LOT MOVED TO POLISH 

CORRECTIVE
ACTION:        NONE         
62.1695 wafers over polished at IDLE2STRATA::POZORSKISun Apr 21 1996 11:2417
LOT:     XD0440
MACHINE: CMP.B2
OPER#:   1985
PROCESS  LEVEL: ILD2
DATE:    4/16/96
SHIFT:   B-SHIFT
QUANTITY:  23    
PRODUCT.....TM3636-032-KA-8C 

PROBLEM:  Wafers 7,8,9,16,24 were over polished at CMP IDL2.   

DISPOSITION: Lot was remarked at operation 2133 DEP_IDLE2 3 to receive an extra
             dep due to the over polish.

CORRECTIVE ACTION:   The wafers will receive and extra dep at operation 2133 
                     DEP_IDLE2 3.  Lot moved on and remark was entered.

62.170Wafer breakage for JD0190 at cmpASDG::CULLEYThu Apr 25 1996 08:1412
Subj:	PEX for JD0190 at 1978 CMP_PMD    CMP

QUANTITY:      22
MACHINE:       CMP.A1
DATE:          4/25/96  D-Shift 

PROBLEM:       Wafer breakage for wafers #3 and #20.

DISPOSITION:   Lot moved on.   

CORRECTIVE
ACTION         None, added remark to operation.
62.171JD0155 Low incoming @ILD3.....YIELD::PHESTERThu Apr 25 1996 17:1327
                                CMP PEX 
                     

LOT #          JD0155

QUANTITY:      22

OPERATION #    3058 PRE-THICKNESS
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          04/25/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS  ILD3

               LOT INCOMING THICKNESS 36644�

               LCL IS                 37050�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY
62.172JD0191 Low outgoing @PMD......YIELD::PHESTERThu Apr 25 1996 17:2025
                                CMP PEX 
                     

LOT #          JD0191

QUANTITY:      24

OPERATION #    2957 THK_CMP 4
/DESCR.

POLISHER:      POST READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          04/025/96  C-Shift

PROBLEM:       LOW OUTGOING  THICKNESS....PMD

               LOT OUTGOING THICKNESS AVG= 6047�  LCL@ 6200�
        
DISPOSITION:   LOT MOVED ON

CORRECTIVE
ACTION         LOT WAS REMARKED FOR EXTRA 500� DEP. AT OPER# 2127 DEP_PMD 2 
62.173XD0449 Low incoming step @PMD....YIELD::PHESTERThu Apr 25 1996 17:2628
                               CMP PEX 
                     

LOT #          XD0449

QUANTITY:      23

OPERATION #    3078 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          04/25/96  C-Shift

PROBLEM:       LOW INCOMING STEP ....PMD

               LOT INCOMING STEP AVG = 2801�

               LCL IS                  3000�
        
DISPOSITION:   LOT WAS PASSED ON

CORRECTIVE
ACTION:        NONE.  LOT REMARKED

62.174JL0162 Low incoming step @ILD2.....YIELD::PHESTERThu Apr 25 1996 17:3628
                                 CMP PEX 
                     

LOT #          JL0162

QUANTITY:      11

OPERATION #    3194 STEP_ILD2
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          04/25/96 C-Shift

PROBLEM:       LOW INCOMING STEP ....ILD3

               LOT INCOMING STEP AVG = 9800� 
 
               UCL IS                  9600�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         NONE

62.175XL0429 low outgoing @ILD3YIELD::PHESTERFri Apr 26 1996 20:2427
                              CMP PEX 
                     

LOT #:             XL0429         

QUANTITY:          17

OPERATION #        POST THICKNESS

POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A5

DATE:              04/26/96

PROBLEM:           OUTGOING MEAN WAS LOW - 8156�

                   LCL IS   9500�

DISPOSITION:       SOME WAFERS WERE OVER-POLISHED BUT NOT DAMAGED.
   
CORRECTIVE
ACTION:            OVER-POLISHED WAFERS WERE GROUPED INTO BINS AND A REMARK 
                   WAS ENTERED AT OPERATION 2178 DEP_ILD3 3 FOR EXTRA DEP ON 
                   THESE WAFERS.

62.176JD0145 low incoming @ILD3YIELD::PHESTERSat Apr 27 1996 13:4227
                                CMP PEX 
                     

LOT #          JD0145

QUANTITY:      15

OPERATION #    3058 PRE-THICKNESS
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          04/27/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS...ILD3 NEWPRODUCT

               LOT INCOMING THICKNESS AVG..36495� 

                                     LCL...37050�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY
62.177JD0145 High incoming step @ILD3YIELD::PHESTERSat Apr 27 1996 13:5227
                              	CMP PEX 
                     

LOT #          JD0145

QUANTITY:      15

OPERATION #    3385 STEP_ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          04/27/96 C-Shift

PROBLEM:       HIGH INCOMING STEP ....ILD3

               LOT INCOMING STEP AVG= 20225�

                                 UCL@ 20000�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION:        NONE         
62.178JD0182 THK_ILD1_PST "Mean" lowYIELD::MANDREOLISun Apr 28 1996 04:1740
Subj:	PEX for JD0182 at 3054 THK_CMP 8 THK_ILD1_PST

QUANTITY:      23
MACHINE:       THICKNESS.A4         
DATE:          04/28/96  B-Shift
SYSTEM:        CMP.A1 


PROBLEM:       THK_ILD1_PST "Mean" low, 4906�  
               LCL = 5200�

     Post thickness measured on THICKNESS.A4

        Wfrs < 5000�              Wfrs > 5000�
     Wafer#  Thickness         Wafer# Thickness
     ------------------------------------------
      11       4849             18      5157
      08       4502             04      5031 
      14       4923             01      5018
      20       4905             16      5205
      02       4860             22      5452
      09       4913             19      5104 
      07       4953 
      05       4864
      03       4850
      17       4558
      21       4824
      10       4872
      06       4811
      24       4838
      12       4795
      13       4963
      15       4596
      
DISPOSITION:   Lot moved on. Added REMARK at Oper# 2130 DEP_ILD1 with
               request to notify Films Engr of the low tox, and may need  
               extra dep. Included Post CMP measurements. 

CORRECTIVE
ACTION         REMARK at DEP_ILD1 to notify Films of low tox wafers. 
62.179JD0191 Low incoming @ILD1.....YIELD::PHESTERWed May 01 1996 15:3829
                              	CMP PEX 
                     

LOT #          JD0191

QUANTITY:      24

OPERATION #    3023 THK_CMP 6    THK_ILD1_PRE
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          05/01/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD1

               THICKNESS WAS 17846�

               LCL IS 18100�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY
 

62.180JD0211 low incoming step @PMDYIELD::PHESTERWed May 01 1996 16:1125
                                CMP PEX 
                     

LOT #          JD0211

QUANTITY:      24

OPERATION #    3078 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          05/01/96  C-SHIFT

PROBLEM:       LOW INCOMING STEP ....PMD

               LOT INCOMING STEP AVG= 2844�  LCL@ 3000�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION:        NONE
62.181JD0203 two wafers scrapped due to crash...YIELD::PHESTERWed May 01 1996 20:4223
                                CMP PEX 
                     

LOT #          JD0203

QUANTITY:      22

OPERATION #    1978 CMP_PMD     CMP 
/DESCR.

POLISHER:      CMP.A1

EVAL TOOL:     N/A

DATE:          05/01/96  C-SHIFT

PROBLEM:       TWO WAFERS SCRAPPED WHEN THEY CRASHED ON THIS TOOL.
        
DISPOSITION:   LOT FINISHED POLISHING AFTER TOOL RECOVERED.

CORRECTIVE
ACTION:        NONE
62.182thickness low at operation 3023ASDG::CULLEYThu May 02 1996 07:5217
Subj:	PEX for hot lot JD0259 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      24
MACHINE:       THICKNESS.A4         
DATE:          5/02/96  D-Shift 

PROBLEM:       thickness low at operation 3023 THK_ILD1_PRE
               LCL = 18100

               ENTITY THICKNESS.A4
               THK_ME       17903.000
               THK_RG         620.000

DISPOSITION:   Lot moved on, range on center.

CORRECTIVE
ACTION         None. Remarks added.
62.183XD0443 high outgoing range @ILD3YIELD::PHESTERFri May 03 1996 15:1725
                              CMP PEX 
                     

LOT #:             XD0443         

QUANTITY:          24

OPERATION #        3064 POST THICKNESS

POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A5

DATE:              05/02/96

PROBLEM:           HIGH OUTGOING RANGE  5115�

                   UCL IS               4500�

DISPOSITION:       LOT MOVED TO FURNACE.  
   
CORRECTIVE
ACTION:            NONE

62.184YD0160 low outgoing @ILD3YIELD::PHESTERFri May 03 1996 15:2725
                              CMP PEX 
                     

LOT #:             YD0160         

QUANTITY:          24

OPERATION #        3064 POST THICKNESS ILD3

POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A5

DATE:              05/02/96

PROBLEM:           LOW OUTGOING MEAN -  9321�               

                   LCL IS               9500�

DISPOSITION:       MOVED TO FURNACE
   
CORRECTIVE
ACTION:            NONE

62.185PEX for JD0211 and JD0192 at 3023 THK_ILD1_PREASDG::CULLEYSat May 04 1996 05:5216
Subj:	PEX for hot lot JD0211 and lot JD0192 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      JD0211-23, JD0192-23
MACHINE:       THICKNESS.A4         
DATE:          5/3/96  D-Shift 
PROBLEM:       thickness low at operation 3023 THK_ILD1_PRE
               LCL = 18100

               ENTITY THICKNESS.A4 JD0211   JD0192
               THK_ME              17916    17899
               THK_RG                737      732

DISPOSITION:   Lot moved on, range on center.

CORRECTIVE
ACTION         None. Remarks added.
62.186JD0194 low incoming @ILD1YIELD::PHESTERSat May 04 1996 14:1527
                               CMP PEX 
                     

LOT #          JD0194

QUANTITY:      22

OPERATION #    3023 THICKNESS.A4
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          05/04/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD1  DC1026

               LOT INCOMING THICKNESS = 17972�

                                 LCL IS 18100�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY         
62.187JD0174 high outgoing range @ILD2YIELD::PHESTERSat May 04 1996 17:1728
                            PE PEX NOTIFICATION
                     

LOT #          JD0174

QUANTITY:      23

OPERATION #    3066 POST THICKNESS
/DESCR.

POLISHER:      POLISHED ON CMP.B2

EVAL TOOL:     THICKNESS.A4

DATE:          05/04/96 C-Shift

PROBLEM:       HIGH POST RANGE     ILD2 DC1026
               

               POST RANGE..3793     UCL..3400
          
        
DISPOSITION:   LOT SENT ON

CORRECTIVE
ACTION:        NONE  MEAN THICKNESS WAS GOOD.
         
62.188JD0197 Low incoming @ILD1YIELD::PHESTERSat May 04 1996 17:3229

                            PE PEX NOTIFICATION
                     

LOT #          JD0197

QUANTITY:      24

OPERATION #    3023 THICKNESS PRE
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          05/04/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS    ILD1 DC1026

               LOT INCOMING THICKNESS..17966� 

               LCL IS  18100�
               
DISPOSITION:   LOT MOVED TO POLISH ON CMP.B2

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY
         
62.189JD0170 LOW INCOMING ILD3 THICKNESSYIELD::MANDREOLIMon May 06 1996 06:2127
                            PE PEX NOTIFICATION
                     

LOT #          JD0170

QUANTITY:      24         

OPERATION #    3058 THICKNESS PRE ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A5 

DATE:          05/06/96 B-Shift

PROBLEM:       LOW INCOMING THICKNESS    ILD3 DC1026

               LOT INCOMING THICKNESS.. 36473�

               LCL IS  37050�
               
DISPOSITION:   LOT MOVED TO POLISH ON CMP.B2

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY, Mean for this chart is < LCL. 
         
62.190JD0226 2 WAFERS CRASHED AT PMD on CMP.A2YIELD::MANDREOLIMon May 06 1996 06:3723
                            PE PEX NOTIFICATION
                     

LOT #          JD0226

QUANTITY:      24 - 2 crashed = 22        

OPERATION #    Polish PMD 
/DESCR.

POLISHER:      CMP.A2 

EVAL TOOL:     NA  

DATE:          05/06/96 B-Shift

PROBLEM:       2 Product wafers crashed and broke. 

DISPOSITION:   scrapped 2 wafers. 

CORRECTIVE
ACTION:        CMP.A2 getting a pad and carrier change. 
         
62.191JD0198 THK_ILD1_PRE below LCL YIELD::MANDREOLITue May 07 1996 07:3923
                            PE PEX NOTIFICATION
                     

LOT #          JD0198

QUANTITY:      24        

OPERATION #    3023 THK_ILD1_PRE 
/DESCR.

POLISHER:      NA 

EVAL TOOL:     THICKNESS.A5  

DATE:          05/07/96 B-Shift

PROBLEM:       CMP incoming ILD1 thickness below LCL 

DISPOSITION:   Polished accordingly

CORRECTIVE
ACTION:        "" 
         
62.192JD0171 THK_ILD3_PRE below LCLYIELD::MANDREOLITue May 07 1996 07:4323
                            PE PEX NOTIFICATION
                     

LOT #          JD0171

QUANTITY:      21        

OPERATION #    3058 THK_ILD3_PRE 
/DESCR.

POLISHER:      NA 

EVAL TOOL:     THICKNESS.A4  

DATE:          05/07/96 B-Shift

PROBLEM:       CMP incoming ILD3 thickness below LCL 

DISPOSITION:   Polished accordingly

CORRECTIVE
ACTION:        "" 
         
62.193JD0169 3 wafers brokenYIELD::MANDREOLIWed May 08 1996 05:4026
                            PE PEX NOTIFICATION
                     

LOT #          JD0169

QUANTITY:      22 - 3 (dropped) = 19        

OPERATION #    3058 THK_ILD3_PRE 
/DESCR.

POLISHER:      NA 

EVAL TOOL:     NA 

DATE:          05/08/96 B-Shift

PROBLEM:       Three wafers were dropped out of the cassette and broken when
               cassette was nearly dropped. It's better than losing the whole
               thing! THIS WAS NOT A CRASH, it was an accident.  

DISPOSITION:   Move on

CORRECTIVE
ACTION:        Gave CPR to the tech as this was a M3 hotlot. Very fortunate
               that it wasn't a total loss. 
         
62.194thickness low at operation 3023 THK_ILD1_PREASDG::CULLEYThu May 09 1996 07:2417
Subj:	PEX for hot lot JD0204 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      23
MACHINE:       THICKNESS.A4         
DATE:          5/08/96  D-Shift 5/08/96 20:09:58

PROBLEM:       thickness low at operation 3023 THK_ILD1_PRE
               LCL = 18100

               ENTITY THICKNESS.A4
               THK_ME       17890.000
               THK_RG         543.000

DISPOSITION:   Lot moved on, range on center.

CORRECTIVE
ACTION         None. Remarks added.
62.195thickness low at operation 3023 THK_ILD1_PREASDG::CULLEYThu May 09 1996 07:2417
Subj:	PEX for hot lot JD0220 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      24
MACHINE:       THICKNESS.A5         
DATE:          D-Shift 5/09/96 02:21:41

PROBLEM:       thickness low at operation 3023 THK_ILD1_PRE
               LCL = 18100

               ENTITY THICKNESS.A4
               THK_ME       17878.000
               THK_RG         421.000

DISPOSITION:   Lot moved on, range on center.

CORRECTIVE
ACTION         None. Remarks added.
62.196JD0208 low incoming @ILD1YIELD::PHESTERThu May 09 1996 16:2328
                               CMP PEX
                     

LOT #          JD0208

QUANTITY:      24

OPERATION #    3023 THICKNESS  ILD1
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          05/09/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS  ILD1

               LOT INCOMING THICKNESS = 17890

                                  LCL = 18100
               

DISPOSITION:   LOT MOVED AND POLISHED ON CMP.B1

CORRECTIVE
ACTION         LOT POLISHED ACCORDINGLY
62.197JD0202 low incoming @ILD1YIELD::PHESTERThu May 09 1996 16:3527
                                CMP PEX 
                     

LOT #          JD0202

QUANTITY:      24

OPERATION #    3023 THICKNESS PRE  ILD1
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          05/09/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS   ILD1

               LOT INCOMING THICKNESS = 17839 

                                  LCL = 18100

DISPOSITION:   LOT MOVE AND POLISHED ON CMP.B1
 
CORRECTIVE     LOT POLISHED ACCORDINGLY
ACTION         
62.198JD0215 low incoming @ILD1YIELD::PHESTERThu May 09 1996 16:3828
                               CMP PEX 
                     

LOT #          JD0215

QUANTITY:      23

OPERATION #    3023 THK_CMP  
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          05/09/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD1  DC1026

               LOT INCOMING THICKNESS = 17888�

                                 LCL IS 18100�
        
DISPOSITION:   LOT WAS REMARKED @OP #3023 FOR LOW INCOMING 
		THICKNESS AND MOVED ON.

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY         
62.199STP_PMD_PRE high at cmp incomingASDG::CULLEYFri May 10 1996 03:5820
Subj:	PEX for JD0230 at 3078 STEP_CMP 1 STEP_PMD   2 


QUANTITY:      24   DC1026-000-AE-8G
MACHINE:       PROFILER.A2         
DATE:          05/10/96  D-Shift

PROBLEM:       STP_PMD_PRE high at cmp incoming:
               UCL=4200   

              HEIGHT_ME    WAFER #1 CENTER          4242.000
                           WAFER #1 EDGE            4383.000   
                           WAFER #2 CENTER          4241.000
                           WAFER #2 EDGE            4360.000
               
DISPOSITION:   Lot moved on. Slightly high, ok.

CORRECTIVE
ACTION         None, added remark to operation.
               Graph and data sheet provided.
62.200PEX for JD0188 at 3066 THK_CMP 11 THK_ILD2_PST 2ASDG::CULLEYFri May 10 1996 04:1515
Subj:	PEX for JD0188 at 3066 THK_CMP 11 THK_ILD2_PST 2

QUANTITY:      23            DC1026-000-AE-8G
MACHINE:       THICKNESS.A5
DATE:          5/10/96  D-Shift

PROBLEM: 5 wafers are thin and need extra thickness,                           
         09,11,12,13,17                                                        
         Please add 2000 angstroms extra.      
         CCL=5200

DISPOSITION:   Lot moved on and remark added at oper #2133. 

CORRECTIVE
ACTION         None. 
62.201thickness low at operation 3023 THK_ILD1_PREASDG::CULLEYFri May 10 1996 05:0617
Subj:	PEX for hot lot JD0200 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      24
MACHINE:       THICKNESS.A5         
DATE:          D-Shift 5/10/96 03:24:01

PROBLEM:       thickness low at operation 3023 THK_ILD1_PRE
               LCL = 18100

               ENTITY THICKNESS.A4
               THK_ME       17906.000
               THK_RG         417.000

DISPOSITION:   Lot moved on, range on center.

CORRECTIVE
ACTION         None. Remarks added.
62.202thickness low at operation 3023 THK_ILD1_PREASDG::CULLEYFri May 10 1996 05:0717
Subj:	PEX for hot lot JD0205 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      24
MACHINE:       THICKNESS.A5         
DATE:          D-Shift 5/10/96 03:39:19

PROBLEM:       thickness low at operation 3023 THK_ILD1_PRE
               LCL = 18100

               ENTITY THICKNESS.A4
               THK_ME       17885.000
               THK_RG         658.000

DISPOSITION:   Lot moved on, range on center.

CORRECTIVE
ACTION         None. Remarks added.
62.203JD0233 high incoming step @PMD....YIELD::PHESTERFri May 10 1996 18:0427
                                CMP PEX 
                     

LOT #          JD0233

QUANTITY:      24

OPERATION #    3078 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          05/10/96  C-Shift

PROBLEM:       HIGH INCOMING STEP ....PMD

               HIGH INCOMING STEP AVG = 4339� 

                                  LCL = 4100�
        
DISPOSITION:   LOT WAS PASSED ON....REMARK ADDED TO WORKSTREAM...

CORRECTIVE
ACTION:        NONE         
62.204JD0234 high incoming avg step @PMDYIELD::PHESTERFri May 10 1996 19:5627
                                  CMP PEX 
                     

LOT #          JD0234

QUANTITY:      24

OPERATION #    3078 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          05/10/96  C-Shift

PROBLEM:       HIGH INCOMING STEP AVG ....PMD

               HIGH INCOMING STEP AVG = 4434� 

                                  LCL = 4200�
        
DISPOSITION:   LOT WAS PASSED ON....REMARK ADDED TO WORKSTREAM...

CORRECTIVE
ACTION:        NONE         
62.205JD0214 at cmp_pmd, 1 broken waferASDG::CULLEYSat May 11 1996 08:0626
Subj:	JD0214 OPEN PEX @CMP


                                  CMP PEX 
                     

LOT #          JD0214

QUANTITY:      24

OPERATION #    1981 CMP_ILD1
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     N/A

DATE:          05/10/96  C-Shift

PROBLEM:       ONE WAFER WAS SCRAPPED.  IT WAS BROKEN WHEN IT FELL OFF THE
               CARRIER DURING LIFTOFF.
        
DISPOSITION:   LOT STILL AT POLISH AS CMP.B2 IS DOWN

CORRECTIVE
ACTION:        NONE   Lot finished without any more problems.      
62.206thickness low at operation 3023 THK_ILD1_PREASDG::CULLEYSat May 11 1996 09:2217
Subj:	PEX for lot JD0213 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      24
MACHINE:       THICKNESS.A5         
DATE:          D-Shift 5/10/96 23:24:25

PROBLEM:       thickness low at operation 3023 THK_ILD1_PRE
               LCL = 18100

               ENTITY THICKNESS.A4
               THK_ME       17857.000
               THK_RG         456.000

DISPOSITION:   Lot moved on, range on center.

CORRECTIVE
ACTION         None. Remarks added.
62.207PEX at 3054 ILD1_pst, low post readingASDG::CULLEYSat May 11 1996 09:3124
Subj:	JD0214  PEX at 3054 ILD1_pst
                     

LOT #          JD0214

QUANTITY:      24

OPERATION #    3054
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     N/A

DATE:          05/11/96  D-Shift

PROBLEM:       low post thickness
               LCL    = 5200
               THK_ME = 4961

DISPOSITION:   LOT moved

CORRECTIVE
ACTION:        NONE   
62.208THK_ILD3_PRE, lowASDG::CULLEYSat May 11 1996 09:3517
Subj:	PEX for JD0174 at 3058  THK_ILD3_PRE, low 

QUANTITY:      22
MACHINE:       THICKNESS.A5         
DATE:          D-Shift  5/11/96 06:03:20

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

               ENTITY THICKNESS.A4
               THK_ME       36341.000
               THK_RG        1061.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None. 
62.209high thickness at incomingASDG::CULLEYSat May 11 1996 09:4316
Subj:	PEX for JD0235 at 2951 THK_CMP 2  THK_PMD_PRE

QUANTITY:      24
MACHINE:       THICKNESS.A5         
DATE:          D-Shift 5/11/96 07:03:35

PROBLEM:       high thickness at incoming.

     
               THK_GM     12214.000
               UCL=1000   12150.000

DISPOSITION:   Lot moved on.  

CORRECTIVE
ACTION         none. Lot was processed with no problems.
62.210JD0183 low incoming @ILD3YIELD::PHESTERSat May 11 1996 16:2430
                               CMP PEX
                     

LOT #          JD0183

QUANTITY:      16

OPERATION #    3058 THICKNESS
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          05/11/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS   ILD-3

               LOT INCOMING THICKNESS = 36705

                                  LCL = 37050
               

        
DISPOSITION:   LOT MOVED TO POLISH ON CMP.B2

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY         

62.211JD0211 low incoming @ILD3YIELD::PHESTERSat May 11 1996 19:3228
                               CMP PEX 
                     

LOT #          JD0211

QUANTITY:      16

OPERATION #    3058 THK_CMP 14  
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          05/11/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD3  DC1026

               LOT INCOMING THICKNESS = 36404�

                                 LCL IS 37050�
        
DISPOSITION:   LOT WAS REMARKED @OP #3058 FOR LOW INCOMING 
	       THICKNESS AND MOVED ON.

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY         
62.212JD0218 low incoming tox at ILD1YIELD::MANDREOLIMon May 13 1996 02:5722
                            PE PEX NOTIFICATION
                     

LOT #          JD0218

QUANTITY:      22        

OPERATION #    3023 THK_ILD1_PRE 
/DESCR.

POLISHER:      NA 

EVAL TOOL:     THICKNESS.A4 

DATE:          05/13/96 B-Shift

PROBLEM:       Incoming ILD1 thickness measured low, 17761� the LCL=18100

DISPOSITION:   Polished accordingly

CORRECTIVE
ACTION:        none
62.213JD0220 high THK_RG incoming ILD2YIELD::MANDREOLIMon May 13 1996 03:0422
                            PE PEX NOTIFICATION
                     

LOT #          JD0220

QUANTITY:      24        

OPERATION #    3053 THK_RG at ILD2
/DESCR.

POLISHER:      NA 

EVAL TOOL:     THICKNESS.A5 

DATE:          05/13/96 B-Shift

PROBLEM:       Incoming ILD2 RANGE measured high, 1090� the UCL=1000�

DISPOSITION:   Polished accordingly

CORRECTIVE
ACTION:        none
62.214JD0180 JD0184 - Low incoming thickness ILD3YIELD::MANDREOLITue May 14 1996 01:5122
                            PE PEX NOTIFICATION
                     

LOT #          JD0180 / JD0184

QUANTITY:      24     /     22      

OPERATION #    [3058.THK_ILD3_PRE]THK_ME /incoming ILD3 Thickness low
/DESCR.

POLISHER:      NA 

EVAL TOOL:     THICKNESS.A5 for both lots

DATE:          05/13/96 B-Shift

PROBLEM:       Incoming ILD3 Thickness measured low, 36471 / 36681 (LCL=37050)

DISPOSITION:   Polished accordingly

CORRECTIVE
ACTION:        None, SPC Chart Mean is running low for most of the points.
62.215JD0179 POST ILD3 RANGE HIGH YIELD::MANDREOLITue May 14 1996 04:0227
                            PE PEX NOTIFICATION
                     

LOT #          JD0179

QUANTITY:      24      

OPERATION #    3064 [CMP_B2.THK_ILD3_PST]THK_RG
/DESCR.        Post CMP ILD3 Thickness RANGE high

POLISHER:      CMP.B2 

EVAL TOOL:     THICKNESS.A5 

DATE:          05/14/96 B-Shift

PROBLEM:       Post ILD3 Thickness RANGE measured high, 6549� (UCL=4500�) 
               This lot was initially polished yesterday, without compensated
               ID/OD offsets. CMP Engr requested using adjusted ID/OD for the
               touch-ups which was done, although the outgoing range was still
               high.  

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION:        Incoming ILD3 lots are currently using adjusted ID/OD offsets to 
               minimize outgoing CMP Tox range excursions.
62.216JD0181 low incoming @ILD3YIELD::PHESTERWed May 15 1996 20:1731
    
                                CMP PEX 
                     

LOT #          JD0181

QUANTITY:      23

OPERATION #    3058 PRE THICKNESS
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          05/15/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS...ILD3

               LOT INCOMING THICKNESS AVG = 36623 �  

               LCL = 37050�

        
DISPOSITION:   LOT TO RUN ON CMP.B1
                                      

CORRECTIVE
ACTION         LOT POLISHED ACCORDINGLY.

62.217JD0182 low incoming @ILD3YIELD::PHESTERWed May 15 1996 20:2128
                               CMP PEX 
                     

LOT #          JD0182

QUANTITY:      24

OPERATION #    3058 THICKNESS
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          05/15/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD3

               LOT INCOMING THICKNESS = 36534 

                                  LCL = 37050
               
DISPOSITION:   POLISH ON CMP.B1


CORRECTIVE     LOT POLISHED ACCORDINGLY
ACTION         
62.218Broken and scratched wafers at B2, crash.ASDG::CULLEYThu May 16 1996 08:1914
Subj:	PEX for JD0212, hot lot, at 1985 CMP_ILD2.

QUANTITY:      19
MACHINE:       THICKNESS.A4         
DATE:          5/15/96  D-Shift 

PROBLEM:       Broken and scratched wafers at B2, crash.

DISPOSITION:   5 wafers scrapped, lot moved on.   

               #'s 9,11,13,21,23
CORRECTIVE
ACTION         None. Inspected scratches which where deep and severe.
               Dark field revealed tremendous damage.
62.219Severe lifting on one alignment mark. @ 1 inch dia.ASDG::CULLEYThu May 16 1996 09:3614
Subj:	PEX for JD0181, at 1989 CMP_ILD3.

QUANTITY:      23
MACHINE:                
DATE:          5/15/96  D-Shift 

PROBLEM:       Severe lifting on one alignment mark. @ 1 inch dia.

DISPOSITION:   1 wafer scrapped, moved on.   

               #23
CORRECTIVE
ACTION         None. This was here at incoming so we decided to scrap it
               before polishing.
62.220JD0212 low incoming @ILD2YIELD::PHESTERThu May 16 1996 09:5025
                              CMP PEX 
                     

LOT #:             JD0212         

QUANTITY:          24

OPERATION #        3053 PRE THICKNESS  ILD2

POLISHER:          PRE 

EVAL TOOL:         THICKNESS.A5

DATE:              05/015/96

PROBLEM:           MEAN BELOW LCL AT 17955�

                   LCL IS 1818�

DISPOSITION:       LOT MOVED POLISH
   
CORRECTIVE
ACTION:            LOT POLISHED ACCORDINGLY

62.221XD0449 high incoming range @ILD2YIELD::PHESTERThu May 16 1996 09:5526
                               CMP PEX 
                     

LOT #          XD0449

QUANTITY:      23

OPERATION #    3053 RANGE PRE
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          05/16/96 C-Shift

PROBLEM:       HIGH INCOMING RANGE ILD2 
               TO BE RUN ON CMP.B1

               LOT INCOMING RANGE=1085�  UCL IS 1000�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE     NONE
ACTION         
62.222 JD0181 high outgoing range....YIELD::PHESTERThu May 16 1996 16:0534
                               CMP PEX 
                     

LOT #          JD0181

QUANTITY:      22

OPERATION #    3064 THK_CMP 16  
/DESCR.

POLISHER:      PST READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          05/16/96 C-Shift

PROBLEM:       HIGH OUT GOING RANGE ILD3 DC1026

               LOT OUTGOING RANGE = 6485�

                             UCL IS 4500�
        
DISPOSITION:   LOT WAS REMARKED @OP #3064 FOR HIGH OUTGOING 
	       RANGE...LOT HIGH RANGE WAS DUE TO HEAVY CENTER 
               REMOVAL...ie....6200� IN THE CENTER AND 12500�
               ON THE EDGE.

               LOT MOVED ON.

CORRECTIVE
ACTION:        RECIPE WAS CORRUPTED.  THIS WAS CORECTED AND A PAD CHANGE WAS
               PERFORMED.   
         
62.223JD0223 low incoming @ILD1YIELD::PHESTERThu May 16 1996 16:1228
                               CMP PEX 
                     

LOT #          JD0223

QUANTITY:      23

OPERATION #    3023 THK_CMP  
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          05/16/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD1  DC1026

               LOT INCOMING THICKNESS = 17942�

                                 LCL IS 18100�
        
DISPOSITION:   LOT WAS REMARKED @OP #3023 FOR LOW INCOMING 
		THICKNESS AND MOVED ON.

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY         
62.224JD0230 low incoming @ILD1YIELD::PHESTERThu May 16 1996 16:2027

                              CMP PEX 
                     

LOT #:             JD0230         

QUANTITY:          23

OPERATION #        3023 PRE THICKNESS  ILD1

POLISHER:          PRE THICKNESS

EVAL TOOL:         THICKNESS.A5

DATE:              05/16/96

PROBLEM:           MEAN BELOW LCL AT 17815�

                              LCL is 18100�                


DISPOSITION:       LOT MOVED POLISH
   
CORRECTIVE
ACTION:            LOT POLISHED ACCORDINGLY

62.225JD0182 high outgoing range @ILD3YIELD::PHESTERThu May 16 1996 16:2832
                               CMP PEX 
                     

LOT #          JD0182

QUANTITY:      24

OPERATION #    3064 THK_CMP 16  
/DESCR.

POLISHER:      CMP.B1   PST READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          05/16/96 C-Shift

PROBLEM:       HIGH OUT GOING RANGE ILD3 DC1026

               LOT OUTGOING RANGE = 6046�

                              UCL IS 4500�
        
DISPOSITION:   LOT WAS REMARKED @OP #3064 FOR HIGH OUTGOING 
	       RANGE...LOT HIGH RANGE WAS DUE TO HEAVY EDGE 
               REMOVAL.

CORRECTIVE
ACTION:        ICORRECT ID/OD ENTERED AFTER AN MQC.  ID/OD CORRECTED.


        
62.226JD0225 low incoming @ILD1YIELD::PHESTERThu May 16 1996 16:3225
                              CMP PEX 
                     

LOT #:             JD0225         

QUANTITY:          23

OPERATION #        3023 PRE THICKNESS  ILD1

POLISHER:          CMP.B1 

EVAL TOOL:         THICKNESS.A4

DATE:              05/16/96

PROBLEM:           MEAN BELOW LCL AT 18015�

                              LCL IS 18100�

DISPOSITION:       MOVED TO POLISH
   
CORRECTIVE
ACTION:            LOT POLISHED ACCORDINGLY

62.227JD0220 5 wafers scrappedYIELD::PHESTERFri May 17 1996 17:0227
                               CMP PEX 
                     

LOT #          JD0220

QUANTITY:      19...(24)

OPERATION #    1989 CMP_ILD 3  
/DESCR.

POLISHER:      RAN ON CMP.B1

EVAL TOOL:     NA

DATE:          05/17/96 C-Shift

PROBLEM:       LOT WAS NOTICED TO HAVE 5 WAFERS W/MASSIVE SCRATCHES (D-SHFT).
               WAFERS WERE PULLED OUT BY CMP ENG/KW. FOR XSEC. ON THE 
	       SEM...SUSPECTED SCRATCHES ARE OR MAYBE AT ONE OF THE 
               PREVIOUS LAYERS.
 
DISPOSITION:   LOT WAS REMARKED @OP #1989 FOR THE SCRAP.
	

CORRECTIVE
ACTION:        NONE.  BALANCE OF LOT PROCESSED NORMALLY.
62.228JD0186 low incoming @ILD3YIELD::PHESTERFri May 17 1996 17:1328
                               CMP PEX 
                     

LOT #          JD0186

QUANTITY:      24

OPERATION #    3058 THK_CMP  
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          05/17/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD3  DC1026

               LOT INCOMING THICKNESS = 36657�

                                 LCL IS 37050�
        
DISPOSITION:   LOT WAS REMARKED @OP #3058 FOR LOW INCOMING 
		THICKNESS AND MOVED ON.

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY         
62.229JD0229 low incoming @ILD1YIELD::PHESTERFri May 17 1996 17:1825
                              CMP PEX 
                     

LOT #:             JD0229        

QUANTITY:          24

OPERATION #        3023 PRE THICKNESS  ILD1

POLISHER:           

EVAL TOOL:         THICKNESS.A5

DATE:              05/17/96

PROBLEM:           MEAN BELOW LCL AT   17908�

                              LCL IS   18100�

DISPOSITION:       MOVED TO POLISH
   
CORRECTIVE
ACTION:            LOT POLISHED ACCORDINGLY.

62.230JD0246 one wafer over-polished @PMDYIELD::PHESTERFri May 17 1996 17:2529
                               CMP PEX 
                     

LOT #          JD0246

QUANTITY:      22

OPERATION #    2957 THK_CMP 4  
/DESCR.

POLISHER:      POST READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          05/17/96 C-Shift

PROBLEM:       LOW OUTGOING THICKNESS PMD  DC1026

               LOT OUTGOING THICKNESS = 6176�

                                 LCL IS 6200�
        
               ONLY ONE WAFER HAD LOW OUTGOING THICKNESS.

DISPOSITION:   LOT MOVED ON. 

CORRECTIVE
ACTION:        THIS WAFER WAS REMARKED @OP#2127 FOR EXTRA DEP.
62.231JD0220 low incoming @ILD3YIELD::PHESTERFri May 17 1996 17:4130
                                CMP PEX
                     

LOT #          JD0220

QUANTITY:      24

OPERATION #    3058 THICKNESS  ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          05/16/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD3     

               LOT INCOMING THICKNESS = 36337�

                                LCL IS  337050�


        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         LOT POLISHED ACCORDINGLY

62.232JD0191 low incoming @ILD3YIELD::PHESTERFri May 17 1996 20:3032

                            PE PEX NOTIFICATION
                     

LOT #          JD0191

QUANTITY:      24

OPERATION #    3058 THICKNESS ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          05/17/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS  

               LOT TO RUN ON CMP.B2

               LOT INCOMING THICKNESS = 36583�

                                 LCL IS 37050�

        
DISPOSITION:   LOT MOVED TO POLISH.

CORRECTIVE
ACTION         LOT POLISHED ACCORDINGLY.

62.233JD0190 low incoming @ILD3YIELD::PHESTERSat May 18 1996 16:2929
                               CMP PEX 
                     

LOT #          JD0190

QUANTITY:      22

OPERATION #    3058 THICKNESS ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          05/18/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS   

               LOT INCOMING THICKNESS = 36378� 

                                 LCL IS 37050�

        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         LOT POLISHED ACCORDINGLY

62.234XD0460 Low incoming step @PMDYIELD::PHESTERSat May 18 1996 16:3228
                               CMP PEX 
                     

LOT #          XD0460

QUANTITY:      21

OPERATION #    3078 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          05/18/96  C-Shift

PROBLEM:       LOW INCOMING STEP ....PMD

               LOT INCOMING STEP AVG = 2976� 

                                LCL IS 3000�
        
DISPOSITION:   LOT WAS PASSED ON....REMARK ADDED TO WORKSTREAM...

CORRECTIVE 
ACTION         NONE
    
62.235JD0227 ILD1 - 1 wafer crash on CMP.A2YIELD::MANDREOLISun May 19 1996 07:1823
                            PE PEX NOTIFICATION
                     

LOT #          JD0227

QUANTITY:      22 - 1 (broken) = 21      

OPERATION #    1981 CMP AFTER ILD1
/DESCR.        

POLISHER:      CMP.A2 

EVAL TOOL:     NA  

DATE:          05/19/96 B-Shift

PROBLEM:       1 wafer crashed and broke during polish. This lot also flagged 
               for low incoming ILD1 thickness, 17906�, LCL = 18100. 

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION:        Rebuilding carrier. 
62.236JD0200 -> High Range out going @IDLE2YIELD::POZORSKITue May 21 1996 18:3225
                              CMP PEX                      

LOT #:             JD0200         

QUANTITY:          24

OPERATION #        3066 THK_ILD2_PST

POLISHER:          CMP.A2


EVAL TOOL:         THICKNESS A5

DATE:              05/21/96

PROBLEM:           RANGE WAS 3700�     UCL IS 3400                

DISPOSITION:       Lot was remarked and moved on to the next operation.
   
CORRECTIVE      
ACTION:            No futher action required.
   


62.237PEX for lots JD0194, JD0203 at 3058 THK_ILD3_PRE, low thickness.ASDG::CULLEYThu May 23 1996 07:5717
Subj:	PEX for lots JD0194, JD0203 at 3058  THK_ILD3_PRE, low thickness. 

QUANTITY:      23
MACHINE:       THICKNESS.A4         
DATE:          05/22/96  D-Shift

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

ENTITY THICKNESS.A4         JD0194        JD0203
               THK_ME       36260.000     36518.000 
               THK_RG         855.000       845.000

DISPOSITION:   Lots moved on. 

CORRECTIVE
ACTION         None. Graph and data to eng.
62.238PEX for JD0265 at 3023 THK_CMP 6 THK_ILD1_PREASDG::CULLEYThu May 23 1996 08:0417
Subj:	PEX for JD0265 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      12 eng
MACHINE:       THICKNESS.A5         
DATE:          05/22/96  D-Shift

PROBLEM:    Range high at operation 3023 THK_ILD1_PRE
               UCL = 18100

     ENTITY THICKNESS.A5
               THK_ME       17935.000
               THK_RG         702.000

DISPOSITION:   Lot moved on.

CORRECTIVE
ACTION         None. Remark added at 3023.
62.239JD0263 high incoming step @PMDYIELD::PHESTERThu May 23 1996 20:3426
                                CMP PEX 
                     

LOT #         JD0263

QUANTITY:      24

OPERATION #    3078 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          05/23/96  C-Shift

PROBLEM:       HIGH INCOMING STEP ....PMD

               HIGH INCOMING STEP AVG = 4352�

                                 LCL IS 4100�
        
DISPOSITION:   LOT MOVED TO POLISH
CORRECTIVE
ACTION         NONE
62.240PEX for JD0204 at 3058 THK_ILD3_PRE, low thickness.ASDG::CULLEYFri May 24 1996 04:1717
Subj:	PEX for JD0204 at 3058  THK_ILD3_PRE, low thickness. 

QUANTITY:      23
MACHINE:       THICKNESS.A4         
DATE:          05/23/96  D-Shift

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

ENTITY THICKNESS.A4
               THK_ME       36687.000 *out low
               THK_RG        1067.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None. Graph and data to eng.
62.241PEX for JD0223 at 3053 THK_CMP 10 THK_ILD2_PREASDG::CULLEYFri May 24 1996 04:1817
Subj:	PEX for JD0223 at 3053 THK_CMP 10 THK_ILD2_PRE 

QUANTITY:      23
MACHINE:       THICKNESS.A4         
DATE:          05/23/96  D-Shift 

PROBLEM:       Thickness low at operation 3053 THK_ILD2_PRE
               LCL=18100

     ENTITY THICKNESS.A4
     actual:   THK_ME       18013.000
               THK_RG         493.000

DISPOSITION:  Lot moved on.  

CORRECTIVE
ACTION         None. Remark added.
62.242PEX for JD0237 at 3023 THK_CMP 6 THK_ILD1_PREASDG::CULLEYFri May 24 1996 04:1917
Subj:	PEX for JD0237 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      23
MACHINE:       THICKNESS.A5         
DATE:          05/23/96  D-Shift

PROBLEM:    Thickness high at operation 3023 THK_ILD1_PRE
               UCL = 18100

     ENTITY THICKNESS.A5
               THK_ME       17796.000
               THK_RG         599.000

DISPOSITION:   Lot moved on.

CORRECTIVE
ACTION         None. Remark added at 3023.
62.243PEX for JD0238 at 3023 THK_CMP 6 THK_ILD1_PREASDG::CULLEYFri May 24 1996 04:1917
Subj:	PEX for JD0238 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      23
MACHINE:       THICKNESS.A5         
DATE:          05/23/96  D-Shift

PROBLEM:    Thickness low at operation 3023 THK_ILD1_PRE
               LCL = 18100

     ENTITY THICKNESS.A5
               THK_ME       17832.000
               THK_RG         488.000

DISPOSITION:   Lot moved on.

CORRECTIVE
ACTION         None. Remark added at 3023.
62.244PEX for JD0197 at 3064 THK_ILD3_PST, high range.ASDG::CULLEYFri May 24 1996 04:2017
Subj:	PEX for JD0197 at 3064 THK_ILD3_PST 

QUANTITY:      24
MACHINE:       CMP.B1         
DATE:          05/24/96  D-Shift

PROBLEM:       Range high at operation 3064 THK_ILD3_PST
               UCL=4500

     ENTITY THICKNESS.A5
     actual:   THK_ME       10292.000
               THK_RG        4642.000 

DISPOSITION:   Lot moved on.  Mean and height where excellant.

CORRECTIVE
ACTION         None, extra polish time ran the range out higher.
62.245JD0240 low incoming @ILD1YIELD::PHESTERFri May 24 1996 16:3428

                              CMP PEX 
                     

LOT #:             JD0240        

QUANTITY:          24

OPERATION #        3023 PRE THICKNESS  ILD1

POLISHER:          N/A

EVAL TOOL:         THICKNESS.A5

DATE:              05/24/96

PROBLEM:           LOT HAD LOW INCOMING THICKNESS OF 17832�.                

                                            LCL IS   18100�

DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:            LOT POLISHED ACCORDINGLY


                                        
62.246THK_ILD3_PRE, low thicknessASDG::CULLEYSat May 25 1996 06:1517
Subj:	PEX for JD0202 at 3058  THK_ILD3_PRE, low thickness. 

QUANTITY:      24
MACHINE:       THICKNESS.A5         
DATE:          05/25/96  D-Shift

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

ENTITY THICKNESS.A4
               THK_ME       36395.000 
               THK_RG        976.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None. Graph and data to eng.
62.247JD0266 low incoming step @PMDYIELD::PHESTERSat May 25 1996 14:0428
                               CMP PEX 
                     

LOT #          JD0266

QUANTITY:      24

OPERATION #    3078 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          05/25/96 C-Shift

PROBLEM:       LOW INCOMING STEP ....PMD

               LOT INCOMING STEP AVG = 3333�

                                LCL IS 3000�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         NONE

62.248XD0469 one wafer scrapped due to over-polish..YIELD::PHESTERSat May 25 1996 16:3924
                            PE PEX NOTIFICATION
                     

LOT #          XD0469

QUANTITY:      15 (16)

OPERATION #    1989 CMP_ILD3
/DESCR.

POLISHER:      CMP.B1

EVAL TOOL:     THICKNESS.A5

DATE:          05/25/96  C-Shift

PROBLEM:       LOT WAS PASSDOWN FROM D-SHIFT....WAFER #3 WAS SCRAPPED.   
               WAFER HAD AVG THICKNESS OF 2794�....LCL @ 9500.

DISPOSITION:   
CORRECTIVE     LOT MOVED ON.  NO DEFINATIVE EXPLANATION FOR WHY THIS ONE WAFER
ACTION         WAS OVER POLISHED.  IT IS POSSIBLE THAT IT WAS RUN WITH 4 MONITOR
               WAFERS.  THIS COULD HAVE AFFECTED THE REMOVAL RATE.
62.249YD0169, low incoming ILD3FABSIX::K_KULPSun May 26 1996 08:2221
                 		CMP PEX

Lot # 		YD0169

QUANTITY:       24

MACHINE:        THICKNESS.A5         

DATE:          05/26/96  B-Shift

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

ENTITY THICKNESS.A4
               THK_ME       36587.000 *out low
               THK_RG        1603.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None
62.250XD0472, low incoming PMDFABSIX::K_KULPSun May 26 1996 08:2334
                               CMP PEX 

LOT #          XD0472

QUANTITY:      24

OPERATION #    3078 STEP_CMP 1
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          05/26/96  B-Shift

PROBLEM:       LOW INCOMING STEP ....PMD

               LOT INCOMING STEP AVG = 2983.75 � 

                                LCL IS 3000�
 
WFR DATA
           PARAMETER       UNIT ID/PROMPT        VALUE    
              RUN_ID_1     XD0472               24
              HEIGHT_ME    WAFER #1 CENTER          2958.000
                           WAFER #1 EDGE            3003.000
                           WAFER #2 CENTER          2951.000
             		   WAFER #2 EDGE            3023.000          

DISPOSITION:   LOT WAS PASSED ON

CORRECTIVE 
ACTION         NONE
    
62.251JD0252 Low incoming @ILD1YIELD::PHESTERWed May 29 1996 19:3129
                               CMP PEX 
                     

LOT #          JD0252

QUANTITY:      23

OPERATION #    3023 THK_CMP  
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          05/29/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD1  DC1026

               LOT INCOMING THICKNESS = 17748�

                                 LCL IS 18100�
        
DISPOSITION:   LOT WAS REMARKED @OP #3023 FOR LOW INCOMING 
		THICKNESS AND MOVED ON.

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY         

62.252PEX for JD0256 at 3023 THK_CMP 6 THK_ILD3_PREASDG::CULLEYThu May 30 1996 07:3017
Subj:	PEX for JD0256 at 3023 THK_CMP 6  THK_ILD3_PRE

QUANTITY:      20
MACHINE:       THICKNESS.A5         
DATE:          05/29/96  D-Shift

PROBLEM:    thickness at operation 3023 THK_ILD3_PRE
               UCL = 18100

     ENTITY THICKNESS.A5
               THK_ME       18012.000
               THK_RG         624.000

DISPOSITION:   Lot moved on.

CORRECTIVE
ACTION         None. Remark added at 3023.
62.253JD0215 low incoming @ILD3YIELD::PHESTERThu May 30 1996 15:1729
                                CMP PEX 
                     

LOT #          JD0215

QUANTITY:      23

OPERATION #    3058 THICKNESS-PRE  ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS .A4

DATE:          05/29/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS   

               LOT INCOMING THICKNESS = 36687�

                                LCL IS  37050�
        

DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE 
ACTION         NONE
    
62.254JD0205 low incoming @ILD3YIELD::PHESTERThu May 30 1996 15:3029
                                CMP PEX 
                     

LOT #          JD0205

QUANTITY:      24

OPERATION #    3058 THICKNESS ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          05/30/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS   

               LOT INCOMING THICKNESS = 36980�

                                LCL IS  37050�
               

DISPOSITION:   LOT MOVED TO POLISH ON CMP.B2

CORRECTIVE
ACTION         NONE

62.255JD0259 low incoming @ILD1YIELD::PHESTERFri May 31 1996 09:5029
                                CMP PEX 
                     

LOT #          JD0259

QUANTITY:      21

OPERATION #    3023 PRE_THICKNESS
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A5

DATE:          05/31/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD1

               LOT INCOMING THICKNESS = 17974�

                                LCL IS  18100�

        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE  
ACTION         LOT POLISHED ACCORDINGLY
   
62.256JD0276 low incoming @ILD1YIELD::PHESTERFri May 31 1996 19:1629
                               CMP PEX 
                     

LOT #          JD0276

QUANTITY:      24

OPERATION #    3023 THK_CMP  
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          05/31/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD1  DC1026

               LOT INCOMING THICKNESS = 17448�

                                 LCL IS 18100�
        
DISPOSITION:   LOT WAS REMARKED @OP #3023 FOR LOW INCOMING 
		THICKNESS AND MOVED ON.

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY         

62.257JD0276 low incoming @ILD1YIELD::PHESTERFri May 31 1996 19:2730
                               CMP PEX 
                     

LOT #          JD0276

QUANTITY:      24

OPERATION #    3023 THK_CMP  
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          05/31/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD1  DC1026

               LOT INCOMING THICKNESS = 17448�

                                 LCL IS 18100�

        
DISPOSITION:   LOT WAS REMARKED @OP #3023 FOR LOW INCOMING 
		THICKNESS AND MOVED ON.

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY         

62.258JD0276 low outgoing @ILD1YIELD::PHESTERFri May 31 1996 19:5531
                                CMP PEX 
                     

LOT #          JD0259

QUANTITY:      21

OPERATION #    3054 POST THICKNESS
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     THICKNESS.A5

DATE:          05/31/96 C-Shift

PROBLEM:       POST THICKNESS ILD1      

               LOT POST THICKNESS = 5025�    

                            LCL IS  5200�
               LOT WAS REMARKED AT DEP  OPERATION 2130
             
        
DISPOSITION:   LOT MOVED ON
CORRECTIVE

ACTION         LOT WAS REMARKED AT DEP  OPERATION 2130 WITH INSTRUCTIONS FOR
               EXTRA DEP.

62.259PEX for JD0226 at 3058 THK_ILD3_PRE, lowASDG::CULLEYSat Jun 01 1996 09:5717
Subj:	PEX for JD0226 at 3058  THK_ILD3_PRE, low 

QUANTITY:      22
MACHINE:       THICKNESS.A4         
DATE:          06/01/96  D-Shift

PROBLEM:       Thickness low at operation 3058 THK_ILD3_PRE
               LCL=37050

ENTITY THICKNESS.A4
               THK_ME       36535.000 
               THK_RG        1027.000

DISPOSITION:   Lot moved on. 

CORRECTIVE
ACTION         None.
62.260Wafers 4 and 6 scrappedASDG::CULLEYSat Jun 01 1996 10:2413
Subj:	PEX for lot JD0278 at CMP 

QUANTITY:      22
MACHINE:       CMP.A1         
DATE:          6/01/96  D-Shift 

PROBLEM:       Wafers 4 and 6 scrapped for scratches. Slurry was leaking
               on prep table.

DISPOSITION:   Lot moved on.

CORRECTIVE
ACTION         Slurry lines and pressure was fixed, scratches gone.
62.261JD0257 low incoming @ILD1YIELD::PHESTERSat Jun 01 1996 16:5928
                              CMP PEX 
                     

LOT #:             JD0257        

QUANTITY:          24

OPERATION #        3023 PRE THICKNESS @ILD1

POLISHER:          N/A

EVAL TOOL:         THICKNESS.A4

DATE:              06/01/96

PROBLEM:           INCOMING THICKNESS AVERAGE WAS  17892�.                

                                           LCL IS  18100�

DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:            LOT POLISHED ACCORDINGLY



                                        
62.262JD0233 high outgoing range @ILD3YIELD::PHESTERSat Jun 01 1996 20:4130

                            PE PEX NOTIFICATION
                     

LOT #          JD0233

QUANTITY:      23

OPERATION #    3064 POST THICKNESS
/DESCR.

POLISHER:      POST READINGS

EVAL TOOL:     THICKNESS .A5

DATE:          06/01/96 C-Shift

PROBLEM:       HIGH POST RANGE  ILD3    
               LOT RAN ON CMP.B2

               POST RANGE WAS  4839@ 

                        UCL IS 4500�            

        
DISPOSITION:   HIGH RANGE WAS WITHIN WAFER.

CORRECTIVE     NONE
ACTION         
62.2633 WAFERS SCRAPPED FROM LOT JD0223 DUE TO CRASHSUBPAC::SMARTINMon Jun 03 1996 18:4324
  

LOT:     JD0223
MACHINE: CMP.B1
OPER#:   1986
PROCESS  LEVEL: ILD3
DATE:    6/3/96
SHIFT:   A-SHIFT
QUANTITY:  23    
PRODUCT.....DC1026-000-DA-8G
 

PROBLEM:     DUMMY WAFER CAME FROM UNDER CARRIER #4 AND              
             CRASHED ON #5. THREE PRODUCT WAFERS WERE                
             SCRATCHED BAD. TOOL NEEDS NEW PAD AND SOME              
             CARRIERS.



DISPOSITION: TOTAL OF THREE WAFERS WERE SCRAPPED FROM THE LOT.
THE REST OF THE LOT WAS MOVED ON.

CORRECTIVE ACTION:     TOOL NEEDS NEW PAD AND SOME CARRIERS.

62.264JD0240 PEX ILD2 4 wafers low thickness. YIELD::MANDREOLIMon Jun 03 1996 23:0129
                            PE PEX NOTIFICATION
                     

LOT #          JD0240 (DC1026)

QUANTITY:      24     

OPERATION #    1985 CMP ILD2 
/DESCR.        

POLISHER:      CMP.B1 

EVAL TOOL:     NA  

DATE:          06/03/96 B-Shift

PROBLEM:       4 wafers had low Post CMP ILD2 thickness after polish. 
               
               Wafer#       Post CMP ILD2 Thick
               --------------------------------
                 17              4087 � 
                 16              4255 � 
                 20              4192 � 
                 08              4700 �

DISPOSITION:   Lot moved on with a REMARK at Oper# 2133 DEP ILD2 for Engr to  
               determine if these 4 wafers should get extra Oxide Dep. 
CORRECTIVE
ACTION:        None. 
62.265PEX FOR CMP.A1 CRASH ON LOT JD0267SUBPAC::SMARTINWed Jun 05 1996 19:1220
  

LOT:     JD0267
MACHINE: CMP.A1
OPER#:   1981
PROCESS  LEVEL: ILD1
DATE:    6/5/96
SHIFT:   A-SHIFT
QUANTITY:  24    
PRODUCT.....DC1026-000-DA-8G
 

PROBLEM:     TOOL CRASHED WITH TWO PRODUCT WAFERS ON THE TOOL.


DISPOSITION: TOTAL OF TWO WAFERS WERE SCRAPPED FROM THE LOT.
THE REST OF THE LOT WAS MOVED ON.

CORRECTIVE ACTION:     TOOL NEEDS NEW PAD AND SOME CARRIERS.

62.266PEX for lot JD0290 at 1978 CMP_PMD, 5 broken wafersASDG::CULLEYThu Jun 06 1996 07:5513
Subj:	PEX for lot JD0290 at 1978 CMP_PMD    CMP.

QUANTITY:      24 to 19
MACHINE:       Cmp-B2
DATE:          6/06/96  D-Shift 

PROBLEM:       System crashed pulverizing 5 wafers.
               Lot JD0290, wafers 5,6,11,12,15.

DISPOSITION:   Lot finished on B1 for a 1 second touch up.

CORRECTIVE
ACTION         System being worked on by EE's.
62.267JD0264 low incoming @ILD1YIELD::PHESTERFri Jun 07 1996 12:0929
                               CMP PEX 
                     

LOT #          JD0264

QUANTITY:      24

OPERATION #    3023 THK_CMP  
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          06/07/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD1  DC1026

               LOT INCOMING THICKNESS = 17859�

                                 LCL IS 18100�
        
DISPOSITION:   LOT WAS REMARKED @OP #3023 FOR LOW INCOMING 
		THICKNESS AND MOVED ON.

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY         

62.268JD0228 low incoming @ILD3YIELD::PHESTERFri Jun 07 1996 12:2029
                               CMP PEX 
                     

LOT #          JD0228

QUANTITY:      18

OPERATION #    3058 THK_CMP  
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          06/07/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD3  DC1026

               LOT INCOMING THICKNESS = 36813�

                                 LCL IS 37100�
        
DISPOSITION:   LOT WAS REMARKED @OP #3058 FOR LOW INCOMING 
		THICKNESS AND MOVED ON.

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY         

62.269JD0270 low incoming @ILD1YIELD::PHESTERSat Jun 08 1996 12:0027
                               CMP PEX
                     

LOT #          JD0270

QUANTITY:      24

OPERATION #    3023 THICKNESS ILD1
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS .A4

DATE:          06/08/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD1

               LOT INCOMING THICKNESS AVG WAS  17950�
 
                                       LCL IS  18100�
        
DISPOSITION:   LOT MOVED TO CMP.B1 AND POLISHED ACCORDINGLY

CORRECTIVE
ACTION         NONE
62.270JD0239 low incoming @ILD3YIELD::PHESTERSat Jun 08 1996 12:0428
                                 CMP PEX 
                     

LOT #          JD0239

QUANTITY:      22

OPERATION #    3058 THICKNESS ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          06/08/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD3

               LOT INCOMING THICKNESS AVG WAS  36131�

                                       LCL IS  37050�

        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         LOT POLISHED ACCORDINGLY
62.271JD0229 low incomiung @ILD3YIELD::PHESTERSat Jun 08 1996 16:0729
                               CMP PEX 
                     

LOT #          JD0229

QUANTITY:      23

OPERATION #    3058 THK_CMP  
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          06/07/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD3  DC1026

               LOT INCOMING THICKNESS = 36724�

                                 LCL IS 37100�
        
DISPOSITION:   LOT WAS REMARKED @OP #3058 FOR LOW INCOMING 
		THICKNESS AND MOVED ON.

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY         

62.272JD0292 incoming thickness low for ILD1YIELD::MANDREOLIMon Jun 10 1996 23:3522
                            PE PEX NOTIFICATION
                     

LOT #          JD0292 (DC1026)

QUANTITY:      24     

OPERATION #    3023 CMP ILD1 PRE CMP THICKNESS 
/DESCR.        

POLISHER:      NA  

EVAL TOOL:     THICKNESS.A4 

DATE:          06/10/96 B-Shift

PROBLEM:       Low incoming ILD1 Thickness. 

DISPOSITION:   Polished accordingly

CORRECTIVE
ACTION:        None  
62.273JD0298 1 wfr crash from CMP.A1 - scrapped (Wfr 08)YIELD::MANDREOLITue Jun 11 1996 04:4923
                            PE PEX NOTIFICATION
                     

LOT #          JD0298 (DC1026)

QUANTITY:      14 - 1 = 13    

OPERATION #    1978 CMP AFTER PMD DEP1 
/DESCR.        

POLISHER:      CMP.A1  

EVAL TOOL:     NA

DATE:          06/10/96 B-Shift

PROBLEM:       1 Wafer {#08} was severely scratched over most die, after .A1 
               crash. 

DISPOSITION:   Wafer is scrapped. 

CORRECTIVE
ACTION:        Carrier and Pad change. MQCs 
62.274JD0248 High outgoing range @ILD3YIELD::PHESTERWed Jun 12 1996 15:2928
                               CMP PEX 
                     

LOT #          JD0248

QUANTITY:      24

OPERATION #    3064 THK_CMP 16  
/DESCR.

POLISHER:      PST READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          06/11/96 C-Shift

PROBLEM:       HIGH OUT GOING RANGE ILD3 DC1026

               LOT OUTGOING RANGE = 4685�

                             UCL IS 4500�
        
DISPOSITION:   LOT WAS REMARKED @OP #3064 FOR HIGH OUTGOING 
	       RANGE.
	
CORRECTIVE:    LOT WAS MOVED ON.
         
62.275JD0289 low incoming @ILD1YIELD::PHESTERThu Jun 13 1996 20:1027
                              CMP PEX 
                     

LOT #:             JD0289        

QUANTITY:          24

OPERATION #        3023 PRE THICKNESS ILD1
POLISHER:          N/A

EVAL TOOL:         THICKNESS.A5

DATE:              06/13/96

PROBLEM:           INCOMING THICKNESS AVERAGE IS 18017�.                

                                         LCL IS  18100�

DISPOSITION:       LOT MOVED TO POLISH.
   
CORRECTIVE
ACTION:            LOT WILL BE POLISHED ACCORDINGLY.



                                        
62.276PEX for JD0276 at 3023 THK_CMP 6 THK_ILD1_PREASDG::CULLEYFri Jun 14 1996 07:0119
Subj:	PEX for JD0276 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      22
MACHINE:       THICKNESS.A5         
DATE:          06/14/96  D-Shift

PROBLEM:       Thickness low at cmp incoming:
               UCL=19900    
                CL=19000
               LCL=18100

               THK_ME    17921.000
               THK_RG      509.000

DISPOSITION:   Lot moved on.  Slightly low tox ok,
               which can be considered good.
               
CORRECTIVE
ACTION         None, added remark to operation.
62.277PEX for JD0286 at 3023 THK_CMP 6 THK_ILD1_PREASDG::CULLEYFri Jun 14 1996 07:0219
Subj:	PEX for JD0286 at 3023 THK_CMP 6  THK_ILD1_PRE

QUANTITY:      24
MACHINE:       THICKNESS.A5         
DATE:          06/13/96  D-Shift

PROBLEM:       Thickness low at cmp incoming:
               UCL=19900    
                CL=19000
               LCL=18100

               THK_ME    17817.000
               THK_RG      427.000

DISPOSITION:   Lot moved on.  Slightly low tox ok,
               which can be considered good.
               
CORRECTIVE
ACTION         None, added remark to operation.
62.278JD0293 low incoming @ILD1YIELD::PHESTERFri Jun 14 1996 17:5926
                              CMP PEX 
                     

LOT #:             JD0293        

QUANTITY:          24

OPERATION #        3023 PRE THICKNESS ILD1
POLISHER:          N/A

EVAL TOOL:         THICKNESS.A4

DATE:              06/14/96

PROBLEM:           LOT HAD INCOMING THICKNESS AVG OF 17910�

                                             LCL IS  18100�. 

DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:            LOT POLISHED ACCORDINGLY


                                        
62.279JD0266 LOW INCOMING/HIGH RANGE @ILD2YIELD::PHESTERFri Jun 14 1996 18:5431
                               CMP PEX 
                     

LOT #          JD0266

QUANTITY:      24

OPERATION #    3058 THICKNESS ILD2
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          06/14/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS/HIGH RANGE ILD2

               LOT INCOMING THICKNESS AVG = 18035�

                                     LCL IS 18100�
               INCOMING RANGE = 845

                        UCL IS  500

        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         LOT POLISHED ACCORDINGLY
62.280JD0251 low incoming @ILD3YIELD::PHESTERSat Jun 15 1996 10:1228
                            PE PEX NOTIFICATION
                     

LOT #          JD0251

QUANTITY:      22

OPERATION #    3058 PRE-THICKNESS
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          06/14/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS-ILD3

               LOT INCOMING THICKNESS = 36090� 

                                LCL is  37050�

        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE     LOT POLISHED ACCORDINGLY
ACTION         
62.281XD0482 low incoming step @PMDYIELD::PHESTERSat Jun 15 1996 19:5229

                            PE PEX NOTIFICATION
                     

LOT #          XD0482

QUANTITY:      23

OPERATION #    3078 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          06/15/96 C-Shift

PROBLEM:       LOW INCOMING STEP ....PMD

               LOT INCOMING STEP AVG = 2865�
 
                                LCL IS 3000�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         NONE
        
62.282JD0240 low incoming @ILD3YIELD::PHESTERSat Jun 15 1996 20:3729

                            PE PEX NOTIFICATION
                     

LOT #          JD0240

QUANTITY:      24

OPERATION #    3058 THICKNESS
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          06/15/96 C-Shift

PROBLEM:       LOW INCOMING THICKNESS ILD3

               LOT INCOMING THICKNESS = 36062�

                                LCL IS  37050�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE 
ACTION         LOT POLISHED ACCORDINGLY

62.283JD0301 LOW ILD1 PRE / JD0247 LOW ILD3 PREYIELD::MANDREOLIMon Jun 17 1996 07:1224
                            PE PEX NOTIFICATION
                     

LOT #          JD0301 (DC1026)
               JD0247  "    "

QUANTITY:      24 for both lots    

OPERATION #    3023 CMP ILD1 PRE CMP THICKNESS 
/DESCR.        3058 CMP ILD3 PRE CMP THICKNESS

POLISHER:      NA  

EVAL TOOL:     THICKNESS.A4 

DATE:          06/17/96 B-Shift

PROBLEM:       Low incoming ILD1 Thickness for JD0301, 18033 (LCL=18100)
               Low incoming ILD3 Thickness for JD0247, 36956 (LCL=37050)
                 
DISPOSITION:   Polished accordingly

CORRECTIVE
ACTION:        none  
62.284LOT JD0325 SCRAPPED FOR SEVERLY OVER POLISH AT PMDSUBPAC::SMARTINWed Jun 19 1996 15:5527
  

LOT:     JD0325
MACHINE: CMP.B1
OPER#:   1978
PROCESS  LEVEL: PMD
DATE:    6/19/96
SHIFT:   A-SHIFT
QUANTITY:  24    
PRODUCT..DC1026-032-DA-8G

 

PROBLEM: LOT WAS SEVERLY OVER POLISHED.  IT WAS BURNT RIGHT DOWN TO THE SILICON
   

DISPOSITION:  LOT WILL BE SCRAPPED


CORRECTIVE ACTION: RECIPES SHOULD NOT BE CHANGED.  SOMEONE CHANGED THE POLISH
                   TIME TO 210 SEC.ON THE PMD RECIPE.  THE RECIPES ARE NOT
                   LOCKED OUT, SO ANYONE CAN CHANGE THE TIME IN THE RECIPE.
                   THE ONLY WAY TO REALLY BE SURE OF THE POLISH TIME IS TO 
                   CHECK IT BEFORE THE RECIPE IS RAN.  THIS PARTICULAR RECIPE
                   WAS NOT CHECKED PRIOR TO RUNNING.    


62.285JD0327 - two wafers scrapped @PMD due to crash.YIELD::PHESTERThu Jun 20 1996 16:2627
                                CMP PEX 
                     

LOT #          JD0327

QUANTITY:      20

OPERATION #    1978 CMP_PMD 
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     N/A

DATE:          06/20/96 D-Shift

PROBLEM:       SYSTEM CRASHED WHILE POLISHING LOT.  WAFERS #9 & #10 WERE
               SCRAPPED DUE TO BREAKAGE.

                      
DISPOSITION:   REMAINDER OF LOT POLISHED SUCCESSFULLY.  SYSTEM REPAIRED.

CORRECTIVE
ACTION         NONE
        

62.286JL0356 High incoming range @PMDYIELD::PHESTERFri Jun 21 1996 15:5426
                              CMP PEX 
                     

LOT #:             JL0356        

QUANTITY:          12

OPERATION #        3361 PRE THICKNESS RANGE -  PMD

POLISHER:          N/A

EVAL TOOL:         THICKNESS.A5

DATE:              06/21/96

PROBLEM:           INCOMING RANGE WAS  1017�.                

                               UCL IS  1000�

DISPOSITION:       LOT MOVED TO POLISH.
   
CORRECTIVE
ACTION:            NONE.

                                        
62.287JL0321 High incoming range @PMDSUBPAC::KULPSun Jun 23 1996 06:5526
                              CMP PEX 
                     

LOT #:             JL0321        

QUANTITY:          12

OPERATION #        3361 PRE THICKNESS RANGE -  PMD

POLISHER:          N/A

EVAL TOOL:         THICKNESS.A4

DATE:              06/23/96

PROBLEM:           INCOMING RANGE WAS  1405�                  

                               UCL IS  1000�

DISPOSITION:       LOT MOVED TO POLISH.
   
CORRECTIVE
ACTION:            NONE.

                                        
62.288Data entry error CMP.B2_ILD3_PST_THK_RGSUBPAC::KULPTue Jun 25 1996 04:5125
                              CMP PEX 
                     

LOT #:             XD0447

QUANTITY:          19

OPERATION #        3064 THK_CMP 16 THK_ILD3_PST_THK_RG  

POLISHER:          CMP.B2 

EVAL TOOL:         THICKNESS.A4

DATE:              06/24/96

PROBLEM:           Data entry error.  The range had the wrong data put in 
		   should be 2710 instead of 10267.  Popped chart.

DISPOSITION:       Lot moved on. 
   
CORRECTIVE
ACTION:            NONE.

                                        
62.289High range CMP.B3 3064 THK_ILD3_PSTSUBPAC::KULPTue Jun 25 1996 05:2045
                              CMP PEX 
                     

LOT #:             XD0472

QUANTITY:          21

OPERATION #        3064 THK_CMP 16  THK_ILD3_PST

POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A5

DATE:              06/24/96

PROBLEM:           Range popped chart.  High out going range ILD3 TM3636

                   Lot outgoing range = 5006�

                                 UCL IS 4500�

LOG AN EVENT EVENT THK_ILD3_PST FOR ENTITY CMP.B3             6/24/96 23:49:33
              THIS TRANSACTION WAS LOGGED BY M_PROVENCHER
              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME_5     WAFER #1                 8857.000
                           WAFER #2                 8799.000
			   WAFER #3                 9458.000   6/24/96 23:49:33
                           WAFER #4                 7619.000
                           WAFER #5                 6789.000
              THK_RG       XD0472                   5006.000
              THK_%SD_5    WAFER #1                   15.200
                           WAFER #2                   10.700
                           WAFER #3                    3.800
                           WAFER #4                   23.900
                           WAFER #5                   20.600
 LOG AN EVENT EVENT END_RUN      FOR ENTITY THICKNESS.A5       6/24/96 23:47:27
     
DISPOSITION:      100% measured lot, remarked low thickness wafers for
                  additonal dep at oper# 2136 DEP_ILD3 3  FILMS_4  
                                                 
DISPOSITION:       Lot moved on. 
   

                                        
62.290JD0281 high incoming step height @ILD3YIELD::PHESTERWed Jun 26 1996 14:3230

                                CMP PEX 
                     

LOT #          JD0281

QUANTITY:      23

OPERATION #    3078 STEP_ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          07/26/96 C-Shift

PROBLEM:       LOW INCOMING STEP ....ILD3

               LOT INCOMING STEP AVG = 20035�

                               UCL IS  20000�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         NONE


62.291XD0485 low incoming range @PMDYIELD::PHESTERWed Jun 26 1996 17:2430
                                CMP PEX 
                     

LOT #          XD0485

QUANTITY:      24

OPERATION #    2951 RANGE PRE-PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.5

DATE:          06/26/96 C-Shift

PROBLEM:       LOW INCOMING RANGE....PMD

               LOT INCOMING RANGE = 1135�

                            LCL IS  1000�
        

DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE 
ACTION         NONE

    
62.292JD0324 high incoming thickness @ILD2YIELD::PHESTERThu Jun 27 1996 14:3228
                              CMP PEX 
                     

LOT #:             JD0324        

QUANTITY:          24

OPERATION #        3053 PRE THICKNESS ILD2

POLISHER:          N/A

EVAL TOOL:         THICKNESS.A5

DATE:              06/27/96

PROBLEM:           LOT INCOMING THICKNESS AVG WAS  19026�.                

                                           UCL IS  19000�

DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:            LOT POLISHED ACCORDINGLY



                                        
62.293JD0298 HIGH SD @ILD2 POSTYIELD::PHESTERFri Jun 28 1996 11:1829
                              CMP PEX 
                     

LOT #:             JD0298

QUANTITY:          13

OPERATION #        3066 THK_CMP 11  THK_ILD2_PST 

POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A4

DATE:              06/28/96

PROBLEM:           LOT THICKNESS STD DEV WAS 17.3

                                      UCL IS 10.0


DISPOSITION:       LOT MOVED ON
   
CORRECTIVE
ACTION:            NONE.  ONE LOW DIE READING OUT OF NINE ON ONE WAFER CAUSED
                   THE SD TO BE HIGH.

                                        

62.294JD0343 high incoming range @PMDYIELD::PHESTERFri Jun 28 1996 18:2128

                                CMP PEX 
                     

LOT #          JD0343

QUANTITY:      24

OPERATION #    2951 RANGE-PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          06/28/96 C-Shift

PROBLEM:       HIGH INCOMING RANGE....PMD

               LOT INCOMING RANGE AVG-1406�  UCL@ 1000�
        

DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         NONE

62.295JD0277 highg incoming step @ILD3YIELD::PHESTERSat Jun 29 1996 16:1529
                              CMP PEX 
                     

LOT #          JD0277

QUANTITY:      22

OPERATION #    3081 STEP_ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          06/29/96 C-Shift

PROBLEM:      HIGH INCOMING STEP ....ILD3

              INCOMING STEP AVG = 20017� 

                          UCL IS  20000�

        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         NONE

62.296XD0481 CMP PEX - High incoming thickness @ILD2YIELD::PHESTERSat Jun 29 1996 16:1728
                               CMP PEX 
                     

LOT #          XD0481

QUANTITY:      24

OPERATION #    3053 THK_CMP  
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          06/29/96 C-Shift

PROBLEM:       HIGH INCOMING THICKNESS ILD2  TM36

               LOT INCOMING THICKNESS = 19213�

                                 LCL IS 19000�
        
DISPOSITION:   LOT WAS REMARKED @OP #3053 FOR HIGH INCOMING 
		THICKNESS AND MOVED ON.

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY         
62.297Popped chart 2957 RATE_TM36 (high)SUBPAC::KULPSun Jun 30 1996 08:3756
                               CMP PEX 

LOT #          XD0493 

Quantity:      23

Product:       TM3636-032-KA-8C

OPERATION #    2957 THK_CMP 4   THK_PMD_PST  8
/DESCR.

Polisher:      CMP.B3 

Eval tool:     THICKNESS.A4

Date:          05/29/96  B-Shift

Problem:       Popped chart 2957 RATE_TM36 (high) and
	       CMP_B3 THK_PMD_PST THK_ME_5 [range] (high)

 COL ENG DATA PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              RATE_TM36                            10650.000
              TIME_TM36                               28.000
 SET LOT ATTR LOT ATTRIBUTES MODIFIED                          6/29/96 21:37:41

 		UCL = 7000
                 CL = 3500

------------------------------------------------------------------------------

             PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME_5     WAFER #1                 6782.000
                           WAFER #2                 6094.000
 LOG AN EVENT              WAFER #3                 6450.000   6/29/96 21:37:17
                           WAFER #4                 6386.000
                           WAFER #5                 6800.000
              THK_RG       XD0493                   1631.000
              THK_SD_5     WAFER #1                    3.100
                           WAFER #2                    4.700
                           WAFER #3                    3.500
                           WAFER #4                    5.000
                           WAFER #5                    4.600
 LOG AN EVENT EVENT END_RUN      FOR ENTITY THICKNESS.A4       6/29/96 21:18:37

  Range = 706       UCL = 650
                     CL = 325
  
  706 was the reading in the data for the graph.  It is the range of the 5
  numbers not the sigma of X bar stated in the y-axis.  
 

DISPOSITION:   LOT WAS PASSED ON

CORRECTIVE 
ACTION         Verify the graph labels and the data to be entered are correct. 
	       Monitor removal rates for CMP.B3, rates seem fast.    
62.298JD0292 low outgoing thickness @ILD3YIELD::PHESTERSun Jun 30 1996 14:5829
                               CMP PEX 
                     

LOT #          JD0292

QUANTITY:      23

OPERATION #    3064 THK_CMP 16  
/DESCR.

POLISHER:      PST READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          06/29/96 C-Shift

PROBLEM:      LOW OUT GOING THICKNESS ILD3 DC1026

               LOT OUTGOING THICKNESS = 8458�

                                 LCL IS 9500�
        
DISPOSITION:   LOT WAS REMARKED @OP #3064 FOR LOW OUTGOING 
	       THICKNESS. LOT WAS ALSO 100% ON THICKNESS.A5 
	       AND REMARKED FOR EXTRA DEPOSITION AT OP# 2136.	
CORRECTIVE
ACTION:        LOT WILL RECIEVE EXTRA DEP AT DEP ILD3.
        
62.299High range post ILD3 thicknessSUBPAC::KULPMon Jul 01 1996 02:1141
                               CMP PEX 

LOT #          JD0288 

Quantity:      24

Product:       DC1026-032-DA-8G 

OPERATION #    3064 THK_CMP 16  THK_ILD3_PST 3 
/DESCR.

Polisher:      CMP.B3 

Eval tool:     THICKNESS.A5

Date:          07/01/96  B-Shift

Problem:       Popped chart 3064, CMP_B3 THK_ILD3_PST THK_ME_5 [range] (high)

	PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
	      THK_ME_5     WAFER #1                10285.000   6/30/96 20:47:25
                           WAFER #2                 9696.000
                           WAFER #3                 9714.000
                           WAFER #4                10714.000
                           WAFER #5                10273.000
              THK_RG       JD0288                   2902.000
              THK_SD_5     WAFER #1                    9.770
                           WAFER #2                    5.270
                           WAFER #3                    6.140
                           WAFER #4                   10.300
                           WAFER #5                    9.910

  Range = 1018 	    UCL = 1000
                     CL =  500
  

DISPOSITION:   LOT WAS PASSED ON

CORRECTIVE :   None
ACTION         

62.300High range post ILD1 thicknessSUBPAC::KULPTue Jul 02 1996 03:2439
                               CMP PEX 

LOT #          XD0486 

Quantity:      19 

Product:       TM3636-032-KA-8C

OPERATION #    3054 THK_CMP 8   THK_ILD1_PST 3
/DESCR.

Polisher:      CMP.B3 

Eval tool:     THICKNESS.A5

Date:          07/01/96  B-Shift

Problem:       Popped chart 3054, CMP_B3 THK_ILD1_PST THK_ME_5 [range] (high)

             THK_ME_5     WAFER #1                 5759.000
                           WAFER #2                 5217.000
                           WAFER #3                 5781.000
                           WAFER #4                 5771.000
                           WAFER #5                 5590.000
              THK_RG       XD0486                   2881.000
 LOG AN EVENT THK_SD_5     WAFER #1                    5.150   7/02/96 00:01:50
                           WAFER #2                   10.400
                           WAFER #3                    5.700
                           WAFER #4                    6.800
                           WAFER #5                    6.100
 
	      UCL: 550  	Data point: 564
               Cl: 275

DISPOSITION:   LOT WAS PASSED ON

CORRECTIVE :   None
ACTION         

62.3013 wfrs broken cmp.b1SUBPAC::KULPWed Jul 03 1996 08:3527
                                CMP PEX 

LOT #          JD0339

QUANTITY:      24 - 3 = 21

OPERATION #    1978 CMP_PMD
/DESCR.

POLISHER:      CMP.B1

EVAL TOOL:     N/A

DATE:          07/03/96 B-Shift

PROBLEM:       System crashed while polishing lot.  3 wafers were
               scrapped due to breakage.

                      
DISPOSITION:   Remainder of lot polished on CMP.A2.
	       CMP.B1, full break-in and MQC's. 

CORRECTIVE
ACTION         NONE
        

62.302CMP PEX FOR WAFER CRASH ON LOT YD0184SUBPAC::SMARTINTue Jul 09 1996 11:0928
  

LOT:     YD0184

MACHINE: CMP.A1

OPER#:   1981

PROCESS  LEVEL: ILD1

DATE:    7/9/96

SHIFT:   A-SHIFT

QUANTITY:  24
    
PRODUCT..TM3636-042-KA-0D 
 

PROBLEM: TWO WAFERS CRASHED ON TABLE.   

DISPOSITION:  LOT WILL MOVED LESS TWO WAFERS.


CORRECTIVE ACTION:  REPLACING PAD AND BOTH CARRIERS.
   


62.303CMP PEX FOR TWO MORE WAFERS BROKE FROM LOT YD0184SUBPAC::SMARTINTue Jul 09 1996 17:0632
  

LOT:     YD0184

MACHINE: CMP.A1

OPER#:   1981

PROCESS  LEVEL: ILD1

DATE:    7/9/96

SHIFT:   A-SHIFT

QUANTITY:  24   DOWN TO 20
    
PRODUCT..TM3636-042-KA-0D 
 

PROBLEM: TWO MORE WAFERS CRASHED ON TABLE.   

DISPOSITION:  LOT WILL MOVED LESS FOUR WAFERS THIS TIME.


CORRECTIVE ACTION:  REPLACING PAD AND BOTH CARRIERS AND ALSO
                    DOWN FOR BLACK PARTICLES COMING OUT OF LEFT             
                    SPINDLE (SEEN DURING SPINDLE FLUSH AND DURING           
                    WAFER UNLOAD). 

   


62.304XD0492 high incoming range @ILD2YIELD::PHESTERWed Jul 10 1996 11:2929
                            PE PEX NOTIFICATION
                     

LOT #          XD0492

QUANTITY:      24

OPERATION #    3053 RANGE ILD2
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          07/10/96 C-Shift

PROBLEM:       HIGH INCOMING  RANGE  ILD2

               HIGH INCOMING RANGE AVG = 1089�

                                  UCL IS 1000�
        

DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         NONE

62.305JD0357 high removal rate @PMDYIELD::PHESTERWed Jul 10 1996 12:4429
                              CMP PEX 
                     

LOT #:             JD0357        

QUANTITY:          24

OPERATION #        2957 POST THICKNESS @PMD 

POLISHER:          CMP.B2

EVAL TOOL:         TKHICKNESS.A4

DATE:              07/10/96

PROBLEM:           REMOVAL RATE ABOVE UCL 8233�.                

DISPOSITION:       LOT MOVED OUT.
   
CORRECTIVE
ACTION:            NONE.  THIS LOT WAS POLISHED ON A SPEEDFAM TOOL WHICH HAS
                   A MUCH HIGHER REMOVAL RATE THAN THE STRAUSBAUGH, WHERE MOST
                   PMD LOTS ARE POLISHED.




                                        
62.306XD0441B high incoming thickness & range @ILD1YIELD::PHESTERWed Jul 10 1996 12:5133
                               CMP PEX 
                     

LOT #          XD0441B 

QUANTITY:      8

OPERATION #    3023 THK_CMP  
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          07/10/96 C-Shift

PROBLEM:       HIGH INCOMING THICKNESS ILD1  TM36

               LOT INCOMING THICKNESS = 19533�

                                 UCL IS 19000�
        
	       LOT INCOMING RANGE = 1187

				 UCL = 1000

DISPOSITION:   LOT WAS REMARKED @OP #3023 FOR HIGH INCOMING 
	       THICKNESS AND RANGE. 

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY.

62.307JD0354 LOW INCOMING STEP HEIGHT @PMDYIELD::PHESTERWed Jul 10 1996 18:2729

                              CMP PEX 
                     

LOT #:             JD0354        

QUANTITY:          24

OPERATION #        3078 PRE PROFILER - PMD 

POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              07/10/96

PROBLEM:           LOW INCOMING STEP HEIGHT AVERAGE AT  2997�

                                                LCL IS  3000�..                

DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:            NONE



                                        
62.308CMP STP_ILD3_PRE FOR JD0295ASDG::CULLEYThu Jul 11 1996 07:1531
Subj:	CMP Polish PEX 

        ***************  PEX FOR CMP POST MEASUREMENT RANGE *************
                                                      (THICKNESS)
                                                      (STEP HEIGHT)
							

PROCESS: Pre CMP STEP HEIGHT ILD3

OPERATION #:3081

POLISHER(CMP.A1, A2, B1, B2):     B2

PROCESS DATE & TIME:  7/11/96 02:09:21

SHIFT:  D

LOT(S) AFFECTED:  JD0295

DEVICE TYPE:  DC1026

PROBLEM DESCRIPTION:  Step-height ON Pre MEASUREMENT WAS over 20K.
    HEIGHT_ME    WAFER #1 CENTER          19830.000
                 WAFER #1 EDGE            20290.000
                 WAFER #2 CENTER          20190.000
                 WAFER #2 EDGE            20860.000

CORRECTIVE ACTION: None  


DISPOSITION: lot was polished with above data under consideration.
62.309CMP STEP_PMD_pre FOR XM0479ASDG::CULLEYThu Jul 11 1996 07:1632
Subj:	CMP Polish PEX 

        ***************  PEX FOR CMP POST MEASUREMENT RANGE *************
                                                      (THICKNESS)
                                                      (STEP HEIGHT)
							

PROCESS: Pre CMP STEP_PMD_pre.

OPERATION #:3078

POLISHER(CMP.A1, A2, B1, B2):     B2

PROCESS DATE & TIME:  7/11/96 02:02:53

SHIFT:  D

LOT(S) AFFECTED:  XM0479

DEVICE TYPE:  TM0069

PROBLEM DESCRIPTION:  Step-height ON Pre MEASUREMENT WAS under 3000 A.
    HEIGHT_ME    WAFER #1 CENTER          2836.000
                 WAFER #1 EDGE            2905.000
                 WAFER #2 CENTER          2956.000
                 WAFER #2 EDGE            3072.000

CORRECTIVE ACTION: None  


DISPOSITION: lot was polished with above data under consideration.
             Spc printed and delivered.
62.310JD0363 high incoming range @PMDYIELD::PHESTERFri Jul 12 1996 17:3928
                              CMP PEX 
                     

LOT #:             JD0363        

QUANTITY:          24

OPERATION #        2951 PRE THICKNESS @PMD 

POLISHER:          N/A

EVAL TOOL:         THICKNESS.A4

DATE:              07/12/96

PROBLEM:           RANGE WAS   3063�.                

                      UCL IS   1000�

DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:            NONE.



                                        
62.311JD0364 high incoming range @PMDYIELD::PHESTERFri Jul 12 1996 17:4527
                              CMP PEX 
                     

LOT #:             JD0364        

QUANTITY:          22

OPERATION #        2951 PRE THICKNESS @ PMD 

POLISHER:          N/A

EVAL TOOL:         THICKNESS.A4

DATE:              07/12/96

PROBLEM:           INCOMING RANGE WAS  1133�.                

                               UCL IS  1000�

DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:            NONE


                                        
62.312JDO364 LOW INCOMING STEP @PMDYIELD::PHESTERFri Jul 12 1996 17:5128
                              CMP PEX 
                     

LOT #:             JD0364        

QUANTITY:          22

OPERATION #        3078 pre profiler @ PMD 

POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              07/12/96

PROBLEM:           INCOMING STEP HEIGHT  WAS 2957�
 
                                    LCL IS   3000�                

DISPOSITION:       MOVED TO POLISH
   
CORRECTIVE         NONE
ACTION:            



                                        
62.313High thickness at M1. FABSIX::S_SHONGFri Jul 19 1996 00:4028
                              CMP PEX 
                     

LOT #:             JD0358

QUANTITY:          21

OPERATION #        1026 pre thickness @ M1

POLISHER:          N/A

EVAL TOOL:         Thickness.A5

DATE:              07/18/96

PROBLEM:           Incoming Thickness  was high at 9712� and 9753�
 
                                          UCL IS   9600�                

DISPOSITION:       Moved on.
   
CORRECTIVE         NONE
ACTION:            



                                        
62.314Pre Thickness for XD0490FABSIX::S_SHONGFri Jul 19 1996 07:1628
                              CMP PEX 
                     

LOT #:             XD0490

QUANTITY:          23

OPERATION #        3023 pre thickness @ M1

POLISHER:          N/A

EVAL TOOL:         Thickness.A4

DATE:              07/19/96

PROBLEM:           Incoming Range for thickness was high at 1175�.
 
                                          	    UCL IS   1000�              

DISPOSITION:       Moved on.
   
CORRECTIVE         NONE
ACTION:            



                                        
62.315Overpolish on JD0358CFABSIX::S_SHONGSat Jul 20 1996 08:4429
                              CMP PEX 
                     

LOT #:             JL0358C

QUANTITY:          11

OPERATION #        1992 CMP_ILD1

POLISHER:          CMP.B2

EVAL TOOL:         Thickness.A4

DATE:              07/19/96

PROBLEM:           Lot was over polished by ~700�. LCL is 5200� the average 
		   for the lot was ~4500�.
 
                                          
DISPOSITION:       Added a remark at operation 2166 ILD_Dep to add an extra
		   1000�. 
   
CORRECTIVE         Informed the operators that if the step height is high 
ACTION:            (Which it was) to reduce the pre set time by 30 seconds. 



                                        
62.316CMP.B1 JD0334, STEP_ILD3 over 20KSUBPAC::KULPSun Jul 21 1996 05:4133
                               CMP PEX 

LOT #          JD0334

QUANTITY:      19 

OPERATION #    3081 STEP_CMP 4  STEP_ILD3    
/DESCR.

POLISHER:      CMP.B1 

EVAL TOOL:     PROFILER.A2 

DATE:          07/21/96 B-Shift

PROBLEM:      Popped chart: HEIGHT_ME (high)
	      
		mean  = 20302.5
	 	UCL: 20,000
		CL:  18,500

              RUN_ID_1     JD0334               4 20
              HEIGHT_ME    WAFER #1 CENTER         20890.000
                           WAFER #1 EDGE           19700.000
                           WAFER #2 CENTER         20960.000
                           WAFER #2 EDGE           19660.000


DISPOSITION:   None 

CORRECTIVE     lot was polished with above data under consideration.
ACTION:        
        
62.317JD0333 THK_ILD3_PST STdev (high) and data entrySUBPAC::KULPSun Jul 21 1996 06:4329
                               CMP PEX 

LOT #          JD0333 

QUANTITY:      19

OPERATION #    3064 THK_CMP 16  THK_ILD3_PST
/DESCR.

POLISHER:      CMP.B1 

EVAL TOOL:     THICKNESS.A4

DATE:          07/21/96 B-Shift

PROBLEM:      Popped chart: STdev (high) and data entry error Range.
	      
		mean  = 10.4
	 	UCL: 10 
		CL:   5 

		Range should be 3295 instead of 19.


DISPOSITION:   None 

CORRECTIVE     range chart needs to be corrected.
ACTION:        
        
62.318JD0369 THK_ILD1_PST STdev (high)SUBPAC::KULPMon Jul 22 1996 07:1238
                               CMP PEX 

LOT #          JD0369  

QUANTITY:      24

OPERATION #    3054 THK_CMP 8   THK_ILD1_PST
/DESCR.

POLISHER:      CMP.B1 

EVAL TOOL:     THICKNESS.A4

DATE:          07/22/96 B-Shift

PROBLEM:      Popped chart: STdev (high) 
	      
		mean  = 15.06 
	 	UCL: 10 
		CL:   5 

              THK_ME_5     WAFER #1                 5473.000
                           WAFER #2                 5234.000
                           WAFER #3                 5713.000
                           WAFER #4                 5329.000
                           WAFER #5                 5796.000
              THK_RG       JD0369                   2672.000
 LOG AN EVENT THK_SD_5     WAFER #1                   13.900   7/22/96 03:59:24
                           WAFER #2                   15.000
                           WAFER #3                   10.600
                           WAFER #4                   19.600
                           WAFER #5                   16.200
 
DISPOSITION:   Lot moved on. 

CORRECTIVE     None
ACTION:        
        
62.319JD0342 - two wafers scrapped @IDLE2 over polishSTRATA::POZORSKIMon Jul 22 1996 15:3124
                                CMP PEX 
                     

LOT #          JD0342

QUANTITY:      20

OPERATION #    1985 IDL2 
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     N/A

DATE:          06/22/96 A-Shift

PROBLEM:       Last lot had 22 wafers, last 2 wafers ran only with 3 dummies
               for some reason the removal rate was higher than the rest of 
               the lot.  Dummies had 50k oxide on them.
                      
DISPOSITION:   Two wafers were scraped from the lot.

CORRECTIVE    Discussed problem with tech, will run with shorter run times when
ACTION        filler wafers are used.
62.321jd0379 scrap 5 WAFERS- B1STRATA::WOOLDRIDGEPleasure, Spiked With PainFri Jul 26 1996 13:0519
Subject: PEX Jd0379 - correction to lot#

ENTERED Kyle Wooldridge
RECIPE: PMD
OPER#: 861 
POLISHER: CMP.B1
PROCESS DATE: 07/26/96
   

PROBLEM:  5 wafers scrap (19 wafer lot)
    
     Tool errored.  Table kept spinning, carriers stopped.  Wafers 
were over polished.


DISPOSITION: Scrap 5

CORRECTIVE  Correct equipment issue. 

62.320JL0418C high SD on one wafer POST @ILD2YIELD::PHESTERSat Jul 27 1996 17:4126
                              CMP PEX 
                     

LOT #:             JL0418C ILD2        

QUANTITY:          5

OPERATION #        3274 POST THICKNESS

POLISHER:          CMP.B3 

EVAL TOOL:         THICKNESS.A4

DATE:              07/27/96

PROBLEM:           STD DEV ON SLOT 1 WAFER WAS 10.6
                            
                   UCL IS 10.0%

DISPOSITION:       LOT MOVED ON.
   
CORRECTIVE         
ACTION:            NONE

                                        
62.3222 WAFERS SCRAPPED AT PMD SYSTEM CRASHED...STRATA::POZORSKIWed Jul 31 1996 20:0125
LOT:     JD0395

MACHINE: CMP.A1

OPER#:   1978

PROCESS  LEVEL: PMD

DATE:    7/31/96

SHIFT:   A-SHIFT

QUANTITY:  19 DOWN TO 17
    
PRODUCT..DC1026-00-DJ-8G
 

PROBLEM: Two wafers crashed on the system for some unknown reason.   

DISPOSITION:  The lot will be moved on with 2 less wafers.

CORRECTIVE ACTION:  The pad and Carriers will be replaced followed by full
                    by MQC's.

62.323JD0354 High outgoing range @ILD3YIELD::PHESTERThu Aug 01 1996 20:1128
                               CMP PEX 
                     

LOT #          JD0354

QUANTITY:      24

OPERATION #    3064 THK_CMP 16  
/DESCR.

POLISHER:      PST READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          08/1/96 C-Shift

PROBLEM:       HIGH OUT GOING RANGE ILD3 DC1026

               LOT OUTGOING RANGE = 4985�

                             UCL IS 4500�
        
DISPOSITION:   LOT WAS REMARKED @OP #3064 FOR HIGH OUTGOING 
	       RANGE.
	
CORRECTIVE:    LOT WAS MOVED ON.
         
62.324JD0408 SLIGHTLY OVER-POLISHED @ILD2YIELD::PHESTERThu Aug 01 1996 20:1627

                              CMP PEX 
                     

LOT #:             JD0408 ILD2        

QUANTITY:          24

OPERATION #        3066 POST THICKNESS ILD2

POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A5

DATE:              08/01/96

PROBLEM:           LOT SLIGHTLY OVER POLISHED AT  4963�

                                        LCL IS    5200�         

DISPOSITION:       LOT REMARKED AND MOVED OUT.
   
CORRECTIVE         NONE.


                                        
62.325JL0404 low outgoing thickness @ILD1YIELD::PHESTERSat Aug 03 1996 15:5729

                              CMP PEX 
                     

LOT #:             JL0404        

QUANTITY:          12

OPERATION #        3114 POST THICKNESS ILD1

POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A5

DATE:              08/03/96

PROBLEM:           OUTGOING THICKNESS WAS    5019�

                                   LCL IS    5200�         

DISPOSITION:       LOT MOVED OUT.
   
CORRECTIVE         LOT WAS REMARKED AT 2166 DEP_ILD1 3 
ACTION:


                                        

62.326JD0394 THK_ILD1_PST - slight overpolishYIELD::MANDREOLISun Aug 04 1996 07:1725
                            PE PEX NOTIFICATION
                     

LOT #          JD0394 (DC1026)

QUANTITY:      24    

OPERATION #    3054 CMP THK_ILD1_PST THICKNESS 
/DESCR.        

POLISHER:      CMP.B2  

EVAL TOOL:     THICKNESS.A5 

DATE:          08/04/96 B-Shift

PROBLEM:       Low POST CMP ILD1 Thickness, LCL is 5200�, the 5 wafer Mean for
               this lot was 4727�. 
                 
DISPOSITION:   Measured lot 100% for thickness. REMARKed the lot with thickness 
               data at DEP ILD1 3 (Oper# 2130) requesting the films folks to 
               deposit ~1000� thicker oxide. 

CORRECTIVE
ACTION:        none  
62.327Pex for JD0398. YIELD::SHONGWed Aug 07 1996 07:3223
                            PE PEX NOTIFICATION
                     

LOT #          JD0398 (DC1026)

QUANTITY:      24    

OPERATION #    3054 CMP THK_ILD1_PST THICKNESS 
/DESCR.        

POLISHER:      CMP.B2  

EVAL TOOL:     THICKNESS.A5 

DATE:          08/07/96 D-Shift

PROBLEM:       Low POST CMP ILD1 Thickness, LCL is 5200�, the 5 wafer Mean for
               this lot was 5139�. 
                 
DISPOSITION:   Lot was OK'ed to move on to Diffusion. 

CORRECTIVE
ACTION:        none  
62.328XD0502 OVER-POLISHED @ILD2YIELD::PHESTERFri Aug 09 1996 11:1627
                              CMP PEX 
                     

LOT #:             XD0502 ILD2        

QUANTITY:          23

OPERATION #        3066 pst thickness.a5  

POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A5

DATE:              08/08/96

PROBLEM:           LOT OVER POLISHED(4964�).  SOME WAFERS WERE POLISHED 1000�
                                              BELOW TARGET.
                                             
                   LCL = 5200�         

DISPOSITION:       LOT MOVED OUT
   
CORRECTIVE         LOT REMARKED AT CAP FOR EXTRA DEPOSITION.
ACTION:

                                        
62.329JD0371 HIGH OUTGOING RANGE @ILD2YIELD::PHESTERFri Aug 09 1996 11:1728
                              CMP PEX 
                     

LOT #:             JD0371 ILD3        

QUANTITY:          12

OPERATION #        3064 POST THICKNESS ILD3  

POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A5

DATE:              08/08/96

PROBLEM:           HIGH OUTGOING RANGE @ILD2 
 
                   OUTGOING RANGE WAS 6740�

                   UCL =4900 �         

DISPOSITION:       LOT MOVED OUT
   
CORRECTIVE
ACTION:            NONE

                                        
62.330High Std.Dev for JD0397YIELD::SHONGFri Aug 09 1996 23:2140
                               CMP PEX 

LOT #          JD0397

QUANTITY:      24

OPERATION #    3384 THK_CMP 11   THK_ILD2_PST
/DESCR.

POLISHER:      CMP.A1 

EVAL TOOL:     THICKNESS.A5

DATE:          08/09/96 D-Shift

PROBLEM:      Popped chart: STdev (high) 
	      
		mean  = 22.38 
	 	UCL: 10 
		CL:   5 
		
		 THK_ME_5     WAFER #1                 5550.000
                              WAFER #2                 5414.000
			      WAFER #3                 5457.000   
 	                      WAFER #4                 5536.000
                              WAFER #5                 5730.000
              
   	         THK_RG       5                        3362.000
              
                 THK_SD_5     WAFER #1                   22.200
                              WAFER #2                   24.400
                              WAFER #3                   21.000
                              WAFER #4                   23.100
                              WAFER #5                   21.200	
 
DISPOSITION:   Lot moved on. 

CORRECTIVE     System was at 300 wafers. Pad was changed. MQC's are being done. 
ACTION:        
        
62.331XD0498 LOW INCOMING STEP @PMDYIELD::PHESTERThu Aug 15 1996 14:5528
                              CMP PEX 
                     

LOT #:             XD0498        

QUANTITY:          24

OPERATION #        3078 pre profiler.a2 PMD
 
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2
         
DATE:              07/18/96

PROBLEM:           INCOMING STEP HEIGHT AVG WAS 2938.5�
                
                                     LCL IS     3000�

DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:            NONE



                                        
62.332JL0410 HIGH OUTGOING RANGE @PMDYIELD::PHESTERThu Aug 15 1996 15:3528

                              CMP PEX 
                     

LOT #:             JL0410 PMD        

QUANTITY:          18

OPERATION #        3106 POST THICKNESS  

POLISHER:          CMP.A1

EVAL TOOL:         THICKNESS.A5

DDATE:              07/25/96

PROBLEM:          
                   OUTGOING RANGE WAS 3791� 

                              UCL IS  3000�

DISPOSITION:       LOT MOVED OUT
   
CORRECTIVE
ACTION:            NONE 

                                        
62.333XD0499 HIGH INCOMING RANGE @ILD1YIELD::PHESTERThu Aug 15 1996 15:3926
                              CMP PEX 
                     

LOT #:             XD0499 ILD1        

QUANTITY:          21

OPERATION #        3023 PRE THICKNESS  
POLISHER:          N/A

EVAL TOOL:         THICKNESS.A4

DATE:              07/25/96

PROBLEM:           INCOMING RANGE WAS 1079� 
                            
                               UCL IS 1000�
                         
DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:            NONE


                                        
62.334XD0354 LOW OUTGOING THICKNESS @ILD1YIELD::PHESTERThu Aug 15 1996 15:5129
                              CMP PEX 
                     

LOT #:             XD0354        

QUANTITY:          24

OPERATION #        3054 THK_CMP 16
  
POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A5

DATE:              07/18/96

PROBLEM:           OUTGOING THICKNESS AVG WAS 4902� 
                            
                                   LCL IS     5200�
                         
DISPOSITION:       LOT MOVED OUT
   
CORRECTIVE
ACTION:            LOT WAS REMARKED @ OPERATION 3054 FOR LOW OUTGOING THICKNESS.
                   LOT WAS GIVEN A 100% THICKNESS EVALUATION AND REMARKED FOR
                   EXTRA DEP @ OPERATION 2130.


                                        
62.335JD0358 LOW OUTGOING @ILD1YIELD::PHESTERThu Aug 15 1996 15:5629
                              CMP PEX 
                     

LOT #:             JD0358

QUANTITY:          21

OPERATION #        3054 THK_CMP 16
  
POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A5

DATE:              07/18/96  C-SHIFT

PROBLEM:           OUTGOING THICKNESS AVG WAS @ILD1 WAS 3932� 
                            
                                             LCL IS     5200�
                         
DISPOSITION:       LOT MOVED OUT
   
CORRECTIVE
ACTION:            LOT WAS REMARKED @ OPERATION 3054 FOR LOW OUTGOING THICKNESS.
                   LOT WAS GIVEN A 100% THICKNESS EVALUATION AND REMARKED FOR
                   EXTRA DEP @ OPERATION 2130.


                                        
62.336JD0368 LOW INCOMING STEP @ILD1YIELD::PHESTERThu Aug 15 1996 16:0027
                              CMP PEX 
                     

LOT #:             JD0368

QUANTITY:          24

OPERATION #        3079 STEP_ILD1
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              07/20/96  C-SHIFT

PROBLEM:           INCOMING STEP HEIGHT WAS 9603�

                                   LCL IS   9600�
                         
DISPOSITION:       LOT MOVED OUT
   
CORRECTIVE
ACTION:            NONE


                                        
62.337PEX for JD0396YIELD::SHONGFri Aug 16 1996 04:5425
                            PE PEX NOTIFICATION
                     

LOT #          JD0396 (DC1026)

QUANTITY:      10    

OPERATION #    3081 Step_CMP 4
/DESCR.        

POLISHER:      

EVAL TOOL:     Profiler.A2

DATE:          08/16/96 D-Shift

PROBLEM:       High incoming step height. The UCL is 20,000� . We had an average
	       of ~20,500�.
                 
DISPOSITION:   None.
	
CORRECTIVE     Informed the operators to reduce the initial center heads down 
ACTION:        time. Center heads came out fine and the lot moved on with no 
	       other problems. 

62.338Pex for JD0382YIELD::SHONGFri Aug 16 1996 04:5426
                            PE PEX NOTIFICATION
                     

LOT #          JD0382 (DC1026)

QUANTITY:      22    

OPERATION #    1985 CMP_ILD2  
/DESCR.        

POLISHER:      CMP.B3  

EVAL TOOL:     THICKNESS.A5 

DATE:          08/16/96 D-Shift

PROBLEM:       High uniformity after final touch up(~13%). There appears to be
 	       a problem with the UV1050. It's not measuring all of the points
	       correctly. 
                 
DISPOSITION:   Moved the lot on. 

CORRECTIVE     Beth and I noticed that there was allot of discrepance with the 
ACTION:        recipes in the UV1050's. There's a plan in place to try and 
	       standardise all of the recipes so we read the same amount of
	       die for each wafer. 
62.339PEX for JD0414YIELD::SHONGFri Aug 16 1996 04:5526
                            PE PEX NOTIFICATION
                     

LOT #          JD0414 (DC1035)

QUANTITY:      24    

OPERATION #    1985 CMP_ILD2  
/DESCR.        

POLISHER:      CMP.B3  

EVAL TOOL:     THICKNESS.A5 

DATE:          08/16/96 D-Shift

PROBLEM:       High uniformity after final touch up(~13%). There appears to be
 	       a problem with the UV1050. It's not measuring all of the points
	       correctly. 
                 
DISPOSITION:   Moved the lot on. 

CORRECTIVE     Beth and I noticed that there was allot of discrepance with the 
ACTION:        recipes in the UV1050's. There's a plan in place to try and 
	       standardise all of the recipes so we read the same amount of
	       die for each wafer. 
62.340PEX for JD0423YIELD::SHONGFri Aug 16 1996 04:5526
                            PE PEX NOTIFICATION
                     

LOT #          JD0423 (DC1035)

QUANTITY:      23    

OPERATION #    1981 CMP_ILD1  
/DESCR.        

POLISHER:      CMP.B3  

EVAL TOOL:     THICKNESS.A5 

DATE:          08/16/96 D-Shift

PROBLEM:       High uniformity after final touch up(~12%). There appears to be
 	       a problem with the UV1050. It's not measuring all of the points
	       correctly. 
                 
DISPOSITION:   Moved the lot on. 

CORRECTIVE     Beth and I noticed that there was allot of discrepance with the 
ACTION:        recipes in the UV1050's. There's a plan in place to try and 
	       standardise all of the recipes so we read the same amount of
	       die for each wafer. 
62.341JL0477A low incoming step @PMDYIELD::PHESTERFri Aug 16 1996 09:2725
                            CMP PEX 
                     

LOT #          JL0477A

QUANTITY:      12

OPERATION #    3362 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          08/16/96  C-Shift

PROBLEM:       LOW INCOMING STEP ....PMD

               LOT INCOMING STEP AVG = 4396�  LCL IS 4000�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         NONE
62.342JL0437 high incoming range @ILD1YIELD::PHESTERFri Aug 16 1996 17:5128
                            CMP PEX 
                     

LOT #          JL0437

QUANTITY:      21

OPERATION #    3112 THK_CMP 6
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          08/16/96  C-Shift

PROBLEM:       HIGH INCOMING THICKNESS RANGE @ILD1

               AVG = 2229� 

               UCL IS 1000�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY

62.343JD0377 - 3441 popped chart for low thickness and high range.SUBPAC::KULPSun Aug 18 1996 08:3132
                              CMP PEX 
                     

LOT #:             JD0377 

QUANTITY:          16

OPERATION #        3441 STP_CMP 25  STEP_ILD25
  
POLISHER:          CMP.B1

EVAL TOOL:         THICKNESS.A4

DATE:              08/18/96  b-SHIFT

PROBLEM:           Outgoing thickness mean was 8495�
                            
                                             	LCL: 9500�
                         
		   Outgoing thickness range was 5568�

						UCL: 4500� 
DISPOSITION:       Lot moved out
   
CORRECTIVE
ACTION:            
                   Lot was given a 100% thickness evaluation and remarked for
                   extra dep @ operation 2244.


                                        
62.344PEX JD0386SUBPAC::KULPMon Aug 19 1996 05:2131
                              CMP PEX 
                     

LOT #:             JD0386 

QUANTITY:          24

OPERATION #        3064 THK_CMP 16  THK_ILD3_PST
  
POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A5

DATE:              08/19/96  B-SHIFT

PROBLEM:           Outgoing thickness STD was 11.158
                            
                                         UCL: 10 
                         
		   Outgoing thickness range was 6690�

				           UCL: 4500� 
DISPOSITION:       Lot moved out
   
CORRECTIVE	   None
ACTION:            
                   


                                        
62.345PEX jd0393SUBPAC::KULPMon Aug 19 1996 05:3331
                              CMP PEX 
                     

LOT #:             JD0393 

QUANTITY:          24

OPERATION #        3064 THK_CMP 16  THK_ILD3_PST
  
POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A5

DATE:              08/19/96  B-SHIFT

PROBLEM:           Outgoing thickness MEAN was 10521� 
                            
                                          UCL: 10500� 
                         
DISPOSITION:       100% thickness measurement, touched up wafers above 
		   10500 Ang. Lot moved out,  remark added of results at
		   oper 3064.  

   
CORRECTIVE	   None
ACTION:            
                   


                                        
62.346CMP PEX XD0521 2 WAFERS BROKENSUBPAC::SMARTINMon Aug 19 1996 18:3224
LOT:     XD0521

MACHINE: CMP.A2

OPER#:   1978 CMP AFTER PMD DEP1

PROCESS  LEVEL: PMD

DATE:    8/19/96 

SHIFT:   B-SHIFT

QUANTITY:  24 DOWN TO 22

PRODUCT..TM0069-032-BA-8C

PROBLEM: Two wafers crashed on the system.

DISPOSITION:  The lot will be moved on with 2 less wafers.

CORRECTIVE ACTION:  The pad and Carriers will be replaced followed by full
                    by MQC's.

62.347CMP.b1 JL0438 over polish 1st 5 wfrsSUBPAC::KULPTue Aug 20 1996 05:5438
LOT:     JL0438

MACHINE: CMP.B1

OPER#:  3114 THK_CMP 8  THK_ILD1_PST

PROCESS  LEVEL: ILD1

DATE:    8/19/96 

SHIFT:   B-SHIFT

QUANTITY: 24  

PRODUCT..  DC1044-002-EB-8P

PROBLEM: 	5 send ahead wafers polished below 3500 LCL: 5200
		did not pop chart. 

DISPOSITION: Remark entered at Dep. oper# 2166 needs extra dep. 

	wfr 23  3674
        wfr 11  3212
        wfr 18  2422
        wfr 10  2839
        wfr 15  3877

       Step 5 ran for 220 seconds, changed to 180 for the rest of lot.

       Also UV1050 could not read all die on wafers with low readings.
	THICKNESS.A4
                    
CORRECTIVE ACTION:    Moved lot on.  Possible need another recipe for small
		      die for ILD1.  small die may have different removal
		      rates.


62.348cmp.b1 broke 2 wfrsSUBPAC::KULPTue Aug 20 1996 08:1426
LOT:     JL0428

MACHINE: CMP.B1

OPER#:   1994 CMP_ILD2    CMP  

PROCESS  LEVEL: ILD2

DATE:    8/20/96 

SHIFT:   B-SHIFT

QUANTITY:  24 DOWN TO 22

PRODUCT..DC1044-002-EB-8P     

PROBLEM: Two wafers crashed on the system.  During 1 sec. touch up broke 
         at step 7.


DISPOSITION:  The lot will be moved on with 2 less wafers.

CORRECTIVE ACTION:  The pad and Carriers will be replaced followed by full
                    by MQC's.

62.349JD0444 high incoming step @ILD1YIELD::PHESTERWed Aug 21 1996 15:1227
                                CMP PEX 
                     

LOT #          JD0444

QUANTITY:      23

OPERATION #    3079 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          08/21/96  C-Shift

PROBLEM:       HIGH INCOMING STEP HEIGHT....ILD1

               LOT INCOMING STEP AVG = 9685� 
 
                                UCL IS 9600�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         LOT POLISHED ACCORDINGLY
62.350JD0441 LOW INCOMING STEP @PMDYIELD::PHESTERFri Aug 23 1996 18:5528
                              CMP PEX 
                     

LOT #:             JD0441 PMD        

QUANTITY:          23

OPERATION #        3078 PRE PROFILE  

POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              08/23/96

PROBLEM:           INCOMING STEP HEIGHT MEAN WAS 2981�

                           LCL IS 3000�
                            

DISPOSITION:       LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:            NONE


                                        
62.351CMP PEX FOR TWO BROKEN WAFERS FROM LOT YD0172SUBPAC::SMARTINSun Aug 25 1996 15:3028
  

LOT:     YD0172

MACHINE: CMP.A2

OPER#:   1981

PROCESS  LEVEL: ILD1

DATE:    8/25/96

SHIFT:   A-SHIFT

QUANTITY:  16   DOWN TO 14
    
PRODUCT..TM3636-092-KA-0D 
 

PROBLEM: TWO  WAFERS CRASHED ON TABLE.   

DISPOSITION:  LOT WILL MOVED LESS TWO WAFERS.


CORRECTIVE ACTION:  REPLACING PAD AND BOTH CARRIERS.
   


62.352CMP PEX FOR OVER POLISH ON LOT JL0525SUBPAC::SMARTINSun Aug 25 1996 15:5147
LOT:     JL0525

MACHINE: CMP.A2

OPER#:   3106 THK_CMP 4   THK_PMD_PST

PROCESS  LEVEL: PMD 

DATE:    8/25/96 

SHIFT:   B-SHIFT

QUANTITY:  24 

PRODUCT..TM0073-000-AA-8P     

PROBLEM: Over polish, popped chart CMP.A2 THK_PMD_PST  THK_ME_5

	LCL: 6200, DATA POINT  6087.200 

              THK_ME_5     WAFER #1                 6053.000
                           WAFER #2                 6018.000
                           WAFER #3                 6278.000
                           WAFER #4                 5978.000
                           WAFER #5                 6109.000
  


DISPOSITION:  The lot will need 100% UV1050, over to A shift. 
		Nothing unusual during processing.

CORRECTIVE ACTION: Additional dep on selected wafers has been requested by
                   CMP.  Please proceed as follows:                           
                                                                            
   1) In Ox-Dep.E2 run a monitor using recipe peteos 3000                   
                                                                           
   2) Measure monitor thickness.  If it is within 150A of target value,     
      go to step 3 
   3) Split lot up into groups by wafer # and process as follows:           
                                                                            
      Wafers# 1,14,6,21,12,16,10,22,13,9,20 use recipe peteos 3000          
                                                                            
      Wafer # 19 use recipe Op 2166 (for dep of 3500A)                      
                                                                            
      All other wafers get std process (2500A dep) 

62.353CMP PEX FOR SEVERLY OVER POLISH-5 WAFERS SCRAPPEDSUBPAC::SMARTINSun Aug 25 1996 18:4930
  

LOT:     JD0466

MACHINE: CMP.B2

OPER#:   1978

PROCESS  LEVEL: PMD

DATE:    8/25/96

SHIFT:   A-SHIFT

QUANTITY:  24 DOWN TO 19
    
PRODUCT..DC1026-000-DJ-8G
 
 

PROBLEM: 5 WAFERS WERE SEVERLY OVER POLISHED AT PMD. OPERATOR GRABBED WRONG LOT
         FOR POLISHING BY MISTAKE.

DISPOSITION:  LOT WILL MOVED LESS FIVE WAFERS.


CORRECTIVE ACTION:  DOUBLE CHECK LOTS AND #'S BEFORE POLISHING.
   


62.354DATA MIS-ENTRY JD0467 @ THK_PMD_PST YIELD::MANDREOLIMon Aug 26 1996 07:4133
                            PE PEX NOTIFICATION
                     

LOT #          JD0467 (DC1026)

QUANTITY:      23    

OPERATION #    [FAB6.CMP_A1.THK_PMD_PST]THK_ME_5.GRF  
/DESCR.        

POLISHER:      CMP.B1  

EVAL TOOL:     THICKNESS.A5 

DATE:          08/26/96 B-Shift

PROBLEM:       SPC Chart flagged due to data mis-entry for POST PMD thickness. 
               Entered 4 values (one of them mis-entered);

               PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
               THK_ME_5     WAFER #1                 6293.000
                            WAFER #2                62474.000   ***
                            WAFER #3                 6495.000
                            WAFER #4                 6550.000
                            WAFER #5                      N/A
                 

DISPOSITION:   Corrected WAFER #2 value to 6247 with WorkStream UNPH function,
               The SPC Chart still needs to be corrected. The Mean for correct
               values is 6396. 

CORRECTIVE
ACTION:        none  
62.355JL0458 2 broken wfrsSUBPAC::KULPWed Aug 28 1996 08:3726
LOT:     JL0458 

MACHINE: CMP.B1

OPER#:   1992 CMP_ILD1    CMP 

PROCESS  LEVEL: ILD1

DATE:    8/28/96 

SHIFT:   B-SHIFT

QUANTITY:  24-2 = 22 

PRODUCT..DC1044-002-EB-8P

PROBLEM: 2 wfrs broke during processing touch down, carrier mis-alignment
	 Table to head 3 alignment was found to be out, need Field service.

DISPOSITION:  last run of lot, 2 other product wafers that were running
		were inspected for scratches. 2 wafers placed on another
		polisher finished polish, placed with rest of lot for touch up.
                       
CORRECTIVE ACTION: Table head alignment need to be performed.  
                                      
62.356Incoming step height YIELD::SHONGThu Aug 29 1996 05:3525
                            PE PEX NOTIFICATION
                     

LOT #          XE0529 

QUANTITY:      24    

OPERATION #    3078 Incoming_Step_Height
/DESCR.        

POLISHER:      N/A

EVAL TOOL:     Profiler.A2

DATE:          08/29/96 D-Shift

PROBLEM:       Incoming step height was low for 2 out of 4 sites. The LCL 
	       for incoming step height is 3000�. The actual for 2 measurement
	       points was 2940� and 2976�. The other two points were above the 
	       LCL(~3020�). 
                 
DISPOSITION:   Sent the lot on. 
	
CORRECTIVE     None. 
ACTION:       
62.357JL0435 OVER-POLISHED @ILD2YIELD::PHESTERThu Aug 29 1996 20:1545
                              CMP PEX 
                     

LOT #:             JL0435 

QUANTITY:          24

OPERATION #        3274  POST THICKNESS   ILD2
 
POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A4
        
DATE:              08/29/96

PROBLEM:           LOT OVERPOLISHED @ILD2

                   OUTGOING THICKNESS WAS  5106�.  

                   LOWER CONTROL LIMIT IS  5200�
                            

DISPOSITION:       LOT INCOMING MEAN THICKNESS WAS GOOD AT 17996�.  RANGE WAS
                   WITHIN CONTROL LIMITS BUT SOMEWHAT HIGHER THAN USUAL AT 792�.
                   NOTHING ABNORMAL FOUND IN PROCESSING.  SEND AHEAD WAFERS
                   WERE POLISHED AND MFG TECH ADVISED THAT ONE WAS A BIT LOW.
                   REMAINDER OF LOT WAS POLISHED NORMALLY.  AFTER POLISHING
                   OF THE FIVE WAFERS READ TWO WERE IN SPEC AND THREE WERE 
                   BELOW THE LCL (SEE BELOW).  THIS IS ATTRIBUTED TO HIGHER
                   THAN NORMAL INCOMING RANGE ON THE LOT.  THE AVERAGE INCOMING
                   RANGE FOR THIS OPERATION IS 439� FROM THE CHART.

              THK_ME_5     WAFER #1                 5282.000
                           WAFER #2                 4844.000
                           WAFER #3                 5157.000
                           WAFER #4                 4809.000
                           WAFER #5                 5442.000

                   LOT WAS MOVED ON.
   
CORRECTIVE
ACTION:            LOT WAS REMARKED AT 2172 DEP_ILD2 FOR POSSIBLE EXTRA DEP.

                                        
62.358JL0457 LOW INCOMING STEP @ILD1YIELD::PHESTERFri Aug 30 1996 18:2227
                            PE PEX NOTIFICATION
                     

LOT #          JL0457

QUANTITY:      24

OPERATION #    3193 STEP_ILD1
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          08/30/96  C-Shift

PROBLEM:       LOW INCOMING STEP ....ILD1

               LOT INCOMING STEP AVG = 9612�  

                                LCL IS 9600�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION:        NONE
62.359Pex for high range. YIELD::SHONGSat Aug 31 1996 06:2022
                            PE PEX NOTIFICATION
                     

LOT #          JD0482 

QUANTITY:      23    

OPERATION #    2951 THK_CMP 2   THK_PMD_PRE 
/DESCR.        

POLISHER:      N/A

EVAL TOOL:     Thickness.A5

DATE:          08/31/96 D-Shift

PROBLEM:       Incoming range was high at 1117. The LCL is 1000. 
                 
DISPOSITION:   Sent the lot on. 
	
CORRECTIVE     Sorted wafers to specific thickness at touch-up. 
ACTION:       
62.360XD0536 LOW INCOMING STEP @PMDYIELD::PHESTERThu Sep 05 1996 15:5527
                                CMP PEX 
                     

LOT #          XD0536

QUANTITY:      20

OPERATION #    3078 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          09/04/96  C-Shift

PROBLEM:       LOW INCOMING STEP HEIGHT @PMD

               LOT INCOMING STEP AVG = 3229�  

                                LCL IS 3000�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         NONE
62.361Low incoming step height.YIELD::SHONGSat Sep 07 1996 03:3623
                            PE PEX NOTIFICATION
                     

LOT #          XD0531

QUANTITY:      22

OPERATION #    3078 STEP_CMP 1
/DESCR.        

POLISHER:      N/A

EVAL TOOL:     Profiler.A2

DATE:          09/06/96 D-Shift

PROBLEM:       Incoming step height for PMD was low. The LCL is 3000�. The lot
	       came in at ~2900�. 
                 
DISPOSITION:   Sent the lot on. 
	
CORRECTIVE     None.
ACTION:       
62.362Low incoming step height.YIELD::SHONGSat Sep 07 1996 03:3723
                            PE PEX NOTIFICATION
                     

LOT #          XD0538

QUANTITY:      22

OPERATION #    3078 STEP_CMP 1
/DESCR.        

POLISHER:      N/A

EVAL TOOL:     Profiler.A2

DATE:          09/06/96 D-Shift

PROBLEM:       Incoming step height for PMD was low. The LCL is 3000�. The lot
	       came in at ~2900�. 
                 
DISPOSITION:   Sent the lot on. 
	
CORRECTIVE     None.
ACTION:       
62.363JL0474 OVER POLISH ILD1SUBPAC::KULPSun Sep 08 1996 07:2336
LOT:     JL0474 

MACHINE: CMP.B3

OPER#:   3114 THK_CMP 8   THK_ILD1_PST 

PROCESS  LEVEL: ILD1

DATE:    9/08/96 

SHIFT:   B-SHIFT

QUANTITY:  24         

PRODUCT..DC1044-003-EB-8P       

EVAL TOOL:         THICKNESS.A5

PROBLEM: Lot overpolished @ILD1

	 Lower control limit is  5200�
         

DISPOSITION:  Lot incoming mean thickness was good at 18312�.  Range was good
	      also at 536.  Nothing abnormal found in processing.

             THK_ME_5     WAFER #1                 5222.000
                          WAFER #2                 5663.000
                          WAFER #3                 5238.000   9/08/96 03:17:24
                          WAFER #4                 5021.000
                          WAFER #5                 5089.000
              THK_RG      JL0474                   1414.000
                       
CORRECTIVE ACTION: Lot was remarked at 2166 DEP_ILD2 for possible extra dep.
                                      
62.364xd0520, high stdevSUBPAC::KULPSun Sep 08 1996 07:3936
                              CMP PEX 
                     

LOT #:             XD0520 

QUANTITY:          24

OPERATION #        3066 THK_CMP 11  THK_ILD2_PST
  
POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A5

DATE:              09/08/96  B-SHIFT

PROBLEM:           Outgoing thickness STD was 12.3  
                            
                                         UCL: 10 
             THK_SD_5    WAFER #1                   10.200
                         WAFER #2                   14.400
                         WAFER #3                   12.800
            		 WAFER #4                      N/A   9/07/96 23:29:33
                         WAFER #5                   11.800




DISPOSITION:       Lot moved out, mean and range chart center of spec.
   
CORRECTIVE	   None
ACTION:            
                   


                                        
62.365JL0493 1 broken waferSUBPAC::KULPTue Sep 10 1996 07:4224
                              CMP PEX 
                     

LOT #:             JL0493

QUANTITY:          24-1= 23

OPERATION #        1984 CMP_L_PMD   CMP 
  
POLISHER:          CMP.B2

EVAL TOOL:         

DATE:              09/10/96  B-SHIFT

PROBLEM:           1 wafer broke when endload flipper dropped a wafer.

DISPOSITION:       Lot moved out, with 1 less wafer.  
   
CORRECTIVE	   EE checked system, nothing unusual
ACTION:            
                   
                                        
62.366JD0497 High INCOMING STEP ....ILD1 9680�SUBPAC::KULPTue Sep 10 1996 08:0527
                            PE PEX NOTIFICATION
                     

LOT #          JD0497

QUANTITY:      6

OPERATION #    3079 STEP_CMP 2  STP_ILD1
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          09/10/96  B-Shift

PROBLEM:       High INCOMING STEP ....ILD1

               LOT INCOMING STEP AVG = 9680�  

                                LCL IS 9600�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION:        NONE
62.367XD0516, 3066 THK_ILD2_PST Popped chart thickness STDSUBPAC::KULPWed Sep 11 1996 05:1038
                              CMP PEX 
                     

LOT #:             XD0516       TM0069-032-BA-8C

QUANTITY:          19

OPERATION #        3066 THK_CMP 11  THK_ILD2_PST 3
  
POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A5

DATE:              09/11/96  B-SHIFT

PROBLEM:           Popped chart thickness STD was 12.34, UCL: 10 

              THK_ME_5     WAFER #1                 5100.000
                           WAFER #2                 6206.000
                           WAFER #3                 5288.000
                           WAFER #4                 5509.000
                           WAFER #5                 5095.000
              THK_RG       XD0516                   1442.000
 
 LOG AN EVENT THK_SD_5     WAFER #1                   13.200   9/11/96 02:32:10
                           WAFER #2                   10.900
                           WAFER #3                   10.900
                           WAFER #4                   12.900
                           WAFER #5                   13.800



DISPOSITION:       Lot moved out, mean and range chart in spec.
   
CORRECTIVE	   None
ACTION:            
                   
62.368XM0515, 3066 THK_ILD2_PST Popped chart thickness STDSUBPAC::KULPWed Sep 11 1996 05:3736
                              CMP PEX 
                     

LOT #:             XM0515 	TM0069-000-CA-8C 

QUANTITY:          20

OPERATION #        3066 THK_CMP 11  THK_ILD2_PST 3
  
POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A5

DATE:              09/11/96  B-SHIFT

PROBLEM:           Popped chart thickness STD was 13.96, UCL: 10 

              THK_ME_5     WAFER #1                 5747.000
                           WAFER #2                 5408.000
 LOG AN EVENT              WAFER #3                 5490.000   9/11/96 00:56:30
                           WAFER #4                 4977.000
                           WAFER #5                 5101.000
              THK_RG       NA                       2612.000
              THK_SD_5     WAFER #1                   13.200
                           WAFER #2                   13.700
                           WAFER #3                   12.900
                           WAFER #4                   16.800
                           WAFER #5                   13.200


DISPOSITION:       Lot moved out, mean and range chart in spec.
   
CORRECTIVE	   None
ACTION:            
                   
62.369over polishSUBPAC::KULPWed Sep 11 1996 08:19167
                              CMP PEX 
                     

LOT #:             JD0482   	DC1026-000-DJ-8G 

QUANTITY:          21

OPERATION #        1981 CMP_ILD1    CMP          2  
  
POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A5

DATE:              09/11/96  B-SHIFT

PROBLEM:           1 wafer over polished. wafer # 5 had 801 Ang.
	 	   It appears that the lot was over dep'd. Lot was split at 
		   CMP on 2 systems to run two different thickness.

		   Below is the remark from 2129 DEP_ILD1 2 and on the
	           next page a description from the operation tech.


  Current Remark   :  Lot = JD0482         Rte =    N/A        Oper = 3014 
    User = R_LAAKKO     Pro = DC1026-000-DJ-8G          Op Des = THK_ILD1 2 
    Start Date/Time = 10-SEP-1996 18:08  End Date/Time =  ....perpetual.... 
                                                                            
   Ignore previous remark in which a lot split was proposed.  Instead,      
   we will send lot on for CMP with a warning that 9 wafers appear to       
   be much thicker than normal and request that they polish back as needed. 
                                                                            
   Normal on-product thk reading at this level (Op 3014) is 18kA +/- 1k     
   NCM #618.01has been Entr'd and Disp'd.                                   
                                                                            
   Wafer thicknesses by wafer # are:                               
 
  Wafer#  Thickness                                                       
       1     18033                                                          
       2     33071                                                          
       3     17915                                                          
       4     17916                                                          
       5     33198                                                          
       6     33172                                                          
       7     33184                                                          
       8     17908                                                          
       9     17931                                                          
       10    33135                                                          
       13    17940                                                          
       14    17953                                                          
       15    17965                                                          
       16    33209                                                          
       17    17956  
       18    17915                                                          
       19    33118                                                          
       20    33029                                                          
       21    17929                                                          
       22    33091                                                          
       23    17954    




DISPOSITION:       Lot moved out 1 less wafer.
   
CORRECTIVE	   Need to to pre readings.
ACTION:            
                   


Ken,
	
I would like to bring to your attention lot JD0482. There is a remark
to this lot (ILD1-JD0482-DC1026)  at operation #3023.
Wafers #3,4,8,9,13,14,15,17,18,21,23, are at normal thickness (@18k)
Wafers #2,5,6,7,10,16,19,20,22, are at abnormal thickness (@33k)
Now we were told that this was brought to the attention of pss.
We had done the following steps:

1, Verified the lot to make sure the wafers numbers were in its
equal in slot number, (wafer #1 in slot #1, wafer #2 in slot #2 etc...). This
was done using the barcoder.a4, in the cmp room.

2, Separated the lot, wafers at 18k were picked out and
measured 100% on thickness.a5. the results verified that the note was correct
on thickness with these wafers.

3, The wafers @ 33k were not measured on thickness prior to
running on CMP.B2. 

4. The mean thickness, and range were entered as data for this
lot by me. I used the data from the 18k wafers. P2 measurements were entered by
me. Also using the data from the 18k wafers.

5. It was decided by me, to run the 18k wafers at 10 seconds
less than normally issued by spec, due to the need of spacers needed to fill up
the voided increments of 5 wafers per run, needed to run on B2. If spacers are
used, this will increase the removal rate, of the particular set of wafers that
run with a spacer.Spec called for an XD_ILD1 lot to run for 140 sec. these
wafers were run for 130 sec. I ran this particular run on B2, and I placed
spacers in the first slot of each run (3 seperate runs).

I had asked a fellow operator to take care of the second part of the
split. and I had told him to run the lot at 300 second to try to take it down
to touch up parameters. Apparently he had taken these requests too literally,
because there was no pre thickness measurment, p2 measurment taken, and the lot
was run for 300 seconds. This was after I had instructed checking the remark,
and treating the two set of wafers like two different lots. And to keep an
careful eye on the thickness range. 

Five breakin wafers were used prior to each run, thus taking up the
first five slots. 

	The two sets were run. here are the thickness per wafer:
			SET #1 33k ran for 300 sec
       	SLOT#	WAFER #	  MEAN   RANGE	GOF	PRE MEAS.(per note only)
	#6       #5       801    1191   .20	33198 
	#7	 #6	15522    1844   .24     33172
        #8	 #7     16119     788   .23     33184
	#9	 #10	16447	 1158	.23     33135
	#10	 #16	16522	 2298	.24     33209

	#11	 #2	15936	 1154	.24     33071
	#12	 #19	15333	 1384	.24     33118
	#13	 #20	15974	 1055	.22     33029
	#14	 #22	15998	 1141	.21     33091
	#15	spacer	  n/a	  n/a	n/a	n/a

			SET #2 18K ran for 130 sec
        SLOT#	WAFER #	  MEAN   RANGE  GOF 	PRE MEAS.(per not only)	
	#6      spacer	  n/a     n/a	n/a	n/a
	#7	#3	 6799	  616	.23	17915
	#8	#4	 7167	  700	.23	17916
	#9	#8	 7092	  728	.25	17908
	#10	#9	 7291	  411	.26	17931

	#11	spacer	  n/a	  n/a	n/a	n/a
	#12	#14	 6950	  646	.25	17953
	#13	#15	 7386	  752	.25	17965
	#14	#17	 7299	 1167	.25	17956
	#15	#18	 7125	 1596	.24	17915

	#16	spacer	  n/a	  n/a	n/a	n/a
	#17	#23	 6878	  785	.23	17954
	#18	#1	 7100	  656	.26	18033
	#19	#21	 7104	  688	.24	17929
	#20	#13	 7301	 1004	.24	17940

	Looking this over, everything looks ok, and it is, with the exception
of wafer #5. I cannot explain why this wafer either:
1, took off an extreme amount of oxide off ( if prior thk is right).

2, the thickness for this wafer is wrong, (but due to not
having the pre measurement data available, this cannot be proved).

3, other.. let me know because I don't know.
The main reason this is even being considered to be manfactured, is to
let you know the extreme situation with this lot, what was done, what was
issued to be done, and of course, what wasn't done, which forces me to write
this to begin with. 

Wafer # 5 needs to be scrapped out. the rest of the lot is
going to touch up and barring any problems, should complete quickly.

Thank you and call me if you need anymore info.		

					Mark R. Provencher	
62.370XE0450 LOW INCOMING STEP @PMDYIELD::PHESTERSat Sep 14 1996 13:0631

                            PE PEX NOTIFICATION
                     

LOT #         XE0450

QUANTITY:      24

OPERATION #    3078 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          09/14/96  C-Shift

PROBLEM:       LOW INCOMING STEP ....PMD

               LOT INCOMING STEP AVG =  2746� 

                              LCL IS    3000�
              

DISPOSITION:   LOT RUNNING ON CMP.A2

CORRECTIVE
ACTION         NONE

 
62.371oper# 3053 THK_ILD2_PRE THK_RG high readingSUBPAC::KULPSun Sep 15 1996 07:4729
                              CMP PEX 
                     

LOT #:             XE0530	TM0069-032-BA-8C 

QUANTITY:          24

OPERATION #        3053 THK_CMP 10  THK_ILD2_PRE
  
POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A4

DATE:              09/11/96  B-SHIFT

PROBLEM:           Popped chart 3053 THK_ILD2_PRE THK_RG  UCL:1000
	
              THK_ME       N/A                     18016.000
              THK_RG       N/A                      1020.000  <---

 LOG AN EVENT EVENT END_RUN      FOR ENTITY THICKNESS.A4       9/15/96 02:01:53


DISPOSITION:       Lot moved on and polished. 
   
CORRECTIVE	   None
ACTION:            
                   
62.372oper# 3053 THK_ILD2_PRE THK_RG high readingSUBPAC::KULPSun Sep 15 1996 07:4830
                              CMP PEX 
                     

LOT #:             XE0524	TM0069-032-BA-8C 

QUANTITY:          24

OPERATION #        3053 THK_CMP 10  THK_ILD2_PRE
  
POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A4

DATE:              09/11/96  B-SHIFT

PROBLEM:           Popped chart 3053 THK_ILD2_PRE THK_RG  UCL:1000
	

              THK_ME       XE0524                  18097.000
              THK_RG       XE0524                   1333.000    <----

 LOG AN EVENT EVENT END_RUN      FOR ENTITY THICKNESS.A4       9/14/96 20:57:13


DISPOSITION:       Lot moved on and polished. 
   
CORRECTIVE	   None
ACTION:            
                   
62.373oper# 3120 THK_ILD2_PRE THK_RG high readingSUBPAC::KULPSun Sep 15 1996 07:5626
                              CMP PEX 
                     

LOT #:             XL0476     DC1044-003-EB-8P 

QUANTITY:          24

OPERATION #        3120 THK_CMP 10  THK_ILD2_PRE 3 
  
POLISHER:          CMP.B1

EVAL TOOL:         THICKNESS.A5

DATE:              09/11/96  B-SHIFT

PROBLEM:           Popped chart 3120 THK_ILD2_PRE THK_RG  UCL:1000
	
             THK_ME       JL0476                  17670.000
COL ENG DATA THK_RG       JL0476                   1101.000   9/14/96  21:11:10

DISPOSITION:       Lot moved on and polished. 
   
CORRECTIVE	   None
ACTION:            
                   
62.374CMP PEX, TWO WAFERS TOASTED FROM XE0530SUBPAC::SMARTINSun Sep 15 1996 17:3531
  

LOT:     XE0530

MACHINE: CMP.B3

OPER#:   1980

PROCESS  LEVEL: ILD-2

DATE:    9/15/96

SHIFT:   A-SHIFT

QUANTITY:  24 DOWN TO 22
    
PRODUCT..TM0069-032-BA-8C

 
 

PROBLEM: 2 WAFERS WERE SEVERLY OVER POLISHED AT ILD-2. WE BELIEVE THIS WAS A
         SHIFT CHANGE PROBLEM ACCORDING TO ART EDTL. TOUCHUP TIME WAS TOO LONG. 


DISPOSITION:  LOT WILL MOVED LESS TWO WAFERS.


CORRECTIVE ACTION:    


62.375oper# 3023 THK_ILD1_PRE high rangeSUBPAC::KULPMon Sep 16 1996 02:1728
                              CMP PEX 
                     

LOT #:             JD0498     DC1026-000-DJ-8G 

QUANTITY:          24

OPERATION #        3023 THK_CMP 6   THK_ILD1_PRE 3 
  
POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A5

DATE:              09/16/96  B-SHIFT

PROBLEM:           Popped chart 3023 THK_ILD1_PRE THK_RG UCL: 1000
	
	      THK_ME       JD0498                  17393.000
              THK_RG       JD0498                   1315.000

LOG AN EVENT EVENT END_RUN      FOR ENTITY THICKNESS.A5       9/15/96 21:11:52

DISPOSITION:       Lot moved on and polished. 
   
CORRECTIVE	   None
ACTION:            
                   
62.376CMP PEX, 15 WAFERS SCRAPPED DUE TO OVER POLISH FROM LOTXD0542SUBPAC::SMARTINMon Sep 16 1996 12:5234
  

LOT:     XD0542

MACHINE: CMP.B1

OPER#:   1981

PROCESS  LEVEL: ILD-1

DATE:    9/16/96

SHIFT:   A-SHIFT

QUANTITY:  20 DOWN TO 5
    
PRODUCT..TM0069-032-BA-8C 


 
 

PROBLEM: 15 WAFERS WERE SEVERLY OVER POLISHED AT ILD-1.
         THIS WAS AN OPERATOR ERROR. HE SHOULD HAVE DONE JUST A TOUCH UP
         BUT INSTEAD HE DID A FULL POLISH TIME FOR THE TOUCH UP.

DISPOSITION:  LOT WILL MOVED LESS 15 WAFERS.


CORRECTIVE ACTION: PLEASE TRY TO BE VERY CAREFULL AND DOUBLE CHECK WHAT STEP
                   YOU ARE POLISHING AND ALSO POLISH TIMES FOR THAT STEP
                   BEFORE RUNNING PRODUCT.


62.377CMP PEX, 5 WAFERS SCRAPPED ON LOT JD0412SUBPAC::SMARTINTue Sep 17 1996 18:2528
  

LOT:     JD0412

MACHINE: CMP.B1

OPER#:   1987

PROCESS  LEVEL: ILD_25

DATE:    9/17/96

SHIFT:   A-SHIFT

QUANTITY:  24 DOWN TO 19
    
PRODUCT..DC1026-012-DA-0D
 

PROBLEM: 5 WAFERS WERE SCRAPPED DUE TO POSSIBLE LOW SLURRY FLOW. ONE WAFER BROKE
         AND SCRATCHED THE OTHER FOUR TO DEATH.

DISPOSITION:  LOT WILL MOVED LESS 15 WAFERS.


CORRECTIVE ACTION: EE IS LOOKING INTO THE PROBLEM OF THE POSSIBLE LOW SLURRY
                   FLOW.

62.378JL0514 LOW STEP - INCOMING PMDYIELD::PHESTERWed Sep 18 1996 12:0929
                                 CMP PEX 
                     

LOT #          JL0514

QUANTITY:      24

OPERATION #    3362 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          09/18/96  C-Shift

PROBLEM:       LOW INCOMING STEP @PMD

               LOT INCOMING STEP AVG B = 4701�  

                                  LCL IS 3000�
               

DISPOSITION:   LOT MOVED TO RUN ON CMP.A2

CORRECTIVE
ACTION         NONE

62.379Pex for lot JL0510YIELD::SHONGThu Sep 19 1996 07:4124
                            PE PEX NOTIFICATION
                     

LOT #          JL0510

QUANTITY:      22

OPERATION #    3362 STP_L_CMP1
/DESCR.        

POLISHER:      N/A

EVAL TOOL:     Profiler.A2

DATE:          09/19/96 D-Shift

PROBLEM:       Incoming step height for PMD was high. The UCL is 4200�. The lot
	       came in at ~4300� for an average. 
                 
DISPOSITION:   I checked through the remarks but didn't find anything that would
	       indicate the problem. I sent the lot on. 
	
CORRECTIVE     None.
ACTION:       
62.380Pex for lot JD0482YIELD::SHONGThu Sep 19 1996 08:1423
                            PE PEX NOTIFICATION
                     

LOT #          JL0482

QUANTITY:      20

OPERATION #    1985 CMP_ILD2 
/DESCR.        

POLISHER:      CMP.B3

EVAL TOOL:     Both (Thickness.A4/A5)

DATE:          09/19/96 D-Shift

PROBLEM:       During the initial polish wafer # 14 was over polished. 
                 
DISPOSITION:   Add a remark at operation 2135 DEP_ILD3 to add an extra 2000� 
	       to wafer #14. 
	
CORRECTIVE     None.
ACTION:       
62.381JD0377 one wafer scrapped - over polish @ILD4YIELD::PHESTERThu Sep 19 1996 16:0636

                               CMP PEX 
                     

LOT #          JD0377   DC1026-012-DA-0D 

QUANTITY:      10 (11)

OPERATION #    2001 CMP_ILD4
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     THICKNESS.A5..."NAKED EYE" 

DATE:          09/18/96  C-SHIFT

PROBLEM:   WAFER RECEIVED HEAVY CENTER POLISH. LOT RAN AT 97/133 (ID/OD) TO 
	   TRY AND AVOID "EDGE HEAVY" REMOVAL.  METAL IN THE CENTER OF THE
	   WAFER WAS TAPPED.   ALL OTHER WAFERS CHECKED OUT FINE. 

           INITIAL POLISH TIME WAS 400 SEC.  INCOMING THICKNESS AVERAGE WAS
           36,560.  IT COULD NOT BE DETERMINED WHAT THE THICKNESS WAS AFTER
           THE INITIAL POLISH AS THE GROUPING THAT THE WAFER WAS IN FOR TOUCH
           UP COULD NOT BE IDENTIFIED.

DISPOSITION:  LOT MOVED ON.  WAFER #9 SCRAPPED.

CORRECTIVE:  PRODUCTION AGREES THAT A MORE CAREFUL CHECK OF CENTER SITE 
ACTION:      MEASUREMENTS MAY BE NEEDED PRIOR TO TO TOUCH UP.  HAD THIS BEEN 
             DONE IN THIS CASE, LOW CENTER THICKESS ON THIS PARTICULAR WAFER 
             MAY HAVE BEEN SPOTTED.  THIS IS ONLY THE SECOND LOT OF THIS DEVICE
             THAT HAS BEEN POLISHED.  SECONDARY POLISH TIMES ON SUBSEQUENT LOTS
             OF THIS DEVICE WILL BE MORE CAREFULLY DETERMINED.

62.382JD0501 OVER-POLISH @ILD1YIELD::PHESTERFri Sep 20 1996 12:5031
                            PE PEX NOTIFICATION
                     

LOT #          JD0501

QUANTITY:      24

OPERATION #    3954 THICK CMP
/DESCR.

POLISHER:      POST READINGS  CMP.B2

EVAL TOOL:     THICKNESS.A4

DATE:          09/18/96  C-Shift

PROBLEM:       LOW POST THICKNESS....ILD1

               LOW POST THICKNESS AVG = 5071�

                                 LCL IS 5200�
             
               INITIAL POLISH TIME BROUGHT MOST OF THE LOT TO WITHIN 1000�
               OF TARGET.  TOUCH UP WAS DONE WITH 1 SEC POLISH USING DIFFERENT
               DOWNFORCES PER SPEC.  

DISPOSITION:   LOT MOVED ON.

CORRECTIVE
ACTION         NONE.  NOT ENOUGH OVER-POLISH FOR EXTRA DEP AT CAP.
62.383JD0481 LOW INCOMING STEP @ILD3YIELD::PHESTERSat Sep 21 1996 14:3630

                                CMP PEX NOTIFICATION
                     

LOT #          JD0481

QUANTITY:      24

OPERATION #    3081 STEP_ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          09/21/96  C-Shift

PROBLEM:       LOW INCOMING STEP ....ILD3

               LOT INCOMING STEP AVG = 19680�

                                LCL IS 20000�


DISPOSITION:   LOT MOVED ON - RUNNING ON CMP.B2

CORRECTIVE
ACTION         NONE

62.384jd0501 4 wfrs scrap overpolishSUBPAC::KULPSun Sep 22 1996 09:06115
                              CMP PEX 
                     

LOT #:             JD0501	DC1026-000-EA-8G

QUANTITY:          24

OPERATION #         1985 CMP_ILD2    CMP  
  
POLISHER:          CMP.B1

EVAL TOOL:         THICKNESS.A4

DATE:              09/22/96  B-SHIFT

PROBLEM:           4 wafer over polish 


DISPOSITION:       Wafers still need touch up.   4 scrapped wafers
   
CORRECTIVE	   None
ACTION:            


                   

	Ken,
	
	This is regarding lot JD0501, ILD2,1026ea, HOT lot, 24 wafers. The
	following items are what had transpired:

	1. Lot was checked for remarks, no remarks found.

	2, Lot was measured for thickness, on thickness.A5, using the folder
	   1026.  This folder rejected the pattern, so I tried using the folder
	   1026 ea. This produced good thickness readings, with a proper 
	   goodness of fit.  The results were averaged, and range was 
	   calculated.
	   
	   They were:

		AVG - 17600� 
		RNG.-   754�

	3, P2 measurements were taken on profiler.A2. Results are:
		C - 9288	e - 9631
		C - 9147	e - 9077

	4. The wafers that were used for thickness (slots #1,6,13,20,and 23),
	   were used as send aheads for the lot.  They were run on CMP.B1. Five
	   Fresh "out of the pod" 50k wafers were used as breakin wafers, before
	   the send aheads were polished. Product was polished for 150 seconds.

	5, The send aheads were scrubbed, and remeasured on thickness A5.here
	   are the results and calculation for removal rate for the lot:

      slot #	pre_avg_thk	post thk	removal rate	g.o.f
		
	   1	17600		 9110		   3396          .22
	   2	"   "		 9175		   3369          .22
	   3 	"   "		 9973		   3050          .28 
	   4	"   "		 9010		   3435          .26 
	   5	"   "		10142		   2983          .27

	   avg r/r - 3246 calculated run time for the lot - 223 seconds

	Note - Normally we would use this time to run the lot.  When I run 4
	       product wafers with a spacer, I will deduct 10 seconds for the
	       accelerated removal rate that we will get when we use a spacer.

	6. I changed the time from 150 second, to 213 seconds on recipe ILD2,
	   saved it, and double checked it.*note* Notice that I used 213 sec. 
	   instead of the calculated 223 sec.. I had taken 10 second off the 
	   time, for the entire lot.

	7. The lot was run for 213 seconds, with the same breakin wafers in the
           first five slots. and a new 50k breakin wafer was used as a Spacer,
           or dummy wafer, placed in slot #23. upon completion the lot was
           scrubbed, and lot 100% measurement was taken on thickness.A5.
	   The results are as follows:

   slot #  thk	          slot #  thk              slot #  thk
	   
    1    breakin           9 	7859		    17   6717
    2    breakin          10    8166                18   5610
    3    breakin          11    7125                19   6597
    4    breakin          12    6685                20   6609
    5    breakin          13    6990                21    815
    6    8246             14    6839                22    353
    7    8411             15    7198                23    breakin/spacer
    8    8209             16    6062                24    975
                                                    25    1382

            * goodness of fit on entire lot was acceptable *

	Now if there was an issue of wafers being thin , wouldn't they show up
        thin intermittently throughout the lot?
	
	Or if there was a certain carrier taking off too much, they would be 
	showing up every fifth wafer.  The data does show that the removal 
	rate was creeping up, and we expect the removal rate to typically jump 
	up somewhat, when we use a spacer wafer to fill out a run. But 
	not like this.
 
	I even used the time designated, for this set of circumstances, for the
 	entire lot. 

	If you have an answer to this please let me know.
	wafers #4, #14, #2, and #17 will have to be scrapped out.

							Thank you 

						Mark R. Provencher

62.385JL0487 2 scrapped wfrs over polishSUBPAC::KULPSun Sep 22 1996 09:19105
                              CMP PEX 
                     

LOT #:             JL0487 	DC1044-003-EB-8P 

QUANTITY:          24

OPERATION #        1994 CMP_ILD2    CMP
  
POLISHER:          CMP.B1

EVAL TOOL:         THICKNESS.A4

DATE:              09/22/96  B-SHIFT

PROBLEM:           2 wafers over polish 


DISPOSITION:       Wafers still need touch up.   2 scrapped wafers
   
CORRECTIVE	   None
ACTION:            


      Ken,

        This is regaurding lot JL0487, ILD2, DC1044, 24 wafers. The
	following items are what had transpired:

        1. Lot was checked for remarks, no remarks found.

        2. Lot was measured for thickness, on thickness.A4, using the folder
           1044. This produced good thickness readings, with a proper
           goodness of fit. The results were averaged, and range was
	   calculated.
           
	   They are:
                AVG - 18112�
                RNG.-   430�

        3. P2 measurments were taken on profiler.A2. Results are:

                c - 9180        e - 9576
                c - 9075        e - 9428

        4. The wafers that were used for thickness (slots #1,6,13,20,and 23),
           were used as send aheads for the lot. They were run on cmp.B1. Five
           decent 50k wafers were used as breakin wafers, before
           the send aheads were polished. Product was polished for 150 seconds.

        5, The send aheads were scrubbed, and remeasured on thickness A5.here
           are the results and calculation for removal rate for the lot:

           slot #  pre_avg_thk     post thk        removal rate    g.o.f

            1      18112            7586              4210         pass
            2      "   "            7638              4189         pass
            3      "   "            7957              4062         pass
            4      "   "            7694              4167         pass
            5      "   "            7939              4069         pass

                avg r/r - 4139 calculated run time for the lot - 182 seconds

    Note - Normally we would use this time to run the lot. And when I run 4
           product wafers with a spacer, I will deduct 10 seconds for the
           excellerated removal rate that we will get when we use a spacer.

        6. I changed the time from 150 sec, to 165 seconds on recipe ILD2,
           saved it, and double checked it (minus 17 sec.). This time for wafer
           slot #11 - #15 I used the ILD1 recipe, with a time of 150 seconds,
           (minus 32 seconds of calculated time). and double checked that time.

        7. The lot was run for the alotted times,with the same breakin wafers
           in the first five slots. and a decent 50k breakin wafer was used
           as a Spacer, or dummy wafer, placed in slot #13. upon completion
           the lot was scrubbed, and lot 100% measument was taken on thickness.
           A4.
           
	   The results are as follows:

   slot #  thk            slot #  thk              slot #  thk

    1    breakin           9    7395                17   7954
    2    breakin          10    7841                18   8028
    3    breakin          11    2681                19   7759
    4    breakin          12    1673                20   7740
    5    breakin          13    breakin/spacer      21   7184
    6    7835             14    3410                22   7273
    7    7805             15    3503                23   7401
    8    7880             16    7621                24   7206
                                                    25   7294

        Now, this has happened a second time in a row, wafers that were 
	grouped together with a spacer,(slots #11,12,13,14,15) was run at 
	less than the time, on the same tool, that was calculated.  This 
	time the time taken off was over 30 seconds.


                                                        Thank you

                                                Mark R. Provencher
                                                     ex 4774
                                                                        

62.387xd0528 thk_ILD3_PST, popped chart stdv 16.1SUBPAC::KULPWed Sep 25 1996 06:5125
                              CMP PEX 
                     

LOT #:             XD0528 	TM0069-032-BA-8C  

QUANTITY:          24

OPERATION #        3064 THK_CMP 16  THK_ILD3_PST 3 
  
POLISHER:          CMP.B3 actually run on B2

EVAL TOOL:         THICKNESS.A4

DATE:              09/25/96  B-SHIFT

PROBLEM:           Popped chart CMP.B3 THK_ILD3_PST THK_SD_5
		   UCL: 10 , data point 16.1  Mean and range chart fine.
                   CMP.B2 had a carrier # 2 and pad changed. 

DISPOSITION:       Moved lot on 
   
CORRECTIVE	   Told ops tech to be careful entering data into the right
ACTION:            entity

62.388JL0514 - 3114 THK_ILD1_PST 3, popped chart stdv 13.78 UCL:10SUBPAC::KULPWed Sep 25 1996 06:5626
                              CMP PEX 
                     

LOT #:             JL0514	DC1044-003-EB-8P         

QUANTITY:          24

OPERATION #        3114 THK_CMP 8   THK_ILD1_PST 3   
  
POLISHER:          CMP.A2

EVAL TOOL:         THICKNESS.A5

DATE:              09/25/96  B-SHIFT

PROBLEM:           Popped chart CMP.A2 THK_ILD1_PST THK_SD_5
		   UCL: 10 , data point 13.78.  Mean and range chart fine.


DISPOSITION:       Moved lot on 
   
CORRECTIVE	   None
ACTION:            

    
62.389XEO552 LOW INCOMING STEP @PMDYIELD::PHESTERThu Sep 26 1996 20:4528
                            PE PEX NOTIFICATION
                     

LOT #          XE0552

QUANTITY:      17

OPERATION #    3078 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          09/26/96  C-Shift

PROBLEM:       LOW INCOMING STEP ....PMD

               LOT INCOMING STEP AVG = 2425�  

                             LCL IS    3000�
        

DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         NONE
62.390JD0468 HIGH OUTGOING SD @ILD3YIELD::PHESTERFri Sep 27 1996 18:4945
                              CMP PEX 
                     

LOT #:             JD0468

QUANTITY:          24

OPERATION #        3064 THK_CMP 16  THK_ILD3_PST
 
POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A5
        
DATE:              08/21/96

PROBLEM:           HIGH SD AVERAGE ON OUTGOING THICKNESS.
                                                                RANGE

              THK_ME_5     WAFER #1                 9303.000   * 5787  .129 gof
                           WAFER #2                 9961.000
                           WAFER #3                 9325.000
                           WAFER #4                 9757.000
                           WAFER #5                 9653.000
              THK_RG       JD0468                   6052.000
              THK_SD_5     WAFER #1                   26.100
                           WAFER #2                   12.200
                           WAFER #3                    7.790
                           WAFER #4                    9.680 
                           WAFER #5                   17.500   

                                               
                           * HIGH RANGE ON THIS WAFER WAS CAUSED BY ONE POINT
                             OUT OF THE NORM.  THE GOODNESS OF FIT FOR THIS
                             POINT WAS LOW.  THIS WAS NOT A 1050 RECIPE PROBLEM
                             AS ALL SUBSEQUENT READINGS IN THIS FOLDER HAD GOOD
                             FIT.


DISPOSITION:  LOT MOVED ON.
   
CORRECTIVE
ACTION:       CONCLUDED PROCESS EXCURSION WAS DUE TO A POOR READING FOR THE ONE
              POINT DISCUSSED ABOVE.  NO FURTHER ACTION TAKEN.
                                       
62.391XD0554 Popped chart CMP.B3 THK_ILD3_PST THK_SD_5SUBPAC::KULPSat Sep 28 1996 07:2726
                              CMP PEX 
                     

LOT #:             XD0554  	TM0069-032-BA-8C  

QUANTITY:          23

OPERATION #        3064 THK_CMP 16  THK_ILD3_PST 3 
  
POLISHER:          CMP.B3 

EVAL TOOL:         THICKNESS.A5

DATE:              09/28/96  D-SHIFT

PROBLEM:           Popped chart CMP.B3 THK_ILD3_PST THK_SD_5
		   UCL: 10 , data point 14.080 Mean and range chart fine.
                   CMP.B3 was running with an older pad, was touched up
		   on CMP.b2 which had a newer pad to bring in uniformity.

DISPOSITION:       Moved lot on 
   
CORRECTIVE	   None 
ACTION:            

62.392JL0488 LOW INCOMING STEP @ILD1YIELD::PHESTERSat Sep 28 1996 09:1729

                            PE PEX NOTIFICATION
                     

LOT #          JL0488

QUANTITY:      23

OPERATION #    3193 STEP_ILD1
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          09/27/96  C-Shift

PROBLEM:       LOW INCOMING STEP ....ILD1

               LOT INCOMING STEP AVG = 9632� 

                                LCL IS 9600�
               

DISPOSITION:   LOT MOVED TO POLISH ON CMP.B2

CORRECTIVE
ACTION         NONE
62.393JD0500 OPEN PEX - 1 WAFER SCRAPPEDYIELD::PHESTERSat Sep 28 1996 17:0635

                              CMP PEX 
                     

LOT #:             JD0500  DC1026-000-DJ-8G

QUANTITY:          24

OPERATION #        3064 THK_CMP 16  THK_ILD3_PST
 
POLISHER:          SCRUB.A3

EVAL TOOL:         N/A
        
DATE:              09/27/96 06:46 AM  D Shift
                                   

PROBLEM:           One wafer broken on scrubber.
                                                

DISPOSITION:       LOT MOVED ON.
   
CORRECTIVE
ACTION:            Unknown.  There was no PSS on duty this shift.  This 
                   incident was not documented in Notesfile.  The EE Tech who
                   handled the situation left the following morning for vacation
                   and will not be back until 10/3.  Secondhand information
                   reveals that EE felt is was an operator error in that the
                   cassette was not properly placed in the recieving platform.
                   However this is the extent of the information available.  No
                   corrective action to verify the tool is known or verified
                   although it is assumed that it was thouroughly checked out
                   before returning to production.  This PEX will be completed
                   when the EE tech can be interviewed.
62.394XE0530 high outgoing range/SD @ILD3....YIELD::PHESTERSat Sep 28 1996 17:1264

                               CMP PEX 
                     

LOT #          XE0530  TM69

QUANTITY:      22

OPERATION #    3064 THK_CMP 16  PST READINGS ILD3
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     THICKNESS.A5

DATE:          09/28/96 C-Shift

PROBLEM:      HIGH OUT GOING RANGE/SD @ILD3 
              
	      LOT OUTGOING RANGE = 4741�             UCL IS 4500�
        
	      LOT OUTGOING STD DEV AVG WAS 13.012    UCL IS 10		

                 THK_ME_5    THK_SD_5   W/W RANGE       MIN/MAX      GOF

  WAFER #1       9958.000      13.400        3093    8201/11,293    >.293
  WAFER #2       9507.000       7.960        1922    8540/10462     >.293
  WAFER #3      10297.000      13.400        3627    8357/11,984    >.313
  WAFER #4      10349.000      15.700        4669    8273/12,942    >.306 *
  WAFER #5       9977.000      14.600        3575    8697/12,272    >.285

                  ----------------------------------

  THK_RG          XE0530     4741.000
                                                    
  STD DEV AVG     XE0530       13.012  

  * Test point 2,7 had the highest thickness at 12,942.  Test point 7,2 had
    the second lowest thickness at 9086.  Both of these coordinates are toward
    the edge.  Rules out heavy center/edge polish.

    Wafer #20 was evaluated on THICKNESS.A4 and again on THICKNESS.A5 with the
    folowing results:

                         THK.A5 (1)       THK.A4         THK.A5(2)

COORDINATE   2,7         12,942           12,467         12,940
             3,4         11,054           11,598         11,054
             5,6         10,142            9,153         10,142
             6,4          8,273            8,900          8,276
             7,2          9,086           11,047          9,089
             7,8         10,595           10,491         10,594

                 MEAN    10,348           10,639         10,349
                 RANGE    4,669            3,747          4,665

DISPOSITION:  LOT MOVED ON.


CORRECTIVE
ACTION:       NONE.  MAJORITY OF RANGE/SD PROBLEM IS WITHIN WAFER (W/W).  ALSO
              THERE IS A LARGE DISCREPANCY BETWEEN EVALUATION TOOLS.

62.395JD0506 2 broke wfrs slurry lossSUBPAC::KULPSun Sep 29 1996 07:3236
                              CMP PEX 
                     

LOT #:             JD0506    DC1026-000-DJ-8G    

QUANTITY:          24-2= 22

OPERATION #        1981 CMP_ILD1    CMP 
  
POLISHER:          CMP.A1 

EVAL TOOL:         n/a                

DATE:              09/29/96  B-SHIFT

PROBLEM:           Broke 2 wafers, lost slurry.

DISPOSITION:       Wafers have not complete polish waiting on MQC's
   
CORRECTIVE	   None 
ACTION:            


Note 15.1                   STRASBAUGH GENERAL ISSUES                    1 of 1
LUDWIG::RIDLON "Eliminate the oblivious"             11 lines  29-SEP-1996
03:59
                                -< slurry loss >-

    Both tools crashed tonight (A1 @1, A2 @1:30) as a result of loosing slurry
    to the room. Ahsland was called and responded in a timely manner. His
    report was that the filter had clogged (which was changed on Friday).
    Two product wafers were lost per tool.


                                                B-shift
62.396xe0541 2 broke wfrs slurry lossSUBPAC::KULPSun Sep 29 1996 07:3636
                              CMP PEX 
                     

LOT #:             XE0541 TM0069-007-BA-8C 

QUANTITY:          16-2 = 14

OPERATION #        1981 CMP_ILD1    CMP 
  
POLISHER:          CMP.A2 

EVAL TOOL:         n/a                

DATE:              09/29/96  B-SHIFT

PROBLEM:           Broke 2 wafers, lost slurry.

DISPOSITION:       Wafers have not complete polish waiting on MQC's
   
CORRECTIVE	   None 
ACTION:            


Note 15.1                   STRASBAUGH GENERAL ISSUES                    1 of 1
LUDWIG::RIDLON "Eliminate the oblivious"             11 lines  29-SEP-1996
03:59
                                -< slurry loss >-

    Both tools crashed tonight (A1 @1, A2 @1:30) as a result of loosing slurry
    to the room. Ahsland was called and responded in a timely manner. His
    report was that the filter had clogged (which was changed on Friday).
    Two product wafers were lost per tool.


                                                B-shift
62.397CMP PEX,2 WAFERS CRASHED FROM LOT JD0524SUBPAC::SMARTINMon Sep 30 1996 15:5546
  

LOT:     JD0524

MACHINE: CMP.A2

OPER#:   1978

PROCESS  LEVEL: PMD

DATE:    9/30/96

SHIFT:   A-SHIFT

QUANTITY:  24 DOWN TO 22

PRODUCT..DC1026-041-DJ-8G 
 

PROBLEM: 2 CRASHED WAFERS ON THE PAD. NEEDS PAD/CARRIER            
                        CHANGE.....  

DISPOSITION:  LOT WILL MOVED LESS 2 WAFERS.


CORRECTIVE ACTION: PAD AND CARRIER CHANGE.

PARAMETERS:
 1) System: A2
 2) Recipe: PMD
 3) Step #: #3
 4) Time into step: 10 SEC.
 5) Type of wafers that broke: PRODUCT
 6) Carrier which wafer slid out of: RIGHT
 7) Other carriers that were damaged: BOTH
 8) Alarms displayed by polisher: RIGHT SPINDLE NOT ARRIVING UP.
 9) Did any other polisher error for slurry or crash: NO, systems____________
10) Did wafer detect work: N/A
11) # of wafers on pad: 300
12) # of wafers on carrier: 150
13) Was there any vibration prior to the crash: NO
14) Was there plenty of slurry (for step 1-5) or water (step 6-9) present on
    the table: YES
15) Check step hight of the carrier from question #6: TRASHED
16) Please note any other unusual circumstances: NONE

62.398CMP PEX,4 WAFERS OVER POLISHED ON LOT JL0509SUBPAC::SMARTINTue Oct 01 1996 17:2526
  

LOT:     JL0509

MACHINE: CMP.B1

OPER#:   1994

PROCESS  LEVEL: ILD-2

DATE:    10/1/96

SHIFT:   A-SHIFT

QUANTITY:  24 DOWN TO 20

PRODUCT...DC1040-001-DB-8P
 

PROBLEM: 4 WAFERS WERE OVER POLISHED DUE TO THE FACT THAT THE CARRIERS STOPPED
         ROTATING DURING THE POLISH.  TOOL IS DOWN FOR CARRIERS NOT ROTATING.

DISPOSITION:  LOT WILL BE MOVED LESS 4 WAFERS.


CORRECTIVE ACTION: EE IS LOOKING INTO WHAT THE PROBLEM MIGHT BE
62.399JD0526 SLIGHT OVER-POLISH @PMDYIELD::PHESTERThu Oct 03 1996 11:1647

                              CMP PEX 
                  
LOT #:             JD0526   DC1026-000-DJ-8G   

QUANTITY:          24
 
OPERATION #        THK_PMD_PST      
 
POLISHER:          CMP.A1

EVAL TOOL:         N/A
        
DATE:              10/02/96  C Shift
                                   

PROBLEM:           LOT OUTGOING THICKNESS AVERAGE WAS 6197�.  LCL IS 6200�.

                                              THICKNESS      RANGE     GOF
 
              THK_ME_5     WAFER #1           6210.000       1162     .215
                           WAFER #2           6032.000        961     .259
                           WAFER #3           6258.000        483     .191
                           WAFER #4           6576.000        743     .190
                           WAFER #5           5912.000        696     .252
              THK_RG       JD0526             1468.000
              THK_SD_5     WAFER #1              6.200
                           WAFER #2              5.300
                           WAFER #3              2.900
                           WAFER #4              4.000
                           WAFER #5              4.300

              REMOVAL RATE FOR SEND AHEAD WAFERS WAS  LEFT:  1300 �PM
                                                      RIGHT: 1200 �PM

              TOUCH-UP PERFORMED USING ABOVE RATES.

DISPOSITION:       LOT MOVED ON.
   
CORRECTIVE
ACTION:       MFG. HAS REPORTED CONTROL PROBLEMS SINCE A SLURRY FLUSH/CHANGE 
              ON 9/27.  THIS HAS BEEN PRIMARILY DUE TO LOW REMOVAL RATES.
              HOWEVER REMOVAL RATES ON THIS TOOL ARE ABOVE THE CONTROL LIMIT AND
              WELL IN SPEC.  GOODNESS OF FIT FOR THICKNESS READINGS WAS HIGH
              AND CONSISTENT.  THIS WAS A MINOR OVER-POLISH AND NO ACTION WAS 
              TAKEN.
62.400JD0533 HIGH OUTGOING SD @ILD2YIELD::PHESTERThu Oct 03 1996 18:3842
                               CMP PEX 
                     

LOT #          JD0533    DC1026 EA

QUANTITY:      24

OPERATION #    3054 THK_CMP 16  
/DESCR.

POLISHER:      CMP.B3    PST READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          10/3/96 C-Shift

PROBLEM:      HIGH OUT GOING RANGE ILD2
              
	      LOT OUTGOING STD % = 10% ~  UCL IS 10%
        
	      *** LOT OUTGOING RANGE WAS W/IN SPEC AT 2658�. ***

		- FINAL MEASUREMENTS WERE, 

                    THICKNESS      SD        RANGE

	WAFER# 1	5854       8.54    
	       2	5184       6.87
	       3	5857      10.0
	       4	5570      11.0
	       5	4916      13.8
		
DISPOSITION:   LOT MOVED ON

CORRECTIVE 
ACTION:        NONE.  ATTEMPT TO CHECK GOF AND RANGE FOR THIS LOT UNSUCCESSFUL.
               ENGINEERING WAS PERFORMING AN OPTIMIZATION ON THE UV1050 AND
               THIS DATA WAS OVER WRITTEN.  THE PROBLEM BEING WORKED ON WAS
               THAT THE TOOL WAS NOT THROWING OUT DATA POINTS WITH BAD GOF.
               THIS WOULD CAUSE RANGE AND SD TO BE ARTIFICIALLY HIGH IN SOME
               CASES.  THIS WAS POSSIBLY THE CASE HERE.
62.401JD0557 LOW INCOMING STEP HEIGHTYIELD::PHESTERSat Oct 05 1996 20:0130
                              CMP PEX 
                     

LOT #:JD0557	                

QUANTITY:   24      

OPERATION #   3078      

POLISHER:      N/A

EVAL TOOL:    PROFILER.A2     

DATE:         10/5/96    

PROBLEM:      LOW INCOMING STEP HEIGH AVERAGE AT 2922�   PMD

              LCL (LCL=3000�)       
                            

DISPOSITION:    LOT MOVED ON
   
CORRECTIVE
ACTION:       NONE




                                        
62.402JD0548 two wafers scrappedYIELD::PHESTERSat Oct 05 1996 20:0627
                              CMP PEX 
                     

LOT #: JD0548	                

QUANTITY:   20      

OPERATION #   2957      

POLISHER:      N/A

EVAL TOOL:     N/A

DATE:         10/5/96    

PROBLEM:      TWO WAFERS SCRAPPED WHEN THEY SLIPPED OUT OF CASSETTE WHILE MFG

DISPOSITION:    LOT MOVED ON
   
CORRECTIVE
ACTION:       NONE




                                        
62.403XE0541 HIGH OUTGOING SD @ILD2YIELD::PHESTERSat Oct 05 1996 20:1137

                               CMP PEX 
                      

LOT #          XE0541	

QUANTITY:      14

OPERATION #    3066 THK_CMP 16  
/DESCR.

POLISHER:      PST READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          10/5/96 C-Shift

PROBLEM:      
	      LOT OUTGOING STD % = 12.5%~  UCL IS 10%  ILD2
        
		
	- FINAL MEASUREMENTS -
       SLT 	MEAN 	STD%
	1-	5651	12.9
	6- 	5837	12.3
	13- 	5640	12.4
	20- 	NA
	23- 	NA
	
	LOT LOOKED GOOD R=1657 

DISPOSITION:  LOT MOVED ON

CORRECTIVE ACTION:  LOW REMOVAL RATES HAVE BEEN CAUSING POLISHING PROBLEMS
                    THIS IS BEING ADDRESSED.

62.404JL0517 high outgoing SD @ILD2YIELD::PHESTERSat Oct 05 1996 20:1535
                               CMP PEX 
                     

LOT #          JL0517	

QUANTITY:      12

OPERATION #    3274 THK_CMP 16  
/DESCR.

POLISHER:      PST READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          10/5/96 C-Shift

PROBLEM:      
	      LOT OUTGOING STD % = 11.3%~  UCL IS 10%  ILD2
        
		
	- FINAL MEASUREMENTS -
       SLT 	MEAN 	STD%
	1-	5849	8.93
	6- 	5679	14.3
	13- 	5850	12.3
	20- 	NA
	23- 	NA
	
	LOT LOOKED GOOD R=1643,   

DISPOSITION:  LOT MOVED ON

CORRECTIVE ACTION: LOW REMOVAL RATES HAVE BEEN CAUSING POLISHING PROBLEMS
                    THIS IS BEING ADDRESSED.
62.405jd0557 2 wfrs broke cmp.a1SUBPAC::KULPSun Oct 06 1996 08:4133
                              CMP PEX 
                     

LOT #:             JD0557 	DC1026-000-EA-8G   

QUANTITY:          24-2 = 22

OPERATION #        864 FURN_PMD 
  
POLISHER:          CMP.A1 

EVAL TOOL:         n/a                

DATE:              10/06/96  B-SHIFT

PROBLEM:           Broke 2 wafers, unknown         

DISPOSITION:       happened @ 19:30 no information left at passdown   
   
CORRECTIVE	   None 
ACTION:            

Note 5.263


    Tool had crashed just before passdown. Did a visual and could find no
    evidence for a reason. Pad was flat, it was product, slurry in lines,
    and no way to tell if it was the carriers or not. Changed everything
    except for the conditioner disk. Pad cond x10. Gave back for
    bkin/mqc's.

                                        B-shift
62.406cmp.a2 2 broken wfrsSUBPAC::KULPMon Oct 07 1996 08:3234
                              CMP PEX 
                     

LOT #:             JD0559   DC1026-000-EA-8G 

QUANTITY:          24-2 = 22

OPERATION #        1978 CMP_PMD     CMP
  
POLISHER:          CMP.A2 

EVAL TOOL:         n/a                

DATE:              10/07/96  B-SHIFT

PROBLEM:           Broke 2 wafers, loss of slurry  

DISPOSITION:       wafers finished polish, then sent to touch up      
   
CORRECTIVE	   None 
ACTION:            

Note 7.239 

   CRASH, and just like that two product wafers turned to sand. Root cause
    for crash suspected to be slurry flow. Air bubbles found in supply line
    in rear vmb. CDU in slurry room pumping very slowly. Called ashland.
    Filters switched and flow came back to normal.
    New pad, carriers, cond disk. Needs mqc's.


                                        B-shift

62.407xe0557 broke 1 wfr CMP_SCRUB1.a1SUBPAC::KULPTue Oct 08 1996 10:3632
                              CMP PEX 
                     

LOT #:             XE0557        PRODUCT...TM0069-007-BA-8C   

QUANTITY:          24-1 = 23 

OPERATION #        1979 CMP_SCRUB1
  
POLISHER:          n/a

EVAL TOOL:         n/a                

DATE:              10/08/96 05:39:43

PROBLEM:           Broke 1 wafer	

DISPOSITION:       wafers moved on
   
CORRECTIVE	   EE fixed CMP-SCRUB.A1
ACTION:            

Note 36.143

    Dropped and broke a product a wafer. Found that the robot was too high
    over the lifter and the wafers were dropping into the blade. Increased
    the "robot at rcv" calibration by 5 counts. Observed several wafers
    unload and all looked good.


                                                B-shift
62.4084 wafer overpolish 3 scrap JD0533SUBPAC::KULPWed Oct 09 1996 09:2528
                              CMP PEX 
                     

LOT #:             JD0533        PRODUCT...DC1026-000-EA-8G  

QUANTITY:          24-3 = 21 

OPERATION #        1979 CMP_SCRUB1
  
POLISHER:          CMP.B3   

EVAL TOOL:         THICKNESS.A5 

DATE:              10-9-96  b shift

PROBLEM:           4 wafers were over polished at touch up.  Breakin wafer
		   was used and times were not reduced for using breaakin.

		   wfr10: 3159
		   wfr 9: 3150
	           wfr12: 3408
		   wfr 7: 2770

DISPOSITION:       wafers 10, 9 and 7 were scrapped out < 3400 
		   wfr 12 was remarked for additional dep.
   
CORRECTIVE	   Reminded ops tech to reduce time when using dummy wafer
62.409CMP PEX, TWO WAFERS OVER POLISHED ON LOT JD0523SUBPAC::SMARTINWed Oct 09 1996 18:2928
  

LOT:     JD0523

MACHINE: CMP.B3

OPER#:   1985

PROCESS  LEVEL: ILD-2

DATE:    10/9/96

SHIFT:   A-SHIFT

QUANTITY:  23 DOWN TO 21

PRODUCT...DC1026-041-DJ-8G 

 

PROBLEM: 2 WAFERS WERE OVER POLISHED. OPERATOR BELIEVES THAT THEY CAME INTO
         THE AREA TOO THIN. PROBLEM WAS FOUND WHEN A 100% WAS DONE ON THE LOT.


DISPOSITION:  LOT WILL BE MOVED LESS 2 WAFERS.


CORRECTIVE ACTION: NONE
62.410XD0534 LOW OUTGOING THICKNESS @PMDYIELD::PHESTERSat Oct 12 1996 18:1228
                            PE PEX NOTIFICATION
                     

LOT #          XD0534

QUANTITY:      22

OPERATION #    2957 POST THICKNESS-PMD
/DESCR.

POLISHER:      POST READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          10/10/96  C-Shift

PROBLEM:       LOW POST THICKNESS....PMD

               LOT POST THICKNESS AVG = 6187� 

                                 LCL IS 6200�
        
DISPOSITION:   LOT POLISHED ON CMP.B3, RAN FOR 15 SECONDS.  

CORRECTIVE
ACTION         LOT MOVED ON

62.411JL0531 HIGH OUTGOING SD @ ILD2YIELD::PHESTERSat Oct 12 1996 18:1538
                               CMP PEX 
                     

LOT #          JL0531	

QUANTITY:      23

OPERATION #    3274 THK_CMP 16  
/DESCR.

POLISHER:      PST READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          10/10/96 C-Shift

PROBLEM:      
	      LOT OUTGOING STD % = 10.93%~  UCL IS 10%
        
		
	- FINAL MEASUREMENTS -
       SLT 	MEAN 	STD%
	1-	5820	10.7
	6- 	5590	10.8
	13- 	5387	11.0
	20- 	5064    11.7
	23- 	NA
	
	LOT LOOKED GOOD R=2645

DISPOSITION:    LOT MOVED ON.  MANY LOTS WITH HIGH SD RECENTLY.  THERE HAVE BEEN
                PROBLEMS WITH SLURRY COMPOSITION BUT THESE ARE BELIEVED TO HAVE
                BEEN RESOLVED.  PE IS AWARE.

CORRECTIVE 
ACTION:         NONE

62.412JD0548 HIGH OUTGOING SD @ILD1YIELD::PHESTERSat Oct 12 1996 18:1733

                            CMP PEX 
                     

LOT #          JD0548

QUANTITY:      20

OPERATION #    3054 POST THICKNESS-ILD1
/DESCR.

POLISHER:      POST READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          10/11/96  C-Shift

PROBLEM:       HIGH % DEV. POST

               POST % DEV. AVG= 18.2�

                         LCL IS 10.0�

               LOT POLISHED ON CMP.B3

DISPOSITION:   LOT MOVED ON.  MANY LOTS WITH HIGH SD RECENTLY.  THERE HAVE BEEN
               PROBLEMS WITH SLURRY COMPOSITION BUT THESE ARE BELIEVED TO HAVE
               BEEN RESOLVED.  PE IS AWARE.

CORRECTIVE
ACTION         NONE

62.413XD0558 HIGH OUTGOING SD @ILD2YIELD::PHESTERSat Oct 12 1996 18:1939

                            CMP PEX 
                     

LOT #          XD0558

QUANTITY:      21

OPERATION #    3066 POST THICKNESS.A5
/DESCR.

POLISHER:      POST READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          10/12/96  C-Shift

PROBLEM:       HIGH % DEV POST THICKNESS ILD-2

               POST % DEV AVG=11.4�  UCL@ 10.0�

               LOT POLISHED ON CMP.B3

DISPOSITION:   WAFER #     % DEV
                 1           9.5
                 2          11.3
                 3          13.0
                 4          11.3
                 5          12.3

               RANGE WAS GOOD.

               LOT MOVED ON.  MANY LOTS WITH HIGH SD RECENTLY.  THERE HAVE BEEN
               PROBLEMS WITH SLURRY COMPOSITION BUT THESE ARE BELIEVED TO HAVE
               BEEN RESOLVED.  PE IS AWARE.

CORRECTIVE
ACTION         NONE
62.414CMP PEX, A1 CRASHED, TWO WAFERS BROKEN ON JD0576SUBPAC::SMARTINSun Oct 13 1996 17:4356
  

LOT:     JD0576

MACHINE: CMP.A1

OPER#:   1978

PROCESS  LEVEL: PMD

DATE:    10/13/96

SHIFT:   A-SHIFT

QUANTITY:  24 DOWN TO 22

PRODUCT...DC1026-000-JA-8G
 

 

PROBLEM: TWO PRODUCT WAFERS CRASHED ON PAD.

DISPOSITION:  LOT WILL BE MOVED LESS 2 WAFERS.

SYSTEM STATUS:

1) System __CMP.A1___
 2) Recipe __PMD______
 3) Step # _3___
 4) Time into step __25__
 5) Type of wafers that broke _PRODUCT (PMD LOT AT TOUCHUP).
 6) Carrier which wafer slid out of _LEFT_
 7) Other carriers that were damaged _BOTH___
 8) Alarms displayed by polisher _ROTATE AXIS ERROR
                                 ______________________________________________
                                 ______________________________________________
 9) Did any other polisher error for slurry or crash _NO_, sysytems____________
10) # of wafers on pad __58__
11) # of wafers on carrier __43__
12) Was there any vibration prior to the crash __NO__
13) Was there plenty of slurry (for step 1&2) or water (step 3) present on
    the table __YES____
14) Check step height of the carrier from question #6 _ 7.0 (SEE
QUESTION#15)

15) Please note any other unusual circumstances:
            
FOUND SCREW MISSING FROM WHITE RETAINER RING ON LEFT CARRIER. STEP HEIGHT
AT THIS POINT WAS 2.0MIL VS 7.0MIL AROUND THE REST OF THE CARRIER. IT'S
VERY POSSIBLE THIS CONTRIBUTED TO THE WAFER LOSS.

16) Put this check sheet in CMP note #9 - DONE


CORRECTIVE ACTION:  NEW PAD AND CARRIERS.
62.415CMP PEX,2 WAFERS SCRATCHED TO DEATH ON JD0580SUBPAC::SMARTINSun Oct 13 1996 19:4856
  

LOT:     JD0580

MACHINE: CMP.A2

OPER#:   1978

PROCESS  LEVEL: PMD

DATE:    10/13/96

SHIFT:   A-SHIFT

QUANTITY:  24 DOWN TO 22

PRODUCT...DC1026-000-JA-8G
 

PROBLEM: WITNESSED WAFER SLIP OUT FROM LEFT CARRIER AND SLIDE UNDER RIGHT
         CARRIER. EMO'D TOOL BEFORE WAFERS BROKE, BUT BOTH WERE SCRATCHED BEYOND
         SAVING. REPLACING PAD/CARRIERS.

DISPOSITION:  LOT WILL BE MOVED LESS 2 WAFERS.

SYSTEM STATUS:
 1) System __CMP.A2___
 2) Recipe __PMD______
 3) Step # _3___
 4) Time into step __2___
 5) Type of wafers that broke _PRODUCT (PMD LOT AT TOUCHUP).
 6) Carrier which wafer slid out of _LEFT_
 7) Other carriers that were damaged _BOTH___
 8) Alarms displayed by polisher NONE-----------------------------------------
                                 ______________________________________________
                                 ______________________________________________
 9) Did any other polisher error for slurry or crash _NO_, sysytems____________
10) # of wafers on pad _322__
11) # of wafers on carrier _193__
12) Was there any vibration prior to the crash __NO__
13) Was there plenty of slurry (for step 1&2) or water (step 3) present on
    the table __YES____
NEWMAIL
14) Check step height of the carrier from question #6 _ 6.5MILS

15) Please note any other unusual circumstances:

        WITNESSED WAFER SLIP OUT FROM LEFT CARRIER AND SLIDE UNDER RIGHT
CARRIER. EMO'D TOOL BEFORE WAFERS BROKE, BUT BOTH WERE SCRATCHED BEYOND
SAVING. REPLACING PAD/CARRIERS.
            
16) Put this check sheet in CMP note #9 - DONE



CORRECTIVE ACTION:  NEW PAD AND CARRIERS.
62.416JL0527 high STdev ILD1 on CMP.B1SUBPAC::KULPMon Oct 14 1996 07:4539
                              CMP PEX 
                     

LOT #:             JL0527 	PRODUCT..DC1041-001-BA-8P  

QUANTITY:          11  

OPERATION #        1992 CMP_ILD1
  
POLISHER:          CMP.B1   

EVAL TOOL:         THICKNESS.A5 

DATE:               10/14/96 00:55:11  B shift

PROBLEM:           High STdev = 19.45 UCL = 10
	           
              THK_ME_5     WAFER #1                 5622.000
                           WAFER #2                 5372.000
                           WAFER #3                 5756.000
                           WAFER #4                 5489.000
                           WAFER #5                      N/A
              THK_RG       JD0527                   3665.000
 LOG AN EVENT THK_SD_5     WAFER #1                   16.100  10/14/96 00:55:11
                           WAFER #2                   20.200
                           WAFER #3                   17.600
                           WAFER #4                   23.900
                           WAFER #5                      N/A


DISPOSITION:  The range was high. This lot was inherited from A shift.  Not
sure all that happened with initial polish and touch up. Checked measurements
on the UV1050, all the sites were measured but GOF doesn't get captured for
some reason.  I was getting a File error.  Could see any thing else why Stdev
was so high.     
   
CORRECTIVE    Moved lot on	   
ACTION:
62.417JD0560 high stdev ILD1 CMP.B3SUBPAC::KULPMon Oct 14 1996 07:4532
                              CMP PEX 

LOT #:             JD0560 	PRODUCT..DC1026-000-EA-8G    

QUANTITY:          23

OPERATION #        1981 CMP_ILD1    CMP 
  
POLISHER:          CMP.B3   

EVAL TOOL:         THICKNESS.A5 

DATE:               10/14/96 01:28:07 B shift

PROBLEM:           High STdev = 10.62   UCL = 10, 

              THK_ME_5     WAFER #1                 5708.000
                           WAFER #2                 5631.000
 LOG AN EVENT              WAFER #3                 5963.000  10/14/96 01:28:07
                           WAFER #4                 5706.000
                           WAFER #5                 5106.000
              THK_RG       JD0560                   2126.000
              THK_SD_5     WAFER #1                   10.700
                           WAFER #2                   10.800
                           WAFER #3                   13.400
                           WAFER #4                    9.800
                           WAFER #5                    8.400

DISPOSITION:  Again GOF did not record on UV1050.
   
CORRECTIVE    none, moved lot on	   
ACTION:
62.418CMP PEX, TWO WAFERS BROKE ON XE0541SUBPAC::SMARTINTue Oct 15 1996 18:0326
  

LOT:     XE0541

MACHINE: CMP.B2

OPER#:   1989

PROCESS  LEVEL: ILD3

DATE:    10/15/96

SHIFT:   A-SHIFT

QUANTITY:  14 DOWN TO 12

PRODUCT...TM0069-007-BA-8C


PROBLEM: WAFER MAPPER BROKE TWO WAFERS.


DISPOSITION:  LOT WILL BE MOVED LESS 2 WAFERS.


CORRECTIVE ACTION:  SYSTEM WAS CLEANED AND IS GOOD TO GO!
62.419Pex report for XE0557YIELD::SHONGThu Oct 17 1996 07:1324
                            PE PEX NOTIFICATION
                     

LOT #          	XE0557

QUANTITY:      	18

OPERATION #    	1981 CMP_ILD1  
/DESCR.        

POLISHER:      	CMP.B2

EVAL TOOL:     	Thickness.A5

DATE:          	10/17/96 D-Shift

PROBLEM:       	Standard deviation for this lot came out at 13.4%. The UCL for 
	       	Standard deviation is 13.0%.  
                 
DISPOSITION:   	I checked remarks on this lot and there has been several splits
		done on it. 
	
CORRECTIVE     	Moved lot on. 
ACTION:        
62.420Pex for lot XE0557YIELD::SHONGThu Oct 17 1996 07:1429
			        PE PEX NOTIFICATION
                     
LOT #          	XE0557

QUANTITY:   	23 

OPERATION #    	1981 CMP ILD1
/DESCR.        

POLISHER:     	CMP.B2

EVAL TOOL:     	THICKNESS.A4

DATE:          	10/16/96 D-Shift

PROBLEM:       	There was a miscommunication between the C-Shift operator and
		the D-shift operator. There were 5 wafers sitting on the table
		when D-shift came in. The D-shift operator thought the C-shift 
		operator said they were the 5 center heads and they still needed
		to be ran. They were the 5 center heads but they had already 
		been ran. The D-shift operator ran them again. So they've seen
		2 segements of 150 seconds. 
                 
DISPOSITION:   	The thickness was read on all 5 wafers which came out real low.
		The thickness ranged from 1800� to 2500�. All 5 wafers were 
		scrapped. 
			
CORRECTIVE     	Production supervisor is going to follow up on this. 
ACTION:        
62.421JD0533 HIGH OUTGOING SD @ILD2YIELD::PHESTERFri Oct 18 1996 19:1936
                               CMP PEX 
                     

LOT #          JD0533

QUANTITY:      24

OPERATION #    3054 THK_CMP 16  
/DESCR.

POLISHER:      PST READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          10/3/96 C-Shift

PROBLEM:      HIGH OUT GOING SD ILD2 DC1026
              
	      LOT OUTGOING STD % = 10%~  UCL IS 10%
        
	      *** LOT OUTGOING RANGE WAS W/IN SPEC AT 2658�. ***

		- FINAL MEASUREMENTS WERE, 
			5854 8.54
			5184 6.87
			5857 10.
			5570 11.
			4916 13.8

DISPOSITION:   LOT MOVED ON

CORRECTIVE 
ACTION:        NONE.  SD WAS JUST AT UCL AND RANGE WAS GOOD

		
62.422JD0526 HIGH INCOMING STEP @ILD2YIELD::PHESTERFri Oct 18 1996 19:2329
                               CMP PEX
                     

LOT #          JD0526

QUANTITY:      24

OPERATION #    3080 STEP ILD2
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          10/18/96  C-Shift

PROBLEM:       HIGH INCOMING STEP HEIGHT...ILD2

               HIGH INCOMING STEP AVG = 9669�

                                 UCL IS 9600�
               LOT RAN ON CMP.B3

DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         LOT POLISHED ACCORDINGLY

62.423XD0513 HIGH OUTGOING SD @ILD3YIELD::PHESTERFri Oct 18 1996 19:2731
                               CMP PEX 
                     

LOT #          XD0513

QUANTITY:      24

OPERATION #    3064 THK_CMP 16  
/DESCR.

POLISHER:      PST READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          10/18/96 C-Shift

PROBLEM:      LOT HAD HIGH STD% ~16.5% UCL IS 16.0%   ILD3
	     
		FINAL MEASURMENTS...
		9447	18.7
		10882	16.6	
		9717	16.1
		9807	13.1
		8287	18.1

DISPOSITION:   LOT MOVED ON 

CORRECTIVE  
ACTION:        NONE TAKEN.  PROBLEM WAS WITHIN WAFER.

62.424XD0441 three wafers scrappedYIELD::PHESTERFri Oct 18 1996 19:3225
                               CMP PEX 
                     

LOT #          XD0441

QUANTITY:      13/10

OPERATION #    1985 CMP_ILD2  
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     THICKNESS.A4

DATE:          10/18/96 C-Shift

PROBLEM:      3 WAFERS WERE OVER POLISHED, WRONG RECIPE WAS RUN.
	

DISPOSITION:   LOT MOVED ON

CORRECTIVE 
ACTION:        THE BALANCE OF THE LOT WILL BE RE-WORKED AT CAP.  LOT HAS BEEN
               REMARKED AT 2133 DEP_ILD2 3 WITH DETAILS AND INSTRUCTIONS.
62.425CMP PEX, 4 WAFERS OVER POLISHED ON JD0580 "HOT LOT" .SUBPAC::SMARTINSun Oct 20 1996 15:4930
  

LOT:     JD0580

MACHINE: CMP.B3

OPER#:   1980

PROCESS  LEVEL: ILD-2

DATE:    10/20/96

SHIFT:   B-SHIFT

QUANTITY:  22 DOWN TO 18

PRODUCT...DC1026-000-JA-8G
 

 

PROBLEM: 2 WAFERS WERE OVER POLISHED. SAME POLISH TIME WAS USED FOR ALL THE 
         PREVIOUS WAFERS WITH NO PROBLEM.  4 WAFERS WERE POLISHED WITH 
         1 DUMMY WAFER AT THE TIME.  ??????? NOT SURE IF THE 1 DUMMY WAFER
         COULD HAVE BROUGHT THE REMOVAL RATE UP THAT MUCH HIGHER. 

DISPOSITION:  LOT WILL BE MOVED LESS 4 WAFERS.


CORRECTIVE ACTION: NONE
62.426CMP PEX, 3 WAFERS OVER POLISHED ON JD0548SUBPAC::SMARTINMon Oct 21 1996 17:2732
  

LOT:     JD0548

MACHINE: CMP.B2

OPER#:   1985

PROCESS  LEVEL: ILD-2

DATE:    10/21/96

SHIFT:   A-SHIFT

QUANTITY:  20 DOWN TO 17

PRODUCT...DC1026-000-EA-8G
 

PROBLEM: 3 WAFERS WERE OVER POLISHED.  THERE WAS A BUBBLE IN THE SLURRY LINE
         AND ASHLAND DECIDED TO CHANGE THE FILTER WHILE THE TOOL WAS POLISHING
         PRODUCT. THIS CAUSED THE TOOL TO SHUT DOWN AND WHEN IT CAME BACK UP
         IT STARTED TO POLISH THE WAFERS AGAIN FOR THE FULL POLISH TIME.
         2 OF THE FIVE WAFERS WERE OK TO REDEP AND THREE WERE TOO THIN.
         TO SUM IT UP...... THE WAFERS WENT THROUGH TWO POLISHES



DISPOSITION:  LOT WILL BE MOVED LESS 3 WAFERS.


CORRECTIVE ACTION: TOOLS SHOULD BE STOPPED BEFORE CHANGING ANY FILTERS
62.427XD0561 2 WAFERS SCRAPPED DUE TO CRASH.YIELD::PHESTERFri Oct 25 1996 19:3130

                               CMP PEX 
                     

LOT #          XD0561 

QUANTITY:      22

OPERATION #    1985 (CMP_ILD DEP2)  
/DESCR.

POLISHER:      CMP.A2

EVAL TOOL:     N/A

DATE:          10/24/96 C-Shift

PROBLEM:       TWO WAFERS SCRAPPED DUE TO TOOL CRASH
              
DISPOSITION:   LOT MOVED ON

CORRECTIVE
ACTION:        CALL RECIEVED FROM ASHLAND CHEMICAL ASKING IF THERE WAS AN
               ADEQUATE SUPPLY OF SLURRY IMMEDIATELY AFTER SYSTEM CRASH. 
               SUSPECT PROBLEM WITH SLURRY DELIVERY.
             
               ONLY 60 WAFERS ON PAD AND 30/30 ON CARRIERS.

               EE TOOK TOOL FOR REPAIR.
62.428XD0589 low outgoing thickness @ILD1YIELD::PHESTERFri Oct 25 1996 19:3731
                            PE PEX NOTIFICATION
                     

LOT #          XD0589

QUANTITY:      24

OPERATION #    3054 POST THICKNESS  ILD1
/DESCR.

POLISHER:      POST READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          10/25/96  C-Shift

PROBLEM:       POST THICKNESS

               LOT POST THICKNESS AVG = 5099�  

                                 UCL IS 5200�

               LOT WAS POLISHED ON CMP.B3

DISPOSITION:   LOT MOVED TO CAP

CORRECTIVE
ACTION         LOT WAS REMARKED AT OPERATION 2130 TO DEP
               600 EXTRA � ON WAFERS # 05,10,13,14,21,22,23

62.429JD0574 high SD @ILD1YIELD::PHESTERSat Oct 26 1996 20:1230

                            PE PEX NOTIFICATION
                     

LOT #          JD0574

QUANTITY:      24

OPERATION #    3054 POST THICKNESS
/DESCR.

POLISHER:      POST READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          10/26/96  C Shift

PROBLEM:       HIGH SD @ ILD1  DC1026   

                  POST SD AVG = 26.4�  

                         UCL IS 10.0�

               LOT RAN ON CMP.B2

DISPOSITION:   LOT MOVED ON

CORRECTIVE     PROBLEM WAS HIGH SD ON ALL FIVE WAFERS CHECKED WITH WAFER# 1
ACTION:        VERY HIGH AR 20%.  OTHERWISE AVERAGE THICKNESS LOOKS GOOD.
62.430xd0559 high range and STdevSUBPAC::KULPSun Oct 27 1996 07:2037
                              CMP PEX 

LOT #:             XD0559       PRODUCT..TM0069-032-BA-8C 

QUANTITY:          23      

OPERATION #        3064 THK_CMP 16  THK_ILD3_PST
  
POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A4    

DATE:              10/27/96 03:31:38  B shift

PROBLEM:           popped chart high range and St.dev  all sites measured,
		   GOF good lot had heavy edge removal.

	           range= 5684   UCL 4500
                   STdev=   22   UCL   16

              THK_ME_5     WAFER #1                 9197.000
                           WAFER #2                10267.000
LOG  AN EVENT              WAFER #3                10022.000  10/27/96 03:31:38
                           WAFER #4                 9054.000
                           WAFER #5                 9620.000
              THK_RG       XD0559                   5684.000
              THK_SD_5     WAFER #1                   28.300
                           WAFER #2                   11.300
                           WAFER #3                   21.200
                           WAFER #4                   26.200
                           WAFER #5                   23.000

DISPOSITION:  Means were in spec.  lot ran edge heavy, due up for MQC's next
	      Moved lot on...
   
CORRECTIVE    None 
ACTION:
62.431Jd0566 2 broken wfrs cmp.b3SUBPAC::KULPSun Oct 27 1996 07:2158
                              CMP PEX 

LOT #:             JD0566 	PRODUCT..DC1026-000-JA-8G 

QUANTITY:          24-2=22

OPERATION #        1985 CMP_ILD2    CMP   
  
POLISHER:          CMP.B3

EVAL TOOL:         N/A

DATE:              10/26/96 B shift

PROBLEM:           2 wafers broke, wfrs slide out carrier 2 into 1.  
		   carrier step height measured high  8.5 -  9.0 mil

DISPOSITION:  Complete touch up on another system, moved lot on with 2 less
		wafers
   
CORRECTIVE    Change carrier 1, 2 and pad,  running MQC's
ACTION:

SPEEDFAM WAFER CRASH FORM (to be filled out by MFG + EEG + PSS, together)

 1) System _cmp.b3____
 2) Recipe _tup_175___
 3) Step # __5__
 4) Time into step __1__
 5) Type of wafers that broke _product_
 6) Carrier which wafer slid out of __2___
 7) Other carriers that were damaged ___1___
 8) Alarms displayed by polisher _Wafer loss alarm on pad______________________
                                 ______________________________________________
                                 ______________________________________________
 9) Did any other polisher error for slurry or crash _No_, sysytems____________
10) Did wafer detect work _Yes__
11) # of wafers on pad _160__
12) # of wafers on carrier _25___
13) Was there any vibration prior to the crash __No__
14) Was there plenty of slurry (for step 1-5) or water (step 6-9) present on
    the table __Yes___
15) Check step hight of the carrier from question #6 _8.5-9.0_
16) Please note any other unusual circumstances:

    Crashed during tup-175. 1 second into segment 5. Wafer came out of 2
    and took out 1. Alarm on screen was main vac low. Operator put that the
    alarm was wafer loss detect on the crash sheet but thats not the alarm
    Roger or I saw. Pad was changed and the two carriers. Checking cup to
    carrier alignments now. We are assuming that it was misload at the
    carrier due to the same thing occurring during our shift last week. Why
    it didn't happen on the other shifts is unknown. On a side note we
    observed the scrubber not operating properly. The brushes stopped
    prematurely while manually unloading 5 wafers. Motor was checked and
    smells like it could be bad. Maxim is down so this might be passed on.


                                                B-shift
62.434JD0550 low pre-thickness mean ILD3 CMP.B3SUBPAC::KULPMon Oct 28 1996 07:3325
                              CMP PEX 

LOT #:             JD0550 	PRODUCT..DC1026-000-EA-8G  

QUANTITY:          17      

OPERATION #        3058 THK_CMP 16  THK_ILD3_PST 3
  
POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A4    

DATE:              10/28/96 01:35     B shift

PROBLEM:           Popped chart low pre mean  all sites measured,
		 
			UCL 35000

              THK_ME       JD0550                  34993.000
              THK_RG       JD0550                   1768.000

DISPOSITION:  Moved lot on...
   
CORRECTIVE    None 
ACTION:
62.435CMP.B2 JD0549 ILD3 high rangeSUBPAC::KULPMon Oct 28 1996 07:3436
                              CMP PEX 

LOT #:             JD0549       PRODUCT..DC1026-000-EA-8G  

QUANTITY:          22      

OPERATION #        3064 THK_CMP 16  THK_ILD3_PST 3
  
POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A4    

DATE:              10/28/96 03:16:14  B shift

PROBLEM:           Popped chart high range all sites measured,
		   GOF good,  lot had heavy center removal.

	           range= 5666   UCL 4500
 
              THK_ME_5     WAFER #1                 9931.000
                           WAFER #2                      N/A
                           WAFER #3                10072.000
                           WAFER #4                 8860.000
                           WAFER #5                 9432.000
              THK_RG       JD0549                   5666.000
 LOG AN EVENT THK_SD_5     WAFER #1                    9.300  10/28/96 03:16:14
                           WAFER #2                      N/A
                           WAFER #3                   10.700
                           WAFER #4                   11.300
                           WAFER #5                    8.970

DISPOSITION:  Lot ran center heavy, nothing unusaual mean and sigma within
		limits.   Moved lot on...
   
CORRECTIVE    None 
ACTION:
62.432JD0550 low pre-thickness mean ILD3 CMP.B3SUBPAC::KULPMon Oct 28 1996 07:4525
                              CMP PEX 

LOT #:             JD0550 	PRODUCT..DC1026-000-EA-8G  

QUANTITY:          17      

OPERATION #        3058 THK_CMP 16  THK_ILD3_PST 3
  
POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A4    

DATE:              10/28/96 01:35     B shift

PROBLEM:           Popped chart low pre mean  all sites measured,
		 
			UCL 35000

              THK_ME       JD0550                  34993.000
              THK_RG       JD0550                   1768.000

DISPOSITION:  Moved lot on...
   
CORRECTIVE    None 
ACTION:
62.433CMP.B2 JD0549 ILD3 high rangeSUBPAC::KULPMon Oct 28 1996 07:4536
                              CMP PEX 

LOT #:             JD0549       PRODUCT..DC1026-000-EA-8G  

QUANTITY:          22      

OPERATION #        3064 THK_CMP 16  THK_ILD3_PST 3
  
POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A4    

DATE:              10/28/96 03:16:14  B shift

PROBLEM:           Popped chart high range all sites measured,
		   GOF good,  lot had heavy center removal.

	           range= 5666   UCL 4500
 
              THK_ME_5     WAFER #1                 9931.000
                           WAFER #2                      N/A
                           WAFER #3                10072.000
                           WAFER #4                 8860.000
                           WAFER #5                 9432.000
              THK_RG       JD0549                   5666.000
 LOG AN EVENT THK_SD_5     WAFER #1                    9.300  10/28/96 03:16:14
                           WAFER #2                      N/A
                           WAFER #3                   10.700
                           WAFER #4                   11.300
                           WAFER #5                    8.970

DISPOSITION:  Lot ran center heavy, nothing unusaual mean and sigma within
		limits.   Moved lot on...
   
CORRECTIVE    None 
ACTION:
62.436JL0648 low outgoing thickness @ILD1YIELD::PHESTERWed Oct 30 1996 19:3640
                               CMP PEX 
                     

LOT #          JL0648

QUANTITY:      5

OPERATION #    3114 THK_CMP  
/DESCR.

POLISHER:      CMP.A1

EVAL TOOL:     THICKNESS.A5

DATE:          10/30/96 C-Shift

PROBLEM:    LOT WAS OVER POLISHED BY C SHIFT . LOT WAS 100% ON THICKNESS.A5
           
		FINAL READINGS
		5111	4.76	
		4865	5.05
		4973	6.37
		4939	6.44
		4862	6.26	  AVG = 4810

              RANGE AND SD WERE BOTH GOOD.               

              THK_RG       JL0648                   1430.000
              THK_SD_5     WAFER #1                    4.760
                           WAFER #2                    5.050
                           WAFER #3                    6.370
                           WAFER #4                    6.440
                           WAFER #5                    6.260

CORRECTIVE 
ACTION:     LOT MOVED ON.

            A REMARK HAS BEEN ADDED TO NEXT DEP OPERATION FOR EXTRA 500�
            DEP.
62.437XD0590 low outgoing thickness @PMDYIELD::PHESTERWed Oct 30 1996 19:3641
                               CMP PEX 
                     

LOT #          XD0590

QUANTITY:      24

OPERATION #    2957 THK_CMP  
/DESCR.

POLISHER:      CMP.A2

EVAL TOOL:     THICKNESS.A4

DATE:          10/30/96 C-Shift

PROBLEM:       LOT WAS OVER POLISHED BY D SHIFT . LOT WAS 100% ON THICKNESS.A5.
           
		FINAL READINGS
		5856	3.4
		5664	3.73
		5841	2.06
		5836	3.03
		6114	2.7      AVG = 5862

                RANGE WAS GOOD AT 1008.  

                SD WAS ALSO GOOD.

                HK_SD_5     WAFER #1                    3.400
                            WAFER #2                    3.730
                            WAFER #3                    2.060
                            WAFER #4                    3.090  
                            WAFER #5                    2.700

 
CORRECTIVE 
ACTION:         LOT MOVED ON.

                A REMARK HAS BEEN ADDED TO NEXT DEP OPERATION FOR EXTRA DEP.
62.438jd0553 broke 2 wfrs cmp.b2SUBPAC::KULPSun Nov 03 1996 07:3335
                              CMP PEX 

LOT #:             JD0553 	PRODUCT..DC1026-000-EA-8G  

QUANTITY:          24-2=22      

OPERATION #        1989 CMP AFTER ILD3 
  
POLISHER:          CMP.B2

EVAL TOOL:         n/a 

DATE:              B shift

PROBLEM:       2 broken wafers 

DISPOSITION:  Lot needs to finish polish   
   
CORRECTIVE    Pad and carrier replaced, running MQC's  note 34.16
ACTION:

                         -< Wafer break (Double Load) >-

        B2 was ready to run some send aheads. It ran a set (5)
        of dummy wafers first. When unloading the dummies,
        carrier 5 did not unload it's wafer. Tool then loaded
        the send aheads and tried to polish. AS soon as the
        double loaded carrier hit the pad the send ahead came
        out, taking out carrier 4 also. Replaced 4 and 5 and
        manually loaded and unloaded wafers with new carrier.
        No problem found. Also replaced the pad. Conditioned
        new pad and returned tool to Operations.

                   		B shift                                                       

62.439JD0581 THK_ILD3 - 16 wafers overpolishedSTRATA::POZORSKISun Nov 03 1996 12:1925
                              CMP PEX 

LOT #:             JD0581       PRODUCT..DC1026-000-JA-WF  

QUANTITY:          23

OPERATION #        3064 THK_CMP 16  THK_ILD3_PST 3
  
POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A5    

DATE:              11/02/96 08:47:24  (Processed on B shift and A-Shift read
                                       100% on the lot on 11/03)

PROBLEM:           The lot was overpolished at CMP_ILD3, there were 14 wafer
                   that need an extra 1000� dep and 2 other wafer that need
                   1500� dep.

DISPOSITION:       Lot has been remarked at operation #2136 for an extra 
                   deposition.
   
CORRECTIVE         Lot will recieve extra dep at DEP ILD3 operation.
ACTION:

62.440jd0455 i wfr over polishSUBPAC::KULPMon Nov 04 1996 08:0148
                              CMP PEX 

LOT #:             JD0455 	PRODUCT..DC1035-000-RA-8T 

QUANTITY:          24           

OPERATION #        2957 THK_CMP 4   THK_PMD_PST 
  
POLISHER:          CMP.A2

EVAL TOOL:         THICKNESS.A5  

DATE:              B shift    11/04/96 05:05

PROBLEM:       1 wafer over polish, popped chart 6163.6     LCL:  6200

              THK_ME_5     WAFER #1                 5746.000
                           WAFER #2                 6387.000
                           WAFER #3                 6292.000
                           WAFER #4                 6380.000
                           WAFER #5                 6013.000
              THK_RG       NA                       2368.000
 LOG AN EVENT THK_SD_5     WAFER #1                    9.600  11/04/96 05:05:21
                           WAFER #2                   10.100
                           WAFER #3                    6.800
                           WAFER #4                   10.000
                           WAFER #5                    9.300


DISPOSITION:  Remarked lot at next dep. step to add 500 ang.
   
CORRECTIVE   None, moved lot on
ACTION:

                         -< Wafer break (Double Load) >-

        B2 was ready to run some send aheads. It ran a set (5)
        of dummy wafers first. When unloading the dummies,
        carrier 5 did not unload it's wafer. Tool then loaded
        the send aheads and tried to polish. AS soon as the
        double loaded carrier hit the pad the send ahead came
        out, taking out carrier 4 also. Replaced 4 and 5 and
        manually loaded and unloaded wafers with new carrier.
        No problem found. Also replaced the pad. Conditioned
        new pad and returned tool to Operations.

                   		B shift                                                       

62.441CMP PEX, 8 WAFERS OVER POLISHED ON XD0591SUBPAC::SMARTINMon Nov 04 1996 09:4939
  

LOT:     XD0591

MACHINE: CMP.B1

OPER#:   1981

PROCESS  LEVEL: ILD-2

DATE:    11/4/96

SHIFT:   B-SHIFT

QUANTITY:  24

PRODUCT...TM0069-032-BA-8C

 

PROBLEM: 8 WAFERS WERE OVER POLISHED.


              5164 A
              4926 A       LCL=5200
              5055 A
              5182 A
              4968 A
              5181 A
              4284 A
              5087 A


DISPOSITION:  THESE 8 WAFERS WERE REMARKED FOR REDEP OF
         500A AND THE 4284A WAFER WILL GET A REDEP OF 1000A.



CORRECTIVE ACTION: NONE
62.442JD0562 high pre step ht. ILD3SUBPAC::KULPWed Nov 06 1996 03:5522
                              CMP PEX 

LOT #:             JD0562  	DC1026-000-JA-8G

QUANTITY:          21  

OPERATION #        1989 STP_ILD3_PRE
  
POLISHER:          CMP.B3

EVAL TOOL:         PROFILER.A2

DATE:              B shift   11/05/96 23:13 

PROBLEM:      Popped chart STP_ILD3_PRE HEIGHT_ME at 20280.  Measured 2
	      other wafers, came in spec. 19383.75

DISPOSITION:  Thickness in spec.  MQC's performed on Profiler. 
   
CORRECTIVE   None, moved on to polish
ACTION:

62.443JD0566 high outgoing range @ILD3YIELD::PHESTERThu Nov 07 1996 18:4628
                             
                                CMP PEX 
                     

LOT #:        JD0566 ILD3	                

QUANTITY:     21      

OPERATION #   3064      

POLISHER:     CMP.B3
 
EVAL TOOL:    THICKNESS.A4     

DATE:         11/7/96    

PROBLEM:      HIGH OUTGOING RANGE AT 5479�

                              UCL IS  4500�     

DISPOSITION:  AVERAGE THICKNESSES WERE GOOD FOR ALL WAFERS CHECKED.  ALL 
              STANDARD DEVIATION CALCULATIONS WERE WELL WITHIN RANGE.  PROBLEM
              APPEARS TO BE ACROSS THE LOT.
   
CORRECTIVE
ACTION:       NONE

                                        
62.444JL0594 high outgoing range & SD @ILD2YIELD::PHESTERThu Nov 07 1996 18:4628
                                CMP PEX 
                     

LOT #          JL0594
 
QUANTITY:      24

OPERATION #    3274    ILD2
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     THICKNESS.A4

DATE:          11/07/96 C-Shift

PROBLEM:       HIGH POST RANGE AND DEV %

               LOT RANGE WAS 3866�     UCL IS  3400�
               LOT % DEV WAS 19.       UCL IS  16.

        
DISPOSITION:   4 OUT OF 5 WAFERS HAD OUT OF SPEC SD.  PROBLEM WAS WITHIN WAFER
               UNIFORMITY.

CORRECTIVE
ACTION:        SR. ENGINEERING NOTIFIED.         
62.445XD0581 over polished @ILD3YIELD::PHESTERThu Nov 07 1996 18:4629
                            PE PEX NOTIFICATION
                     

LOT #          XD0581

QUANTITY:      23

OPERATION #    3064 POST THICKNESS
/DESCR.

POLISHER:      POST READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          11/7/96  C-Shift

PROBLEM:       LOW POST THICKNESS    ILD3

               LOT POST THICKNESS AVG=9349�  UCL IS 9500�
               LOT WAS POLISHED ON CMP.B2
               POST  RANGE WAS 2569

DISPOSITION:   LOT SENT TO CAP.

CORRECTIVE
ACTION         LOT HAS BEEN GROUPED INTO 500� BINS AND REMARKED TO EXTRA DEP 
               WAFERS AT OPERATION 2136.

62.446popped chart CMP.B1 THK_ILD2_PST THK_SD_5 = 16.6 UCL:16SUBPAC::KULPSun Nov 10 1996 08:1934
                              CMP PEX 

LOT #:             JD0591     DC1026-000-JA-WF  

QUANTITY:          24  

OPERATION #        3066 THK_CMP 11 THK_ILD2_PST 3 
  
POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A4 

DATE:              B shift   11/10/96 03:47

PROBLEM:      popped chart CMP.B1 THK_ILD2_PST THK_SD_5 = 16.6   UCL:16

              THK_ME_5     WAFER #1                 5636.000
                           WAFER #2                 5391.000
                           WAFER #3                 5291.000
                           WAFER #4                 5736.000
                           WAFER #5                 6371.000
              THK_RG       JD0591                   2893.000
              THK_SD_5     WAFER #1                   16.500
                           WAFER #2                   19.000
                           WAFER #3                   14.300
 LOG AN EVENT              WAFER #4                   19.000  11/10/96 03:47:08
                           WAFER #5                   14.200

DISPOSITION:  Moved lot on readings on map were not even, on side larger then
		other.
   
CORRECTIVE   Ran MQC's
ACTION:

62.447JD0589 high stdev ILD3 CMP.B3SUBPAC::KULPSun Nov 17 1996 08:4834
                              CMP PEX 

LOT #:             JD0589

QUANTITY:          24 

OPERATION #        3064 THK_ILD3_PST
  
POLISHER:          CMP.B3

EVAL TOOL:         N/A 

DATE:              B shift   11/17/96 

PROBLEM:      Popped Stdev chart, ILD3. This lot was inherited from C shift
	      with high STd. from 100 % inspect.
	       
              THK_ME_5     WAFER #1                10124.000
                           WAFER #2                 9664.000
                           WAFER #3                10403.000
                           WAFER #4                 9768.000
                           WAFER #5                 9611.000
              THK_RG       N/A                      2589.000
 LOG AN EVENT THK_SD_5     WAFER #1                   20.800  11/17/96 05:52:35
                           WAFER #2                   12.800
                           WAFER #3                   23.000
                           WAFER #4                   10.000
                           WAFER #5                   16.300

DISPOSITION:  Finish touch up moved on
   
CORRECTIVE   None
ACTION:

62.448JD0617 - 2 wfrs scrapped due to crashSTRATA::POZORSKISun Nov 17 1996 19:0949
                              CMP PEX 

LOT #:             JD0617 	PRODUCT..DC1026-000-JA-WF  

QUANTITY:          24-2=22      

OPERATION #        1985 CMP ILD2 
  
POLISHER:          CMP.B1

EVAL TOOL:         n/a 

DATE:              A shift

PROBLEM:       2 broken wafers 

DISPOSITION:  The machine did not alarm, the scrubber did not release wafers 
              into the unload cassette which caused the wafer breakage.
   
CORRECTIVE    EE is still looking into to this problem.     
ACTION:


================================================================================
Note 34.18                   CMP.B WAFER CRASH FORM                     18 of 18
FABSIX::K_JUBINVILLE                                 24 lines  17-NOV-1996 17:13
                               -< CMP.B1 crash >-
--------------------------------------------------------------------------------
crash report for product wafers broken in unload station on cmp.b1. 
Lot # JD0617, two broken wafers at operation 1985; 24 wafers down to 22.	
1) System CMP.B1	___________
 2) Recipe ild2__________
 3) Step # n/a____
 4) Time into step n/a_____
 5) Type of wafers that broke product__________
 6) Carrier which wafer slid out of n/a_____
 7) Other carriers that were damaged none________
 8) Alarms displayed by polisher wafer loss_did not alarm__________________

 9) Did any other polisher error for slurry or crash no____, systems_no_________
10) Did wafer detect work no_____
11) # of wafers on pad n/a_____
12) # of wafers on carrier n/a_____
13) Was there any vibration prior to the crash n/a_____
14) Was there plenty of slurry (for step 1-5) or water (step 6-9) present on
    the table n/a________
15) Check step height of the carrier from question #6 n/a______
16) Please note any other unusual circumstances: machine did not alarm.scrubber	
did not release wafers into unload cassette causing breakage.
62.449JL0656 Popped Stdev chart, THK_ILD1_PST THK_SD_5SUBPAC::KULPTue Nov 19 1996 05:3934
                              CMP PEX 

LOT #:             JL0656 

QUANTITY:          24 

OPERATION #        3114 THK_CMP 8
  
POLISHER:          CMP.B1

EVAL TOOL:         THICKNESS.A4    

DATE:              B shift   11/19/96 

PROBLEM:      Popped Stdev chart, THK_ILD1_PST THK_SD_5, UCL: 13.0, 
	      data pt. 13.48

              THK_ME_5     WAFER #1                 5920.000
                           WAFER #2                 5706.000
                           WAFER #3                 5775.000
                           WAFER #4                 5556.000
                           WAFER #5                 5712.000
              THK_RG       JL0656                   2683.000
              THK_SD_5     WAFER #1                   15.400
 LOG AN EVENT              WAFER #2                   13.100  11/19/96 03:09:04
                           WAFER #3                   10.300
                           WAFER #4                   12.100
                           WAFER #5                   16.500

DISPOSITION:  moved lot on, range and mean in spec.
   
CORRECTIVE   None
ACTION:

62.450JD0651 Popped Stdev chart, THK_ILD1_PST THK_SD_5SUBPAC::KULPTue Nov 19 1996 05:4734
                              CMP PEX 

LOT #:             JD0651 

QUANTITY:          24 

OPERATION #        3054 THK_CMP 8
  
POLISHER:          CMP.A2

EVAL TOOL:         THICKNESS.A4    

DATE:              B shift   11/19/96 

PROBLEM:      Popped Stdev chart, THK_ILD1_PST THK_SD_5  UCL: 10.0, 
	      data pt. 10.96

              THK_ME_5     WAFER #1                 5419.000
                           WAFER #2                 5098.000
 LOG AN EVENT              WAFER #3                 5944.000  11/19/96 03:33:20
                           WAFER #4                 5667.000
                           WAFER #5                 5220.000
              THK_RG       JD0651                   2067.000
              THK_SD_5     WAFER #1                   13.300
                           WAFER #2                   10.800
                           WAFER #3                    9.900
                           WAFER #4                    9.700
                           WAFER #5                   11.100

DISPOSITION:  moved lot on, range and mean in spec.
   
CORRECTIVE   None
ACTION:

62.451XD0595 HAD 3 WAFERS OVER POLISHEDSTRATA::POZORSKITue Nov 19 1996 10:5930
                            PE PEX NOTIFICATION
                     

LOT #          XD0595

QUANTITY:      20

OPERATION #    3064 POST THICKNESS
/DESCR.

POLISHER:      POST READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          11/19/96  A-Shift

PROBLEM:       LOW POST THICKNESS ON 3 WAFERS AFTER ILD3.
               
               
DISPOSITION:   LOT SENT FOR EXTRA DEP.
               SUSPECT SOME OF THE WAFERS CAME IN WITH INSUFFICIENT OXIDE, 
               CAUSING WAFERS TO BE OVER POLISHED.  A LOT CAME IN YESTERDAY
               WITH ONE WAFER WITH 10K EXTRA, THIS IS WHAT HAS LEAD US TO 
               BELIEVE THIS IS THE POSSIBLE CAUSE.

CORRECTIVE
ACTION         LOT HAS BEEN GROUPED INTO 4000�, 3000�, 1000� BINS AND 
               A REMARK FOR THE EXTRA DEP HAS BEEN ENTERED AT OPSERATION 2136.


62.452JL0642 HIGH RANGE @ILD1YIELD::PHESTERThu Nov 21 1996 11:0431

                              CMP PEX 
                     

LOT #:        JL0642 ILD1	                

QUANTITY:     24      

OPERATION #   3144      

POLISHER:     CMP.B3
 
EVAL TOOL:    THICKNESS.A4     

DATE:         11/16/96    

PROBLEM:      RANGE ABOVE UCL @4156�      
                            
              LOT MEAN THICKNESS LOOKED GOOD.  THIS WAS A DUE TO A COUPLE OF
              WITHING WAFER POINTS THAT WERE HIGH/LOW.

DISPOSITION:      LOT MOVED TO CAP
   
CORRECTIVE
ACTION:       NONE




                                        
62.453JD0591 High SD @ILD3YIELD::PHESTERFri Nov 22 1996 08:2828

                              CMP PEX 
                     

LOT #:        JD0591 ILD3	                

QUANTITY:     24      

OPERATION #   3064      

POLISHER:     CMP.B3
 
EVAL TOOL:    THICKNESS.A5     

DATE:         11/21/96    

PROBLEM:      STD DEV WAS 16.260.   UCL IS 16.0.      
                            

DISPOSITION:  LOT MOVED TO CAP.
   
CORRECTIVE
ACTION:       NONE.  MEAN THICKNESSES WERE FAIRLY GOOD HOWEVER 3 OUT OF FIVE
              WAFERS HAD HIGH SD.  PROBLEM WAS WITHIN WAFER.


                                        
62.454JL0671 HIGH INCOMING STEP @PMDYIELD::PHESTERSat Nov 23 1996 15:0225
                               CMP PEX 
                     

LOT #          JL0671

QUANTITY:      24

OPERATION #    3362STP_L_PMD  
/DESCR.

POLISHER:      NA

EVAL TOOL:     PROFILER.A2 

DATE:          11/23/96 C-Shift

PROBLEM:       Lot had a high incoming Step Height of an avg of 4309�, UCL at
       	       4200�.

DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE 
ACTION:        Lot polish time was ajusted to compensate for high step
               heights.
62.455JL0518 High outgoing range @ILD2YIELD::PHESTERSat Nov 23 1996 16:3531
                              CMP PEX 
                     

LOT #:        JL0518 ILD2	                

QUANTITY:     19      

OPERATION #   3274      

POLISHER:     CMP.B2
 
EVAL TOOL:    THICKNESS.A4     

DATE:         11/23/96    

PROBLEM:      LOT HAD HIGH OUTGOING RANGE AT 3477�.  UCL IS 3400�                            

DISPOSITION:  ALL FIVE WAFERS MEASURED HAD GOOD MEAN THICKNESS.  HIGH RANGE WAS
              CAUSED BY TWO SEPERATE HIGH/LOW POINTS.    
   
              LOT MOVED TO CAP.

CORRECTIVE
ACTION:       NONE.





                                        
62.456jd0664 slightly low thickness mean ILD1SUBPAC::KULPTue Nov 26 1996 07:2835
                              CMP PEX 

LOT #:             JD0664 

QUANTITY:          24 

OPERATION #        3054 THK_CMP 8   THK_ILD1_PST 3
  
POLISHER:          CMP.A1

EVAL TOOL:         THICKNESS.A4

DATE:              B shift   11/26/96 

PROBLEM:           Slighty low thickness mean reading.
		   THK_ILD1_PST THK_ME_5 popped chart low. LCL: 5200   
		   Mean: 5153.600  Wafer 3 and 4 measured low.

              THK_ME_5     WAFER #1                 5234.000
                           WAFER #2                 5349.000
 LOG AN EVENT              WAFER #3                 4926.000  11/26/96 01:49:52
                           WAFER #4                 5043.000
                           WAFER #5                 5216.000
              THK_RG       JD0664                   1036.000
              THK_SD_5     WAFER #1                    5.050
                           WAFER #2                    4.630
                           WAFER #3                    5.950
                           WAFER #4                    4.340
                           WAFER #5                    4.470

DISPOSITION:      Moved lot on. 

CORRECTIVE        None 
ACTION:            

62.457CMP PEX 3 WAFERS SCRAPPED DUE TO OVER POLISHSUBPAC::SMARTINTue Nov 26 1996 11:4130
  

LOT:     JL0657

MACHINE: CMP.B2

OPER#:   1995

PROCESS  LEVEL: ILD-2

DATE:    11/26/96

SHIFT:   B-SHIFT

QUANTITY:  23 DOWN TO 20

PRODUCT....DC1044-003-EC-8P 


 

PROBLEM: 5 WAFERS WERE OVER POLISHED. 3 WAFERS OUT OF THE 5 WILL BE SCRAPPED DUE
         TO SEVERE OVER POLISH. THE OTHER TWO WILL BE RE-DEPPED.


DISPOSITION:  2 WAFERS WERE REMARKED FOR REDEP.
              THE OTHER THREE WILL BE SCRAPPED.


CORRECTIVE ACTION: NONE
62.458CMP PEX, 1 WAFER SCRAPPED DUE TO OVER POLISHSUBPAC::SMARTINTue Nov 26 1996 18:3829
  

LOT:     JD0646

MACHINE: CMP.A1

OPER#:   1981

PROCESS  LEVEL: ILD-1

DATE:    11/26/96

SHIFT:   A-SHIFT

QUANTITY:  24 DOWN TO 23

PRODUCT....DC1026-900-JA-WF 
 

PROBLEM: 1 WAFER WAS OVER POLISHED. ALL WAFERS WERE POLISHED FOR A TOTAL TIME 
         OF 8 MIN 13 SEC.  1 WAFER CAME OUT WITH A THICKNESS OF 3000A.
         THE REST OF THE LOT WAS FINE. THIS WAS DONE ON THE THIRD PASS FOR THE
         LOT.   LCL=3400 FOR RE-DEP.


DISPOSITION: 1 WAFER WILL BE SCRAPPED. THE REST OF THE LOT WILL BE MOVED ON LESS
             1 WAFER.

CORRECTIVE ACTION: NONE
62.459JD0667 HIGH INCOMING STEP HEIGHT @ILD1YIELD::PHESTERSat Nov 30 1996 08:1028
                              CMP PEX 
                     

LOT #          JD0667

QUANTITY:      24

OPERATION #    3079 STEP..ILD1
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          11/29/96  C-Shift

PROBLEM:       HIGH INCOMING STEP ....ILD1

               LOT INCOMING STEP HEIGHT AVG = 9617�  UCL IS 9600�

               LOT BEING POLISHED ON CMP.B2

DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION:        LOT POLISHED ACCORDINGLY

62.460XE0608 LOW INCOMING STEP HEIGHT @PMDYIELD::PHESTERSat Nov 30 1996 08:1630

                              CMP PEX 
                     

LOT #:        XE0608	PMD                

QUANTITY:     24      

OPERATION #   3078      

POLISHER:     CMP.A1 

EVAL TOOL:    PROFILER.A2     

DATE:         11/29/96    

PROBLEM:      LOW INCOMING STEP HEIGHT

              INCOMING STEP HEIGHT WAS 2955�   LCL IS 3000�
                            

DISPOSITION:  LOT MOVED TO POLISH
   
CORRECTIVE
ACTION:       NONE



                                        
62.461JL0673 overpolished @ILD1YIELD::PHESTERSat Nov 30 1996 19:1032
                            	CMP PEX
                     

LOT #          JL0673

QUANTITY:      24

OPERATION #    3114...THICKNESS POST
/DESCR.

POLISHER:      POST READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          11/30/96  C-Shift

PROBLEM:       LOW POST THICKNESS ILD1

               LOT POST THICKNES AVG = 4990�      UCL IS 5200�

               LOT WAS POLISHED ON CMP.B1.
          
        
DISPOSITION:   LOT WAS POLISHED USING THE REMOVAL RATE FROM A DIFFERENT DEVICE
               AT ILD1 THAT WAS POLISHED JUST PRIOR TO THIS LOT.  THE REMOVAL
               RATE WAS NOT THE SAME AND LOT WAS OVERPOLISHED.

CORRECTIVE
ACTION:        REMARK HAS BEEN POSTED AT DEP OPERATION #2166
               WITH WAFER #'S TO BE DEPED AN EXTRA 500�.

62.462XD0560 OVERPOLISHED @ILD3YIELD::PHESTERSat Nov 30 1996 19:1332
                                 CMP PEX 
                     

LOT #          XD0560

QUANTITY:      23

OPERATION #    3064 POST THICKNESS  ILD3
/DESCR.

POLISHER:      POST READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          11/27/96  C-Shift

PROBLEM:       LOW POST THICKNESS

               LOT POST THICKNESS AVG= 8102�  LCL IS 10000� + OR - 500�

               LOT WAS POLISHED ON CMP.B2

DISPOSITION:   LOT WAS STARTED BY ONE MFG TECH WHO POLISHED IT FOR 400 SEC.
               IT WAS THEN FINISHED BY ANOTHER WHO POLISHED IT FOR 350 SEC.
               REMOVAL RATE WAS HIGH AND THE LOT SHOULD NOT HAVE BEEN POLISHED
               THIS LONG.  MIS-COMMUNICATION.   

CORRECTIVE
ACTION:        LOT HAS BEEN REMARKED AT OPERATION 2136 DEP ILD3
               WITH WAFER #'S AND THICKNESS OF EXTRA DEP NEEDED.
         
62.463CMP PEX, 5 WAFERS SCRAPPED DUE TO TOOL FAILURE.SUBPAC::SMARTINMon Dec 02 1996 17:0129
  

LOT:     XD0605

MACHINE: CMP.B1

OPER#:   1985

PROCESS  LEVEL: ILD-2

DATE:    12/2/96

SHIFT:   A-SHIFT

QUANTITY:  23 DOWN TO 18

PRODUCT....TM0069-032-BA-8C
 
 

PROBLEM: 5 WAFERS WERE SCRAPPED DUE TO TOOL FAILURE. THE CPU LOCKED UP. AS A 
         RESULT FROM THE LOCK UP THE TOOL KEPT ON POLISHING THE WAFERS. THE 
         TOOL HAD TO BE REBOOTED. AFTER THE REBOOT, EXERCISE WAFERS WERE RAN
         WITH NO PROBLEMS.

DISPOSITION: 5 WAFERS WILL BE SCRAPPED. THE REST OF THE LOT WILL BE MOVED ON
             LESS 5 WAFERS.

CORRECTIVE ACTION:  TOOL TESTED OK AFTER THE REBOOT.
62.4642 wafers scrapped (crash) CMP.A2SUBPAC::KULPWed Dec 04 1996 07:3949
                              CMP PEX 

LOT #:             JL0691 

QUANTITY:          23-2=21

OPERATION #        1984 CMP_L_PMD   CMP 
  
POLISHER:          CMP.A2

EVAL TOOL:         N/A

DATE:              B shift   12/04/96 

PROBLEM:           2 wafers crashed      

DISPOSITION:       Lot is still in the area, 

CORRECTIVE         EE cleaning system, will need MQC's
ACTION:            


 CMP.A1 & CMP.A2 WAFER CRASH FORM (to be filled out by MFG/EEG/PSS, together)

2 product wafers crashed

pmd recipe
0 seconds in interval #3

 1) System _cmp.a2 ___
 2) Recipe _ pmd _____
 3) Step # _3___
 4) Time into step __ 0 ___
 5) Type of wafers that broke _product jl0691 (x2)__
 6) Carrier which wafer slid out of _ left _
 7) Other carriers that were damaged _ both ___
 8) Alarms displayed by polisher _ no alarm was sounded _______________________
                                 ______________________________________________
                                 ______________________________________________
 9) Did any other polisher error for slurry or crash _ no _, __________
10) # of wafers on pad _ 112 __
11) # of wafers on carrier _ l-241 r-242 __
12) Was there any vibration prior to the crash _ no ___
13) Was there plenty of slurry (for step 1&2) or water (step 3) present on
    the table _ yes _____
14) Check step height of the carrier from question #6 _ carrier too trashed __
15) Please note any other unusual circumstances:

16) Put this check sheet in CMP note #9 - done.
62.4654 wafers over polish, scrapped out < 3400KSUBPAC::KULPWed Dec 04 1996 07:4268
                              CMP PEX 

LOT #:             JL0669 

QUANTITY:          22-4=18 

OPERATION #        1994 CMP_ILD2    CMP         
  
POLISHER:          CMP.B1

EVAL TOOL:         THICKNESS.A4

DATE:              B shift   12/02/96 

PROBLEM:           4 wafers overpolished

DISPOSITION:       Wafers are still in the area, touch up.

CORRECTIVE         Op's tech should not guess at times after machine error.
ACTION:            Remove wafers from CMP system for accurate measuremnts.

        The wafer id's are as follows:

        The four wafers to be scrapped:

        wafer #4 with thk of 2132
        wafer #12 with thk of 1102
        wafer #1 with thk of 1539
        wafer #8 with thk of 862

        the four for dep
        wafer #24 will need .5k (4899)
        wafer #20 will need  1k (4564)
        wafer #9  will need  1k (4101)
        wafer #17 will need 1k  (4043)

        Just so you know all wafer measurments were checked on both UV1050
	tools.
                                      
        These are the events that happened when five wafers were on CMP.B1,

        1. At interval 5 set time 166sec, with 147 sec. left, an alarm sounded.
        2. Upon investigation, alarm read "alarm - process doors open"
        3. Checked the time, it was stuck at 147, but carriers were still
           down on the pad polishing.
        4. Went around back to check if process doors had jostled loose
           initializing an alarm, none of the doors were open or jostled.
        5. Came around to front, pressed start button to get rid alarm, and to
           start time, so end segment could be performed.
        6. Carriers stopped rotating, carrier not rotating alarms go off.
        7. Maint was called @ 1:00 am
        8. Upon investigation,it was found that a sensor on one of the process
           doors was intermitently giving an open circut causing the alarm.
        9. Run was started and touched down again and end segment was ended.


Note 17.476 

    Alarmed for process door open during process. Operator checked doors
    and found them closed and restarted to continue processing. The tool
    then alarmed for heads not rotating in segment 5. Thats when we saw the
    Bat signal. We checked all the doors and found that the right side
    index table process door sensor wasn't seeing the door. Turned out to
    be just a loose crimp on one of the pins. Corrected and resumed
    polishing with out a hitch.


                                                B-shift
62.466CMP PEX,5 WAFERS OVER POLISHED ON JD0664SUBPAC::SMARTINWed Dec 04 1996 18:4029
  

LOT:     JD0664

MACHINE: CMP.B1

OPER#:   1980

PROCESS  LEVEL: ILD-2

DATE:    12/4/96

SHIFT:   B-SHIFT

QUANTITY:  24

PRODUCT...DC1026-900-JA-WF
.
 
 

PROBLEM: 5 WAFERS WERE OVER POLISHED ON B SHIFT LAST NIGHT. TIME WAS THOUGHT
         TO BE MISCALCULATED ON THE TOUCH UP ACCORDING TO A SHIFT.


DISPOSITION: 5 WAFERS WERE  REMARKED FOR REDEP.


CORRECTIVE ACTION:  NEED TO TALK TO B SHIFT ON THIS ONE.
62.467CMP PEX,2 WAFERS OVER POLISHED ON XE0553SUBPAC::SMARTINWed Dec 04 1996 18:5130
  

LOT:     XE0553

MACHINE: CMP.A2

OPER#:   1978

PROCESS  LEVEL: PMD

DATE:    12/4/96

SHIFT:   A-SHIFT

QUANTITY:  24

PRODUCT...TM0069-907-BA-8C 

.
PROBLEM: 2 WAFERS WERE OVER POLISHED.

       WFR#1=5824
       WFR#2=5574      LCL=6200

DISPOSITION: 2 WAFERS WERE  REMARKED FOR REDEP OF 500A


CORRECTIVE ACTION: THIS LOT WAS POLISHED FOR 80 SEC. SPEC SAYS THEY SHOULD
                   BE POLISHED FOR 100 SEC. IF THE OPERATOR WENT BY SPEC
                   WE WOULD HAVE HAD A SCRAP PROBLEM.???????????
62.468CMP PEX 3 WAFERS SCRAPPED DUE TO OVER POLISH ON JD0524SUBPAC::SMARTINWed Dec 04 1996 19:2334
  

LOT:     JD0524

MACHINE: CMP.B2

OPER#:   2001

PROCESS  LEVEL: ILD25

DATE:    11/21/96 ?????

SHIFT:   C-SHIFT

QUANTITY:  7 WAFERS DOWN TO 4

PRODUCT...DC1026-041-DJ-WF


.
PROBLEM: 3 WAFERS WERE SCRAPPED DUE TO OVER POLISH. I WAS TOLD THIS WAS DONE
         TWO WEEKS AGO ON C SHIFT AND THEN THE LOT WAS PUT ON HOLD. THE
         THREE WAFERS WERE POLISHED WITH TWO DUMMY WAFERS. THE DUMMY WAFERS HAD
         NO OXIDE ON THEM WHICH INCREASED THE REMOVAL RATE ON THE THREE WAFERS.
   FYI-   THE LOT WAS NEVER PROC'D INTO THE POLISHING STEP WHEN THEY GOT TOASTED
         TWO WEEKS AGO.  


DISPOSITION: 3 WAFERS WERE SCRAPPED AND THE OTHER 4 WAFERS WERE SENT ON.
             1 WAFER OUT OF THE 4 WAS REMARKED FOR REDEP.


CORRECTIVE ACTION: PLEASE MAKE SURE THE THE DUMMIES HAVE ENOUGH OXIDE ON THEM
                   BEFORE USING THEM
62.469XM0587 low thickness and high range outgoing @ILD2YIELD::PHESTERThu Dec 05 1996 16:2849
                               CMP PEX 
                     

LOT #          XM0587	

QUANTITY:      22

OPERATION #    3066_THK_CMP  ILD2
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     THICKNESS.A5

DATE:          12/5/96 C-Shift

PROBLEM:       LOT HAD LOW OUTGOING THICKNESS AND HIGH RANGE.  SD WAS JUST
               BELOW UCL.

	       FINAL MEASURMENTS:     THICK. UNF.
	       			      5252 8.67
				      5892 13.5
				      5077 17.1
				      5355 17.2
				      4350 23.0
                                  AVG 5185  (LCL 5200)
                                RANGE 557   (UCL 550)

               LAST WAFER HAD A ONE SITE AT 2136�, CAUSING RANGE AND THICKNESS
               TO BE OUT OF SPEC.

DISPOSITION:   LOT MOVED TO CAP.

CORRECTIVE
ACTION:        THE THIN WAFER WAS READ AGAIN ON THICKNESS.A4 AND READ
               5741� WITH A SD OF 5.6 AND RANGE OF 880�.  (NOTE ABOVE READINGS
               TAKEN ON .A5).  ALSO LOT WAS GIVEN 100% ON THICKNESS.A4.
   
               IT WAS FOUND THAT THE PATTERN REC. WAS SLIPPING OFF THE DIE ON
               TWO EDGE DIE ON THICKNESS.A4.  ALSO THICKNESS.A4 WAS READING
               THE DIE IN A DIFFERENT LOCATION THAN THICKNESS.A5.  THIS HAS
               BEEN CORRECTED.

               THE LOT WAS READ 100% AGAIN WITH CORRECTED PROGRAM ON 
               THICKNESS.A5.  GOF WAS GOOD ON ALL POINTS.  FIVE WAFERS WERE
               IDENTIFIED THAT NEEDED AN EXTRA 1000� AT CAP AND LOT WAS
               REMARKED.  ALSO ONE WAFER NEEDED A SLIGHT TOUCH-UP AND THIS
               WAS DONE.
62.470JD0633 SOME WAFERS OVER-POLISHED @ILD3YIELD::PHESTERFri Dec 06 1996 10:3348

                               CMP PEX 
                     

LOT #          JD0633	

QUANTITY:      20

OPERATION #    3064_THK_CMP  ILD3
/DESCR.

POLISHER:      CMP.B1

EVAL TOOL:     THICKNESS.A4

DATE:          12/6/96 C-Shift

PROBLEM:       SOME WAFERS OVER-POLISHED @ILD3

               THICKNESS AVG = 8567�   LCL IS 9500�

	FINAL MEASURMENTS:     THICK.	 UNF.
				7480	5.78
				9463	6.01
				8136	6.00
				8391	9.42
				9366	2.78

DISPOSITION:  LOT MOVED TO DEP_ILD3 3

           LOT WAS 100% AND REMARKED FOR EXTRA DEP.

           GROUP #1...1000� EXTRA  W#...7,21,3,15,18,16,5,2                 

           GROUP #2...2000� EXTRA  W#...4,6,19,12,9                         

CORRECTIVE
ACTION:    WAFERS FROM THE LOT WERE READ ON BOTH THICKNESS.A4 AND .A5 TO CHECK
           CORRELATION AND IT WAS GOOD.  GOODNESS OF FIT WAS ACCEPTABLE TO 
           EXCELLENT ON ALL POINTS READ.

           THIS LOT WAS POLISHED ON THE PREVIOUS SHIFT AND WAS UNDERGOING FINAL
           THICKNESS EVALUATION AT SHIFT CHANGE.  NO CONCRETE EXPLANATION FOR
           OVER-POLISH.  SUSPECT SOME MIS-CALCULATIONS ON TOUCH-UP TIMES.

           REMOVAL RATE ON TOOL AT TIME OF POLISH WAS EXCEPTIONALLY GOOD AND
           WOULD AMPLIFY ANY MIS-CALCULATION.
62.471XD0622 over dep CMP PMD reworkSUBPAC::KULPMon Dec 09 1996 04:5323
                              CMP PEX 

LOT #:             XD0622   Hot lot

QUANTITY:          23

OPERATION #        2947 THK_PMD 2 
  
POLISHER:          CMP.B3

EVAL TOOL:         N/A

DATE:              B shift   12/09/96 

PROBLEM:           Over dep. from films, oper. error wrong recipe used.      

DISPOSITION:       Lot had ~ 16.3K thickness, target 8900.

CORRECTIVE         Did 100% on lot, running very conservative.  Lot will run
ACTION:            over to A shift, I belive it will require FURN before
	           moving to Photo.


62.472XD0618 - 1981 CMP AFTER ILD1 BROKE 2 WAFERS ON CMP.A2SUBPAC::KULPMon Dec 09 1996 06:0452
                              CMP PEX 

LOT #:             JL0691 

QUANTITY:          24-2=22

OPERATION #        1981 CMP_ILD1
  
POLISHER:          CMP.A2

EVAL TOOL:         N/A

DATE:              B shift   12/09/96 

PROBLEM:           2 wafers crashed      

DISPOSITION:       Lot is still in the area, 

CORRECTIVE         EE cleaned  system, will need MQC's
ACTION:            


 CMP.A1 & CMP.A2 WAFER CRASH FORM (to be filled out by MFG/EEG/PSS, together)

2 product wafers crashed

ild recipe
 seconds in interval #

 1) System _cmp.a2 ___
 2) Recipe _ ild _____
 3) Step # _ 2/3 ___
 4) Time into step __  ___
 5) Type of wafers that broke _product xd0618 ild1 (x2)__
 6) Carrier which wafer slid out of _ left _
 7) Other carriers that were damaged _ both ___
 8) Alarms displayed by polisher _ no alarm was sounded until after crash _____
                                 ______________________________________________
                                 ______________________________________________
 9) Did any other polisher error for slurry or crash _ no _, __________
10) # of wafers on pad _ 54 __
11) # of wafers on carrier _ l-256 r-256 __
12) Was there any vibration prior to the crash _ no ___
13) Was there plenty of slurry (for step 1&2) or water (step 3) present on
    the table _ yes _____
14) Check step height of the carrier from question #6 _ carrier too trashed __
15) Please note any other unusual circumstances: breakin wafers ran, with no
     problem. this was the first 180 sec, and the first two product wafers,
     from this lot to touch pad.

16) Put this check sheet in CMP note #9 - done.

62.473XD0625 2 wafers lost on CMP.A1 SUBPAC::KULPTue Dec 10 1996 07:3884
                              CMP PEX 

LOT #:             XD0625 

QUANTITY:          24-2=22

OPERATION #        1978 CMP_PMD     CMP 
  
POLISHER:          CMP.A1

EVAL TOOL:         N/A

DATE:              B shift   12/10/96 

PROBLEM:           1 wafer broke, the other scratched beyond repair       

DISPOSITION:       Lot is still in the area, 

CORRECTIVE         EE cleaned  system, will need MQC's
ACTION:            


                                                                       REV. 2.0
                                                                       12/9/97

                      CMP.A1 & CMP.A2 WAFER BREAKAGE FORM
                      -----------------------------------

 1) System:  CMP.A1:__ x ___    CMP.A2:_____

 2) Time of incident:___ 4:30 am _ 12/10/96 __________

 3) Name of Operations Technician:_ M_Provencher _________

 4) Recipe Name:__ pmd _____

 5) Recipe Step #:__ 3/4 ____

 6) Time into step:___ 0 ____

 7) Type of wafers that broke:  PRODUCT:_ x ___   MONITOR:_____

 8) If Product, give:  LOT #:____  xd0625 ____     DEVICE #:__ t-69 ____

 9) If Monitors, were they:  PAD BREAKIN/EXERCISE:__ n/a __    MQC:__ n/a __

10) Which carrier lost the wafer:   RIGHT:_____   LEFT:__ x ___

                                    BOTH:_____    DON'T KNOW:_____

11) Alarms displayed by polisher:_left carrier not arriving up ________________
                                 ______________________________________________
12) # of wafers on pad:__ 58 ____

13) # of wafers on carrier:__ l-118/r-206 __

14) If Product, how many wafers in the lot were polished before the crash:_ 24
_

15) Was the PRODUCT lot receiving:  INITIAL POLISH:_____ or  TOUCH UP:__ x __

16) If Monitors, how many monitors were polished before the crash:__ n/a __

17) Were any "ASSISTS" recently logged prior to the crash:  YES_____  NO__ x __


    If yes, what were the "ASSISTS" for:_______________________________________

    ___________________________________________________________________________

18) On previous runs, were the carriers sticking to the pad at the end of

    the polish cycle:   YES:_____   NO:__ x __

19) Was there plenty of slurry (for step 1&2) or water (step 3) present on
    the table:  YES:__x __  NO:_____

20) Please note any and all other unusual circumstances that were noticed
    about the tool at the time of the crash or on any prior runs.  No in-
    formation is too trivial!! Two screws were missing from the left carrier,
    (where wafer slid out). They were found in the carrier clean station. step
    height was performed on the left carrier. it measured -.004.

                                                              
62.474Jd0615 - 2 wafer overpolished 1 wafer scrappedSTRATA::POZORSKITue Dec 10 1996 17:1621
                              CMP PEX 

LOT #:             JD0615 

QUANTITY:          24-1=23

OPERATION #        1985 ILD2     CMP 
  
POLISHER:          CMP.B2

EVAL TOOL:         N/A

DATE:              B shift   12/10/96 

PROBLEM:           2 wafers over polished and the lot was remarked for extra
                   dep, 1 wafer was scrapped due to extensive over polish.

DISPOSITION:       Lot was remarked and moved on.

CORRECTIVE         Not sure really what happened it was processed on B-Shift,
ACTION:            and A-Shift discovered this.
62.475XD0624 - 4 wafer overpolishedSTRATA::POZORSKITue Dec 10 1996 17:1721
                              CMP PEX 

LOT #:             XD0624 

QUANTITY:          24

OPERATION #        1985 ILD2     CMP 
  
POLISHER:          CMP.B2

EVAL TOOL:         N/A

DATE:              B shift   12/10/96 

PROBLEM:           4 wafer were over polished by 2000�.

DISPOSITION:       This lot was polished on B-Shift and A-Shift discoved
                   the 4 wafers by doing 100%  Lot was remarked and moved on.

CORRECTIVE         The lot was remarked and moved on.  Will need to talk to
ACTION:            B-Shift to see really what is happening to these.
62.476Pex for lot XD0605YIELD::SHONGFri Dec 13 1996 07:3451
                               CMP PEX 
                     

LOT #          XD0605	

QUANTITY:      18

OPERATION #    3064_THK_CMP  ILD3
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     THICKNESS.A5

DATE:          12/12/96 C-Shift

PROBLEM:       OUTGOING THICNESSS AVERAGE WAS LOW, RANGE WAS HIGH.

               THICKNES AVG = 9279�   LCL IS 9500�

                      RANGE = 6018�   UCL IS 4500�

FINAL MEASSUREMENTS

              THK_ME_5     WAFER #1                11438.000
                           WAFER #2                 8094.000
                           WAFER #3                 8177.000
                           WAFER #4                 9407.000
                           WAFER #5                      N/A
              THK_RG       XD0605                   6018.000

              LOT WAS PROCESSED ON D-SHIFT.

DISPOSITION:  LOT WAS MOVED TO CAP.

CORRECTIVE
ACTION:       THIS LOT HAD PROBLEMS WITH METROLOGY EVALUATION ON THICKNESS.A4.
              THE LOT WAS READ ON THICKNESS.A5 AND RESULTS WERE BETTER.

              THE PROGRAM ON THICKNESS.A4 WAS READING THREE OF THE WRONG DIE.
              THIS WAS CORRECTED AND NOW THICKNESS.A4 AND .A5 HAVE IDENTICAL
              PROGRAMS.  IN ADDITION BOTH PROGRAMS WERE OPTIMIZED.  READINGS
              ARE WITHIN 10� FROM TOOL TO TOOL.

              REASON FOR OVERPOLISH ON SELECTED WAFERS IS NOT CLEAR AS IT WAS 
              PREVIOUS SHIFT.

              LOT WAS 100% ON THICKNESS.A5 & BINNED 
              ACCORDINGLY AND A REMARK WAS ADDED AT OP#2136 FOR EXTRA DEP.
	
62.477JL0706 high SD @ILD2YIELD::PHESTERSat Dec 14 1996 13:2641

                              CMP PEX 
                     

LOT #:        JL0706 ILD2               

QUANTITY:     23      

OPERATION #   3274      

POLISHER:     CMP.B3 

EVAL TOOL:    THICKNESS.A5     

DATE:         12/13/96    

PROBLEM:      STD DEV ABOVE UCL.      

              STD DEV WAS 16.2.   UCL IS 16.0
                            
              HK_ME_5      WAFER #1                 5224.000
                           WAFER #2                 5377.000
                           WAFER #3                 5839.000
                           WAFER #4                 5737.000
                           WAFER #5                 5105.000
              THK_RG       JL0706                   3101.000
              THK_SD_5     WAFER #1                   12.400
                           WAFER #2                   18.800
                           WAFER #3                   12.600
                           WAFER #4                   15.600  12/13/96 15:44:08
                           WAFER #5                   21.600

DISPOSITION:  LOT MOVED ON.
   
CORRECTIVE
ACTION:       THICKNESS AND RANGE WERE RIGHT ON TARGET.  ALL MEASUREMENT GOFs'
              GOOD.  INCOMING THICKNESS AND SD LOOKED GOOD AS WELL.  LOOKS TO BE
              A WITHIN WAFER ISSUE.  NO CORRECTIVE ACTION.

                                        
62.478xd0759 low incoming step heightSUBPAC::KULPSun Dec 15 1996 07:3293
                              CMP PEX 

LOT #:             XD0759 

QUANTITY:          23

OPERATION #        3078 STP_PMD_PRE 
  
POLISHER:          CMP.A1

EVAL TOOL:         N/A

DATE:              B shift   12/10/96 

PROBLEM:           Incoming step height out of spec. low

Incoming step height was 2975�   LCL is 3000�

              RUN_ID_1     XD0759               23

              HEIGHT_ME    WAFER #1 CENTER          3040.000
 LOG AN EVENT              WAFER #1 EDGE            2951.000  12/15/96 03:36:16
                           WAFER #2 CENTER          2954.000
                           WAFER #2 EDGE            2955.000

DISPOSITION: Lot moved to polish       

CORRECTIVE   None      
ACTION:            


                                                                       REV. 2.0
                                                                       12/9/97

                      CMP.A1 & CMP.A2 WAFER BREAKAGE FORM
                      -----------------------------------

 1) System:  CMP.A1:__ x ___    CMP.A2:_____

 2) Time of incident:___ 4:30 am _ 12/10/96 __________

 3) Name of Operations Technician:_ M_Provencher _________

 4) Recipe Name:__ pmd _____

 5) Recipe Step #:__ 3/4 ____

 6) Time into step:___ 0 ____

 7) Type of wafers that broke:  PRODUCT:_ x ___   MONITOR:_____

 8) If Product, give:  LOT #:____  xd0625 ____     DEVICE #:__ t-69 ____

 9) If Monitors, were they:  PAD BREAKIN/EXERCISE:__ n/a __    MQC:__ n/a __

10) Which carrier lost the wafer:   RIGHT:_____   LEFT:__ x ___

                                    BOTH:_____    DON'T KNOW:_____

11) Alarms displayed by polisher:_left carrier not arriving up ________________
                                 ______________________________________________
12) # of wafers on pad:__ 58 ____

13) # of wafers on carrier:__ l-118/r-206 __

14) If Product, how many wafers in the lot were polished before the crash:_ 24
_

15) Was the PRODUCT lot receiving:  INITIAL POLISH:_____ or  TOUCH UP:__ x __

16) If Monitors, how many monitors were polished before the crash:__ n/a __

17) Were any "ASSISTS" recently logged prior to the crash:  YES_____  NO__ x __


    If yes, what were the "ASSISTS" for:_______________________________________

    ___________________________________________________________________________

18) On previous runs, were the carriers sticking to the pad at the end of

    the polish cycle:   YES:_____   NO:__ x __

19) Was there plenty of slurry (for step 1&2) or water (step 3) present on
    the table:  YES:__x __  NO:_____

20) Please note any and all other unusual circumstances that were noticed
    about the tool at the time of the crash or on any prior runs.  No in-
    formation is too trivial!! Two screws were missing from the left carrier,
    (where wafer slid out). They were found in the carrier clean station. step
    height was performed on the left carrier. it measured -.004.

                                                              
62.479JD0688 1 wafer scrapped STRATA::POZORSKIMon Dec 16 1996 11:1325
                              CMP PEX 
                     

LOT #: JD0688	                

QUANTITY:   24-1 = 23      

OPERATION #   1982      

POLISHER:      N/A

EVAL TOOL:     N/A

DATE:         12/15/96    

PROBLEM:      One wafer was scrapped off of Scrub.A3, the system alarmed while
              a wafer was on the Dry Spin Station.  EE went in and tried to 
              recover the wafer but, the system was locked up so they had to
              EMO the system which caused the wafer to break.  The wafer got 
              caught on the roller.

DISPOSITION:  The wafer was scrapped out and the rest of the lot was moved on.
   
CORRECTIVE
ACTION:       NONE.
62.480JD0708 Had high incoming stp heightSTRATA::POZORSKIMon Dec 16 1996 18:4229
                              CMP PEX 

LOT #:             JD0708 

QUANTITY:          23

OPERATION #        3097 STD_ILD1_PRE HEIGHT_ME
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   12/16/96 

PROBLEM:           Incoming step height out of spec. High

Incoming step height was 9660�   UCL= 9600

              RUN_ID_1     NA                   MA
              HEIGHT_ME    WAFER #1 CENTER          9619.000
                           WAFER #1 EDGE            9778.000  12/16/96 15:17:41
                           WAFER #2 CENTER          9474.000
                           WAFER #2 EDGE            9770.000


DISPOSITION: Lot moved to polish        

CORRECTIVE   None
ACTION:            
62.482JD0733 2 wafers overpolishedSTRATA::POZORSKITue Dec 17 1996 14:4323
                               CMP PEX 
                     

LOT #          JD0733

QUANTITY:      24

OPERATION #    2957 THK_CMP  
/DESCR.

POLISHER:      CMP.A1

EVAL TOOL:     THICKNESS.A5

DATE:          12/17/96 A-Shift

PROBLEM:       Two wafers were overpolished, the lot was polished correctly and
               times were set according to the 2 send ahead wafers.  The rest 
               the lot came out good with the times.
               These two wafers will need to get an extra 1500� dep on them.
 
CORRECTIVE     The lot was moved on and a remark was added to get an extra dep
ACTION:        
62.483JL0713 ILD1 - Two wafers overpolishedYIELD::MANDREOLIWed Dec 18 1996 05:1830
                            PE PEX NOTIFICATION
                     

LOT #          JL0713 (DC1033)

QUANTITY:      22    

OPERATION #    1992 CMP_ILD1
/DESCR.        

POLISHER:      CMP.B3  

EVAL TOOL:     THICKNESS.A5 

DATE:          12/18/96 B-Shift

PROBLEM:       3 wafers overpolished. 

DISPOSITION:   REMARK added at Oper 2166 DEP_ILD1 3 for;
               
               Wafers 11, 16 to get extra 1000� Deposition. 
               Wafer 24 to get extra 500� Dep. 

               These 3 wafers were polished with dummies, although without a 
               reduction in time due to having fillers.. This could account 
               for the accelerated removal rate, or they came into the room  
               from films with lower tox..?  (previous shift) 
               
CORRECTIVE
ACTION:       Three wafers REMARKed at Oper# 2166 for extra Dielectric Dep.    
62.484JD0687 ILD2 - 5 wafers scrapped for over-polishYIELD::MANDREOLIWed Dec 18 1996 05:3125
                            PE PEX NOTIFICATION
                     

LOT #          JD0687 (DC1026)

QUANTITY:      24 - 5 = 19    

OPERATION #    1985 CMP_ILD2
/DESCR.        

POLISHER:      CMP.B3  

EVAL TOOL:     THICKNESS.A5 

DATE:          12/18/96 B-Shift

PROBLEM:       5 wafers overpolished. The 5 send ahead wafers for this lot 
               were accidently polished again with full time, resulting in 
               severe overpolish with Metal exposure. Wafers are in the CMP 
               area.  

DISPOSITION:   Wafers {01, 08, 10, 17, 21} will be scrapped at Oper# 1985. 
               
CORRECTIVE
ACTION:        no further action required. 
62.485XD0632 2 WAFERS SCRAPPED @PMD DUE TO CRASHYIELD::PHESTERThu Dec 19 1996 13:35110

                              CMP PEX 
                     

LOT #:        XD0632   PMD

QUANTITY:     22

OPERATION #   1978 CMP_PMD       

POLISHER:     CMP.A2

EVAL TOOL:    N/A     

DATE:         12/14/96    

PROBLEM:      TWO WAFERS SCRAPPED AT TOUCH-UP.  HIGH AMPERAGE ON TOOL NOTED JUST
              BEFORE CRASH.  NO TIME TO EMO TOOL BEFORE CRASH.  EE SUSPECTED 
              A BAD PAD.  OTHER PROBLEMS HAVE BEEN ENCOUNTERED WITH THIS LOT. 
              A NEW LOT OF PADS WAS SELECTED AND THE PAD WAS CHANGED OUT.

DISPOSITION:  LOT MOVED ON.
   
CORRECTIVE
ACTION:       CRASH FORM FILLED OUT AND POSTED.  FORM ATTATCHED.


                                                                       REV. 2.0
                                                                       12/9/97

                      CMP.A1 & CMP.A2 WAFER BREAKAGE FORM
                      -----------------------------------

 1) System:  CMP.A1:_____    CMP.A2:__XXXXX

 2) Time of incident:__8:39

 3) Name of Operations Technician:_Gwen

 4) Recipe Name:__PMD

 5) Recipe Step #:___2_

 6) Time into step:__4.2 sec

 7) Type of wafers that broke:  PRODUCT:_X_   MONITOR:_____

 8) If Product, give:  LOT #:XD0632   DEVICE #:_PMD

 9) If Monitors, were they:  PAD BREAKIN/EXERCISE:______    MQC:______

10) Which carrier lost the wafer:   RIGHT:_XXXX   LEFT:_____

                                    BOTH:_____    DON'T KNOW:_____

11) Alarms displayed by polisher:__NO ALARMS AMPS SPIKED UP TO 35 THRU 48
                                 ______________________________________________
                                 ______________________________________________

12) # of wafers on pad:_106

13) # of wafers on carrier:__59

14) If Product, how many wafers in the lot were polished before the crash:_24

15) Was the PRODUCT lot receiving:  INITIAL POLISH:_____ or  TOUCH UP:XXX

16) If Monitors, how many monitors were polished before the crash:______

17) Were any "ASSISTS" recently logged prior to the crash:  YES_____  NO_XXX

    If yes, what were the "ASSISTS" for:_______________________________________

    ___________________________________________________________________________

18) On previous runs, were the carriers sticking to the pad at the end of

    the polish cycle:   YES:_____   NO:XXXX

19) Was there plenty of slurry (for step 1&2) or water (step 3) present on
    the table:  YES:_____  NO:_____YOU CAN NOT SEE THE SLURRY FLOW FROM
                                   THE OPERATORS POSITION IN FRONT OF
                                   THE TOOL. VIEW IS BLOCKED BY CARRIERS.

20) Please note any and all other unusual circumstances that were noticed
    about the tool at the time of the crash or on any prior runs.  No in-
    formation is too trivial!!
          The amps on the tool have been going very high just before
    the table:  YES:_____  NO:_____YOU CAN NOT SEE THE SLURRY FLOW FROM
                                   THE OPERATORS POSITION IN FRONT OF
                                   THE TOOL. VIEW IS BLOCKED BY CARRIERS.

20) Please note any and all other unusual circumstances that were noticed
    about the tool at the time of the crash or on any prior runs.  No in-
    formation is too trivial!!
          The amps on the tool have been going very high just before
          a wafer slides out.  I was watching the tool when the wafer
          slid out.  Brad was with me also watching the tool.
          We were looking at the amps just as the wafer slid out
          but unable to emo the tool in time to stop the wafer
          from crashing into the carrier.


21) Enter this form as a reply to NOTE #9 in the FABSIX::CMP notesfile.

[EOB]

                                        

62.486JD0710 2 Wafers scrapped @PMDYIELD::PHESTERThu Dec 19 1996 13:3692
          
                              CMP PEX 
                     

LOT #:        JD0710   PMD

QUANTITY:     22

OPERATION #   1978 CMP_PMD  

POLISHER:     CMP.A1 

EVAL TOOL:    N/A     

DATE:         12/14/96    

PROBLEM:      TWO WAFERS SCRAPPED AT PMD INITIAL POLISH.  

DISPOSITION:  LOT MOVED ON.   

CORRECTIVE
ACTION:       NO IMMEDIATE CAUSE IDENTIFIED.  EE INVESTIGATED AND SUSPECTED 
              THE PAD WAS BAD.  A NEW LOT OF PADS WAS SELECTED AND THE PAD WAS
              CHANGED OUT.

              CRASH FORM HAS BEEN SUBMITTED AND IS ATTATCHED.


                      CMP.A1 & CMP.A2 WAFER BREAKAGE FORM
                      -----------------------------------

 1) System:  CMP.A1:_X____    CMP.A2:_____

 2) Time of incident:__14:30__________

 3) Name of Operations Technician:____EARL_______

 4) Recipe Name:_____PMD________

 5) Recipe Step #:____2_____

 6) Time into step:___?______

 7) Type of wafers that broke:  PRODUCT:__X___   MONITOR:_____

 8) If Product, give:  LOT #:__JD0710________     DEVICE #:__DC1026__________

 9) If Monitors, were they:  PAD BREAKIN/EXERCISE:___NA___    MQC:__NA____

10) Which carrier lost the wafer:   RIGHT:__?___   LEFT:__X___

        WAFERS WERE POLISHING IN SEG#2 WHAEN I NOTICED THE
    BREAK'GE.

                                    BOTH:_____    DON'T KNOW:_____

11) Alarms displayed by polisher:___NA.....I'LL ASSUME THERE SHOULD BE_________
                                 ______________________________________________
                                 ______________________________________________

12) # of wafers on pad:___14____

13) # of wafers on carrier:__183/62____

14) If Product, how many wafers in the lot were polished before the
    crash:__6 WITH 4 BREAK'IN PRIOR...THIS LEADS ME TO BE LEAVE THERE WERE
     MORE WAFERS ON THIS PAD THAN THE COUNTER SHOWED.___

15) Was the PRODUCT lot receiving:  INITIAL POLISH:_XXX____ or  TOUCH UP:_____

16) If Monitors, how many monitors were polished before the crash:__NA____

17) Were any "ASSISTS" recently logged prior to the crash:  YES_____ NO__XX___

    If yes, what were the "ASSISTS" for:_______________________________________

    ___________________________________________________________________________

18) On previous runs, were the carriers sticking to the pad at the end of

    the polish cycle:   YES:_____   NO:__XX___

19) Was there plenty of slurry (for step 1&2) or water (step 3) present on
    the table:  YES:__XX___  NO:_____...?

20) Please note any and all other unusual circumstances that were noticed
    about the tool at the time of the crash or on any prior runs.  No in-
    formation is too trivial!!

21) Enter this form as a reply to NOTE #9 in the FABSIX::CMP notesfile.
                                        

62.487jd0652 1 wfr overpolishSUBPAC::KULPSun Dec 22 1996 08:2985
                              CMP PEX 

LOT #:             Jd0652 

QUANTITY:          22

OPERATION #        3064 THK_CMP 16
  
POLISHER:          CMP.b1

EVAL TOOL:         THICKNESS.A5

DATE:              B shift   12/22/96 

PROBLEM:           1 wafer over polish, from c shift.

DISPOSITION: Remarked for extra dep.  3000 ang.  2136 DEP_ILD3 3
             B shift just scrubbed and measured.

CORRECTIVE   Have to question c shift when they come back in
ACTION:            


                                                                       REV. 2.0
                                                                       12/9/97

                      CMP.A1 & CMP.A2 WAFER BREAKAGE FORM
                      -----------------------------------

 1) System:  CMP.A1:__ x ___    CMP.A2:_____

 2) Time of incident:___ 4:30 am _ 12/10/96 __________

 3) Name of Operations Technician:_ M_Provencher _________

 4) Recipe Name:__ pmd _____

 5) Recipe Step #:__ 3/4 ____

 6) Time into step:___ 0 ____

 7) Type of wafers that broke:  PRODUCT:_ x ___   MONITOR:_____

 8) If Product, give:  LOT #:____  xd0625 ____     DEVICE #:__ t-69 ____

 9) If Monitors, were they:  PAD BREAKIN/EXERCISE:__ n/a __    MQC:__ n/a __

10) Which carrier lost the wafer:   RIGHT:_____   LEFT:__ x ___

                                    BOTH:_____    DON'T KNOW:_____

11) Alarms displayed by polisher:_left carrier not arriving up ________________
                                 ______________________________________________
12) # of wafers on pad:__ 58 ____

13) # of wafers on carrier:__ l-118/r-206 __

14) If Product, how many wafers in the lot were polished before the crash:_ 24
_

15) Was the PRODUCT lot receiving:  INITIAL POLISH:_____ or  TOUCH UP:__ x __

16) If Monitors, how many monitors were polished before the crash:__ n/a __

17) Were any "ASSISTS" recently logged prior to the crash:  YES_____  NO__ x __


    If yes, what were the "ASSISTS" for:_______________________________________

    ___________________________________________________________________________

18) On previous runs, were the carriers sticking to the pad at the end of

    the polish cycle:   YES:_____   NO:__ x __

19) Was there plenty of slurry (for step 1&2) or water (step 3) present on
    the table:  YES:__x __  NO:_____

20) Please note any and all other unusual circumstances that were noticed
    about the tool at the time of the crash or on any prior runs.  No in-
    formation is too trivial!! Two screws were missing from the left carrier,
    (where wafer slid out). They were found in the carrier clean station. step
    height was performed on the left carrier. it measured -.004.

                                                              
62.488CMP PEX, TWO WAFERS BROKE ON CMP.A1 FOR JD0732SUBPAC::SMARTINSun Dec 22 1996 11:5527
  

LOT:     JD0732

MACHINE: CMP.A1

OPER#:   1978

PROCESS  LEVEL: PMD

DATE:    12/22/96

SHIFT:   A-SHIFT

QUANTITY:  23 WAFERS DOWN TO 21

PRODUCT...DC1026


.
PROBLEM:TWO WAFERS SCRAPPED DUE TO CRASH. RIGHT HAND CARRIER LOST WAFER AND 
        TOOK OUT THE LEFT CARRIER AND WAFER.


DISPOSITION:  LOT WILL BE MOVED ON LESS THE TWO WAFERS.

CORRECTIVE ACTION:  PAD AND CARRIERS WILL BE CHANGED.
62.489CMP PEX,2 WAFERS OVER POLISHED ON JD0742SUBPAC::SMARTINMon Dec 23 1996 19:1236
  

LOT:     JD0742

MACHINE: CMP.B3

OPER#:   883

PROCESS  LEVEL: ILD1

DATE:    12/23/96

SHIFT:   A-SHIFT

QUANTITY:  24

PRODUCT...DC1031-903-EA-8P 



.
PROBLEM: Two wafers over polished.
        2 wafers out of the entire lot came out thin, lot ran based upon send     
   aheads,  which resulted from 5987 to 7342. Its believed at some level
   these two wafers were below LCL on thickness. Also noted was that these
   2 wafers did not measure on ANY thickness tool, it had to be re taught to
   get it to measure the 2 wafers.


DISPOSITION: The two wafers were remarked for extra dep and moved on.
           Wafer #    Thickness  Extra dep.                                         
   3           4985        500                                              
   6           4758        500 
 

CORRECTIVE ACTION:  The two wafers will get redepped for an extra 500A
62.490Pex for ILD1 lots. YIELD::SHONGFri Dec 27 1996 07:2428
                            PE PEX NOTIFICATION
                     

LOT #          	JD0682/JL0747

QUANTITY:      	24

OPERATION #    	1981 CMP_ILD1  
/DESCR.        

POLISHER:      	CMP.A2

EVAL TOOL:     	Thickness.A4

DATE:          	12/27/96 D-Shift

PROBLEM:     	This lot had high STD.DEV after touchup for ILD1(~18%). Lot 
		was ran on CMP.A2. I checked the incoming STD.DEV and that was
 		fine. The 100% done prior to touchup looked good. The average 
		for the lot was ~6 to 7%. The device type for this lot is 
		DC1026. 
		                 
DISPOSITION:   	I remarked the lot for the high STD.DEV and moved it on. Thick-
		ness was still in spec. 
	
CORRECTIVE     	At this point I think the problem is the tool. I'm having prod-
ACTION:        	uction run MQC's before they run any more lots. This might be 
		carried over to the next shift. 
62.491jd0688 4 wafers scrapped, CMP.B2SUBPAC::KULPTue Dec 31 1996 08:1959
                              CMP PEX 

LOT #:             JD0688

QUANTITY:          23-4=19

OPERATION #        1989 CMP_ILD3 
  
POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A5

DATE:              B shift   12/31/96 

PROBLEM:           4 wafers were scratched when carrier 5 stuck to pad.
		   dummy wafer on carrier 5 broke, scratching other wafers.

DISPOSITION: Lot moved on with 4 less wafers.

CORRECTIVE   System will require pad change, carrier change and MQC's
ACTION:            

SPEEDFAM WAFER CRASH FORM (to be filled out by MFG + EEG + PSS, together)

 1) System:   CMP.B2
 2) Recipe:   TUP_D
 3) Step #:   4
 4) Time into step:   ?
 5) Type of wafers that broke: 1 dummy 4 product 11,12,17,18
 6) Carrier which wafer slid out of:  #5
 7) Other carriers that were damaged:  #yes, all
 8) Alarms displayed by polisher:  n/a was EMO'd before alarm
 9) Did any other polisher error for slurry or crash: NO
10) Did wafer detect work:  NO
11) # of wafers on pad:  304
12) # of wafers on carrier:  60
13) Was there any vibration prior to the crash:  NO
14) Was there plenty of slurry (for step 1-5) or water (step 6-9) present on
    the table:  no, but plenty of slurry in delivery tube
15) Check step hight of the carrier from question #6:  n/a
16)** Please note any other unusual circumstances:
        System alarmed with no error message displayed on screen. Both Ops
        and EE personnel observed carrier 5 stuck to the pad while the others
        were up. The table was spinning at the desired speed but the carriers
        were not rotating. EE's first thought for an explanation was that
        the wafer loss detect board didn't operate properly. This was tested
        using the same recipe and 4 dummies (carrier 5 was trashed). While the
        carriers were on the pad a wafer was manually placed under the wafer
        loss sensor. The wafer loss board led lit up for the sensor being
        tripped but the wafer loss detect led didn't light up. The table and
        carriers kept spinning and stayed on the table. With this in mind our
        next thought was that maybe the wafer came out in step 3 while vacuum
        was still on. The alarm could have been main vac low which may cause
        the carriers to lift off the pad and possibly stop the slurry pumps.
        Which would explain all observations seen. At any rate the wafer loss
        board will be replaced and tested for functionality.

                                                B-shift EE.
17) Put this check sheet in CMP note #32: done
62.492CMP PEX.10 WAFERS SCRAPPED DUE TO OVER DEP at 2165 DEP_ILD1 2SUBPAC::SMARTINTue Dec 31 1996 10:5551
  

LOT:     JL0751

MACHINE: CMP.B1

OPER#:   1993

PROCESS  LEVEL: ILD1

DATE:    12/31/96

SHIFT:   A-B SHIFT

QUANTITY:  24 DOWN TO 14

PRODUCT...DC1071-900-BA-8
 
.
PROBLEM:  Over dep. at 2165 DEP_ILD1 2, lot was over depped should have been 
         ~18k, the thickness of the lot is ~33k.  Lot was polished 
         longer to get it into spec.  Popped chart at pre step height ~ 24.
         Most likly because of extra dep and rework at CMP.B3.  No annotation
         for popped chart.  "A" shift did initial rework polish for 400 sec.
         from 33K to 16K.  100% performed on lot before polishing to 5500 on
         "B" shift. End result was 15 wafers over polished.
         10 Wafers will be scrapped and 5 will get extra dep.
       

DISPOSITION:  Wafers #22, 7, 2, 14, 6 were over polished and need an extra
              1000 ang of oxide put on them. 
              Wafers 1,3,5,6,7,10,15,16,17,20 will be scrapped.

          WAFER/THK

1=3082*     12=4782      23=4146
2=5228      13=5388      24=5799
3=2669*     14=5726
4=4737      15=3203*
5=2484*     16=3039*
6=2529*     17=2875*
7=2203*     18=5036
8=4030      19=5581
9=4911      20=3322*
10=3153*    21=3433
11=5451     22=4452 

     * = SCRAP        

CORRECTIVE ACTION:  Dep lot to spec at 2165 DEP_ILD1 2.

62.493XE0756 LOW INCOMING STEP HEIGHT @PMDYIELD::PHESTERThu Jan 02 1997 08:4327
                                 CMP PEX 
                     

LOT #          XE0756

QUANTITY:      19

OPERATION #    3078 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          12/26/96  C-Shift

PROBLEM:       LOW INCOMING STEP ....PMD

               LOT INCOMING STEP AVG = 2844� 

                              LCL IS   3000�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         NONE
62.494JD0687 HIGH INCOMING STEP @ILD3YIELD::PHESTERThu Jan 02 1997 13:2329
                            PE PEX NOTIFICATION
                     

LOT #          JD0687

QUANTITY:      19

OPERATION #    3081 STEP_ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          12/27/96  C-Shift

PROBLEM:       HIGH INCOMING STEP ....ILD3

               LOT INCOMING STEP AVG = 20260�  

                               UCL IS  20000�
        
DISPOSITION:   LOT MOVED TO POLISH

CORRECTIVE
ACTION         NONE.  NO TREND SEEN.


62.4951 wfr broke CMP.B2 Jd0709SUBPAC::KULPMon Jan 06 1997 07:2641
                              CMP PEX 

LOT #:             JD0709

QUANTITY:          18-1=17

OPERATION #        1989 CMP_ILD3  
  
POLISHER:          CMP.B2

EVAL TOOL:         N/A         

DATE:              B shift   01/06/96    

PROBLEM:           1 wafer broke while unloading manually when system locked
		   up. 

DISPOSITION: Lot moved on with 1 less wafers.

CORRECTIVE   see below                       
ACTION:            

Note 19.291

    Operator found tool alarming whilst processing. Observations made were;
    MHTA was over the index table, the pad conditioner was over (but not on)
    the polish table, the table was rotating, the transfer paddle at track
    1, no wafer was blocking the track sensors, the mhta had unloaded and
    loaded fine, main vac was good, screen had locked up. All DIN's were
    checked and nothing out of the ordinary was found. Those that should be
    lit were lit and those that would indicate a problem were not lit.
    EMO'd tool to recover since the screen locked up. While unloading the
    wafers manually from the index table 1 broke. It broke real easily as
    no excessive pressure was used and the fracture was straight across the
    wafer starting from the notch. May have been a chip in the edge. PSS
    was informed. Since the transfer paddle remained at track 1 while the
    mhta unloaded and loaded, 5 wafers were ran with the "NOT_TOUCH" recipe
    to insure proper operation of the unload module.

							B-shift

62.496JL0837A HIGH INCOMING STEP @PMDLUDWIG::POZORSKISun Jan 12 1997 09:5733
                              CMP PEX 

LOT #:             JL0837A 

QUANTITY:          6

OPERATION #        3362 STP_L_CMP1
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   01/12/97 

PROBLEM:           Incoming step height out of spec. High

Incoming step height was 4534�   UCL= 4200

           PARAMETER          UNIT ID/PROMPT        VALUE    FG LT
              RUN_ID_1     JL0837A                  N/A
              HEIGHT_ME    WAFER #1 CENTER          4669.000
                           WAFER #1 EDGE            4078.000
                           WAFER #2 CENTER          4611.000
                           WAFER #2 EDGE            4779.000


DISPOSITION: Lot moved to polish        

CORRECTIVE   Lots polish time will be ajusted to compensate for high step
ACTION:      heights.

             (FYI - THERE WAS A CHART THAT POPPED BUT, NO ANNOTATIONS CAME 
                     UP WHEN IT POPPED THE CHART??????)
62.497JL0841 HIGH INCOMING STEP HEIGHT @PMDSTRATA::POZORSKISun Jan 12 1997 19:4232
                              CMP PEX 

LOT #:             JL0841

QUANTITY:          24

OPERATION #        3362 STP_L_CMP1
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   01/12/97 

PROBLEM:           Incoming step height out of spec. High

Incoming step height was 4387�   UCL= 4200

         RUN_ID_1     JL0841                   N/A
         HEIGHT_ME    WAFER #1 CENTER          4330.000
                      WAFER #1 EDGE            4313.000
                      WAFER #2 CENTER          4388.000
                      WAFER #2 EDGE            4517.000

DISPOSITION: Lot moved to polish        

CORRECTIVE   Lots polish time will be ajusted to compensate for high step
ACTION:      heights.

             (FYI - THERE WAS A CHART THAT POPPED BUT, NO ANNOTATIONS CAME 
                     UP WHEN IT POPPED THE CHART??????)

62.498JL0845 2 WAFERS SCRAPPED/2 OVERPOLISHED @PMDSTRATA::POZORSKIMon Jan 13 1997 12:1869
			      CMP PEX  

LOT:     JL0845

MACHINE: CMP.A2

OPER#:   1984

PROCESS  LEVEL: PMD

DATE:    01/13/97

SHIFT:   A-SHIFT (LOT WAS RUN ON B-SHIFT)

QUANTITY:  24 WAFERS DOWN TO 22

PRODUCT...DC1031

PROBLEM: 1) ONE WAFER SCRAPPED DUE TO CRASH. THE WAFER BROKE IN THE LEFT LOAD
            CUP IT SNAPPED INTO 3 PIECES.  NOT REALLY SURE WHY BUT, THE PAD AND 
            CARRIERS WERE NOT DAMAGED BY THIS CRASH.

         2) ONE WAFER WAS SCRAPPED DUE TO THE FACT IT GOT OVER POLISHED, THEY
            THINK WHAT HAPPENED WAS WHEN THE CRASHED HAPPENED THEY TOOK THIS
            WAFER AND PUT IT BACK IN TO GET POLISHED NOT REALIZING THAT IT HAD
            ALREADY BEEN POLISHED.  THE THICKNESS CAME OUT AT 2467�.

         3) TWO WAFERS WERE OVER POLISHED, A REMARK WAS ADDED AT OPERATION 
            2160 TO RECEIVED AN EXTRA 500�.

DISPOSITION:  LOT WILL BE MOVED ON WITH TWO LESS WAFER.  A CRASH REPORT WAS
              WRITTEN.  SEE BELOW FOR REPORT.

CORRECTIVE ACTION:  CLEANED THE LOAD STATION AND IS BACK TO RUNNING PRODUCT.

********************************************************************************
			    CRASH REPORT

 CMP.A1 & CMP.A2 WAFER CRASH FORM (to be filled out by MFG/EEG/PSS, together)

LOT#   - JL0845
DEVICE - DC1031
OPER#  - 1984 (CMP AFTER PMD DEP1)
WAFERS - 1 WAFER BROKE IN LOAD STATION

 1) System __CMP.A2___
 2) Recipe __PMD______
 3) Step # _NONE___
 4) Time into step __??___
 5) Type of wafers that broke _PRODUCT (PMD LOT).
 6) Carrier which wafer slid out of _BROKE ON LEFT STATION_
 7) Other carriers that were damaged _NONE___
 8) Alarms displayed by polisher NONE-----------------------------------------
				 ______________________________________________
				 ______________________________________________
 9) Did any other polisher error for slurry or crash _NO_, sysytems____________
10) # of wafers on pad _66__
11) # of wafers on carrier _33__
12) Was there any vibration prior to the crash __NO__
13) Was there plenty of slurry (for step 1&2) or water (step 3) present on
    the table __YES____
14) Check step height of the carrier from question #6 _ N/A

15) Please note any other unusual circumstances:

        WAFER BROKE IN THE LEFT LOAD CUP. IT SNAPPED CLEAN INTO 3 PIECES
(DID NOT SHATTER). NOT SURE WHY. PAD AND CARRIERS NOT DAMAGED. 
            
16) Put this check sheet in CMP note #9 - DONE
62.499JL0848 HIGH INCOMMING STEP HEIGHT @PMDSTRATA::POZORSKITue Jan 14 1997 14:3328
                              CMP PEX 

LOT #:             JL0848

QUANTITY:          24

OPERATION #        3362 STP_L_PMDPRE
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   01/14/97 

PROBLEM:           Incoming step height out of spec. High

Incoming step height was 4568�   UCL= 4200

         RUN_ID_1     JL0848                   N/A
         HEIGHT_ME    WAFER #1 CENTER          4671.000
                      WAFER #1 EDGE            4460.000
                      WAFER #2 CENTER          4644.000
                      WAFER #2 EDGE            4495.000

DISPOSITION: Lot moved to polish        

CORRECTIVE   Lots polish time will be ajusted to compensate for high step
ACTION:      heights.
62.500JD0765 3 wafers scrapped (overpolished)STRATA::POZORSKITue Jan 14 1997 15:3227
                                    PEX 


LOT #          JD0765 (DC1026)

QUANTITY:      22 - 3 = 19    

OPERATION #    1985 CMP_ILD2
/DESCR.        

POLISHER:      CMP.B1  

EVAL TOOL:     THICKNESS.A5 

DATE:          01/14/97 A-Shift

PROBLEM:       3 wafers overpolished. These wafers were going through
               for touch-up and the operator edited the M2 recipe for the 
               10 sec, which was needed to touch-up these wafers but, instead
               of loading the M2 recipe they loaded the M1 recipe which was set
               to run for 196 sec.  Needless to say the wafers were toasted.

DISPOSITION:   Wafers will be scrapped at Oper# 1985. 
               
CORRECTIVE     They are going to double check the recipe before hitting START.
ACTION:        no further action required. 

62.5012 wafers over polish ILD3, lot# JD0710SUBPAC::KULPWed Jan 15 1997 07:2226
                              CMP PEX 

LOT #:             JD0710 

QUANTITY:          22

OPERATION #        1989 CMP_ILD3    CMP  
  
POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A5 

DATE:              B shift   01/15/96    

PROBLEM:           2 wafers overpolish, lot was inherited from A shift, 
		   not sure of cause for overpolish. Found at 100% after touch
		   up.

DISPOSITION: Lot remarked at oper 2136, 

	   wafer# 5 (slot#24) needs 2000� added
           wafer#19 (slot#25) needs 4000� added  

CORRECTIVE   None.
ACTION:            

62.502pex.;STRATA::TDYERWed Jan 15 1997 08:062
  test of com file.
62.503JL0820 high incoming step height @PMDSTRATA::POZORSKIWed Jan 15 1997 11:2032
                              CMP PEX 

LOT #:             JL0820

QUANTITY:          24

OPERATION #        3362 STP_L_CMP1
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   01/15/97 

PROBLEM:           Incoming step height out of spec. High

Incoming step height was 4507�   UCL= 4200

              RUN_ID_1     JL0820               N/A
              HEIGHT_ME    WAFER #1 CENTER          4484.000
                           WAFER #1 EDGE            4485.000   
                           WAFER #2 CENTER          4535.000
                           WAFER #2 EDGE            4522.000


DISPOSITION: Lot moved to polish        

CORRECTIVE   Lots polish time will be ajusted to compensate for high step
ACTION:      heights.

             There was no remarks as to any splits or problem and I talk to
             etch to see if there were any problem and no noted.  
62.504JL0849 high incoming step height @PMDSTRATA::POZORSKIWed Jan 15 1997 11:3932
                              CMP PEX 

LOT #:             JL0849

QUANTITY:          24

OPERATION #        3362 STP_L_CMP1
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   01/15/97 

PROBLEM:           Incoming step height out of spec. High

Incoming step height was 4560�   UCL= 4200

              RUN_ID_1     JL0849                NA   
              HEIGHT_ME    WAFER #1 CENTER          4700.000              
                           WAFER #1 EDGE            4170.000   
                           WAFER #2 CENTER          4719.000
                           WAFER #2 EDGE            4654.000

DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.

             There was a remark at oper #3363 THK_OXSPCR for high and out of
             control thickness and also there was another remark at oper #3260 
             for high shr rho.  Other then that nothing else was found.
62.505Low incoming step heightYIELD::SHONGFri Jan 17 1997 03:0024
                            PE PEX NOTIFICATION
                     

LOT #          	XD0633

QUANTITY:      	24

OPERATION #    	3081 STEP_ILD3
/DESCR.        

POLISHER:      	N/A

EVAL TOOL:     	Profiler.A2

DATE:          	01/17/97 D-Shift

PROBLEM:     	This lot came into the area with low step height. The LCL for
		step height is 17000. The lot came in at 16840. 
									
		                 
DISPOSITION:   	Moved the lot on to polish.
	
CORRECTIVE     	None
ACTION:        	
62.506CMP PEX,SLIGHTLY HIGH POST THK FOR JD0734SUBPAC::SMARTINMon Jan 20 1997 08:5044
  

LOT:     JD0732

MACHINE: CMP.B2

OPER#:   1986

PROCESS  LEVEL: ILD3

DATE:    1/20/97

SHIFT:   B- SHIFT

QUANTITY:  21

PRODUCT....DC1026-900-JA-8G

LOT; JD0732 
.
PROBLEM: Lots post thickness reading was three angstroms over the upper
         control limit.  Lot came out with 10,503 the upper control
         limit is 10,500. Lot is too close to touch up.
           

          PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                10442.000                   
                           WAFER #2                10421.000                   
                           WAFER #3                10323.000                   
                           WAFER #4                10827.000                   
                           WAFER #5                      N/A                   
              THK_RG       JD0732                   3373.000                   
              THK_SD_5     WAFER #1                   13.300                   
                           WAFER #2                    8.700   
                           WAFER #3                    8.800   
                           WAFER #4                   13.800                   
                           WAFER #5                      N/A

         
DISPOSITION: Lot will be moved on to next operation.


CORRECTIVE ACTION: None required.

62.507JL0884 HIGH INCOMING STEP HEIGHT @PMDSTRATA::POZORSKITue Jan 21 1997 11:3831
                              CMP PEX 

LOT #:             JL0884

QUANTITY:          24

OPERATION #        3362 STP_L_CMP1
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   01/21/97 

PROBLEM:           Incoming step height out of spec. High

Incoming step height was 4628�   UCL= 4200

             RUN_ID_1     JL0884               N/A
             HEIGHT_ME    WAFER #1 CENTER          4486.000
	                  WAFER #1 EDGE            4645.000
                          WAFER #2 CENTER          4664.000
                          WAFER #2 EDGE            4717.000

DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.

             There was no remarks for this lot as to why we had high incoming
             step heights.
62.508JD0809 low outgoing thickness @ILD2LUDWIG::PHESTERSat Jan 25 1997 14:0134

                            PE PEX NOTIFICATION
                     

LOT #          JD0809

QUANTITY:      24

OPERATION #    3066 POST THICKNESS
/DESCR.

POLISHER:      POST READINGS - CMP.B1

EVAL TOOL:     THICKNESS.A4

DATE:          01/24/97  C-Shift

PROBLEM:       LOW POST MEAN THICKNESS....ILD2

               LOT POST THICKNESS AVG = 5175� 

                                LCL IS  5200�
        
DISPOSITION:   LOT MOVED ON.
              
               LOT PROCESSED BY THE BOOK, HOWEVER THE REMOVAL RATE FROM CARRIER 
               CARRIER WENT BAD DURING PROCESSING OF THIS LOT.  AFTER THIS LOT
               WAS PROCESSED EE TOOK TOOL FOR A PM AND REPLACED PAD AND
               CARRIERS.

CORRECTIVE
ACTION         WAFERS NEEDING EXTRA DEP WERE REMARKED AT OPERATION
               2133.
62.509JD0784 HIGH OUTGOING RANGE @ILD3LUDWIG::PHESTERSat Jan 25 1997 17:4835

                               CMP PEX 
                     

LOT #          JL0784  DC1026

QUANTITY:      24

OPERATION #    3064 THK_ILD3_PST 
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     THICKNESS.A4

DATE:          1/25/97 C-Shift

PROBLEM:       HIGH OUTGOING RANGE @ILD3              

DISPOSITION:   LOT MOVE ON.
 
               TOOL IS A BIT MORE EDGE FAST THAN NORMAL ON THIS LOT.  NOTHING
               UNUSUAL ABOUT THE RUN.

               MEAN THICKNESS AND SD ARE GOOD.

CORRECTIVE
ACTION:        PAD IS RELATIVELY NEW.  OTHER ILD LEVELS POLISHING WELL ON THIS
               PAD.  

               INCOMING THICKNESS, RANGE AND SD WERE VERY GOOD.

               METRO TOOLS CHECK OUT AND GOF WAS GOOD.

62.510JD0763 high outgoing range @ILD3LUDWIG::PHESTERSat Jan 25 1997 19:2935

                            PE PEX NOTIFICATION
                     

LOT #          JD0763

QUANTITY:      23

OPERATION #    3064 POST THICKNESS .A5
/DESCR.

POLISHER:      POST READINGS

EVAL TOOL:     THICKNESS.A5 ILD3

DATE:          01/25/87  C-Shift

PROBLEM:       HIGH POST RANGE ILD3 DC1026

               HIGH POST RANGE LOT AVG = 4745�  

                                UCL IS   4500�
        

DISPOSITION:  Lot was polishing on CMP.B3 at the change of shifts.
              Lot only had a removal rate on B3 of 900, so lot was
              moved over to B1 because tool had new pad.  Removal rate
              went to 2280�.  Lot finished polishing on B1.

              Ran a ILD2 lot on B1 right after the ILD3 and the
              post range was excellent, 1200.  

CORRECTIVE
ACTION        NONE.
62.512CMP.B3 broke 1 wafer on wafer track JL0824SUBPAC::KULPSun Jan 26 1997 03:5254
                              CMP PEX 

LOT #:             JL0824  

QUANTITY:          24-1=23

OPERATION #        1994 CMP_ILD2    CMP  
  
POLISHER:          CMP.B3

EVAL TOOL:         N/A          

DATE:              B shift   01/26/96    

PROBLEM:        1 broken wafer.  The wafer did not clear the wafer track 
		before another wafer was brought over to get unloaded 
		from the paddle.

DISPOSITION:    Moved lot on with 1 less wafer

CORRECTIVE      EE cleaned wafer track turned back over to ops.
ACTION:            


Note 32.26                   CMP.B WAFER CRASH FORM                    26 of 27
							  28 lines  25-JAN-1997
                            -< One more for CMP.B3 >-


 SPEEDFAM WAFER CRASH FORM (to be filled out by MFG + EEG + PSS, together)

 1) System _cmp.b3____
 2) Recipe _TUP_A___
 3) Step # __?__
 4) Time into step __?__
 5) Type of wafers that broke _Product_
 6) Carrier which wafer slid out of _None___
 7) Other carriers that were damaged _None__
 8) Alarms displayed by polisher _Scrubber time out. Wafer has not cleared_____
                                 _Wafer track._________________________________
                                 ______________________________________________
 9) Did any other polisher error for slurry or crash ___, sysytems____________
10) Did wafer detect work _No__
11) # of wafers on pad _580__
12) # of wafers on carrier ___
13) Was there any vibration prior to the crash __No__
14) Was there plenty of slurry (for step 1-5) or water (step 6-9) present on
    the table __Yes___
15) Check step hight of the carrier from question #6 ___
16) Please note any other unusual circumstances:

The wafer did not clear the wafer track before another wafer was brought
over to get unloaded from the paddle.

62.513CMP.B2 broke 1 wafer on scrubber JD0789SUBPAC::KULPSun Jan 26 1997 03:5354
                              CMP PEX 

LOT #:             JD0789 

QUANTITY:          24-1=23

OPERATION #        1985 CMP_ILD2    CMP   
  
POLISHER:          CMP.B2

EVAL TOOL:         N/A          

DATE:              B shift   01/26/96    

PROBLEM:        1 wafer broke.  The wafer broke on the scrubber, it wasn't 
		seated correctly and got caught on the top scrubbing pad.     

DISPOSITION:    Moved lot on with 1 less wafer

CORRECTIVE      EE cleaned scrubber, turned back over to ops.
ACTION:            


Note 32.27                   CMP.B WAFER CRASH FORM                    27 of 27
                                                     33 lines  25-JAN-1997
23:26
                                 -< .b2 break >-


 SPEEDFAM WAFER CRASH FORM (to be filled out by MFG + EEG + PSS, together)

 1) System:   CMP.B2
 2) Recipe:   TUP_175
 3) Step #:   n/a
 4) Time into step:   n/a
 5) Type of wafers that broke: 1 product #15
 6) Carrier which wafer slid out of:  n/a
 7) Other carriers that were damaged:  n/a
 8) Alarms displayed by polisher: scrubber time out
 9) Did any other polisher error for slurry or crash: NO
10) Did wafer detect work:  n/a
11) # of wafers on pad:1200/1225
12) # of wafers on carrier: 1039
13) Was there any vibration prior to the crash:  NO
14) Was there plenty of slurry (for step 1-5) or water (step 6-9) present on
    the table:  n/a
15) Check step hight of the carrier from question #6:  n/a
16)** Please note any other unusual circumstances:
        This wafer broke on the scrubber, it wasn't seated correctly and got
  caught on the top scrubbing pad

                                                B-shift EE.
17) Put this check sheet in CMP note #32: done
                                                        
62.514CMP PEX, HIGH INCOMING STEP HEIGHT FOR JL0880SUBPAC::SMARTINSun Jan 26 1997 18:1331
  

LOT #:             JL0880

QUANTITY:          24

OPERATION #        3362 STP_L_CMP1
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   01/26/97 

PROBLEM:           Incoming step height out of spec. High
           
              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              RUN_ID_1     JL0880               N/A                            
              HEIGHT_ME    WAFER #1 CENTER          4478.000                   
                           WAFER #1 EDGE            4468.000                   
                           WAFER #2 CENTER          4417.000                   
                           WAFER #2 EDGE            4339.000 

                                              ucl=4100.000
         
         
DISPOSITION: Lot will be moved on to next operation.


CORRECTIVE ACTION: None required.

62.515xd0585 2 wafer broken cmp.a2SUBPAC::KULPMon Jan 27 1997 08:1498
                              CMP PEX 

LOT #:             XD0585 

QUANTITY:          24-2=22

OPERATION #        1978 CMP_PMD     CMP  
  
POLISHER:          CMP.A2

EVAL TOOL:         N/A          

DATE:              B shift   01/27/96    

PROBLEM:        2 wafers broke.  

DISPOSITION:    Moved lot on with 2 less wafers and finish polish.

CORRECTIVE      Cleaned up, change carrier and pad.  New MQC's required.
ACTION:         

                                                                      REV. 2.0
                                                                       12/9/97

                      CMP.A1 & CMP.A2 WAFER BREAKAGE FORM
                      -----------------------------------

 1) System:  CMP.A1:__   ___    CMP.A2:__ x ___

 2) Time of incident:___ 4:10 am 01/27/97 __________

 3) Name of Operations Technician:_ M_Provencher _________

 4) Recipe Name:__ pmd _____

 5) Recipe Step #:__ 3/4 ____

 6) Time into step:___ 0 ____

 7) Type of wafers that broke:  PRODUCT:_ x ___   MONITOR:_____

 8) If Product, give:  LOT #:____  xd0585 ____     DEVICE #:__ t-69 ____

 9) If Monitors, were they:  PAD BREAKIN/EXERCISE:__ n/a __    MQC:__ n/a __

10) Which carrier lost the wafer:   RIGHT:__ x ___   LEFT:__  ___

                                    BOTH:_____    DON'T KNOW:_____

11) Alarms displayed by polisher:_right carrier not arriving up ________________

12) # of wafers on pad:__ 80 ____

13) # of wafers on carrier:__ l-40/r-40 __

14) If Product, how many wafers in the lot were polished before the crash:_ 24_

15) Was the PRODUCT lot receiving:  INITIAL POLISH:_____ or  TOUCH UP:__ x __

16) If Monitors, how many monitors were polished before the crash:__ n/a __

17) Were any "ASSISTS" recently logged prior to the crash:  YES_____  NO__ x __

    If yes, what were the "ASSISTS" for:_______________________________________

18) On previous runs, were the carriers sticking to the pad at the end of

    the polish cycle:   YES:__ x ___   NO:__  __

19) Was there plenty of slurry (for step 1&2) or water (step 3) present on
    the table:  YES:__ x __  NO:_____

20) Please note any and all other unusual circumstances that were noticed
    about the tool at the time of the crash or on any prior runs.  No in-
    formation is too trivial!! right carrier was intermitantly sticking for
    no longer than 1 second.


Note 7.309                   CMP.A2 EE/PE PASSDOWNS                  309 of 309

                                  -< crash  >-

    Tool crashed with no apparent nor obvious reason. The wafer came out
    of the right carrier. Earlier in the evening the right carrier was
    sticking to the pad. The black oring and the platen screws were
    replaced but the problem persisted. The carriers were swapped which
    improved the release but the right still lagged by about a second.
    Not sure why the right would be sticking to the pad with a good
    carrier. The cal/config numbers were checked and compared to A1 with
    nothing out of the ordinary found. To recover from the crash the
    carriers were flushed (autocycle, f8, f5) due to the right carrier
    sucking up wafer debris. And then the carriers, pad, and diamond disk
    were replaced. The disk was just replaced this AM by A-shift and
    already had signs of considerable wear (only 80 wafers on  pad).
    Weekly pm was going to be performed but A-shift beat us to it.


                                        B-shift
62.516 XE0902 incoming step height low ILD2SUBPAC::KULPMon Jan 27 1997 08:1531
                              CMP PEX 

LOT #:             XE0902     TM0060-007-CA-8C    Hot lot

QUANTITY:          9

OPERATION #        3080 STEP_CMP 3  STEP_ILD2  
  
POLISHER:          CMP.B1

EVAL TOOL:         PROFILER.A2            

DATE:              B shift   01/27/96    

PROBLEM:           Incoming step height very low. LCL: 7200
        
LOG AN EVENT EVENT STP_ILD2_PRE FOR ENTITY CMP.B1             1/26/97 23:44:35

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              RUN_ID_1     XE0902               9
              HEIGHT_ME    WAFER #1 CENTER          1674.000	
 LOG AN EVENT              WAFER #1 EDGE            1893.000   1/26/97 23:44:35
                           WAFER #2 CENTER          1561.000
                           WAFER #2 EDGE            1626.000


DISPOSITION:       Moved lot on to polish.

CORRECTIVE ACTION: None, 1st time processed through area.           

                                                        
62.517XE0609 - 5 wafers over polishedSTRATA::POZORSKIMon Jan 27 1997 15:1528
                              CMP PEX 

LOT #:             XE0609

QUANTITY:          22

OPERATION #        1989 CMP_ILD3 
  
POLISHER:          CMP.B1

EVAL TOOL:         THICKNESS.A5 

DATE:              A shift   01/27/97    

PROBLEM:           5 wafers overpolish, lot was inherited from B shift.  A-Shift
                   was told that they were overpolished before they left.
                   Not really sure what happened with them.  Looks like the
                   polish time was over calculated on these wafers.

DISPOSITION: Lot remarked at oper 2136, 

	     wafer# 11,15 and 20 needs additional 2000� added at dep.
             wafer# 12 and 17 needs additional 4000� added at dep.

CORRECTIVE   Lot was remarked and moved on.
ACTION:            


62.518JD0786 - 5 wafer over polishedLUDWIG::POZORSKITue Jan 28 1997 14:5131
                              CMP PEX 

LOT #:        JD0786

QUANTITY:     24

OPERATION #   1989 CMP_ILD3 
  
POLISHER:     CMP.B2

EVAL TOOL:    THICKNESS.A5 

DATE:         A shift   01/28/97    

PROBLEM:      5 wafers overpolish, these wafers polished faster than the 
              rest of the lot, for the touch-up time calculated for the
              rest of the lot was correct.


DISPOSITION:  Lot remarked at oper 2136, 

	      Please add an additional 3,000 angstroms to wafer # 15.     
              Please add an additional 2,000 angstroms to wafer # 17. 
              Please add an additional 1,000 angstroms to wafer #'s 11,23 
              and 24.      

CORRECTIVE   Lot was remarked and moved on.
ACTION:            



62.519JL0884 5 wafer scrapped overpolishSUBPAC::KULPWed Jan 29 1997 08:2927
                              CMP PEX 

LOT #:             JL0884 

QUANTITY:          24-5= 19 

OPERATION #        1992 CMP_ILD1    CMP    
  
POLISHER:          CMP.B3

EVAL TOOL:         Thickness.A5 

DATE:              B shift   01/28/96    

PROBLEM:        5 send ahead smoked.  5 scrap.

DISPOSITION:    Moved lot on with 5 less wafers, still need touch up.

CORRECTIVE      Not sure what exactly happened.  Calculations were determined
		correct, rest of lot still needs touch up.  Op's tech said 
		1 sec was used for the 5 send aheads. Not sure if the send 
		aheads saw the calculated 190 sec. time for the rest of lot.  
		It doesn't appear to be the case, because still a lot of 
		circuitry left.  Or some other time was entered, other then 
		the 1 sec. for the 5 send aheads. Not able to tell, no run 
		history on CMP system.
		
62.520JL0822 1 wafer scrapped overpolishSUBPAC::KULPWed Jan 29 1997 08:3024
                              CMP PEX 

LOT #:             JL0822 

QUANTITY:          24-1=23 

OPERATION #        1994 CMP_ILD2
  
POLISHER:          CMP.B3

EVAL TOOL:         Thickness.A5 

DATE:              B shift   01/28/96    

PROBLEM:        1 wafer scrapped and 2 reworked for over polish.

DISPOSITION:    Moved lot on with 1 less wafer. This lot was inherited
		from previous shift. This did not occur at touch up.
		Finished touch up with out any other problems.	No charts
		popped or annotations created.	

CORRECTIVE Action:  Need to talk to A shift for possible answers to what
		    happened.     
		
62.521CMP PEX,JL0906,HIGH INCOMING STEP HEIGHT.SUBPAC::SMARTINWed Jan 29 1997 09:4231
  

LOT #:             JL0906

QUANTITY:          24

OPERATION #        3362 STP_L_CMP1
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   01/29/97 

PROBLEM:           Incoming step height out of spec. High
                                                        
                  PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              RUN_ID_1     JL0906               N/A                            
              HEIGHT_ME    WAFER #1 CENTER          4353.000 
                           WAFER #1 EDGE            4224.000   1/29/97 08:57:07
                           WAFER #2 CENTER          4576.000                   
                           WAFER #2 EDGE            4577.000 
             
                                        UCL=4200.000
         
         
DISPOSITION: Lot will be moved on to next operation.


CORRECTIVE ACTION: None required.

62.522CMP PEX,1 WAFER OVERPOLISHED ON JL0887 "B" SHIFTSUBPAC::SMARTINWed Jan 29 1997 11:3645
  

LOT:     JD0887

MACHINE: CMP.B2

OPER#:   1992

PROCESS  LEVEL: ILD-1

DATE:    1/29/97

SHIFT:   B- SHIFT

QUANTITY:  24

PRODUCT.....DC1064-903-BA-8P 


LOT; JL0887 
.
PROBLEM: 1 Wafer was over polished on the first five send ahead wafers
         for this lot.
                       PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 5284.000                   
                           WAFER #2                 5275.000                   
                           WAFER #3                 5723.000                   
                           WAFER #4                 5631.000                   
*** OVER POLISHED WAFER    WAFER #5                 4685.000                   
              THK_RG       JL0887                   1550.000                   
              THK_SD_5     WAFER #1                    4.200                   
                           WAFER #2                    2.750                   
                           WAFER #3                    2.560                   
                           WAFER #4                    5.610

                                        LCL=5200       
         
DISPOSITION: Please add an additional 1,000 angstroms at DEP to wafer #6.             |
             This wafer was overpolished at CMP.  Thank you!! 



CORRECTIVE ACTION: Maybe cut back on the send ahead time for the initial
                   polish. 

62.523CMP PEX,JL0941 HIGH INCOMING STEP HEIGHTSUBPAC::SMARTINWed Jan 29 1997 15:1831
  

LOT #:             JL0941

QUANTITY:          24

OPERATION #        3362 STP_L_CMP1
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   01/29/97 

PROBLEM:           Incoming step height out of spec. High
                                                        
                PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              RUN_ID_1     JL0941               N/A                            
              HEIGHT_ME    WAFER #1 CENTER          4336.000                   
                           WAFER #1 EDGE            4244.000                   
                           WAFER #2 CENTER          4680.000                   
                           WAFER #2 EDGE            4489.000     
            
                                        UCL=4200.000
         
         
DISPOSITION: Lot will be moved on to next operation.


CORRECTIVE ACTION: None required.

62.524CMP PEX, 7 WAFERS OVER POLISHED FROM XD0781SUBPAC::SMARTINWed Jan 29 1997 15:3548
  

LOT:     XD0781

MACHINE: CMP.B3

OPER#:   1989

PROCESS  LEVEL: ILD-3

DATE:    1/29/97

SHIFT:   A- SHIFT

QUANTITY:  22

PRODUCT.....DC1043-905-AC-8P


LOT; XD0781 
.
PROBLEM: Lot passed on from previous shift with only a few wafers requiring a
         very light touch up, which they got. Random sorted the lot and
         discovered 2 thin wafers. 100% Measured the lot and found 5 additional
         wafers that are low and will require extra dep. Also found a recipe
         on CMP.B3 ( TUP A ) that was corrupted, recipe was deleted and a new
         one was copied from a good recipe. We caught and repaired the recipe
         before the light touch up was performed.



         
DISPOSITION: The lot was remarked for the extra dep required. 
            
            Wafer   Thickness       Extra Dep.
              4       5503             4500
              23      6484             3500
              13      7247             2700
              19      7994             2000
              20      8329             2000
              2       8946             1000
              14      9341              500



CORRECTIVE ACTION: Due to the corrupt recipe that was found, please check
                   recipes before they are run on the tool to make sure
                   they are correct.
62.525JL0952 2 wafers scrapped due to crash on .A2LUDWIG::PHESTERThu Jan 30 1997 17:1932

                               CMP PEX 
                     

LOT #          JL0952   DC1064

QUANTITY:      22

OPERATION #    1984 CMP_L_PMD 
/DESCR.

POLISHER:      CMP.A2

EVAL TOOL:     THICKNESS.A4

DATE:          1/30/97 D-Shift

PROBLEM:       TWO WAFERS SCRAPPED DUE TO CRASH

DISPOSITION:   LOT MOVE ON.
 
        Due to the end results of the location of the broken
        wafer, it looks like that the wafer slid out the left carrier
        just prior to the right carrier lifting off.

        Upon removal of the pad, several small bubbles were noticed
        under the IC1000 pad.

CORRECTIVE
ACTION:         CRASH REPORT HAS BEEN WRITTEN AND POSTED.

62.526JL0901 high incoming step @PMDSTRATA::PHESTERFri Jan 31 1997 19:2042

                              CMP PEX 
                     

LOT #:   JL0901 PMD              

QUANTITY:   24     

OPERATION # 3362        

POLISHER:     CMP.A1

EVAL TOOL:    PROFILER.A2

DATE:         1/31/97    

PROBLEM:      MEAN WAS 4231.5   UCL IS 4200
                           

DISPOSITION:  CHECKED THICKNESS AND SD AT OX DEP AND IT LOOKED PRETTY GOOD.
              NO OBVIOUS EXPLANATION.  OX DEP DATA BELOW.

             THK_ME_5     WAFER #1                11638.000
                           WAFER #2                11455.000
                           WAFER #3                11409.000
                           WAFER #4                11390.000
                           WAFER #5                11374.000
              THK_UN_5     WAFER #1                    1.130
                           WAFER #2                    1.270
                           WAFER #3                    1.320
                           WAFER #4                    1.240  
                           WAFER #5                    1.290
                                              
   
CORRECTIVE
ACTION:      NONE




                                        
62.527High Std.Dev YIELD::SHONGSat Feb 01 1997 07:1028
                            PE PEX NOTIFICATION
                     

LOT #          	XE0902

QUANTITY:      	09

OPERATION #    	1989 CMP_ILD3
/DESCR.        

POLISHER:      	CMP.B2

EVAL TOOL:     	Profiler.A2

DATE:          	02/01/97 D-Shift

PROBLEM:     	This lot had high Std.Dev at this operation. 
			
DISPOSITION:    Checked remarks on this lot. This lot has been through a ton 
		of splits. Including non-standard thickness prior to coming into
		CMP. The UCL for Std.Dev is 16%. The lot had readings of ~16.4%
		and 17.0%. The films group has been moving this lot through 
		using a monitor instead of product due to no program in there 
		UV1050. The monitor failed but the lot was moved on. Lot was 
		moved on here as well to Furn. 
	
CORRECTIVE     	None
ACTION:        	
62.528JL0829 SLIGHTLY LOW OUTGOING THICKNESS @PMD STRATA::PHESTERSat Feb 01 1997 13:5727
                              CMP PEX 
                     

LOT #:   JL0829 PMD              

QUANTITY:   24      

OPERATION # 3106        

POLISHER:     CMP.A1

EVAL TOOL:    THICKNESS.A4

DATE:         1/11/97    

PROBLEM:      MEAN WAS 6172  LCL IS 6200      
                            

DISPOSITION:      LOTS MOVED ON.
   
CORRECTIVE
ACTION:       LOT LOOKED GOOD COMING IN.  UNIFORMITY WAS OK.  NOTHING UNUSUAL
              ABOUT PROCESS.  GOF ON ALL POINTS LOOKED GOOD.


                                        
62.529LATE POSTING XD0582 SLIGHTLY HIGH SD @PMDSTRATA::PHESTERSat Feb 01 1997 14:0626
                              CMP PEX 
                     

LOT #:   XD0582 PMD              

QUANTITY:   23      

OPERATION # 2957        

POLISHER:     CMP.A2

EVAL TOOL:    THICKNESS.A4

DATE:         1/17/97    

PROBLEM:      SD WAS 9.8  UCL IS 9.0
                            

DISPOSITION:      LOT MOVED ON 
   
CORRECTIVE    MEAN THICKNESS WAS GOOD.  NOTHING UNUSUAL ABOUT LOT INCOMING
ACTION:       OR PROCESSING.  GOF ON READING GOOD.


                                        
62.530JL0938 High incoming step height @pmdSTRATA::POZORSKIMon Feb 03 1997 15:5633
                              CMP PEX 

LOT #:             JL0938

QUANTITY:          24

OPERATION #        3362 STP_L_CMP1
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   02/03/97 

PROBLEM:           Incoming step height out of spec. High

Incoming step height was 4493�   UCL= 4200

              RUN_ID_1     JL0938               N/A
              HEIGHT_ME    WAFER #1 CENTER          4531.000
                           WAFER #1 EDGE            4430.000   2/03/97 15:09:36
                           WAFER #2 CENTER          4501.000
                           WAFER #2 EDGE            4511.000

        
DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.

             There was no remarks for this lot as to why we had high incoming
             step heights.

62.531CMP.A2 CRASH @ PMD, XD0947 lost 2 wafers {02, 24}YIELD::MANDREOLITue Feb 04 1997 04:0925
                            PE PEX NOTIFICATION
                     

LOT #          XD0947 (TM0069) 

QUANTITY:      24 - 2 = 22

OPERATION #    1978 CMP_PMD
/DESCR.        

POLISHER:      CMP.A2  

EVAL TOOL:     N/A 

DATE:          02/03/97 23:55:00 B-Shift

PROBLEM:       CMP.A2 CRASHED. Right Carrier dropped its wafer in step 3 of the 
               PMD recipe. One wafer smashed, the other severely scratched. See
               CMP Notesfile 9.50 for all crash details. 

DISPOSITION:   Two wafers {#02 #24} were scrapped from the lot. 
               
CORRECTIVE
ACTION:        PAD and CARRIER change completed, system running breakins and
               then MQC. 
62.532Overpolish on a PMD lot. YIELD::SHONGWed Feb 05 1997 00:0030
                            PE PEX NOTIFICATION
                     

LOT #          	JD0936 

QUANTITY:      	22

OPERATION #    	1978 CMP_PMD
/DESCR.        

POLISHER:      	CMP.B2

EVAL TOOL:     	THICKNESS.A5

DATE:          	02/04/97 D-Shift

PROBLEM:     	The lot was overpolished by ~3000� at this operation. The UV1050
		program was not measuring the correct spot on the wafer. In turn
		the readings that were given after the operator polished the lot
		were false. The operator thought the lots needed to be polished
		some more but they actual were to thin as it was. Eric noticed
		the recipe was wrong and adjusted it. The lot was re-measured 	
		and was then noticed.
			
DISPOSITION:    A remark has been added to operation 2127 Dep_PMD to add an 
		extra 3000�. 
	
CORRECTIVE     	It might be time to change the password on the UV1050's. It 
ACTION:        	seems everybody has there hands in there and making changes 
		that are not needed. 
62.533Overpolish on a PMD lot. YIELD::SHONGWed Feb 05 1997 00:0131
                            PE PEX NOTIFICATION
                     

LOT #          	JD0928 

QUANTITY:      	20 

OPERATION #    	1978 CMP_PMD
/DESCR.        

POLISHER:      	CMP.A1

EVAL TOOL:     	THICKNESS.A4

DATE:          	02/04/97 D-Shift

PROBLEM:     	The lot was overpolished by ~3000� at this operation. The UV1050
		program was not measuring the correct spot on the wafer. In turn
		the readings that were given after the operator polished the lot
		were false. The operator thought the lots needed to be polished
		some more but they actual were to thin as it was. Eric noticed
		the recipe was wrong and adjusted it. The lot was re-measured 	
		and was then noticed.
			
DISPOSITION:    A remark has been added to operation 2127 Dep_PMD to add an 
		extra 3000�. 
	
CORRECTIVE     	It might be time to change the password on the UV1050's. It 
ACTION:        	seems everybody has there hands in there and making changes 
		that are not needed. 

62.534xd0585 5 wafers scrapped @ILD1STRATA::PHESTERFri Feb 07 1997 16:0731

                               CMP PEX 
                     

LOT #          XD0585

QUANTITY:      22...17

OPERATION #     1981 CMP AFTER ILD1  
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     NA

DATE:          2/7/97 C-Shift

PROBLEM  5 SEND AHEADS RAN AT 200 SEC. WAFERS CAME OFF .B2 RANGING FROM 6090 -
 	 6915. RAN LOT FOR 217 SECONDS. 100% ON THICK.A5, 5 SEVERELY OVER 
         POLISHED (METAL) AND 14 WERE OVERPOLISHED. THESE 5 THAT WERE SCRAPED
         WERE IN THE MIDDLE OF THE RUN. THIS WAS THE 4TH RUN OF THE LOT, 5 
         (SEND AHEAD TOUCH UP) WAFERS PRIOR WERE FINE, 5 AFTER WERE FINE..??
        
DISPOSITION: 5 WAFERS SCRAPPED.  LOT MOVED ON.
             LOT WILL BE BINNED ACCORDING TO THICKNESS AND REMARKED FOR EXTRA
             DEP AT NEXT OPERATION.  
     
CORRECTIVE 
ACTION:    TOOL HAS BEEN CHECKED AND NOTHING OBVIOUS FOUND.  MQCs' WILL BE 
           DONE ON TOOL.
62.535JL0672 1 wafer scrapped overpolishedSTRATA::POZORSKISun Feb 09 1997 12:5725
                              CMP PEX 

LOT #:             JL0672 

QUANTITY:          24-1=23 

OPERATION #        1994 CMP_ILD2
  
POLISHER:          CMP.B1

EVAL TOOL:         Thickness.A5 

DATE:              A shift   02/09/97    

PROBLEM:        1 wafer scrapped for being overpolished. The one wafer was 
                toasted it was run with the rest of the lot at 220 sec it is 
                the only wafer that came out low it read 990 and he reread it
                and it was 1061.  The program look good so, it looks like this
                wafer may have had a problem when it came into the room.

DISPOSITION:    Moved lot on with 1 less wafer. 

CORRECTIVE Action:  Lot was remarked and moved on, no further action required
                    at this time.		

62.536High SD @PMD - JL09696STRATA::POZORSKISun Feb 09 1997 19:2932
                              CMP PEX 

LOT #:             JL0969

QUANTITY:          24

OPERATION #        1984 CMP_L_PMD 
  
POLISHER:          CMP.B1

EVAL TOOL:         THICKNESS.A5

DATE:              A shift   02/09/97 

PROBLEM:           Slightly high SD after lot was polished 12.2 (UCL = 9)

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME_5     WAFER #1                 6543.000
                           WAFER #2                 6689.000
                           WAFER #3                 6621.000
                           WAFER #4                 6710.000
                           WAFER #5                 6583.000
              THK_RG       NA                            N/A   2/09/97 19:19:06
              THK_SD_5     WAFER #1                   13.100
                           WAFER #2                   12.600
                           WAFER #3                   14.500
                           WAFER #4                   10.600
                           WAFER #5                   10.200

DISPOSITION: Lot moved on.

CORRECTIVE   No further action required, lot was moved.
62.537JL0978 High incoming step height @PMDSTRATA::POZORSKIMon Feb 10 1997 15:5333
                              CMP PEX 

LOT #:             JL0978

QUANTITY:          24

OPERATION #        3362 STP_L_CMP1
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   02/10/97 

PROBLEM:           Incoming step height out of spec. High

Incoming step height was 4500�   UCL= 4200

              RUN_ID_1     NA                   JL0978
              HEIGHT_ME    WAFER #1 CENTER          4528.000
                           WAFER #1 EDGE            4586.000
                           WAFER #2 CENTER          4318.000

        
DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.

             There was no remarks for this lot as to why we had high incoming
             step heights.


62.538JL0938- 3 wafers overpolished- update from b-shiftSTRATA::POZORSKIMon Feb 10 1997 16:4337
                            PE PEX NOTIFICATION
                     

LOT #          JL0938 (DC1031) 

QUANTITY:      24

OPERATION #    1992 CMP_ILD1
/DESCR.        

POLISHER:      CMP.B2  

EVAL TOOL:     THICKNESS.A5 

DATE:          02/10/97 B-Shift

PROBLEM:       3 of the 5 send ahead wafers for this lot were slightly
               overpolished, after the initial 170 second time. Thickness 
               Measurements are:
    
               THICKNESS.A4         

               Wfr#    Tox           
                13     4995�            (LCL = 5200 �) 
                19     5032�
                22     4747�

               The other two wafers were within limits at 5483�, and 5282�. 
               

DISPOSITION:   Time was adjusted down to 165 and the remainder of the lot was 
               polished. 
               
CORRECTIVE     The 3 above mentioned wafers will require extra dep. 
ACTION:        Wafers #13 & 19 will need an extra dep of 500�
               Wafer #22 will need an extra dep of 1000�.  A remark was added
               at operation 2166 DEP_ILD1 3.
62.539JL0944 - 5 WAFERS OVERPOLISHED @ILD1STRATA::POZORSKIMon Feb 10 1997 17:4636
                                CMP PEX REPORT
                                --------------

LOT:     JL0944

MACHINE: CMP.B3

OPER#:   1992

PROCESS  LEVEL: ILD-1

DATE:    2/10/97

SHIFT:   A-SHIFT

QUANTITY:  24

PRODUCT..DC1044-903-EC-8P
.
PROBLEM: 5 wafers was over polished on the first five send ahead wafers
         for this lot. These were five send aheads that were polished for the
         same initial time as five wafers from a previous similar lot. However,
         these five wafers came out a little thin.

         
DISPOSITION: These wafers were remarked at oper #2166 DEP_ILD1 3 to receive 
             extra dep.
             Please add an additional 1,500 angstroms at DEP to wafer #12
             Please add an additional 1,000 angstroms at DEP to wafer #10,13,
             21 and 22.
           

CORRECTIVE ACTION: Maybe need to cut back on the send ahead time for the initial
                   polish or do not go by the previous lot.


62.540JL0907 - All wafers overpolished @ILD2STRATA::POZORSKIMon Feb 10 1997 18:1959
                                CMP PEX REPORT
                                --------------

LOT:     JL0907

MACHINE: CMP.B1

OPER#:   1994

PROCESS  LEVEL: CMP_ILD2

DATE:    2/10/97

SHIFT:   A-SHIFT

QUANTITY:  24

PRODUCT..DC1044-903-EC-8P
.
PROBLEM: All 24 wafers were overpolished at ILD2.  They ran all of the wafers
         for 200 secs and these were the readings they got after the 200 sec:
        
         1. 7656  x    8. 6721  a    15. 7004  -    22. 6619  a
         2. 7108  -    9. 6886  a    16. 6827  a    23. 6694  a
         3. 7741  X   10. 6993  a    17. 6822  a    24. 6325  a
         4. 7332  -   11. 6620  a    18. 6873  a
         5. 7797  x   12. 6883  a    19. 6770  a
         6. 7005  -   13. 6744  a    20. 7188  -
         7. 7662  x   14. 6533  a    21. 6833  a

         After that they group the wafers and the ones with the (a) next to
         them were run for 8 secs.
         The ones with the (x) were run for 30 secs.
         The ones with the (-) were run for 19 secs.
      
         (NOTE - The removal rate to begin with was 3287) 

         And after running these wafers they came out as followed:

         1. 5265   10. 4833   19. 5038 
         2. 5538   11. 4740   20. 4853
         3. 5191   12. 5003   21. 5374
         4. 5253   13. 4804   22. 5045
         5. 4736   14. 5084   23. 4853
         6. 5085   15. 5051   24. 4561
         7. 4704   16. 5011  
         8. 4763   17. 4584
         9. 5271   18. 4669

         Eric checked the program on the UV1050 and everything looked good as
         far as reading the right sites so, this is one that we are really 
         not sure what happened.  

DISPOSITION: This lot was remarked at oper #2172 DEP_ILD2 3 to receive 
             500� extra dep on all of the wafers.

CORRECTIVE ACTION: Not really sure what needs to be done due to the fact we
                   are not sure what happened.  The only thing to do would be
                   to cut back on the touch up times.  
62.541JD0960 - 2 wafers scrapped due to crash on A2STRATA::POZORSKIMon Feb 10 1997 18:5725
                            PE PEX NOTIFICATION
                     

LOT #          JD0960

QUANTITY:      23 - 2 = 21

OPERATION #    1978 CMP_PMD 
/DESCR.        

POLISHER:      CMP.A2  

EVAL TOOL:     N/A 

DATE:          02/10/97 A-Shift

PROBLEM:       They were running the 2 wafers through the touch-up when 
               the right carrier decided that it didn't want that wafer so,
               it lost the one wafer which causing the other wafer to get 
               scratched up.  

DISPOSITION:   Two wafers were scrapped from the lot. 
               
CORRECTIVE     PAD and CARRIER change completed, system running breakins and
ACTION         then MQC. 
62.542JL0979 - High step height at PMDSTRATA::POZORSKITue Feb 11 1997 12:5933
                              CMP PEX 

LOT #:             JL0979

QUANTITY:          24

OPERATION #        3362 STP_L_CMP1
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   02/11/97 

PROBLEM:           Incoming step height out of spec. (Slightly High)

Incoming step height was 4217�   UCL= 4200

              RUN_ID_1     JL0979               N/A
              HEIGHT_ME    WAFER #1 CENTER          4198.000
                           WAFER #1 EDGE            4176.000
                           WAFER #2 CENTER          4229.000
                           WAFER #2 EDGE            4265.000

        
DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.

             There was no remarks for this lot as to why we had high incoming
             step heights.
62.543XE0597 - 13 wafers overpolished @ILD1STRATA::POZORSKITue Feb 11 1997 14:2369
                                CMP PEX REPORT
                                --------------

LOT:     XE0597

MACHINE: CMP.B2

OPER#:   1981                                                              

PROCESS  LEVEL: CMP_ILD1

DATE:    2/11/97

SHIFT:   A-SHIFT

QUANTITY:  22

PRODUCT..TM0069-907-BA-8C 
                     
PROBLEM: 13 Wafers overpolished...Ran 5 send aheads last night but then did a 
         pad change.  B shift I assume ran 5 more and then the lot.  There was
         no additional information on what time they ran the rest of the lot
         given to us.  It was passed down to us that the lot should be close
         to being done and needed 100%. They had trouble reading this lot this
         morning and called Rich Dumas. He did make adjustments to the program.
         Also, Eric made further adjustments. It's very possible that the send
         aheads of this lot were not reading accurately.


              THK_ME_5     WAFER #1                 5728.000
                           WAFER #2                 5735.000
                           WAFER #3                 5029.000
                           WAFER #4                 5115.000
                           WAFER #5                 5408.000
              THK_RG       XE0597                   2212.000
              THK_SD_5     WAFER #1                   12.300   2/11/97 13:47:59
                           WAFER #2                   14.200
                           WAFER #3                    3.070
                           WAFER #4                    7.140
         Below are the thickness results from the 13 wafes after the touch-ups
         were done:

                               Wafer #       reading 

                                 3             4880
                                 4             4925              
                                 5             4807              
                                 8             4577              
                                 10            5011              
                                 11            5138
                                 14            5060
                                 15            4567
                                 17            4751
                                 18            5111
                                 19            4891
                                 20            5016
                                 23            5095
 
DISPOSITION: These wafers were remarked at oper #2166 DEP_ILD1 3 to receive 
             extra dep.

             Wafer #8 and #15 were remarked for an extra 1000A dep.  All 
             remaining wafers were remarked for an extra 500� dep.           


CORRECTIVE:  Need better passdown from the other shift so that we know 
ACTION       what went on that shift.  It is very hard to understand what
             happened if the information is not passed down.  Also we
             are not sure what time was used for the touch-up.
62.544JL0972 - Slightly high incoming step height @pmdSTRATA::POZORSKIWed Feb 12 1997 16:1433
                              CMP PEX 

LOT #:             JL0972

QUANTITY:          23

OPERATION #        3362 STP_L_CMP1
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   02/11/97 

PROBLEM:           Incoming step height out of spec. (Slightly High)

Incoming step height was 4370�   UCL= 4200

              RUN_ID_1     JL0972               N/A
              HEIGHT_ME    WAFER #1 CENTER          4401.000
                           WAFER #1 EDGE            4432.000
                           WAFER #2 CENTER          4330.000
                           WAFER #2 EDGE            4318.000

        
DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.

             This lot did get splits done at 1332 I2_L_N+, 1334 I2_L_MDN D,
             1335 I2_L_MDN S, 1326 I2_L_WELL, 1327 I2_L_VTP other then that no
             other splits were done.
62.545Overpolioshed wafersYIELD::SHONGWed Feb 12 1997 23:3633
                            PE PEX NOTIFICATION
                     

LOT #          	JD0959

QUANTITY:      	24

OPERATION #    	1978 CMP_PMD
/DESCR.        

POLISHER:      	CMP.B1

EVAL TOOL:     	THICKNESS.A5

DATE:          	02/12/97 D-Shift

PROBLEM:     	Five wafers from this lot were overpolished at this operation.
		I checked the history in the UV1050 and everything looked OK. 
		Thickness dropped to ~5000� for five wafers after the first 
		pass. There's a remark at this operation about pattern Recog-
		nition issues for some of the wafers. Apparently the lot was 
		split in photo using different reticles and that was going to 
		through off the pattern set up for several wafers. Out of the
		five wafers overpolished two of them were from the split. 
		A special recipe was set up in the UV1050 for these wafers. 
		I think the 5 wafers could have received an extra polish some 
		how but I'm not sure. 
			
DISPOSITION:    I added a remark at operation 2127 DEP_PMD 2 for an extra 
		1500� on wafers 1,3,8,12 and 23. 
	
CORRECTIVE     	None. 
ACTION:        	
62.546JL0901 HIGH INCOMING STEP @PMDSTRATA::PHESTERThu Feb 13 1997 15:3829

                              CMP PEX 
                     

LOT #:   JL0901 PMD              

QUANTITY:   24     

OPERATION # 3362        

POLISHER:     cmp.a1 

EVAL TOOL:    profiler.a2     

DATE:         1/31/97    

PROBLEM:      INCOMING STEP HEIGHT SLIGHTLY ABOVE UCL.      
                            

DISPOSITION:  LOT MOVED TO POLISH

              SD FROM DEP LOOKED PRETTY GOOD.
   
CORRECTIVE
ACTION:       NONE. LOT WILL BE POLISHED ACCORDINGLY.


                                        
62.547JD0933 high SD @ILD1STRATA::PHESTERThu Feb 13 1997 19:0345

                              CMP PEX 
                     

LOT #:        JD0933              

QUANTITY:     24     

OPERATION #   3054  THK_ILD1_PST

POLISHER:     CMP.B1

EVAL TOOL:    THICKNESS.A5

DATE:         2/13/97    

PROBLEM:      HIGH OUTGOING STANDARD DEVIATION AVERAGE AT 17.8.  UCL IS 15.0

              THK_ME_5     WAFER #1                      N/A
                           WAFER #2                 5504.000
                           WAFER #3                 5523.000
                           WAFER #4                 5418.000
                           WAFER #5                 5112.000
              THK_RG       JD0933                   3263.000
              THK_SD_5     WAFER #1                      N/A
                           WAFER #2                   13.000
                           WAFER #3                   17.500
                           WAFER #4                   22.000   2/13/97 10:54:26
                           WAFER #5                   18.800
                            

DISPOSITION:  LOT MOVED ON

              MEAN THICKNESS LOOKED GOOD.  INCOMING SD WAS VERY GOOD.  NO SPLITS
              THAT WOULD CONTRIBUTE TO THE PROBLEM.  UV1050 PROGRAMS AND
              READINGS VERIFIED AS GOOD.
   
CORRECTIVE
ACTION:       LOT WAS POLISHED ACROSS SHIFTS.  SPC CHART SHOWS SD TRENDING UP 
              THE LAST THREE RUNS.  SYSTEM WAS POLISHING EDGE FAST.  ID/OD
              WAS ADJUSTED AND THE NEXT LOT THAT WAS RUN HAD SD OF 12.3.


                                        
62.548YE0218 high outgoing range @ILD3STRATA::PHESTERFri Feb 14 1997 19:1444
 
                              CMP PEX 
                     

LOT #:        YE0218

QUANTITY:     23     

OPERATION #   3064 THK_CMP 16   THK_ILD3_PST

POLISHER:     CMP.B1

EVAL TOOL:    THICKNESS.A5

DATE:         2/14/97    

PROBLEM:      RANGE SLIGHTLY ABOVE UCL @ 4644�.  UCL IS 4500�

              THK_ME_5     WAFER #1                10168.000
                           WAFER #2                 9821.000
                           WAFER #3                 9567.000
                           WAFER #4                10230.000
                           WAFER #5                10576.000
              THK_RG       YE0218                   4644.000
              THK_SD_5     WAFER #1                   14.600
                           WAFER #2                   10.700
                           WAFER #3                    7.600
                           WAFER #4                    8.400   2/14/97 12:48:11
                           WAFER #5                   10.400

DISPOSITION:  LOT MOVED ON

              MEAN THICKNESS LOOKED GOOD.  INCOMING SD WAS VERY GOOD.  NO SPLITS
              THAT WOULD CONTRIBUTE TO THE PROBLEM.  UV1050 PROGRAMS AND
              READINGS VERIFIED AS GOOD.  RANGE EXCURSION IS ACROSS LOT.  NO
              OVERPOLISHING SEEN ON WAFERS.
   
CORRECTIVE
ACTION:       SUBSEQUENT LOT POLISHED ON TOOL HAD MUCH LOWER RANGE.  LOOKS LIKE
              AN ANOMALY.


                                        
62.549JL0901 15 wafers overpolishSUBPAC::KULPSun Feb 16 1997 05:59124
                              CMP PEX
 
LOT #:             JL0901  PRODUCT...DC1040-901-DB-8P    

QUANTITY:          24

OPERATION #        1994 CMP_ILD2 
  
POLISHER:          CMP.B2

EVAL TOOL:         Thickness.A4 

DATE:              B shift   02/15/96    

PROBLEM:        15 wafers were over polished from previous shift C.
		popped chart CMP_B2, THK_ILD2_PST THK_ME_5  


DISPOSITION:    Send aheads used 5, removal rate was 4155 from previous shift
		and a time of 180sec. Going through some calculations this is
		what I came up with. Lots were remarked extra dep. at capping
		dep. and moved on.

              THK_ME_5     WAFER #1                 4456.000  LCL:5200
                           WAFER #2                 4245.000  mean = 4992.80
 LOG AN EVENT              WAFER #3                 5255.000  
                           WAFER #4                 5641.000
                           WAFER #5                 5367.000

              THK_RG       JL0901                   1921.000   2/16/97 00:11:06

              THK_SD_5     WAFER #1                   10.100
                           WAFER #2                   13.100
                           WAFER #3                    8.500
                           WAFER #4                    9.600
                           WAFER #5                    8.300

Wafers from films:

		K_ME_5     WAFER #1                18083.000
                           WAFER #2                18259.000
                           WAFER #3                18228.000
                           WAFER #4                18390.000
                           WAFER #5                18273.000

 					    avg    18246.     target 18000

              18246-5500 = 12746�/180sec = 70.81 * 60 = 4247.6.4�/min calc'ed 
	      removal rate. Initial run is spec'ed at 150 sec for ILD2.		

    Thick.A2  1. Take five pre readings mean: 18246�  
              2. Pre - target = delta: 18246� - 5500� = 12746�
	      3. run for 150 sec.s  ??? not sure no history on speedfams!!
    Thick.A4  4. Meas. the five send aheads from UV1050 = 4349.26�
	      5. If given a removal rate from previous shift of 4155, then
		 a guess at the time could be done. (4155�/min)/60 sec =
		 69.25�/sec. 18246� - 4349� (5 send aheads) = 13897� removed.
		 13897�/(69.25�/sec) = 200.7 sec.  

CORRECTIVE Action:  Speedfams need data capture.  Better communication between
		    shifts. There was a pad change just before this lot was run
		    not sure of the reason, nothing in notes or passdown.
		    If my calculations are correct, then a guess at the 
		    initial run time was about 200 sec, which is to long.
		    Some how we need to capture the data for removal rate and
		    run time for each run of a lot.  There isn't a way to calc.	
		    predicted removal vs. actual removal.  Until then, I don't
		    think we will know if it's the CMP tool or measurement
		    techniques.   

		
	Ken, Keith, and Mark,

	good evening, passed down, from c-shift, was lot jl0901 ild2 1040 at
CMP.b2.it was measuring 100% on thickness.a4. 

	After 100% the lot, here are the results:
        wafer slot  wafer #  thickness  deviation   g.o.f.

           1         08		4456*	20.0        good
           2         18		4008-	25.1        "  "
           3         02         4007-    9.8        "  "
           4         10         4627*   14.9        "  "
           5         06         4245*   13.1        "  "
           6         --          
           7         11         4783#   20.0        "  "
           8         03         5090#    7.5        "  "
           9         14         5094#    8.9        "  "
          10         22         5204    13.4        "  "
          11         21         5587     9.8        "  "
          12         07         4749#    8.0        "  "
          13         13         5255     8.5        "  "
          14         09         5114#    7.8        "  "
          15         24         5385     9.2        "  "
          16         15         5304    16.4        "  "
          17         19         4725#   16.1        "  "
          18         04         5241     8.2        "  "
          19         16         5459     7.7        "  "
          20         01         5641     9.6        "  "
          21         05         5391    11.4        "  "
          22         17         4932#   13.5        "  "
          23         23         5367     8.3        "  "
          24         12         5528     6.2        "  "
	  25         20         5467    10.2        "  "
	
 (#) - wafers will need 500 � extra depped
 (*) - wafers will need 1000 � extra depped
 (-) - wafers will need 1500 � extra depped
 
	wafers #'s 3,7,9,11,14,17,19 will need 500 � extra depped
                  
        wafers #'s 6,8,10 will need 1k� extra depped
    
        wafers #'s 2,18 will need 1.5k� extra depped

	To verify my readings, I checked the goodness of fit, the measurement
sites, and watched the measurements physically, all was acceptable. This is 
going to pop the charts, and annotations will be addressed. Also, the lot 
will have to be remarked.
	Please, if any questions, or if there is anything further to be 
addressed, please let me know.
						thanks 
                                                      Scot

62.550JL1002 high stdev PMD, CMP.B1SUBPAC::KULPSun Feb 16 1997 06:4738
                              CMP PEX
 
LOT #:             JL1002 	DC1064-003-BA-8P  

QUANTITY:          24

OPERATION #        1984 CMP_L_PMD
  
POLISHER:          CMP.B1

EVAL TOOL:         Thickness.A5

DATE:              B shift   02/16/96    

PROBLEM:        Popped chart CMP_B1, THK_PMD_PST THK_SD_5

              THK_ME_5     WAFER #1                 6225.000
                           WAFER #2                 6294.000
                           WAFER #3                 6203.000
                           WAFER #4                 7026.000
                           WAFER #5                 6761.000
 LOG AN EVENT THK_RG       JL1002                   2327.000   2/16/97 06:04:28
              THK_SD_5     WAFER #1                   10.400
                           WAFER #2                    6.010
                           WAFER #3                    5.720
                           WAFER #4                    5.850
                           WAFER #5                    4.240



DISPOSITION:  Moved lot on, wafer # 1 had 1 site measure at 5000�.
	      This brought mean down and Stdev. up.  Measured on Thickness.a4
	      measured the same way, edge die was reading low, re-measured
	      again, moved measurement in 1 die from bad site, Stdev. 	 
	      Wafer #1 mean 6328.8, stdev 6.79 in spec.

CORRECTIVE Action:  None required at this time.

62.551JL0976, 20 wafers over polish ILD1, CMP.B1SUBPAC::KULPSun Feb 16 1997 06:48124
                              CMP PEX 

LOT #:             JL0976     PRODUCT...DC1064-003-BA-8P     

QUANTITY:          24

OPERATION #        1992 CMP_ILD1  
  
POLISHER:          CMP.B1

EVAL TOOL:         Thickness.A5 

DATE:              B shift   02/15/96    

PROBLEM:        20 wafers were over polished from previous shift C.

DISPOSITION:    Send aheads used 5, removal rate was ???? and time ????
		popped chart THK_ILD1_PST THK_ME_5,  THK_ILD1_PST THK_RG 
		and THK_ILD1_PST THK_SD_5 for CMP.B1

              THK_ME_5     WAFER #1                 4290.000  LCL: 5200
                           WAFER #2                 5130.000   mean = 4492.4
                           WAFER #3                 4395.000
                           WAFER #4                 4441.000
                           WAFER #5                 4206.000

              THK_RG       JL0976                   3834.000  UCL: 3400

              THK_SD_5     WAFER #1                   14.500  UCL: 15
                           WAFER #2                   16.400  mean = 15.6
                           WAFER #3                   15.000
                           WAFER #4                   14.400
 LOG AN EVENT              WAFER #5                   17.700   2/16/97 00:09:56
         
Films thickness:

              THK_ME_5     WAFER #1                17881.000
                           WAFER #2                18090.000
                           WAFER #3                18183.000
                           WAFER #4                18208.000
                           WAFER #5                18260.000
                                             avg.  18124.4

	      18124-5500 = 12624/150sec = 84.16�/sec * 60sec/min = 5049.6�/min
	      removal rate by spec. Initial run is 150 sec for ILD1.

    Thick.A2  1. Take five pre readings: 18124�  
              2. pre - target = delta  : 18246� - 5500� = 12746�
	      3. run for 150 sec.s  ??? not sure no history on speedfams!!
    Thick.A4  4. meas. the five send aheads. = 5406.84�
	      5. no removal rate or time given from previous shift.

	      It seems like the send aheads were polished correct from the
	      UV1050 data, at what polish time, not sure. The 100% was
	      performed on B shift, 5 wafers close to the LCL were probably 
	      the send aheads.  100% was on Thick.A5 the rest of the lot needs
	      extra dep. not sure what happened.  Lots were remarked.
	     
CORRECTIVE Action:  Speedfams need data capture.  Better communication between
                    shifts.  Not sure what run times were used and calc'ed 
		    for removal rates.


	Ken, Keith, and Mark,

	good evening, passed down, from c-shift, was lot JL0976 ILD1 1064 at
cmp.b1.it was measuring on thickness.a5. I had to 100%, due to low reading on 
final 5 wafers measured. here are the results:

	wafer slot  wafer #  thickness  deviation   g.o.f.

	    1         20       4290       14.5       pass
            6         13       5129       16.3       pass
           13         23       4394       15.0       pass
           20          6       4440       14.5       pass
           23          1       4206       17.7       pass
        --------------------------------------------------
         mean                  4490       15.6       all sites good

	After 100% the lot, here are the results:

        wafer slot  wafer #  thickness  deviation   g.o.f.

           1         20        4290*      14.5      good
           2         12        4442*      15.1      "  "
           3          7        4353*      12.9      "  "
           4          4        5182       11.5      "  "
           5         24        4868#      12.8      "  "
           6         13        5129       16.3      "  "
           7         19        4950#      11.4      "  "
           8         18        4649*      10.2      "  "
           9          2        4438*      16.6      "  "
          10          5        4819#      15.1      "  "
          11         16        5190       7.46      "  "
          12         14        5373       12.8      "  "
          13         23        4394*      15.0      "  "
          14         21        4264*      18.1      "  "
          15          8        4786*      9.04      "  "
          16         11        4573*      11.7      "  "
          17         22        4194*      13.8      "  "
          18          9        4991#      8.56      "  "
          19         15        4910#      9.62      "  "
          20          6        4440*      14.5      "  "
          21         17        4218*      16.1      "  "
          22          3        4653*      18.2      "  "
          23          1        4206*      17.7      "  "
          24         10        4821#      12.7      "  "

 (#) - wafers will need 500 � extra depped
 (*) - wafers will need 1000 � extra depped

	wafers #5,7,10,18,19,24 will need 500 � extra depped

        wafers #1,2,3,8,9,13,14,15,16,17,20,21,22,23 will need 1k� extra depped

	To verify my readings, I checked the goodness of fit, the measurment
sites, and watched the measuments physically, all was within parameters. This
is going to pop the charts, and anotations will be addressed. Also, the lot
will have to be remarked.
	Please, if any questions, or if there is anything further to be 
addressed, please let me know.
						I thank you in advance
						Mark R. Provencher b-shift cmp

62.552CMP PEX FOR LOW INCOMING STEP HEIGHT FOR XE0903SUBPAC::SMARTINSun Feb 16 1997 09:3833
  

LOT #:             XE0903

QUANTITY:          24

OPERATION #        3086 STP_PMD_PRE
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   02/16/97 

PROBLEM:           Incoming step height out of spec. LOW


             PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              RUN_ID_1     XE0903               N/A                            
              HEIGHT_ME    WAFER #1 CENTER          2822.000                   
                           WAFER #1 EDGE            2687.000                   
                           WAFER #2 CENTER          2802.000  
                           WAFER #2 EDGE            2758.000
                 
                                        LCL=3000.000
         
         
DISPOSITION: Polish times will be adjusted accordingly.  Lot will be moved
             on to next operation.


CORRECTIVE ACTION: None required.

62.553 JD0897 1 scrap wafer over polish CMP.B3,ILD2SUBPAC::KULPMon Feb 17 1997 05:3143
                              CMP PEX
 
LOT #:             JD0897  	PRODUCT..DC1035-000-SC-8T

QUANTITY:          24

OPERATION #        1985 CMP_ILD2   
  
POLISHER:          CMP.B3

EVAL TOOL:         Thickness.A5

DATE:              B shift   02/17/96    

PROBLEM:           1 wafer over polish to 3343�, Thick.A5 scrapped < 3400.
        				  3126�, Thick.A4	
	
DISPOSITION:       Checked measurements on both thickness tools. GOF and
		   thickness were above target for rest of lot.  Low reading
		   found at 100% after initial run.  Checked charts and remarks
		   at dep. no indication of unusual processing at dep.
		   No alarms on system.

Films thickness  THK_ME_5  WAFER #1                18282.000
                           WAFER #2                17722.000
                           WAFER #3                17765.000
                           WAFER #4                17658.000
                           WAFER #5                17723.000

                                           avg     17830

		5 send aheads results  low 6918.2  high 7848.5
			175sec   rr 3522   from A shift

		1-4 +1sp: 170 sec
		6-10 	:   1 sec  original send aheads
		11-15   : 190 sec
		16-20   : 190 sec  wfr 16 which was low reading was in this run.
		21-25 	: 190 sec	

CORRECTIVE Action: Continued touch up on lot.  Lot will be moved on with 1 less
		   wafer. Possible low incoming thickness. 

62.554Cmp pex for high incoming step height for JL1004 SUBPAC::SMARTINMon Feb 17 1997 11:2232
  

LOT #:             JLI004

QUANTITY:          24

OPERATION #        3362  STP_L_PMDPRE 
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   02/17/97 

PROBLEM:           Incoming step height out of spec. HIGH

            PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              RUN_ID_1     NA                   N/A                            
              HEIGHT_ME    WAFER #1 CENTER          4511.000 
                           WAFER #1 EDGE            4645.000   2/17/97 10:51:08
                           WAFER #2 CENTER          4615.000                   
                           WAFER #2 EDGE            4550.000 
                 
                                        UCL=4200.000
         
         
DISPOSITION: Polish times will be adjusted accordingly.  Lot will be moved
             on to next operation.  No remarks were found from dep.


CORRECTIVE ACTION: None required.

62.555CMP PEX FOR HIGH STDEV ON JL0997SUBPAC::SMARTINMon Feb 17 1997 17:4048
  

LOT #:             JL0997

QUANTITY:          24

OPERATION #        1991
  
POLISHER:          CMP.A2

EVAL TOOL:         Thickness.A4

DATE:              A shift   02/17/97 

PROBLEM:      Wafer #23 was doubled dep'd for what ever reason.  There were no
              remarks stating what happened in films.  Since the wafer was
              double dep'd and the wafer had to be polished for so long that
              the uniformity went high for that wafer only.

                 PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 6539.000                   
                           WAFER #2                 6571.000
                           WAFER #3                 6528.000   2/17/97 14:24:51
                           WAFER #4                 6536.000                   
                           WAFER #5                 6439.000                   
              THK_RG       JL0997                   1580.000                   
              THK_SD_5     WAFER #1                    3.460                   
                           WAFER #2                   10.100                   
                           WAFER #3                    3.700                   
                           WAFER #4                    4.110                   
                           WAFER #5                    4.070 
         
                                       UCL=9.0
         
DISPOSITION:
    After the lot was polished the first passs all wafers were in spec and   
   on target except 1. None of the wafers except this one needed to be      
   touched up. The remaining oxide on wafer #23 was 12118 after ~115 second 
   polish. The wafer was polished for an additional 150 seconds to bring it 
   to target. PE was informed before wafer was repolished. Wafer #23 after  
   polish had a mean of 6552 and a range 1582. No explanantion in previous  
   remarks as to why this wafer was ~double the thickness of all other      
   wafers in lot.  The lot was remarked as to what wafer was high and the lot
   was moved on.


CORRECTIVE ACTION: None required.

62.556CMP PEX, 2 WAFERS OVERPOLISHED ON JL0943SUBPAC::SMARTINMon Feb 17 1997 18:4146
  

LOT:     JL0943

MACHINE: CMP.B3

OPER#:   1994

PROCESS  LEVEL: ILD-2

DATE:    2/17/97

SHIFT:   A- SHIFT

QUANTITY:  24

PRODUCT......DC1044-903-EC-8P


LOT; JL0943
.
PROBLEM: POLISHED LOT ACCORDING TO SEND AHEADS DATA. 2 WAFERS CAME OUT TOO
         THIN AND THE REST OF THE LOT NEEDED A TOUCH UP.  


               PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 5387.000                   
                           WAFER #2                 5427.000                   
                           WAFER #3                 5141.000                   
                           WAFER #4                 5806.000                   
                           WAFER #5                 5340.000                   
              THK_RG       NA                       2001.000 

                                        LCL=5200       
         
DISPOSITION: A REMARK WAS ADDED FOR EXTRA DEP TO THESE 2 WAFERS.

WAFER   THICKNESS       EXTRA DEP.
4       4898            500
8       4977            500



CORRECTIVE ACTION: Maybe cut back on the send ahead time for the initial
                   polish. 

62.557CMP PEX FROM YESTERDAY FOR HIGH STDEV FOR JD0935SUBPAC::SMARTINTue Feb 18 1997 09:1747
  

LOT:     JD0935

MACHINE: CMP.B1

OPER#:   1981

PROCESS  LEVEL: ILD-1

DATE:    2/17/97

SHIFT:   A- SHIFT

QUANTITY:  24

PRODUCT......DC1073-900-BA-8G


LOT; JD0935
.
PROBLEM: HIGH STD DEV ON OUT GOING READING.


              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 5747.000                   
                           WAFER #2                 5758.000                   
                           WAFER #3                      N/A                   
                           WAFER #4                      N/A                   
                           WAFER #5                      N/A                   
              THK_RG       JD0935                   2750.000
              THK_SD_5     WAFER #1                   15.500   2/17/97 19:03:11
                           WAFER #2                   17.100                   
                           WAFER #3                      N/A                   
                           WAFER #4                      N/A                   
                           WAFER #5                      N/A 

                                        UCL=15.0

         
DISPOSITION: LOT WAS REMARKED AND MOVED ON.


CORRECTIVE ACTION:THIS WAS THE THIRD LOT IN A ROW THAT HAD HIGH STDE
           V FOR THIS TOOL. PAD AND CARRIERS WILL BE CHANGED
           AND THE STDEV SHOULD COME BACK IN.

62.558CMP PEX,11 WAFERS OVER POLISHED ON JL0972SUBPAC::SMARTINTue Feb 18 1997 13:0459
  

LOT:     JL0972

MACHINE: CMP.B3

OPER#:   1992

PROCESS  LEVEL: ILD-1

DATE:    1/18/97

SHIFT:   B- SHIFT

QUANTITY:  24

PRODUCT.....DC1040-001-DB-8P
 


LOT; JL0972
.
PROBLEM: Lot passed on from previous shift, with a final 5 then ship the lot.
         We found some thin wafers during the final 5 which resulted in going
         to 100%.

               PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 5205.000                   
                           WAFER #2                 5680.000                   
                           WAFER #3                 5310.000                   
                           WAFER #4                 5743.000
                           WAFER #5                 5500.000   2/18/97 10:52:36
              THK_RG       NA                       1692.000                   
              THK_SD_5     WAFER #1                    7.600                   
                           WAFER #2                   26.100                   
                           WAFER #3                    8.000                   
                           WAFER #4                    8.300                   
                           WAFER #5                    5.800 

                                        LCL=5200       
         
DISPOSITION:   The following wafers were remarked for extra dep.

Wafer   Thickness       Extra Dep.
6       5165            500
2       4929            500
23      4979            500
9       5028            500
21      4881            500
13      4714            500
24      4807            500
11      4992            500
14      4884            500
16      4645            1000
22      4529            1000



CORRECTIVE ACTION: The 11 wafers will get redep'd
62.559Revised pex for cmp on JL0972 over polishSUBPAC::SMARTINTue Feb 18 1997 13:4578
  

LOT:     JL0972

MACHINE: CMP.B3

OPER#:   1992

PROCESS  LEVEL: ILD-1

DATE:    1/18/97

SHIFT:   B- SHIFT

QUANTITY:  24

PRODUCT.....DC1040-001-DB-8P
 


LOT; JL0972
.
PROBLEM: Lot passed on from previous shift, with a final 5 then ship the lot.
         We found some thin wafers during the final 5 which resulted in going
         to 100%.

               PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 5205.000                   
                           WAFER #2                 5680.000                   
                           WAFER #3                 5310.000                   
                           WAFER #4                 5743.000
                           WAFER #5                 5500.000   2/18/97 10:52:36
              THK_RG       NA                       1692.000                   
              THK_SD_5     WAFER #1                    7.600                   
                           WAFER #2                   26.100                   
                           WAFER #3                    8.000                   
                           WAFER #4                    8.300                   
                           WAFER #5                    5.800 

                                        LCL=5200       
         
DISPOSITION:   The following wafers were remarked for extra dep.

Wafer   Thickness       Extra Dep.
6       5165            500
2       4929            500
23      4979            500
9       5028            500
21      4881            500
13      4714            500
24      4807            500
11      4992            500
14      4884            500
16      4645            1000
22      4529            1000



CORRECTIVE ACTION:  This lot was also remarked that it recieved an over etch per
             remarks.  All wafer that were over etched also came out thin after
             the polish.

Current Remark   :  Lot = JD0928         Rte =    N/A        Oper = 1424 |
  |  User = R_MANGIAFICO Pro = DC1035-000-SC-8T          Op Des = ET_M1      |
  |  Start Date/Time = 11-FEB-1997 02:51  End Date/Time =  ....perpetual.... |
  |                                                                          |
  | THIS LOT WAS SPLIT ON METALETCH.A1 AS REMARKED TO DO.                    |
  |                                                                          |
  | WAFERS 1,4,7,10,13,16,19,22 GOT THE STANDARD 83 SEC OVERETCH TIME.       |
  |                                                                          |
  | WAFERS 2,5,8,11,14,17,20,23,3,6,9,12,15,18,21,24 RECIEVED 50 SEC         |
  | OVERETCH TIME AS REMARKED TO DO                                          |
  |                                                                          |
  | ENDPOINT TIMES FOR BOTH SETS OF PILOTS WERE 46 
  |                                                                          |
  | LOT WAS RANDOM SORTED AND MOVED ON 


62.560CMP PEX,HIGH STDEV FOR JL0972SUBPAC::SMARTINTue Feb 18 1997 13:4777
  

LOT:     JL0972

MACHINE: CMP.B3

OPER#:   1992

PROCESS  LEVEL: ILD-1

DATE:    1/18/97

SHIFT:   B- SHIFT

QUANTITY:  24

PRODUCT.....DC1040-001-DB-8P
 


LOT; JL0972
.
PROBLEM: High STD DEV for the lot. The lot came from films with the following
         remark.

Current Remark   :  Lot = JD0928         Rte =    N/A        Oper = 1981 |
  |  User = R_LAAKKO     Pro = DC1035-000-SC-8T          Op Des = CMP_ILD1   |
  |  Start Date/Time = 12-FEB-1997 12:18  End Date/Time =  ....perpetual.... |
  |                                                                          |
  | This lot popped a chart at Op 3014 Thk_ILD1 2 for high thk range.        |
  | Five sample wafers measured from 16157 to 17793A for a range of          |
  | 1636A versus a spec maximum of 800A.                                     |
  |                                                                          |
  | Lot has been re-ordered by slot# but Prometrix UV 1050s in Films are not |
  | available for 100% lot thk measurement.                                  |
  |                                                                          |
  | Please do 100% thk measurement and adjust polish conditions accordingly. 



               PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 5205.000                   
                           WAFER #2                 5680.000                   
                           WAFER #3                 5310.000                   
                           WAFER #4                 5743.000
                           WAFER #5                 5500.000   2/18/97 10:52:36
              THK_RG       NA                       1692.000                   
              THK_SD_5     WAFER #1                    7.600                   
                           WAFER #2                   26.100                   
                           WAFER #3                    8.000                   
                           WAFER #4                    8.300                   
                           WAFER #5                    5.800 

                                        LCL=15.0       
         
DISPOSITION: This lot was also remarked that it recieved an over etch per
             remarks.  All wafer that were over etched also came out thin after
             the polish.
Current Remark   :  Lot = JD0928         Rte =    N/A        Oper = 1424 |
  |  User = R_MANGIAFICO Pro = DC1035-000-SC-8T          Op Des = ET_M1      |
  |  Start Date/Time = 11-FEB-1997 02:51  End Date/Time =  ....perpetual.... |
  |                                                                          |
  | THIS LOT WAS SPLIT ON METALETCH.A1 AS REMARKED TO DO.                    |
  |                                                                          |
  | WAFERS 1,4,7,10,13,16,19,22 GOT THE STANDARD 83 SEC OVERETCH TIME.       |
  |                                                                          |
  | WAFERS 2,5,8,11,14,17,20,23,3,6,9,12,15,18,21,24 RECIEVED 50 SEC         |
  | OVERETCH TIME AS REMARKED TO DO                                          |
  |                                                                          |
  | ENDPOINT TIMES FOR BOTH SETS OF PILOTS WERE 46 
  |                                                                          |
  | LOT WAS RANDOM SORTED AND MOVED ON 
 
 


CORRECTIVE ACTION:  Garbage in garbage out syndrome
62.561CMP PEX FOR OVER POLISH ON XD0864SUBPAC::SMARTINTue Feb 18 1997 16:3360
  

LOT:     XD0864

MACHINE: CMP.B2

OPER#:   1986

PROCESS  LEVEL: ILD-3

DATE:    1/18/97

SHIFT:   A - SHIFT

QUANTITY:  24

PRODUCT.....TM0069-932-BA-8C
 
LOT; XD0864
.
PROBLEM:  Over polished wafers.
               
              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 9925.000                   
                           WAFER #2                10418.000                   
                           WAFER #3                10213.000                   
                           WAFER #4                10412.000                   
                           WAFER #5                 9909.000                   
              THK_RG       NA                       4193.000
              THK_SD_5     WAFER #1                   15.200   2/18/97 15:48:06
                           WAFER #2                   13.600                   
                           WAFER #3                   15.900                   
                           WAFER #4                   11.000                   
                           WAFER #5                   10.900


          PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              RATE_TM69                             3543.000                   
              TIME_TM69                              150.000 


         
DISPOSITION: Lot was remarked for extra dep.
             Add 1000A extra dep to #2, 5, 8, 9, 10, 11, 12, 16, 19, 21, 23, 24 
             Add 2000A extra dep to #17, 20 and 7

From the best that we can tell, it looks like the polish rate increased.
The lot ranged from 12000-15200 and I grouped the lot and ran them
conservitively.  Kyle is aware of the situation and looked at the data.




CORRECTIVE ACTION: Kevin Jubinville had mentioned earlier this week that
                   TM60's tend to have an increase in polish rate after you
                   hit a certain point in polishing.  Maybe this is the
                   case w/ TM69's also...can't explain it...



62.562CMP PEX,1 WAFER SCRAPPED AND 6 OVER POLISHED ON JD0870SUBPAC::SMARTINTue Feb 18 1997 19:3272
  

LOT:     JD0870

MACHINE: CMP.B1

OPER#:   1985

PROCESS  LEVEL: ILD-2

DATE:    1/18/97

SHIFT:   A - SHIFT

QUANTITY:  22 DOWN TO 21

PRODUCT.....DC1073-900-BA-8G

 
LOT; JD0870
.
PROBLEM: 1 wafer scrapped and 6 over polished wafers.  Lot JD1032 was ran at
         the same time as JD0870 and that lot came out fine. It doesn't make
         any sense that two lots with the same device and incoming thk was
         just about the same and they were both polished together on the same
         tool.  Why is the end result so different?
         The send aheads were ran for 160 sec and the polish was ran for
         180 sec for both lots.

         I did find out that lot JD1032 had to be reworked. Not sure if
         this could be the reason why.


        This Lot had to be reworked in OX-DEP.E3 due to the Dep            
         Rate problem that occurred in OX-DEP.E1. Here are the              
         Recipes, Slot #'s and the corresponding Wafer #'s of the           
         portion of the Lot that was reworked.                              
         Wfr.#  Slot#      Thickness:      Std:       Spec = 1700 - 1900    
          14       2         17738          1.09                            
           3       4         17217          .883                            
          13       6         17903          .759  
          11       8         18103          .617                            
           4      10         18153          .595                            
          22      12         18235          .591                            
          12      14         18350          .631                            
          19      16         18258          .770                            
          18      18         18998          .747                            
          23      20         18179          .635                            
           7      22         18181          .663 
          24      24         18165          .635 

                     
DISPOSITION:Results were, Lot Jd0870 thickness was from 3000 to 7135
            results were, Lot jd1032 thickness was from 5763 to 7428 No over
            polish's                                                                 
                                                                             
  
Please add extra Dep to these wafers:                                    
                                                                          
   Wafer   Thickness       Extra Dep.                                       
   14      3421            2000                                             
   13      3800            1500                                             
   15      4094            1500                                             
   18      4288            1500                                             
   8       4438            1000
   24      4820             500 
            


CORRECTIVE ACTION: Lot was remarked for extra dep


62.563JL0968 HIGH INCOMING STEP @ILD1STRATA::PHESTERWed Feb 19 1997 11:1932

                            PE PEX NOTIFICATION
                     

LOT #          JL0968

QUANTITY:      23

OPERATION #    3198  STEP_ILD1
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          02/19/97  C-Shift

PROBLEM:       HIGH INCOMING STEP ....ILD1

               LOT INCOMING STEP AVG = 9638�  UCL IS 9600�
        
               Lot will be processed on CMP.B2
               Annotation #4996 was opened and then closed.

DISPOSITION:   LOT MOVED TO POLISH

               THE ONLY POSSIBILE CAUSE FOUND FOR THIS IS THAT SOME WAFERS
               WERE OVER-POLISHED AT PMD.

CORRECTIVE
ACTION         NONE.  EXCURSION WARRANTS NO FURTHER ACTION.
62.564XE0949 - 2 wafers scrapped due to chipsSTRATA::POZORSKISun Feb 23 1997 17:2023
                            CMP PEX NOTIFICATION
                     

LOT #          XE0949

QUANTITY:      23 - 2 = 21

OPERATION #    1998 CMP_SCRUB1
/DESCR.        

POLISHER:      NA  

TOOL:          CMP-SCRUB.A2 

DATE:          02/23/97 A-Shift

PROBLEM:       2 wafers were found chipped after handler mis-handled wafers in
               cmp-scrub.a2. Wafer #'s 23 and 24 were scrapped.                         

DISPOSITION:   Two wafers were scrapped from the lot. 
               
CORRECTIVE     EE found the cassette to have a broken location tab so, they
ACTION         threw out the bad cassette and replaced it with a good one.
62.565JD0935 - 1 wafer over polished @ILD2STRATA::POZORSKISun Feb 23 1997 17:3539
                                   CMP PEX

LOT:     JD0935

MACHINE: CMP.B2

OPER#:   1985

PROCESS  LEVEL: CMP_ILD2 

DATE:    2/23/97

SHIFT:   A - SHIFT

QUANTITY: 24

PRODUCT....DC1073-900-BA-8G

 
LOT: JD0935
.
PROBLEM: One wafer was over polished at ILD2, the proper touchup times were used
         for this lot.  For some particular reason this wafer just seem to 
         polish a little quicker then the rest of the lot.  No real reason as
         to why this 1 wafer got over polished......

              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME_5     WAFER #1                 5504.000
                           WAFER #2                 5033.000 (#1 low)
                           WAFER #3                 5759.000
                           WAFER #4                 5202.000
                           WAFER #5                 5715.000
              THK_RG       JD0935                   1922.000
                              
DISPOSITION: Lot was remarked at 2133 DEP_ILD2 3 for an additional 500� to 
             wafer #1 of this lot.
                    
  
CORRECTIVE ACTION: Lot was remarked for extra dep and was moved on.
62.566XE0614 - 4 wafers over polished STRATA::POZORSKISun Feb 23 1997 18:0536
                                   CMP PEX

LOT:     XE0614

MACHINE: CMP.B2

OPER#:   1989

PROCESS  LEVEL: CMP_ILD3 

DATE:    2/23/97

SHIFT:   A - SHIFT

QUANTITY: 20

PRODUCT....TM0069-907-BA-8C

 
LOT: XE0614
.
PROBLEM: Four wafers were over polished at ILD3, B-Shift polished these wafers
         and A-Shift read them on the UV-1050.  B-Shift used a removal rate of
         3,600� per minute and polished it for the calculated time.
         However, being this lot is a TM69 IDL3 they have noticed recently that
         the removal rate for this device seems to accelerate when the lot is
         close to completion.
                              
DISPOSITION: Lot was remarked at 2136 DEP_ILD3 3 for an additional dep on these
             wafers below:

             Wafer #5 will require and additional 2,000� at dep.
             Wafers #3,8,12 will require an additional 1,000� dep.
                    
  
CORRECTIVE ACTION: Lot was remarked for extra dep and was moved on.
62.567JL1001 - 2 wafers overpolished @ILD1STRATA::POZORSKISun Feb 23 1997 18:1936
                                   CMP PEX

LOT:     JL1001

MACHINE: CMP.B1

OPER#:   1992

PROCESS  LEVEL: CMP_ILD1 

DATE:    2/23/97

SHIFT:   A - SHIFT

QUANTITY: 24

PRODUCT....DC1064-003-BA-8P


LOT: JL1001

PROBLEM: Two wafers was over polished at ILD1, the proper touchup times were
         used for this lot.  For some unknown reason this wafer just seem to 
         polish a little quicker then the rest of the lot.  No real reason as
         to why these 2 wafer got over polished......

	 Wafer #2 came out at 4439
         Wafer #10 came out at 4550
         (LCL = 5200�)
                              
DISPOSITION: Lot was remarked at 2166 DEP_ILD1 3 for an additional dep on these
             wafers.  Both wafers will get an additional dep of 1000�.
                    
  
CORRECTIVE   Lot was remarked for extra dep on the 2 wafers and moved on.
ACTION:      NOTE - The rest of the lot came out good.
62.568JL1003 - 1 wafer with high sdSTRATA::POZORSKISun Feb 23 1997 19:3436
                                  CMP PEX 

LOT #:             JL1003

QUANTITY:          24

OPERATION #        1992 CMP_ILD1 
  
POLISHER:          CMP.B2

EVAL TOOL:         THICKNESS.A5

DATE:              A shift   02/23/97 

PROBLEM:           Slightly high range on the THK_SD_5 due to 1 wafer being 
                   high for SD after it was polished.  Range came in at 13.210
                  (UCL = 13)
              
              THK_ME_5     WAFER #1                 5380.000
                           WAFER #2                 5462.000
                           WAFER #3                 5394.000
                           WAFER #4                 5637.000
                           WAFER #5                 5575.000
              THK_RG       JL1003                   2747.000
              THK_SD_5     WAFER #1                    5.930
                           WAFER #2                    4.890
                           WAFER #3                    6.800
                           WAFER #4                   18.100 (Kind of High)
                           WAFER #5                    5.690 

DISPOSITION: Lot was remarked and moved on, there were no splits done on this
             lot but, there was a remark at operation 1992 CMP_ILD1 saying that
             this lot 6 wafers above the UCL of 19000�.  Other then that nothing
             else was noted.

CORRECTIVE   No further action required, lot was moved.
62.569CMP PEX, 8 WAFERS FOR EXTRA DEP FOR YD0238SUBPAC::SMARTINMon Feb 24 1997 18:2444
  

LOT:     YD0238 

MACHINE: CMP.B2

OPER#:   1982

PROCESS  LEVEL: ILD-1

DATE:    2/24/97

SHIFT:   A - SHIFT

QUANTITY:  12

PRODUCT.....DC1018-010-AB-0D
 
LOT; YD0238
.
PROBLEM: 8 Wafers over polished
                     
DISPOSITION: Polished SA's @ 140 sec.  Calculated removal rate @3424.
 Touched-up SA's @50 secs. and ran lot @209 secs. thickness ranged from 
 6190-7200. Grouped wafers and ran @ following times:
          6200-6335  TUP 300
          6490-6675  2 secs.
          7030-7200  14 secs.
 After touch-up wafers ranged from 4901-5349.  Wafers 1,2,5,6,7,8,10,12
need 500A added at DEP.  Wafers were remarked accordingly.

               PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 5084.000                   
                           WAFER #2                      N/A                   
                           WAFER #3                 5252.000                   
                           WAFER #4                      N/A                   
                           WAFER #5                 5349.000                   
              THK_RG       NA                       1786.000 
            
 

CORRECTIVE ACTION: Lot was remarked for extra dep


62.570JD0992 - 3 wafers with high stddevSTRATA::POZORSKITue Feb 25 1997 12:3535
                                  CMP PEX 

LOT #:             JD0992

QUANTITY:          24

OPERATION #        1981 CMP_ILD1
  
POLISHER:          CMP.B1

EVAL TOOL:         THICKNESS.A5

DATE:              A shift   02/25/97 

PROBLEM:           Slightly high range on the THK_SD_5 due to 3 wafers being 
                   high for SD after it was polished.  Mean Range came in at 
                   15.7 (UCL = 15)
              
THK_IDL1_PST  THK_ME_5     WAFER #1                 5782.000
                           WAFER #2                 5556.000
                           WAFER #3                 5661.000
                           WAFER #4                 5258.000
                           WAFER #5                 5482.000
              THK_RG       NA                       2964.000   
              THK_SD_5     WAFER #1                   18.100 * 
                           WAFER #2                   18.400 *
                           WAFER #3                   15.600 *
                           WAFER #4                   13.400
                           WAFER #5                   13.200


DISPOSITION: Lot was remarked and moved on, there was only 1 split done on this
             lot and it was at I2_VTN S, other then that nothing else was noted.
         
CORRECTIVE   No further action required, lot was moved.
62.571CMP PEX, JD1017 5 WAFERS REMARKED FOR EXTRA DEP.SUBPAC::SMARTINTue Feb 25 1997 19:201
    
62.572CMP PEX,XM0948 3 WAFERS REMARKED FOR EXTRA DEP.SUBPAC::SMARTINTue Feb 25 1997 19:3149
  

LOT:     XM0948 

MACHINE: CMP.B1

OPER#:   1982

PROCESS  LEVEL: ILD1

DATE:    2/25/97

SHIFT:   A - SHIFT

QUANTITY:  24

PRODUCT. TM0069-925-CA-8C

 
LOT; XM0948
.
PROBLEM: 3 Wafers over polished
            
           PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 4760.000                   
                           WAFER #2                 5638.000                   
                           WAFER #3                 5653.000                   
                           WAFER #4                 5411.000                   
                           WAFER #5                 5276.000                   
              THK_RG       XM0948                   2339.000 

         
DISPOSITION: Wafers 10, 13, & 16 need an additional 1000 angstrom oxide dep.
 

SA's ran @ 150.  SA's thickness ranged from 6481-6947.  SA's were touched
up at TUP375 and lot was run @166 secs.  At 100% measure, 15 were in spec,
6 wafers needed slight touchup (ranged from 5813-6978) and 3 wafers
were overpolished @4146, 4752, and 4661 (Wafer #'s 10, 13, and 16)
As a further note, these were the last three wafers in the cassette when
they came into CMP.  Most likely, incoming thickness was low.
Lot was remarked at DEP.
           
         
 

CORRECTIVE ACTION: Lot was remarked for extra dep


62.573CMP PEX ,JD1017 5 WAFERS REMARKED FOR EXTRA DEPSUBPAC::SMARTINTue Feb 25 1997 19:3742
  

LOT:     JD1017 

MACHINE: CMP.B1

OPER#:   1978

PROCESS  LEVEL: PMD

DATE:    2/25/97

SHIFT:   A - SHIFT

QUANTITY:  24

PRODUCT......DC1035-000-SC-8T 

 
LOT; JD1017
.
PROBLEM: 5 Wafers over polished
            
            PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 6640.000                   
                           WAFER #2                 5740.000                   
                           WAFER #3                 6717.000                   
                           WAFER #4                 6519.000                   
                           WAFER #5                 5624.000                   
              THK_RG       JD1017                   1192.000  

         
DISPOSITION: Please add an EXTRA 1000A oxide to wafer #14,15,20,21 and 23.   
            The original SA's were run for 15 secs. and ranged from 7526-7855. 
            These wafers were touched up @ 1 sec. Wafers ranged from 5520-5850.
           
         
 

CORRECTIVE ACTION: Lot was remarked for extra dep


62.574XD0914 HIGH INCOMING STEP @ILD2STRATA::PHESTERThu Feb 27 1997 18:4333

                            PE PEX NOTIFICATION
                     

LOT #          XD0914

QUANTITY:      22

OPERATION #    3080 STEP_ILD2
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          02/27/97  C-Shift

PROBLEM:       LOW INCOMING STEP ...ILD-2

               LOT INCOMING STEP AVG =  9742� 

               UCL IS   9600�
        
               ANNOTATION # 5753 
               HAS BEEN CLOSED


DISPOSITION:   LOT MOVED ON.

CORRECTIVE
ACTION         NONE.  THIS LOT HAS RECIEVED MULTIPLE SPLITS AT ILD DEP 
               OPERATIONS.  THIS COULD BE THE REASON.
62.575JL1014 over polished @ILD2STRATA::PHESTERFri Feb 28 1997 19:3633

                       PROCESS EXCURSION REPORT FOR IMPLANT
                      ______________________________________
  

   PROCESS:      1308 MDDP

   PROCESS DATE: 2/28/97  C SHIFT
   
   IMPLANTER:    MED-I.A2

   T-WAVE:       N/A        LOT WAS AN ENGINEERING SPLIT LOT.

   RECIPE:       N/A       
          
   ENERGY:       N/A
 
   CURRENT:      N/A

   QUANTITY:      23

   LOT(S):       XD1020

   PROBLEM:      WAFER # 16 SCRAPPED.  HANDLER HAD A WAFER NOT FOUND ERROR.
                 EE ADVISED PROBABLY CAUSED BY AN ARC.  WAFER WAS BROKEN IN 
                 CHAMBER WHILE TRANSPORTING.

   DISPOSITION:  LOT MOVED ON.
  
   CORRECTIVE 
   ACTION:       TOOL HAS BEEN CLEANED.  MAID SERVICE, DUMMY IMPLANTS AND MQC
                 ARE BEING PERFORMED.
62.575JL1014 OVER POLISHED @ILD2STRATA::PHESTERSat Mar 01 1997 18:1333

                            PE PEX NOTIFICATION
                     

LOT #          JL1014

QUANTITY:      24

OPERATION #    1994 CMP_ILD2
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     THICKNESS.A4

DATE:          02/28/97  C-Shift

PROBLEM:       LOT OVERPOLISHED AT THIS OPERATION.

DISPOSITION:   LOT MOVED ON.

               MFG TECH POLISHED SEND AHEADS AND THEY CAME OUT GOOD AT 6 - 7K.
               THE BALANCE OF THE LOT WAS THEN POLISHED.  THE POLISH TIME USED
               WAS SOMEWHAT LOWER THAN THE SEND AHEADS WOULD INDICATE.

               INCOMING THINCKNESSES WERE GOOD AS WELL AS UNIFORM.

CORRECTIVE
ACTION         LOT WAS BINNED ACCORDING TO THICKNESS AND REMARKED AT CAP FOR
               EXTRA DEP.  HANDED OVER TO NEXT SHIFT FOR TOOL DISPOSITION.
               MQCs MAY BE PERFORMED.

62.576JL1042 HIGH SD @ILD1LUDWIG::PHESTERSat Mar 01 1997 19:3744

                            PE PEX NOTIFICATION
                     

LOT #          JL1042

QUANTITY:      24

OPERATION #    1992 CMP_ILD1
/DESCR.

POLISHER:      CMP.B3

EVAL TOOL:     THICKNESS.A4

DATE:          03/01/97  C-Shift

PROBLEM:       SLIGHTLY OUT OF SPEC SD AT THIS OPERATION.

               SD WAS 15.25   UCL IS 15.0

THK_ME_5     WAFER #1                      N/A
                           WAFER #2                 5701.000
                           WAFER #3                 5745.000
                           WAFER #4                 4832.000
                           WAFER #5                 5861.000
              THK_RG       JL1042                   3313.000
              THK_SD_5     WAFER #1                      N/A   3/01/97 17:23:56
                           WAFER #2                   19.700
                           WAFER #3                    9.100
                           WAFER #4                   20.500
                           WAFER #5                   11.700

DISPOSITION:   LOT MOVED ON.
               
               INCOMING THINCKNESSES WERE GOOD AS WELL AS SD.  LOT DID
               HOWEVER HAVE HIGH SD AT DEP ILD1.  PSS MADE SOME ADJUSTMENTS
               TO TiN SUBSTRATE THICKNESS IN UV150 RECIPE AND THE UNIFORMITY
               CAME RIGHT IN.  SUSPECT CHANGE IN TIN THICKNESS.  NO TIME TO
               MAKE ADJUSTMENTS THIS SHIFT.  ONCOMING PSS NOTIFIED OF PROBLEM.

CORRECTIVE
ACTION         ADJUSTMENTS MAY BE NEEDED IN UV1050 TIN SUBSTRATE THICKNESS.
62.577XD0915 ILD3 3 wafers broken while mapping input cassetteYIELD::MANDREOLISun Mar 02 1997 06:5525
                            PE PEX NOTIFICATION
                     

LOT #          XD0915 (TM0069) 
                                 
QUANTITY:      23 - 3 = 20

OPERATION #    1989 CMP AFTER ILD3
/DESCR.        

POLISHER:      CMP.B3  

EVAL TOOL:     NA 

DATE:          03/02/97 B-Shift

PROBLEM:       Three wafers {04,09,20} were broken while mapping the input 
               cassette. It appears that the cassette wasn't sitting correctly 
               in the input station, although the sensor was made, and the 
               mapping sequence broke the bottom three wafers in the cassette

DISPOSITION:   Lot moved on with count minus 3. 

CORRECTIVE     Cleaned up broken wafer pieces, the other wafers from this lot 
ACTION:        were not damaged. 
62.578JL1090 - Slightly high incoming step heights @PMDSTRATA::POZORSKISun Mar 02 1997 09:0529
                              CMP PEX 

LOT #:             JL1090

QUANTITY:          24

OPERATION #        3362 STP_L_PMDPRE
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   03/02/97 

PROBLEM:           Incoming step height out of spec. (Slightly High)

Incoming step height was 4339�   UCL= 4200

              RUN_ID_1     JL1090               N/A
              HEIGHT_ME    WAFER #1 CENTER          4246.000
                           WAFER #1 EDGE            4059.000
                           WAFER #2 CENTER          4562.000
                           WAFER #2 EDGE            4488.000

        
DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.  There were no splits noted on this lot.
62.579JL1062 - High incoming Step height @PMDSTRATA::POZORSKISun Mar 02 1997 11:1629
                              CMP PEX 

LOT #:             JL1062

QUANTITY:          24

OPERATION #        3362 STP_L_PMDPRE
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   03/02/97 

PROBLEM:           Incoming step height out of spec. 

Incoming step height was 4523�   UCL= 4200

              RUN_ID_1     JL1062               N/A
              HEIGHT_ME    WAFER #1 CENTER          4620.000
                           WAFER #1 EDGE            4481.000
                           WAFER #2 CENTER          4500.000
                           WAFER #2 EDGE            4492.000

        
DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.  There were no splits noted on this lot.
62.580JD1118 - HAD HIGH OUTGOING RANGE @ILD3STRATA::POZORSKISun Mar 02 1997 15:2640
                              CMP PEX 
                     

LOT #:        JD1118                 

QUANTITY:     16      

OPERATION #   3064 THK_ILD3_PST      

POLISHER:     CMP.B2
 
EVAL TOOL:    THICKNESS.A5

DATE:         03/02/96    

PROBLEM:      LOT HAD HIGH OUTGOING RANGE ON ONE OF THE OUTGOING WAFERS ON THE 
              FINAL MASUREMENT.                

              THK_ME_5     WAFER #1                10166.000
                           WAFER #2                10490.000
                           WAFER #3                10098.000
                           WAFER #4                 9814.000
                           WAFER #5                      N/A
              THK_RG       JD1118                   5817.000
              THK_SD_5     WAFER #1                   10.200   3/02/97 14:24:10
                           WAFER #2                   13.900
                           WAFER #3                   15.300
                           WAFER #4                   19.700
                           WAFER #5                      N/A


                                     
DISPOSITION:  ALL FIVE WAFERS MEASURED HAD GOOD MEAN THICKNESS.  HIGH RANGE WAS
              CAUSED BY ONE OUTGOING WAFER OF A RANGE OF ~5800�. (UCL = 4500�)
   
              LOT MOVED ON AND A REMARK WAS ADDED AT OPERATION #2136 FOR THE
              RANGE.

CORRECTIVE    NONE....THEY ARE GOING TO MONITOR THIS TOOL FOR POSSIBLE PROBLEMS
ACTION:       ON THE OTHER LOTS.
62.581JD0930 - 2 wafers overpolished @ILD2STRATA::POZORSKISun Mar 02 1997 18:5832
                                   CMP PEX

LOT:     JD0930

MACHINE: CMP.B2

OPER#:   1985

PROCESS  LEVEL: CMP_ILD2 

DATE:    03/02/97

SHIFT:   A - SHIFT

QUANTITY: 24

PRODUCT....DC1026-000-JA-8G

 
LOT: JD0930

PROBLEM: Two wafers were over polished at ILD2 (Wafer #21 & 24), this is a lot
         that was being run for Eric.  These 2 wafers had low incoming 
         thickness per a remark at operation #3080.  When they went to run the
         lot, slot #25 had a dummy wafer in it and they did not reduce the run 
         time sufficiently to compensate for the dummy wafer in this slot 
         causing the wafer #21 and 24 to be overpolished.
                              
DISPOSITION: Lot was remarked at 2133 DEP_ILD2 3 for an additional 500� to 
             wafer #21 & 24 of this lot.
                    
CORRECTIVE ACTION: Lot was remarked for extra dep and was moved on.
62.582JL1081 - High Step Heights @PMDSTRATA::POZORSKIMon Mar 03 1997 13:5529
                              CMP PEX 

LOT #:             JL1081

QUANTITY:          24

OPERATION #        3362 STP_L_PMDPRE
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   03/03/97

PROBLEM:           Incoming step height out of spec. 

Incoming step height was 4372�   UCL= 4200

              RUN_ID_1     JL1081               N/A
              HEIGHT_ME    WAFER #1 CENTER          4408.000
                           WAFER #1 EDGE            4315.000
                           WAFER #2 CENTER          4456.000
                           WAFER #2 EDGE            4310.000

        
DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.  There were no splits noted on this lot.
62.583jd1031 one wafer scrapped on scrubberLUDWIG::PHESTERThu Mar 06 1997 12:3828

                            PE PEX NOTIFICATION
                     

LOT #          JD1031

QUANTITY:      23

OPERATION #    1980 CMP_SCRUB3
/DESCR.

POLISHER:      CMP.B3

EVAL TOOL:     N/A

DATE:          03/06/97  C-Shift

PROBLEM:       ONE WAFER SCRAPPED AT THE SCRUB OPERATION.

               DUE TO A LIFTER ERROR ONE WAFER WAS BROKEN WHILE BEING 
               TRANSPORTED IN THE SCRUBBER TOOL.

DISPOSITION:   LOT MOVED ON.
               
CORRECTIVE
ACTION         EQUIPMENT ENGINEERING IS WORKING ON A REPAIR.

62.584XE0903 high outgoing range @ILD3STRATA::PHESTERFri Mar 07 1997 15:3745

                            PE PEX NOTIFICATION
                     

LOT #          XE0903

QUANTITY:      23

OPERATION #    3120 THK_ILD3_PST
/DESCR.
 
POLISHER:      CMP.B2 

EVAL TOOL:     THICKNESS.A4

DATE:          03/07/97  C-Shift

PROBLEM:       HIGH RANGE AT THIS OPERATION.


              THK_ME_5     WAFER #1                 9975.000
                           WAFER #2                10099.000
                           WAFER #3                 9980.000
                           WAFER #4                10185.000
                           WAFER #5                10085.000
              THK_RG       XE0903                   6638.000
 LOG AN EVENT THK_SD_5     WAFER #1                   17.500   3/07/97 14:08:24
                           WAFER #2                   17.400
                           WAFER #3                   20.900
                           WAFER #4                   18.600
                           WAFER #5                   15.000

DISPOSITION:   LOT MOVED ON.
               
CORRECTIVE
ACTION         LOT REMARKED AT 2291 DEP_ILD3 TO NOTIFY FILMS.

               ALL METRO TOOL READING VERIFIED AS GOOD.  

               PROBLEM IS WITHIN WAFER AS TOOL IS POLISHING EDGE HEAVEY AT THIS
               OPERATION.  AVERAGE THICKNESS GOOD.

               ID/OD ON TOOL IS SET AT THE MAXIMUM.  ANOTHER LOT THAT POLISHED
               AT THTE SAME TIME WAS FINE.  PAD IS OK.
62.585JD0959 HIGH OUTGOING SD @ILD3LUDWIG::PHESTERSat Mar 08 1997 18:0947

                               CMP PEX 
                     

LOT #          JD0959

QUANTITY:      22

OPERATION #    3064 POST THICKNESS.A4   ILD3
/DESCR.

POLISHER:      POST READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          03/08/96  C-Shift

PROBLEM:       HIGH THICKNESS & RANGE

               POST THICKNESS AVG = 10572�

                          UCL IS    10500�
        
DISPOSITION:   Lot ran on D-shift on CMP.B3

               Wafer #     mean thickness    % Dev
                     1        11141           12.1
                     2        10636           12.2
                     3        10992           22.2
                     4         9844           25.1
                     5        10248           12.3
                   mean       10572        

              Open anno #6569  

              IT WAS DECIDED TO TOUCH UP THIS LOT.  PROD. SUPER MOVED THE LOT
              BACK AND THE TOUCH UP WAS DONE.  MEAN THICKNESS CAME IN BUT SD
              WAS STILL HIGH.  THIS PROBLEM IS ATTRIBUTED TO THE PAD LOSING 
              REMOVAL RATE DURING POLISHING.

              

CORRECTIVE
ACTION        ORIGINAL ANNOTATION WAS CLOSED AS WELL AS NEW ANNOTATION WHEN
              LOT WAS PROC'D THROUGH THE SECOND TIME.  PE WILL DELETE THE 1ST
              POINT. 
62.586XM0948 CMP_ILD2 4 wafers scrapped for overpolishYIELD::MANDREOLISun Mar 09 1997 03:5933
                            PE PEX NOTIFICATION
                     

LOT #          XM0948 (TM0069) 
                                 
QUANTITY:      24 - 4 = 20

OPERATION #    1985 CMP_ILD2
/DESCR.        

POLISHER:      CMP.B2 ?   

EVAL TOOL:     THICKNESS.A5 

DATE:          03/08/97 C-Shift

PROBLEM:       Four wafers {4, 9, 10, 23} were severely overpolished with
               exposed Metal. This happened at the end of the previous shift 
               and the lot was being measured 100% on this shift. All the other
               wafers were right on for target thickness, and there is no
               explanation for these overpolished ones. My guess is that they 
               were polished twice, that's only an assumption... Or perhaps 
               they were not dep'd at ILD2...? You make the call. Without the 
               Speedfam polish info (it's not saved) there is no verification.  

               REMARKs show nothing out of the ordinary. There were 3 wafers
               overpolished at ILD1 and remarked for extra dep, although only 
               one of them is common to these, wafer #10. 

DISPOSITION:   Lot moved on with count minus 4. 

CORRECTIVE     Getting the Speedfams to store processing info would help...
ACTION:        I think there are folks working on that.  
62.587JL1088 - 8 wafers overpolished @PMDSTRATA::POZORSKISun Mar 09 1997 14:5251
                                   CMP PEX

LOT:     JL1088

MACHINE: CMP.A2

OPER#:   1984

PROCESS  LEVEL: CMP_L_PMD 

DATE:    03/09/97

SHIFT:   A - SHIFT

QUANTITY: 24

PRODUCT....DC1043-005-AC-8P 
 
LOT: JL1088

PROBLEM: Eight wafers were over polished at CMP_L_PMD (Wafer #1,2,5,6,10,18,20,
         24), the lot was run on .A2 but, being the tool failed its mqc's they
         decided to run the touch up wafers on .A1.  It was noted after the lot
         had completed the touch-ups that the left carrier seem to have had some
         problems, it would stay down longer then it was suppose to and all of
         these overpolished wafers came off the left carrier.
                              
DISPOSITION: Lot was remarked at 2160 DEP_PMD for an additional Dep to 
             wafers #1,2,5,6,10,18,20,24 of this lot.  Below are the final 
             thickness results:

             Wafer #  THK      Additional Oxide needed at Oper 2160        
             (LCL = 6200�)                                        
             
               6     6132      500                                         
                                                                            
               10    6044      500                                         
                                                                           
               2     6176      500                                         

               24    6070      500                                         
                                                                            
               18    6028      500                                         
                                                                           
               5     6033      500                                         
                                                                            
               1     6060      500                                         

               20    6071      500      

CORRECTIVE ACTION: Lot was remarked for extra dep and was moved on.
62.588JL1087 - 9 wafers overpolished @PMDSTRATA::POZORSKISun Mar 09 1997 15:0556
                                   CMP PEX

LOT:     JL1087

MACHINE: CMP.A1 & .A2(touchups)

OPER#:   1984

PROCESS  LEVEL: CMP_L_PMD 

DATE:    03/09/97

SHIFT:   A - SHIFT

QUANTITY: 24

PRODUCT....DC1043-005-AC-8P 
 
LOT: JL1087

PROBLEM: Nine wafers were over polished at CMP_L_PMD (Wafer #1,2,6,9,13,15,17,
         19,23), the lot was run on .A2 but, being the tool failed its mqc's
         they decided to run the touch up wafers on .A1.  It was noted after
         the lot had completed the touch-ups that the left carrier seem to have
         had some problems, the left carrier would stay down longer then it was
         suppose to and all of these overpolished wafers came off the left
         carrier.  In fact the tool ended up crashing (w/dummy wafer) due to the
         left carrier sticking.
                              
DISPOSITION: Lot was remarked at 2160 DEP_PMD for an additional Dep to 
             wafers #1,2,6,9,13,15,17,19,23 of this lot.  Below are the final 
             thickness results:

             Wafer #  THK      Additional Oxide needed at Oper 2160        
             (LCL = 6200�)                                        
             
             6         6194      500                                  
                                                                            
             13        6184      500                                        
                                                                            
             23        6021      500                                        
                                                                            
             9         6148      500

             1         6120      500                                        
                                                                            
             15        6081      500                                        
                                                                            
             19        6055      500                                        
                                                                            
             17        6035      500                                        

             2         6192      500 

CORRECTIVE ACTION: Lot was remarked for extra dep and was moved on, the tool 
             went down to have the pad & carrier change done due to the crash.
62.589JL1089 - High incoming step heights @PMDSTRATA::POZORSKISun Mar 09 1997 15:2028
                              CMP PEX 

LOT #:             JL1089

QUANTITY:          24

OPERATION #        3362 STP_L_CMP1 
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   03/09/97

PROBLEM:           Incoming step height out of spec. 

Incoming step height was 4492.5�   UCL= 4200

              RUN_ID_1     JL1089               N/A
              HEIGHT_ME    WAFER #1 CENTER          4545.000
                           WAFER #1 EDGE            4254.000
                           WAFER #2 CENTER          4589.000
                           WAFER #2 EDGE            4582.000
        
DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.  There were no splits or problems noted for this lot.
62.590XD0805 - LOW INCOMING STEP HEIGHTS @ILD3STRATA::POZORSKISun Mar 09 1997 16:3928
                            PE PEX NOTIFICATION
                     

LOT #          XD0805

QUANTITY:      22

OPERATION #    3081 STEP_ILD3
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          03/09/97  A-Shift

PROBLEM:       LOW INCOMING STEP ...ILD3

               LOT INCOMING STEP AVG = 16885� 

               LCL = 17000
        
DISPOSITION:   LOT MOVED ON.

CORRECTIVE
ACTION         NONE.  THIS LOT HAS RECIEVED SPLITS AT ILD DEP OPERATIONS.
               THIS COULD BE PART OF THE REASON, PLUS THERE WERE OTHER SPLITS 
               DONE ON THIS LOT.
62.591JL1123 - High incoming step heights @PMDSTRATA::POZORSKISun Mar 09 1997 18:5928
                              CMP PEX 

LOT #:             JL1123

QUANTITY:          24

OPERATION #        3362 STP_L_CMP1 
  
POLISHER:          N/A

EVAL TOOL:         PROFILER.A2

DATE:              A shift   03/09/97

PROBLEM:           Incoming step height out of spec. 

Incoming step height was 4449.75�   UCL= 4200

              RUN_ID_1     NA                   MNA
              HEIGHT_ME    WAFER #1 CENTER          4316.000
                           WAFER #1 EDGE            4502.000   3/09/97 17:15:50
                           WAFER #2 CENTER          4460.000
                           WAFER #2 EDGE            4521.000

DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.  There were no splits or problems noted for this lot.
62.592JD0985 ILD3 4 wafers overpolishedYIELD::MANDREOLIMon Mar 10 1997 05:2450
                            PE PEX NOTIFICATION
                     

LOT #          JD0985 (DC1073) 
                                 
QUANTITY:      24 

OPERATION #    1989 CMP_ILD3
/DESCR.        

POLISHER:      CMP.B1    

EVAL TOOL:     THICKNESS.A5 

DATE:          03/09/97 A-Shift/B-shift

PROBLEM:       Four wafers overpolished and will require extra dep at Oper 2136
               DEP_ILD3. 

               * Incoming Tox ~34800 � 
               * Lot initally polished for 300 seconds.
               * Mean of 22k� Oxide remaining, Removal Rate 2405�/min used. 
               * Polished lot for additional 297 seconds. 
               * 100% measure before touch up. Target = 10000 � 500

               Tox results were: 
               Batch 1) 14466  12955  13670  14816  14407
               Batch 2) 12301  11969  11792  12088  10904
               Batch 3) 12541  11689  12371  12900  11906
               Batch 4) 12666  10592  11208  12857  11591 
               Batch 5)  7177   6189   6073   5449  BLANK  * require extra dep

               Batch 5 ran with same time as other batches, the Time for this 
               batch should have been reduced ~20%. This could be why these 
               wafers were overpolished. 

DISPOSITION:   Lot has been REMARKED accordingly                               
                                          
               These FOUR wafers require additional OXIDE DEPOSITION at this 
               Operation; they were overpolsihed at CMP_ILD3. 

               WAFER#    SLOT#     ADD
               -------------------------
                 15       22      3000� 
                  8       23      3000� 
                 23       24      3000� 
                 14       25      4000� 

CORRECTIVE     Lot remarked for extra capping dep. 
ACTION:    
62.593JL1095 - Slightly high incoming step heights @PMDSTRATA::POZORSKIMon Mar 10 1997 11:2129
                              CMP PEX 

LOT #:        JL1095

QUANTITY:     24

OPERATION #   3362 STP_L_CMP1 
  
POLISHER:     N/A

EVAL TOOL:    PROFILER.A2

DATE:         A shift   03/10/97

PROBLEM:      Incoming step height out of spec. 
              
              Incoming step height was 4384.5�   UCL= 4200
 
              RUN_ID_1     JL1095               N/A
              HEIGHT_ME    WAFER #1 CENTER          4234.000
                           WAFER #1 EDGE            4518.000   3/10/97 10:50:52
                           WAFER #2 CENTER          4504.000
                           WAFER #2 EDGE            4282.000

DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.  There were no splits or problems noted for this lot.

62.594JL1099 - Slightly high incoming step heights @PMDSTRATA::POZORSKIMon Mar 10 1997 11:3429
                              CMP PEX 

LOT #:        JL1099

QUANTITY:     24

OPERATION #   3362 STP_L_CMP1 
  
POLISHER:     N/A

EVAL TOOL:    PROFILER.A2

DATE:         A shift   03/10/97

PROBLEM:      Incoming step height out of spec. 
              
              Incoming step height was 4327�   UCL= 4200

              RUN_ID_1     JL1099               N/A
              HEIGHT_ME    WAFER #1 CENTER          4417.000
                           WAFER #1 EDGE            4313.000
                           WAFER #2 CENTER          4169.000
                           WAFER #2 EDGE            4409.000
 
DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.  There were no splits or problems noted for this lot.

62.595JL1100 had high incoming step heights @PMDSTRATA::POZORSKIMon Mar 10 1997 18:3228
                              CMP PEX 

LOT #:        JL1100

QUANTITY:     22

OPERATION #   3362 STP_L_CMP1 
  
POLISHER:     N/A

EVAL TOOL:    PROFILER.A2

DATE:         A shift   03/10/97

PROBLEM:      Incoming step height out of spec. 
              
              Incoming step height was 4497�  UCL= 4200

              RUN_ID_1     JL1100               N/A
              HEIGHT_ME    WAFER #1 CENTER          4084.000
                           WAFER #1 EDGE            4443.000   3/10/97 16:04:28
                           WAFER #2 CENTER          4649.000
                           WAFER #2 EDGE            4812.000
 
DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.  There were no splits or problems noted for this lot.
62.596JD0932 - 3 wafers with high std @ILD2LUDWIG::POZORSKITue Mar 11 1997 18:5234
                                  CMP PEX 

LOT #:             JD0932

QUANTITY:          23

OPERATION #        1985 CMP_ILD2 
  
POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A4

DATE:              A shift   03/11/97 

PROBLEM:           Slightly high range on the THK_SD_5 due to 3 wafers being 
                   high for SD after it was polished.  Mean Range came in at 
                   15.1 (UCL = 14)

              THK_ME_5     WAFER #1                 5896.000
                           WAFER #2                 5871.000
                           WAFER #3                 5531.000
                           WAFER #4                 5313.000
                           WAFER #5                 5528.000
              THK_RG       NA                       1728.000
              THK_SD_5     WAFER #1                   18.400 *
                           WAFER #2                    7.300
                           WAFER #3                    9.480
                           WAFER #4                   19.000 *
                           WAFER #5                   22.400 *

DISPOSITION: Lot was remarked and moved on, there was a split done on this
             lot at DEP_PMD 1, other then that nothing else was noted.
         
CORRECTIVE   No further action required, lot was moved.
62.597JL1122 - Slightly high incoming step heights @PMDLUDWIG::POZORSKITue Mar 11 1997 19:0328
                              CMP PEX 

LOT #:        JL1122

QUANTITY:     22

OPERATION #   3362 STP_L_CMP1 
  
POLISHER:     N/A

EVAL TOOL:    PROFILER.A2

DATE:         A shift   03/11/97

PROBLEM:      Incoming step height out of spec. 
              
              Incoming step height was 4315.5�  UCL= 4200

              RUN_ID_1     JL1122               N/A
              HEIGHT_ME    WAFER #1 CENTER          4330.000
                           WAFER #1 EDGE            4544.000
                           WAFER #2 CENTER          4037.000
                           WAFER #2 EDGE            4351.000
 
DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.  There were no splits or problems noted for this lot.
62.598JL1122 - 2 wafers had high SD after PMDSTRATA::POZORSKIWed Mar 12 1997 09:3433
                              CMP PEX 

LOT #:        JL1122

QUANTITY:     24

OPERATION #   1984 CMP_L_PMD 
  
POLISHER:     CMP.A1

EVAL TOOL:    THICKNESS.A5

DATE:         A shift   02/12/97 

PROBLEM:      Slightly high SD on 2 wafers after lot was polished 9.02
              (UCL = 9)

              THK_ME_5     WAFER #1                 6462.000
                           WAFER #2                 6516.000
                           WAFER #3                 6849.000
                           WAFER #4                 6545.000
                           WAFER #5                 6283.000
              THK_RG       JL1122                   2342.000
              THK_SD_5     WAFER #1                    9.940 *
                           WAFER #2                    8.130   3/12/97 09:16:24
                           WAFER #3                    7.730
                           WAFER #4                    8.210
                           WAFER #5                   11.100 *

DISPOSITION:  Lot was put on hold because Bryan wants to do some extra 
              thickness measuremts on this lot and then it will be moved on.

CORRECTIVE    No further action required.
62.599XD1024 - 5 wafers scrapped @ILD1STRATA::POZORSKIWed Mar 12 1997 17:1335
                            PE PEX NOTIFICATION
                     

LOT #          XD1024 (TM0069) 
                                 
QUANTITY:      23 - 5 = 18

OPERATION #    1981 CMP_ILD1
/DESCR.        

POLISHER:      CMP.B1   

EVAL TOOL:     THICKNESS.A5 

DATE:          03/12/97 A-Shift

PROBLEM:       Five wafers {1,2,5,6,9} were severely overpolished with
               exposed Metal.  These 5 wafers were there send ahead's and they
               were run for 150 sec and the readings were 8108, 7555, 8020,
               7829, 7337 for a total of 7700.  They took the removal rate of 
               4249 and then they took the send ahead's avg 7500-5500 = 
               and then they divided it by 4249 x 60 = 28.2 sec but, they ended
               up cutting it down to 18 sec and then re-ran the 5 wafers and 
               for some unknown reason they came out overpolished at 1326, 959,
               1102, 1010, 1063.  Eric was in there at the time and I talked to
               him and he said that everything that the tech did was right and
               he could not see why this happen becasue, all of the other wafers
               were right on for target thickness. So, there is no real 
               explanation for why these wafers were overpolished. Without the 
               Speedfam polish info (it's not saved) there is no verification.  

DISPOSITION:   Lot moved on with count minus 5.

CORRECTIVE     Getting the Speedfams to store processing info would help...
ACTION:        I think there are folks working on that.  
62.600XM1027 - SLIGHTLY LOW INCOMING STEP HEIGHTS @PMDSTRATA::POZORSKIWed Mar 12 1997 17:2528
                              CMP PEX 

LOT #:        XM1027

QUANTITY:     24

OPERATION #   3078 STEP_CMP 1 (STEP_PMD)
  
POLISHER:     N/A

EVAL TOOL:    PROFILER.A2

DATE:         A shift   03/12/97

PROBLEM:      Incoming step height slightly low.
              
              Incoming step height was 2994.25�  LCL= 3000

              RUN_ID_1     NA                   XM1027
              HEIGHT_ME    WAFER #1 CENTER          3036.000
                           WAFER #1 EDGE            2942.000   3/12/97 16:52:09
                           WAFER #2 CENTER          3081.000
                           WAFER #2 EDGE            2918.000
 
DISPOSITION: Lot moved to polish        

CORRECTIVE   Lot polish time will be ajusted to compensate for high step
ACTION:      heights.  There were no splits or problems noted for this lot.
62.601JL1159 high incoming step @PMDSTRATA::PHESTERThu Mar 13 1997 10:5931
                            	CMP PEX 
                     

LOT #          JL1159

QUANTITY:      24

OPERATION #    3362 STEP_PMD
/DESCR.

POLISHER:      PRE READINGS

EVAL TOOL:     PROFILER.A2

DATE:          03/13/96  C-Shift

PROBLEM:       HIGH INCOMING STEP ....PMD

               HIGH INCOMING STEP AVG = 4424�  

                                 LCL IS 4200�
        

DISPOSITION:   CLOSED ANNOTATION # 7031.   LOT MOVED TO POLISH.


CORRECTIVE
ACTION         NOTHING UNUSUAL IN LOT HISTORY TO EXPLAIN THIS.  LOT LOOKED
               VERY GOOD AT PMD DEP.  GOOD UNIFORMITY AND THICKNESS WAS RIGHT
               ON TARGET.   NO FURTHER ACTION.
62.602JD1052 4 WAFERS SCRAPPED @ILD2 - CRASH ON .B3STRATA::PHESTERFri Mar 14 1997 09:4425
                            	CMP PEX 
                     

LOT #          JD1052

QUANTITY:      20

OPERATION #    
/DESCR.        1985 CMP_ILD2

POLISHER:      CMP.B3

EVAL TOOL:     N/A

DATE:          03/13/96  C-Shift

PROBLEM:       FOUR WAFERS SCRAPPED DUE TO TOOL CRASH.        

DISPOSITION:   LOT MOVED ON.

CORRECTIVE
ACTION         EE CHECKED ALL VARIABLES AND MADE SOME ADJUSTMENTS BUT NO
               ROOT CAUSE FOUND.

62.603JL1144 some wafers overpolished @pmdSTRATA::PHESTERSat Mar 15 1997 18:1732
                            	CMP PEX 
                     

LOT #          JL1144

QUANTITY:      20

OPERATION #    
/DESCR.        1985 CMP_ILD2

POLISHER:      CMP_B1

EVAL TOOL:     THICKNESS.A5

DATE:          03/15/96  C-Shift

PROBLEM:       SOME WAFERS OVERPOLISHED.

               THIS LOT WAS POLISHED ON THE PREVIOUS SHIFT.  LOT WAS GIVEN 
               100% EVAL AND SOME WAFERS FOUND TO BE OVERPOLISHED.  ALL
               METROLOGY MEASUREMENTS VERIFIED AS GOOD.  NO CAUSE FOUND.
               THIS LOT WAS A PMD LOT WHICH IS USUALLY POLISHED ON THE A TOOLS.
               IT MAY BE THAT THE REMOVAL RATE WAS MISCALCULATED.  NO WAY TO
               BE SURE.  THIS TOOL PERFORMED WELL AFTER THIS LOT WAS POLISHED
               AND THE PAD HAD AROUND 400 WAFERS ON IT.

DISPOSITION:   LOT MOVED ON.  

CORRECTIVE
ACTION         LOT BINNED AND REMARKED AT CAP FOR EXTRA DEP.

62.604CMP PEX FOR 1 BROKEN WAFER IN LOT JD1108SUBPAC::SMARTINSun Mar 16 1997 18:5435
  

LOT:     JD1108 

MACHINE: CMP.B2

OPER#:   1978

PROCESS  LEVEL: PMD

DATE:    3/16/97

SHIFT:   A - SHIFT

QUANTITY:  24 DOWN TO 23

PRODUCT. DC1026-003-JB-8G  

 
LOT; JD1108
.
PROBLEM: 1 PRODUCT WAFER BROKE.
          SYSTEM CRASHED. 8 SECONDS INTO SEGMENT 5.               
          CARRIERS NOT ROTATING ALARM. CARRIER 5 DOWN             
          ON PAD. OTHER CARRIERS UP. 


         
DISPOSITION: LOT WILL BE SENT ON LESS 1 WAFER.           
         
 

CORRECTIVE ACTION: TOOL IS BEING LOOKED AT NOW BY EE.


62.605CMP PEX FOR HIGH INCOMING STEP HEIGHT FOR JL1158SUBPAC::SMARTINMon Mar 17 1997 09:0741
    
  

LOT:     JL1158 

MACHINE: CMP.A1

OPER#:   1984

PROCESS  LEVEL: PMD

DATE:    3/17/97

SHIFT:   A - SHIFT

EVAL TOOL:  PROFILER.A2  

QUANTITY:  24 

PRODUCT. DC1031-003-EA-8P 
 
LOT; JD1108
.
PROBLEM: HIGH INCOMING STEP HEIGHT.

         PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              RUN_ID_1     JL1158               N/A                            
              HEIGHT_ME    WAFER #1 CENTER          4654.000    
                           WAFER #1 EDGE            4605.000   3/17/97 08:23:16
                           WAFER #2 CENTER          4521.000                   
                           WAFER #2 EDGE            4590.000
                                           UCL=4200

         
DISPOSITION:  LOT WILL BE POLISHED ACCORDINGLY DUE TO THE HIGH INCOMING
              STEP HEIGHTS.           
         
 

CORRECTIVE ACTION: NONE REQUIRED.

62.606CMP PEX FOR HIGH INCOMING STEP HEIGHT FOR JL1162SUBPAC::SMARTINMon Mar 17 1997 11:1641
  

LOT:     JL1162 

MACHINE: CMP.A2

OPER#:   1984

PROCESS  LEVEL: PMD

DATE:    3/17/97

SHIFT:   A - SHIFT

EVAL TOOL:  PROFILER.A2  

QUANTITY:  24 

PRODUCT. .DC1071-000-BA-8   
 
 
LOT; JL1162
.
PROBLEM: HIGH INCOMING STEP HEIGHT.
           PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              RUN_ID_1     JL1162               N/A                            
              HEIGHT_ME    WAFER #1 CENTER          4460.000                   
                           WAFER #1 EDGE            4070.000                   
                           WAFER #2 CENTER          4373.000                   
                           WAFER #2 EDGE            4270.000
    
                                           UCL=4200

         
DISPOSITION:  LOT WILL BE POLISHED ACCORDINGLY DUE TO THE HIGH INCOMING
              STEP HEIGHTS.           
         
 

CORRECTIVE ACTION: NONE REQUIRED.

62.607CMP PEX,JL1129 REMARKED FOR EXTRA DEP.SUBPAC::SMARTINMon Mar 17 1997 13:3148
  

LOT:     JL1129

MACHINE: CMP.B2

OPER#:   1992

PROCESS  LEVEL: ILD1

DATE:    3/17/97

SHIFT:   A - SHIFT

QUANTITY:  24

PRODUCT..DC1040-001-FA-8P 

 
LOT; JL1129
.
PROBLEM: 8 wafers were over polished. Lot was turned over from B shift
         for a Final 5.  2 out of 5 readings were below spec.
         Measured lot 100%.


         PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 5633.000                   
                           WAFER #6                 5685.000                   
                           WAFER #13                5379.000                   
                           WAFER #20                5175.000                   
                           WAFER #23                5085.000                   
              THK_RG       NA                       1191.000 



         
DISPOSITION: #1,9,10,18,22,23 were remarked for an extra 500A dep
         #5 and #11 were remarked for an extra 1000A dep.
           
         
 

CORRECTIVE ACTION: #1,9,10,18,22,23 were remarked for an extra 500A dep
         #5 and #11 were remarked for an extra 1000A 
.


62.608CMP PEX,LOT JD1133 4 WAFERS REMARKED FOR EXTRA DEPSUBPAC::SMARTINMon Mar 17 1997 15:0357
  

LOT:     JD1133

MACHINE: CMP.B2

OPER#:   1981

PROCESS  LEVEL: ILD1

DATE:    3/17/97

SHIFT:   A - SHIFT

QUANTITY:  24

PRODUCT..DC1073-000-BA-8G
 

 
LOT; JD1133
.
PROBLEM: 4 wafers were over polished.

            PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 5282.000 
                           WAFER #6                 5847.000   3/17/97 14:45:12
                           WAFER #13                5423.000                   
                           WAFER #20                5581.000                   
                           WAFER #23                4849.000                   
              THK_RG       JD1133                    948.000                   
              THK_SD_5     WAFER #1                    3.920                   
                           WAFER #6                    4.070                   
                           WAFER #13                   5.290                   
                           WAFER #20                   6.420                   
                           WAFER #23                   5.000 


                                        CL=5200-5800


         
DISPOSITION:  Wafer numbers 2,13,14 and 15 were remarked at operation 2130
              for an additional 500 angstroms of dep. 
         
 

CORRECTIVE ACTION: Five send ahead wafers were run for 160 seconds, and a
                   removal rate of 3766 angstroms/per minute was calculated.
                   Based on this removal rate, the entire lot was run for
                   186 seconds and read on the UV-1050, resulting in one
                   wafer recording 4800 angstroms and three wafers recording
                   5000 angstroms.  I suspect that these four wafers had
                   low incoming thickness.
.


62.609CMP PEX,1 WAFER REMARKED FOR EXTRA DEP FOR JD1106SUBPAC::SMARTINTue Mar 18 1997 11:1447
  

LOT:     JD1133

MACHINE: CMP.A1

OPER#:   1979

PROCESS  LEVEL: PMD

DATE:    3/18/97

SHIFT:   A - SHIFT

QUANTITY:  24

PRODUCT..DC1026-003-JB-8G 
 
LOT; JD1106
.
PROBLEM: 1 wafer was over polished at PMD from last night.
                     
               PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 6553.000                   
                           WAFER #2                 6747.000                   
                           WAFER #3                 6687.000                   
                           WAFER #4                 6592.000                   
                           WAFER #5                 6296.000                   
              THK_RG       JD1106                    764.000                   
              THK_SD_5     WAFER #1                    2.620                   
                           WAFER #2                    2.630
                           WAFER #3                    3.130   3/18/97 10:42:45
                           WAFER #4                    2.020                   
                           WAFER #5                    2.480

                                 control limits= 6200-6800
         
DISPOSITION:  Wafer number 3, was remarked for an additional 500 angstroms of
              dep which came out with 6077A
         
 

CORRECTIVE ACTION:. This was carried over from last night. Lot was being
                    100% this morning and it was found to have 1 wafer over
                    polished.


62.610CMP PEX, 8 WAFERS REMARKED FOR EXTRA DEP ON XM1027SUBPAC::SMARTINTue Mar 18 1997 17:3662
  

LOT:     XM1027

MACHINE: CMP.B2

OPER#:   1979

PROCESS  LEVEL: ILD1

DATE:    3/18/97

SHIFT:   A - SHIFT

QUANTITY:  24

PRODUCT.TM0069-025-CA-8C 
 
 
LOT; XM1027
.
PROBLEM: 8 wafer was over polished at ILD1.  8 wafers were below spec on
         initial run. ?????????.

              
                    PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 4873.000                   
                           WAFER #2                 5443.000                   
                           WAFER #3                 5792.000                   
                           WAFER #4                 4680.000                   
                           WAFER #5                 5767.000                   
              THK_RG       NA                       1644.000                   
              THK_SD_5     WAFER #1                   11.200 
                           WAFER #2                   11.100   3/18/97 16:42:57
                           WAFER #3                    7.310                   
                           WAFER #4                   12.900                   
                           WAFER #5                   11.000 


                         CL =  5200-5800A

                     PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              RATE_TM69                             4102.000                   
              TIME_TM69                              160.000 
       
                       
DISPOSITION: SA's were polished for 160 secs. and ranged from 7505-8684. 
             Calculated removel rate = 4102 based on the lowest wafer.
             TUP'd 5 SA's @12 secs. and lot @189 secs. After polish, SA's
             ranged from 5571-7502 and lot ranged from 4680-7285.
             8 wafers were below spec on initial run, 8 wafers in spec,
             and 8 wafers needed touch up.





CORRECTIVE ACTION: Remarked wafer #'s 9,11,13,14,15
            ,      20,21, and 24 for an extra 500A dep at operation 2130.
                   Pad was changed after this run.


62.611JL1160 overpolishSUBPAC::KULPSun Mar 23 1997 04:5839
                              CMP PEX
 
LOT #:             JL1160  	PRODUCT...DC1040-001-FA-8P  

QUANTITY:          24-1 = 23

OPERATION #        1992 CMP_ILD1
  
POLISHER:          CMP.B1

EVAL TOOL:         Thickness.A4

DATE:              B shift   03/22/97    

PROBLEM:           Several wafers over polish, 1 wafer scrap.
		   Left over from C shift, 100 % on B shift.	

DISPOSITION:       1 wafer scraped, below 3400�, remark low wafers for extra
		   dep.

	      LOG AN EVENT EVENT THK_ILD1_PST FOR ENTITY CMP.B1            
              PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME_5     WAFER #1                 5690.000
LOG AN EVENT               WAFER #2                 5122.000   3/22/97 23:36:15
                           WAFER #3                 5926.000
                           WAFER #4                 5051.000
                           WAFER #5                 5836.000
              THK_RG       JL1160                   1343.000
              THK_SD_5     WAFER #1                    8.800
                           WAFER #2                    9.600
                           WAFER #3                    4.400
                           WAFER #4                    5.800
                           WAFER #5                    3.600

CORRECTIVE ACTION: Wafer#'s 01,02,13,14,24 need 500�, and wafer#15 needs 1000�.
		   It seems from the passdown that the lot was processed at 160
		   sec. instead of 150 sec. which is spec'ed.  Op's tech should
		   follow spec. for initial run times.     

62.612jl1128 overpolishSUBPAC::KULPSun Mar 23 1997 04:5837
                              CMP PEX
 
LOT #:             JL1128    PRODUCT...DC1040-001-FA-8P   

QUANTITY:          24

OPERATION #        1994 CMP_ILD2 
  
POLISHER:          CMP.B2

EVAL TOOL:         Thickness.A4

DATE:              B shift   03/22/97    

PROBLEM:           Several wafers over polish, 
		   Left over from C shift, 100 % on B shift.	

DISPOSITION:       Remark low wafers for extra dep.

              THK_ME_5     WAFER #1                 5296.000
                           WAFER #2                 5840.000
 LOG AN EVENT              WAFER #3                 5291.000   3/22/97 23:39:58
                           WAFER #4                 5624.000
                           WAFER #5                 5729.000
              THK_RG       JL1128                   1294.000
              THK_SD_5     WAFER #1                   10.100
                           WAFER #2                    6.100
                           WAFER #3                    7.900
                           WAFER #4                    8.800
                           WAFER #5                    8.100

CORRECTIVE ACTION: Add 500� to wafer#'s 3,5,7,10,11,12,16,20,22,23,24 at
		   operation # 2172.  It seems from the passdown that the lot 
		   was processed at 190 sec. instead of 150 sec. which is 
		   spec'ed.  Op's tech should follow spec. for initial run 
		   times.     

62.613CMP PEX,SLIGHTLY LOW THICKNESS FOR JD1105 @ILD1SUBPAC::SMARTINMon Mar 24 1997 13:2947
  

LOT:     JD1105

MACHINE: CMP.B2

OPER#:   1982

PROCESS  LEVEL: ILD1

DATE:    3/24/97

SHIFT:   A - SHIFT

QUANTITY:  24

PRODUCT. DC1026-003-JB-8G
 
 
LOT; JD1105
.
PROBLEM: Lot had slightly low thickness after polish.  Lot came in at
         5196A and the LCL=5200

          PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 5161.000                   
                           WAFER #2                 5434.000                   
                           WAFER #3                 5121.000
                           WAFER #4                 5137.000   3/24/97 12:00:39
                           WAFER #5                 5127.000                   
              THK_RG       NA                            N/A                   
              THK_SD_5     WAFER #1                    3.400                   
                           WAFER #2                    5.500                   
                           WAFER #3                    6.300                   
                           WAFER #4                    5.400                   
                           WAFER #5                    5.500 

                                        LCL=5200                                                
                       
DISPOSITION: Lot was remarked and moved on.  Lot is too close to the lower
             control limit to do a redep of 500A, this would bring it too
             close to the upper control limit.



CORRECTIVE ACTION: Lot was polished to spec. no further action required.

62.614CMP PEX,LOW INCOMING STEP HEIGHT FOR JL1210SUBPAC::SMARTINMon Mar 24 1997 13:4442
  

LOT:     JL1210

MACHINE: CMP.B1

OPER#:   1984

PROCESS  LEVEL: PMD

DATE:    3/24/97

SHIFT:   A - SHIFT

QUANTITY:  24

PRODUCT. .DC1040-001-FA-8P

 
LOT; JL1210
.
PROBLEM: Lot had LOW incoming step height.

       PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              RUN_ID_1     NA                   JL1210                         
              HEIGHT_ME    WAFER #1 CENTER          2987.000  
                           WAFER #1 EDGE            2845.000   3/24/97 10:12:15
                           WAFER #2 CENTER          2955.000                   
                           WAFER #2 EDGE            3034.000 
       
                                        LCL=3000
                       
DISPOSITION: Lot polish time will be adjusted accordingly for the LOW
             incoming step height.




CORRECTIVE ACTION: Lot polish time will be adjusted accordingly for the LOW
                   incoming step height.


62.615CMP PEX, 10 WAFERS SCRAPPED DUE TO OVER POLISH ON JD1108SUBPAC::SMARTINMon Mar 24 1997 16:48157
  

LOT:     JD1108

MACHINE: CMP.B3

OPER#:   1981

PROCESS  LEVEL: ILD1

DATE:    3/24/97

SHIFT:   A - SHIFT

QUANTITY:  23 DOWN TO 13

PRODUCT. DC1026-003-JB-8G  
 
 LOT; JD1108
.
PROBLEM: 10 Wafers were scrapped due to over polish. 2 wafers remarked
         for extra dep

This lot was started on a shift 3/23/97
Ran Send aheads for 160 sec, resulted: 6884 t0 8337 or a avg removal of 
4105/min. Ran rest of lot for 176 sec and touched up send aheads at 2 sec.
we then 100% measured the lot and passed that info to the on coming shift:

Time:  Send ahead tup: 2 sec, rest of lot: 176 sec with reduced time in last
        run for the spacer wafer. time based upon send ahead data above.

1-5118 send ahead tup
2-6188 send ahead tup
3-5948 send ahead tup
4-6492 send ahead tup
5-6113 send ahead tup
6-7213 initial polish
7-6832 initial polish
8-7235 initial polish
9-6779 initial polish
10-7481 initial polish
11-6364 initial polish
12-7019 initial polish
13-6257 initial polish
14-7174 initial polish
15-6646 initial polish
16-7623 initial polish
17-7715 initial polish
18-7424 initial polish
19-7081 initial polish
20-7283 initial polish
21-6890 initial polish
22-6919 initial polish
23-6952 initial polish

This is how we left the lot after 100% thickness measurment on thick.a5
the order of the wafers were untouched. Again we passed this info onto
the next shift and from what I was told this is what they did:

1-5118 not touched.
2-6188 group A
3-5948 group A
4-6492 group B        Where,
5-6113 group A          group a= TUP 200
6-7213 group C          group b= 1 Sec TUP
7-6832 group B          group c= 1 Sec TUP
8-7235 group C          group d= 2 Sec TUP
9-6779 group B          group e= 1 Sec TUP??  according to there data I cannot
10-7481 group D                               find if it was ever used and what
11-6364 group A                               for.
12-7019 group C
13-6257 group A         This is the data they sent via. Zaurus to Zaurus xfer.
14-7174 group D
15-6646 group B
16-7623 group D
17-7715 group D
18-7424 group D
19-7081 group D
20-7283 group D
21-6890 group B
22-6919 group B
23-6952 group C

Resulted:
according to there data, From what they said the lot was Final sorted so slot
# matches wafer # and this is there after TUP data:

1-5712
2-6269
3-3383
4-3150
5-2841
6-6068
7-5055
8-5700
9-6282
10-3012
11-5977
12-2813
13-5396
14-2997
15-5451
16-5996
17-3656
18-3029
19- na
20-3140
21-3921
22-2516
23-5693
24-2884

Anything below 3400 gets scrapped out according to spec.

I guess from there they put the lot aside for us to do.

Sooooo...

1. We Reread a sample wafer (wafer 3) 3 times using 2 different thickness tools
to confirm the over polished wafers.

2.We then continued to touch up the wafers 9,2 used tup 325,
  6,16 and 11 used a tup 225.

3. results were:
    9-5686,2-5719
    6-5781,16-5841,11-5745

4. remarked the 2 wafers that will need extra dep.

5. final 100% data now will look like this:


1-5712
2-5719
6-5781
7-5055
8-5700
9-5686
11-5745
13-5396
15-5451
16-5841
17-3656
21-3921
23-5693


                                                
                       
DISPOSITION: Lot was remarked for extra dep on 2 wafers and 10 wafers were
             scrapped out.


CORRECTIVE ACTION:  No data capture to actually tell what times were used for
                    the touch up.

62.616CMP PEX,JD1136 Leftover lot from B-shift 3 wafers overpolished.SUBPAC::SMARTINMon Mar 24 1997 17:0051
  

LOT:     JD1136

MACHINE: CMP.B2

OPER#:   1981

PROCESS  LEVEL: ILD1

DATE:    3/24/97

SHIFT:   A - SHIFT

QUANTITY:  24

PRODUCT. DC1035-000-SC-8T 
 
LOT; JD1136
.
PROBLEM:  Leftover lot from B-shift 3 wafers overpolished.

              
               PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 5281.000                   
                           WAFER #2                 5824.000                   
                           WAFER #3                 5466.000                   
                           WAFER #4                 5757.000                   
                           WAFER #5                 5857.000                   
              THK_RG       JD1136                   2755.000 
              THK_SD_5     WAFER #1                   11.800   3/24/97 16:14:56
                           WAFER #2                   10.300                   
                           WAFER #3                   14.400                   
                           WAFER #4                   18.300                   
                           WAFER #5                   12.000


                         CL =  5200-5800A

                      
                       
DISPOSITION: 3 wafers #10,12,4 need an additional 500 angstroms @ OPER 2130.
             I remarked the polish and Dep operation and the lot was moved on.





CORRECTIVE ACTION:  3 wafers #10,12,4 need an additional 500 angstroms


62.617JD1181 HIGH SD OUTGOING @PMDYIELD::PHESTERFri Mar 28 1997 11:1641
                            	CMP PEX 
                     

LOT #          JD1181

QUANTITY:      24

OPERATION #    1978 CMP_PMD
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     THICKNESS.A5

DATE:          03/28/96  C-Shift

PROBLEM:       HIGH OUTGOING SD @PMD

 LOG AN EVENT THK_SD_5     WAFER #1                    4.200   3/28/97 09:39:22
                           WAFER #2                    4.900
                           WAFER #3                    9.900
                           WAFER #4                    4.800
                           WAFER #5                    3.100
              THK_ME_5     WAFER #1                 6567.000
                           WAFER #2                 6542.000
                           WAFER #3                 6001.000
                           WAFER #4                 6297.000
                           WAFER #5                 6784.000
              THK_RG       JD1181                   2017.000        

DISPOSITION:   CLOSED ANNOTATION # 8173.   LOT MOVED TO CAP.


CORRECTIVE
ACTION         CHECKED POINTS AND READINGS ALL HAD ACCEPTABLE GOF.  ONE SITE
               (THE THINNEST) WAS SLIGHTLY HIGHER.  RE-READ THIS WAFER AND
               CHECKED THREE ADDITIONAL SITES AROUND THE ONE ORIGINALLY READ AND
               IT APPEARS THAT THIS PARTICULAR WAFER (SLOT 13) WAS POLISHED A 
               A BIT EDGE HEAVY.  THE PAD IS OK AND MQCS WERE DONE ON THE TOOL
               AFTER THIS LOT AND WERE GOOD.
62.618JL1221 - 2 wafers slightly overpolished @ILD1STRATA::POZORSKISun Mar 30 1997 16:0145
                                   CMP PEX

LOT:     JL1221

MACHINE: CMP.B3

OPER#:   1992

PROCESS  LEVEL: CMP_ILD1 

DATE:    3/30/97

SHIFT:   A - SHIFT

QUANTITY: 24

PRODUCT....DC1040-001-FA-8P 

LOT: JL1221

PROBLEM: Two wafers was over polished at ILD1, the lot was polished on B-Shift
         and we had to finish up reading the final 5 and that is when it was
         discovered that there were 2 wafers slightly overpolished.
         No reason as to why these 2 wafer got over polished will have to talk
         to B-Shift.

	 Wafer #6 came out at 4918
         Wafer #15 came out at 5142
         (LCL = 5200�)


              THK_ME_5     WAFER #1                 5779.000
                           WAFER #2                 5743.000
                           WAFER #3                 5580.000
                           WAFER #4                 4918.000 (#6)*
                           WAFER #5                 5695.000
              THK_RG       JL1221                   3046.000

                              
DISPOSITION: Lot was remarked at 2166 DEP_ILD1 3 for an additional dep on these
             2 wafers.  Both wafers will get an additional dep of 500�.
                    
  
CORRECTIVE   Lot was remarked for extra dep on the 2 wafers and moved on.
ACTION:      NOTE - The rest of the lot came out good.
62.619CMP.B3 CRASH ON YD0241, 1 PRODUCT WAFER IS HISTORY.SUBPAC::SMARTINTue Apr 01 1997 19:5954
  

LOT:     YD0241

MACHINE: CMP.B3

OPER#:   1989

PROCESS  LEVEL: ILD3

DATE:    4/1/97

SHIFT:   A - SHIFT

QUANTITY:  12 DOWN TO 11

PRODUCT. DC1018-010-AB-0D   
 
LOT; YD0241
.
PROBLEM: CMP.B3 CRASHED TAKING OUT 1 DUMMY WAFER AND 1 PRODUCT WAFER.

 1) System _cmp.b3__________
 2) Recipe _tup b_____
 3) Step # _5___
 4) Time into step __1___
 5) Type of wafers that broke _1 dummy that took out 1 product total of 2.
 6) Carrier which wafer slid out of __3___
 7) Other carriers that were damaged __2_____
 8) Alarms displayed by polisher ____wafer loss detected sending carriers up.__
                                 ______________________________________________
                                 ______________________________________________
 9) Did any other polisher error for slurry or crash no__, systems____________
10) Did wafer detect work _yes__
11) # of wafers on pad _900__
12) # of wafers on carrier 178___
13) Was there any vibration prior to the crash _yes__
14) Was there plenty of slurry (for step 1-5) or water (step 6-9) present on
    the table ___yes___
15) Check step hight of the carrier from question #6 _carrier toated
16) Please note any other unusual circumstances:  none


                      
                       
DISPOSITION: LOT WILL BE MOVED ON LESS 1 WAFER.




CORRECTIVE ACTION: EE WILL BE DOING AN ALIGNMENT AND THEN THE PAD WILL BE
                   CHANGED AND THE TWO CARRIERS THAT WERE AFFECTED BY THE
                   CRASH will be changed also.

62.620JD1176 TWO WAFERS SCRAPPED DUE TO CRASH ON .B1YIELD::PHESTERThu Apr 03 1997 14:4026
                            	CMP PEX 
                     

LOT #          JD1176

QUANTITY:      21

OPERATION #    
/DESCR.        1981 CMP_ILD1

POLISHER:      CMP.B1

EVAL TOOL:     N/A

DATE:          04/03/96  C-SHIFT

PROBLEM:       TWO WAFERS SCRAPPED DUE TO CRASH ON TOOL.

DISPOSITION:   CRASH OCCURRED DURING TOUCH-UP.  LOT FINISHED AND CRASH REPORT
               WRITTEN AND POSTED IN CMP NOTE #34.

CORRECTIVE
ACTION         EE CHECKED TOOL AND FOUND NO OBVIOUS CAUSE.  PROBLEM WAS A 
               SLIDE-OUT ON CARRIER 4.  RECIPE CHECKED AND WAS OK.  NO LOADING
               PROBLEMS.  TOOL CLEANED AND GIVEN BACK TO PRODUCTION.
62.621YFABSIX::B_NEWELLSat Apr 05 1997 12:2829

 SPEEDFAM WAFER CRASH FORM (to be filled out by MFG + EEG + PSS, together)

 1) System __CMP.B1____
 2) Recipe __BREAK INS
 3) Step # __3___
 4) Time into step __3 OUT OF 13 SECONDS____
 5) Type of wafers that broke __1 BREAK IN DUMMY
 6) Carrier which wafer slid out of __3
 7) Other carriers that were damaged __3 & 2
 8) Alarms displayed by polisher ___ALL CARRIERS NOT ROTATING 
                                    FOLLOWED BY NO VACUUM
 9) Did any other polisher error for slurry or crash _NO__, sysytems____________
10) Did wafer detect work _YES_
11) # of wafers on pad _NA
12) # of wafers on carrier 81
13) Was there any vibration prior to the crash __NO____
14) Was there plenty of slurry (for step 1-5) or water (step 6-9) present on
    
    the table ____YES_____
15) Check step height of the carrier from question #6 __
16) Please note any other unusual circumstances:
    



17) Put this check sheet in CMP note #34

62.622JD1311 one wafer broken on CMP-SCRUB.A1YIELD::MANDREOLISun Apr 06 1997 07:2423
                            PE PEX NOTIFICATION
                     

LOT #          JD1311 (DC1073)  HOT LOT
                                 
QUANTITY:      24 - 1 = 23

OPERATION #    1978 CMP AFTER PMD DEP1 (ACTUALLY 1979 CMP_SCRUB) 
/DESCR.        

POLISHER:      N/A     

EVAL TOOL:     N/A  

DATE:          04/06/97 B-shift

PROBLEM:       One wafer (#01) was broken when it fell off of the Spin dry 
               station on CMP-SCRUB.A1. 

DISPOSITION:   Wafer# 01 is scrapped due to breakage. 
                                          
CORRECTIVE     
ACTION:        none. 
62.623CMP.B2 - Scrapped 2 wafers due to a crashSTRATA::POZORSKISun Apr 06 1997 12:3663
                            CMP PEX NOTIFICATION
                     

LOT #          JL1153

DEVICE         DC1064-004-CA-8P 
                                 
QUANTITY:      19 - 2 = 17

OPERATION #    1994 CMP_ILD2    CMP  
/DESCR.        

POLISHER:      CMP.B2 

EVAL TOOL:     N/A  

DATE:          04/06/97 A-shift

PROBLEM:       Two wafers (#3 & #11) scrapped due to the crash on CMP.B2. 

DISPOSITION:   The tool was 4 seconds into step #3 when the tool had an alarm
               for carrier #3 not rotating.  The product wafer from carrier #3
               slid out and ended up crashing into carrier #2 which also had a
               product wafer in it.  Both of these carrier ring were severely
               damaged due to this crash.
                                          
CORRECTIVE     EE went in and found carrier #3 to have 4 screws missing from
ACTION:        the extension ring.  The tool went down for a pad & carrier
               change.  The lot will be moved on with 2 less wafers in it and
               a crash report has been written and it was posted in the CMP
               NOTE #34.


================================================================================
Note 32.35                   CMP.B WAFER CRASH FORM                     35 of 35
SUBPAC::LANDRY                                       26 lines   6-APR-1997 09:41
                               -< CMP.B1 Crash >-
--------------------------------------------------------------------------------

 SPEEDFAM WAFER CRASH FORM (to be filled out by MFG + EEG + PSS, together)

 1) System:  CMP.B1
 2) Recipe:  ILD2
 3) Step #:  3
 4) Time into step:  4 seconds
 5) Type of wafers that broke:  Product
 6) Carrier which wafer slid out of:  #3
 7) Other carriers that were damaged: #2
 8) Alarms displayed by polisher:  "carrier #3 not rotating"
 9) Did any other polisher error for slurry or crash:  NO  systems:  N/A
10) Did wafer detect work:  YES
11) # of wafers on pad:  210
12) # of wafers on carrier:  42
13) Was there any vibration prior to the crash:  NO
14) Was there plenty of slurry (for step 1-5) or water (step 6-9) present on
    the table:  YES
15) Check step height of the carrier from question #6:  carrier ring too 
                                                        severely damaged
16) Please note any other unusual circumstances:  Found carrier #3 to have
                                                  four screws missing from the 
                                                  extension ring.  

17) Put this check sheet in CMP note:  Done
62.624JD1178 - 3 wafers overpolished STRATA::POZORSKIMon Apr 07 1997 15:5625
                              CMP PEX 

LOT #:             JD1178

QUANTITY:          24

OPERATION #        1985 CMP_ILD2     CMP 
  
POLISHER:          CMP.B1

EVAL TOOL:         N/A

DATE:              B shift/A-Shift   04/07/97 

PROBLEM:           3 wafer were over polished by 500�.

                   Wafer #4  = 5061      
                   Wafer #7  = 4983    (LCL = 5200�)
                   Wafer #21 = 5062

DISPOSITION:       This lot was polished on B-Shift and A-Shift discoved
                   the 3 wafers by doing 100%  Lot was remarked and moved on.

CORRECTIVE         The lot was remarked for extra dep and moved on. 
ACTION:            
62.625CMP.A2 - 3 wafers scrapped due to crash.STRATA::POZORSKIMon Apr 07 1997 18:1326
                            	CMP PEX 
                     

LOT #          JL1269

QUANTITY:      24 - 3 = 21

OPERATION #    1984 CMP_L_PMD   CMP 
/DESCR.        

POLISHER:      CMP.A2

EVAL TOOL:     N/A

DATE:          04/07/96  A-SHIFT

PROBLEM:       THREE WAFERS SCRAPPED DUE TO CRASH ON TOOL.

DISPOSITION:   CRASH OCCURRED WHEN THE WAFERS WERE BEING UNLOADED INTO THE
               CASSETTE.
               
CORRECTIVE     EE LOOKED AT THE AND FOUND THE STEP HEIGHT FOR THE ELEVATOR 
ACTION         TO THE ROBOT WAS OFF SO, THEY WENT IN AND ADJUSTED THE LEFT
               ELEVATOR.  THE LOT WAS MOVED ON WITH 3 LESS WAFERS IN IT AND
               A CRASH REPORT WAS WRITTEN AND FILED IN THE CMP NOTESFILE.
               
62.626JD1237 - 5 wafers overpolished @ILD1STRATA::POZORSKIMon Apr 07 1997 18:2229
                              CMP PEX 

LOT #:             JD1237

QUANTITY:          24

OPERATION #        1981 CMP_ILD1     CMP 
  
POLISHER:          CMP.B3

EVAL TOOL:         N/A

DATE:              B shift/A-Shift   04/07/97 

PROBLEM:           5 wafer were over polished on .B3.  

DISPOSITION:       These wafers were the last two touch-up runs from B-shift.
                   A-Shift discoved these wafers by doing 100%.  The lot was
                   remarked and moved on.

                          THK     Additional oxide needed
                   # 23   5033          500 Angstroms
                   # 22   4930          500     "
                   #  9   4831          500     "
                   # 15   4837          500     "
                   # 24   4754          1000    "

CORRECTIVE         The lot was remarked for extra dep and moved on. 
ACTION:            
62.627XD1109 - 3 wafers Broken on CMP.B3STRATA::POZORSKITue Apr 08 1997 20:3325
                            CMP PEX NOTIFICATION
                     

LOT #          XD1109 
                                 
QUANTITY:      23 - 3 = 20

OPERATION #    1989 CMP AFTER ILD3
/DESCR.        

POLISHER:      CMP.B3  

EVAL TOOL:     NA 

DATE:          04/08/97 A-Shift

PROBLEM:       Three wafers were broken while mapping the input cassette.
               EE went in and homed the tool and after that it seems to be 
               working good now.  Maybe it just lost its mind or it was just
               tired from working so hard.

DISPOSITION:   Lot moved on with count minus 3. 

CORRECTIVE     Cleaned up broken wafer pieces, the other wafers from this lot 
ACTION:        were not damaged so, the lot was moved on.
62.628JD1108 - High STD & RangeSTRATA::POZORSKIWed Apr 09 1997 20:1534
                                  CMP PEX 

LOT #:             JD1108

QUANTITY:          23

OPERATION #        1985 CMP_ILD3 
  
POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A4

DATE:              A shift   04/09/97 

PROBLEM:           Slightly high range on the THK_SD_5 was high at 17.3 (UCL=16)
                   and also the THK_RG was high at 5625 (UCL = 4500)
                   
 THK_ILD3_PST PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
              THK_ME_5     WAFER #1                10358.000
                           WAFER #2                10345.000
                           WAFER #3                10137.000
                           WAFER #4                      N/A
                           WAFER #5                      N/A
              THK_RG       JD1108                   5625.000
              THK_SD_5     WAFER #1                   19.700
                           WAFER #2                   14.600
                           WAFER #3                   17.800
                           WAFER #4                      N/A
                           WAFER #5                      N/A 

DISPOSITION: Lot was remarked and moved on, there was no prior splits done to
             this lot.
         
CORRECTIVE   The tool wen down for a pad change and the lot was moved.
62.6294 wafers overpolished YIELD::SHONGFri Apr 11 1997 05:0243
                            PE PEX NOTIFICATION
                     

LOT #          	JD1175

QUANTITY:      	24

OPERATION #    	1985 CMP AFTER ILD2
/DESCR.        

POLISHER:      	CMP.B1

EVAL TOOL:     	THICKNESS.A4

DATE:          	04/11/97 D-Shift

PROBLEM:    	Four wafers from this lot were scrapped at this operation. The 
		lot was ran with lot JL1229. They were both at the same oper-
		ation. The last 4 wafers in each lot were overpolished. The 
		remaining thickness average for the four wafers was ~1700�. 
		Metal was exposed on the edges and in the center. 

		Both sets of wafers were ran with a monitor. The operator 
		calculated the removal rate to be 250 seconds. The rest of the
		lot was fine ~6000�. These eight wafers were grossly over-
		polished.  	

		I checked the thickness machine for this lot in films. The
                incoming thickness was fine for the wafer that was in slot
                23(wafer #15). Slot # 23 is a standard slot checked for
                thickness. The wafers hadn't been moved in CMP so they should
                have correlated.
					
DISPOSITION:  	I had the operator do MQC's on the tool. Removal rate and Std.
		Dev were fine. Nothing to explain this problem. I question the 
		operator in regards to the possibility of the wafers being his
		send aheads. But if that was the case there would be a 5th 
		wafer. 

CORRECTIVE     	I told the operator on the next run to reduce the polish time 
ACTION:        	on the four wafers that are being ran with the monitor. I want
		to monitor the removal rate for the four wafers with the oxide
		monitor. 
62.6304 wafers overpolished. YIELD::SHONGFri Apr 11 1997 05:0237
                            PE PEX NOTIFICATION
                     

LOT #          	JL1229

QUANTITY:      	24

OPERATION #    	1994 CMP AFTER ILD2
/DESCR.        

POLISHER:      	CMP.B1

EVAL TOOL:     	THICKNESS.A4

DATE:          	04/11/97 D-Shift

PROBLEM:    	Four wafers from this lot were scrapped at this operation. The 
		lot was ran with lot JD1175. They were both at the same level
		(ILD2). The last 4 wafers in each lot were overpolished. The 
		remaining thickness average for the four wafers was ~1700� to
		1800�. Metal was exposed on the edges and in the center. 

		Both sets of wafers were ran with a monitor. The operator 
		calculated the removal rate to be 250 seconds. The rest of the
		lot was fine ~6000�. These eight wafers were grossly over-
		polished.  	

DISPOSITION:  	I had the operator do MQC's on the tool. Removal rate and Std.
		Dev were fine. Nothing to explain this problem. I question the 
		operator in regards to the possibility of the wafers being his
		send aheads. But if that was the case there would be a 5th 
		wafer. 

CORRECTIVE     	I told the operator on the next run to reduce the polish time 
ACTION:        	on the four wafers that are being ran with the monitor. I want
		to monitor the removal rate for the four wafers with the oxide
		monitor. 
62.6311 wafer overpolished. YIELD::SHONGFri Apr 11 1997 05:1227
                            PE PEX NOTIFICATION
                     

LOT #          	JL1347

QUANTITY:      	24

OPERATION #    	1984 CMP AFTER PMD DEP1 - LIGHT
/DESCR.        

POLISHER:      	CMP.A1

EVAL TOOL:     	THICKNESS.A4

DATE:          	04/11/97 D-Shift

PROBLEM:    	Wafer # 2 was overpolished at this operation. Thickness reading
		was real low <1000�. The oxide on the edge of the wafers was
		polished down to the sic. The wafer was processed in the center
		of the lot. The remaining 23 wafers were fine. The entire lot 
		was ran for 120 seconds. 

DISPOSITION:  	I believe the wafer came into the area with a problem. It will 
		be scrapped out when the lot moves on. 

CORRECTIVE     	None. 
ACTION:        	
62.632XB0782 2 wafers broken in automobile crashYIELD::MANDREOLISun Apr 13 1997 07:1425
                            PE PEX NOTIFICATION
                     

LOT #          XB0782 (TM0069) 
                                 
QUANTITY:      24 - 2 = 22

OPERATION #    1989 CMP AFTER ILD3
/DESCR.        

POLISHER:      CMP.B4     

EVAL TOOL:     N/A  

DATE:          04/12/97 C-SHIFT

PROBLEM:       Crash, product wafer slipped out of Carrier #4 and resulted in 
               the product wafer on Carrier #3 breaking. Two wafers scrapped.  

DISPOSITION:   This crash occurred at the shift change. EE changed all the
               carriers and the Pad was also changed of course. 
                                          
CORRECTIVE     
ACTION:        Lot has been moved over to CMP.B2, running more send aheads and
               the remainder of the lot will be polished there. 
62.633JL1270 - HIGH RANGE FOR THE STD DEV @ILD1STRATA::POZORSKISun Apr 13 1997 12:5638
                            CMP PEX NOTIFICATION
                     

LOT #          JL1270

QUANTITY:      24

OPERATION #    1992  MSP_ILD1    CMP_MSP 
/DESCR.

POLISHER:      CMP.B2

EVAL TOOL:     THICKNESS.A4

DATE:          04/13/97  B-Shift

PROBLEM:       OUT OF SPEC FOR THE RANGE ON THE STD DEV AT THIS OPERATION.

               RANGE WAS 16.8   UCL FOR RANGE IS 13 

THK_ILD1_PST PARM SET ID.....THICK13       VERSION....2       4/13/97 01:49:56
             PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
             THK_ME_5     WAFER #1                 5543.000
                          WAFER #2                 5790.000
                          WAFER #3                 5913.000
                          WAFER #4                 5611.000
                          WAFER #5                 5531.000
             THK_RG       JL1270                   2812.000
             THK_SD_5     WAFER #1                    8.500
                          WAFER #2                   20.600
                          WAFER #3                    3.800
                          WAFER #4                   10.200   4/13/97 01:49:56
                          WAFER #5                   17.500

DISPOSITION:   LOT MOVED ON.
               
CORRECTIVE     THE TOOL WENT DOWN FOR MQC, AND THE LOT WAS MOVED ON.
ACTION         
62.634JD1230 12 wafers overpolished after ILD2YIELD::MANDREOLIMon Apr 14 1997 08:3334
                            PE PEX NOTIFICATION
                     

LOT #          JD1230 (DC1026)  
                                 
QUANTITY:      24 

OPERATION #    1985 CMP_ILD2 
/DESCR.        

POLISHER:      CMP.B1      

EVAL TOOL:     THICKNESS.A4  

DATE:          04/13/97 B-SHIFT

PROBLEM:       12 wafers are overpolished, they were all part of a split at 
               this operation, (2xHDP). The Polish time was mis-calculated. 

               Here are the wafer#s and their final thickness results; 

        1-5755 2-5690 3-4090 4-4638 5-5513 6-5508 7-4058 8-4473 9-5667 10-5667

        11-4136 12-4342 13-5143 14-5567 15-4755 16-4883 17-5635 18-5398 19-4256

        20-4103 21-5716 22-6323 23-4039 24-4738


DISPOSITION: The lot is on HOLD for Eric B at Oper# 3066 per REMARK. Needs to
             have extensive measurements taken after the polish. 
                                          
CORRECTIVE           
ACTION:      HOLDing for Engineering. We have not REMARKed the lot to get extra
             dep at the cap step 2133 yet. 
62.635NIT.A2 PEX REPORT FOR HIGH/TOTAL PARTICLES CENTERFABSIX::S_AGUILATue Apr 15 1997 07:4128

                                  NITRIDE PEX

RECIPE:  SPACER

FURNACE:  NIT-TUBE.A2 

PROCESS DATE: 04/15/97 B SHIFT

LOT_POSITION               TOP                  JD1460
                           T CENTER             N/A
                           B CENTER             N/A
                           BOTTOM               N/A
                                               
                                                         
PROBLEM:   HIGH LARGE AND TOTAL PARTICLES ON THE CENTER

  UPP_LG_TCB               TOP                        21.000
                           CENTER                    105.000    HS
                           BOTTOM                     41.000
              UPP_TO_TCB   TOP                        72.000
                           CENTER                    739.000    HS
                           BOTTOM                    245.000
CORRECTIVE 
ACTION:      DECTREE WAS RUN. REMARKED THE LOT AT OPERATION 2767. ONE MORE LOT
             IS BEING RUN ON THE TOP ZONE XB1503. AFTER THIS RUN IS OVER THE 
             SYSTEM IS DUE FOR DUMMY CHANGE
62.636CMP PEX, 2 WAFERS REMARKED FOR EXTRA DEP ON XD1168.SUBPAC::SMARTINTue Apr 15 1997 14:3339
  

LOT:     XD1168

MACHINE: CMP.B2

OPER#:   1989

PROCESS  LEVEL: ILD3

DATE:    4/15/97

SHIFT:   A - SHIFT

QUANTITY:  24

PRODUCT. TM0069-932-BA-8C 
 
LOT; XD1168
.
PROBLEM:  Two wafers were overpolished on lot #XD1168.


                      
                       
DISPOSITION: These wafers were polished on CMP.B2.  Wafer #'s 3 and 17 were
             remarked at operation 2136 for an additional 1,000 angstroms
             of dep.  Wafer #3 came in at 8490 and wafer #17 came in at 9155.
             These wafers were run on a touchup recipe at the end of the run
             and the rest of the wafers in that group came out fine.
             I suspect these wafers were mavericks that ran away from the
             group.




CORRECTIVE ACTION: Wafer #'s 3 and 17 were remarked at operation 2136 for
                   an additional 1,000 angstroms of dep.

62.637CMP PEX FOR HIGH S/D AND HIGH RANGE FOR JD1233SUBPAC::SMARTINTue Apr 15 1997 17:2038
                                  CMP PEX 

LOT #:             JD1233

QUANTITY:          24

OPERATION #        1985 CMP_ILD2
  
POLISHER:          CMP.B3

EVAL TOOL:         THICKNESS.A4

DATE:              A shift   04/15/97 

PROBLEM:           Slightly high range on the THK_SD_5 was high at 18.2 (UCL=18)
                   and also the THK_RG was high at 4051 (UCL = 3400)
                   
 THK_ILD2_PST PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
             THK_ME_5     WAFER #1                 5235.000                   
                           WAFER #2                 5241.000                   
                           WAFER #3                 5680.000                   
                           WAFER #4                 5623.000                   
                           WAFER #5                 5563.000                   
              THK_RG       JD1233                   4051.000  
         


             THK_SD_5     WAFER #1                   28.900   4/15/97 15:33:45
                           WAFER #2                   25.400                   
                           WAFER #3                   12.400                   
                           WAFER #4                    8.820                   
                           WAFER #5                   15.700

DISPOSITION: Lot was remarked and moved on, there was no prior splits done to
             this lot.
         
CORRECTIVE   The tool went down for a pad change after this lot was ran.

62.638CMP PEX, 1 WAFER BROKE DURING LIFT OFF ON JL1271SUBPAC::SMARTINTue Apr 15 1997 20:0433
  

LOT:     JL1271

MACHINE: CMP.B2

OPER#:   1994

PROCESS  LEVEL: ILD2

DATE:    4/15/97

SHIFT:   A - SHIFT

QUANTITY:  24 DOWN TO 23

PRODUCT. .DC1031-003-EA-8P
 
LOT; JL1271
.
PROBLEM: CMP.B2 CRASHED ON LIFTOFF. TAKING OUT  1 PRODUCT WAFER.
         THE WAFER BROKE IN THE TUB.
                      
                       
DISPOSITION: LOT WILL BE MOVED ON LESS 1 WAFER.




CORRECTIVE ACTION: EE CHECKED THE ALIGNMENT AND THE PAD AND ALSO CHECKED
                   THEW CARRIERS AND FOUND NOTHING WRONG WITH THE SYSTEM.
                   SYSTEM IS BACK OVER TO PRODUCTION SHORTLY.  EE IS NOT
                   QUITE SURE WHY IT DROPPED A WAFER.
62.639CMP PEX, 1 WAFER OVER POLISHED ON JL1163SUBPAC::SMARTINTue Apr 15 1997 20:4237
  

LOT:     JL1163

MACHINE: CMP.B1

OPER#:   1994

PROCESS  LEVEL: ILD2

DATE:    4/15/97

SHIFT:   A - SHIFT

QUANTITY:  24

PRODUCT. DC1071-000-CA-8 

 
LOT; JL1163
.
PROBLEM:  One wafer was overpolished on lot #XD1168.


                      
                       
DISPOSITION: This wafer was overpolished on the initial run.  The next lowest
             wafer measured 5563.  Looking @ remarks, the lot was remarked at
             ILD1 3 to add 1000A oxide at this operaion.  No other explanation
             except it missed extra dep at the ILD1 level.




CORRECTIVE ACTION: Wafer #19 remarked for 500A extra oxide.
                   Wafer measured 4973.

62.640XD1104 4 WAFERS SCRAPPED DUE TO OVER-POLISHFABSIX::P_HESTERThu Apr 17 1997 12:1858
                                  CMP PEX

LOT:          XD1104

MACHINE:      CMP.B1

OPER#:        1985 CMP_ILD2 

PROCESS       ILD2

DATE:         4/16/97

SHIFT:        C-D - SHIFT
 
QUANTITY:     20

PRODUCT:      TM0079-001-AA-8T

LOT:          XD1104

PROBLEM:      FOUR WAFERS SCRAPPED DUE TO OVER POLISH.

              INCOMING THICKNESS FROM FILMS WAS NOT BAD:

              THK_ME_5     WAFER #1                17970.000
                           WAFER #2                17792.000
                           WAFER #3                18112.000
                           WAFER #4                17448.000
                           WAFER #5                17848.000
              THK_SD_5     WAFER #1                    1.100
                           WAFER #2                    0.600
                           WAFER #3                    0.700   4/15/97 15:23:38
                           WAFER #4                    0.600
                           WAFER #5                    0.500                

              SEND-AHEAD WAFERS WERE POLISHED PER SPEC AND R/R CALCULATED
              AT 3364.  REMAINDER OF LOT WAS PROCESSED ACCORDINGLY.

              SEND AHEAD WAFERS WERE READ ON UV-1050 USING THE ILD1 RECIPE.
              BEFORE FINAL POLISH, METROLOGY COPIED AND OPTIMIZED THE RECIPE
              FOR ILD2.  THEY THEN CONFIRMED THAT THE READINGS TAKEN WITH THE 
              ILD1 RECIPE WERE CORRECT.  READINGS WERE ALSO TAKEN ON ALTERNATE
              UV-1050 AND CORRESPONDED.

              AFTER SECOND POLISH IT WAS DISCOVERED THAT 4 WAFERS WERE OVER-
              POLISHED AND HAD EXPOSED METAL.
              

DISPOSITION:  BALANCE OF LOT MOVED ON.

CORRECTIVE ACTION:  NONE.  THIS WAS NOT A METROLOGY PROBLEM.  THIS COULD BE 
                    RELATED TO THE DEVICE.  THIS LOT HAS 57 REMARKS SO FAR AND
                    HAS HAD MULTIPLE SPLITS, INCLUDING SPLITS AT POLY REOX AND
                    SPACER OPERATIONS.  ALSO DIFFERENT CD SPLITS WERE DONE.
                    THIS MAY HAVE AFFECTED REMOVAL RATES AND BEEN A FACTOR IN
                    THIS INCIDENT.

62.641JD1460 2 wafers scrapped @PMD - crash.FABSIX::P_HESTERThu Apr 17 1997 17:1427
                                  CMP PEX

LOT:          JD1460

MACHINE:      CMP.A1

OPER#:        1978 CMP_PMD  

PROCESS       PMD

DATE:         4/16/97

SHIFT:        C - SHIFT
 
QUANTITY:     15

PRODUCT:      DC1039-000-BA-8G

PROBLEM:      TWO WAFERS SCRAPPED DUE TO CRASH.

DISPOSITION:  BALANCE OF LOT MOVED ON.

CORRECTIVE ACTION:  NO ALARMS ON THIS ONE.  NO OBVIOUS CAUSE.  CRASH REPORT
                    FILLED OUT AND POSTED.


62.642XD1205 HIGH OUTGOING SD @ILD1FABSIX::P_HESTERThu Apr 17 1997 22:1550
                            PE PEX NOTIFICATION
                     

LOT #          XD1205

DEVICE:        TM0079-001-AA-8T

QUANTITY:      23

OPERATION #    3054 SD-POST
/DESCR.

POLISHER:      CMP.B3

EVAL TOOL:     THICKNESS.A4

DATE:          04/17/97  C-Shift

PROBLEM:       HIGH SD OUTGOING

              THK_ME_5     WAFER #1                 5473.000
                           WAFER #2                 5722.000
                           WAFER #3                 5719.000
                           WAFER #4                 5699.000   4/17/97 16:50:51
                           WAFER #5                 4637.000
              THK_RG       XD1205                   3188.000
              THK_SD_5     WAFER #1                   16.200
                           WAFER #2                   16.400
                           WAFER #3                   18.700
                           WAFER #4                   20.300
                           WAFER #5                   16.500             
        
DISPOSITION:   PROBLEM WAS WORST IN WAFER # 4.   POSSIBLY HEAD IS GOING BAD BUT
               ANOTHER ILD2 LOT WAS POLISHED AT THE SAME TIME WITH RANGE IN THE
               4.0 - 9.0 RANGE.  ALL 5 WAFERS SAMPLED HAD HIGH SD AND WERE
               CONFIRMED ON AN ALTERNATE METROLOGY TOOL.  

               THIS LOT ALSO RECIEVED MULTIPLE SPLITS AMONG THEM AT FURN_REOX,
               SPACER_ETCH, THK_REOX, POLY CD.  THIS MAY AFFECT HOW THE LOT
               POLISHED.  

               ALL METROLOGY READINGS WERE VERIFIED AS GOOD WITH GOOD GOF.

               LOT MOVED ON.
  

CORRECTIVE
ACTION:      TOOL IS GOING DOWN FOR MONTHLY PM.
         
62.643CMP.B2 CRASHED 1 WAFER SCRAPPEDFABSIX::S_AGUILASun Apr 20 1997 06:4923
                            	CMP PEX 
                     

LOT #          JL1312 (HOT LOT) 

QUANTITY:      24 - 1 = 23

OPERATION #    
/DESCR.        1989 CMP_ILD3

POLISHER:      CMP.B2

EVAL TOOL:     N/A

DATE:          04/20/96  B-SHIFT

PROBLEM:       CMP.B2 CRASHED, ONE WAFERS SCRAPPED. WAFER SLID OUT OF CARRIER 
	       2 OR 3.

DISPOSITION:   LOT STILL POLISHING
               
CORRECTIVE      
ACTION         CARRIERS AND PAD WERE CHANGED. SEE CRASH REPORT  
62.644CMP PEX, 4 WAFERS REMARKED FOR EXTRA DEP FOR JD1307SUBPAC::SMARTINSun Apr 20 1997 17:5240
  

LOT:     JD1307

MACHINE: CMP.B2

OPER#:   1981

PROCESS  LEVEL: ILD1

DATE:    4/20/97

SHIFT:   A - SHIFT

QUANTITY:  24

PRODUCT. DC1026-000-JB-8G 

 
LOT; JD1307
.
PROBLEM:  4 wafers (#1,10,19, and 22)  were overpolished on initial run.
          SA's were run for 160 secs.
           results of SA's: 6995, 6842, 6814, 6533, and 6065

           Lot was run for 177 secs.


                      
                       
DISPOSITION:  Some splits were previously done to this lot but wafer numbers
              do not correlate to any particular split. Wafers were remarked 
              for an extra 500A dep.  (Measured 4981, 4899, 4771, 4749)




CORRECTIVE ACTION: Wafer #1,10,19,and 22 were remarked for 500A extra oxide.
                   

62.645CMP PEX, 3 WAFERS REMARKED FOR EXTRA DEP FOR JD1312SUBPAC::SMARTINSun Apr 20 1997 18:0038
  

LOT:     JD1312

MACHINE: CMP.B2

OPER#:   1989

PROCESS  LEVEL: ILD3

DATE:    4/20/97

SHIFT:   A - SHIFT

QUANTITY:  23

PRODUCT. DC1071 

 
LOT; JD1307
.
PROBLEM: 3 Wafers were over polished.
                      
                       
DISPOSITION: Wafer #14 and #19 were overpolished @ initial polish?
             Info that was passed down looks that way.
             These wafers measured 7762 and 8624 respectively.

Wafer #13  was in a group ranging from 12K - 12.9K.  The group was run 
for 60secs.  Wafer measured below spec 8987.




CORRECTIVE ACTION:  Wafer #14 was remarked for 2000 extra dep.
                    Wafer #19 and #13  were remarked for 1000 extra dep.
                   

62.646CMP PEX,1 WAFER SCRAPPED FROM LOT JL1008SUBPAC::SMARTINSun Apr 20 1997 20:0933
  

LOT:     JL1008

MACHINE: CMP.B3

OPER#:   1994

PROCESS  LEVEL: ILD2

DATE:    4/20/97

SHIFT:   A - SHIFT

QUANTITY:  18 DOWN TO 17

PRODUCT. .DC1064-003-BA-8P

 
LOT; JL1008
.
PROBLEM:  1 Wafer was scrapped due to over polish.
                      
                       
DISPOSITION:Wafer #24 reads 2626 after 1st pass polish. Lot polished for
            246 seconds with all other wafers reading between 5700-6500.
            Spec states wafer must be scrapped if <3400.




CORRECTIVE ACTION:  Lot will be sent on less 1 wafer.                   

62.647CMP.B3 TWO WAFERS BROKENFABSIX::S_AGUILAMon Apr 21 1997 06:0626
                            	CMP PEX 
                     

LOT #          JD1296 

QUANTITY:      24 - 2 = 22

OPERATION #    
/DESCR.         1985 CMP_ILD2   

POLISHER:      CMP.B3

EVAL TOOL:     N/A

DATE:          04/21/96  B-SHIFT

PROBLEM:       TWO WAFERS WERE FOUND BROKEN AT THE RECOVERY CASSETTE. ON A 
               LATER RUN (AFTER IT HAD FINISHED) IT WAS DISCOVERED THAT WAFERS 
               ON SLOT #7 AND #8 ON THE RECEIVE CASSETTE HAD CROSS SLOTTED. 
               THIS APPEARS TO BE THE CAUSE OF WHAT HAPPENED EARLIER  

DISPOSITION:   LOT WAS SEND TO THE SCRUBER. 
               
CORRECTIVE      
ACTION         DRG RECOMMENDED TO PLACE A REMARK FOR A 100 % PARTICLE
               MEASUREMENT AT THE NEXT  UPP PARTICLE INSPECTION (OPER. 2624). 
62.648CMP PEX, 2 WAFERS REMARKED FOR EXTRA DEP ON JD1249.SUBPAC::SMARTINWed Apr 23 1997 16:1539
  

LOT:     JD1249

MACHINE: CMP.B3

OPER#:   1985

PROCESS  LEVEL: ILD2

DATE:    4/23/97

SHIFT:   TOUCHED UP ON  B - SHIFT

QUANTITY:  24

PRODUCT. .DC1073-000-BA-8G
 
LOT; JD1249
.
PROBLEM:  2 WAFERS OVER POLISHED AND WILL NEED EXTRA DEP.

           PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 4786.000                   
                           WAFER #2                 5577.000                   
                           WAFER #3                 5755.000                   
                           WAFER #4                 5740.000                   
                           WAFER #5                 5784.000                   
              THK_RG       JD1249                   1981.000 

                      
                       
DISPOSITION: THE TWO WAFERS # 18 WAS 5177A AND WAFER #23 WAS 4786. BOTH THESE
             WERE REMARKED FOR EXTRA 500A OF DEP @ OP# 2133.



CORRECTIVE ACTION:  NONE REQUIRED.                   

62.649JD1298 slight over polish @ILD2YIELD::PHESTERFri Apr 25 1997 09:3043
                            PE PEX NOTIFICATION
                     

LOT #          JD1298

QUANTITY:      24

OPERATION #    3066 POST THICKNESS ILD2
/DESCR.

POLISHER:      POST READING

EVAL TOOL:     THICKNESS.A5

DATE:          04/24/97  C-Shift

PROBLEM:       LOW POST THICKNESS

               LOT POST THICKNESS AVG = 4598�  

                                 LCL IS 5200�
        

              THK_ME_5     WAFER #1                 5348.000
                           WAFER #2                 4120.000
                           WAFER #3                 4844.000
                           WAFER #4                      N/A
                           WAFER #5                 4081.000

DISPOSITION:   
              LOT HAD POLISHED ON .B3.  TOOL WENT DOWN AND MOVED THE LOT TO
              .B4 FOR TOUCH-UP. WAFERS RAN FOR 1 SEC TOUCH-UP.
              TOOL HAS HIGH REMOVAL RATE 3600� ON MQC.
              WAFERS THAT WERE LOW HAVE BEEN REMARKED FOR EXTRA DEP
              AND THE LOT HAS BEEN MOVED ON.

              ALL MEASUREMENTS CHECKED AND VERIFIED AS GOOD.
              

CORRECTIVE
ACTION:       SHOULD PROBABLY RECONSIDER DOING 1 SEC TOUCH-UPS ON CMP.B4
              AS REMOVAL RATE IS SO HIGH.         
62.650JD1326 high range/SD @ILD1YIELD::PHESTERFri Apr 25 1997 10:3146
                            PE PEX NOTIFICATION
                     

LOT #          JD1326

QUANTITY:      24

OPERATION #    
/DESCR.        3054 THK_ILD1_PST

POLISHER:      CMP.A1

EVAL TOOL:     THICKNESS.A5

DATE:          04/24/97  C-Shift

PROBLEM:       HIGH RANGE/SD @ILD2

               RANGE WAS  4547    SD WAS  21.3

                   UCL IS 3400     UCL IS 15.0

 LOG AN EVENT THK_ME_5     WAFER #1                 5913.000   4/24/97 16:23:11
                           WAFER #2                 5461.000
                           WAFER #3                 5205.000
                           WAFER #4                 5878.000
                           WAFER #5                 5493.000
              THK_RG       JD1326                   4547.000
              THK_SD_5     WAFER #1                   22.700
                           WAFER #2                   18.800
                           WAFER #3                   23.300
                           WAFER #4                   18.300
                           WAFER #5                   23.400

DISPOSITION:     LOT MOVED TO CAP.  ALL METROLOGY READINGS VERIFIED AS GOOD.
               
                 LOT WAS POLISHED ON STRASBAUGH TOOL.  ILD1 CAN BE DONE ON THIS
                 TOOL BUT ARE NORMALLY NOT BECAUSE OF LOW REMOVAL RATE.  LOW
                 REMOVAL CAUSES EXTENDED POLISH TIMES WHICH USUALLY RESULTS IN
                 EDGE FAST POLISHING.  THIS WAS THE CASE WITH ALL FIVE WAFERS
                 IN THIS SAMPLE.            

CORRECTIVE
ACTION:          NONE

62.651JD1460B high range/SD @ILD3FABSIX::P_HESTERFri Apr 25 1997 17:2359
                                  CMP PEX 
                     

LOT #          JD1460B
                                          

DEVICE:        DC1039-000-BA-8G

QUANTITY:      6

OPERATION #    3064 POST THICKNESS ILD3
/DESCR.

POLISHER:      CMP.B4

EVAL TOOL:     THICKNESS.A4

DATE:          04/25/97  D-C SHIFT

PROBLEM:       HIGH RANGE/SD OUTGOING

               RANGE WAS 7054.0   UCL IS  4500

               AVG SD WAS 21.08   UCL IS  16.00

              THK_ME_5     WAFER #1                10381.000
                           WAFER #2                10430.000
                           WAFER #3                 9942.000
                           WAFER #4                 9943.000
                           WAFER #5                10177.000
              THK_RG       JD1460B                  7054.000
              THK_SD_5     WAFER #1                   21.900
                           WAFER #2                   23.300
                           WAFER #3                   20.000
                           WAFER #4                   20.000
                           WAFER #5                   20.200         

              LOT WAS IN PROCESS WHEN THE SLURRY BARREL WENT DRY.  THIS IS
              THE PROBABLE CAUSE OF THE HIGH RANGE/SD.  POLISHING WAS CENTER
              FAST WHICH IS UNUSUAL.  THE FIRST MQC ON THIS PAD HAD A 
              UNIFORMITY OF ~9%.  THE 2ND MQC, DONE AFTER THIS LOT WAS 
              POLISHED WAS UP TO ~13%.  NORMALLY THE UNIFORMITY WILL IMPROVE
              AFTER THE 1ST MQC.  POSSIBLY SOME CONCENTRATED SLURRY FROM THE
              BOTTOM OF THE BARREL AFFECTED THE PERFORMANCE OF THE PAD.  ALSO
              SLURRY PROBABLY NOT FLOWING CONSISTENTLY AT THE BOTTOM OF THE 
              BARREL.

              ANOTHER POSSIBLE CAUSE WAS THAT THE CONDITIONING RING WAS JUST 
              CHANGED RECENTLY.  IF NOT CENTERED PROPERLY THIS COULD BE CAUSING
              HIGH SD.

              ALL METROLOGY MEASUREMENTS VERIFIED AS GOOD.

DISPOSITION:  LOT MOVED ON.     

CORRECTIVE
ACTION:       CONDITIONING RING WILL BE CHECKED.  RECOMMEND CHECKING SLURRY 
              LEVEL BEFORE POLISHING A LOT.        
62.652XD1292 TWO WAFERS SCRAPPED @PMDFABSIX::P_HESTERSat Apr 26 1997 17:5730
                                  CMP PEX 
                     

LOT #          XD1292
                                          

DEVICE:        TM0069-084-BA-8C 

QUANTITY:      22

OPERATION #    978 CMP_PMD 
/DESCR.

POLISHER:      CMP.A2

EVAL TOOL:     N/A

DATE:          04/25/97  C SHIFT

PROBLEM:       TWO WAFERS SCRAPPED

               WAFERS WERE BROKEN WHEN UNLOAD ROBOT CRASHED INTO THE RIGHT
               SEND CASSETTE.

DISPOSITION:  LOT MOVED ON.     

CORRECTIVE
ACTION:       EE ADDRESSED AND CORRECTED CONDITION.

62.653JD1399 slight overpolish @ILD2YIELD::PHESTERSat May 03 1997 19:3937
                              	CMP PEX 
                     

LOT #          JD1399

QUANTITY:      24

OPERATION #    1985 CMP_ILD2
/DESCR.

POLISHER:      CMP.B2 & B4

EVAL TOOL      THICKNESS.A5

DATE:          05/03/97  C-Shift

PROBLEM:       LOW POST THICKNESS MEAN

               POST MEAN AVG  = 4939� 

                         LCL IS 5200�
        
DISPOSITION:   LOT WAS SPLIT BETWEEN .B4 AND .B2 TO TEST 18%
               SLURRY.
               WAFERS THAT NEEDED EXTRA DEP HAVE BEEN REMARKED
               AT OPERATION # 2133.
               ANNOTATION # 10779 HAS BEEN CLOSED.
 
               ALL OVERPOLISHED WAFERS WERE RUN ON CMP.B4 WHICH HAD THE 18%
               SLURRY.  THIS SLURRY HAS A VERY HIGH REMOVAL RATE AND WE ARE
               LEARNING HOW TO CONTROL POLISHING WITH IT.


 
CORRECTIVE
ACTION         NONE
62.654CMP PEX, 12 WAFERS REMARKED FOR EXTRA DEP FROM JD1469SUBPAC::SMARTINSun May 04 1997 18:0881
  

LOT:     JD1469

MACHINE: CMP.B3

OPER#:   1985

PROCESS  LEVEL: ILD3

DATE:    5/4/97

SHIFT:  A - SHIFT

QUANTITY:  23

PRODUCT. .DC1073
 
LOT; JD1469
.
PROBLEM: 12 WAFERS OVER POLISHED AND WILL NEED EXTRA DEP.

           PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 5380.000                   
                           WAFER #2                 5790.000                   
                           WAFER #3                 5751.000                   
                           WAFER #4                 5680.000                   
                           WAFER #5                 5540.000   
              THK_SD_5     WAFER #1                    7.600   5/04/97 16:29:10
                           WAFER #2                    8.300                   
                           WAFER #3                   11.200                   
                           WAFER #4                    9.700                   
                           WAFER #5                    8.600

                      
                       
DISPOSITION:  The following wafers will require extra dep :

Wafer   Thickness       Extra Dep.

7       3574            2000
21      3669            2000
12      3884            1500
14      4182            1500
5       4527            1000
19      4534            1000
1       4790            500
2       4877            500
10      4890            500
16      5105            500
18      5187            500

Lot History below:

This lot was passed onto the next shift, Overpolished wafers were found
during 100% measurement. Its believed that this is a lot problem and NOT
a Tool or operator error problem, proof: these wafers needed touching up
they were grouped together tightly as follows,


Thickness       group   TUP recipe      Resulted Thickness
6474            A       TUP 350         5380
6353            A       TUP 350         4790*

6172            B       TUP 200         5790
6119            B       TUP 200         5395
6083            B       TUP 200         5380

5984            c       TUP 100         5187*
5982            C       TUP 100         4890*
5913            C       TUP 100         5231

  These 3 groups were polished on A Shift, as you can see this lot did not
  polish well, 3 more wafers overpolished. Other lots polished on this tool
  ran just fine.




CORRECTIVE ACTION:  Wafers were remarked for extra dep.                   

62.6552 WAFERS OVERPOLISHED ON CMP.B2, XE1112FABSIX::S_AGUILAMon May 05 1997 08:1833
                                 -< CMP PEX, >-
--------------------------------------------------------------------------------
  

LOT:     XE1112

MACHINE: CMP.b2

OPER#:   2009

PROCESS  LEVEL: CMP_ILD3

DATE:    5/5/97

SHIFT:  B-SHIFT (THIS PROBLEM HAPPENED AT SHIFT CHANGE)

QUANTITY:  21

PROBLEM: 2 WAFERS OVER POLISHED, WAFERS #6 AND #7 WILL NEED TO BE EXTRA DEP.
         WITH ~1K A 

                       
DISPOSITION:  The following wafers will require extra dep :

Wafer   Thickness       Extra Dep.    CL

#6        9201           ~1000        LCL = 9500
#7        8864           ~1000        UCL = 10500

CORRECTIVE ACTION:  Wafers were remarked for extra dep.                   


62.656JD1384 - 9 WAFERS OVERPOLISHED & HIGH THK_SD_5STRATA::POZORSKIMon May 05 1997 14:0457
				CMP PEX
                              ----------

LOT:     JD1384

MACHINE: CMP.B3

OPER#:   1981

PROCESS  LEVEL: ILD1

DATE:    5/5/97

SHIFT:   Leftover from B SHIFT

QUANTITY:  24

PRODUCT. DC1035-000-SC-8T 
 
LOT:     JD1384
.
PROBLEM:  9 WAFERS OVER POLISHED AND WILL NEED EXTRA DEP and IT ALSO HAD HIGH 
          THK_SD_5 FOR THE RANGE ON ONE OF THE 5 OUT GOING WAFERS.

              THK_ME_5     WAFER #1                 5085.000
                           WAFER #2                 5645.000
                           WAFER #3                 5587.000
                           WAFER #4                 5109.000
                           WAFER #5                 5098.000
              THK_RG       JD1384                   2964.000
              THK_SD_5     WAFER #1                   20.000 (UCL = 13
                           WAFER #2                    7.340   
                           WAFER #3                    7.800
                           WAFER #4                    4.000
                           WAFER #5                    6.620

                       
DISPOSITION:  Jd1384 ILD1 Dc1035. (this was leftover from B-shift)
              9 wafers Overpolished @CMP ILD1. These wafers will
              need an additional oxide dep at OPER 2130.

              Wafer        Actual THK   Additional ox needed at
              Number       @CMP ILD1    OPER 2130

              3             4101        1500
              9             4362        1000
              22            4658        1000
              4             4956         500
              23            4734         500
              2             4804         500
              20            5024         500
              13            5009         500
              11            4863         500


CORRECTIVE    LOT WAS REMARED AND MOVED ON, NO FURTHER ACTION REQUIRED.
ACTION:  
62.657JD1307 - 2 wafers scrapped due to breakageLUDWIG::POZORSKIMon May 05 1997 17:5229
				CMP PEX
                              ----------

LOT:     JD1307

MACHINE: SCRUB.A3

OPER#:   1986 

PROCESS  LEVEL: CMP_SCRUB4

DATE:    5/5/97

SHIFT:   S SHIFT

QUANTITY:  24 - 2 = 22

PRODUCT. DC1026-000-JB-8G  
 
LOT:     JD1307
.
PROBLEM:  Two wafers scrapped (11 & 12) due to the fact they broke in the 
          unload station.
                       
DISPOSITION:  Two wafers scrapped after they broke in the unload station due
              to a cassette being dropped through the top of the machine.  

CORRECTIVE    EE came in cleaned up the wafers and the tool was give to 
ACTION:       production.  The rest of the lot was moved on with 2 less wafers.
62.658XD1116 - 6 wafers scrapped due to overpolishSTRATA::POZORSKITue May 06 1997 18:3332
				CMP PEX
                              ----------

LOT:     XD1116

MACHINE: CMP.B3

OPER#:   1981 

PROCESS  LEVEL: CMP_ILD1 

DATE:    5/6/97

SHIFT:   A SHIFT

QUANTITY:  20 - 6 = 14

PRODUCT. TM0069-084-BA-8C 
 
LOT:     XD1116

PROBLEM:  6 wafers scrapped due to being overpolished.
                       
DISPOSITION:  5 wafers run as send aheads were polished just through the TiN
              in 100 sec.  Eric's note that the lots will polish faster gave
              no impression that they should be polished for under 30 seconds
              when the standard potion took over 180 seconds.  So the first 5
              wafers from this split are scrap material as well as one wafer
              that came into the area with 1/2 the oxide it should.

CORRECTIVE    Lot will have 6 less wafers when it is moved out of this area.
ACTION:       
62.659CMP PEX FOR XD1241 1 scrap-10 overpolished left over from b shift.SUBPAC::SMARTINWed May 07 1997 20:1553
  

LOT:     XD1241

MACHINE: CMP.B2

OPER#:   1986

PROCESS  LEVEL: ILD3

DATE:    5/7/97

SHIFT:  B - SHIFT

QUANTITY:  24 DOWN TO 23

PRODUCT. .TM0069-084-BA-8C

 
LOT; XD1241
.
PROBLEM: 1 scrap-10 overpolished left over from b shift.

    These are the overpolished wafers left over from "B" shift.  The
lot is remarked for extra Dep and Matt just finished up all the
measurements needed as per remark.   The lot was run for 400s.  A 
sample was taken and they were around 15000.  The lot was then run 
for an additional 100s.  
  Just as an FYI...This is a W CMP/WEB split.  All of these wafers are
from the W CMP split 


                      
                       
DISPOSITION:  The following wafers will require extra dep :


#   Mean    Std.   Extra DEP
25  8202    4.49   1500A
2   7729   13.5    2000A
9   8683    6.83   1500A
10  9391    5.61   500A
11  8411    9.24   1500A 
12  6620   15.4    3500A 
17  2705   47.7    SCRAP***************
18  7770    9.81   2000A
19  8503    9.5    1500A
20  5542    8.38   4500A 
21  9449    6.57   500A 


CORRECTIVE ACTION:  Wafers were remarked for extra dep.                   

62.660Pex for overpolished lots.YIELD::SHONGSat May 10 1997 08:2329
                            PE PEX NOTIFICATION
                     

LOT #          	JD1457

QUANTITY:      	24

OPERATION #    	1978 CMP AFTER PMD DEP1
/DESCR.        

POLISHER:      	CMP.A1

EVAL TOOL:     	THICKNESS.A1

DATE:          	05/10/97 D-Shift

PROBLEM:    	Two wafers from this lot were overpolished at operation 1978
		CMP_PMD. The operator ran his send aheads and recalculated 
		the time for the rest of the lot. While polishing the rest of 
		the lot he accidentally put the send aheads back through. 
		Wafer #'s being scrapped are 1 and 2. 

DISPOSITION:  	Wafers were scrapped for low thickness ~2500 to 3000�. This 
		lot is a split lot for 18% slurry. The wafers that were scrap-
		ped were from the POR portion. 

CORRECTIVE     	Talked to the operator and discussed the importance of not 
ACTION:        	sending the send aheads through twice. He assured me it wouldn't
 		happen again. 
62.661XD1482 - 2 wafers overpolished @PMDSTRATA::POZORSKISun May 11 1997 13:4924
                              CMP PEX 

LOT #:             XD1482

QUANTITY:          24

OPERATION #        1978 CMP_PMD     CMP 
  
POLISHER:          CMP.A1

EVAL TOOL:         N/A

DATE:              B shift/A-Shift   05/11/97 

PROBLEM:           2 wafers (#1 & 5) were overpolished.

DISPOSITION:       This lot was polished on B-Shift and A-Shift discoved
                   the 2 wafers when the lot was measured on the UV-1050.  Lot
                   was remarked at operation 2127 DEP_PMD 2 for an extra 1000�
                   on these 2 wafers and the lot was moved on.  The cause of 
                   these 2 overpolished wafers is unknown.

CORRECTIVE         The lot was remarked for extra dep and moved on. 
ACTION:            
62.662CMP.B3 - 3 WAFERS SCRAPPED DUE TO A CRASHSTRATA::POZORSKISun May 11 1997 17:5163
                            	CMP PEX 
                     

LOT #          JL1486 

QUANTITY:      24 - 3 = 21

OPERATION #    
/DESCR.        1992 MSP_ILD1

POLISHER:      CMP.B3

EVAL TOOL:     N/A

DATE:          05/11/96  B-SHIFT/A-SHIFT

PROBLEM:       3 WAFERS SCRAPPED ON CMP.B3 DUE TO THE FACT IT CRASHED ON THE 
               TOUCH-UP-C RECIPE IN STEP #3 WITH 1 SEC INTO THIS STEP, THE
               WAFER SLID OUT OF CARRIER 5. THE TOOL WAS HAVING SOME MAJOR 
               VIBRATIONS BEFORE IT CRASHED.

DISPOSITION:   A-SHIFT FINISH POLISHING THE LOT AFTER THE MQC'S WERE PERFORMED
               AFTER THE PAD & CARRIER CHANGE. THE LOT WAS MOVED IT ON WITH 3
               LESS WAFERS. 

               (SEE CRASH REPORT BELOW)

               
CORRECTIVE     EE WENT IN AND REPLACED BOTH PAD AND CARRIERS, THEY CHECKED HEAD 
ACTION         TO CUP ALIGNMENT AND HEIGHT, AS WELL AS VACUUM LEVEL AND RECIPES
               AND ALL APPEARED TO BE OKAY EXCEPT FOR A TIME DIFFERENCE IN STEP
               ONE OF THE TUP-C (IT WAS SET UP FOR 2 SECS INSTEAD OF 25 SECS)
               THIS WAS CHANGED BACK TO THE 25 SECS AND WAS TURNED BACK OVER
               TO PRODUCTION TO RUN MQC'S AND THEN THE LOT WAS COMPLETED AND 
               MOVED ON.

    
 SPEEDFAM WAFER CRASH FORM (to be filled out by MFG + EEG + PSS, together)

 1) System:   CMP.B3
 2) Recipe:   touch-up-c
 3) Step #:   3
 4) Time into step:   1sec
 5) Type of wafers that broke: 3 product 
 6) Carrier which wafer slid out of: 5
 7) Other carriers that were damaged:all  
 8) Alarms displayed by polisher: none
 9) Did any other polisher error for slurry or crash: NO               
10) Did wafer detect work:  yes     
11) # of wafers on pad: this tool crashed earlier tonight, it had a fresh
12) # of wafers on carrier:  pad and all new carriers
13) Was there any vibration prior to the crash:  yes
14) Was there plenty of slurry (for step 1-5) or water (step 6-9) present on
    the table: yes
15) Check step hight of the carrier from question #6:  n/a
16)** Please note any other unusual circumstances: tool had MAJOR vibrations 
 before it crashed. Due to the time of the crash i could not get the broken 
 wafer #'s

						B-shift EE.
17) Put this check sheet in CMP note #32: done


62.663CMP_PEX Lot XE1025 Slightly over-polished.....YIELD::VANHANEHEMMon May 12 1997 13:5538
                                CMP PEX


LOT #          XE1025

QUANTITY:      24

OPERATION #
/DESCR.        3054 - THK_ILD1_PST

POLISHER:      CMP.B3

EVAL TOOL:     THICKNESS.A4

DATE:          05/09/96 C-Shift

PROBLEM:       Lot failed for low Mean @5186 (LCL=5200).  Only three standard
               wafers were entered into workstream according to the following
               remark:
 
------------------------------------------------------------------------
DATE LOGGED : 19-FEB-1997 15:50:59.97
OPERATION   : 1999 - CMP_ILD1
OPERATOR    : K_WOOLDRIDGE
------------------------------------------------------------------------
                Wooldridge @ PAGER #957 if you have questions.

Please also note that this lot was split at PMD and some wafers have a
300A SiN layer under PMD. Please use wafers #1-6,13-18 for measurements
(wafers without SiN). Doubtful you will be able to measure the others.
------------------------------------------------------------------------

DISPOSITION:   Lot was sent on as is.

CORRECTIVE
    ACTION:    None needed.  Lots before and after this were good and it
               was a nonstandard lot with measurement capabilities on only a
               few wafers.
62.664JD1459 ILD1 - 4 scrap, 8 overpolished @ ILD1 HDPYIELD::MANDREOLITue May 13 1997 07:5674
                              PEX NOTIFICATION
                     

LOT #          JD1459 (DC1035)  
                                 
QUANTITY:      24 - 4 = 20 

OPERATION #    1981 CMP_ILD1 
/DESCR.        

POLISHER:      CMP.B2      

EVAL TOOL:     THICKNESS.A5  

DATE:          05/12/97 B-SHIFT

PROBLEM:       Lot has 4 wafers scrapped and 8 requiring extra capping dep. 
               All wafers from the 2xHDP Split had extremely high removal rate,
               compared to the POR portion.

   REMARK INFO: 

   This lot needs to be split at this operation. The final thickness should
   be the same for both halves of the split but they need to be run seperately 
   as they will polish at different rates. Please sort the lot into two 
   cassettes and process as two seperate lots (DO NOT use one set of send 
   aheads for both splits). The splits are below:                  
                                                                            
                            POR                    2xHDP    
                      ---------------           -----------------             
   wafers:            1,2,5,6,9,10,13,          3,4,7,8,11,12,15,        
                      14,17,18,21,22            16,19,20,23,24           
                                                                            
   ILD1 splits:                                                             
   ------------                                                             
   ILD1_1 thickness:        3.5kA                     7.0kA                 
   ILD1_2 thickness:       16.2kA                     9.5kA                 
                                                                            
   CMP to:                  5.5kA                     5.5kA                 
                                                                            
   ILD1_3 thickness:        3.5kA                     3.5kA                 
                           --------                  --------               
   Final Tox:               9.0kA                     9.0kA                 

   Started with the 2xHDP portion; measured 4 wafers to get Mean thickness, 
   which was 15425�. The standard for ILD1 initial polish is 160 seconds, these
   four send aheads were run for 140 seconds and were all overpolished to the 
   extent of being scrap. Wafers {03,04,07,08} ranged from 2869� to 3058�, with 
   the LCL for scrap being <3400�. So these 4 wafers are scrapped.  
               
   From the above 4 wafers, the Removal Rate was calculated at 5345�/min, and
   this was used to adjust Time to 111 seconds for the remaining 8 wafers in
   this Split. These 8 wafers were overpolished, and will need extra capping 
   Dep at Oper# 2130 DEP_ILD1 3. These wafers are REMARKed for the extra dep, 
   Their thickness measurements are; 

                             Wafer#    Tox           LCL is 5200 �
                             _____________        Target is 5500 �
                              11      4088        
                              12      4144        add 1500� to each wafer
                              15      4121
                              16      4185
                              19      4077
                              20      4247
                              23      4136
                              24      4091
 
DISPOSITION: 4 wafers scrapped, 8 wafers REMARKed to get extra capping Dep.   

CORRECTIVE   These HDP lots are polishing with very fast removal rates. We need
ACTION:      to get a reference TIME for these portions in order to minimize 
             overpolishing. "Polish and Learn..." 

             The POR wafers (12) are finishing up now.   
62.665CMP PEX,JD1459 4 WAFERS REMARKED FOR EXTRA DEP.SUBPAC::SMARTINTue May 13 1997 14:1548
  

LOT:     JD1459

MACHINE: CMP.B2

OPER#:   1981

PROCESS  LEVEL: ILD1

DATE:    5/13/97

SHIFT:  A - SHIFT

QUANTITY:  20

PRODUCT. .DC1035-000-SC-8T
 
LOT; JD1459
.
PROBLEM: 4 more wafers were overpolished from the standard portion of this lot.
         Wafer #1 (4841), #2(5044), #6(4706) and #9(4908).  Lot was turned over
         from previous shift, I do not know TUP times.  An additional remark
         was added at oper.2130 to add an extra 500A DEP to these wafers.


           PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 4841.000                   
                           WAFER #2                 5634.000                   
                           WAFER #3                 4706.000                   
                           WAFER #4                 4247.000                   
                           WAFER #5                 4136.000                   
              THK_RG       NA                            N/A      
                           WAFER #1                   10.800   5/13/97 12:28:28
                           WAFER #2                    8.670                   
                           WAFER #3                   11.200                   
                           WAFER #4                    4.880                   
                           WAFER #5                   12.400
           
                       
DISPOSITION: Popped chart due to overpolished wafers.  
Chart popped for THK_ME_5.  (4/5 wafers overpolished on final 5).  Added
remark to annotation that wafers were remarked for the extra dep.


CORRECTIVE ACTION:  Wafers were remarked for extra 500A DEP to these wafers.
                    annotation#11495 was remarked and closed.      

62.666CMP PEX,JD1401 5 WAFERS REMARKED FOR EXTRA DEPSUBPAC::SMARTINTue May 13 1997 17:3061
  

LOT:     JD1401

MACHINE: CMP.B3

OPER#:   1981

PROCESS  LEVEL: ILD1

DATE:    5/13/97

SHIFT:  A - SHIFT

QUANTITY:  24

PRODUCT. .DC1026-000-JB-8G  

 
LOT; JD1401
.
PROBLEM:  Found these on a B-shift 100% measure lot.

          5 wafers overpolished on 1st pass polish.  The initial send ahead time
          was done for 210 secs and some wafers were in spec and some were 
          a little high.  It is somewhat unclear why the polish time was 
          set for 230 secs when 210 would have been ok according to the 
          send ahead wafers.  The head to head variation was somewhat high as
          well for this lot.
          

       PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 5749.000                   
                           WAFER #2                 5399.000                   
                           WAFER #3                 5707.000                   
                           WAFER #4                 5251.000                   
                           WAFER #5                 5777.000                   
              THK_RG       JD1401                   1753.000 
              THK_SD_5     WAFER #1                   10.500   5/13/97 13:50:44
                           WAFER #2                    4.770                   
                           WAFER #3                    8.240                   
                           WAFER #4                   11.500                   
                           WAFER #5                    9.450 

           
                       
DISPOSITION:  All 5 will need an additional 500 Angstrom Oxide dep at
              OPER 2130.

            Wafer                Actual CMP      
            Number               ILD1 THK 
           
              19                 4723
              15                 5144
              22                 4988
              10                 5040
              17                 5178

CORRECTIVE ACTION:  Wafers were remarked for extra 500A DEP to these wafers.
                          

62.667Overpolished wafersYIELD::SHONGFri May 16 1997 08:1125
                            PE PEX NOTIFICATION
                     

LOT #          	JD1403

QUANTITY:      	24

OPERATION #    	1985 CMP_ILD2
/DESCR.        

POLISHER:      	CMP.B4

EVAL TOOL:     	THICKNESS.A4

DATE:          	05/15/97 D-Shift

PROBLEM:    	This lot was slightly overpolished at operation 1985 CMP_ILD2.
		While polishing the operator recieved alarms for slurry flow. 
		I believe this playe a part in the overpolished wafers. 
		Thickness ranged from ~4K to 5K angstroms. 

DISPOSITION:  	Lot has been remarked to recieve extra dep. 

CORRECTIVE     	Slurry came back at ~3:00am. Tool was MQC'ed and is in spec. 
ACTION: 	
62.668JL1528 4 WAFERS SCRAPPED DUE TO OVER-POLISHYIELD::PHESTERSat May 17 1997 20:0227
                                   CMP PEX 
                     

LOT #          JL1528   DC1044 ILD1

QUANTITY:      23

OPERATION #    1992 CMP ILD1
/DESCR.

POLISHER:      CMP.B4

EVAL TOOL:     THICKNESS.A4

DATE:          05/17/97  C-Shift

PROBLEM:       4 WAFERS WERE SCRAPPED DUE TO SEVERE  OVER-POLISH

               OPERATOR REVERSED TOUCH-UP TIME FOR SEND AHEADS WITH POLISH
               TIME FOR THE BALANCE OF THE LOT.  SO SEND-AHEADS GOT BURNED.
               BALANCE OF THE LOT IS OK.               
        
DISPOSITION:   SCRAP 4 WAFERS.  LOT MOVED ON.

CORRECTIVE
ACTION         NONE
62.669CMP PEX JL1547, 1 WAFER BROKE ON CMP.A1.SUBPAC::SMARTINSun May 18 1997 17:1562
  

LOT:     JL1547

MACHINE: CMP.A1

OPER#:   1984

PROCESS  LEVEL: PMD

DATE:    5/18/97

SHIFT:  A - SHIFT

QUANTITY:  24 DOWN TO 23

PRODUCT. ..DC1064-004-CA-8P
 
LOT; JL1547
.
PROBLEM: Lot # jl1547, one product wafer broken at operation 1984.
         IT APPEARS THAT RIGHT CARRIER DROPPED WAFER ON LIFTOFF AND
         WAFER MAY HAVE BEEN BROKEN BY CONDITIONER.

           
                       
DISPOSITION: LOT WILL BE SENT ON LESS 1 WAFER. 

CORRECTIVE ACTION: PAD AND CARRIERS WILL BE CHANGED AND THE SYSTEM WILL
                   RERUN MQC'S.

From:   FABSIX::FABSIX::K_JUBINVILLE "CMP .... Whatever it takes  18-May-1997 15
29 -0400"
To:     @CMP.DIS;1
CC:
Subj:   wafer crash on CMP.A1

crash report for product wafer broken on polish table on CMP.A1. 
Lot # jl1547, one product wafer broken at operation 1984, 24 wafers down to 23. 
1) System : CMP.A1
 2) Recipe: PMD
 3) Step # : N/A
 4) Time into step: COMPLETED
 5) Type of wafers that broke: PRODUCT
 6) Carrier which wafer slid out of: RIGHT
 7) Other carriers that were damaged: NONE
 8) Alarms displayed by polisher: WAFER NOT SITTING AT RIGHT LOAD.
                                 ______________________________________________
                                 ______________________________________________
 9) Did any other polisher error for slurry or crash: NO systems: NO

10) Did wafer detect work no_____
11) # of wafers on pad : 194
12) # of wafers on carrier: 16
13) Was there any vibration prior to the crash: N/A
14) Was there plenty of slurry (for step 1-5) or water (step 6-9) present on
    the table n/a________
15) Check step hight of the carrier from question #6: 70 MILS
16) Please note any other unusual circumstances: IT APPEARS THAT RIGHT CARRIER
DROPPED WAFER ON LIFTOFF AND WAFER MAY HAVE BEEN BROKEN BY CONDITIONER.
                          

62.670CMP PEX, JL1461-13 WAFERS OVER POLISHED.SUBPAC::SMARTINSun May 18 1997 18:0974
  

LOT:     JD1461

MACHINE: CMP.B4

OPER#:   1981

PROCESS  LEVEL: ILD1

DATE:    5/18/97

SHIFT:  A - SHIFT

QUANTITY:  24

PRODUCT. .DC1035-000-SC-8T 
 
LOT; JD1461
.
PROBLEM: Jd1461 has 13 overpolished wafers.

           PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 5430.000                   
                           WAFER #2                 4788.000                   
                           WAFER #3                 4496.000                   
                           WAFER #4                 4865.000                   
                           WAFER #5                 5386.000                   
              THK_RG       JD1461                   1958.000 
              THK_SD_5     WAFER #1                   11.900   5/18/97 16:37:49
                           WAFER #2                    8.160                   
                           WAFER #3                   12.400                   
                           WAFER #4                   17.000                   
                           WAFER #5                    6.770 


                               CL=5200-5800
                       
DISPOSITION:There are 13 overpolished wafers @CMP ILD1. For JD1461

               Wafer          Act CMP ILD1      Additional oxide
               Number         Thickness         Needed @ OPER 2130


                19              4689             1000 Angstroms
                 1              4788              500
                18              4976              500
                14              5103              500
                21              4855              500
                16              4769              500
                23              4496             1000
                17              5034              500
                24              5177              500
                 4              4701              500
                13              4865              500
                12              4884              500
                 2              4794              500               
This lot required 4 Groups (20 wafers) of Touch ups. The following were the 
pre touch-up thickness ranges and the times the wafers were polished for. 

1st Group          2nd Group         3rd Group       4th Group
6815-7041          6662-6794         6571-6639       6333-6476
3 seconds          2 seconds         1 second        TUP 375

               Time                       Time 
             Polished                   Polished

6815-7041    3 seconds     6662-6794    2 seconds




CORRECTIVE ACTION: LOT WAS REMARKED FOR EXTRA DEP.                          

62.671CMP PEX,JD1455 had 4 wafers scrapped and the rest redepSUBPAC::SMARTINMon May 19 1997 14:2057
  

LOT:     JD1455

MACHINE:  Started on CMP.B3 and finished on CMP.B2 due to tool failure.

OPER#:   1985

PROCESS  LEVEL: ILD2

DATE:    5/19/97

SHIFT:  A - SHIFT

QUANTITY:  24 DOWN TO 20

PRODUCT. . DC1035-000-SC-8T 
 
 
LOT; JD1455
.
PROBLEM: This lot has four wafers that are scrap and the rest of the lot
          was remarked for extra dep.  The wrong recipe was used by mistake.
          A metal-3 recipe was used to polish the lot.   Metal-2 recipe
          should have been used.
          What happened was the lot was running on cmp.b3 and that went down for
          water leak. So I ran the lot on cmp.b2 but used the removal rate
          from my machine which I was running a metal-3 and the lot that came
          over was a metal-2 I had a removal rate of 2426 and cmp.b2 was
          running a removal rate of some where around 4000.
     
         4 scrapped wafers were  # 13, 03, 02, 09
           #13=3022A
           #03=3043A      lcl=3200 for scraps
           #02=3052A
           #09=2892A            

     
DISPOSITION: The rest of this lot was remarked for an extra 2000A of redep.
          PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 4065.000                   
                           WAFER #2                 4234.000  
                           WAFER #3                 3978.000   5/19/97 12:31:09
                           WAFER #4                 4098.000                   
                           WAFER #5                 4365.000                   
              THK_RG       NA                            N/A                   
              THK_SD_5     WAFER #1                    5.800                   
                           WAFER #2                    7.700                   
                           WAFER #3                    6.600                   
                           WAFER #4                    5.400                   
                           WAFER #5                    7.800 

                                       cl=5200-5800   


CORRECTIVE ACTION: LOT WAS REMARKED FOR EXTRA DEP.                          

62.672CMP PEX 5 WAFERS SCRAPPED FROM OUR BONUS ON LOTJD1554SUBPAC::SMARTINMon May 19 1997 20:0241
  

LOT:     JD1554

MACHINE:  Started on CMP.B3 and finished on CMP.B2 due to tool failure.

OPER#:   1981

PROCESS  LEVEL: ILD1

DATE:    5/19/97

SHIFT:  A - SHIFT

QUANTITY:  24 DOWN TO 19

PRODUCT. . DC1073 
 
 
LOT; JD1554
.
PROBLEM:5 wafers scrapped  #2,6,14,16 and 21

Lot was started on .B3 by B shift.  Tool went down during lot run and 
remainder of wafers were run on CMP.B2.  I loaded the remainder of the 
lot for 180secs. for 1st pass polish on CMP .B2.   When we (A shift) run 
Touch ups on our send aheads, they run PRIOR to the lot.  The SA's that needed
the TUP's on this lot were loaded AFTER the lot.  Bottom line...the wafers 
that I thought were 1st pass polish (last run of the lot) were actually 
the send aheads that needed touch ups.

     
DISPOSITION: The lot will be sent on less 5 wafers. 

CORRECTIVE ACTION: Maybe we should have a standard that all send a head wafers
                   should be separated from the lot once they have been ran and
                   or make all send a heads the first 5 wafers in the lot.
                   The send a heads were wafers 19-24 on this lot and they were
                   put back in the same cassette.  Could be a communication
                   problem as well.                         

62.673CMP PEX,JD1540 4 WAFERS SCRAPPED FOR SCRATCHES.SUBPAC::SMARTINTue May 20 1997 17:1937
  

LOT:     JD1540

MACHINE: CMP.B4

OPER#:   1989

PROCESS  LEVEL: ILD3

DATE:    5/20/97

SHIFT:  A - SHIFT

QUANTITY:  24 DOWN TO 20

PRODUCT. . DC1073 
 
 
LOT; JD1540
.
PROBLEM:  4 wafers scrapped  #3,5,10,AND 13

         The send ahead wafers got severly scratched by the tool.  We are not
         sure what pad the scratches came from.  EE partitioned the two pads
         for scratches and both showed no signs of scratches.  The rest of the
         lot that was not polished yet had no scratches.  The lot that was
         ran prior to this lot was good also.  I looked at the carriers and they
         seem to have alot of dried slurry on them.  Maybe a piece of dried
         slurry fell off the carriers while the lot was polishing.
     
DISPOSITION: The lot will be sent on less  wafers. 

CORRECTIVE ACTION: EE took the tool and gave it a good cleaning. mqc's were
                   ran and they passed with no problems.  There has been a 
                   few wafers ran on the tool since and I was told the tool
                   looks good.
62.674XE1025 slightly low outgoing thickness @ILD2YIELD::PHESTERSat May 24 1997 09:5836
                                CMP PEX 
                     

LOT #          XE1025

QUANTITY:      24

OPERATION #    2006 CMP POLISH ILD2
/DESCR.

POLISHER:      CMP.B4 POST READINGS

EVAL TOOL:     THICKNESS.A4

DATE:          5/24/97  C-Shift

PROBLEM:       LOW POST THICKNESS ILD2

               LOT POST THICKNESS MEAS AVG  = 4751�  

                                       LCL IS 5200�
        
DISPOSITION:   Lot was polished on D shift on .B4.
               Tech had a problem with tool in that the removal
               rate increased the closer it got to target.  Normal
               removal rates decrease the closer to target.
               
               Also this tool was running on a slurry barrel and the level was
               low.  It is possible that the slurry could have had a higher
               solid content causing the higher removal rate.  The barrel was
               changed out after this lot was polished.

CORRECTIVE
ACTION         Lot has been remarked for extra dep at operation # 2284.

62.675XD1383 low outgoing thickness @ ILD3YIELD::PHESTERSat May 24 1997 20:2741
                                CMP PEX 
                     

LOT #          XD1383

QUANTITY:      24

OPERATION #    1989 CMP_ILD3
/DESCR.

POLISHER:      CMP.B4 POST READINGS

EVAL TOOL:     THICKNESS.A5

DATE:          5/24/97  C-Shift

PROBLEM:       LOW POST THICKNESS ILD3

               LOT POST THICKNESS MEAS AVG  = 9456�  

                                       LCL IS 9500�

              THK_ME_5     WAFER #1                 9308.000
                           WAFER #2                 9150.000
                           WAFER #3                 9467.000
                           WAFER #4                 9931.000
                           WAFER #5                 9425.000
              THK_RG       XD1383                   3617.000
              THK_SD_5     WAFER #1                   12.100   5/24/97 17:03:35
                           WAFER #2                   11.100
                           WAFER #3                   10.400
                           WAFER #4                    9.100
                           WAFER #5                    5.100
        
DISPOSITION:   REMOVAL RATE IS INCREASING AFTER INITIAL POLISH.  THIS IS 
               HIGHLY UNUSUAL.  EE AND PE ARE INVESTIGATING.

CORRECTIVE
ACTION         LOT REMARKED FOR EXTRA DEP @ 2136 DEP_ILD3 3.

62.676XD1483 five wafers over-polished @ILD2FABSIX::P_HESTERWed May 28 1997 20:1136
                              CMP PEX 

LOT #:             XD1483

QUANTITY:          24

OPERATION #        1985 CMP_ILD2     CMP 
  
POLISHER:          CMP.B4/CMP.A1

EVAL TOOL:         N/A

DATE:              D-SHIFT   05/28/97 

PROBLEM:           5 WAFERS WERE OVER-POLISHED BY 1500�.

                   Wafer #1  = 4308      
                   Wafer #2  = 4333    (LCL = 5200�)
                   Wafer #3  = 4528
                   wafer #4  = 4679
                   wafer #5  = 3613


DISPOSITION:       LOT WAS POLISHED ON PREVIOUS SHIFT.  FROM INFORMATION 
                   GATHERED THE LOT WAS STARTED ON CMP.B4 (SPEEDFAM) AND DUE
                   TO A TOOL PROBLEM WAS MOVED TO FINISH ON CMP.A1 (STRASBAUGH).
                   APPARENTLY THE ENTIRE LOT INCLUDING THE SEND AHEADS WAS THEN
                   POLISHED FOR 180 SEC ON CMP.A1.  AS A RESULT THE SEND-AHEADS
                   WERE OVERPOLISHED.  DUE TO LOWER REMOVAL RATE ON THE .A TOOLS
                   THE WAFERS WERE NOT SEVERELY OVER-POLISHED.


CORRECTIVE         
ACTION:            THE LOT WAS REMARKED ACCORDINGLY FOR EXTRA DEP AND MOVED ON. 
 
62.677jd1561 7 overpolish 1 scrapSUBPAC::KULPThu May 29 1997 09:1222
                              CMP PEX
 
LOT #:             JD1561 	

QUANTITY:          24-1=23

OPERATION #        3054 THICK CMP @ ILD1 ON PROMETRIX
  
POLISHER:          CMP.B2   

EVAL TOOL:         THICKNESS.A1

DATE:              D shift   05/29/97    

PROBLEM:           7 wafer over polish, 1 scrap ( wafer# 20)

DISPOSITION:       Lot moved on with 1 less wafers.

CORRECTIVE ACTION:  Run time was 230 sec. 3150 RR all other wafers were good
		    with 7 touch ups.  No alarms, remarked 6 wafers for extra 
		    dep.
 
62.678JD1561 revised PEX - 7 wafers overpolish @ILD1YIELD::PHESTERThu May 29 1997 17:4031
                              CMP PEX
 
LOT #:             JD1561 	

QUANTITY:          24-1=23

OPERATION #        3054 THICK CMP @ ILD1 ON PROMETRIX
  
POLISHER:          CMP.B2   

EVAL TOOL:         THICKNESS.A1

DATE:              D shift   05/29/97    

PROBLEM:           7 wafer over polish, 1 scrap ( wafer# 20)

DISPOSITION:       Lot moved on with 1 less wafers.

CORRECTIVE ACTION:  Run time was 230 sec. 3150 RR all other wafers were good
		    with 7 touch ups.  No alarms, remarked 6 wafers for extra 
		    dep.

                    Investigation showed this lot had the lowest mean thickness
                    of the last 20 or so lots leaving dielectrics (17502).  
                    Also the mean thickness of lots leaving dielectrics at this
                    level have been averaging below the target thickness for a
                    week or so.  This is not necessarily the sole cause of this
                    incident, but could have contributed.


62.679JD1401 several wafers over polish. ILD3SUBPAC::KULPFri May 30 1997 08:2341
                              CMP PEX
 
LOT #:             JD1401 	DC1026-000-JB-8G   

QUANTITY:          23

OPERATION #        1989 CMP_ILD3 
  
POLISHER:          CMP.B4

EVAL TOOL:         THICKNESS.A1

DATE:              D shift   05/29/97    

PROBLEM:      7 wafers overpolished from C shift.     

Incoming data: 
             	MACH..OX-DEP.E1   32K - 36K   mean 32281.199   range  802.000 
 
             PARAMETER       UNIT ID/PROMPT        VALUE    FG LT
 
 COL ENG DATA THK_ME_5     WAFER #1                32073.000   5/28/97 06:38:18
                           WAFER #2                32391.000
                           WAFER #3                31975.000
                           WAFER #4                32190.000
                           WAFER #5                32777.000
              THK_SD_5     WAFER #1                    1.000
                           WAFER #2                    0.570
                           WAFER #3                    1.200
                           WAFER #4                    0.860
                           WAFER #5                    0.780

DISPOSITION:      additional dep. required a capping dep. remarks entered.
		  1@ 1000, 3@ 2000, 1@ 2500, 1@ 4000 1@ 4500 

CORRECTIVE ACTION:  This lot was started on C shift with real high removal
		    rates.  Initial polish of 400 sec, some wafers went down
		    to 5000 to 12000 � range.  It was getting near the end of
		    the barrel, .75 gone, requested to change.  When is the
		    barrel going away???
 
62.680xb1342 all wafers overpolish PMDSUBPAC::KULPFri May 30 1997 08:2440
                              CMP PEX
 
LOT #:             XB1342   TM0069-085-FA-8C  

QUANTITY:          22

OPERATION #        1978 CMP_PMD
  
POLISHER:          CMP.A1   

EVAL TOOL:         THICKNESS.A1

DATE:              C shift   05/29/97    

PROBLEM:           All wafers overpolished

XB1342  Just notified at 7:20 that this lot (TM69 @PMD) was thin.  OPS said
        there were no remarks or anything unusual.  Did send aheads, calc'd
        RR at 2900 (fast) and did lot for 103 sec.  Lot came out at between
        5700 and 5900.  OPS will bin and remark for extra dep.  Will PEX in
        AM if necessary.

Incoming data: MACH..OX-DEP.B3C   12.1K to 10.9K  target 11.5K

              THK_ME_5     WAFER #1                11513.000
                           WAFER #2                11528.000
                           WAFER #3                11520.000
                           WAFER #4                11497.000
                           WAFER #5                      N/A
              THK_UN_5     WAFER #1                    1.060
                           WAFER #2                    1.070
                           WAFER #3                    1.030
                           WAFER #4                    1.020
                           WAFER #5                      N/A


DISPOSITION:       moved lot on...

CORRECTIVE ACTION:  Add 500� on all wafers . 
 
62.681pex report for JL1585, 1 wafer scrapped due to overpolishFABSIX::S_AGUILATue Jun 03 1997 07:4930
                                 -< CMP PEX, >-
--------------------------------------------------------------------------------
  

LOT:     JL1585

MACHINE: CMP.B2

OPER#:   1992

PROCESS  LEVEL: MSP_ILD1

DATE:    6/3/97

SHIFT:  B-SHIFT 

QUANTITY:  22-1 = 21

PROBLEM: 1 WAFER SCRAPPED DUE TO OVER POLISHING (WAFER #11)

DISPOSITION: The lot is on hold for day shift engineering for "review",  wafer 
             #24 on slot 24 had problems with pattern rec. The rest of the
             wafers polished to spec.
 
CORRECTIVE ACTION:  Lot will have 1 less wafer when it is moved out of this
                    area                   



62.682Updated cmp pex,1 more scrap due to wafer missing patternSUBPAC::SMARTINTue Jun 03 1997 14:2736
                                 -< CMP PEX, >-
--------------------------------------------------------------------------------
  

LOT:     JL1585

MACHINE: CMP.B2

OPER#:   1992

PROCESS  LEVEL: MSP_ILD1

DATE:    6/3/97

SHIFT:  B-SHIFT 

QUANTITY:  22-2=20

PROBLEM: 1 WAFER SCRAPPED DUE TO OVER POLISHING (WAFER #11) AND WAFER #24
         scrapped out for m1 layer never being patterned (per Roger Laakko)


DISPOSITION: When I inspected wafer #24 it was obvious that there was something
             wrong with this wafer.  The pattern was very different from the
             rest of the wafers.  The lot was then turn back over to films to
             fined out what the deal is.  After films took a look at this
             wafer it was discovered it never recieved m1 layer pattern.
             

 
CORRECTIVE ACTION:  Lot will have 2 less wafer when it is moved out of this
                    area.  No further action required.                   



62.683CMP PEX, 15 WAFERS REMARKED FOR EXTRA DEP ON XB1369SUBPAC::SMARTINTue Jun 03 1997 16:0255
  

LOT:     XB1369

MACHINE: CMP.A2

OPER#:   1979

PROCESS  LEVEL: PMD

DATE:    6/3/97

SHIFT:  100%ed on A - SHIFT but polished on "b" shift

QUANTITY:  23

PRODUCT. . TM0069-085-FA-8C 
 
LOT; XB1369
.
PROBLEM:  15 Wafers remarked for extra dep.

            PARAMETER       UNIT ID/PROMPT        VALUE    FG LT             
              THK_ME_5     WAFER #1                 6283.000                   
                           WAFER #2                 6023.000                   
                           WAFER #3                 6313.000                   
                           WAFER #4                 6070.000                   
                           WAFER #5                 6069.000                   
              THK_RG       NA                        343.000  
                                        lcl=6200
     
DISPOSITION: The following wafers will need extra dep, they are on the thin
             side lot polished from previous shift and passed on to the next.

Wafer   Thickness       extra Dep.

21      5817            500
4       6185            500           cl=6200-6800
11      5922            500
24      6023            500
5       6062            500
18      6038            500
8       6152            500
9       6133            500
1       6132            500
2       6009            500
17      6070            500
16      6190            500
23      5889            500
7       6069            500
20      5985            500


CORRECTIVE ACTION:  The polish times that were used to polish this lot was
                    definitly a little too aggressive.
62.684JD1474, 3 WAFERS REMARKED FOR EXTRA DEPFABSIX::S_AGUILAWed Jun 04 1997 04:3743

                                CMP PEX REPORT
--------------------------------------------------------------------------------
  

LOT:     JD1474

MACHINE: CMP.B2

OPER#:  1989

PROCESS LEVEL: CMP_ILD3

DATE:   6/4/97

SHIFT:  B shift

QUANTITY:  24

PRODUCT:  DC1073-000-DA-8G 

 
PROBLEM:  3 Wafers overpolished, wafers remarked for extra dep.

Incoming Thickness
THK_ME_5                   WAFER #1                32401.000   6/01/97 06:14:16
                           WAFER #2                32490.000
                           WAFER #3                      N/A
                           WAFER #4                31882.000
                           WAFER #5                32573.000
          
DISPOSITION: The following wafers will need extra dep

Wafer#   Thickness       extra Dep.
2         9000            ~1000A
6         8350            ~1500A                    cl=10,000A +/-500A
17        8723            ~1500A


CORRECTIVE ACTION:  The lot was remarked @ Oper #2136 DEP_ILD3 for extra dep.  
                    Lot was moved on. Also this lot flagged for thickness
		    range, wafer #6 thickness was too low = 8350A  
62.685XE1199, 5 WAFERS REMARKED FOR EXTRA DEPFABSIX::S_AGUILAWed Jun 04 1997 05:0444

                                CMP PEX REPORT
--------------------------------------------------------------------------------
  

LOT:     XE1199

MACHINE: CMP.B2

OPER#:  1989

PROCESS LEVEL: CMP_ILD3

DATE:   6/4/97

SHIFT:  This lot started being process on A shift, finished on B shift

QUANTITY:  19

PRODUCT:  TM0060-000-HA-8C  

 
PROBLEM:  5 Wafers overpolished, wafers remarked for extra dep.

Incoming Thickness
THK_ME_5                   WAFER #1                33732.000
                           WAFER #2                33734.000 
                           WAFER #3                33646.000
                           WAFER #4                N/A
                           WAFER #5                33728.000
          
DISPOSITION: The following wafers will need extra dep

Wafer#   Thickness       extra Dep.
3         9100            ~1000
9         7686            ~2500 
16	  7364		  ~2500	                 cl=10,000A +/-500A
18        8341            ~1500
24        8539            ~1500

CORRECTIVE ACTION:  The lot was remarked @ Oper #2291 DEP_ILD3 for extra dep.  
                    Lot was moved on.