| 8.5 | MONTHLY P.M. | PATE::GEE |  | Tue Nov 07 1995 00:58 | 91 | 
|  |  R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE: 11-07-95   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH.: A & B SHIFT
 INITIAL
 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.
 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  
 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
 ___x___ 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:__.0025______
 ___x___ 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout:___.001____
                Left Spindlele Runout:___.002____
 ___x___ 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:__.002____
                Left Spindle Hub Runout:___.001_____
 ___x___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error:   -0.47
                Right Spindle Force Error:   -0.33
                Left Spindle Calibration Variable:
                     Pre-adjust:  .94     Post-adjust:   .74
                Right Spindle Calibration Variable:
                     Pre-adjust:  .97     Post-adjust:   .84
 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.
 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust:___24.01____   Post-adjust:___N/A______
 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 15.01/-15.01  Post-adjust:____N/A______
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust:__5.00______   Post-adjust:___N/A______
 __N/A__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.
                Pre-adjust:___N/A______   Post-adjust:___N/A______
 ___x___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.
 COMMENTS: CHANGED THE SLURRY FILTER
    __________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 | 
| 8.1 | Weekly PM Checksheet Template | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Wed Nov 08 1995 21:07 | 78 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:__________   SYSTEM RTC CODE:__________   EQUIP. TECH.:_______________
 INITIAL
 _______ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:________
                                         Post-adjust:________
 _______ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:________
                                         Post-adjust:________
 _______ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:________
  
 _______ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 _______ 6.1.5  Check all tubing and fittings for leaks. 
 _______ 6.1.6  Check all tubing and fittings for air leaks.
 _______ 6.1.7  Check all indicator lights.
 _______ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 _______ 6.1.9  Wipe down polish table, tub, and splash ring.
 _______ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 _______ 6.1.11 Wipe down pad conditioning arm.
 _______ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 _______ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 _______ 6.1.14 Wipe down outer surface of both spindle hubs.
 _______ 6.1.15 Remove and clean O-rings, replace if necessary.
 _______ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 _______ 6.1.17 Wipe down all surfaces of the robot.
 _______ 6.1.18 Clean end effector vacuum chuck air port.
 _______ 6.1.19 Inspect and clean end effector air nozzle.
 _______ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 _______ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 _______ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 _______ 6.1.23 Check Neslab TCU for leaks.
 _______ 6.1.24 Check Neslab TCU temperature readout.
 _______ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 _______ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 _______ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:__________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 | 
| 8.2 | Monthly PM Checksheet Template | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Wed Nov 08 1995 21:07 | 90 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE:__________   SYSTEM RTC CODE:__________   EQUIP. TECH.:_________________
 INITIAL
 _______ 6.2.1  Perform weekly PM checks in addition to this monthly list.
 _______ 6.2.2  Replace the fluid lines on the peristaltic pumps.  
 _______ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
 _______ 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:____________
 _______ 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout:____________
                Left Spindlele Runout:____________
 _______ 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:____________
                Left Spindle Hub Runout:____________
 _______ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error:____________
                Right Spindle Force Error:____________
                Left Spindle Calibration Variable:
                     Pre-adjust:____________  Post-adjust:____________
                Right Spindle Calibration Variable:
                     Pre-adjust:____________  Post-adjust:____________
 _______ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
 _______ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
 _______ 6.2.10 Check shuttle travel.  Adjust if necessary.
 _______ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust:____________   Post-adjust:____________
 _______ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust:____________   Post-adjust:____________
 
 _______ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust:____________   Post-adjust:____________
 _______ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.
                Pre-adjust:____________   Post-adjust:____________
 _______ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
 _______ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
 _______ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
 _______ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.
 COMMENTS:__________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 | 
| 8.3 | Semi-annual PM Checksheet Template | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Wed Nov 08 1995 21:07 | 30 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semmi-annual Preventive Maintenance Check Sheet, REV. C
 INITIAL
 _______ 6.3.1  Perform Weekly and Monthly PM's in addition to this Semi-Annual
                list.
 _______ 6.3.2  Check all safety interlocked doors for proper operation.  
 _______ 6.3.2  Check all EMO's for proper operation.
 _______ 6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.
 _______ 6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.
 _______ 6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.
 COMMENTS:__________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 | 
| 8.4 | Annual PM Checksheet Template | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Wed Nov 08 1995 21:08 | 27 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Annual Preventive Maintenance Check Sheet, REV. C
 INITIAL
 _______ 6.4.1  Perform Weekly, Monthly, and Semi-Annual PM's in  addition to
                this Annual list
 _______ 6.4.2  Perform Bridge Position calibration.
 _______ 6.4.3  Check Robot Position Alignment.  Calibrate if necessary.
 _______ 6.4.4  Check Robot Travel position.  Adjust if necessary.
 _______ 6.4.5  Check Robot Arm position.  Adjust if necessary.
 _______ 6.4.6  Check Elevator Height position.  Adjust if necessary.
 COMMENTS:__________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 | 
| 8.6 | Weekly PM for 11/22 completed | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Wed Nov 22 1995 06:12 | 71 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 11/22/95  SYSTEM RTC CODE: CMP.B1   EQUIP. TECH.: BJ
 INITIAL
 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:________
 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi
                                         Post-adjust:________
 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40 psi
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X___ 6.1.5  Check all tubing and fittings for leaks. - SEE COMMENTS 
 ___X___ 6.1.6  Check all tubing and fittings for air leaks.
 ___X___ 6.1.7  Check all indicator lights.
 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X___ 6.1.11 Wipe down pad conditioning arm.
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 ___X___ 6.1.17 Wipe down all surfaces of the robot.
 ___X___ 6.1.18 Clean end effector vacuum chuck air port.
 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 ___X___ 6.1.23 Check Neslab TCU for leaks.
 ___X___ 6.1.24 Check Neslab TCU temperature readout.
 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  Solenoid #31 in the valve cabinet is leaking and was ordered.
            It is due in today and will be replaced time permitting.
 | 
| 8.7 | WEEKLY PM COMPLETED FOR WW22 | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Wed Nov 29 1995 21:54 | 74 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 11/29/95   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Leon and BJ
 INITIAL
 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:________
 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi
                                         Post-adjust:________
 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X___ 6.1.5  Check all tubing and fittings for leaks. 
 ___X___ 6.1.6  Check all tubing and fittings for air leaks.
 ___X___ 6.1.7  Check all indicator lights.
 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X___ 6.1.11 Wipe down pad conditioning arm.
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 ___X___ 6.1.17 Wipe down all surfaces of the robot.
 ___X___ 6.1.18 Clean end effector vacuum chuck air port.
 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 ___X___ 6.1.23 Check Neslab TCU for leaks.
 ___X___ 6.1.24 Check Neslab TCU temperature readout.
 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  Checked both hubs due to bad uniformity.  Found the left
            hub out .08 mils and the right was at .0025.  I brought
            them both in within .0005 mils.
    
________________________________________________________________________
 | 
| 8.8 | Semi-annual check sheets (inc. weekly + monthly) | FABSIX::B_FINN |  | Wed Dec 06 1995 13:04 | 211 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 12/06/95  SYSTEM RTC CODE: CMP.A2     EQUIP. TECH.: MR/BF
 INITIAL
 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100____
                                         Post-adjust:________
 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__86____
                                         Post-adjust:________
 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___40___
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X___ 6.1.5  Check all tubing and fittings for leaks. 
 ___X___ 6.1.6  Check all tubing and fittings for air leaks.
 ___X___ 6.1.7  Check all indicator lights.
 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X___ 6.1.11 Wipe down pad conditioning arm.
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 ___X___ 6.1.17 Wipe down all surfaces of the robot.
 ___X___ 6.1.18 Clean end effector vacuum chuck air port.
 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 _N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 ___X___ 6.1.23 Check Neslab TCU for leaks.
 ___X___ 6.1.24 Check Neslab TCU temperature readout.
 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:__________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
                      -< Monthly PM Checksheet Template >-
 -------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE:12/6/95   SYSTEM RTC CODE: CMP.A2     EQUIP. TECH.:BF/MR/TL
 INITIAL
 ____X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.
 ____X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  
 ____X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
 ____X___ 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:___0.001"________
 ___X____ 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout:____0.001"________
                Left Spindlele Runout:___0.001"_________
 ____X___ 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:_____0.0005"_______
                Left Spindle Hub Runout:______0.00075______
 ____X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error:_____-0.79_______
                Right Spindle Force Error:____-0.29________
                Left Spindle Calibration Variable:
                     Pre-adjust:___0.98______  Post-adjust:____1.03________
                Right Spindle Calibration Variable:
                     Pre-adjust:___0.99_________ Post-adjust:__1.04__________
 ___X____ 6.2.8  Check left and right load station alignment.  Adjust if
                 necessary.
 ___X____ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                 necessary.
 ___X____ 6.2.10 Check shuttle travel.  Adjust if necessary.
 ___X____ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                 Pre-adjust:__24.03_______   Post-adjust:___24.00_________
 ___X____ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                 Pre-adjust:___15.02_________   Post-adjust:___15.00_______
 
 ___X____ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                 Pre-adjust:___5.00_________   Post-adjust:___5.00_________
 __N/A___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.
                 Pre-adjust:____________   Post-adjust:____________
 ___X____ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                 necessary using Shell Tellus 10 or equivalent.
 ___X____ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
  	         Adjust level if necessary.
 ___X____ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                 fittings.
 ___X____ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                 connectors.
 COMMENTS:__________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semmi-annual Preventive Maintenance Check Sheet, REV. C
       DATE:12/6/95   SYSTEM RTC CODE: CMP.A2     EQUIP. TECH.:BF/MR/TL
 
INITIAL
 ___X____ 6.3.1 Perform Weekly and Monthly PM's in addition to this Semi-Annual
                list.
 ___X___ 6.3.2  Check all safety interlocked doors for proper operation.  
 ___X___ 6.3.2  Check all EMO's for proper operation.
 ___x___ 6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.
 ___X___ 6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.
 ___X___ 6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.
 COMMENTS:__________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 | 
| 8.9 | weekly pm completed | FABSIX::B_FINN |  | Sun Dec 10 1995 15:18 | 75 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:12/10/95   SYSTEM RTC CODE: CMP.A2  EQUIP. TECH: Finn
 INITIAL
 __X_____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:________ 100
                                         Post-adjust:________
 ___X____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:________88
                                         Post-adjust:________85
 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:_40______
  
 ___x____ 6.1.4 Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___x___ 6.1.5  Check all tubing and fittings for leaks. 
 ___x___ 6.1.6  Check all tubing and fittings for air leaks.
 ___x___ 6.1.7  Check all indicator lights.
 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring. 
 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___x___ 6.1.11 Wipe down pad conditioning arm.
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 ___x___ 6.1.17 Wipe down all surfaces of the robot.
 ___x___ 6.1.18 Clean end effector vacuum chuck air port.
 ___x___ 6.1.19 Inspect and clean end effector air nozzle.
 
 ___x___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __X____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 ___x___ 6.1.23 Check Neslab TCU for leaks.
 ___x___ 6.1.24 Check Neslab TCU temperature readout.
 ___x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___x___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:__________________________________________________________________
 slurry pump 1+2  needed calibration changes
 | 
| 8.10 | weekly completed | FABSIX::B_FINN |  | Tue Dec 19 1995 17:58 | 76 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:12/19/95   SYSTEM RTC CODE: CMP.A2  EQUIP. TECH: Finn/Landry
 INITIAL
 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:________ 100
                                         Post-adjust:________100
 ___X____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:________88
                                         Post-adjust:________85
 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:_41______
  
 ___x____ 6.1.4 Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___x___ 6.1.5  Check all tubing and fittings for leaks. 
 ___x___ 6.1.6  Check all tubing and fittings for air leaks.
 ___x___ 6.1.7  Check all indicator lights.
 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring. 
 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___x___ 6.1.11 Wipe down pad conditioning arm.
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 ___x___ 6.1.17 Wipe down all surfaces of the robot.
 ___x___ 6.1.18 Clean end effector vacuum chuck air port.
 ___x___ 6.1.19 Inspect and clean end effector air nozzle. 
 
 ___x___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __X____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 ___x___ 6.1.23 Check Neslab TCU for leaks.
 ___x___ 6.1.24 Check Neslab TCU temperature readout.
 ___x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___x___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:__________________________________________________________________
 Slurry pump 1 needed calibration changes
 Added water to Neslab
 Cleaned light coat of oil from drip pan from bridge lube. Saw no leaks.
                                                                
 | 
| 8.11 | No PM necessary for WW26 FY96 | SUBPAC::TOOKER |  | Thu Dec 21 1995 15:07 | 6 | 
|  | Due to the scheduled FAB6 shutdown during Work Week 26 Fiscal Year 1996, no PM will be performed
on CMP.A2.
       Jim Tooker
       CMP Equipment Engineer
 | 
| 8.12 | WW27 WEEKLY PM COMPLETE | FABSIX::B_WESTPHAL |  | Sat Jan 06 1996 16:51 | 78 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:06 JAN 96    SYSTEM RTC CODE: CMP.A2      EQUIP. TECH.:POIRIER/WESTPHAL
 INITIAL
 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:_100____
                                         Post-adjust:N/A_____
 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:_86_____
                                         Post-adjust:_N/A____
 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:_UNREADABLE
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X___ 6.1.5  Check all tubing and fittings for leaks. 
 ___X___ 6.1.6  Check all tubing and fittings for air leaks.
 ___X___ 6.1.7  Check all indicator lights.
 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X___ 6.1.11 Wipe down pad conditioning arm.
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 ___X___ 6.1.17 Wipe down all surfaces of the robot.
 ___X___ 6.1.18 Clean end effector vacuum chuck air port.
 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 ___X___ 6.1.23 Check Neslab TCU for leaks.
    
 ___X___ 6.1.24 Check Neslab TCU temperature readout.
 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENT:                                                                      ___
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 | 
| 8.13 | MONTHLY PM FOR CMP.A2 COMPLETED | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Wed Jan 10 1996 06:15 | 90 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE: 1/10/96  SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: D shift
 INITIAL
 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.
 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  
 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
 ___X___ 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout: .0015
 ___X___ 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout: .002
                Left Spindle Runout: .001
 ___X___ 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout: .0015
                Left Spindle Hub Runout: .001
 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error: 1.28
                Right Spindle Force Error: .15
                Left Spindle Calibration Variable:
                     Post-adjust: 169.52
                Right Spindle Calibration Variable:
                     Post-adjust: 167.31
 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.
 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 24.02  Post-adjust:____________
 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: -15.02/15.02   Post-adjust:____________
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust: 5   Post-adjust:____________
 __N/A__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.
                Pre-adjust:____________   Post-adjust:____________
 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.
 COMMENTS:__________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 | 
| 8.14 | weekly completed | FABSIX::B_FINN |  | Fri Jan 19 1996 18:26 | 75 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
                              Week Ending 1-20-96  WW29
  DATE: 1-19-96          SYSTEM RTC CODE: CMP.A2     EQUIP. TECH: Brad/Brendan
 INITIAL   
 __X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
 __X___ 6.1.2  N2 pressure @ 87 PSI:    Pre-adjust: 88 psi
                                         Post-adjust:_N/A____
 __X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40 psi
  
 __X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __X___ 6.1.5  Check all tubing and fittings for leaks. 
 __X___ 6.1.6  Check all tubing and fittings for air leaks.
 __X___ 6.1.7  Check all indicator lights.
 __X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __X___ 6.1.9  Wipe down polish table, tub, and splash ring.
 __x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __x___ 6.1.11 Wipe down pad conditioning arm.
 __x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __x___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __x___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __x___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 __x___ 6.1.17 Wipe down all surfaces of the robot.
 __x___ 6.1.18 Clean end effector vacuum chuck air port.
   
 __X___ 6.1.19 Inspect and clean end effector air nozzle.
 __x__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __x___ 6.1.23 Check Neslab TCU for leaks.
 __x___ 6.1.24 Check Neslab TCU temperature readout.
 __x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __x___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
COMMENTS:  Slurry pump 1 + 2 was adjusted, was on the low side.
	   Added water to chiller.
 | 
| 8.15 | Weekly completed....two air motors installed | SUBPAC::LANDRY |  | Tue Jan 23 1996 16:00 | 80 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 1-23-96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: Landry/Finn
 INITIAL
 _TL/BF_ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
 _TL/BF_ 6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 87 psi
                                         Post-adjust:_N/A____
 _TL/BF_ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
 _TL/BF_ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 _TL/BF_ 6.1.5  Check all tubing and fittings for leaks. 
 _TL/BF_ 6.1.6  Check all tubing and fittings for air leaks.
 _TL/BF_ 6.1.7  Check all indicator lights.
 _TL/BF_ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 _TL/BF_ 6.1.9  Wipe down polish table, tub, and splash ring.
 _TL/BF_ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 _TL/BF_ 6.1.11 Wipe down pad conditioning arm.
 _TL/BF_ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 _TL/BF_ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 _TL/BF_ 6.1.14 Wipe down outer surface of both spindle hubs.
 _TL/BF_ 6.1.15 Remove and clean O-rings, replace if necessary.
 _TL/BF_ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 _TL/BF_ 6.1.17 Wipe down all surfaces of the robot.
 _TL/BF_ 6.1.18 Clean end effector vacuum chuck air port.
   
 _TL/BF_ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 _TL/BF_ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 _TL/BF_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 _TL/BF_ 6.1.23 Check Neslab TCU for leaks.
 _TL/BF_ 6.1.24 Check Neslab TCU temperature readout.
 _TL/BF_ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 _TL/BF_ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 _TL/BF_ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
COMMENTS:  
*  Changed air motors on both scrub/clean stations per Jim Tookers request.
*  Ran MQC's after installation of the scrubber air motors.
*  Conditioning disk was NOT changed out at this time.  Cleaned and re-
   installed original disk
 | 
| 8.16 | WW 31 Weekly PM | FABSIX::R_POIRIER |  | Tue Jan 30 1996 05:53 | 79 | 
|  | --------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
				WW31
  DATE:_1/30/96_   SYSTEM RTC CODE:_CMP.A2_   EQUIP. TECH.:_B SHIFT_
 INITIAL
 _RP____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:_100 psi_
                                         Post-adjust:__N/A__
 _RP____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:_88 psi_
                                         Post-adjust:_N/A_
 _RP____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__42 psi_
  
 _RP____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 _RP____ 6.1.5  Check all tubing and fittings for leaks. 
 _RP____ 6.1.6  Check all tubing and fittings for air leaks.
 _RP____ 6.1.7  Check all indicator lights.
 _RP____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 _RP____ 6.1.9  Wipe down polish table, tub, and splash ring.
 _RP____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 _RP____ 6.1.11 Wipe down pad conditioning arm.
 _RP____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 _RP____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 _RP____ 6.1.14 Wipe down outer surface of both spindle hubs.
 _RP____ 6.1.15 Remove and clean O-rings, replace if necessary.
 _RP____ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 _RP____ 6.1.17 Wipe down all surfaces of the robot.
 _RP____ 6.1.18 Clean end effector vacuum chuck air port.
 _RP____ 6.1.19 Inspect and clean end effector air nozzle.
 _N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 _RP____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 _RP____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 _RP____ 6.1.23 Check Neslab TCU for leaks.
 _RP____ 6.1.24 Check Neslab TCU temperature readout.
 _RP____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 _RP____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 _RP____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:_Did Pad change during weekly PM. _______________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 | 
| 8.17 | Waiver for WW32 Monthly PM | SUBPAC::TOOKER |  | Fri Feb 09 1996 17:12 | 7 | 
|  | Due to robot and software upgrade causing excessive down time this week, the
monthly PM scheduled to take place this week will not be performed.  Instead,
a weekly PM has been performed and the monthly PM will be re-scheduled for next 
week.
Thanks,
Jim Tooker
 | 
| 8.18 | MONTHLY PM COMPLETED FOR WW33 | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Sat Feb 17 1996 07:07 | 90 | 
|  |         R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE: 2/17/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: D SHIFT
 INITIAL
 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.
 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  
 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
 ___X___ 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout: .002
 ___X___ 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout: .0025
                Left Spindle Runout: .003
 ___X___ 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout: .001
                Left Spindle Hub Runout: .0005
 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error: 1.36
                Right Spindle Force Error: .68
                Left Spindle Calibration Variable (Dead weight):
                     Pre-adjust: 163.03  Post-adjust: 166.75
                Right Spindle Calibration Variable (Dead weight):
                     Pre-adjust: 167.31  Post-adjust:____________
 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.
 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 24   Post-adjust:____________
 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 15.02/-15.01   Post-adjust:____________
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust: 4.99   Post-adjust:____________
 ___X___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.
                Pre-adjust: 12.01   Post-adjust:____________
 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.
 COMMENTS:__________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
       
 ___________________________________________________________________________
 | 
| 8.19 | WW34 Weekly PM | FABSIX::R_POIRIER |  | Mon Feb 19 1996 05:56 | 72 | 
|  |                                 -< weekly ww34 >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 2/19/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: B-shift
              
 INITIAL
 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:________
 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 88 psi
                                         Post-adjust:________
 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___x___ 6.1.5  Check all tubing and fittings for leaks. 
 ___x___ 6.1.6  Check all tubing and fittings for air leaks.
 ___x___ 6.1.7  Check all indicator lights.
 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___x___ 6.1.11 Wipe down pad conditioning arm.
 
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___x___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 ___x___ 6.1.17 Wipe down all surfaces of the robot.
 ___x___ 6.1.18 Clean end effector vacuum chuck air port.
 ___x___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___x___ 6.1.23 Check Neslab TCU for leaks.
 ___x___ 6.1.24 Check Neslab TCU temperature readout.
 ___x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 _______ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS: 
 | 
| 8.20 | ww 35 pm weekly pm completed | FABSIX::B_FINN |  | Wed Feb 28 1996 18:50 | 76 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 2/28/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: A-shift
              
 ___X__ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:________
 ___X__ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 88 psi
                                         Post-adjust:________
 ___X__ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X___ 6.1.5  Check all tubing and fittings for leaks. 
 ___X___ 6.1.6  Check all tubing and fittings for air leaks.
 ___X___ 6.1.7  Check all indicator lights.
 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X__ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X__ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X__ 6.1.11 Wipe down pad conditioning arm.
 
 ___X__ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___X__ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 ___X___ 6.1.17 Wipe down all surfaces of the robot.
 ___X___ 6.1.18 Clean end effector vacuum chuck air port.
 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 ___X___ 6.1.23 Check Neslab TCU for leaks.
 ___X___ 6.1.24 Check Neslab TCU temperature readout.
 ___x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___x__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___x__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS: Slurry Pump #1 cal variable changed from .84 to .9
           Slurry Pump #2 cal variable changed from .75 to .79
	   Added @ a gallon of water to TCU resevoir
	   System no longer utilizes a point of use slurry filter
	   Light coat of bridge oil found on drip pan
 | 
| 8.21 | MONTHLY PM COMPLETED FOR WW36 | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Thu Mar 07 1996 23:26 | 90 | 
|  |         R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE: 3/7-8/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: C+D SHIFT
 INITIAL                                 
 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.
 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  
 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
 ___X___ 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout: .002
 ___X___ 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout: .002
                Left Spindle Runout: .002
 ___X___ 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:  .0005
                Left Spindle Hub Runout:   .002
 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error:  < 2 - IN PC  A2L-307.XLS  
                Right Spindle Force Error: < 2 - IN PC  A2R-307.XLS  
                Left Spindle Calibration Variable (Dead weight):
                     Pre-adjust: IN PC  Post-adjust: 
                Right Spindle Calibration Variable (Dead weight):
                     Pre-adjust: IN PC Post-adjust:____________
 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.
 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 24   Post-adjust:____________
 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 15.02/-15.01   Post-adjust:____________
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust: 4.99   Post-adjust:____________
 ___X___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.
                Pre-adjust: 12.01   Post-adjust:____________
 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.
 COMMENTS:__________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
       
 ___________________________________________________________________________
 | 
| 8.22 | weekly p.m. completed | FABSIX::R_GEE |  | Sun Mar 10 1996 23:17 | 72 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 03/10/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: B shift
 INITIAL
 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:________
 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi
                                         Post-adjust:______
 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___x___ 6.1.5  Check all tubing and fittings for leaks. 
 ___x___ 6.1.6  Check all tubing and fittings for air leaks.
 ___x___ 6.1.7  Check all indicator lights.
 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___x___ 6.1.11 Wipe down pad conditioning arm.
 
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___x__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 ___x___ 6.1.17 Wipe down all surfaces of the robot.
 ___x___ 6.1.18 Clean end effector vacuum chuck air port.
 ___x___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___x___ 6.1.23 Check Neslab TCU for leaks.
 ___x___ 6.1.24 Check Neslab TCU temperature readout.
 ___x__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___x__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___x__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:
	replaced the carriers and pad.          
                                                      
 | 
| 8.23 | Weekly PM completed for WW38 | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Wed Mar 20 1996 06:30 | 74 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 03/20/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: BJ
 INITIAL
 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:________
 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi
                                         Post-adjust:______
 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X___ 6.1.5  Check all tubing and fittings for leaks. 
 ___X___ 6.1.6  Check all tubing and fittings for air leaks.
 ___X___ 6.1.7  Check all indicator lights.
 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X___ 6.1.11 Wipe down pad conditioning arm.
 
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 ___X___ 6.1.17 Wipe down all surfaces of the robot.
 ___X___ 6.1.18 Clean end effector vacuum chuck air port.
 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __N/A__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___X___ 6.1.23 Check Neslab TCU for leaks.
 ___X___ 6.1.24 Check Neslab TCU temperature readout.
 ___X__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___X__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___X__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  Replaced all slurry pump compression fittings on the input
            and output on the slurry pumps.
    
    
    
 | 
| 8.24 | WW39 Weekly PM | FABSIX::R_POIRIER |  | Sun Mar 24 1996 06:36 | 75 | 
|  | --------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 03/24/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: B Shift
 INITIAL
 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:________
 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 84 psi
                                         Post-adjust:______
 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X___ 6.1.5  Check all tubing and fittings for leaks. 
 ___X___ 6.1.6  Check all tubing and fittings for air leaks.
 ___X___ 6.1.7  Check all indicator lights.
 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X___ 6.1.11 Wipe down pad conditioning arm.
 
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 ___X___ 6.1.17 Wipe down all surfaces of the robot.
 ___X___ 6.1.18 Clean end effector vacuum chuck air port.
 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __N/A__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___X___ 6.1.23 Check Neslab TCU for leaks.
 ___X___ 6.1.24 Check Neslab TCU temperature readout.
 ___X__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___X__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___X__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  
            
    
    
    
 | 
| 8.25 | 3/31/96 weekly completed | STRATA::FINN |  | Sun Mar 31 1996 18:35 | 74 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 03/31/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: A Shift
 INITIAL
 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:________
 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 84 psi
                                         Post-adjust:______
 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 50
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X___ 6.1.5  Check all tubing and fittings for leaks. 
 ___X___ 6.1.6  Check all tubing and fittings for air leaks.
 ___X___ 6.1.7  Check all indicator lights.
 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X___ 6.1.11 Wipe down pad conditioning arm.
 
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 ___X___ 6.1.17 Wipe down all surfaces of the robot.
 ___X___ 6.1.18 Clean end effector vacuum chuck air port.
 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __X____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___X___ 6.1.23 Check Neslab TCU for leaks.
 ___X___ 6.1.24 Check Neslab TCU temperature readout.
 ___X__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___X__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___X__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  
            
    Added water to Chiller
    Calibrated both slurry pumps
    
 | 
| 8.26 | WW41 Monthly PM | FABSIX::R_POIRIER |  | Wed Apr 10 1996 01:37 | 156 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly/Monthly Preventive Maintenance Check Sheet, REV. C
  DATE: 04/10/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: B Shift
 INITIAL
 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:________
 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 84 psi
                                         Post-adjust:______
 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 45
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X___ 6.1.5  Check all tubing and fittings for leaks. 
 ___X___ 6.1.6  Check all tubing and fittings for air leaks.
 ___X___ 6.1.7  Check all indicator lights.
 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X___ 6.1.11 Wipe down pad conditioning arm.
 
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 ___X___ 6.1.17 Wipe down all surfaces of the robot.
 ___X___ 6.1.18 Clean end effector vacuum chuck air port.
 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __X____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___X___ 6.1.23 Check Neslab TCU for leaks.
 ___X___ 6.1.24 Check Neslab TCU temperature readout.
 ___X__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___X__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___X__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  
            
Found small amount of oil in drip pan.
    
--------------------------------------------------------------------------------
        R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE: 04/10/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: B Shift
 INITIAL                                 
 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.
 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  
 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
 ___X___ 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout: .002
 ___X___ 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout: .001
                Left Spindle Runout: .001
 ___X___ 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:  .001
                Left Spindle Hub Runout:   .001
 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error:  < 2 - IN PC  A1_L4196.XLS  
                Right Spindle Force Error: < 2 - IN PC  A1_R4196.XLS  
                Left Spindle Calibration Variable (Dead weight):
                     Pre-adjust: IN PC  Post-adjust: 
                Right Spindle Calibration Variable (Dead weight):
                     Pre-adjust: IN PC Post-adjust:____________
 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.
 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 24   Post-adjust:____________
 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 15.02/-15.01   Post-adjust:____________
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust: 5.01   Post-adjust:____________
 ___X___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.
                Pre-adjust: 12.01   Post-adjust:____________
 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.
 COMMENTS:__________________________________________________________________
 | 
| 8.27 | 4/14/96 weekly pm completed | FABSIX::B_FINN |  | Sun Apr 14 1996 19:19 | 77 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 4/14/96   SYSTEM RTC CODE: CMP.A2      EQUIP. TECH: Landry/Finn
 INITIAL
 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:   100 PSI
                                         Post-adjust:  N/A
 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   82 PSI
                                         Post-adjust:  N/A
 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  45 PSI
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X___ 6.1.5  Check all tubing and fittings for leaks. 
 ___X___ 6.1.6  Check all tubing and fittings for air leaks.
 ___X___ 6.1.7  Check all indicator lights.
 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring. 
 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X___ 6.1.11 Wipe down pad conditioning arm.
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 ___X___ 6.1.17 Wipe down all surfaces of the robot.
 ___X___ 6.1.18 Clean end effector vacuum chuck air port.
 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 
 _N/a___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __X____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __X____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __X____ 6.1.23 Check Neslab TCU for leaks.
 __X____ 6.1.24 Check Neslab TCU temperature readout.
 __X____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __X____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __X____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS
 Repair leak on pump 2 hose (replaced both Pump 1 and 2 hose)
 Slurry pump 1+2 required cal after hose replacement
 Small amount of bridge oil in drip tray
                                         
 | 
| 8.28 | ww43 weekly pm completed | FABSIX::B_FINN |  | Mon Apr 22 1996 18:28 | 72 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 4/22/96   SYSTEM RTC CODE: CMP.A2  EQUIP. TECH.: LANDRY/FINN
 INITIAL
 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___
                                         Post-adjust:________
 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__85______
                                         Post-adjust:________
 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__45______
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X___ 6.1.5  Check all tubing and fittings for leaks. 
 ___X___ 6.1.6  Check all tubing and fittings for air leaks.
 ___X___ 6.1.7  Check all indicator lights.
 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X___ 6.1.11 Wipe down pad conditioning arm.
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 ___X___ 6.1.17 Wipe down all surfaces of the robot.
 ___X___ 6.1.18 Clean end effector vacuum chuck air port.
 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/a__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 ___X___ 6.1.23 Check Neslab TCU for leaks.
 ___X___ 6.1.24 Check Neslab TCU temperature readout.
 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS: Required calibration to slurry pump 1
	   Light oil in tray from bridge oilier 
	   Added a quart of water to chiller
 | 
| 8.29 | WW 44 completed.....Weekly version | SUBPAC::LANDRY |  | Tue Apr 30 1996 09:38 | 74 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 4-30-96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: "A" shift
 INITIAL
 _TL/BF_ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
 _TL/BF_ 6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi
                                         Post-adjust:_N/A____
 _TL/BF_ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
 _TL/BF_ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 _TL/BF_ 6.1.5  Check all tubing and fittings for leaks. 
 _TL/BF_ 6.1.6  Check all tubing and fittings for air leaks.
 _TL/BF_ 6.1.7  Check all indicator lights.
 _TL/BF_ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 _TL/BF_ 6.1.9  Wipe down polish table, tub, and splash ring.
 _TL/BF_ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 _TL/BF_ 6.1.11 Wipe down pad conditioning arm.
 _TL/BF_ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 _TL/BF_ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 _TL/BF_ 6.1.14 Wipe down outer surface of both spindle hubs.
 _TL/BF_ 6.1.15 Remove and clean O-rings, replace if necessary.
 _TL/BF_ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 _TL/BF_ 6.1.17 Wipe down all surfaces of the robot.
 _TL/BF_ 6.1.18 Clean end effector vacuum chuck air port.
   
 _TL/BF_ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 _TL/BF_ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 _TL/BF_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 _TL/BF_ 6.1.23 Check Neslab TCU for leaks.
 _TL/BF_ 6.1.24 Check Neslab TCU temperature readout.
 _TL/BF_ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 _TL/BF_ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 _TL/BF_ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
COMMENTS:  Both slurry pumps required a minor variable value change.  Both
           were found to be slightly on the low side.
      	   Added approximately 1/2 gallon on DI water to the TCU resevoir.
 | 
| 8.30 | MONTHLY PM FOR WW45 COMPLETED | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Thu May 09 1996 22:22 | 159 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE: 05/09/96   SYSTEM RTC CODE:CMP.A2       SHIFT: C, D and Jim T.
 INITIAL
 JPS/JT/JP 6.2.1  Perform weekly PM checks in addition to this monthly list.
  JPS/BW  6.2.2  Replace the fluid lines on the peristaltic pumps.  
  JPS/JP 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
 __X____ 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:___.002_____
 __X____ 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout:___.001_____
                Left Spindlele Runout:__.001______
 __X____ 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:__.0005_____
                Left Spindle Hub Runout:____.0015___
  JPS/JT 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error:   .11
                Right Spindle Force Error:  .31
                Left Spindle Calibration Variable:
                     Pre-adjust: 1.07         Post-adjust: 1.07
                Right Spindle Calibration Variable:
                     Pre-adjust: 1.08         Post-adjust: 1.07
 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
     JPS 6.2.10 Check shuttle travel.  Adjust if necessary.
     JPS 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 23.99 VDC   Post-adjust: 23.99
     JPS 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 15.02 VDC   Post-adjust: 15.02
 
     JPS 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust: 4.95 VDC   Post-adjust: 4.95
 ___X___ 6.2.17 Check the     12 VAC  power supply.  Calibrate if necessary.
                Pre-adjust:____12.0 ___   Post-adjust:____n/a_____
       JP 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
     JPS 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
     JPS 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
     JPS 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.
 COMMENTS: RIGHT SEND TANK HAS SMALL LEAK,
           LEFT RECIEVE FILL REGULATOR HAS SMALL LEAK AT VALVE STEM.
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 05/09/96   SYSTEM RTC CODE: CMP.A2   SHIFT: C 
 INITIAL
     JPS 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100
                                         Post-adjust: 100
     JPS 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85
                                         Post-adjust:  85
     JPS 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 41 PSI
  
     JPS 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
     JPS 6.1.5  Check all tubing and fittings for leaks. 
     JPS 6.1.6  Check all tubing and fittings for air leaks.
      JP 6.1.7  Check all indicator lights.
     JPS 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
     JPS 6.1.9  Wipe down polish table, tub, and splash ring.
     JPS 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
     JPS 6.1.11 Wipe down pad conditioning arm.
      JT 6.1.12 Remove, rinse, and replace diamond conditioning disk.
     JPS 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     JPS 6.1.14 Wipe down outer surface of both spindle hubs.
     JPS 6.1.15 Remove and clean O-rings, replace if necessary.
 
     JPS 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
     JPS 6.1.17 Wipe down all surfaces of the robot.
     JPS 6.1.18 Clean end effector vacuum chuck air port.
     JPS 6.1.19 Inspect and clean end effector air nozzle.
     N/A 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
     JPS 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  JPS/JP 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
     JPS 6.1.23 Check Neslab TCU for leaks.
     JPS 6.1.24 Check Neslab TCU temperature readout.
  JPS/JP 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  JPS/JP 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
     JPS 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:FOUND 208 IND. LAMP TO BE BLOWN NEEDS REPLACING.
 RECALIBRATED PUMP'S 1 AND 2. PUMP 1 .77 CHANGED TO .8 AND PUMP 2 CHANGED
 FROM .75 TO .80.
                                                           
 | 
| 8.31 | WW 46 weekly pm completed | STRATA::FINN |  | Sun May 12 1996 18:10 | 74 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 5/12/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: A SHIFT
 INITIAL
  BF/TL  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
  BF/TL  6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi
                                         Post-adjust:_N/A____
  BF/TL  6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
  BF/TL  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
  BF/TL  6.1.5  Check all tubing and fittings for leaks. 
  BF/TL  6.1.6  Check all tubing and fittings for air leaks.
  BF/TL  6.1.7  Check all indicator lights.
  BF/TL  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
  BF/TL  6.1.9  Wipe down polish table, tub, and splash ring.
  BF/TL  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  BF/TL  6.1.11 Wipe down pad conditioning arm.
  BF/TL  6.1.12 Remove, rinse, and replace diamond conditioning disk.
  BF/TL  6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  BF/TL  6.1.14 Wipe down outer surface of both spindle hubs.
  BF/TL  6.1.15 Remove and clean O-rings, replace if necessary.
  BF/TL  6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  BF/TL  6.1.17 Wipe down all surfaces of the robot.
  BF/TL  6.1.18 Clean end effector vacuum chuck air port.
   
  BF/TL  6.1.19 Inspect and clean end effector air nozzle.
  BF/TL  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
  N/A
 
  BF/TL  6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  BF/TL  6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
  BF/TL  6.1.23 Check Neslab TCU for leaks.
  BF/TL  6.1.24 Check Neslab TCU temperature readout.
  BF/TL  6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  BF/TL  6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  BF/TL  6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
COMMENTS:  Both slurry pumps required calibration.  
      	   Added approximately 0.5 gallon of DI water to the Chiller.
 | 
| 8.32 | WW 47 - Weekly | SUBPAC::LANDRY |  | Tue May 21 1996 10:04 | 71 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 5/21/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: A SHIFT
 INITIAL
  BF/TL  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
  BF/TL  6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi
                                         Post-adjust:_N/A____
  BF/TL  6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
  BF/TL  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
  BF/TL  6.1.5  Check all tubing and fittings for leaks. 
  BF/TL  6.1.6  Check all tubing and fittings for air leaks.
  BF/TL  6.1.7  Check all indicator lights.
  BF/TL  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
  BF/TL  6.1.9  Wipe down polish table, tub, and splash ring.
  BF/TL  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  BF/TL  6.1.11 Wipe down pad conditioning arm.
  BF/TL  6.1.12 Remove, rinse, and replace diamond conditioning disk.
  BF/TL  6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  BF/TL  6.1.14 Wipe down outer surface of both spindle hubs.
  BF/TL  6.1.15 Remove and clean O-rings, replace if necessary.
  BF/TL  6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  BF/TL  6.1.17 Wipe down all surfaces of the robot.
  BF/TL  6.1.18 Clean end effector vacuum chuck air port.
   
  BF/TL  6.1.19 Inspect and clean end effector air nozzle.
   N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  BF/TL  6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  BF/TL  6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
  BF/TL  6.1.23 Check Neslab TCU for leaks.
  BF/TL  6.1.24 Check Neslab TCU temperature readout.
  BF/TL  6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  BF/TL  6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  BF/TL  6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
COMMENTS:  Added approximately 0.5 gallon of DI water to the Chiller.
 | 
| 8.33 | SHUTDOWN CHECKSHEET | STRATA::RIDLON | Eliminate the obvious | Mon May 27 1996 06:34 | 39 | 
|  |                     CMP.A1 & CMP.A2 SHUTDOWN CHECKSHEET
                    -----------------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Change RTC status to SCHEDULED DOWN.             ___B___     _5/27__
  2.  Remove all wafer carriers.  If possible
      keep them wet.  If not ensure that there
      are enough carriers with new films for
      startup.                                         ___B___     _5/27__
  3.  Remove all wafer cassettes and drain Send
      and Receive DI Water tanks.                      ___B___     _5/27__
  4.  Purge both slurry lines with DI Water.           ___B___     _5/27__
  5.  Remove and discard all polishing pads.           ___B___     _5/27__
  6.  Remove all PVA scrub brushes and submerge
      in DI water.                                     ___B___     _5/27__
  7.  Perform a complete clean of each system
      to remove dried slurry.  Wipe down and dry
      all wet surfaces.                                ___B___     _5/27__
  8.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing to UDR.          ___B___     _5/27__
  9.  Power down each system.                          ___B___     _5/27__
 10.  Power down each vacuum pump cabinet.             ___B___     _5/27__
 11.  Power down each Neslab TCU.                      ___B___     _5/27__
 12.  Enter checksheet into notesfile.
 | 
| 8.34 | weekly completed | STRATA::FINN |  | Tue May 28 1996 18:35 | 69 | 
|  |   DATE: 5-27-96     SYSTEM RTC CODE: CMP.A2    EQUIP. TECH:  A shift
 INITIAL
 __X__  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
 __X__  6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi
                                         Post-adjust:_N/A____
 __X__  6.1.3  DI Water pressure @ 36 PSI:   Actual Reading:  42 psi
  
 __X__  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __X__  6.1.5  Check all tubing and fittings for leaks. 
 __X__  6.1.6  Check all tubing and fittings for air leaks.
 __X__  6.1.7  Check all indicator lights.
 __X__  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __X__  6.1.9  Wipe down polish table, tub, and splash ring.
 __X__  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __X__  6.1.11 Wipe down pad conditioning arm.
 __X__  6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __X__  6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __X__  6.1.14 Wipe down outer surface of both spindle hubs.
 __X__  6.1.15 Remove and clean O-rings, replace if necessary.
 __X__  6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 __X__  6.1.17 Wipe down all surfaces of the robot.
 __X__  6.1.18 Clean end effector vacuum chuck air port.
   
 __X__  6.1.19 Inspect and clean end effector air nozzle.
 __N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __X__  6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __X__  6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __X__  6.1.23 Check Neslab TCU for leaks.
 __X__  6.1.24 Check Neslab TCU temperature readout.
 __X__  6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __X__  6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __X__  6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
COMMENTS:  Slurry Pumps required cal
 | 
| 8.35 | Startup Checksheet | SUBPAC::LANDRY |  | Tue May 28 1996 18:49 | 33 | 
|  | 
                         CMP.A2 STARTUP CHECKSHEET
                    ----------------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are
      available and ready to use.                      B shift     5/28/96
  2.  Power up each system.                            A shift     5/28/96
  3.  Power up each vacuum pump cabinet.               A shift     5/28/96
  4.  Power up each Neslab TCU.                        A shift     5/28/96
  5.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing into the tool    A shift     5/28/96
  7.  Install wafer carriers.                          A shift     5/28/96
  8.  Place cassettes in left and right send
      and receive stations to fill DI Water
      tanks.                                           A shift     5/28/96
  9.  Install new polishing pads.                      A shift     5/28/96
 10.  Re-install PVA scrub brushes.                    A shift     5/28/96
 11.  Place systems in wet idle mode.                  A shift     5/28/96
 12.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for pad break-in & MQC.                          A shift     5/28/96
 | 
| 8.36 | weekly completed | STRATA::FINN |  | Tue May 28 1996 19:00 | 69 | 
|  |   DATE: 5-27-96     SYSTEM RTC CODE: CMP.A2    EQUIP. TECH:  A+Bshift
 INITIAL
 __X__  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
 __X__  6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi
                                         Post-adjust:_N/A____
 __X__  6.1.3  DI Water pressure @ 36 PSI:   Actual Reading:  42 psi
  
 __X__  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __X__  6.1.5  Check all tubing and fittings for leaks. 
 __X__  6.1.6  Check all tubing and fittings for air leaks.
 __X__  6.1.7  Check all indicator lights.
 __X__  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __X__  6.1.9  Wipe down polish table, tub, and splash ring.
 __X__  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __X__  6.1.11 Wipe down pad conditioning arm.
 __X__  6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __X__  6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __X__  6.1.14 Wipe down outer surface of both spindle hubs.
 __X__  6.1.15 Remove and clean O-rings, replace if necessary.
 __X__  6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 __X__  6.1.17 Wipe down all surfaces of the robot.
 __X__  6.1.18 Clean end effector vacuum chuck air port.
   
 __X__  6.1.19 Inspect and clean end effector air nozzle.
 __N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __X__  6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __X__  6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __X__  6.1.23 Check Neslab TCU for leaks.
 __X__  6.1.24 Check Neslab TCU temperature readout.
 __X__  6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __X__  6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __X__  6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
COMMENTS:  Slurry Pumps required cal
 | 
| 8.37 | Weekly performed, S/A delayed one week | SUBPAC::LANDRY |  | Sun Jun 02 1996 18:19 | 73 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 6/2/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: Doc
 INITIAL
  TL    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
  TL    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi
                                         Post-adjust:_N/A____
  TL    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 43 psi
  
  TL    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  TL    6.1.5  Check all tubing and fittings for leaks. 
  TL    6.1.6  Check all tubing and fittings for air leaks.
  TL    6.1.7  Check all indicator lights.
  TL    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
  TL    6.1.9  Wipe down polish table, tub, and splash ring.
  TL    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  TL    6.1.11 Wipe down pad conditioning arm.
  TL    6.1.12 Remove, rinse, and replace diamond conditioning disk.
  TL    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  TL    6.1.14 Wipe down outer surface of both spindle hubs.
  TL    6.1.15 Remove and clean O-rings, replace if necessary.
  TL    6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  TL    6.1.17 Wipe down all surfaces of the robot.
  TL    6.1.18 Clean end effector vacuum chuck air port.
   
  TL    6.1.19 Inspect and clean end effector air nozzle.
  N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  TL    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  TL    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
  TL    6.1.23 Check Neslab TCU for leaks.
  TL    6.1.24 Check Neslab TCU temperature readout.
  TL    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  TL    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  TL    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
COMMENTS:  Added approximately 0.5 gallon of DI water to the Chiller.
           Both Carriers and the Pad Changed out during this PM.
 | 
| 8.38 | Annual PM resheduled for WW50 due to unscheduled down time | SUBPAC::TOOKER |  | Fri Jun 07 1996 15:33 | 6 | 
|  | Due to the unscheduled down time on cmp.a2 caused by the bad robot cable, the
annual pm scheduled for WW49 will not take place.  The annual pm will be re-
scheduled for WW50.
Thanks,
Jim Tooker
 | 
| 8.40 | WW50 ANNNUAL P.M. | ASDG::POIRIER |  | Fri Jun 14 1996 16:38 | 202 | 
|  | --------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Annual Preventive Maintenance Check Sheet, REV. C
 DATE: 6/14/96   SYSTEM RTC CODE: CMP.A2       SHIFT(S): A, C and D
 INITIAL
 ___X___ 6.4.1  Perform Weekly, Monthly, and Semi-Annual PM's in  addition to
                this Annual list
 ___X___ 6.4.2  Perform Bridge Position calibration.
 ___X___ 6.4.3  Check Robot Position Alignment.  Calibrate if necessary.
 ___X___ 6.4.4  Check Robot Travel position.  Adjust if necessary.
 ___X___ 6.4.5  Check Robot Arm position.  Adjust if necessary.
 ___X___ 6.4.6  Check Elevator Height position.  Adjust if necessary.
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semi-annual Preventive Maintenance Check Sheet, REV. C
 INITIAL
 ___X___ 6.3.1  Perform Weekly and Monthly PM's in addition to this Semi-Annual
                list.
 ___X___ 6.3.2  Check all safety interlocked doors for proper operation.  
 ___X___ 6.3.2  Check all EMO's for proper operation.
 ___X___ 6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.
 ___X___ 6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.
            Right spindle gear box was completed only..
    
    
 ___X___ 6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE:__6-14-96_   SYSTEM RTC CODE:CMP.A2       EQUIP. TECH.: D+C
 INITIAL
 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.
 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  
 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
 ___X___ 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:____.001________
 ___X___ 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout:___.0009_________
                Left Spindlele Runout:__.0015__________
 ___X___ 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:___.001_________
                Left Spindle Hub Runout:_____.0015_______
 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error:_____.035_______
                Right Spindle Force Error:____-1.87________
                Left Spindle Calibration Variable:
                     Pre-adjust:____1.07________  Post-adjust:____1.08________
                Right Spindle Calibration Variable:
                     Pre-adjust:___1.07_________  Post-adjust:____1.07________
 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.
 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust:____24.0____   Post-adjust:_____24.0___
 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust:___+/-15.02_   Post-adjust:____+/-15.02
     
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust:____4.99____   Post-adjust:____5.00____
 ___X___ 6.2.17 Check the ~ 12   Volt power supply.  Calibrate if necessary.
                Pre-adjust:___~12.01___   Post-adjust:____________
 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 6/11/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: Brendan
 INITIAL
  BF    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
  BF    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi
                                         Post-adjust:_N/A____
  BF    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 43 psi
  
  BF    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  BF    6.1.5  Check all tubing and fittings for leaks. 
  BF    6.1.6  Check all tubing and fittings for air leaks.
  BF    6.1.7  Check all indicator lights.
  BF    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
  BF    6.1.9  Wipe down polish table, tub, and splash ring.
  BF    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  BF    6.1.11 Wipe down pad conditioning arm.
  BF    6.1.12 Remove, rinse, and replace diamond conditioning disk.
  BF    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  BF    6.1.14 Wipe down outer surface of both spindle hubs.
  BF    6.1.15 Remove and clean O-rings, replace if necessary.
  BF    6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  BF    6.1.17 Wipe down all surfaces of the robot.
  BF    6.1.18 Clean end effector vacuum chuck air port.
   
  BF    6.1.19 Inspect and clean end effector air nozzle.
  N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  BF    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  BF    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
  BF    6.1.23 Check Neslab TCU for leaks.
  BF    6.1.24 Check Neslab TCU temperature readout.
  BF    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  BF    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  BF    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 | 
| 8.41 | weekly p.m. completed | FABSIX::R_GEE |  | Mon Jun 17 1996 04:31 | 72 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 6/17/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: B Shift
 INITIAL
  _X_    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
  _X_    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 85 psi
                                         Post-adjust:_80____
  _X_    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40 psi
  
  _X_    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
             contamination found.  
  _X_    6.1.5  Check all tubing and fittings for leaks. 
  _X_    6.1.6  Check all tubing and fittings for air leaks.
  _X_    6.1.7  Check all indicator lights.
  _X_    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
  _X_    6.1.9  Wipe down polish table, tub, and splash ring.
  _X_    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  _X_    6.1.11 Wipe down pad conditioning arm.
  _X_    6.1.12 Remove, rinse, and replace diamond conditioning disk.
  _X_    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  _X_    6.1.14 Wipe down outer surface of both spindle hubs.
  _X_    6.1.15 Remove and clean O-rings, replace if necessary.
  _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  _X_    6.1.17 Wipe down all surfaces of the robot.
  _X_    6.1.18 Clean end effector vacuum chuck air port.
   
  _X_    6.1.19 Inspect and clean end effector air nozzle.
  _N/A_  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  _X_    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  _X_    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
  _X_   6.1.23 Check Neslab TCU for leaks.
  _X_    6.1.24 Check Neslab TCU temperature readout.
  _X_    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  _X_    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  _X_    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
COMMENTS: Filled the bridge oiler, 4oz. 
	  Replaced the pad and conditioner disk.  
 | 
| 8.42 | Weekly p.m. completed | FABSIX::R_GEE |  | Tue Jun 25 1996 06:40 | 71 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 6/25/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: B Shift
 INITIAL
  _X_    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
  _X_    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 85 psi
                                         Post-adjust:_82____
  _X_    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40 psi
  
  _X_    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
             contamination found.  
  _X_    6.1.5  Check all tubing and fittings for leaks. 
  _X_    6.1.6  Check all tubing and fittings for air leaks.
  _X_    6.1.7  Check all indicator lights.
  _X_    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
  _X_    6.1.9  Wipe down polish table, tub, and splash ring.
  _X_    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  _X_    6.1.11 Wipe down pad conditioning arm.
  _X_    6.1.12 Remove, rinse, and replace diamond conditioning disk.
  _X_    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  _X_    6.1.14 Wipe down outer surface of both spindle hubs.
  _X_    6.1.15 Remove and clean O-rings, replace if necessary.
  _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  _X_    6.1.17 Wipe down all surfaces of the robot.
  _X_    6.1.18 Clean end effector vacuum chuck air port.
   
  _X_    6.1.19 Inspect and clean end effector air nozzle.
  _N/A_  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  _X_    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  _X_    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
  _X_   6.1.23 Check Neslab TCU for leaks.
  _X_    6.1.24 Check Neslab TCU temperature readout.
  _X_    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  _X_    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  _X_    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
COMMENTS: Replaced the pad.  
 | 
| 8.43 | weekly p.m. | FABSIX::R_GEE |  | Mon Jul 01 1996 23:07 | 71 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 7/02/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: B Shift
 INITIAL
  _X_    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
  _X_    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 85 psi
                                         Post-adjust:_85____
  _X_    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40 psi
  
  _X_    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
             contamination found.  
  _X_    6.1.5  Check all tubing and fittings for leaks. 
  _X_    6.1.6  Check all tubing and fittings for air leaks.
  _X_    6.1.7  Check all indicator lights.
  _X_    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
  _X_    6.1.9  Wipe down polish table, tub, and splash ring.
  _X_    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  _X_    6.1.11 Wipe down pad conditioning arm.
  _X_    6.1.12 Remove, rinse, and replace diamond conditioning disk.
  _X_    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  _X_    6.1.14 Wipe down outer surface of both spindle hubs.
  _X_    6.1.15 Remove and clean O-rings, replace if necessary.
  _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  _X_    6.1.17 Wipe down all surfaces of the robot.
  _X_    6.1.18 Clean end effector vacuum chuck air port.
   
  _X_    6.1.19 Inspect and clean end effector air nozzle.
  _N/A_  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  _X_    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  _X_    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
  _X_   6.1.23 Check Neslab TCU for leaks.
  _X_    6.1.24 Check Neslab TCU temperature readout.
  _X_    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  _X_    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  _X_    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
COMMENTS: Replaced the pad, carriers and condition disk.
 | 
| 8.44 | CMP.A2 JULY 4TH SHUT-DOWN CHECKSHEET | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Wed Jul 03 1996 23:40 | 42 | 
|  | 
                    CMP.A2 SHUTDOWN CHECKSHEET
                    --------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Change RTC status to SCHEDULED DOWN.              n/a per Dennis G.
  2.  Remove all wafer carriers.  If possible
      keep them wet.  If not ensure that there
      are enough carriers with new films for
      startup.                                           BJ        7/3/96 
  3.  Remove all wafer cassettes and drain Send
      and Receive DI Water tanks.                        BJ        7/3/96 
  4.  Purge both slurry lines with DI Water.             BJ        7/3/96 
  5.  Remove and discard all polishing pads.             BJ        7/3/96 
  6.  Remove all PVA scrub brushes and submerge
      in DI water.                                       BJ        7/3/96 
  7.  Perform a complete clean of each system
      to remove dried slurry.  Wipe down and dry
      all wet surfaces.                                  BJ        7/3/96 
  8.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing to UDR.            BJ        7/3/96 
  9.  Power down each system.                            BJ        7/3/96 
 10.  Power down each vacuum pump cabinet.               BJ        7/3/96 
 11.  Power down each Neslab TCU.                        BJ        7/3/96 
 12.  Enter checksheet into notesfile.                   BJ        7/3/96 
    
 | 
| 8.45 | A2 START-UP | FABSIX::L_SHKOLNIKOV |  | Sat Jul 06 1996 06:38 | 35 | 
|  | 
                    CMP.A2 STARTUP CHECKSHEET
                    -------------------------              
                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are
      available and ready to use.                      __LS___     07-06-96
  2.  Power up each system.                            __LS___     07-06-96
  3.  Power up each vacuum pump cabinet.               __LS___     07-06-96
  4.  Power up each Neslab TCU.                        __LS___     07-06-96
  5.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing into the tool    __LS___     07-06-96
  6.  Place cassettes in left and right send
      and receive stations to fill DI Water
      tanks.                                           __LS___     07-06-96
  7.  Install new polishing pads.                      __LS___     07-06-96
  8.  Install wafer carriers.                          __LS___     07-06-96
  9.  Re-install PVA scrub brushes.                    __LS___     07-06-96
 10.  Place systems in wet idle mode.                  __LS___     07-06-96
 11.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for pad break-in & MQC.                          __LS___     07-06-96
 | 
| 8.46 | Monthly PM for WW2 completed | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Wed Jul 10 1996 07:07 | 157 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
  DATE: 7/10/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: BJ
 INITIAL
   BJ     6.2.1  Perform weekly PM checks in addition to this monthly list.
   BJ     6.2.2  Replace the fluid lines on the peristaltic pumps.  
   BJ     6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
    
   BJ     6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:___.002_____
   BJ     6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout:___.001_____
                Left Spindle Runout:__.001______
   BJ     6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:__.0005_____
                Left Spindle Hub Runout:____.0005___
   BJ    6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error:   .68
                Right Spindle Force Error:  -.69
                Left Spindle Calibration Variable:
                     Pre-adjust: 1.07         Post-adjust: 1.06
                Right Spindle Calibration Variable:
                     Pre-adjust: 1.07         Post-adjust: 1.07
   BJ    6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
   BJ    6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
   BJ    6.2.10 Check shuttle travel.  Adjust if necessary.
   BJ    6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 24.01 VDC   Post-adjust: N/A
   BJ    6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 15.02 VDC   Post-adjust: 15.02
 
   BJ    6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust: 5.01 VDC   Post-adjust: N/A
   BJ    6.2.17 Check the 12 VAC  power supply.  Calibrate if necessary.
                Pre-adjust: 12.0   Post-adjust:  N/A
   BJ    6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
   BJ    6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
   BJ    6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
   BJ    6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 7/10/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: BJ
 INITIAL
          
   BJ    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_90____
   BJ    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 85 psi
                                         Post-adjust:_85____
   BJ    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38 psi
  
   BJ    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
   BJ    6.1.5  Check all tubing and fittings for leaks. 
   BJ    6.1.6  Check all tubing and fittings for air leaks.
   BJ    6.1.7  Check all indicator lights.
   BJ    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
   BJ    6.1.9  Wipe down polish table, tub, and splash ring.
   BJ    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
   BJ    6.1.11 Wipe down pad conditioning arm.
   BJ    6.1.12 Remove, rinse, and replace diamond conditioning disk.
   BJ    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
   BJ    6.1.14 Wipe down outer surface of both spindle hubs.
   BJ    6.1.15 Remove and clean O-rings, replace if necessary.
   BJ    6.1.16 Wipe down inside and outside of load/cleaning station buckets.
   BJ    6.1.17 Wipe down all surfaces of the robot.
   BJ    6.1.18 Clean end effector vacuum chuck air port.
   
   BJ    6.1.19 Inspect and clean end effector air nozzle.
   N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
   N/A   6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
   BJ    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
   BJ    6.1.23 Check Neslab TCU for leaks.
   BJ    6.1.24 Check Neslab TCU temperature readout.
   BJ    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
   BJ    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
   BJ    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:
 | 
| 8.47 | weekly p.m. completed | FABSIX::R_GEE |  | Wed Jul 17 1996 01:19 | 236 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 7/17/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: B Shift
 INITIAL
  _X_    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
  _X_    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi
                                         Post-adjust:_84____
  _X_    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38 psi
  
  _X_    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
             contamination found.  
  _X_    6.1.5  Check all tubing and fittings for leaks. 
  _X_    6.1.6  Check all tubing and fittings for air leaks.
  _X_    6.1.7  Check all indicator lights.
  _X_    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
  _X_    6.1.9  Wipe down polish table, tub, and splash ring.
  _X_    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  _X_    6.1.11 Wipe down pad conditioning arm.
  _X_    6.1.12 Remove, rinse, and replace diamond conditioning disk.
  _X_    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  _X_    6.1.14 Wipe down outer surface of both spindle hubs.
  _X_    6.1.15 Remove and clean O-rings, replace if necessary.
  _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  _X_    6.1.17 Wipe down all surfaces of the robot.
  _X_    6.1.18 Clean end effector vacuum chuck air port.
   
  _X_    6.1.19 Inspect and clean end effector air nozzle.
  _N/A_  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  _X_    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  _X_    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
  _X_   6.1.23 Check Neslab TCU for leaks.
  _X_    6.1.24 Check Neslab TCU temperature readout.
  _X_    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  _X_    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  _X_    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
COMMENTS: Replaced the carriers.
 | 
| 8.48 | ww4 weekly pm completed | FABSIX::L_SHKOLNIKOV |  | Thu Jul 25 1996 06:20 | 71 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 7/25/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: D Shift
 INITIAL
  _X_    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
  _X_    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi
                                         Post-adjust:_82____
  _X_    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38 psi
  
  _X_    6.1.4  Check drip pan for any slurry/moisture. Clean any    
             contamination found.  
  _x_    6.1.5  Check all tubing and fittings for leaks. 
  _X_    6.1.6  Check all tubing and fittings for air leaks.
  _X_    6.1.7  Check all indicator lights.
  _X_    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
  _X_    6.1.9  Wipe down polish table, tub, and splash ring.
  _X_    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  _X_    6.1.11 Wipe down pad conditioning arm.
  _X_    6.1.12 Remove, rinse, and replace diamond conditioning disk.
  _X_    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  _X_    6.1.14 Wipe down outer surface of both spindle hubs.
  _X_    6.1.15 Remove and clean O-rings, replace if necessary.
  _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  _X_    6.1.17 Wipe down all surfaces of the robot.
  _X_    6.1.18 Clean end effector vacuum chuck air port.
   
  _X_    6.1.19 Inspect and clean end effector air nozzle.
  _N/A_  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  _X_    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  _X_    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
  _X_   6.1.23 Check Neslab TCU for leaks.
  _X_    6.1.24 Check Neslab TCU temperature readout.
  _X_    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  _X_    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  _X_    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
COMMENTS: 
 | 
| 8.49 | ww05 weekly p.m. | FABSIX::R_GEE |  | Sun Jul 28 1996 21:56 | 71 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 7/28/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: B Shift
 INITIAL
  _X_    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
  _X_    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 86 psi
                                         Post-adjust:_80____
  _X_    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38 psi
  
  _X_    6.1.4  Check drip pan for any slurry/moisture. Clean any    
             contamination found.  
  _x_    6.1.5  Check all tubing and fittings for leaks. 
  _X_    6.1.6  Check all tubing and fittings for air leaks.
  _X_    6.1.7  Check all indicator lights.
  _X_    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
  _X_    6.1.9  Wipe down polish table, tub, and splash ring.
  _X_    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  _X_    6.1.11 Wipe down pad conditioning arm.
  _X_    6.1.12 Remove, rinse, and replace diamond conditioning disk.
  _X_    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  _X_    6.1.14 Wipe down outer surface of both spindle hubs.
  _X_    6.1.15 Remove and clean O-rings, replace if necessary.
  _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  _X_    6.1.17 Wipe down all surfaces of the robot.
  _X_    6.1.18 Clean end effector vacuum chuck air port.
   
  _X_    6.1.19 Inspect and clean end effector air nozzle.
  _N/A_  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  _X_    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  _X_    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
  _X_   6.1.23 Check Neslab TCU for leaks.
  _X_    6.1.24 Check Neslab TCU temperature readout.
  _X_    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  _X_    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  _X_    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
COMMENTS: Changed the pad and carriers.
 | 
| 8.50 | MONTHLY PM FOR WW6 COMPLETED | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Wed Aug 07 1996 06:10 | 158 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
  DATE: 8/7/96      SYSTEM RTC CODE: CMP.A2    TECH/SHIFT: D SHIFT
    
   X     6.2.1  Perform weekly PM checks in addition to this monthly list.
   X     6.2.2  Replace the fluid lines on the peristaltic pumps.  
   X     6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
     
   X     6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:___.002_____
   X     6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout:___.001_____
                Left Spindle Runout:__.001______
   X     6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:__.0005_____
   X
                Left Spindle Hub Runout:____.0005___
   X    6.2.7  Perform the spindle down Force Calibration on the right and
               left spindles.
                Left Spindle Force Error:   .1.52
                Right Spindle Force Error:  -.25
                Left Spindle Calibration Variable:
                     Pre-adjust: 1.06         Post-adjust: N/C
                Right Spindle Calibration Variable:
                     Pre-adjust: 1.07         Post-adjust: N/C
   X    6.2.8  Check left and right load station alignment.  Adjust if
               necessary.
    
   X    6.2.9  Check left and right cleaning station alignment.  Adjust if
               necessary.
   X    6.2.10 Check shuttle travel.  Adjust if necessary.
     
   X    6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 23.96 VDC   Post-adjust: N/A
   X    6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 15.02 VDC   Post-adjust: 15.02
 
   X    6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust: 5.00 VDC   Post-adjust: N/A
   X    6.2.17 Check the 12 VAC  power supply.  Calibrate if necessary.
                Pre-adjust: 11.94   Post-adjust:  N/A
   X    6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
               necessary using Shell Tellus 10 or equivalent.
    
   X    6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
               Adjust level if necessary.
         
   X    6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
               fittings.
     
   X    6.2.21 Check the system vacuum cabinet for any loose fittings or
               connectors.
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 8/6/96      SYSTEM RTC CODE: CMP.A2    TECH/SHIFT: D 
 INITIAL
          
   X     6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_90____
   X     6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 85 psi
                                         Post-adjust:_85____
   X     6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 36 psi
  
   X     6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
   X     6.1.5  Check all tubing and fittings for leaks. 
   X     6.1.6  Check all tubing and fittings for air leaks.
   X     6.1.7  Check all indicator lights.
   X     6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
   X     6.1.9  Wipe down polish table, tub, and splash ring.
   X     6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
   X     6.1.11 Wipe down pad conditioning arm.
   X     6.1.12 Remove, rinse, and replace diamond conditioning disk.
   X     6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
   X     6.1.14 Wipe down outer surface of both spindle hubs.
   X     6.1.15 Remove and clean O-rings, replace if necessary.
   X     6.1.16 Wipe down inside and outside of load/cleaning station buckets.
   X     6.1.17 Wipe down all surfaces of the robot.
   X     6.1.18 Clean end effector vacuum chuck air port.
   
   X     6.1.19 Inspect and clean end effector air nozzle.
   N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
   N/A   6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
   X     6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
   X     6.1.23 Check Neslab TCU for leaks.
   X     6.1.24 Check Neslab TCU temperature readout.
   X     6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
   X     6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
   X     6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:
   
 | 
| 8.51 | WW VII - Weekly version | SUBPAC::LANDRY |  | Sun Aug 11 1996 13:03 | 73 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
 DATE:  8/11/96      SYSTEM RTC CODE:  CMP.A1      EQUIP TECH:  A shift
 INITIAL
 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100_____
                                         Post-adjust:________
 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__86______
                                         Post-adjust:________
 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__37___
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X___ 6.1.5  Check all tubing and fittings for leaks. 
 ___X___ 6.1.6  Check all tubing and fittings for air leaks.
 ___X___ 6.1.7  Check all indicator lights.
 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X___ 6.1.11 Wipe down pad conditioning arm.
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X__ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 ___X___ 6.1.17 Wipe down all surfaces of the robot.
 ___X___ 6.1.18 Clean end effector vacuum chuck air port.
 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 ___X___ 6.1.23 Check Neslab TCU for leaks.
 ___X___ 6.1.24 Check Neslab TCU temperature readout.
 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:   Adjusted Slurry pump #1 variable number from .77 to .74
                                                                
 | 
| 8.52 | WW08 WEEKLY PM | FABSIX::L_SHKOLNIKOV |  | Wed Aug 21 1996 06:57 | 72 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
 DATE:  8/21/96      SYSTEM RTC CODE:  CMP.A2      EQUIP TECH:  D shift
 INITIAL
   _X_   6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  _100_    
                                         Post-adjust: N/A
   _X_   6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  _86__  
                                         Post-adjust: N/A
   _X_   6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__38__ 
  
   _X_   6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
   _X_   6.1.5  Check all tubing and fittings for leaks. 
   _X_   6.1.6  Check all tubing and fittings for air leaks.
   _X_   6.1.7  Check all indicator lights.
   _X_   6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
   _X_   6.1.9  Wipe down polish table, tub, and splash ring.
   _X_   6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
   _X_   6.1.11 Wipe down pad conditioning arm.
   _X_   6.1.12 Remove, rinse, and replace diamond conditioning disk.
   _X_   6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
   _X_  6.1.14 Wipe down outer surface of both spindle hubs.
   _X_   6.1.15 Remove and clean O-rings, replace if necessary.
   _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.
   _X_   6.1.17 Wipe down all surfaces of the robot.
   _X_   6.1.18 Clean end effector vacuum chuck air port.
   _X_   6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
   _X_   6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
   _X_   6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
   _X_   6.1.23 Check Neslab TCU for leaks.
   _X_   6.1.24 Check Neslab TCU temperature readout.
   _X_   6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
   _X_   6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
   _X_   6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS: Adjusted Slurry pump #2 variable number from .80 to .76
    
    
 | 
| 8.53 | WW IX - Weekly version | SUBPAC::LANDRY |  | Sun Aug 25 1996 12:31 | 73 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
 DATE:  8/25/96      SYSTEM RTC CODE:  CMP.A2      EQUIP TECH: A shift
 INITIAL
   _X_   6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  _100_    
                                         Post-adjust: N/A
   _X_   6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  _82_   
                                         Post-adjust: N/A
   _X_   6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__36__ 
  
   _X_   6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
   _X_   6.1.5  Check all tubing and fittings for leaks. 
   _X_   6.1.6  Check all tubing and fittings for air leaks.
   _X_   6.1.7  Check all indicator lights.
   _X_   6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
   _X_   6.1.9  Wipe down polish table, tub, and splash ring.
   _X_   6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
   _X_   6.1.11 Wipe down pad conditioning arm.
   _X_   6.1.12 Remove, rinse, and replace diamond conditioning disk.
   _X_   6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
   _X_   6.1.14 Wipe down outer surface of both spindle hubs.
   _X_   6.1.15 Remove and clean O-rings, replace if necessary.
   _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.
   _X_   6.1.17 Wipe down all surfaces of the robot.
   _X_   6.1.18 Clean end effector vacuum chuck air port.
   _X_   6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
   _X_   6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
   _X_   6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
   _X_   6.1.23 Check Neslab TCU for leaks.
   _X_   6.1.24 Check Neslab TCU temperature readout.
   _X_   6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
   _X_   6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
   _X_   6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  Found the process cooling line check valve leaking.  Removed said
            valve, cleaned, rebuilt and re-installed.  
            Added fluid to Neslab resevoir.
 | 
| 8.54 | CMP.A1 SHUTDOWN CHECKSHEET | FABSIX::R_POIRIER |  | Mon Sep 02 1996 01:48 | 36 | 
|  |                     CMP.A1 & CMP.A2 SHUTDOWN CHECKSHEET
                    -----------------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Remove all wafer carriers.  If possible
      keep them wet.  If not ensure that there
      are enough carriers with new films for
      startup.                                         ___B___     _9/1/96_
  2.  Remove all wafer cassettes and drain Send
      and Receive DI Water tanks.                      ___B___     _9/1/96_
  3.  Purge both slurry lines with DI Water.           ___B___     _9/1/96_
  4.  Remove and discard all polishing pads.           ___B___     _9/1/96_
  5.  Remove all PVA scrub brushes and submerge
      in DI water.                                     ___B___     _9/1/96_
  6.  Perform a complete clean of each system
      to remove dried slurry.  Wipe down and dry
      all wet surfaces.                                ___B___     _9/1/96_
  7.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing to UDR.          ___B___     _9/1/96_
  8.  Power down each system.                          ___B___     _9/1/96_
  9.  Power down each vacuum pump cabinet.             ___B___     _9/1/96_
 10.  Power down each Neslab TCU.                      ___B___     _9/1/96_
 11.  Enter checksheet into notesfile.		       ___B___     _9/1/96_    
 | 
| 8.55 | WW X - Monthly version | SUBPAC::LANDRY |  | Tue Sep 03 1996 16:17 | 160 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
  DATE: 9/1 + 3/96      SYSTEM RTC CODE: CMP.A2    TECH/SHIFT: A shift
    
   X     6.2.1  Perform weekly PM checks in addition to this monthly list.
   X     6.2.2  Replace the fluid lines on the peristaltic pumps.  
   
   X     6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
     
   X     6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:___.002_____
   X     6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout:___.001_____
                Left Spindle Runout:__.001______
   X     6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:__.001_____
   
                Left Spindle Hub Runout:____.001___
   X   6.2.7  Perform the spindle down Force Calibration on the right and
               left spindles.
                Left Spindle Force Error:   .54
                Right Spindle Force Error:  .42
                Left Spindle Calibration Variable:
                     Pre-adjust: 1.06         Post-adjust: 1.07
                Right Spindle Calibration Variable:
                     Pre-adjust: 1.07         Post-adjust: N/C
   X    6.2.8  Check left and right load station alignment.  Adjust if
               necessary.
    
   X    6.2.9  Check left and right cleaning station alignment.  Adjust if
               necessary.
   X    6.2.10 Check shuttle travel.  Adjust if necessary.
     
   X    6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 23.98 VDC   Post-adjust: N/A
   X    6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: +15.01 VDC   Post-adjust: N/A
                            -15.01 VDC   Post-adjust: N/A 
   X    6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust: 4.99 VDC   Post-adjust: N/A
   X    6.2.17 Check the 12 VAC  power supply.  Calibrate if necessary.
                Pre-adjust: 11.94   Post-adjust:  N/A
   X    6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
               necessary using Shell Tellus 10 or equivalent.
    
   X    6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
               Adjust level if necessary.
         
   X    6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
               fittings.
     
   X    6.2.21 Check the system vacuum cabinet for any loose fittings or
               connectors.
      Comments:  Added oil to the bridge lubricator.
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 9/1 + 3/96      SYSTEM RTC CODE: CMP.A2         TECH/SHIFT: A shift 
 INITIAL
          
   X     6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:  N/A
   X     6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi
                                         Post-adjust:  N/A
   X     6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 39 psi
  
   X     6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
   X     6.1.5  Check all tubing and fittings for leaks. 
   X     6.1.6  Check all tubing and fittings for air leaks.
   X     6.1.7  Check all indicator lights.
   X     6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
   X     6.1.9  Wipe down polish table, tub, and splash ring.
   X     6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
   X     6.1.11 Wipe down pad conditioning arm.
   X     6.1.12 Remove, rinse, and replace diamond conditioning disk.
   X     6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
   X     6.1.14 Wipe down outer surface of both spindle hubs.
   X     6.1.15 Remove and clean O-rings, replace if necessary.
   X     6.1.16 Wipe down inside and outside of load/cleaning station buckets.
   X     6.1.17 Wipe down all surfaces of the robot.
   X     6.1.18 Clean end effector vacuum chuck air port.
   
   X     6.1.19 Inspect and clean end effector air nozzle.
   N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
   X     6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
   X     6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
   X     6.1.23 Check Neslab TCU for leaks.
   X     6.1.24 Check Neslab TCU temperature readout.
   X     6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
   X     6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
   X     6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:
   
 | 
| 8.56 | startup checksheet | SUBPAC::LANDRY |  | Tue Sep 03 1996 19:10 | 35 | 
|  | 
                    CMP.A2 STARTUP CHECKSHEET
                    -------------------------              
                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are
      available and ready to use.                      ___A___     09-03-96
  2.  Power up each system.                            ___A___     09-03-96
  3.  Power up each vacuum pump cabinet.               ___A___     09-03-96
  4.  Power up each Neslab TCU.                        ___A___     09-03-96
  5.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing into the tool    ___A___     09-03-96
  6.  Place cassettes in left and right send
      and receive stations to fill DI Water
      tanks.                                           ___A___     09-03-96
  7.  Install new polishing pads.                      ___A___     09-03-96
  8.  Install wafer carriers.                          ___A___     09-03-96
  9.  Re-install PVA scrub brushes.                    ___A___     09-03-96
 10.  Place systems in wet idle mode.                  ___A___     09-03-96
 11.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for pad break-in & MQC.                          ___A___     09-03-96
 | 
| 8.57 | WW XI - Weekly | SUBPAC::LANDRY |  | Tue Sep 10 1996 19:28 | 75 | 
|  | 
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
  DATE: 9/10/96      SYSTEM RTC CODE: CMP.A2    TECH/SHIFT: A shift
    
 INITIAL
          
   X     6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:  N/A
   X     6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi
                                         Post-adjust:  N/A
   X     6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40 psi
  
   X     6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
   X     6.1.5  Check all tubing and fittings for leaks. 
   X     6.1.6  Check all tubing and fittings for air leaks.
   X     6.1.7  Check all indicator lights.
   X     6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
   X     6.1.9  Wipe down polish table, tub, and splash ring.
   X     6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
   X     6.1.11 Wipe down pad conditioning arm.
   X     6.1.12 Remove, rinse, and replace diamond conditioning disk.
   X     6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
   X     6.1.14 Wipe down outer surface of both spindle hubs.
   X     6.1.15 Remove and clean O-rings, replace if necessary.
   X     6.1.16 Wipe down inside and outside of load/cleaning station buckets.
   X     6.1.17 Wipe down all surfaces of the robot.
   X     6.1.18 Clean end effector vacuum chuck air port.
   
   X     6.1.19 Inspect and clean end effector air nozzle.
   N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
   X     6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
   X     6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
   X     6.1.23 Check Neslab TCU for leaks.
   X     6.1.24 Check Neslab TCU temperature readout.
   X     6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
   X     6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
   X     6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  Both load stations had new pedistals installed at this PM
   
 | 
| 8.58 | ww12 weekly pm completed | STRATA::FINN |  | Sun Sep 15 1996 10:36 | 74 | 
|  | 
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
  DATE: 9/15/96      SYSTEM RTC CODE: CMP.A2    TECH/SHIFT: A shift
    
 INITIAL
          
  X      6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:  N/A
  X      6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi
                                         Post-adjust:  N/A
  X      6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40 psi
  
  x      6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
  x      6.1.5  Check all tubing and fittings for leaks. 
  x      6.1.6  Check all tubing and fittings for air leaks.
  x      6.1.7  Check all indicator lights.
  x      6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
  x      6.1.9  Wipe down polish table, tub, and splash ring.
  x      6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  x      6.1.11 Wipe down pad conditioning arm.
   
  x      6.1.12 Remove, rinse, and replace diamond conditioning disk.
  x      6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  x      6.1.14 Wipe down outer surface of both spindle hubs.
  x      6.1.15 Remove and clean O-rings, replace if necessary.
  x      6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  x      6.1.17 Wipe down all surfaces of the robot.
  x      6.1.18 Clean end effector vacuum chuck air port.
   
  x      6.1.19 Inspect and clean end effector air nozzle.
   N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  x      6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  x      6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
  x      6.1.23 Check Neslab TCU for leaks.
  x      6.1.24 Check Neslab TCU temperature readout.
  x      6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  x      6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  x      6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  Calibrated slurry pumps 1 + 2
   
 | 
| 8.59 | WW13 WEEKLY PM COMPLETED | FABSIX::O_WHITFORD |  | Wed Sep 25 1996 22:21 | 81 | 
|  |               <<< ASDG::DISK$SYS_DATA:[NOTES$LIBRARY]CMP.NOTE;1 >>>
                                    -< CMP >-
================================================================================
Note 8.1                      CMP.A2 PM CHECKSHEETS                      1 of 58
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              78 lines   8-NOV-1995 21:07
                       -< Weekly PM Checksheet Template >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:_9/25/96___   SYSTEM RTC CODE:__CMP.A2__   EQUIP. TECH.:  Dave W., BJ
 INITIAL
 ___DW____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100______
                                         Post-adjust:___100_____
 __DW_____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___80_____
                                         Post-adjust:____80____
 __DW_____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:_38~42_____
  
 __DW_____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __DW_____ 6.1.5  Check all tubing and fittings for leaks. 
 __DW_____ 6.1.6  Check all tubing and fittings for air leaks.
 __DW_____ 6.1.7  Check all indicator lights.
 __DW_____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X____ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X____ 6.1.11 Wipe down pad conditioning arm.
 ___X____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 ___X____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __DW_____ 6.1.14 Wipe down outer surface of both spindle hubs.
 __DW_____ 6.1.15 Remove and clean O-rings, replace if necessary.
 __DW_____ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 __DW_____ 6.1.17 Wipe down all surfaces of the robot.
 __DW_____ 6.1.18 Clean end effector vacuum chuck air port.
 __DW_____ 6.1.19 Inspect and clean end effector air nozzle.
 __NA_____ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __DW_____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __DW_____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __DW_____ 6.1.23 Check Neslab TCU for leaks.
 __DW 38C_____ 6.1.24 Check Neslab TCU temperature readout.
 __DW_____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __DW_____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __DW_____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  Replaced the following o-rings in the hubs
  
            LEFT - 6.75-outer (1st)         RIGHT - 6.75-outer (1st)   
                 - 2.75-3rd                       - 3.75-2nd
 | 
| 8.60 | WW14 Weekly PM | FABSIX::R_POIRIER |  | Sun Sep 29 1996 04:15 | 72 | 
|  | --------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:_9/29/96___   SYSTEM RTC CODE:__CMP.A2__   EQUIP. TECH.:  B Shift
 INITIAL
 ___X_____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100______
                                         Post-adjust:___100_____
 ___X_____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___84_____
                                         Post-adjust:__________
 ___X_____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:_38~42_____
  
 ___X_____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X_____ 6.1.5  Check all tubing and fittings for leaks. 
 ___X_____ 6.1.6  Check all tubing and fittings for air leaks.
 ___X_____ 6.1.7  Check all indicator lights.
 ___X_____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X____ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X____ 6.1.11 Wipe down pad conditioning arm.
 ___X____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 ___X____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X_____ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X_____ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X_____ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 ___X_____ 6.1.17 Wipe down all surfaces of the robot.
 ___X_____ 6.1.18 Clean end effector vacuum chuck air port.
 ___X_____ 6.1.19 Inspect and clean end effector air nozzle.
 __NA_____ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 ___X_____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___X_____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 ___X_____ 6.1.23 Check Neslab TCU for leaks.
 ___X_____ 6.1.24 Check Neslab TCU temperature readout.  (38 C)
 ___X_____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___X_____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___X_____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  
          
 | 
| 8.61 | Monthly p.m. completed | FABSIX::R_GEE |  | Tue Oct 08 1996 12:40 | 166 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
  DATE: 10/8/96      SYSTEM RTC CODE: CMP.A2    TECH/SHIFT: All shiftS
    
  _X__    6.2.1  Perform weekly PM checks in addition to this monthly list.
  JS    6.2.2  Replace the fluid lines on the peristaltic pumps.  
   
  JT     6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
     
  B    6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:___.002_____
  B    6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout:___.001_____
                Left Spindle Runout:__.001______
  B    6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:__.001_____
   
                Left Spindle Hub Runout:____.001___
  D     6.2.7  Perform the spindle down Force Calibration on the right and
               left spindles.
                Left Spindle Force Error:   .97
                Right Spindle Force Error:  .99
                Left Spindle Calibration Variable:
                     Pre-adjust: ___         Post-adjust: .41
                Right Spindle Calibration Variable:
                     Pre-adjust: ___         Post-adjust: -.36
  JT    6.2.8  Check left and right load station alignment.  Adjust if
               necessary.
     ADJUSTED BY JT ON 10/03/96.
    
  JT    6.2.9  Check left and right cleaning station alignment.  Adjust if
               necessary.
     ADJUSTED BY JT ON 10/03/96
   B    6.2.10 Check shuttle travel.  Adjust if necessary.
     
   B    6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 23.98 VDC   Post-adjust: N/A
   B    6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: +15.01 VDC   Post-adjust: N/A
                            -15.01 VDC   Post-adjust: N/A 
   B    6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust: 4.99 VDC   Post-adjust: N/A
   B    6.2.17 Check the 12 VAC  power supply.  Calibrate if necessary.
                Pre-adjust: 12.1   Post-adjust:  N/A
   B    6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
               necessary using Shell Tellus 10 or equivalent.
    
   B    6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
               Adjust level if necessary.
           >>> SOFT WATER ADDED TO BRING LEVEL UP.     
     
   B    6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
               fittings.
     
   B    6.2.21 Check the system vacuum cabinet for any loose fittings or
               connectors.
      Comments:  
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 9/8/96      SYSTEM RTC CODE: CMP.A2         TECH/SHIFT: A/B shift 
 INITIAL
          
   B     6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:  N/A
   B     6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi
                                         Post-adjust:  N/A
   B     6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 37 psi
  
   B     6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
   B     6.1.5  Check all tubing and fittings for leaks. 
   B     6.1.6  Check all tubing and fittings for air leaks.
   B     6.1.7  Check all indicator lights.
  A/B    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
   A     6.1.9  Wipe down polish table, tub, and splash ring.
   A     6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
   A     6.1.11 Wipe down pad conditioning arm.
   A     6.1.12 Remove, rinse, and replace diamond conditioning disk.
   A     6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
   A     6.1.14 Wipe down outer surface of both spindle hubs.
   A     6.1.15 Remove and clean O-rings, replace if necessary.
   B     6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 
   B     6.1.17 Wipe down all surfaces of the robot.
   B     6.1.18 Clean end effector vacuum chuck air port.
   
   B     6.1.19 Inspect and clean end effector air nozzle.
   N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
   B     6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
   A    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
   B     6.1.23 Check Neslab TCU for leaks.
   B     6.1.24 Check Neslab TCU temperature readout.
   B     6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
   B     6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
   B     6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:
   
 | 
| 8.62 | WW XVI - Weekly completed | SUBPAC::LANDRY |  | Sun Oct 13 1996 14:24 | 73 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:  10/13/96    SYSTEM RTC CODE:  CMP.A2    EQUIP. TECH.:  A Shift
 INITIAL
 ___X_____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100______
                                         Post-adjust:____________
 ___X_____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___82______
                                         Post-adjust:____________
 ___X_____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___37_____
  
 ___X_____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X_____ 6.1.5  Check all tubing and fittings for leaks. 
 ___X_____ 6.1.6  Check all tubing and fittings for air leaks.
 ___X_____ 6.1.7  Check all indicator lights.
 ___X_____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X____ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X____ 6.1.11 Wipe down pad conditioning arm.
 ___X____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 ___X____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X_____ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X_____ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X_____ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 ___X_____ 6.1.17 Wipe down all surfaces of the robot.
 ___X_____ 6.1.18 Clean end effector vacuum chuck air port.
 ___X_____ 6.1.19 Inspect and clean end effector air nozzle.
 __NA_____ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 ___X_____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___X_____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 ___X_____ 6.1.23 Check Neslab TCU for leaks.
 ___X_____ 6.1.24 Check Neslab TCU temperature readout.  (38 C)
 ___X_____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___X_____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___X_____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  1)  Topped off the Neslab TCU
      	    2)  section 6.1.20 no longer utilizes mentioned filters
          
 | 
| 8.63 | ww17 weekly pm. | FABSIX::L_SHKOLNIKOV |  | Fri Oct 25 1996 06:02 | 71 | 
|  |     
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
    
  DATE: 10/24/96      SYSTEM RTC CODE:  CMP.A2     EQUIP. TECH.:  D Shift
 INITIAL
 _ls__    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100__
                                         Post-adjust:
 _ls__    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___82__
                                         Post-adjust:
 _ls__    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__35__
  
 _ls__    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                 contamination found.  
 _ls__    6.1.5  Check all tubing and fittings for leaks. 
       
 _ls__    6.1.6  Check all tubing and fittings for air leaks.
 _ls__    6.1.7  Check all indicator lights.
 _ls__    6.1.8  Check all stations/components for slurry, debris, or  
                 any contaminants.  Clean if necessary.  
 _ls__    6.1.9  Wipe down polish table, tub, and splash ring.
 _ls__    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 _ls__    6.1.11 Wipe down pad conditioning arm.
 _ls__    6.1.12 Remove, rinse, and replace diamond conditioning disk.
 _ls__    6.1.13 Remove, wipe down, and rinse pad conditioner park station.
 _ls__    6.1.14 Wipe down outer surface of both spindle hubs.
 _ls__    6.1.15 Remove and clean O-rings, replace if necessary.
 _ls__    6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 _ls__    6.1.17 Wipe down all surfaces of the robot.
 _ls__    6.1.18 Clean end effector vacuum chuck air port.
 _ls__    6.1.19 Inspect and clean end effector air nozzle.
 _n/a_    6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
                         (no longer in use)
 _ls__    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 _ls__    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 _ls__    6.1.23 Check Neslab TCU for leaks.
 _ls__    6.1.24 Check Neslab TCU temperature readout.  (38 C)
 _ls__    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 _ls__    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 _ls__    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS: 
 | 
| 8.64 | WW18 WEEKLY | LUDWIG::RIDLON | Eliminate the oblivious | Mon Oct 28 1996 23:52 | 81 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 10/28/96   SYSTEM RTC CODE: cmp.a2   EQUIP. TECH.: R_Poirier, M_Ridlon
 INITIAL
 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___
                                         Post-adjust:________
 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___82___
                                         Post-adjust:________
 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___38___
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X___ 6.1.5  Check all tubing and fittings for leaks. 
 ___X___ 6.1.6  Check all tubing and fittings for air leaks.
 ___X___ 6.1.7  Check all indicator lights.
 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X___ 6.1.11 Wipe down pad conditioning arm.
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 ___X___ 6.1.17 Wipe down all surfaces of the robot.
 ___X___ 6.1.18 Clean end effector vacuum chuck air port.
 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 ___X___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
     BOTH PUMPS NEEDED SOME MINOR ADJUSTMENTS.
 ___X___ 6.1.23 Check Neslab TCU for leaks.
 ___X___ 6.1.24 Check Neslab TCU temperature readout.
 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:__________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
                                                                  
 | 
| 8.65 | WW 19 - Monthly PM completed | SUBPAC::LANDRY |  | Mon Nov 04 1996 19:31 | 169 | 
|  |     
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE:  11-4-96   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH.: Finn, Gee, Landry
 INITIAL
 _BG/TL_ 6.2.1  Perform weekly PM checks in addition to this monthly list.
 __TL___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  
 __TL___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
 __BF___ 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:___.002______
 __BG___ 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout:____.000______
                Left Spindle Runout:______.001______
 __BG___ 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:_pre.007_ post.002______
                Left Spindle Hub Runout:__.0015_______
 _BG/TL_ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error:   -.60
                Right Spindle Force Error:   +.06
                Left Spindle Calibration Variable:
                     Pre-adjust:   157.31      Post-adjust:   148.87
                Right Spindle Calibration Variable:
                     Pre-adjust:   160.22      Post-adjust:   152.38
 _BG/TL_ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
 _BG/TL_ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
 __TL___ 6.2.10 Check shuttle travel.  Adjust if necessary.
 __TL___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust:___24.00_____   Post-adjust:___NONE_________
 __TL___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: +15.02/-15.01   Post-adjust:___NONE______
 
 __TL___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust:___5.00_____   Post-adjust:___NONE____
 __TL___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.
                Pre-adjust:___12.18___   Post-adjust:__NONE____
 __BG___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
 __BG___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
 __BG___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
 __TL___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connections.
COMMENTS:  Added oil to the Bridge Lube resevoir
           Added softwater to the Neslab TCU
================================================================================
  
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 11-4-96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Gee, Landry
 INITIAL
 __BG___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100 PSI
                                         Post-adjust:  None
 __BG___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   82 PSI
                                         Post-adjust:  85 PSI
 __BG___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  33 PSI
  
 __BG___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __TL___ 6.1.5  Check all tubing and fittings for leaks. 
 __TL___ 6.1.6  Check all tubing and fittings for air leaks.
 __BG___ 6.1.7  Check all indicator lights.
 TL_BG_BF 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.
 _TL_BG_  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __TL___ 6.1.11 Wipe down pad conditioning arm.
 __TL___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __BF___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __BF___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __BF___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __BG___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 __BG___ 6.1.17 Wipe down all surfaces of the robot.
 __BG___ 6.1.18 Clean end effector vacuum chuck air port.
 __BG___ 6.1.19 Inspect and clean end effector air nozzle.
 _N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
         	NOTE: No point of use filters.
 __TL___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
      		
 _BG_TL_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __BG___ 6.1.23 Check Neslab TCU for leaks.
 __BG___ 6.1.24 Check Neslab TCU temperature readout.
 __BG___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __BG___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __BG___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS: 
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 | 
| 8.66 | WW XX - Weekly completed | SUBPAC::LANDRY |  | Tue Nov 12 1996 10:52 | 70 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 11/12/96   SYSTEM RTC CODE: cmp.a2   EQUIP. TECH.: TL,BG,BF
 INITIAL
 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___
                                         Post-adjust:________
 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___85___
                                         Post-adjust:________
 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___28___
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X___ 6.1.5  Check all tubing and fittings for leaks. 
 ___X___ 6.1.6  Check all tubing and fittings for air leaks.
 ___X___ 6.1.7  Check all indicator lights.
 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X___ 6.1.11 Wipe down pad conditioning arm.
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 ___X___ 6.1.17 Wipe down all surfaces of the robot.
 ___X___ 6.1.18 Clean end effector vacuum chuck air port.
 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 ___X___ 6.1.23 Check Neslab TCU for leaks.
 ___X___ 6.1.24 Check Neslab TCU temperature readout.
 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  6.1.20 N/A = No point of use filters on this system
 | 
| 8.67 | WW21 Weekly PM | FABSIX::R_POIRIER |  | Mon Nov 18 1996 04:50 | 71 | 
|  | --------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 11/18/96   SYSTEM RTC CODE: cmp.a2   EQUIP. TECH.: B Shift 
 INITIAL
 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___
                                         Post-adjust:________
 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___85___
                                         Post-adjust:________
 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___28___
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 ___X___ 6.1.5  Check all tubing and fittings for leaks. 
 ___X___ 6.1.6  Check all tubing and fittings for air leaks.
 ___X___ 6.1.7  Check all indicator lights.
 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.
 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 ___X___ 6.1.11 Wipe down pad conditioning arm.
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.
 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.
 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 ___X___ 6.1.17 Wipe down all surfaces of the robot.
 ___X___ 6.1.18 Clean end effector vacuum chuck air port.
 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 ___X___ 6.1.23 Check Neslab TCU for leaks.
 ___X___ 6.1.24 Check Neslab TCU temperature readout.
 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  6.1.20 N/A = No point of use filters on this system
 | 
| 8.68 | WEEKLY WW22 | FABSIX::M_RIDLON | Eliminate the oblivious | Mon Nov 25 1996 05:11 | 77 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 11/25/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Ridlon
 INITIAL
 __XX___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100___
                                         Post-adjust:________
 __XX___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:____84__
                                         Post-adjust:________
 __XX___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___37___
  
 __XX___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __XX___ 6.1.5  Check all tubing and fittings for leaks. 
 __XX___ 6.1.6  Check all tubing and fittings for air leaks.
 __XX___ 6.1.7  Check all indicator lights.
 __XX___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __XX___ 6.1.9  Wipe down polish table, tub, and splash ring.
 __XX___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __XX___ 6.1.11 Wipe down pad conditioning arm.
 __XX___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __XX___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __XX___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __XX___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __XX___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 __XX___ 6.1.17 Wipe down all surfaces of the robot.
 __XX___ 6.1.18 Clean end effector vacuum chuck air port.
 __XX___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __XX___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __XX___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __XX___ 6.1.23 Check Neslab TCU for leaks.
 __XX___ 6.1.24 Check Neslab TCU temperature readout.
 __XX___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __XX___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __XX___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:__________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 | 
| 8.69 | SEMI-ANNUAL PM COMPLETED FOR WW23 | FABSIX::O_WHITFORD | Quticherwhinin' | Thu Dec 05 1996 23:44 | 195 | 
|  |     
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semi-annual Preventive Maintenance Check Sheet, REV. C
 DATE: 12/5/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: JUBINVILLE
                                                         WHITFORD
JUBINVILLE 6.3.1  Perform Weekly and Monthly PM's in addition to this  
                  Semi-Annual list.
WHITFORD   6.3.2  Check all safety interlocked doors for proper operation.  
JUBINVILLE
JUBINVILLE 6.3.2  Check all EMO's for proper operation.
N/A        6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.
N/A        6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.
N/A        6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.
 COMMENTS:  
            RE: 6.3.3, 6.3.4 and 6.3.5: Per Jim Tooker, the oil in 
            the gear boxes are just to be checked for proper level, 
            not changed
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE: 12/5/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: JUBINVILLE
                                                         WHITFORD
 INITIAL
JUBINVILLE 6.2.1  Perform weekly PM checks in addition to this monthly list.
 WHITFORD 6.2.2  Replace the fluid lines on the peristaltic pumps.  
JUBINVILLE 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
JUBINVILLE 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout: .001
JUBINVILLE 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout: .001
                Left Spindle Runout: .001
JUBINVILLE 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout: .001
                Left Spindle Hub Runout: .002
JUBINVILLE 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error: PRE: 1.1   POST: N/C
                Right Spindle Force Error: PRE: -3.2  POST: .02
                Left Spindle Calibration Variable:
                     Pre-adjust: 148.87  Post-adjust: N/C
                Right Spindle Calibration Variable:
                     Pre-adjust: 152.78  Post-adjust: 154.74
JUBINVILLE 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
JUBINVILLE 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
JUBINVILLE 6.2.10 Check shuttle travel.  Adjust if necessary.
 WHITFORD 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 23.98 VDC   Post-adjust: 23.98 VDC
 WHITFORD 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 15.02 VDC   Post-adjust: 15.02
 
 WHITFORD 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust: 5.00 VDC   Post-adjust: 5.00 VDC
 WHITFORD 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.
                Pre-adjust: 12 VAC   Post-adjust: 12 VAC
 WHITFORD 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
 JUBINVILLE      necessary using Shell Tellus 10 or equivalent.
JUBINVILLE 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
JUBINVILLE 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
JUBINVILLE 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.
 COMMENTS:__________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 12/5/96   SYSTEM RTC CODE: CMP.A2      EQUIP. TECH.: BRIAN JUBINVILLE
                                                             DAVE WHITFORD
 INITIAL
 WHITFORD 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 PSI
                                         Post-adjust: 100 PSI
 WHITFORD 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  85 PSI
                                         Post-adjust:  85 PSI
 WHITFORD 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 30 PSI	
  
 WHITFORD 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                 contamination found.  
 WHITFORD 6.1.5  Check all tubing and fittings for leaks. 
 WHITFORD 6.1.6  Check all tubing and fittings for air leaks.
 WHITFORD 6.1.7  Check all indicator lights.
 WHITFORD 6.1.8  Check all stations/components for slurry, debris, or  
 JUBINVILLE      any contaminants.  Clean if necessary.  
JUBINVILLE 6.1.9  Wipe down polish table, tub, and splash ring.
JUBINVILLE 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
JUBINVILLE 6.1.11 Wipe down pad conditioning arm.
JUBINVILLE 6.1.12 Remove, rinse, and replace diamond conditioning disk.
JUBINVILLE 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
JUBINVILLE 6.1.14 Wipe down outer surface of both spindle hubs.
JUBINVILLE 6.1.15 Remove and clean O-rings, replace if necessary.
JUBINVILLE 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
JUBINVILLE 6.1.17 Wipe down all surfaces of the robot.
JUBINVILLE 6.1.18 Clean end effector vacuum chuck air port.
JUBINVILLE 6.1.19 Inspect and clean end effector air nozzle.
N/A        6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
N/A        6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
JUBINVILLE 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
JUBINVILLE 6.1.23 Check Neslab TCU for leaks.
JUBINVILLE 6.1.24 Check Neslab TCU temperature readout.
JUBINVILLE 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
JUBINVILLE 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
JUBINVILLE 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  6.1.20 and 6.1.21 were eliminated from the tool a year ago
 
 | 
| 8.70 | WW 24 - Weekly completed | SUBPAC::LANDRY |  | Sun Dec 08 1996 17:36 | 70 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 12/8/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Gee  /  Landry
 INITIAL
 __XX___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100___
                                         Post-adjust:________
 __XX___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:____80__
                                         Post-adjust:___85___
 __XX___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___38___
  
 __XX___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __XX___ 6.1.5  Check all tubing and fittings for leaks. 
 __XX___ 6.1.6  Check all tubing and fittings for air leaks.
 __XX___ 6.1.7  Check all indicator lights.
 __XX___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __XX___ 6.1.9  Wipe down polish table, tub, and splash ring.
 __XX___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __XX___ 6.1.11 Wipe down pad conditioning arm.
 __XX___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __XX___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __XX___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __XX___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __XX___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 __XX___ 6.1.17 Wipe down all surfaces of the robot.
 __XX___ 6.1.18 Clean end effector vacuum chuck air port.
 __XX___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __XX___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __XX___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __XX___ 6.1.23 Check Neslab TCU for leaks.
 __XX___ 6.1.24 Check Neslab TCU temperature readout.
 __XX___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __XX___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __XX___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:   6.1.20  No longer utilizes said filters
 | 
| 8.71 | WW 25 - Weekly completed | FABSIX::R_GEE |  | Sun Dec 15 1996 17:50 | 76 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 12/15/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Gee, Finn, Landry
 INITIAL
 __XX___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100___
                                         Post-adjust:________
 __XX___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:____80__
                                         Post-adjust:___85___
 __XX___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___41___
  
 __XX___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __XX___ 6.1.5  Check all tubing and fittings for leaks. 
 __XX___ 6.1.6  Check all tubing and fittings for air leaks.
 __XX___ 6.1.7  Check all indicator lights.
 __XX___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __XX___ 6.1.9  Wipe down polish table, tub, and splash ring.
 __XX___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __XX___ 6.1.11 Wipe down pad conditioning arm.
 __XX___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __XX___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __XX___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __XX___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __XX___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 __XX___ 6.1.17 Wipe down all surfaces of the robot.
 __XX___ 6.1.18 Clean end effector vacuum chuck air port.
 __XX___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __XX___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __XX___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __XX___ 6.1.23 Check Neslab TCU for leaks.
 __XX___ 6.1.24 Check Neslab TCU temperature readout.
 __XX___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __XX___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __XX___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:   6.1.20  No longer utilizes said filters
    
    	     Changed the Polish Pad, rebuilt the right carrier, changed the
             conditioning disk.
    
             Cleaned up oil (from oiler) in drip pan
                                                    
 | 
| 8.72 | WW 26 - Weekly completed | SUBPAC::LANDRY |  | Sun Dec 22 1996 10:45 | 75 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 12/22/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Gee, Landry
 INITIAL
 __XX___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100___
                                         Post-adjust:________
 __XX___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:____82__
                                         Post-adjust:___85___
 __XX___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___42___
  
 __XX___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __XX___ 6.1.5  Check all tubing and fittings for leaks. 
 __XX___ 6.1.6  Check all tubing and fittings for air leaks.
 __XX___ 6.1.7  Check all indicator lights.
 __XX___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __XX___ 6.1.9  Wipe down polish table, tub, and splash ring.
 __XX___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __XX___ 6.1.11 Wipe down pad conditioning arm.
 __XX___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __XX___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __XX___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __XX___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __XX___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 __XX___ 6.1.17 Wipe down all surfaces of the robot.
 __XX___ 6.1.18 Clean end effector vacuum chuck air port.
 __XX___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __XX___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __XX___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __XX___ 6.1.23 Check Neslab TCU for leaks.
 __XX___ 6.1.24 Check Neslab TCU temperature readout.
 __XX___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __XX___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __XX___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:   6.1.20  No longer utilizes said filters
    
    	     Changed the Polish Pad.
    
             Cleaned up oil (from oiler) in drip pan
                                                    
 | 
| 8.73 | WW27 Weekly PM completed | FABSIX::R_POIRIER |  | Tue Dec 31 1996 02:16 | 78 | 
|  | --------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 12/29/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Roger Poirier
							   Mitch Ridlon
 INITIAL
 __RP___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100___
                                         Post-adjust:________
 __RP___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:____84__
                                         Post-adjust:_______
 __RP___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___43___
  
 __RP___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __RP___ 6.1.5  Check all tubing and fittings for leaks. 
 __RP___ 6.1.6  Check all tubing and fittings for air leaks.
 _MR/RP_ 6.1.7  Check all indicator lights.
 _MR/RP_ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __RP___ 6.1.9  Wipe down polish table, tub, and splash ring.
 __RP___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __RP___ 6.1.11 Wipe down pad conditioning arm.
 __MR___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __RP___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __RP___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __RP___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __MR___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 __MR___ 6.1.17 Wipe down all surfaces of the robot.
 __MR___ 6.1.18 Clean end effector vacuum chuck air port.
 __MR___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __MR___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __RP___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __RP___ 6.1.23 Check Neslab TCU for leaks.
 __RP___ 6.1.24 Check Neslab TCU temperature readout.
 __MR___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __MR___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __MR___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS: N/A 6.1.20  No longer utilizes said filters
    
	   Engineer informed of all N/A
	   Changed the Polish Pad/conditioning disk
    
           Cleaned up oil (from oiler) in drip pan
                                                    
 | 
| 8.74 | CMP.A2 shutdown checksheet completed | FABSIX::R_GEE |  | Tue Dec 31 1996 15:28 | 40 | 
|  | 			
                    CMP.A1 & CMP.A2 SHUTDOWN CHECKSHEET	 Tech: _Tim Landry_
                    -----------------------------------        _Bob Gee____
							
                                                        Tech.       Date
                                                       -------     -------
  1.  Remove all wafer carriers.  Do not re-use.
      Ensure that there are a sufficient ammount
      of re-built carriers to support the startup.      ___X___     _12/31/96
  2.  Remove all wafer cassettes and drain Send
      and Receive DI Water tanks.                       ___X___     _12/31/96
  3.  Purge both slurry lines with DI Water.            ___X___     _12/31/96
  4.  Remove and discard all polishing pads.            ___X___     _12/31/96
  5.  Remove all PVA scrub brushes and submerge
      in a mixture of DI water and H2O2.                ___X___     _12/31/96
  6.  Perform a complete clean of each system
      to remove dried slurry.  Wipe down and dry
      all wet surfaces.                                 ___X___     _12/31/96
  7.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing to UDR.           ___X___     _12/31/96
  8.  Disconnect incoming DI Water line and purge
      system DI Water lines with N2.  Re-connect
      DI Water line when finished.
  9.  Power down each system.                           ___X___     _12/31/96
 10.  Power down each vacuum pump cabinet.              ___X___     _12/31/96
 11.  Power down each Neslab TCU.                       ___X___     _12/31/96
 12.  Enter checksheet into CMP Notesfile.		___X___     _12/31/96
 | 
| 8.75 | CMP.A2 START-UP COMPLETED | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Thu Jan 02 1997 07:38 | 34 | 
|  | 
                    CMP.A1 & CMP.A2 STARTUP CHECKSHEET
                    ----------------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are           BJ       1/2/97
      available and ready to use.                       
  2.  Power up each system.                              BJ       1/2/97
  3.  Power up each vacuum pump cabinet.                 BJ       1/2/97
  4.  Power up each Neslab TCU.                          BJ       1/2/97
  5.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing into the tool      BJ       1/2/97
  6.  Place cassettes in left and right send
      and receive stations to fill DI Water
      tanks.                                             BJ       1/2/97
  7.  Install new polishing pads.                        LS       1/2/97
  8.  Install new wafer carriers.                        BJ       1/2/97
  9.  Re-install PVA scrub brushes.                      LS       1/2/97
 10.  Place systems in wet idle mode.                    LS       1/2/97
 11.  Notify Operations that the systems are ready
      for pad break-in & MQC.                            LS       1/2/97
 12.  Enter checksheet into notesfile.                   BJ       1/2/97
 | 
| 8.76 | WW 28 - Monthly completed | SUBPAC::LANDRY |  | Tue Jan 07 1997 14:26 | 169 | 
|  |     
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE:   1-7-97   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH:  Tim Landry   (TL)
                                                           Bob Gee      (BG)
                                                           Jim Sadin    (JS)
                                                           Brendan Finn (BF)
 INITIAL
 __JS___ 6.2.1  Perform weekly PM checks in addition to this monthly list.
 _TL/JS_ 6.2.2  Replace the fluid lines on the peristaltic pumps.  
 _TL/JS_ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
 _TL/JS_ 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:___.002______
 _TL/JS_ 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout:____.001______
                Left Spindle Runout:______.001______
 _TL/JS_ 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:_pre.005_ post.001______
                Left Spindle Hub Runout:__pre.004- post.001_______
 _TL/JS_ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error:    +.04
                Right Spindle Force Error:   +.24
                Left Spindle Calibration Variable:
                     Pre-adjust:   148.87      Post-adjust:   148.83
                Right Spindle Calibration Variable:
                     Pre-adjust:   154.74      Post-adjust:   150.02
 _TL/JS_ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
 _TL/JS_ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
 __BF___ 6.2.10 Check shuttle travel.  Adjust if necessary.
 _TL/JS_ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust:___23.97_____   Post-adjust:___NONE_________
 _TL/JS_ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: +15.01/-15.01   Post-adjust:___NONE______
 
 _TL/JS_ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust:___4.99_____   Post-adjust:___NONE____
 _TL/JS_ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.
                Pre-adjust:___12.17___   Post-adjust:__NONE____
 _BF/BG_ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
 _TL/JS_ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
 _TL/JS_ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
 _TL/JS_ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connections.
COMMENTS:    Added softwater to the Neslab TCU
================================================================================
  
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 1-7-97   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Tim Landry   (TL)
                                                         Jim Sadin    (JS)
                                                         Bob Gee      (BG)
                                                         Brendan Finn (BF)
 INITIAL
 __BG___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100 PSI
                                         Post-adjust:  None
 __BG___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   81 PSI
                                         Post-adjust:  85 PSI
 __BG___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  40 PSI
  
 __BF___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __BF___ 6.1.5  Check all tubing and fittings for leaks. 
 __BF___ 6.1.6  Check all tubing and fittings for air leaks.
 _BG/BF_ 6.1.7  Check all indicator lights.
 TL_BG_BF 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __JS___ 6.1.9  Wipe down polish table, tub, and splash ring.
 _TL_BG_ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __JS___ 6.1.11 Wipe down pad conditioning arm.
 __JS___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __JS___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __BF___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __BF___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __BG___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 __BG___ 6.1.17 Wipe down all surfaces of the robot.
 __BG___ 6.1.18 Clean end effector vacuum chuck air port.
 __BG___ 6.1.19 Inspect and clean end effector air nozzle.
 _N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
         	NOTE: No point of use filters.
 __TL___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
      		
 _BG_TL_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __BG___ 6.1.23 Check Neslab TCU for leaks.
 __BG___ 6.1.24 Check Neslab TCU temperature readout.
 __BG___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __BG___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __BG___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:   6.1.20  The system no longer utilizes said filter.  Equip Eng has
                     been notified.
      	     6.1.2   N2 supply to the room is at 81 PSI, which is also what
                     the system is reading.  Equip Eng has been notified.
 | 
| 8.77 | WW29 Weekly PM | FABSIX::R_POIRIER |  | Sun Jan 12 1997 21:43 | 79 | 
|  | --------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 01/12/97   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Roger Poirier
							   Mitch Ridlon
 INITIAL
 __RP___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100___
                                         Post-adjust:__100___
 __RP___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:____84__
                                         Post-adjust:___85__
 __RP___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___42___
  
 __RP___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __RP___ 6.1.5  Check all tubing and fittings for leaks. 
 __RP___ 6.1.6  Check all tubing and fittings for air leaks.
 _MR/RP_ 6.1.7  Check all indicator lights.
 _MR/RP_ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 _MR/RP_ 6.1.9  Wipe down polish table, tub, and splash ring.
 __RP___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __RP___ 6.1.11 Wipe down pad conditioning arm.
 __MR___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __RP___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __RP___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __RP___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __MR___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 __MR___ 6.1.17 Wipe down all surfaces of the robot.
 __MR___ 6.1.18 Clean end effector vacuum chuck air port.
 __MR___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __RP___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __RP___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __RP___ 6.1.23 Check Neslab TCU for leaks.
 __RP___ 6.1.24 Check Neslab TCU temperature readout.
 __MR___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __MR___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __MR___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS: N/A 6.1.20  No longer utilizes said filters
    
	   Engineer informed of all N/A
	   Changed the Polish Pad/Carriers/Conditioning Disk
    
           Cleaned up oil (from oiler) in drip pan
                                                    
	   Re-calibrated Slurry Flow 2. (From 1.2 to 1.1)
 | 
| 8.78 | WW30 weekly pm | FABSIX::J_SADIN | Freedom isn't free. | Mon Jan 20 1997 14:35 | 77 | 
|  | --------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 01/20/97   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: James Sadin
							   Brendan Finn
 INITIAL                                                   Tim Landry
 __JS___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100___
                                         Post-adjust:__100___
 __JS___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:____84__
                                         Post-adjust:___84__
 __JS___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___42___
  
 __BF___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __JS___ 6.1.5  Check all tubing and fittings for leaks. 
 __JS___ 6.1.6  Check all tubing and fittings for air leaks.
 _TL/BF_ 6.1.7  Check all indicator lights.
 _JS/BF_ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 _JS/TL_ 6.1.9  Wipe down polish table, tub, and splash ring.
 __BF___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __BF___ 6.1.11 Wipe down pad conditioning arm.
 __JS___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __TL___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __JS___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __JS___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __JS___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 __TL___ 6.1.17 Wipe down all surfaces of the robot.
 __TL___ 6.1.18 Clean end effector vacuum chuck air port.
 __BF___ 6.1.19 Inspect and clean end effector air nozzle.
 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __BF___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 _TL/BF_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __JS___ 6.1.23 Check Neslab TCU for leaks.
 __JS___ 6.1.24 Check Neslab TCU temperature readout.
 __BF___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __BF___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
   
 __TL___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS: N/A 6.1.20  No longer utilizes said filters
    
	   Engineer informed of all N/A
           6.1.2 - N2 pressure not adjustable any higher
           
 | 
| 8.79 | ww 31 weekly p.m. completed | FABSIX::R_GEE |  | Sun Jan 26 1997 15:48 | 75 | 
|  |            R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:1/26/97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH:  Tim Landry   (TL)
                                                         Brendan Finn (BF)
                                                         Jim Sadin    (JS)
 INITIAL						 Bob Gee      (BG)
 __BG___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100
                                         Post-adjust: 100
 __BG___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85
                                         Post-adjust:  85
 __BG___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   38
  
 __BF___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __TL___ 6.1.5  Check all tubing and fittings for leaks. 
 __TL___ 6.1.6  Check all tubing and fittings for air leaks.
 __JS___ 6.1.7  Check all indicator lights.
 JS/TL/BF/BG 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.
 __TL___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __BF___ 6.1.11 Wipe down pad conditioning arm.
 __TL___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __BG___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __BF___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __BG___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __JS___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 __BF___ 6.1.17 Wipe down all surfaces of the robot.
 __BF___ 6.1.18 Clean end effector vacuum chuck air port.
 __BF___ 6.1.19 Inspect and clean end effector air nozzle.
 __NA___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __TL___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __TL___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __BF___ 6.1.23 Check Neslab TCU for leaks.
                                               
 __BF___ 6.1.24 Check Neslab TCU temperature readout.
 __BG___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __BG___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __BG___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:__________________________________________________________________
6.1.3  System unable to reach 40 PSI, Equip Eng notified
6.1.20 Point of use slurry filters no longer used, Equip Eng notified
 | 
| 8.80 | WW32 Monthly PM | FABSIX::R_POIRIER |  | Sun Feb 02 1997 05:02 | 170 | 
|  |     
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE:   2-2-97   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH:  Mitch Ridlon (MR)
                                                           Roger Poirier (RP)
 INITIAL
 _MR/RP 6.2.1  Perform weekly PM checks in addition to this monthly list.
 __MR__ 6.2.2  Replace the fluid lines on the peristaltic pumps.  
 __RP__ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
 __MR/RP__ 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:___.002______
 __MR/RP__ 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout:____.001______
                Left Spindle Runout:______.001______
 __MR/RP__ 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:_pre.005_ post.001______
                Left Spindle Hub Runout:__pre.004- post.001_______
 __MR/RP__ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error:    .60
                Right Spindle Force Error:   -.85
                Left Spindle Calibration Variable:
                     Pre-adjust:   144.26      Post-adjust:   143.66
                Right Spindle Calibration Variable:
                     Pre-adjust:   149.52  Post-adjust:  149.62
 __MR/RP__ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
 __MR/RP__ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
 __MR___ 6.2.10 Check shuttle travel.  Adjust if necessary.
 __MR/RP__ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust:___24.03_____   Post-adjust:___NONE_________
 __MR/RP__ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: +15.03/-15.02   Post-adjust:___NONE______
 
 __MR/RP__ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust:___5.00_____   Post-adjust:___NONE____
 __MR/RP__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.
                Pre-adjust:___12.26___   Post-adjust:__NONE____
 __MR__ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
 __RP__ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
 __RP__ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
 __RP_ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connections.
COMMENTS: 
================================================================================
  
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
 DATE:   2-2-97   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH:  Mitch Ridlon (MR)
                                                           Roger Poirier (RP)
 INITIAL
 __RP___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100 PSI
                                         Post-adjust:  None
 __RP___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   81 PSI
                                         Post-adjust:  81 PSI
 __RP___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  40 PSI
  
 __MR/RP___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __RP/MR___ 6.1.5  Check all tubing and fittings for leaks. 
 __RP/MR___ 6.1.6  Check all tubing and fittings for air leaks.
 __RP__ 6.1.7  Check all indicator lights.
 __RP__ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 _MR/RP 6.1.9  Wipe down polish table, tub, and splash ring.
 _MR/PR 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __MR__ 6.1.11 Wipe down pad conditioning arm.
 __MR__ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __MR__ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __MR__ 6.1.14 Wipe down outer surface of both spindle hubs.
 __MR__ 6.1.15 Remove and clean O-rings, replace if necessary.
 __MR__ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 __RP__ 6.1.17 Wipe down all surfaces of the robot.
 __RP__ 6.1.18 Clean end effector vacuum chuck air port.
 __RP__ 6.1.19 Inspect and clean end effector air nozzle.
 _N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
         	NOTE: No point of use filters.
 __MR__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
      		
 __RP__ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __RP___ 6.1.23 Check Neslab TCU for leaks.
 __RP___ 6.1.24 Check Neslab TCU temperature readout.
 __RP___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __RP___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __RP___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:   6.1.20  The system no longer utilizes said filter.  Equip Eng has
                     been notified.
      	     6.1.2   N2 supply to the room is at 81 PSI, which is also what
                     the system is reading.  Equip Eng has been notified.
	     6.1.12  The conditioning disk was replaced 50 wafers ago. Still
	             plenty of life in it so it was not replaced.		
 | 
| 8.81 | WW33 Weekly PM | FABSIX::R_POIRIER |  | Mon Feb 10 1997 05:09 | 76 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:02-10-97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Roger Poirier (RP)
 INITIAL						 
 __RP___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100
                                         Post-adjust: 100
 __RP___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   82
                                         Post-adjust:  82
 __RP___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   42
  
 __RP___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __RP___ 6.1.5  Check all tubing and fittings for leaks. 
 __RP___ 6.1.6  Check all tubing and fittings for air leaks.
 __RP___ 6.1.7  Check all indicator lights.
 __RP___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __RP___ 6.1.9  Wipe down polish table, tub, and splash ring.
 __RP___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __RP___ 6.1.11 Wipe down pad conditioning arm.
 __RP___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __RP___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __RP___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __RP___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __RP___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 __RP___ 6.1.17 Wipe down all surfaces of the robot.
 __RP___ 6.1.18 Clean end effector vacuum chuck air port.
 __RP___ 6.1.19 Inspect and clean end effector air nozzle.
 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __RP___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __RP___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __RP___ 6.1.23 Check Neslab TCU for leaks.
                                               
 __RP___ 6.1.24 Check Neslab TCU temperature readout.
 __RP___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __RP___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __RP___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:  Found small pool of oil under Polish table. Cleaned and notified
	    Equip. Engineer.
	
	6.1.20 N/A Point of use slurry filters no longer used.
	       Equip Eng notified
 | 
| 8.82 | WW 34 - Weekly completed | SUBPAC::LANDRY |  | Sun Feb 16 1997 18:19 | 76 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:02-16-97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Brendan Finn   (BF)
                                                         James Sadin    (JS)
                                                         Timothy Landry (TL)
 INITIAL						 
 __TL___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100
                                         Post-adjust: 100
 __TL___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85
                                         Post-adjust:  85
 __TL___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   37
  
 __BF___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __BF___ 6.1.5  Check all tubing and fittings for leaks. 
 __BF___ 6.1.6  Check all tubing and fittings for air leaks.
 __JS___ 6.1.7  Check all indicator lights.
 TL/JS/BF 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __JS___ 6.1.9  Wipe down polish table, tub, and splash ring.
 __JS___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __BF___ 6.1.11 Wipe down pad conditioning arm.
 __BF___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __BF___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __TL___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __JS___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __TL___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 __TL___ 6.1.17 Wipe down all surfaces of the robot.
 __TL___ 6.1.18 Clean end effector vacuum chuck air port.
 __TL___ 6.1.19 Inspect and clean end effector air nozzle.
 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __JS___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __BF___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __BF___ 6.1.23 Check Neslab TCU for leaks.
                                               
 __BF___ 6.1.24 Check Neslab TCU temperature readout.
 __JS___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __JS___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __JS___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:   6.1.20 N/A Point of use slurry filters no longer used.
	            Equip Eng notified
      	     A new pad and two new carriers were re-installed
 | 
| 8.83 | WW35 - weekly completed | FABSIX::J_SADIN | Freedom isn't free. | Sun Feb 23 1997 16:30 | 76 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:02-23-97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Robert Gee     (BG)
                                                         James Sadin    (JS)
                                                         Timothy Landry (TL)
 INITIAL						 
 __JS___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100
                                         Post-adjust: 100
 __JS___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85
                                         Post-adjust:  85
 __JS___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   42
  
 __BG___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 _BG__ 6.1.5  Check all tubing and fittings for leaks. 
 __BG___ 6.1.6  Check all tubing and fittings for air leaks.
 __JS/TL/BG___ 6.1.7  Check all indicator lights.
 TL/JS/BG 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.
 __TL___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __TL___ 6.1.11 Wipe down pad conditioning arm.
 __BG___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __TL___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __JS___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __JS___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __BG___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 __BG___ 6.1.17 Wipe down all surfaces of the robot.
 __BG___ 6.1.18 Clean end effector vacuum chuck air port.
 __BG___ 6.1.19 Inspect and clean end effector air nozzle.
 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __JS___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 _TL/JS___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __JS___ 6.1.23 Check Neslab TCU for leaks.
                                               
 __JS___ 6.1.24 Check Neslab TCU temperature readout.
 __TL___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __BG___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __TL___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:   6.1.20 N/A Point of use slurry filters no longer used.
	            Equip Eng notified
      	     A new pad and conditioner were installed.
 | 
| 8.84 | WW36 monthly pm completed | FABSIX::B_WESTPHAL |  | Fri Mar 07 1997 19:25 | 182 | 
|  |                                                                            
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 3/6/97   SYSTEM RTC CODE: CMP.A2    EQUIP. TECH.: Dave Whitford    (DW)
        3/7/97                                            Leon Shkolnikov  (LS)
                                                          John Poirier     (JP)
                                                          Brad Westphal    (BW)
  INITIAL
      DW 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100
                                         Post-adjust: 100
      DW 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   83
                                         Post-adjust:  83
      DW  6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42
  
      JP  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
      JP  6.1.5  Check all tubing and fittings for leaks. 
      JP  6.1.6  Check all tubing and fittings for air leaks.
      JP  6.1.7  Check all indicator lights.
      JP  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
      JP  6.1.9  Wipe down polish table, tub, and splash ring.
      JP  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
      JP  6.1.11 Wipe down pad conditioning arm.
      BW   6.1.12 Remove, rinse, and replace diamond conditioning disk.
      BW 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
      BW 6.1.14 Wipe down outer surface of both spindle hubs.
   *1 BW 6.1.15 Remove and clean O-rings, replace if necessary.
      JP 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
      BW 6.1.17 Wipe down all surfaces of the robot.
      BW 6.1.18 Clean end effector vacuum chuck air port.
      BW 6.1.19 Inspect and clean end effector air nozzle.
   N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
      JP 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
   N/A * 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
      JP 6.1.23 Check Neslab TCU for leaks.
      JP 6.1.24 Check Neslab TCU temperature readout.
      JP 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
      JP 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
      JP 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS: 
        6.1.15 * 1 o-ring from each spindle was bad but we only had 1 spare 
	         part w/ none in stock. shortage was filled out (06-12122-00)
        6.1.20   The point of use slurry filters are no longer used.
        6.1.22   The slurry pump hoses will be replaced and the pumps 
                 recalibrated when the monthly portion of the pm is performed.
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE: 3/7/97   SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: John Poirier   (JP)
                                                        Brad Westphal  (BW) 
 INITIAL
   JP/BW 6.2.1  Perform weekly PM checks in addition to this monthly list.
    * BW 6.2.2  Replace the fluid lines on the peristaltic pumps.  
      JP 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
   JP/BW 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:__.0008__________
   JP/BW 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout:__.001__________
                Left Spindlele Runout:__.001__________
  
   JP/BW 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:_.001___________
                Left Spindle Hub Runout:__.001__________
   JP/BW 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error:   .8%
                Right Spindle Force Error:  .5%
                Left Spindle Calibration Variable:
                     Pre-adjust: 148.5        Post-adjust: 148.5
                Right Spindle Calibration Variable:
                     Pre-adjust: 149.62        Post-adjust: 156.31
     JP  6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
     JP  6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
     JP  6.2.10 Check shuttle travel.  Adjust if necessary.
         6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
     BW
                Pre-adjust:_24.01v_____   Post-adjust:____N/A_____
         6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
     BW         Pre-adjust:+15.01v/-15.02   Post-adjust:___N/A______
 
         6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
     BW         Pre-adjust:_4.98v______   Post-adjust:____N/A_____
         6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.
            
     BW         Pre-adjust:_12.01___________   Post-adjust:____n/a________
      JP 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
      JP 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
      JP  6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
      JP  6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.
 COMMENTS:_6.2.2 The pumps were recalibrated when the hoses were replaced.
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 | 
| 8.85 | WW37 weekly pm complete | FABSIX::J_SADIN | Freedom isn't free. | Sun Mar 09 1997 11:18 | 83 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:03-09-97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Robert Gee     (BG)
                                                         James Sadin    (JS)
                                                         Timothy Landry (TL)
                                                         Brendan Finn   (BF)   
 INITIAL						 
 __JS___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100
                                         Post-adjust: 100
 __JS___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85
                                         Post-adjust:  85
 __JS___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   40
  
 __BF___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 _BG__ 6.1.5  Check all tubing and fittings for leaks. 
 __BG___ 6.1.6  Check all tubing and fittings for air leaks.
 __JS/TL/BG/BF___ 6.1.7  Check all indicator lights.
 TL/JS/BG/BF 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.
 __TL___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __TL___ 6.1.11 Wipe down pad conditioning arm.
 __BG___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __TL___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __JS___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __BF___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __BG___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 __BF___ 6.1.17 Wipe down all surfaces of the robot.
 __BG___ 6.1.18 Clean end effector vacuum chuck air port.
 __BG___ 6.1.19 Inspect and clean end effector air nozzle.
 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __JS___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 _TL/JS___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __BF___ 6.1.23 Check Neslab TCU for leaks.
                                               
 __BF___ 6.1.24 Check Neslab TCU temperature readout.
 __TL___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __BG___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __TL___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:   6.1.20 N/A Point of use slurry filters no longer used.
	            Equip Eng notified
      	     A new pad was installed.
        ** - Found gear box oil leaking out of all gearbox bolts.
             Checked gearbox oil level, drained 1/2 pint.
    	     Tightened all lower gearbox bolts.  
           - tightened all exhaust bellows clamps. 
 | 
| 8.86 | WW38 weekly pm completed. | FABSIX::J_SADIN | Freedom isn't free. | Sun Mar 16 1997 16:50 | 82 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:03-16-97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Robert Gee     (BG)
                                                         James Sadin    (JS)
                                                         Timothy Landry (TL)
                                                         Brendan Finn   (BF)   
 INITIAL						 
 __JS___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100
                                         Post-adjust: 100
 __JS___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85
                                         Post-adjust:  85
 __JS___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   40
  
 __BF___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 _BG__ 6.1.5  Check all tubing and fittings for leaks. 
 __BG___ 6.1.6  Check all tubing and fittings for air leaks.
 __JS/TL/BG/BF___ 6.1.7  Check all indicator lights.
 TL/JS/BG/BF 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.
 __TL___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __TL___ 6.1.11 Wipe down pad conditioning arm.
 __BG___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __TL___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __JS___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __BF___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __BG___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 __BF___ 6.1.17 Wipe down all surfaces of the robot.
 __BG___ 6.1.18 Clean end effector vacuum chuck air port.
 __BG___ 6.1.19 Inspect and clean end effector air nozzle.
 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __JS___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 _TL/JS___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __BF___ 6.1.23 Check Neslab TCU for leaks.
                                               
 __BF___ 6.1.24 Check Neslab TCU temperature readout.
 __TL___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __BG___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __TL___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:   6.1.20 N/A Point of use slurry filters no longer used.
	            Equip Eng notified
      	     A new pad, carriers and conditoner were installed.
    	     a small puddle of oil was found under the motor/gearbox
    coupling for the table. wiped clean and eng informed.
    
    
 | 
| 8.87 | WW39 Weekly PM completed | FABSIX::R_POIRIER |  | Tue Mar 25 1997 07:01 | 84 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:03-25-97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Roger Poirier (RP)
                                                         Mitch Ridlon (MR)
                                                         Al Quillen   (AQ)
                                                            
 INITIAL						 
 __RP___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100
                                         Post-adjust: 100
 __RP___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85
                                         Post-adjust:  85
 __RP___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   41
  
 RP/MR/AQ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 RP/AQ/MR 6.1.5  Check all tubing and fittings for leaks. 
 __RP___ 6.1.6  Check all tubing and fittings for air leaks.
 _RP/MR/AQ 6.1.7  Check all indicator lights.
 __RP___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 _AQ/RP_ 6.1.9  Wipe down polish table, tub, and splash ring.
 __RP___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __RP___ 6.1.11 Wipe down pad conditioning arm.
 _AQ/RP___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __RP___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __RP___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __RP___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __RP___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 __RP___ 6.1.17 Wipe down all surfaces of the robot.
 __RP___ 6.1.18 Clean end effector vacuum chuck air port.
 __RP___ 6.1.19 Inspect and clean end effector air nozzle.
 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __RP___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __RP__ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __RP___ 6.1.23 Check Neslab TCU for leaks.
                                               
 __RP___ 6.1.24 Check Neslab TCU temperature readout.
 __AQ___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __RP___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __RP___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:   6.1.20 N/A Point of use slurry filters no longer used.
	            Equip Eng notified
      	     A new pad, and conditoner were installed.
    	     a small puddle of oil was found under the motor/gearbox
             coupling for the table. wiped clean and eng informed.
    
	     A large amount of water was found in lower drip pan.
	     Found a loose connector, tightened and drained the water.
    
 | 
| 8.88 | WW40 weekly pm completed | FABSIX::J_SADIN | Freedom isn't free. | Sun Mar 30 1997 16:15 | 77 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:03-30-97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: James Sadin
                                                         Brendan Finn
                                                         Timothy Landry
   
 INITIAL						 
 __JS___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100
                                         Post-adjust: 100
 __JS___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85
                                         Post-adjust:  85
 __JS___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   42
  
 _TL/BF_  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 _TL/BF_  6.1.5  Check all tubing and fittings for leaks. 
 __JS___ 6.1.6  Check all tubing and fittings for air leaks.
 _TL/JS_   6.1.7  Check all indicator lights.
 __BF__  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 JS/BF/TL6.1.9  Wipe down polish table, tub, and splash ring.
 _TL/BF_ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __TL__  6.1.11 Wipe down pad conditioning arm.
 _JS___    6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __TL___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __BF___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __BF___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __JS___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 __JS___ 6.1.17 Wipe down all surfaces of the robot.
 __TL___ 6.1.18 Clean end effector vacuum chuck air port.
 __TL___ 6.1.19 Inspect and clean end effector air nozzle.
 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __JS___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __JS__ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 _BF____ 6.1.23 Check Neslab TCU for leaks.
                                               
 __BF___ 6.1.24 Check Neslab TCU temperature readout.
 __TL___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __BF___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __JS___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:   6.1.20 N/A Point of use slurry filters no longer used.
	            Equip Eng notified
      	     A new pad, and conditoner were installed.
 | 
| 8.89 | WW41 monthly PM completed | FABSIX::J_SADIN | Freedom isn't free. | Tue Apr 08 1997 14:31 | 175 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:_04-08-97_   SYSTEM RTC CODE:_cmp.a2___   EQUIP. TECH.: brendan finn
                                                               james sadin
 INITIAL
 __js___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100__
                                         Post-adjust:__100___
 __js___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___85___
                                         Post-adjust:__85____
 __js___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__40____
  
 __bf___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __bf___ 6.1.5  Check all tubing and fittings for leaks. 
 __bf___ 6.1.6  Check all tubing and fittings for air leaks.
 __js___ 6.1.7  Check all indicator lights.
 __js___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __js___ 6.1.9  Wipe down polish table, tub, and splash ring.
 __js___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __bf___ 6.1.11 Wipe down pad conditioning arm.
 __bf___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __bf___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __js___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __bf___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __js___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 __js___ 6.1.17 Wipe down all surfaces of the robot.
 __js___ 6.1.18 Clean end effector vacuum chuck air port.
 __js___ 6.1.19 Inspect and clean end effector air nozzle.
 __na___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __bf___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __bf___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __js___ 6.1.23 Check Neslab TCU for leaks.
 __js___ 6.1.24 Check Neslab TCU temperature readout.
 __bf___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __bf___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __bf___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:___6.1.12 - filters no longer in use______________________________
 _____replaced 2.75" spindle o-ring on right spindle________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE:__04-08-97   SYSTEM RTC CODE:_cmp.a2___   EQUIP. TECH.:_brendan finn____
                                                              james sadin
 INITIAL
 __js/bf 6.2.1  Perform weekly PM checks in addition to this monthly list.
 __bf___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  
 __bf___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
 _js/bf_ 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:___<.001____
 _js/bf_ 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout:___<.001____ (adjusted from .004)
                Left Spindle Runout:____<.001__
 _js/bf_ 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:___<.001____
                Left Spindle Hub Runout:____<.001___
 _js/bf_ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error:__.18________
                Right Spindle Force Error:___.61______
                Left Spindle Calibration Variable:
                     Pre-adjust:___148.53___  Post-adjust:___153.14___
                Right Spindle Calibration Variable:
                     Pre-adjust:__156.31____  Post-adjust:___155.70___
 __js/bf 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
 _js/bf_ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
 _js/bf_ 6.2.10 Check shuttle travel.  Adjust if necessary.
 __BF___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 24.00 vdc  Post-adjust: 24.00 vdc
 __BF___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: +15.05   - 15.05   Post-adjust: + 15.05  -15.05
    
 __BF___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust:  5.00 vdc   Post-adjust: 5.00 vdc
   
 __BF___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.
                Pre-adjust:____12.05___   Post-adjust     12.05 vac
 __js  ___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
 __js___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
 __js___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
 __bf___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.
 COMMENTS:__________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 | 
| 8.90 | WW42 Weekly PM Checksheet | ASDG::POIRIER |  | Thu Apr 17 1997 12:18 | 81 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:4/17/97_____   SYSTEM RTC CODE:CMP.A2____   EQUIP. TECH.:John Poirier JP
                                                                Mike Standing MS
 INITIAL
 _JP____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:_100____
                                         Post-adjust:_100____
 _JP____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:_85 ____
                                         Post-adjust:_85_____
 _JP____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:_42_____
  
 _JP____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 _JP____ 6.1.5  Check all tubing and fittings for leaks. 
 _JP____ 6.1.6  Check all tubing and fittings for air leaks.
 _JP____ 6.1.7  Check all indicator lights.
 _JP____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 _JP____ 6.1.9  Wipe down polish table, tub, and splash ring.
 _JP____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 _JP____ 6.1.11 Wipe down pad conditioning arm.
 _MS____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 _MS____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 _JP____ 6.1.14 Wipe down outer surface of both spindle hubs.
 _JP____ 6.1.15 Remove and clean O-rings, replace if necessary.
 _JP____ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 _  MS__ 6.1.17 Wipe down all surfaces of the robot.
 ___MS__ 6.1.18 Clean end effector vacuum chuck air port.
 ___MS__ 6.1.19 Inspect and clean end effector air nozzle.
 ___N/A  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 ___JP__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 ___MS__ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 ___MS__ 6.1.23 Check Neslab TCU for leaks.
 ___MS__ 6.1.24 Check Neslab TCU temperature readout.
 ___JP__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 
  JP_ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __JP___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS:N/A 6.1.20 Point of use slurry filters have been removed from
                     the tool.
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 ___________________________________________________________________________
 | 
| 8.91 | CMP.A2 WW43 WEEKLY PM COMPLETED | FABSIX::J_SADIN | Freedom isn't free. | Sun Apr 20 1997 09:53 | 81 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:04/20/97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH:  BRENDAN FINN
                                                          JAMES SADIN
                                                          TIMOTHY LANDRY
 INITIAL						 
  JS    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100
                                        Post-adjust: 100
  JS    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85
                                        Post-adjust:  85
  JS  * 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  37 PSI
  TL    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  TL    6.1.5  Check all tubing and fittings for leaks. 
  BF    6.1.6  Check all tubing and fittings for air leaks.
  BF    6.1.7  Check all indicator lights.
  BF    6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  
  JS    6.1.9  Wipe down polish table, tub, and splash ring.
  JS    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  JS    6.1.11 Wipe down pad conditioning arm.
  BF    6.1.12 Remove, rinse, and replace diamond conditioning disk.
  JS    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
  TL    6.1.14 Wipe down outer surface of both spindle hubs.
  TL    6.1.15 Remove and clean O-rings, replace if necessary.
  BF    6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  JS    6.1.17 Wipe down all surfaces of the robot.
  JS    6.1.18 Clean end effector vacuum chuck air port.
  JS    6.1.19 Inspect and clean end effector air nozzle.
  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
  JS    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  TL/JS 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.
  BF    6.1.23 Check Neslab TCU for leaks.
  BF    6.1.24 Check Neslab TCU temperature readout.
  TL    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  TL    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  BF    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.
 COMMENTS:__________________________________________________________________
  *     6.1.3  System unable to reach 40 PSI, Equip Eng notified.
  N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.
    
    * found small puddle of oil under motor/gearbox mating point. cleaned
    up. 
 | 
| 8.92 | CMP.A2 WW44 WEEKLY PM COMPLETED. | FABSIX::J_SADIN | Freedom isn't free. | Sun Apr 27 1997 16:01 | 84 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:04/27/97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Bob Gee
                                                         Timothy Landry
                                                         James Sadin 
 INITIAL						 
  JS    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100
                                        Post-adjust: 100
  JS    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85
                                        Post-adjust:  85
  JS  * 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  37 PSI
  TL    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  TL    6.1.5  Check all tubing and fittings for leaks. 
  BG    6.1.6  Check all tubing and fittings for air leaks.
  BG    6.1.7  Check all indicator lights.
  BG    6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  
  JS    6.1.9  Wipe down polish table, tub, and splash ring.
  JS    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  JS    6.1.11 Wipe down pad conditioning arm.
  BG    6.1.12 Remove, rinse, and replace diamond conditioning disk.
  JS    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
  TL    6.1.14 Wipe down outer surface of both spindle hubs.
  TL    6.1.15 Remove and clean O-rings, replace if necessary.
  BG    6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  JS    6.1.17 Wipe down all surfaces of the robot.
  JS    6.1.18 Clean end effector vacuum chuck air port.
  JS    6.1.19 Inspect and clean end effector air nozzle.
  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
  JS    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  TL/JS 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.
  BG    6.1.23 Check Neslab TCU for leaks.
  BG    6.1.24 Check Neslab TCU temperature readout.
  TL    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  TL    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  BG    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.
 COMMENTS:__________________________________________________________________
  *     6.1.3  System unable to reach 40 PSI, Equip Eng notified.
  N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.
    
    * found small puddle of oil under motor/gearbox mating point. cleaned
    up. 
    * lots of bridge oil under polish table. cleaned up and refilled oil
        reservoir.
 | 
| 8.93 | Monthy PM for WW45 completed | SUBPAC::BJUBINVILLE | CMP Equipment Engineering | Fri May 09 1997 03:56 | 164 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 05.09.97   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Leon Shkolnikov  ls
 INITIAL
 __ls__  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100__
                                         Post-adjust:__100__
 __ls__ 6.1.2   N2 pressure @ 85 PSI:    Pre-adjust:___85___
                                         Post-adjust:__85___
 __ls__  6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__40__
  
 __ls__  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 __ls__  6.1.5  Check all tubing and fittings for leaks. 
 __ls__  6.1.6  Check all tubing and fittings for air leaks.
 __ls__  6.1.7  Check all indicator lights.
 __ls__  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
 __ls__  6.1.9  Wipe down polish table, tub, and splash ring.
 __ls__  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __ls__  6.1.11 Wipe down pad conditioning arm.
 __ls___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __ls___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
 __ls___ 6.1.14 Wipe down outer surface of both spindle hubs.
 __ls___ 6.1.15 Remove and clean O-rings, replace if necessary.
 __ls___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.
 __ls___ 6.1.17 Wipe down all surfaces of the robot.
 __ls___ 6.1.18 Clean end effector vacuum chuck air port.
 __ls___ 6.1.19 Inspect and clean end effector air nozzle.
 __**___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 __ls___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 __ls___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 __ls___ 6.1.23 Check Neslab TCU for leaks.
 __ls___ 6.1.24 Check Neslab TCU temperature readout.
 __ls___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __ls___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __ls___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
 COMMENTS: ** Not in use any more. EE notified.
 ___________________________________________________________________________
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE:  05.09.97   SYSTEM RTC CODE: CMP.A2  EQUIP. TECH.: Leon Shkolnikov  ls
                                                          Brian Jubinville BJ
 INITIAL
 __ls__  6.2.1  Perform weekly PM checks in addition to this monthly list.
 __ls__  6.2.2  Replace the fluid lines on the peristaltic pumps.  
 __ls__  6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
       
 __ls__  6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:   <.001    
 __ls__  6.2.5  Measure and record right and left spindle runout.
        
                Right Spindle Runout:   <.001                          
                Left Spindle Runout:    <.001  
  bj/ls  6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:    .001    
                Left Spindle Hub Runout:  pre: .005  post: 0005       
  bj     6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error: pre: -8.38  post: -.9             
                Right Spindle Force Error: pre: -11.61  post: .15            
                Left Spindle Calibration Variable:
                     Pre-adjust: 153.14       Post-adjust: 161.52      
                Right Spindle Calibration Variable:
                     Pre-adjust: 155.7        Post-adjust: 163.91      
 __ls__  6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
 __ls__  6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
 __ls__  6.2.10 Check shuttle travel.  Adjust if necessary.
 __ls__  6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: 23.98 vdc  Post-adjust: 23.98 vdc
 __ls__  6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust: +/-15.01           Post-adjust: +/-15.01       
    
 __ls__  6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust:  5.00 vdc   Post-adjust: 5.00 vdc
   
 __ls__  6.2.17 Check the   ~ 12 Volt power supply.  Calibrate if necessary.
                Pre-adjust:  12.05      Post-adjust     12.05 vac
 __ls__  6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
 __ls___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
 __ls___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
 __ls___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.
 COMMENTS:__________________________________________________________________
 
 | 
| 8.94 | ww46 weekly p.m. completed | FABSIX::R_GEE |  | Tue May 13 1997 17:45 | 77 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:05/13/97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Bob Gee
                                                         Timothy Landry
                                                         James Sadin 
 INITIAL						 
  JS    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100
                                        Post-adjust: 100
  JS    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85
                                        Post-adjust:  85
  JS    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  40 PSI
  TL    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  TL    6.1.5  Check all tubing and fittings for leaks. 
  BG    6.1.6  Check all tubing and fittings for air leaks.
  BG    6.1.7  Check all indicator lights.
  BG    6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  
  TL    6.1.9  Wipe down polish table, tub, and splash ring.
  JS    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  JS    6.1.11 Wipe down pad conditioning arm.
  BG    6.1.12 Remove, rinse, and replace diamond conditioning disk.
  JS    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
  TL    6.1.14 Wipe down outer surface of both spindle hubs.
  TL    6.1.15 Remove and clean O-rings, replace if necessary.
  BG    6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  JS    6.1.17 Wipe down all surfaces of the robot.
  JS    6.1.18 Clean end effector vacuum chuck air port.
  JS    6.1.19 Inspect and clean end effector air nozzle.
  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
  JS    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  TL/JS 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.
  BG    6.1.23 Check Neslab TCU for leaks.
  BG    6.1.24 Check Neslab TCU temperature readout.
  TL    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  TL    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  BG    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.
 COMMENTS:__________________________________________________________________
  N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.
    
 | 
| 8.95 | ww47 weekly pm completed | FABSIX::J_SADIN | Freedom isn't free. | Sun May 18 1997 10:38 | 77 | 
|  | 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:05/18/97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Bob Gee
                                                         Dave Whitford
                                                         James Sadin 
 INITIAL						 
  JS    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100
                                        Post-adjust: 100
  JS    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85
                                        Post-adjust:  85
  JS    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  40 PSI
  DW    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  DW    6.1.5  Check all tubing and fittings for leaks. 
  BG    6.1.6  Check all tubing and fittings for air leaks.
  BG    6.1.7  Check all indicator lights.
  BG    6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  
  DW    6.1.9  Wipe down polish table, tub, and splash ring.
  JS    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  JS    6.1.11 Wipe down pad conditioning arm.
  BG    6.1.12 Remove, rinse, and replace diamond conditioning disk.
  JS    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
  DW    6.1.14 Wipe down outer surface of both spindle hubs.
  DW    6.1.15 Remove and clean O-rings, replace if necessary.
  BG    6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  JS    6.1.17 Wipe down all surfaces of the robot.
  JS    6.1.18 Clean end effector vacuum chuck air port.
  JS    6.1.19 Inspect and clean end effector air nozzle.
  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
  JS    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  DW/JS 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.
  BG    6.1.23 Check Neslab TCU for leaks.
  BG    6.1.24 Check Neslab TCU temperature readout.
  DW    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  DW    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  BG    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.
 COMMENTS:__________________________________________________________________
  N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.
    
 | 
| 8.96 | ww48 weekly pm completed. | FABSIX::J_SADIN | Freedom isn't free. | Tue May 27 1997 09:21 | 81 | 
|  | --------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE:05/25/97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH:  James Sadin
                                                          Bob Gee
                                                          Tim Landry
                                                          Brendan Finn
 INITIAL						 
  JS     6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100
                                        Post-adjust: 100
  JS     6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  85
                                        Post-adjust:  85
  JS    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  40 PSI  
  BG    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  BG/TL 6.1.5  Check all tubing and fittings for leaks. 
  BG/TL 6.1.6  Check all tubing and fittings for air leaks.
    
  BF    6.1.7  Check all indicator lights.
    
  BG/TL 6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  
  TL/BF 6.1.9  Wipe down polish table, tub, and splash ring.
  TL/JS 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
  BF/BG 6.1.11 Wipe down pad conditioning arm.
  TL    6.1.12 Remove, rinse, and replace diamond conditioning disk.
  TL/JS 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
    
  BF/JS 6.1.14 Wipe down outer surface of both spindle hubs.
  TL/BG 6.1.15 Remove and clean O-rings, replace if necessary.
  JS/TL 6.1.16 Wipe down inside and outside of load/cleaning station buckets.
  BG    6.1.17 Wipe down all surfaces of the robot.
  BG/TL 6.1.18 Clean end effector vacuum chuck air port.
  BG    6.1.19 Inspect and clean end effector air nozzle.
  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
  BG/JS 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
  JS/BG 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.
  BG/JS 6.1.23 Check Neslab TCU for leaks.
  BG/JS 6.1.24 Check Neslab TCU temperature readout.
     
  TL/BG 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
  BG/TL 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
  BF/BG 6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.
 COMMENTS:__________________________________________________________________
  
* N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.
            
 | 
| 8.97 | CMP.A2 SHUTDOWN AND STARTUP CHECKSHEETS | FABSIX::J_SADIN | Freedom isn't free. | Tue May 27 1997 10:04 | 84 | 
|  | 
				CMP.A2
               CMP.A1 & CMP.A2 SHUTDOWN CHECKSHEET FOR 5/26/97
               -----------------------------------------------
							AL QUILLEN  (AQ)
							BRUCE DURGIN  (BD)
                                                        ROGER POIRIER (RP)
                                                        Tech.       Date
                                                       -------     -------
  1.  Change Workstream tool status to NON-SCHEDULED
      DOWN.  If Workstream will not let the tools go
      to NON-SCHEDULED, leave the tools at UP IDLE.
      DO NOT put any tools to SCHEDULED or UNSCHEDULED  RP          5-26
      DOWN.                                            _______     _______
  2.  Remove all wafer carriers.  Do not re-use.
      Ensure that there are a sufficient ammount        AQ,BD       5-26
      of re-built carriers to support the startup.     _______     _______
  3.  Remove all wafer cassettes and drain Send        BD,AQ        5-26
      and Receive DI Water tanks.                      _______     _______
                                                        AQ,BD       5-26
  4.  Purge both slurry lines with DI Water.           _______     _______
                                                        AQ,BD       5-26
  5.  Remove and discard all polishing pads.           _______     _______
  6.  Remove all PVA scrub brushes and submerge         AQ,BD       5-26
      in a mixture of DI water and H2O2.               _______     _______
  7.  Perform a complete clean of each system
      to remove dried slurry.  Wipe down and dry        BD,AQ       5-26
      all wet surfaces.                                _______     _______
  8.  Rotate main incoming DI Water valves 180 deg.     AQ,BD       5-26
      so that all DI water is flowing to UDR.          _______     _______
                                                        AQ,BD       5-26
  9.  Power down each system.                          _______     _______
                                                        AQ,BD       5-26
 10.  Power down each vacuum pump cabinet.             _______     _______
                                                        AQ,BD       5-26
 11.  Power down each Neslab TCU.                      _______     _______
 12.  Enter checksheet into CMP Notesfile.               RP         5-26
							-------    -------
             CMP.A1 & CMP.A2 STARTUP CHECKSHEET FOR 5/27
             -------------------------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are         js/tl/bg       5/27
      available and ready to use.                      _______     _______
                                                       js/tl/bg       5/27
  2.  Power up each system.                            _______     _______
                                                       js/tl/bg       5/27
  3.  Power up each vacuum pump cabinet.               _______     _______
                                                       js/tl/bg       5/27
  4.  Power up each Neslab TCU.                        _______     _______
  5.  Rotate main incoming DI Water valves 180 deg.    js/tl/bg       5/27
      so that all DI water is flowing into the tool    _______     _______
  6.  Place cassettes in left and right send           js/tl/bg       5/27
      and receive stations to fill DI Water
      tanks.                                           _______     _______
                                                       js/tl/bg       5/27
  7.  Install new polishing pads.                      _______     _______
                                                       js/tl/bg       5/27
  8.  Install new wafer carriers.                      _______     _______
                                                       js/tl/bg       5/27
  9.  Re-install PVA scrub brushes.                    _______     _______
                                                       js/tl/bg       5/27
 10.  Perform polish pad breakin.                      _______     _______
 11.  Notify Operations that the systems are ready     js/tl/bg       5/27
      MQC's.                                           _______     _______
                                                       js/tl/bg       5/27
 12.  Enter checksheet into notesfile.
 | 
| 8.98 | ww49 Annual p.m. completed | FABSIX::R_GEE |  | Sun Jun 01 1997 14:38 | 213 | 
|  |  
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Annual Preventive Maintenance Check Sheet, REV. C
 DATE: 6-1-97   SYSTEM RTC CODE: CMP.A2       SHIFT(S): Bob Gee      (BG)
                                                        Tim Landry   (TL)
							Jim Sadin    (JS)
							Brendan Finn (BF)
 INITIAL
BF/BG/JS/TL 6.4.1  Perform Weekly, Monthly, and Semi-Annual PM's in  addition to
                this Annual list
 _TL___ 6.4.2  Perform Bridge Position calibration.
 _BF___ 6.4.3  Check Robot Position Alignment.  Calibrate if necessary.
 _JS___ 6.4.4  Check Robot Travel position.  Adjust if necessary.
 _BG___ 6.4.5  Check Robot Arm position.  Adjust if necessary.
 _TL___ 6.4.6  Check Elevator Height position.  Adjust if necessary.
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semi-annual Preventive Maintenance Check Sheet, REV. C
 INITIAL
BF/BG/JS/TL 6.3.1  Perform Weekly and Monthly PM's in addition to this Semi-Annual
                list.
 _BG___ 6.3.2  Check all safety interlocked doors for proper operation.  
 _BF___ 6.3.2  Check all EMO's for proper operation.
 _BG/TL_ 6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.
	
 __BG__ 6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.
		
 __BG__ 6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.
Comments:  6.3.3, 6.3.4, 6.3.5 Checked oil levels only per. EE.
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C
 DATE:__6-1-97_   SYSTEM RTC CODE:CMP.A2       EQUIP. TECH.: Bob Gee      (BG)
                                                             Tim Landry   (TL)
                                                             Jim Sadin    (JS)
                                                             Brendan Finn (BF)
 INITIAL
 BF/BG/JS/TL 6.2.1  Perform weekly PM checks in addition to this monthly list.
 _JS___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  
 __BF__ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
 _BF/BG_ 6.2.4  Measure and record polish table alignment runout. 
                Polish Table Runout:___ .00075 _________
 _BF/BG/JS/TL_ 6.2.5  Measure and record right and left spindle runout.
                Right Spindle Runout:___ .001 _________
                Left Spindlele Runout:__ .001 __________
 _BG/JS_ 6.2.6  Measure and record right and left spindle hub runout.
                Right Spindle Hub Runout:___ .001 _________
                Left Spindle Hub Runout:___ .001 _________
BF/BG/JS/TL 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.
                Left Spindle Force Error:___1.78_________
                Right Spindle Force Error:__.04______
                Left Spindle Calibration Variable:
                     Pre-adjust:____1.06_______  Post-adjust:____1.05_______
                Right Spindle Calibration Variable:
                     Pre-adjust:____1.06________  Post-adjust:___1.05_________
 _JS___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.
 _BG___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.
 _BF___ 6.2.10 Check shuttle travel.  Adjust if necessary.
 __TL__ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust:____23.97____   Post-adjust:_____23.99___
 __TL__ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                Pre-adjust:___ -15.01 __   Post-adjust:__ -15.01 ___  
                Pre-adjust:___ +15.00 __   Post-adjust:__ +15.00 ___  
   
 __TL__ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary
                Pre-adjust:____4.99____   Post-adjust:____4.99____
 __TL__ 6.2.17 Check the ~ 12   Volt power supply.  Calibrate if necessary.
                Pre-adjust:___11.82___   Post-adjust:____11.82________
 __JS__ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.
 __JS__ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.
 __JS__ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.
 __JS__ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.
Comments:  6.2.17  There is no adjustment for this item.  The reading is
                   for reference ONLY.  EE has been notified
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
  DATE: 6-1-97      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH:  Bob Gee      (BG)
                                                             Tim Landry   (TL)
                                                             Jim Sadin    (JS)
                                                             Brendan Finn (BF)
 INITIAL
 __BF__     6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi
                                         Post-adjust:_N/A____
 __BF__     6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi
                                         Post-adjust:_N/A____
 __BF__     6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 43 psi
  
 __BG__     6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
 __BG__     6.1.5  Check all tubing and fittings for leaks. 
 __JS__     6.1.6  Check all tubing and fittings for air leaks.
 __JS__     6.1.7  Check all indicator lights.
 BG/JS/BF/TL  6.1.8  Check all stations/components for slurry, debris, or  
                     any contaminants.  Clean if necessary.  
 __JS__     6.1.9  Wipe down polish table, tub, and splash ring.
 __JS__     6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
 __BG__     6.1.11 Wipe down pad conditioning arm.
 __BG__     6.1.12 Remove, rinse, and replace diamond conditioning disk.
 __BG__     6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __BF__     6.1.14 Wipe down outer surface of both spindle hubs.
 __BF__     6.1.15 Remove and clean O-rings, replace if necessary.
 __TL__     6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 __TL__     6.1.17 Wipe down all surfaces of the robot.
 __TL__     6.1.18 Clean end effector vacuum chuck air port.
   
 __TL__     6.1.19 Inspect and clean end effector air nozzle.
  N/A       6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
 _JS__      6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
 _BG/JS_    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                   necessary.
 __JS__     6.1.23 Check Neslab TCU for leaks.
 __JS__     6.1.24 Check Neslab TCU temperature readout.
 __TL__     6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 __TL__     6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 __TL__     6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.
Comments: 6.1.20 no point of use slurry filters. 
 |