TOPIC 5.0 CMP.A1 EE/PE PASSDOWNS
5.135Mon Jan 22 1996 14:04 The new airmotors have arrived 8 lines
5.136Mon Jan 22 1996 15:05 New robot calibration procedures 9 lines
5.144Tue Jan 30 1996 19:13 robot vacuum switch calibration 25 lines
5.146Wed Jan 31 1996 16:10 "wafer present on robot" error problem 23 lines
5.156Fri Feb 16 1996 14:35 Software bug 15 lines
5.160Fri Mar 01 1996 15:39 New wafer push bars installed 9 lines
5.180Wed Mar 20 1996 16:25 Purge pressure increased on cmp.a1 10 lines
5.181Wed Mar 20 1996 16:26 System upgraded with new load and clean station rings 8 lines
5.191Mon Apr 08 1996 13:43 New Strasbaugh maintenance manuals are here 12 lines
5.200Thu May 02 1996 16:31 Downforce calibration performed on cmp.a1 7 lines
5.202Fri May 10 1996 13:22 Fairchild E-P analog counter settings for calibrations 42 lines
5.205Fri May 17 1996 16:26 Robot position over load variable adjusted 16 lines
5.270Thu Oct 10 1996 16:48 Send cassette water dunk featuer now operational 7 lines
5.321Thu Jan 02 1997 18:43 status of cmp.a1 23 lines
5.374Tue Apr 29 1997 16:26 New robot cable has been ordered 5 lines
TOPIC 6.0 CMP.A1 PM CHECKSHEETS
6.11Thu Dec 21 1995 15:04 No PM necessary for WW26 FY96 6 lines
6.15Fri Jan 19 1996 10:25 monthly PM waived 7 lines
TOPIC 7.0 CMP.A2 EE/PE PASSDOWNS
7.120Mon Jan 22 1996 15:06 New airmotors have arrived 8 lines
7.129Fri Feb 09 1996 16:59 cmp.a2 robot upgrade update 13 lines
7.138Fri Feb 16 1996 14:33 Softt ware bug 15 lines
7.143Fri Mar 01 1996 15:39 New wafer push bars installed 9 lines
7.155Wed Mar 20 1996 16:27 System upgraded with new load and clean station rings 8 lines
7.157Thu Mar 21 1996 16:12 Performed left & right spindle downforce and backpressure calibration 13 lines
7.168Mon Apr 08 1996 13:42 New Strasbaugh maintenance manuals are here 12 lines
7.176Wed May 01 1996 16:17 Down force calibration performed today 10 lines
7.180Thu May 09 1996 17:21 New E-P regulator installed on left spindle 10 lines
7.181Fri May 10 1996 13:23 Fairchild E-P analog counter settings for calibrations 42 lines
7.234Thu Oct 03 1996 17:00 Wafer load problems 18 lines
7.244Thu Oct 10 1996 16:48 Send cassette water dunk featuer now operational 7 lines
TOPIC 8.0 CMP.A2 PM CHECKSHEETS
8.11Thu Dec 21 1995 15:07 No PM necessary for WW26 FY96 6 lines
8.17Fri Feb 09 1996 17:12 Waiver for WW32 Monthly PM 7 lines
8.38Fri Jun 07 1996 16:33 Annual PM resheduled for WW50 due to unscheduled down time 6 lines
TOPIC 45.0 CMP-SCRUB.A1 EE/PE PASSDOWNS
45.80Fri Feb 16 1996 10:50 Contact phone numbers for OnTrak 27 lines
45.89Fri Mar 29 1996 15:05 The parts for cmp-scrub.a1 will be here Saturday, 3/30/96 8 lines
45.104Tue May 14 1996 17:16 The new NH4OH drip manifolds have been installed 7 lines
45.106Tue May 14 1996 17:18 New NH4OH drip manifolds have been installed 7 lines
45.124Fri Jun 28 1996 11:28 OnTrak after hours support 6 lines
45.132Fri Aug 16 1996 15:59 Do not use the rubber boots on the carriers 12 lines
45.140Wed Oct 02 1996 17:27 Update on pressure interlock upgrades 9 lines
45.142Fri Oct 04 1996 17:03 Update on pressure interlock upgrades 15 lines
45.148Thu Oct 17 1996 15:56 DI Water pressure switch setpoint lowered 8 lines
45.168Wed Jan 22 1997 15:39 Status of new software rev. 8 lines
TOPIC 46.0 CMP-SCRUB.A1 PM CHECKSHEETS
46.12Thu Dec 21 1995 15:09 No PM necessary for WW26 Fy96 6 lines
TOPIC 47.0 CMP-SCRUB.A2 EE/PE PASSDOWNS
47.79Fri Feb 16 1996 10:50 Contact phone numbers for OnTrak 27 lines
47.84Tue Mar 12 1996 15:57 cracked index station cover 6 lines
47.107Fri Jun 28 1996 11:30 OnTrak after hours support 6 lines
47.112Fri Aug 16 1996 15:59 Do not use the rubber boots on the carriers 12 lines
47.113Wed Sep 04 1996 14:45 Spin station motor controller replaced 12 lines
47.114Wed Sep 04 1996 16:41 Adjusted spin station wafer sensor 4 lines
47.121Thu Oct 03 1996 17:06 OnTrak upgrade work continues 6 lines
47.123Fri Oct 04 1996 17:04 Update on pressure interlock upgrades 15 lines
47.137Wed Jan 22 1997 15:41 status of software upgrade 8 lines
TOPIC 48.0 CMP-SCRUB.A2 PM CHECKSHEETS
48.11Thu Dec 21 1995 15:11 No PM necessary for WW26 FY96 6 lines
TOPIC 49.0 CMP-SCRUB.A3 EE/PE PASSDOWNS
49.1Fri Jun 28 1996 11:30 OnTrak after hours support 6 lines
49.31Wed Oct 02 1996 17:26 Update on pressure interlock upgrades 9 lines
49.32Fri Oct 04 1996 17:04 Update on the pressure interlock upgrades 15 lines
TOPIC 54.0 CMP-SCRUB.C1 EE/PE PASSDOWNS
54.7Wed Jan 22 1997 15:43 Black Empak cassettes can now be used 5 lines
TOPIC66.0Tue Aug 27 1996 13:46 FY97 PM SCHEDULE (with corrected system name) 160 lines

Additional information

First Post:Thu Dec 21 1995
Last Post:Tue Apr 29 1997
# Topics:1
# Replies:57
# We have note bodies for:58
Total memory used by this script: 799,240 (4,194,304)