[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Conference asdg::cmp

Title:CMP
Notice:Welcome to the CMP notesfile
Moderator:FABSIX::B_TOWERLLE
Created:Tue Oct 31 1995
Last Modified:Fri Jun 06 1997
Last Successful Update:Fri Jun 06 1997
Number of topics:94
Total number of notes:6381

8.0. "CMP.A2 PM CHECKSHEETS" by SUBPAC::SADIN (Freedom isn't free.) Sun Nov 05 1995 12:16

          <<< ASDG::DISK$SYS_DATA:[NOTES$LIBRARY]FILMS_ONLY.NOTE;1 >>>
                                -< Films Only! >-
================================================================================
Note 58.0                    (CMP.A2) PM CHECKSHEETS                  18 replies
ASDG::POIRIER                                         9 lines  13-JUL-1995 11:04
--------------------------------------------------------------------------------
    
    
    
           THIS NOTE WILL BE USED FOR POSTING PM CHECKSHEETS ON
    
    
                         
                                (CMP.A2)
    
================================================================================
Note 58.1                    (CMP.A2) PM CHECKSHEETS                     1 of 18
SUBPAC::TOOKER                                       78 lines  13-JUL-1995 14:54
                       -< Weekly PM Checksheet Template >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:__________   SYSTEM RTC CODE:__________   EQUIP. TECH.:_______________

 INITIAL

 _______ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:________

                                         Post-adjust:________

 _______ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:________

                                         Post-adjust:________

 _______ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:________
  
 _______ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _______ 6.1.5  Check all tubing and fittings for leaks. 

 _______ 6.1.6  Check all tubing and fittings for air leaks.

 _______ 6.1.7  Check all indicator lights.

 _______ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 _______ 6.1.9  Wipe down polish table, tub, and splash ring.

 _______ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 _______ 6.1.11 Wipe down pad conditioning arm.

 _______ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 _______ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 _______ 6.1.14 Wipe down outer surface of both spindle hubs.

 _______ 6.1.15 Remove and clean O-rings, replace if necessary.

 _______ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 _______ 6.1.17 Wipe down all surfaces of the robot.

 _______ 6.1.18 Clean end effector vacuum chuck air port.

 _______ 6.1.19 Inspect and clean end effector air nozzle.

 _______ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 _______ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _______ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 _______ 6.1.23 Check Neslab TCU for leaks.

 _______ 6.1.24 Check Neslab TCU temperature readout.

 _______ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 _______ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 _______ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 58.2                    (CMP.A2) PM CHECKSHEETS                     2 of 18
SUBPAC::TOOKER                                       90 lines  13-JUL-1995 14:55
                      -< Monthly PM Checksheet Template >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:__________   SYSTEM RTC CODE:__________   EQUIP. TECH.:_________________

 INITIAL

 _______ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 _______ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 _______ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 _______ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:____________

 _______ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:____________

                Left Spindlele Runout:____________

 _______ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:____________

                Left Spindle Hub Runout:____________

 _______ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:____________

                Right Spindle Force Error:____________

                Left Spindle Calibration Variable:

                     Pre-adjust:____________  Post-adjust:____________

                Right Spindle Calibration Variable:

                     Pre-adjust:____________  Post-adjust:____________

 _______ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 _______ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 _______ 6.2.10 Check shuttle travel.  Adjust if necessary.

 _______ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 _______ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________
 
 _______ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:____________   Post-adjust:____________

 _______ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 _______ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 _______ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 _______ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 _______ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 58.3                    (CMP.A2) PM CHECKSHEETS                     3 of 18
SUBPAC::TOOKER                                       30 lines  13-JUL-1995 14:56
                    -< Semi-Annual PM Checksheet Template >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semmi-annual Preventive Maintenance Check Sheet, REV. C

 INITIAL

 _______ 6.3.1  Perform Weekly and Monthly PM's in addition to this Semi-Annual
                list.

 _______ 6.3.2  Check all safety interlocked doors for proper operation.  

 _______ 6.3.2  Check all EMO's for proper operation.

 _______ 6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.

 _______ 6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.

 _______ 6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 58.4                    (CMP.A2) PM CHECKSHEETS                     4 of 18
SUBPAC::TOOKER                                       27 lines  13-JUL-1995 14:56
                       -< Annual PM Checksheet Template >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Annual Preventive Maintenance Check Sheet, REV. C

 INITIAL

 _______ 6.4.1  Perform Weekly, Monthly, and Semi-Annual PM's in  addition to
                this Annual list

 _______ 6.4.2  Perform Bridge Position calibration.

 _______ 6.4.3  Check Robot Position Alignment.  Calibrate if necessary.

 _______ 6.4.4  Check Robot Travel position.  Adjust if necessary.

 _______ 6.4.5  Check Robot Arm position.  Adjust if necessary.

 _______ 6.4.6  Check Elevator Height position.  Adjust if necessary.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 58.5                    (CMP.A2) PM CHECKSHEETS                     5 of 18
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"             149 lines  19-JUL-1995 02:48
                       -< MONTHLY PM FOR JULY COMPLETED >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
           Weekly and Monthly Preventive Maintenance Check Sheets, REV. C

  DATE: 7/14/95   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: All techs and
                                                          J. Tooker

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust: N/A

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 85 psi

                                         Post-adjust: N/A

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: > 30 PSI
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
     
 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.



           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 7/14/95   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Leon, Doc and BJ

 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 
 
 
 ___X___ 6.2.5  Measure and record right and left spindle runout.

 
 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

     
 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: .17

                Right Spindle Force Error: 1.04 

                Left Spindle Calibration Variable:

                     Pre-adjust: 147.67  Post-adjust: N/A

                Right Spindle Calibration Variable:

                     Pre-adjust: 149.47  Post-adjust: 152.6
    
 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:____________   Post-adjust:____________

 __N/A__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:  Down force results in PC under the files A2L_0714.XLS and
            A2R_0714.XLS
               
================================================================================
Note 58.6                    (CMP.A2) PM CHECKSHEETS                     6 of 18
ASDG::POIRIER                                       164 lines  20-JUL-1995 17:00
                          -< Monthly PM Checksheet  >-
--------------------------------------------------------------------------------



           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
           Weekly and Monthly Preventive Maintenance Check Sheets, REV. C

  DATE: 7/14/95   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Leon, Doc, BJ,
                                                          John & Jim T.
 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust: N/A

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 85 psi

                                         Post-adjust: N/A

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: > 30 PSI
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.

 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _______ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.



           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 7/14/95   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Leon, Doc and BJ

 INITIAL

 ___x___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 __n/a__ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___x___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___x___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:_.0015"_______

 ___x___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:_.002"_______

                Left Spindlele Runout:_.001"_______

 ___x___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:_.0015"________

                Left Spindle Hub Runout:___.0025"_________

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: -2.57 (average)

                Right Spindle Force Error: 2.82 (average)

                Left Spindle Calibration Variable:

                     Pre-adjust: 147.67  Post-adjust: (No Change) 147.67

                Right Spindle Calibration Variable:

                     Pre-adjust: 152.64  Post-adjust: 149.82

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:____________   Post-adjust:____________

 __N/A__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 58.7                    (CMP.A2) PM CHECKSHEETS                     7 of 18
SUBPAC::LANDRY                                       78 lines  29-JUL-1995 17:12
                              -< WW IV - Weekly >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:  7/29/95   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH.:  Landry

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:   100

                                         Post-adjust:  N/A

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:    90

                                         Post-adjust:  N/A

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  Not Available
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  The DI water gauge is currently malfunctioning.  

            No point of use filter currently in-line yet.

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 58.8                    (CMP.A2) PM CHECKSHEETS                     8 of 18
PATE::GEE                                            79 lines   1-AUG-1995 06:23
                         -< work week 05 weekly p.m. >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:  8/01/95   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH.:  Gee/Leon

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:   100

                                         Post-adjust:  N/A

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:    90

                                         Post-adjust:   85

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  Not Available
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.

 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  The DI water gauge is currently malfunctioning.  

            No point of use filter currently in-line yet.

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

================================================================================
Note 58.9                    (CMP.A2) PM CHECKSHEETS                     9 of 18
ASDG::POIRIER                                        91 lines   9-AUG-1995 19:55
                           -< Monthly P.M. - 8/9/95 >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:_8/9/95____   SYSTEM RTC CODE:_CMP.A2_____   EQUIP. TECH.:JP/Gee/BJ___

 INITIAL

 ____X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___X____ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___x____ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___x____ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:__.002_____

 ___x___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:__.001________

                Left Spindlele Runout:__.001_______

 ___x___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:___.002______

                Left Spindle Hub Runout:____.002______

 ___x____ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:____-.02________

                Right Spindle Force Error:___.04_________

                Left Spindle Calibration Variable:

                     Pre-adjust:___135.5_____  Post-adjust:____145.41_____

                Right Spindle Calibration Variable:

                     Pre-adjust:__157.23_____  Post-adjust:____148.79_____

 ___x____ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___x____ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___x____ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___x____ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:___24.01_____   Post-adjust:__24.01______

 ___x____ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:___15.01______   Post-adjust:_15.01______
 
 ___x____ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:____5.0______   Post-adjust:__5.0____

 ___na____ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 ___x____ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___x____ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___x____ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___x____ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

================================================================================
Note 58.10                   (CMP.A2) PM CHECKSHEETS                    10 of 18
SUBPAC::LANDRY                                       78 lines  19-AUG-1995 16:03
                        -< WW IIV Checksheet - Weekly >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:  8/19/95   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH.:  Landry

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:    98

                                         Post-adjust:  N/A

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:    88

                                         Post-adjust:  N/A

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  Not Available
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  The DI water gauge is currently malfunctioning.  

            No point of use filter currently in-line yet.
             
 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 58.11                   (CMP.A2) PM CHECKSHEETS                    11 of 18
SUBPAC::LANDRY                                       78 lines  26-AUG-1995 19:06
                        -< Weekly check sheet/pm done >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:  8/26/95   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH.:  Landry

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:   100

                                         Post-adjust:  N/A

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:    86

                                         Post-adjust:  N/A

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  Not Available
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  The DI water gauge is currently malfunctioning.  

            No point of use filter currently in-line yet.

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 58.12                   (CMP.A2) PM CHECKSHEETS                    12 of 18
SUBPAC::LANDRY                                       75 lines   1-SEP-1995 18:26
                            -< Weekly PM performed >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:  9/1/95   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH.:  Landry

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:   100

                                         Post-adjust:  N/A

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:    94

                                         Post-adjust:  N/A

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  Not Available
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  The DI water gauge is currently malfunctioning.  

            No point of use filter currently in-line yet.

      	    Slurry Pump 1 calibration was sugnificantly out of range.
            Variable adjustment was necessary.
================================================================================
Note 58.13                   (CMP.A2) PM CHECKSHEETS                    13 of 18
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              91 lines   8-SEP-1995 00:07
                      -< Monthly PM for Sept. completed >-
--------------------------------------------------------------------------------
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 9/6/95   SYSTEM RTC CODE: CMP.A2  EQUIP. TECH.: A, B C and D shift

 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout: in spec per B shift via C shift

 ___X___ 6.2.5  Measure and record right and left spindle runout.

               Right Spindle Runout: in spec per B shift via C shift

                Left Spindle Runout: in spec per B shift via C shift

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: in spec per C shift

                Left Spindle Hub Runout:  in spec per C shift

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: 1.14

                Right Spindle Force Error: -.31

                Left Spindle Calibration Variable:

                     Pre-adjust: 142.91 Post-adjust: N/C

                Right Spindle Calibration Variable:

                     Pre-adjust: 144.79  Post-adjust: 148.49

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: in spec per C shift  Post-adjust:____________

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: in spec per C shift  Post-adjust:____________
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: in spec per C shift   Post-adjust:____________

 __N/A__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
                                      
 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 58.14                   (CMP.A2) PM CHECKSHEETS                    14 of 18
SUBPAC::LANDRY                                       75 lines  10-SEP-1995 19:49
                            -< Weekly PM performed >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:  9/10/95   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH.:  Landry / Finn

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:   100

                                         Post-adjust:  N/A

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:    92

                                         Post-adjust:  N/A

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  Not Available
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  The DI water gauge is currently malfunctioning.  

            No point of use filter currently in-line yet.

      	    Slurry Pump 2 calibration was  out of range.
            Variable adjustment was necessary.
================================================================================
Note 58.15                   (CMP.A2) PM CHECKSHEETS                    15 of 18
FABSIX::B_FINN                                       76 lines   7-OCT-1995 10:02
                             -< weekly pm 10/7/95 >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:  10/7/95   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH.:  Finn

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:   100

                                         Post-adjust:  N/A

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:    92

                                         Post-adjust:  N/A

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  Not Available
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  

            No point of use filter currently in-line yet.

	    Large amount of dried slurry was cleaned from drip pan


================================================================================
Note 58.16                   (CMP.A2) PM CHECKSHEETS                    16 of 18
FABSIX::L_SHKOLNIKOV                                 85 lines  19-OCT-1995 06:01
                           -< MONTHLY PM COMPLETED >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 10/19/95   SYSTEM RTC CODE: CMP.A2  EQUIP. TECH.: Leon and BJ

 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout: SEE COMENTS  

 ___X___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: SEE COMENTS  

                Left Spindlele Runout: SEE COMENTS  

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: SEE COMENTS  

                Left Spindle Hub Runout: SEE COMENTS  

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: SEE COMENTS  

                Right Spindle Force Error: SEE COMENTS  

                Left Spindle Calibration Variable:

                     Pre-adjust: SEE COMENTS  Post-adjust______

                Right Spindle Calibration Variable:

                     Pre-adjust: SEE COMENTS  Post-adjust:________ 

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 24.03         Post-adjust:____________

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.
                                  
                Pre-adjust: +/- 15.02     Post-adjust:____________
                                  
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:  5.0          Post-adjust:____________

 __N/A__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:  Down force, spindle, hub and table alignments checked within
            the last two weeks due to uniformity issues.  All were either
            in spec or brought into spec.
                                          
================================================================================
Note 58.17                   (CMP.A2) PM CHECKSHEETS                    17 of 18
PATE::GEE                                            78 lines  23-OCT-1995 01:38
                           -< weekly p.m. 10/23/95 >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:  10/23/95   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH.:  Gee/RPoirier


 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:   100

                                         Post-adjust:  N/A

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:    93

                                         Post-adjust:  85

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 43 psi
  
 ___x__ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __x__ 6.1.5  Check all tubing and fittings for leaks. 

 __x__ 6.1.6  Check all tubing and fittings for air leaks.

 __x__ 6.1.7  Check all indicator lights.

 __x__ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __x__ 6.1.9  Wipe down polish table, tub, and splash ring.

 __x__ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __x__ 6.1.11 Wipe down pad conditioning arm.

 _n/a_ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __x__ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __x__ 6.1.14 Wipe down outer surface of both spindle hubs.

 __x__ 6.1.15 Remove and clean O-rings, replace if necessary.

 __x__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __x__ 6.1.17 Wipe down all surfaces of the robot.

 __x__ 6.1.18 Clean end effector vacuum chuck air port.

 __x__ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __x__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __x__ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __x___ 6.1.23 Check Neslab TCU for leaks.

 __x___ 6.1.24 Check Neslab TCU temperature readout.

 __x__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __x__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __x__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:
	    Filled the bridge oil.

	    Replaced 2 hub o-rings    
 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

================================================================================
Note 58.18                   (CMP.A2) PM CHECKSHEETS                    18 of 18
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              78 lines   2-NOV-1995 22:56
                       -< WEEKLY PM COMPLETED FOR 11/2 >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 11/2/95   SYSTEM RTC CODE:  	CMP.A2  EQUIP. TECH. D SHIFT

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 88 psi

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
T.RTitleUserPersonal
Name
DateLines
8.5MONTHLY P.M.PATE::GEETue Nov 07 1995 00:5891
 R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 11-07-95   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH.: A & B SHIFT

 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___x___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:__.0025______

 ___x___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:___.001____

                Left Spindlele Runout:___.002____

 ___x___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:__.002____

                Left Spindle Hub Runout:___.001_____

 ___x___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:   -0.47

                Right Spindle Force Error:   -0.33

                Left Spindle Calibration Variable:

                     Pre-adjust:  .94     Post-adjust:   .74

                Right Spindle Calibration Variable:

                     Pre-adjust:  .97     Post-adjust:   .84

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:___24.01____   Post-adjust:___N/A______

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 15.01/-15.01  Post-adjust:____N/A______
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:__5.00______   Post-adjust:___N/A______

 __N/A__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:___N/A______   Post-adjust:___N/A______

 ___x___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS: CHANGED THE SLURRY FILTER
    __________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
8.1Weekly PM Checksheet TemplateSUBPAC::BJUBINVILLENFD Fire - RescueWed Nov 08 1995 21:0778
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:__________   SYSTEM RTC CODE:__________   EQUIP. TECH.:_______________

 INITIAL

 _______ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:________

                                         Post-adjust:________

 _______ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:________

                                         Post-adjust:________

 _______ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:________
  
 _______ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _______ 6.1.5  Check all tubing and fittings for leaks. 

 _______ 6.1.6  Check all tubing and fittings for air leaks.

 _______ 6.1.7  Check all indicator lights.

 _______ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 _______ 6.1.9  Wipe down polish table, tub, and splash ring.

 _______ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 _______ 6.1.11 Wipe down pad conditioning arm.

 _______ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 _______ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 _______ 6.1.14 Wipe down outer surface of both spindle hubs.

 _______ 6.1.15 Remove and clean O-rings, replace if necessary.

 _______ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 _______ 6.1.17 Wipe down all surfaces of the robot.

 _______ 6.1.18 Clean end effector vacuum chuck air port.

 _______ 6.1.19 Inspect and clean end effector air nozzle.

 _______ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 _______ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _______ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 _______ 6.1.23 Check Neslab TCU for leaks.

 _______ 6.1.24 Check Neslab TCU temperature readout.

 _______ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 _______ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 _______ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
8.2Monthly PM Checksheet TemplateSUBPAC::BJUBINVILLENFD Fire - RescueWed Nov 08 1995 21:0790
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:__________   SYSTEM RTC CODE:__________   EQUIP. TECH.:_________________

 INITIAL

 _______ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 _______ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 _______ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 _______ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:____________

 _______ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:____________

                Left Spindlele Runout:____________

 _______ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:____________

                Left Spindle Hub Runout:____________

 _______ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:____________

                Right Spindle Force Error:____________

                Left Spindle Calibration Variable:

                     Pre-adjust:____________  Post-adjust:____________

                Right Spindle Calibration Variable:

                     Pre-adjust:____________  Post-adjust:____________

 _______ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 _______ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 _______ 6.2.10 Check shuttle travel.  Adjust if necessary.

 _______ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 _______ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________
 
 _______ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:____________   Post-adjust:____________

 _______ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 _______ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 _______ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 _______ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 _______ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
8.3Semi-annual PM Checksheet TemplateSUBPAC::BJUBINVILLENFD Fire - RescueWed Nov 08 1995 21:0730
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semmi-annual Preventive Maintenance Check Sheet, REV. C

 INITIAL

 _______ 6.3.1  Perform Weekly and Monthly PM's in addition to this Semi-Annual
                list.

 _______ 6.3.2  Check all safety interlocked doors for proper operation.  

 _______ 6.3.2  Check all EMO's for proper operation.

 _______ 6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.

 _______ 6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.

 _______ 6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
8.4Annual PM Checksheet TemplateSUBPAC::BJUBINVILLENFD Fire - RescueWed Nov 08 1995 21:0827
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Annual Preventive Maintenance Check Sheet, REV. C

 INITIAL

 _______ 6.4.1  Perform Weekly, Monthly, and Semi-Annual PM's in  addition to
                this Annual list

 _______ 6.4.2  Perform Bridge Position calibration.

 _______ 6.4.3  Check Robot Position Alignment.  Calibrate if necessary.

 _______ 6.4.4  Check Robot Travel position.  Adjust if necessary.

 _______ 6.4.5  Check Robot Arm position.  Adjust if necessary.

 _______ 6.4.6  Check Elevator Height position.  Adjust if necessary.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
8.6Weekly PM for 11/22 completedSUBPAC::BJUBINVILLENFD Fire - RescueWed Nov 22 1995 06:1271
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 11/22/95  SYSTEM RTC CODE: CMP.B1   EQUIP. TECH.: BJ

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40 psi
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. - SEE COMMENTS 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  Solenoid #31 in the valve cabinet is leaking and was ordered.
            It is due in today and will be replaced time permitting.
8.7WEEKLY PM COMPLETED FOR WW22SUBPAC::BJUBINVILLENFD Fire - RescueWed Nov 29 1995 21:5474
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 11/29/95   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Leon and BJ

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  Checked both hubs due to bad uniformity.  Found the left
            hub out .08 mils and the right was at .0025.  I brought
            them both in within .0005 mils.
    
________________________________________________________________________
8.8Semi-annual check sheets (inc. weekly + monthly)FABSIX::B_FINNWed Dec 06 1995 13:04211
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 12/06/95  SYSTEM RTC CODE: CMP.A2     EQUIP. TECH.: MR/BF

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100____

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__86____

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___40___
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________



                      -< Monthly PM Checksheet Template >-
 -------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:12/6/95   SYSTEM RTC CODE: CMP.A2     EQUIP. TECH.:BF/MR/TL

 INITIAL

 ____X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ____X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ____X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ____X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:___0.001"________


 ___X____ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:____0.001"________

                Left Spindlele Runout:___0.001"_________

 ____X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:_____0.0005"_______

                Left Spindle Hub Runout:______0.00075______

 ____X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:_____-0.79_______

                Right Spindle Force Error:____-0.29________

                Left Spindle Calibration Variable:

                     Pre-adjust:___0.98______  Post-adjust:____1.03________

                Right Spindle Calibration Variable:

                     Pre-adjust:___0.99_________ Post-adjust:__1.04__________

 ___X____ 6.2.8  Check left and right load station alignment.  Adjust if
                 necessary.

 ___X____ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                 necessary.

 ___X____ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X____ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                 Pre-adjust:__24.03_______   Post-adjust:___24.00_________

 ___X____ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                 Pre-adjust:___15.02_________   Post-adjust:___15.00_______
 
 ___X____ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                 Pre-adjust:___5.00_________   Post-adjust:___5.00_________

 __N/A___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                 Pre-adjust:____________   Post-adjust:____________

 ___X____ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                 necessary using Shell Tellus 10 or equivalent.

 ___X____ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
  	         Adjust level if necessary.

 ___X____ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                 fittings.

 ___X____ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                 connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________



           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semmi-annual Preventive Maintenance Check Sheet, REV. C

       DATE:12/6/95   SYSTEM RTC CODE: CMP.A2     EQUIP. TECH.:BF/MR/TL
 

INITIAL

 ___X____ 6.3.1 Perform Weekly and Monthly PM's in addition to this Semi-Annual
                list.

 ___X___ 6.3.2  Check all safety interlocked doors for proper operation.  

 ___X___ 6.3.2  Check all EMO's for proper operation.

 ___x___ 6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.

 ___X___ 6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.

 ___X___ 6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
8.9weekly pm completedFABSIX::B_FINNSun Dec 10 1995 15:1875
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:12/10/95   SYSTEM RTC CODE: CMP.A2  EQUIP. TECH: Finn

 INITIAL

 __X_____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:________ 100

                                         Post-adjust:________

 ___X____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:________88

                                         Post-adjust:________85

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:_40______
  
 ___x____ 6.1.4 Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring. 

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.

 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.
 
 ___x___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 slurry pump 1+2  needed calibration changes


8.10weekly completedFABSIX::B_FINNTue Dec 19 1995 17:5876
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:12/19/95   SYSTEM RTC CODE: CMP.A2  EQUIP. TECH: Finn/Landry

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:________ 100

                                         Post-adjust:________100

 ___X____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:________88

                                         Post-adjust:________85

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:_41______
  
 ___x____ 6.1.4 Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring. 

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.

 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle. 
 
 ___x___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 Slurry pump 1 needed calibration changes
 Added water to Neslab
 Cleaned light coat of oil from drip pan from bridge lube. Saw no leaks.
                                                                
8.11No PM necessary for WW26 FY96SUBPAC::TOOKERThu Dec 21 1995 15:076
Due to the scheduled FAB6 shutdown during Work Week 26 Fiscal Year 1996, no PM will be performed
on CMP.A2.


       Jim Tooker
       CMP Equipment Engineer
8.12WW27 WEEKLY PM COMPLETEFABSIX::B_WESTPHALSat Jan 06 1996 16:5178
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:06 JAN 96    SYSTEM RTC CODE: CMP.A2      EQUIP. TECH.:POIRIER/WESTPHAL

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:_100____

                                         Post-adjust:N/A_____

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:_86_____

                                         Post-adjust:_N/A____

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:_UNREADABLE
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.
    
 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENT:                                                                      ___

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
8.13MONTHLY PM FOR CMP.A2 COMPLETEDSUBPAC::BJUBINVILLENFD Fire - RescueWed Jan 10 1996 06:1590
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 1/10/96  SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: D shift

 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout: .0015

 ___X___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: .002

                Left Spindle Runout: .001

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: .0015

                Left Spindle Hub Runout: .001

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: 1.28

                Right Spindle Force Error: .15

                Left Spindle Calibration Variable:

                     Post-adjust: 169.52

                Right Spindle Calibration Variable:

                     Post-adjust: 167.31

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 24.02  Post-adjust:____________

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: -15.02/15.02   Post-adjust:____________
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 5   Post-adjust:____________

 __N/A__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
8.14weekly completedFABSIX::B_FINNFri Jan 19 1996 18:2675
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
                              Week Ending 1-20-96  WW29

  DATE: 1-19-96          SYSTEM RTC CODE: CMP.A2     EQUIP. TECH: Brad/Brendan

 INITIAL   

 __X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 __X___ 6.1.2  N2 pressure @ 87 PSI:    Pre-adjust: 88 psi

                                         Post-adjust:_N/A____

 __X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40 psi
  
 __X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __X___ 6.1.5  Check all tubing and fittings for leaks. 

 __X___ 6.1.6  Check all tubing and fittings for air leaks.

 __X___ 6.1.7  Check all indicator lights.

 __X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __x___ 6.1.11 Wipe down pad conditioning arm.

 __x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __x___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __x___ 6.1.17 Wipe down all surfaces of the robot.

 __x___ 6.1.18 Clean end effector vacuum chuck air port.
   
 __X___ 6.1.19 Inspect and clean end effector air nozzle.

 __x__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __x___ 6.1.23 Check Neslab TCU for leaks.

 __x___ 6.1.24 Check Neslab TCU temperature readout.

 __x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __x___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:  Slurry pump 1 + 2 was adjusted, was on the low side.
	   Added water to chiller.

8.15Weekly completed....two air motors installedSUBPAC::LANDRYTue Jan 23 1996 16:0080
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 1-23-96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: Landry/Finn

 INITIAL

 _TL/BF_ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 _TL/BF_ 6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 87 psi

                                         Post-adjust:_N/A____

 _TL/BF_ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
 _TL/BF_ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _TL/BF_ 6.1.5  Check all tubing and fittings for leaks. 

 _TL/BF_ 6.1.6  Check all tubing and fittings for air leaks.

 _TL/BF_ 6.1.7  Check all indicator lights.

 _TL/BF_ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 _TL/BF_ 6.1.9  Wipe down polish table, tub, and splash ring.

 _TL/BF_ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 _TL/BF_ 6.1.11 Wipe down pad conditioning arm.

 _TL/BF_ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 _TL/BF_ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 _TL/BF_ 6.1.14 Wipe down outer surface of both spindle hubs.

 _TL/BF_ 6.1.15 Remove and clean O-rings, replace if necessary.

 _TL/BF_ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 _TL/BF_ 6.1.17 Wipe down all surfaces of the robot.

 _TL/BF_ 6.1.18 Clean end effector vacuum chuck air port.
   
 _TL/BF_ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 _TL/BF_ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _TL/BF_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 _TL/BF_ 6.1.23 Check Neslab TCU for leaks.

 _TL/BF_ 6.1.24 Check Neslab TCU temperature readout.

 _TL/BF_ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.


 _TL/BF_ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 _TL/BF_ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:  

*  Changed air motors on both scrub/clean stations per Jim Tookers request.

*  Ran MQC's after installation of the scrubber air motors.

*  Conditioning disk was NOT changed out at this time.  Cleaned and re-
   installed original disk

8.16WW 31 Weekly PMFABSIX::R_POIRIERTue Jan 30 1996 05:5379
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
				WW31
  DATE:_1/30/96_   SYSTEM RTC CODE:_CMP.A2_   EQUIP. TECH.:_B SHIFT_

 INITIAL

 _RP____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:_100 psi_

                                         Post-adjust:__N/A__

 _RP____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:_88 psi_

                                         Post-adjust:_N/A_

 _RP____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__42 psi_
  
 _RP____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _RP____ 6.1.5  Check all tubing and fittings for leaks. 

 _RP____ 6.1.6  Check all tubing and fittings for air leaks.

 _RP____ 6.1.7  Check all indicator lights.

 _RP____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 _RP____ 6.1.9  Wipe down polish table, tub, and splash ring.

 _RP____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 _RP____ 6.1.11 Wipe down pad conditioning arm.

 _RP____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 _RP____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 _RP____ 6.1.14 Wipe down outer surface of both spindle hubs.

 _RP____ 6.1.15 Remove and clean O-rings, replace if necessary.

 _RP____ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 _RP____ 6.1.17 Wipe down all surfaces of the robot.

 _RP____ 6.1.18 Clean end effector vacuum chuck air port.

 _RP____ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 _RP____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _RP____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 _RP____ 6.1.23 Check Neslab TCU for leaks.

 _RP____ 6.1.24 Check Neslab TCU temperature readout.

 _RP____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 _RP____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 _RP____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:_Did Pad change during weekly PM. _______________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
8.17Waiver for WW32 Monthly PMSUBPAC::TOOKERFri Feb 09 1996 17:127
Due to robot and software upgrade causing excessive down time this week, the
monthly PM scheduled to take place this week will not be performed.  Instead,
a weekly PM has been performed and the monthly PM will be re-scheduled for next 
week.

Thanks,
Jim Tooker
8.18MONTHLY PM COMPLETED FOR WW33SUBPAC::BJUBINVILLENFD Fire - RescueSat Feb 17 1996 07:0790
        R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 2/17/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: D SHIFT

 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout: .002

 ___X___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: .0025

                Left Spindle Runout: .003

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: .001

                Left Spindle Hub Runout: .0005

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: 1.36

                Right Spindle Force Error: .68

                Left Spindle Calibration Variable (Dead weight):

                     Pre-adjust: 163.03  Post-adjust: 166.75

                Right Spindle Calibration Variable (Dead weight):

                     Pre-adjust: 167.31  Post-adjust:____________

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 24   Post-adjust:____________

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 15.02/-15.01   Post-adjust:____________
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 4.99   Post-adjust:____________

 ___X___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust: 12.01   Post-adjust:____________

 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
       
 ___________________________________________________________________________
8.19WW34 Weekly PMFABSIX::R_POIRIERMon Feb 19 1996 05:5672
                                -< weekly ww34 >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 2/19/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: B-shift
              
 INITIAL

 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 88 psi

                                         Post-adjust:________

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.
 
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 _______ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: 
8.20ww 35 pm weekly pm completedFABSIX::B_FINNWed Feb 28 1996 18:5076
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 2/28/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: A-shift
              


 ___X__ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___X__ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 88 psi

                                         Post-adjust:________

 ___X__ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X__ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X__ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X__ 6.1.11 Wipe down pad conditioning arm.
 
 ___X__ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___X__ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: Slurry Pump #1 cal variable changed from .84 to .9
           Slurry Pump #2 cal variable changed from .75 to .79

	   Added @ a gallon of water to TCU resevoir

	   System no longer utilizes a point of use slurry filter

	   Light coat of bridge oil found on drip pan
8.21MONTHLY PM COMPLETED FOR WW36SUBPAC::BJUBINVILLENFD Fire - RescueThu Mar 07 1996 23:2690
        R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 3/7-8/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: C+D SHIFT

 INITIAL                                 

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout: .002

 ___X___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: .002

                Left Spindle Runout: .002

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:  .0005

                Left Spindle Hub Runout:   .002

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:  < 2 - IN PC  A2L-307.XLS  

                Right Spindle Force Error: < 2 - IN PC  A2R-307.XLS  

                Left Spindle Calibration Variable (Dead weight):

                     Pre-adjust: IN PC  Post-adjust: 

                Right Spindle Calibration Variable (Dead weight):

                     Pre-adjust: IN PC Post-adjust:____________

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 24   Post-adjust:____________

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 15.02/-15.01   Post-adjust:____________
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 4.99   Post-adjust:____________

 ___X___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust: 12.01   Post-adjust:____________

 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
       
 ___________________________________________________________________________
8.22weekly p.m. completedFABSIX::R_GEESun Mar 10 1996 23:1772
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 03/10/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: B shift

 INITIAL

 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi

                                         Post-adjust:______

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.
 
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:
	replaced the carriers and pad.          
                                                      
8.23Weekly PM completed for WW38SUBPAC::BJUBINVILLENFD Fire - RescueWed Mar 20 1996 06:3074
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 03/20/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: BJ

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi

                                         Post-adjust:______

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.
 
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __N/A__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  Replaced all slurry pump compression fittings on the input
            and output on the slurry pumps.
    
    
    
8.24WW39 Weekly PMFABSIX::R_POIRIERSun Mar 24 1996 06:3675
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 03/24/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: B Shift

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 84 psi

                                         Post-adjust:______

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.
 
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __N/A__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  
            
    
    
    
8.253/31/96 weekly completedSTRATA::FINNSun Mar 31 1996 19:3574
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 03/31/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: A Shift

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 84 psi

                                         Post-adjust:______

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 50
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.
 
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  
            
    Added water to Chiller
    Calibrated both slurry pumps
    
8.26WW41 Monthly PMFABSIX::R_POIRIERWed Apr 10 1996 02:37156
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly/Monthly Preventive Maintenance Check Sheet, REV. C

  DATE: 04/10/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: B Shift

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 84 psi

                                         Post-adjust:______

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 45
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.
 
 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  
            
Found small amount of oil in drip pan.
    
--------------------------------------------------------------------------------
        R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 04/10/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: B Shift

 INITIAL                                 

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout: .002

 ___X___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: .001

                Left Spindle Runout: .001

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:  .001

                Left Spindle Hub Runout:   .001

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:  < 2 - IN PC  A1_L4196.XLS  

                Right Spindle Force Error: < 2 - IN PC  A1_R4196.XLS  

                Left Spindle Calibration Variable (Dead weight):

                     Pre-adjust: IN PC  Post-adjust: 

                Right Spindle Calibration Variable (Dead weight):

                     Pre-adjust: IN PC Post-adjust:____________

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 24   Post-adjust:____________

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 15.02/-15.01   Post-adjust:____________
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 5.01   Post-adjust:____________

 ___X___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust: 12.01   Post-adjust:____________

 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________
8.274/14/96 weekly pm completedFABSIX::B_FINNSun Apr 14 1996 20:1977
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 4/14/96   SYSTEM RTC CODE: CMP.A2      EQUIP. TECH: Landry/Finn

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:   100 PSI

                                         Post-adjust:  N/A

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   82 PSI

                                         Post-adjust:  N/A

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  45 PSI
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring. 

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.
 
 _N/a___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __X____ 6.1.23 Check Neslab TCU for leaks.

 __X____ 6.1.24 Check Neslab TCU temperature readout.

 __X____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __X____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS

 Repair leak on pump 2 hose (replaced both Pump 1 and 2 hose)
 Slurry pump 1+2 required cal after hose replacement
 Small amount of bridge oil in drip tray

                                         
8.28ww43 weekly pm completedFABSIX::B_FINNMon Apr 22 1996 19:2872
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 4/22/96   SYSTEM RTC CODE: CMP.A2  EQUIP. TECH.: LANDRY/FINN

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__85______

                                         Post-adjust:________

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__45______
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/a__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: Required calibration to slurry pump 1
	   Light oil in tray from bridge oilier 
	   Added a quart of water to chiller
8.29WW 44 completed.....Weekly versionSUBPAC::LANDRYTue Apr 30 1996 10:3874
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 4-30-96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: "A" shift

 INITIAL

 _TL/BF_ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 _TL/BF_ 6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi

                                         Post-adjust:_N/A____

 _TL/BF_ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
 _TL/BF_ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _TL/BF_ 6.1.5  Check all tubing and fittings for leaks. 

 _TL/BF_ 6.1.6  Check all tubing and fittings for air leaks.

 _TL/BF_ 6.1.7  Check all indicator lights.

 _TL/BF_ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 _TL/BF_ 6.1.9  Wipe down polish table, tub, and splash ring.

 _TL/BF_ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 _TL/BF_ 6.1.11 Wipe down pad conditioning arm.

 _TL/BF_ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 _TL/BF_ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 _TL/BF_ 6.1.14 Wipe down outer surface of both spindle hubs.

 _TL/BF_ 6.1.15 Remove and clean O-rings, replace if necessary.

 _TL/BF_ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 _TL/BF_ 6.1.17 Wipe down all surfaces of the robot.

 _TL/BF_ 6.1.18 Clean end effector vacuum chuck air port.
   
 _TL/BF_ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 _TL/BF_ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _TL/BF_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 _TL/BF_ 6.1.23 Check Neslab TCU for leaks.

 _TL/BF_ 6.1.24 Check Neslab TCU temperature readout.

 _TL/BF_ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 _TL/BF_ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 _TL/BF_ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:  Both slurry pumps required a minor variable value change.  Both
           were found to be slightly on the low side.

      	   Added approximately 1/2 gallon on DI water to the TCU resevoir.
8.30MONTHLY PM FOR WW45 COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu May 09 1996 23:22159
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 05/09/96   SYSTEM RTC CODE:CMP.A2       SHIFT: C, D and Jim T.

 INITIAL

 JPS/JT/JP 6.2.1  Perform weekly PM checks in addition to this monthly list.

  JPS/BW  6.2.2  Replace the fluid lines on the peristaltic pumps.  

  JPS/JP 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 __X____ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:___.002_____

 __X____ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:___.001_____

                Left Spindlele Runout:__.001______

 __X____ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:__.0005_____

                Left Spindle Hub Runout:____.0015___

  JPS/JT 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:   .11

                Right Spindle Force Error:  .31

                Left Spindle Calibration Variable:

                     Pre-adjust: 1.07         Post-adjust: 1.07

                Right Spindle Calibration Variable:

                     Pre-adjust: 1.08         Post-adjust: 1.07

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

     JPS 6.2.10 Check shuttle travel.  Adjust if necessary.

     JPS 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 23.99 VDC   Post-adjust: 23.99

     JPS 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 15.02 VDC   Post-adjust: 15.02
 
     JPS 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 4.95 VDC   Post-adjust: 4.95

 ___X___ 6.2.17 Check the     12 VAC  power supply.  Calibrate if necessary.

                Pre-adjust:____12.0 ___   Post-adjust:____n/a_____

       JP 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

     JPS 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

     JPS 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

     JPS 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS: RIGHT SEND TANK HAS SMALL LEAK,
           LEFT RECIEVE FILL REGULATOR HAS SMALL LEAK AT VALVE STEM.

    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 05/09/96   SYSTEM RTC CODE: CMP.A2   SHIFT: C 

 INITIAL

     JPS 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

     JPS 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  85

     JPS 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 41 PSI
  
     JPS 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

     JPS 6.1.5  Check all tubing and fittings for leaks. 

     JPS 6.1.6  Check all tubing and fittings for air leaks.

      JP 6.1.7  Check all indicator lights.

     JPS 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

     JPS 6.1.9  Wipe down polish table, tub, and splash ring.

     JPS 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

     JPS 6.1.11 Wipe down pad conditioning arm.

      JT 6.1.12 Remove, rinse, and replace diamond conditioning disk.

     JPS 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

     JPS 6.1.14 Wipe down outer surface of both spindle hubs.

     JPS 6.1.15 Remove and clean O-rings, replace if necessary.
 
     JPS 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

     JPS 6.1.17 Wipe down all surfaces of the robot.

     JPS 6.1.18 Clean end effector vacuum chuck air port.

     JPS 6.1.19 Inspect and clean end effector air nozzle.

     N/A 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

     JPS 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  JPS/JP 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

     JPS 6.1.23 Check Neslab TCU for leaks.

     JPS 6.1.24 Check Neslab TCU temperature readout.

  JPS/JP 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  JPS/JP 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

     JPS 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:FOUND 208 IND. LAMP TO BE BLOWN NEEDS REPLACING.

 RECALIBRATED PUMP'S 1 AND 2. PUMP 1 .77 CHANGED TO .8 AND PUMP 2 CHANGED
 FROM .75 TO .80.
                                                           
8.31WW 46 weekly pm completedSTRATA::FINNSun May 12 1996 19:1074
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 5/12/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: A SHIFT

 INITIAL

  BF/TL  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

  BF/TL  6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi

                                         Post-adjust:_N/A____

  BF/TL  6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
  BF/TL  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

  BF/TL  6.1.5  Check all tubing and fittings for leaks. 

  BF/TL  6.1.6  Check all tubing and fittings for air leaks.

  BF/TL  6.1.7  Check all indicator lights.

  BF/TL  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

  BF/TL  6.1.9  Wipe down polish table, tub, and splash ring.

  BF/TL  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  BF/TL  6.1.11 Wipe down pad conditioning arm.

  BF/TL  6.1.12 Remove, rinse, and replace diamond conditioning disk.

  BF/TL  6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  BF/TL  6.1.14 Wipe down outer surface of both spindle hubs.

  BF/TL  6.1.15 Remove and clean O-rings, replace if necessary.

  BF/TL  6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  BF/TL  6.1.17 Wipe down all surfaces of the robot.

  BF/TL  6.1.18 Clean end effector vacuum chuck air port.
   
  BF/TL  6.1.19 Inspect and clean end effector air nozzle.

  BF/TL  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
  N/A
 
  BF/TL  6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  BF/TL  6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

  BF/TL  6.1.23 Check Neslab TCU for leaks.

  BF/TL  6.1.24 Check Neslab TCU temperature readout.

  BF/TL  6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  BF/TL  6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  BF/TL  6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:  Both slurry pumps required calibration.  

      	   Added approximately 0.5 gallon of DI water to the Chiller.
8.32WW 47 - WeeklySUBPAC::LANDRYTue May 21 1996 11:0471
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 5/21/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: A SHIFT

 INITIAL

  BF/TL  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

  BF/TL  6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi

                                         Post-adjust:_N/A____

  BF/TL  6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
  BF/TL  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

  BF/TL  6.1.5  Check all tubing and fittings for leaks. 

  BF/TL  6.1.6  Check all tubing and fittings for air leaks.

  BF/TL  6.1.7  Check all indicator lights.

  BF/TL  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

  BF/TL  6.1.9  Wipe down polish table, tub, and splash ring.

  BF/TL  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  BF/TL  6.1.11 Wipe down pad conditioning arm.

  BF/TL  6.1.12 Remove, rinse, and replace diamond conditioning disk.

  BF/TL  6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  BF/TL  6.1.14 Wipe down outer surface of both spindle hubs.

  BF/TL  6.1.15 Remove and clean O-rings, replace if necessary.

  BF/TL  6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  BF/TL  6.1.17 Wipe down all surfaces of the robot.

  BF/TL  6.1.18 Clean end effector vacuum chuck air port.
   
  BF/TL  6.1.19 Inspect and clean end effector air nozzle.

   N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  BF/TL  6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  BF/TL  6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

  BF/TL  6.1.23 Check Neslab TCU for leaks.

  BF/TL  6.1.24 Check Neslab TCU temperature readout.

  BF/TL  6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  BF/TL  6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  BF/TL  6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:  Added approximately 0.5 gallon of DI water to the Chiller.
8.33SHUTDOWN CHECKSHEETSTRATA::RIDLONEliminate the obviousMon May 27 1996 07:3439
                    CMP.A1 & CMP.A2 SHUTDOWN CHECKSHEET
                    -----------------------------------


                                                        Tech.       Date
                                                       -------     -------


  1.  Change RTC status to SCHEDULED DOWN.             ___B___     _5/27__

  2.  Remove all wafer carriers.  If possible
      keep them wet.  If not ensure that there
      are enough carriers with new films for
      startup.                                         ___B___     _5/27__

  3.  Remove all wafer cassettes and drain Send
      and Receive DI Water tanks.                      ___B___     _5/27__

  4.  Purge both slurry lines with DI Water.           ___B___     _5/27__

  5.  Remove and discard all polishing pads.           ___B___     _5/27__

  6.  Remove all PVA scrub brushes and submerge
      in DI water.                                     ___B___     _5/27__

  7.  Perform a complete clean of each system
      to remove dried slurry.  Wipe down and dry
      all wet surfaces.                                ___B___     _5/27__

  8.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing to UDR.          ___B___     _5/27__

  9.  Power down each system.                          ___B___     _5/27__

 10.  Power down each vacuum pump cabinet.             ___B___     _5/27__

 11.  Power down each Neslab TCU.                      ___B___     _5/27__

 12.  Enter checksheet into notesfile.
8.34weekly completedSTRATA::FINNTue May 28 1996 19:3569
  DATE: 5-27-96     SYSTEM RTC CODE: CMP.A2    EQUIP. TECH:  A shift

 INITIAL

 __X__  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 __X__  6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi

                                         Post-adjust:_N/A____

 __X__  6.1.3  DI Water pressure @ 36 PSI:   Actual Reading:  42 psi
  
 __X__  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __X__  6.1.5  Check all tubing and fittings for leaks. 

 __X__  6.1.6  Check all tubing and fittings for air leaks.

 __X__  6.1.7  Check all indicator lights.

 __X__  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __X__  6.1.9  Wipe down polish table, tub, and splash ring.

 __X__  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __X__  6.1.11 Wipe down pad conditioning arm.

 __X__  6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __X__  6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __X__  6.1.14 Wipe down outer surface of both spindle hubs.

 __X__  6.1.15 Remove and clean O-rings, replace if necessary.

 __X__  6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __X__  6.1.17 Wipe down all surfaces of the robot.

 __X__  6.1.18 Clean end effector vacuum chuck air port.
   
 __X__  6.1.19 Inspect and clean end effector air nozzle.

 __N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X__  6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X__  6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __X__  6.1.23 Check Neslab TCU for leaks.

 __X__  6.1.24 Check Neslab TCU temperature readout.

 __X__  6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __X__  6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X__  6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:  Slurry Pumps required cal

8.35Startup ChecksheetSUBPAC::LANDRYTue May 28 1996 19:4933
                         CMP.A2 STARTUP CHECKSHEET
                    ----------------------------------

                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are
      available and ready to use.                      B shift     5/28/96

  2.  Power up each system.                            A shift     5/28/96

  3.  Power up each vacuum pump cabinet.               A shift     5/28/96

  4.  Power up each Neslab TCU.                        A shift     5/28/96

  5.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing into the tool    A shift     5/28/96

  7.  Install wafer carriers.                          A shift     5/28/96

  8.  Place cassettes in left and right send
      and receive stations to fill DI Water
      tanks.                                           A shift     5/28/96

  9.  Install new polishing pads.                      A shift     5/28/96

 10.  Re-install PVA scrub brushes.                    A shift     5/28/96

 11.  Place systems in wet idle mode.                  A shift     5/28/96

 12.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for pad break-in & MQC.                          A shift     5/28/96
8.36weekly completedSTRATA::FINNTue May 28 1996 20:0069
  DATE: 5-27-96     SYSTEM RTC CODE: CMP.A2    EQUIP. TECH:  A+Bshift

 INITIAL

 __X__  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 __X__  6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi

                                         Post-adjust:_N/A____

 __X__  6.1.3  DI Water pressure @ 36 PSI:   Actual Reading:  42 psi
  
 __X__  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __X__  6.1.5  Check all tubing and fittings for leaks. 

 __X__  6.1.6  Check all tubing and fittings for air leaks.

 __X__  6.1.7  Check all indicator lights.

 __X__  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __X__  6.1.9  Wipe down polish table, tub, and splash ring.

 __X__  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __X__  6.1.11 Wipe down pad conditioning arm.

 __X__  6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __X__  6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __X__  6.1.14 Wipe down outer surface of both spindle hubs.

 __X__  6.1.15 Remove and clean O-rings, replace if necessary.

 __X__  6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __X__  6.1.17 Wipe down all surfaces of the robot.

 __X__  6.1.18 Clean end effector vacuum chuck air port.
   
 __X__  6.1.19 Inspect and clean end effector air nozzle.

 __N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X__  6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X__  6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __X__  6.1.23 Check Neslab TCU for leaks.

 __X__  6.1.24 Check Neslab TCU temperature readout.

 __X__  6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __X__  6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X__  6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:  Slurry Pumps required cal

8.37Weekly performed, S/A delayed one weekSUBPAC::LANDRYSun Jun 02 1996 19:1973
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 6/2/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: Doc

 INITIAL

  TL    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

  TL    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi

                                         Post-adjust:_N/A____

  TL    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 43 psi
  
  TL    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  

  TL    6.1.5  Check all tubing and fittings for leaks. 

  TL    6.1.6  Check all tubing and fittings for air leaks.

  TL    6.1.7  Check all indicator lights.

  TL    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

  TL    6.1.9  Wipe down polish table, tub, and splash ring.

  TL    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  TL    6.1.11 Wipe down pad conditioning arm.

  TL    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  TL    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  TL    6.1.14 Wipe down outer surface of both spindle hubs.

  TL    6.1.15 Remove and clean O-rings, replace if necessary.

  TL    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  TL    6.1.17 Wipe down all surfaces of the robot.

  TL    6.1.18 Clean end effector vacuum chuck air port.
   
  TL    6.1.19 Inspect and clean end effector air nozzle.

  N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  TL    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  TL    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

  TL    6.1.23 Check Neslab TCU for leaks.

  TL    6.1.24 Check Neslab TCU temperature readout.

  TL    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  TL    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  TL    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:  Added approximately 0.5 gallon of DI water to the Chiller.

           Both Carriers and the Pad Changed out during this PM.
8.38Annual PM resheduled for WW50 due to unscheduled down timeSUBPAC::TOOKERFri Jun 07 1996 16:336
Due to the unscheduled down time on cmp.a2 caused by the bad robot cable, the
annual pm scheduled for WW49 will not take place.  The annual pm will be re-
scheduled for WW50.

Thanks,
Jim Tooker
8.40WW50 ANNNUAL P.M.ASDG::POIRIERFri Jun 14 1996 17:38202
--------------------------------------------------------------------------------

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Annual Preventive Maintenance Check Sheet, REV. C

 DATE: 6/14/96   SYSTEM RTC CODE: CMP.A2       SHIFT(S): A, C and D

 INITIAL

 ___X___ 6.4.1  Perform Weekly, Monthly, and Semi-Annual PM's in  addition to
                this Annual list

 ___X___ 6.4.2  Perform Bridge Position calibration.

 ___X___ 6.4.3  Check Robot Position Alignment.  Calibrate if necessary.

 ___X___ 6.4.4  Check Robot Travel position.  Adjust if necessary.

 ___X___ 6.4.5  Check Robot Arm position.  Adjust if necessary.

 ___X___ 6.4.6  Check Elevator Height position.  Adjust if necessary.



           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semi-annual Preventive Maintenance Check Sheet, REV. C

 INITIAL

 ___X___ 6.3.1  Perform Weekly and Monthly PM's in addition to this Semi-Annual
                list.

 ___X___ 6.3.2  Check all safety interlocked doors for proper operation.  

 ___X___ 6.3.2  Check all EMO's for proper operation.

 ___X___ 6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.

 ___X___ 6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.

            Right spindle gear box was completed only..
    
    
 ___X___ 6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.


           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:__6-14-96_   SYSTEM RTC CODE:CMP.A2       EQUIP. TECH.: D+C

 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:____.001________

 ___X___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:___.0009_________

                Left Spindlele Runout:__.0015__________

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:___.001_________

                Left Spindle Hub Runout:_____.0015_______

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:_____.035_______

                Right Spindle Force Error:____-1.87________

                Left Spindle Calibration Variable:

                     Pre-adjust:____1.07________  Post-adjust:____1.08________

                Right Spindle Calibration Variable:

                     Pre-adjust:___1.07_________  Post-adjust:____1.07________

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____24.0____   Post-adjust:_____24.0___

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:___+/-15.02_   Post-adjust:____+/-15.02
     
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:____4.99____   Post-adjust:____5.00____

 ___X___ 6.2.17 Check the ~ 12   Volt power supply.  Calibrate if necessary.

                Pre-adjust:___~12.01___   Post-adjust:____________

 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.



           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 6/11/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: Brendan

 INITIAL

  BF    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

  BF    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi

                                         Post-adjust:_N/A____

  BF    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 43 psi
  
  BF    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  

  BF    6.1.5  Check all tubing and fittings for leaks. 

  BF    6.1.6  Check all tubing and fittings for air leaks.

  BF    6.1.7  Check all indicator lights.

  BF    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

  BF    6.1.9  Wipe down polish table, tub, and splash ring.

  BF    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  BF    6.1.11 Wipe down pad conditioning arm.

  BF    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  BF    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  BF    6.1.14 Wipe down outer surface of both spindle hubs.

  BF    6.1.15 Remove and clean O-rings, replace if necessary.

  BF    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  BF    6.1.17 Wipe down all surfaces of the robot.

  BF    6.1.18 Clean end effector vacuum chuck air port.
   
  BF    6.1.19 Inspect and clean end effector air nozzle.

  N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  BF    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  BF    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

  BF    6.1.23 Check Neslab TCU for leaks.

  BF    6.1.24 Check Neslab TCU temperature readout.

  BF    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  BF    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  BF    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


8.41weekly p.m. completedFABSIX::R_GEEMon Jun 17 1996 05:3172
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 6/17/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: B Shift

 INITIAL

  _X_    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

  _X_    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 85 psi

                                         Post-adjust:_80____

  _X_    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40 psi
  
  _X_    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
             contamination found.  

  _X_    6.1.5  Check all tubing and fittings for leaks. 

  _X_    6.1.6  Check all tubing and fittings for air leaks.

  _X_    6.1.7  Check all indicator lights.

  _X_    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

  _X_    6.1.9  Wipe down polish table, tub, and splash ring.

  _X_    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  _X_    6.1.11 Wipe down pad conditioning arm.

  _X_    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  _X_    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  _X_    6.1.14 Wipe down outer surface of both spindle hubs.

  _X_    6.1.15 Remove and clean O-rings, replace if necessary.

  _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  _X_    6.1.17 Wipe down all surfaces of the robot.

  _X_    6.1.18 Clean end effector vacuum chuck air port.
   
  _X_    6.1.19 Inspect and clean end effector air nozzle.

  _N/A_  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  _X_    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  _X_    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

  _X_   6.1.23 Check Neslab TCU for leaks.

  _X_    6.1.24 Check Neslab TCU temperature readout.

  _X_    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  _X_    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  _X_    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS: Filled the bridge oiler, 4oz. 
	  Replaced the pad and conditioner disk.  
8.42Weekly p.m. completedFABSIX::R_GEETue Jun 25 1996 07:4071
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 6/25/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: B Shift

 INITIAL

  _X_    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

  _X_    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 85 psi

                                         Post-adjust:_82____

  _X_    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40 psi
  
  _X_    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
             contamination found.  

  _X_    6.1.5  Check all tubing and fittings for leaks. 

  _X_    6.1.6  Check all tubing and fittings for air leaks.

  _X_    6.1.7  Check all indicator lights.

  _X_    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

  _X_    6.1.9  Wipe down polish table, tub, and splash ring.

  _X_    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  _X_    6.1.11 Wipe down pad conditioning arm.

  _X_    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  _X_    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  _X_    6.1.14 Wipe down outer surface of both spindle hubs.

  _X_    6.1.15 Remove and clean O-rings, replace if necessary.

  _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  _X_    6.1.17 Wipe down all surfaces of the robot.

  _X_    6.1.18 Clean end effector vacuum chuck air port.
   
  _X_    6.1.19 Inspect and clean end effector air nozzle.

  _N/A_  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  _X_    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  _X_    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

  _X_   6.1.23 Check Neslab TCU for leaks.

  _X_    6.1.24 Check Neslab TCU temperature readout.

  _X_    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  _X_    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  _X_    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS: Replaced the pad.  
8.43 weekly p.m. FABSIX::R_GEETue Jul 02 1996 00:0771
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 7/02/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: B Shift

 INITIAL

  _X_    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

  _X_    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 85 psi

                                         Post-adjust:_85____

  _X_    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40 psi
  
  _X_    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
             contamination found.  

  _X_    6.1.5  Check all tubing and fittings for leaks. 

  _X_    6.1.6  Check all tubing and fittings for air leaks.

  _X_    6.1.7  Check all indicator lights.

  _X_    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

  _X_    6.1.9  Wipe down polish table, tub, and splash ring.

  _X_    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  _X_    6.1.11 Wipe down pad conditioning arm.

  _X_    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  _X_    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  _X_    6.1.14 Wipe down outer surface of both spindle hubs.

  _X_    6.1.15 Remove and clean O-rings, replace if necessary.

  _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  _X_    6.1.17 Wipe down all surfaces of the robot.

  _X_    6.1.18 Clean end effector vacuum chuck air port.
   
  _X_    6.1.19 Inspect and clean end effector air nozzle.

  _N/A_  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  _X_    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  _X_    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

  _X_   6.1.23 Check Neslab TCU for leaks.

  _X_    6.1.24 Check Neslab TCU temperature readout.

  _X_    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  _X_    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  _X_    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS: Replaced the pad, carriers and condition disk.
8.44CMP.A2 JULY 4TH SHUT-DOWN CHECKSHEETSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Jul 04 1996 00:4042

                    CMP.A2 SHUTDOWN CHECKSHEET
                    --------------------------


                                                        Tech.       Date
                                                       -------     -------


  1.  Change RTC status to SCHEDULED DOWN.              n/a per Dennis G.

  2.  Remove all wafer carriers.  If possible
      keep them wet.  If not ensure that there
      are enough carriers with new films for
      startup.                                           BJ        7/3/96 

  3.  Remove all wafer cassettes and drain Send
      and Receive DI Water tanks.                        BJ        7/3/96 

  4.  Purge both slurry lines with DI Water.             BJ        7/3/96 

  5.  Remove and discard all polishing pads.             BJ        7/3/96 

  6.  Remove all PVA scrub brushes and submerge
      in DI water.                                       BJ        7/3/96 

  7.  Perform a complete clean of each system
      to remove dried slurry.  Wipe down and dry
      all wet surfaces.                                  BJ        7/3/96 

  8.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing to UDR.            BJ        7/3/96 

  9.  Power down each system.                            BJ        7/3/96 

 10.  Power down each vacuum pump cabinet.               BJ        7/3/96 

 11.  Power down each Neslab TCU.                        BJ        7/3/96 

 12.  Enter checksheet into notesfile.                   BJ        7/3/96 
    
8.45A2 START-UPFABSIX::L_SHKOLNIKOVSat Jul 06 1996 07:3835
                    CMP.A2 STARTUP CHECKSHEET
                    -------------------------              

                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are
      available and ready to use.                      __LS___     07-06-96

  2.  Power up each system.                            __LS___     07-06-96

  3.  Power up each vacuum pump cabinet.               __LS___     07-06-96

  4.  Power up each Neslab TCU.                        __LS___     07-06-96

  5.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing into the tool    __LS___     07-06-96

  6.  Place cassettes in left and right send
      and receive stations to fill DI Water
      tanks.                                           __LS___     07-06-96

  7.  Install new polishing pads.                      __LS___     07-06-96

  8.  Install wafer carriers.                          __LS___     07-06-96

  9.  Re-install PVA scrub brushes.                    __LS___     07-06-96

 10.  Place systems in wet idle mode.                  __LS___     07-06-96

 11.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for pad break-in & MQC.                          __LS___     07-06-96


8.46Monthly PM for WW2 completedSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Jul 10 1996 08:07157
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C


  DATE: 7/10/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: BJ

 INITIAL

   BJ     6.2.1  Perform weekly PM checks in addition to this monthly list.

   BJ     6.2.2  Replace the fluid lines on the peristaltic pumps.  

   BJ     6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
    
   BJ     6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:___.002_____

   BJ     6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:___.001_____

                Left Spindle Runout:__.001______

   BJ     6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:__.0005_____

                Left Spindle Hub Runout:____.0005___

   BJ    6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:   .68

                Right Spindle Force Error:  -.69

                Left Spindle Calibration Variable:

                     Pre-adjust: 1.07         Post-adjust: 1.06

                Right Spindle Calibration Variable:

                     Pre-adjust: 1.07         Post-adjust: 1.07

   BJ    6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

   BJ    6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

   BJ    6.2.10 Check shuttle travel.  Adjust if necessary.

   BJ    6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 24.01 VDC   Post-adjust: N/A

   BJ    6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 15.02 VDC   Post-adjust: 15.02
 
   BJ    6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 5.01 VDC   Post-adjust: N/A

   BJ    6.2.17 Check the 12 VAC  power supply.  Calibrate if necessary.

                Pre-adjust: 12.0   Post-adjust:  N/A

   BJ    6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

   BJ    6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

   BJ    6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

   BJ    6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.


           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 7/10/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: BJ

 INITIAL
          
   BJ    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_90____

   BJ    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 85 psi

                                         Post-adjust:_85____

   BJ    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38 psi
  
   BJ    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

   BJ    6.1.5  Check all tubing and fittings for leaks. 

   BJ    6.1.6  Check all tubing and fittings for air leaks.

   BJ    6.1.7  Check all indicator lights.

   BJ    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

   BJ    6.1.9  Wipe down polish table, tub, and splash ring.

   BJ    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

   BJ    6.1.11 Wipe down pad conditioning arm.

   BJ    6.1.12 Remove, rinse, and replace diamond conditioning disk.

   BJ    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
   BJ    6.1.14 Wipe down outer surface of both spindle hubs.

   BJ    6.1.15 Remove and clean O-rings, replace if necessary.

   BJ    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

   BJ    6.1.17 Wipe down all surfaces of the robot.

   BJ    6.1.18 Clean end effector vacuum chuck air port.
   
   BJ    6.1.19 Inspect and clean end effector air nozzle.

   N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
   N/A   6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

   BJ    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

   BJ    6.1.23 Check Neslab TCU for leaks.

   BJ    6.1.24 Check Neslab TCU temperature readout.

   BJ    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

   BJ    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

   BJ    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.



 COMMENTS:

8.47weekly p.m. completedFABSIX::R_GEEWed Jul 17 1996 02:19236
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 7/17/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: B Shift

 INITIAL

  _X_    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

  _X_    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi

                                         Post-adjust:_84____

  _X_    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38 psi
  
  _X_    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
             contamination found.  

  _X_    6.1.5  Check all tubing and fittings for leaks. 

  _X_    6.1.6  Check all tubing and fittings for air leaks.

  _X_    6.1.7  Check all indicator lights.

  _X_    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

  _X_    6.1.9  Wipe down polish table, tub, and splash ring.

  _X_    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  _X_    6.1.11 Wipe down pad conditioning arm.

  _X_    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  _X_    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  _X_    6.1.14 Wipe down outer surface of both spindle hubs.

  _X_    6.1.15 Remove and clean O-rings, replace if necessary.

  _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  _X_    6.1.17 Wipe down all surfaces of the robot.

  _X_    6.1.18 Clean end effector vacuum chuck air port.
   
  _X_    6.1.19 Inspect and clean end effector air nozzle.

  _N/A_  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  _X_    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  _X_    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

  _X_   6.1.23 Check Neslab TCU for leaks.

  _X_    6.1.24 Check Neslab TCU temperature readout.

  _X_    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  _X_    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  _X_    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS: Replaced the carriers.





































































































































































8.48ww4 weekly pm completedFABSIX::L_SHKOLNIKOVThu Jul 25 1996 07:2071
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 7/25/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: D Shift

 INITIAL

  _X_    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

  _X_    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi

                                         Post-adjust:_82____

  _X_    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38 psi
  
  _X_    6.1.4  Check drip pan for any slurry/moisture. Clean any    
             contamination found.  

  _x_    6.1.5  Check all tubing and fittings for leaks. 

  _X_    6.1.6  Check all tubing and fittings for air leaks.

  _X_    6.1.7  Check all indicator lights.

  _X_    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

  _X_    6.1.9  Wipe down polish table, tub, and splash ring.

  _X_    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  _X_    6.1.11 Wipe down pad conditioning arm.

  _X_    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  _X_    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  _X_    6.1.14 Wipe down outer surface of both spindle hubs.

  _X_    6.1.15 Remove and clean O-rings, replace if necessary.

  _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  _X_    6.1.17 Wipe down all surfaces of the robot.

  _X_    6.1.18 Clean end effector vacuum chuck air port.
   
  _X_    6.1.19 Inspect and clean end effector air nozzle.

  _N/A_  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  _X_    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  _X_    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

  _X_   6.1.23 Check Neslab TCU for leaks.

  _X_    6.1.24 Check Neslab TCU temperature readout.

  _X_    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  _X_    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  _X_    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS: 
8.49ww05 weekly p.m.FABSIX::R_GEESun Jul 28 1996 22:5671
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 7/28/96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: B Shift

 INITIAL

  _X_    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

  _X_    6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 86 psi

                                         Post-adjust:_80____

  _X_    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38 psi
  
  _X_    6.1.4  Check drip pan for any slurry/moisture. Clean any    
             contamination found.  

  _x_    6.1.5  Check all tubing and fittings for leaks. 

  _X_    6.1.6  Check all tubing and fittings for air leaks.

  _X_    6.1.7  Check all indicator lights.

  _X_    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

  _X_    6.1.9  Wipe down polish table, tub, and splash ring.

  _X_    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  _X_    6.1.11 Wipe down pad conditioning arm.

  _X_    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  _X_    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  _X_    6.1.14 Wipe down outer surface of both spindle hubs.

  _X_    6.1.15 Remove and clean O-rings, replace if necessary.

  _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  _X_    6.1.17 Wipe down all surfaces of the robot.

  _X_    6.1.18 Clean end effector vacuum chuck air port.
   
  _X_    6.1.19 Inspect and clean end effector air nozzle.

  _N/A_  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  _X_    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  _X_    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

  _X_   6.1.23 Check Neslab TCU for leaks.

  _X_    6.1.24 Check Neslab TCU temperature readout.

  _X_    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  _X_    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  _X_    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS: Changed the pad and carriers.
8.50MONTHLY PM FOR WW6 COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Aug 07 1996 07:10158
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C


  DATE: 8/7/96      SYSTEM RTC CODE: CMP.A2    TECH/SHIFT: D SHIFT
    


   X     6.2.1  Perform weekly PM checks in addition to this monthly list.

   X     6.2.2  Replace the fluid lines on the peristaltic pumps.  

   X     6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
     
   X     6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:___.002_____

   X     6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:___.001_____

                Left Spindle Runout:__.001______

   X     6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:__.0005_____
   X
                Left Spindle Hub Runout:____.0005___

   X    6.2.7  Perform the spindle down Force Calibration on the right and
               left spindles.

                Left Spindle Force Error:   .1.52

                Right Spindle Force Error:  -.25

                Left Spindle Calibration Variable:

                     Pre-adjust: 1.06         Post-adjust: N/C

                Right Spindle Calibration Variable:

                     Pre-adjust: 1.07         Post-adjust: N/C

   X    6.2.8  Check left and right load station alignment.  Adjust if
               necessary.
    
   X    6.2.9  Check left and right cleaning station alignment.  Adjust if
               necessary.

   X    6.2.10 Check shuttle travel.  Adjust if necessary.
     
   X    6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 23.96 VDC   Post-adjust: N/A

   X    6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 15.02 VDC   Post-adjust: 15.02
 
   X    6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 5.00 VDC   Post-adjust: N/A

   X    6.2.17 Check the 12 VAC  power supply.  Calibrate if necessary.

                Pre-adjust: 11.94   Post-adjust:  N/A

   X    6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
               necessary using Shell Tellus 10 or equivalent.
    
   X    6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
               Adjust level if necessary.
         
   X    6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
               fittings.
     
   X    6.2.21 Check the system vacuum cabinet for any loose fittings or
               connectors.


           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 8/6/96      SYSTEM RTC CODE: CMP.A2    TECH/SHIFT: D 

 INITIAL
          
   X     6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_90____

   X     6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 85 psi

                                         Post-adjust:_85____

   X     6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 36 psi
  
   X     6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

   X     6.1.5  Check all tubing and fittings for leaks. 

   X     6.1.6  Check all tubing and fittings for air leaks.

   X     6.1.7  Check all indicator lights.

   X     6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

   X     6.1.9  Wipe down polish table, tub, and splash ring.

   X     6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

   X     6.1.11 Wipe down pad conditioning arm.

   X     6.1.12 Remove, rinse, and replace diamond conditioning disk.

   X     6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
   X     6.1.14 Wipe down outer surface of both spindle hubs.

   X     6.1.15 Remove and clean O-rings, replace if necessary.

   X     6.1.16 Wipe down inside and outside of load/cleaning station buckets.

   X     6.1.17 Wipe down all surfaces of the robot.

   X     6.1.18 Clean end effector vacuum chuck air port.
   
   X     6.1.19 Inspect and clean end effector air nozzle.

   N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
   N/A   6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

   X     6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

   X     6.1.23 Check Neslab TCU for leaks.

   X     6.1.24 Check Neslab TCU temperature readout.

   X     6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

   X     6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

   X     6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.



 COMMENTS:

   
8.51WW VII - Weekly versionSUBPAC::LANDRYSun Aug 11 1996 14:0373
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

 DATE:  8/11/96      SYSTEM RTC CODE:  CMP.A1      EQUIP TECH:  A shift

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100_____

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__86______

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__37___
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X__ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:   Adjusted Slurry pump #1 variable number from .77 to .74
                                                                


8.52WW08 WEEKLY PMFABSIX::L_SHKOLNIKOVWed Aug 21 1996 07:5772
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

 DATE:  8/21/96      SYSTEM RTC CODE:  CMP.A2      EQUIP TECH:  D shift

 INITIAL

   _X_   6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  _100_    

                                         Post-adjust: N/A

   _X_   6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  _86__  

                                         Post-adjust: N/A

   _X_   6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__38__ 
  
   _X_   6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

   _X_   6.1.5  Check all tubing and fittings for leaks. 

   _X_   6.1.6  Check all tubing and fittings for air leaks.

   _X_   6.1.7  Check all indicator lights.

   _X_   6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

   _X_   6.1.9  Wipe down polish table, tub, and splash ring.

   _X_   6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

   _X_   6.1.11 Wipe down pad conditioning arm.

   _X_   6.1.12 Remove, rinse, and replace diamond conditioning disk.

   _X_   6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

   _X_  6.1.14 Wipe down outer surface of both spindle hubs.

   _X_   6.1.15 Remove and clean O-rings, replace if necessary.

   _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.

   _X_   6.1.17 Wipe down all surfaces of the robot.

   _X_   6.1.18 Clean end effector vacuum chuck air port.

   _X_   6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

   _X_   6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

   _X_   6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

   _X_   6.1.23 Check Neslab TCU for leaks.

   _X_   6.1.24 Check Neslab TCU temperature readout.

   _X_   6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

   _X_   6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

   _X_   6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: Adjusted Slurry pump #2 variable number from .80 to .76
    
    
8.53WW IX - Weekly versionSUBPAC::LANDRYSun Aug 25 1996 13:3173
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

 DATE:  8/25/96      SYSTEM RTC CODE:  CMP.A2      EQUIP TECH: A shift

 INITIAL

   _X_   6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  _100_    

                                         Post-adjust: N/A

   _X_   6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  _82_   

                                         Post-adjust: N/A

   _X_   6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__36__ 
  
   _X_   6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

   _X_   6.1.5  Check all tubing and fittings for leaks. 

   _X_   6.1.6  Check all tubing and fittings for air leaks.

   _X_   6.1.7  Check all indicator lights.

   _X_   6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

   _X_   6.1.9  Wipe down polish table, tub, and splash ring.

   _X_   6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

   _X_   6.1.11 Wipe down pad conditioning arm.

   _X_   6.1.12 Remove, rinse, and replace diamond conditioning disk.

   _X_   6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

   _X_   6.1.14 Wipe down outer surface of both spindle hubs.

   _X_   6.1.15 Remove and clean O-rings, replace if necessary.

   _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.

   _X_   6.1.17 Wipe down all surfaces of the robot.

   _X_   6.1.18 Clean end effector vacuum chuck air port.

   _X_   6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

   _X_   6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

   _X_   6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

   _X_   6.1.23 Check Neslab TCU for leaks.

   _X_   6.1.24 Check Neslab TCU temperature readout.

   _X_   6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

   _X_   6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

   _X_   6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  Found the process cooling line check valve leaking.  Removed said
            valve, cleaned, rebuilt and re-installed.  

            Added fluid to Neslab resevoir.
8.54CMP.A1 SHUTDOWN CHECKSHEETFABSIX::R_POIRIERMon Sep 02 1996 02:4836
                    CMP.A1 & CMP.A2 SHUTDOWN CHECKSHEET
                    -----------------------------------


                                                        Tech.       Date
                                                       -------     -------

  1.  Remove all wafer carriers.  If possible
      keep them wet.  If not ensure that there
      are enough carriers with new films for
      startup.                                         ___B___     _9/1/96_

  2.  Remove all wafer cassettes and drain Send
      and Receive DI Water tanks.                      ___B___     _9/1/96_

  3.  Purge both slurry lines with DI Water.           ___B___     _9/1/96_

  4.  Remove and discard all polishing pads.           ___B___     _9/1/96_

  5.  Remove all PVA scrub brushes and submerge
      in DI water.                                     ___B___     _9/1/96_

  6.  Perform a complete clean of each system
      to remove dried slurry.  Wipe down and dry
      all wet surfaces.                                ___B___     _9/1/96_

  7.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing to UDR.          ___B___     _9/1/96_

  8.  Power down each system.                          ___B___     _9/1/96_

  9.  Power down each vacuum pump cabinet.             ___B___     _9/1/96_

 10.  Power down each Neslab TCU.                      ___B___     _9/1/96_

 11.  Enter checksheet into notesfile.		       ___B___     _9/1/96_    
8.55WW X - Monthly versionSUBPAC::LANDRYTue Sep 03 1996 17:17160
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C


  DATE: 9/1 + 3/96      SYSTEM RTC CODE: CMP.A2    TECH/SHIFT: A shift
    


   X     6.2.1  Perform weekly PM checks in addition to this monthly list.

   X     6.2.2  Replace the fluid lines on the peristaltic pumps.  
   
   X     6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
     
   X     6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:___.002_____

   X     6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:___.001_____

                Left Spindle Runout:__.001______

   X     6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:__.001_____
   
                Left Spindle Hub Runout:____.001___

   X   6.2.7  Perform the spindle down Force Calibration on the right and
               left spindles.

                Left Spindle Force Error:   .54

                Right Spindle Force Error:  .42

                Left Spindle Calibration Variable:

                     Pre-adjust: 1.06         Post-adjust: 1.07

                Right Spindle Calibration Variable:

                     Pre-adjust: 1.07         Post-adjust: N/C

   X    6.2.8  Check left and right load station alignment.  Adjust if
               necessary.
    
   X    6.2.9  Check left and right cleaning station alignment.  Adjust if
               necessary.

   X    6.2.10 Check shuttle travel.  Adjust if necessary.
     
   X    6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 23.98 VDC   Post-adjust: N/A

   X    6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +15.01 VDC   Post-adjust: N/A
                            -15.01 VDC   Post-adjust: N/A 

   X    6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 4.99 VDC   Post-adjust: N/A

   X    6.2.17 Check the 12 VAC  power supply.  Calibrate if necessary.

                Pre-adjust: 11.94   Post-adjust:  N/A

   X    6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
               necessary using Shell Tellus 10 or equivalent.
    
   X    6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
               Adjust level if necessary.
         
   X    6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
               fittings.
     
   X    6.2.21 Check the system vacuum cabinet for any loose fittings or
               connectors.

      Comments:  Added oil to the bridge lubricator.

--------------------------------------------------------------------------------

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 9/1 + 3/96      SYSTEM RTC CODE: CMP.A2         TECH/SHIFT: A shift 

 INITIAL
          
   X     6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:  N/A

   X     6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi

                                         Post-adjust:  N/A

   X     6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 39 psi
  
   X     6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

   X     6.1.5  Check all tubing and fittings for leaks. 

   X     6.1.6  Check all tubing and fittings for air leaks.

   X     6.1.7  Check all indicator lights.

   X     6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

   X     6.1.9  Wipe down polish table, tub, and splash ring.

   X     6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

   X     6.1.11 Wipe down pad conditioning arm.

   X     6.1.12 Remove, rinse, and replace diamond conditioning disk.

   X     6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
   X     6.1.14 Wipe down outer surface of both spindle hubs.

   X     6.1.15 Remove and clean O-rings, replace if necessary.

   X     6.1.16 Wipe down inside and outside of load/cleaning station buckets.

   X     6.1.17 Wipe down all surfaces of the robot.

   X     6.1.18 Clean end effector vacuum chuck air port.
   
   X     6.1.19 Inspect and clean end effector air nozzle.

   N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
   X     6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

   X     6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

   X     6.1.23 Check Neslab TCU for leaks.

   X     6.1.24 Check Neslab TCU temperature readout.

   X     6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

   X     6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

   X     6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:

   
8.56startup checksheetSUBPAC::LANDRYTue Sep 03 1996 20:1035
                    CMP.A2 STARTUP CHECKSHEET
                    -------------------------              

                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are
      available and ready to use.                      ___A___     09-03-96

  2.  Power up each system.                            ___A___     09-03-96

  3.  Power up each vacuum pump cabinet.               ___A___     09-03-96

  4.  Power up each Neslab TCU.                        ___A___     09-03-96

  5.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing into the tool    ___A___     09-03-96

  6.  Place cassettes in left and right send
      and receive stations to fill DI Water
      tanks.                                           ___A___     09-03-96

  7.  Install new polishing pads.                      ___A___     09-03-96

  8.  Install wafer carriers.                          ___A___     09-03-96

  9.  Re-install PVA scrub brushes.                    ___A___     09-03-96

 10.  Place systems in wet idle mode.                  ___A___     09-03-96

 11.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for pad break-in & MQC.                          ___A___     09-03-96


8.57WW XI - WeeklySUBPAC::LANDRYTue Sep 10 1996 20:2875
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C


  DATE: 9/10/96      SYSTEM RTC CODE: CMP.A2    TECH/SHIFT: A shift
    
 INITIAL
          
   X     6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:  N/A

   X     6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi

                                         Post-adjust:  N/A

   X     6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40 psi
  
   X     6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

   X     6.1.5  Check all tubing and fittings for leaks. 

   X     6.1.6  Check all tubing and fittings for air leaks.

   X     6.1.7  Check all indicator lights.

   X     6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

   X     6.1.9  Wipe down polish table, tub, and splash ring.

   X     6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

   X     6.1.11 Wipe down pad conditioning arm.

   X     6.1.12 Remove, rinse, and replace diamond conditioning disk.

   X     6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
   X     6.1.14 Wipe down outer surface of both spindle hubs.

   X     6.1.15 Remove and clean O-rings, replace if necessary.

   X     6.1.16 Wipe down inside and outside of load/cleaning station buckets.

   X     6.1.17 Wipe down all surfaces of the robot.

   X     6.1.18 Clean end effector vacuum chuck air port.
   
   X     6.1.19 Inspect and clean end effector air nozzle.

   N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
   X     6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

   X     6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

   X     6.1.23 Check Neslab TCU for leaks.

   X     6.1.24 Check Neslab TCU temperature readout.

   X     6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

   X     6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

   X     6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  Both load stations had new pedistals installed at this PM

   
8.58ww12 weekly pm completedSTRATA::FINNSun Sep 15 1996 11:3674
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C


  DATE: 9/15/96      SYSTEM RTC CODE: CMP.A2    TECH/SHIFT: A shift
    
 INITIAL
          
  X      6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:  N/A

  X      6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi

                                         Post-adjust:  N/A

  X      6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40 psi
  
  x      6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

  x      6.1.5  Check all tubing and fittings for leaks. 

  x      6.1.6  Check all tubing and fittings for air leaks.

  x      6.1.7  Check all indicator lights.

  x      6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

  x      6.1.9  Wipe down polish table, tub, and splash ring.

  x      6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  x      6.1.11 Wipe down pad conditioning arm.
   
  x      6.1.12 Remove, rinse, and replace diamond conditioning disk.

  x      6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
  x      6.1.14 Wipe down outer surface of both spindle hubs.

  x      6.1.15 Remove and clean O-rings, replace if necessary.

  x      6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  x      6.1.17 Wipe down all surfaces of the robot.

  x      6.1.18 Clean end effector vacuum chuck air port.
   
  x      6.1.19 Inspect and clean end effector air nozzle.

   N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
  x      6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  x      6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

  x      6.1.23 Check Neslab TCU for leaks.

  x      6.1.24 Check Neslab TCU temperature readout.

  x      6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  x      6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  x      6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  Calibrated slurry pumps 1 + 2
   
8.59WW13 WEEKLY PM COMPLETEDFABSIX::O_WHITFORDWed Sep 25 1996 23:2181
              <<< ASDG::DISK$SYS_DATA:[NOTES$LIBRARY]CMP.NOTE;1 >>>
                                    -< CMP >-
================================================================================
Note 8.1                      CMP.A2 PM CHECKSHEETS                      1 of 58
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              78 lines   8-NOV-1995 21:07
                       -< Weekly PM Checksheet Template >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:_9/25/96___   SYSTEM RTC CODE:__CMP.A2__   EQUIP. TECH.:  Dave W., BJ

 INITIAL

 ___DW____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100______

                                         Post-adjust:___100_____

 __DW_____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___80_____

                                         Post-adjust:____80____

 __DW_____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:_38~42_____
  
 __DW_____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __DW_____ 6.1.5  Check all tubing and fittings for leaks. 

 __DW_____ 6.1.6  Check all tubing and fittings for air leaks.

 __DW_____ 6.1.7  Check all indicator lights.

 __DW_____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X____ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X____ 6.1.11 Wipe down pad conditioning arm.

 ___X____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __DW_____ 6.1.14 Wipe down outer surface of both spindle hubs.

 __DW_____ 6.1.15 Remove and clean O-rings, replace if necessary.

 __DW_____ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __DW_____ 6.1.17 Wipe down all surfaces of the robot.

 __DW_____ 6.1.18 Clean end effector vacuum chuck air port.

 __DW_____ 6.1.19 Inspect and clean end effector air nozzle.

 __NA_____ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __DW_____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __DW_____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __DW_____ 6.1.23 Check Neslab TCU for leaks.

 __DW 38C_____ 6.1.24 Check Neslab TCU temperature readout.

 __DW_____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __DW_____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __DW_____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  Replaced the following o-rings in the hubs
  
            LEFT - 6.75-outer (1st)         RIGHT - 6.75-outer (1st)   
                 - 2.75-3rd                       - 3.75-2nd

8.60WW14 Weekly PMFABSIX::R_POIRIERSun Sep 29 1996 05:1572
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:_9/29/96___   SYSTEM RTC CODE:__CMP.A2__   EQUIP. TECH.:  B Shift

 INITIAL

 ___X_____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100______

                                         Post-adjust:___100_____

 ___X_____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___84_____

                                         Post-adjust:__________

 ___X_____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:_38~42_____
  
 ___X_____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X_____ 6.1.5  Check all tubing and fittings for leaks. 

 ___X_____ 6.1.6  Check all tubing and fittings for air leaks.

 ___X_____ 6.1.7  Check all indicator lights.

 ___X_____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X____ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X____ 6.1.11 Wipe down pad conditioning arm.

 ___X____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X_____ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X_____ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X_____ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X_____ 6.1.17 Wipe down all surfaces of the robot.

 ___X_____ 6.1.18 Clean end effector vacuum chuck air port.

 ___X_____ 6.1.19 Inspect and clean end effector air nozzle.

 __NA_____ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X_____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X_____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X_____ 6.1.23 Check Neslab TCU for leaks.

 ___X_____ 6.1.24 Check Neslab TCU temperature readout.  (38 C)

 ___X_____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X_____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X_____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  
          
8.61Monthly p.m. completedFABSIX::R_GEETue Oct 08 1996 13:40166
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C


  DATE: 10/8/96      SYSTEM RTC CODE: CMP.A2    TECH/SHIFT: All shiftS
    


  _X__    6.2.1  Perform weekly PM checks in addition to this monthly list.


  JS    6.2.2  Replace the fluid lines on the peristaltic pumps.  
   
  JT     6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
     
  B    6.2.4  Measure and record polish table alignment runout. 


                Polish Table Runout:___.002_____

  B    6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:___.001_____

                Left Spindle Runout:__.001______

  B    6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:__.001_____
   
                Left Spindle Hub Runout:____.001___

  D     6.2.7  Perform the spindle down Force Calibration on the right and
               left spindles.

                Left Spindle Force Error:   .97

                Right Spindle Force Error:  .99

                Left Spindle Calibration Variable:

                     Pre-adjust: ___         Post-adjust: .41

                Right Spindle Calibration Variable:

                     Pre-adjust: ___         Post-adjust: -.36

  JT    6.2.8  Check left and right load station alignment.  Adjust if
               necessary.
     ADJUSTED BY JT ON 10/03/96.
    
  JT    6.2.9  Check left and right cleaning station alignment.  Adjust if
               necessary.
     ADJUSTED BY JT ON 10/03/96

   B    6.2.10 Check shuttle travel.  Adjust if necessary.
     
   B    6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 23.98 VDC   Post-adjust: N/A

   B    6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +15.01 VDC   Post-adjust: N/A
                            -15.01 VDC   Post-adjust: N/A 

   B    6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 4.99 VDC   Post-adjust: N/A

   B    6.2.17 Check the 12 VAC  power supply.  Calibrate if necessary.

                Pre-adjust: 12.1   Post-adjust:  N/A

   B    6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
               necessary using Shell Tellus 10 or equivalent.
    
   B    6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
               Adjust level if necessary.

           >>> SOFT WATER ADDED TO BRING LEVEL UP.     
     
   B    6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
               fittings.
     
   B    6.2.21 Check the system vacuum cabinet for any loose fittings or
               connectors.

      Comments:  

--------------------------------------------------------------------------------

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 9/8/96      SYSTEM RTC CODE: CMP.A2         TECH/SHIFT: A/B shift 

 INITIAL
          
   B     6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:  N/A

   B     6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi

                                         Post-adjust:  N/A

   B     6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 37 psi
  
   B     6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

   B     6.1.5  Check all tubing and fittings for leaks. 

   B     6.1.6  Check all tubing and fittings for air leaks.

   B     6.1.7  Check all indicator lights.

  A/B    6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

   A     6.1.9  Wipe down polish table, tub, and splash ring.

   A     6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

   A     6.1.11 Wipe down pad conditioning arm.

   A     6.1.12 Remove, rinse, and replace diamond conditioning disk.

   A     6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
   A     6.1.14 Wipe down outer surface of both spindle hubs.

   A     6.1.15 Remove and clean O-rings, replace if necessary.

   B     6.1.16 Wipe down inside and outside of load/cleaning station buckets.
 
   B     6.1.17 Wipe down all surfaces of the robot.

   B     6.1.18 Clean end effector vacuum chuck air port.
   
   B     6.1.19 Inspect and clean end effector air nozzle.

   N/A   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
   B     6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

   A    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

   B     6.1.23 Check Neslab TCU for leaks.

   B     6.1.24 Check Neslab TCU temperature readout.

   B     6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

   B     6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

   B     6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:

   
8.62WW XVI - Weekly completedSUBPAC::LANDRYSun Oct 13 1996 15:2473
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:  10/13/96    SYSTEM RTC CODE:  CMP.A2    EQUIP. TECH.:  A Shift

 INITIAL

 ___X_____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100______

                                         Post-adjust:____________

 ___X_____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___82______

                                         Post-adjust:____________

 ___X_____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___37_____
  
 ___X_____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X_____ 6.1.5  Check all tubing and fittings for leaks. 

 ___X_____ 6.1.6  Check all tubing and fittings for air leaks.

 ___X_____ 6.1.7  Check all indicator lights.

 ___X_____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X____ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X____ 6.1.11 Wipe down pad conditioning arm.

 ___X____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X_____ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X_____ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X_____ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X_____ 6.1.17 Wipe down all surfaces of the robot.

 ___X_____ 6.1.18 Clean end effector vacuum chuck air port.

 ___X_____ 6.1.19 Inspect and clean end effector air nozzle.

 __NA_____ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X_____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X_____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X_____ 6.1.23 Check Neslab TCU for leaks.

 ___X_____ 6.1.24 Check Neslab TCU temperature readout.  (38 C)

 ___X_____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X_____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X_____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  1)  Topped off the Neslab TCU

      	    2)  section 6.1.20 no longer utilizes mentioned filters
          
8.63ww17 weekly pm.FABSIX::L_SHKOLNIKOVFri Oct 25 1996 07:0271
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
    
  DATE: 10/24/96      SYSTEM RTC CODE:  CMP.A2     EQUIP. TECH.:  D Shift

 INITIAL

 _ls__    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100__

                                         Post-adjust:

 _ls__    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___82__

                                         Post-adjust:

 _ls__    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__35__
  
 _ls__    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                 contamination found.  

 _ls__    6.1.5  Check all tubing and fittings for leaks. 
       
 _ls__    6.1.6  Check all tubing and fittings for air leaks.

 _ls__    6.1.7  Check all indicator lights.

 _ls__    6.1.8  Check all stations/components for slurry, debris, or  
                 any contaminants.  Clean if necessary.  

 _ls__    6.1.9  Wipe down polish table, tub, and splash ring.

 _ls__    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 _ls__    6.1.11 Wipe down pad conditioning arm.

 _ls__    6.1.12 Remove, rinse, and replace diamond conditioning disk.

 _ls__    6.1.13 Remove, wipe down, and rinse pad conditioner park station.

 _ls__    6.1.14 Wipe down outer surface of both spindle hubs.

 _ls__    6.1.15 Remove and clean O-rings, replace if necessary.

 _ls__    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 _ls__    6.1.17 Wipe down all surfaces of the robot.

 _ls__    6.1.18 Clean end effector vacuum chuck air port.

 _ls__    6.1.19 Inspect and clean end effector air nozzle.

 _n/a_    6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
                         (no longer in use)
 _ls__    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _ls__    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 _ls__    6.1.23 Check Neslab TCU for leaks.

 _ls__    6.1.24 Check Neslab TCU temperature readout.  (38 C)

 _ls__    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 _ls__    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 _ls__    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: 
8.64WW18 WEEKLYLUDWIG::RIDLONEliminate the obliviousMon Oct 28 1996 23:5281
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 10/28/96   SYSTEM RTC CODE: cmp.a2   EQUIP. TECH.: R_Poirier, M_Ridlon

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___82___

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___38___
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 ___X___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

     BOTH PUMPS NEEDED SOME MINOR ADJUSTMENTS.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
                                                                  
8.65WW 19 - Monthly PM completedSUBPAC::LANDRYMon Nov 04 1996 19:31169
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:  11-4-96   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH.: Finn, Gee, Landry

 INITIAL

 _BG/TL_ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 __TL___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 __TL___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 __BF___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:___.002______

 __BG___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:____.000______

                Left Spindle Runout:______.001______

 __BG___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:_pre.007_ post.002______

                Left Spindle Hub Runout:__.0015_______

 _BG/TL_ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:   -.60

                Right Spindle Force Error:   +.06

                Left Spindle Calibration Variable:

                     Pre-adjust:   157.31      Post-adjust:   148.87

                Right Spindle Calibration Variable:

                     Pre-adjust:   160.22      Post-adjust:   152.38

 _BG/TL_ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 _BG/TL_ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 __TL___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 __TL___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:___24.00_____   Post-adjust:___NONE_________

 __TL___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +15.02/-15.01   Post-adjust:___NONE______
 
 __TL___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:___5.00_____   Post-adjust:___NONE____

 __TL___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:___12.18___   Post-adjust:__NONE____

 __BG___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 __BG___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 __BG___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 __TL___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connections.

COMMENTS:  Added oil to the Bridge Lube resevoir

           Added softwater to the Neslab TCU


================================================================================

  
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 11-4-96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Gee, Landry

 INITIAL

 __BG___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100 PSI

                                         Post-adjust:  None

 __BG___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   82 PSI

                                         Post-adjust:  85 PSI

 __BG___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  33 PSI
  
 __BG___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __TL___ 6.1.5  Check all tubing and fittings for leaks. 

 __TL___ 6.1.6  Check all tubing and fittings for air leaks.

 __BG___ 6.1.7  Check all indicator lights.

 TL_BG_BF 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.

 _TL_BG_  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __TL___ 6.1.11 Wipe down pad conditioning arm.

 __TL___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __BF___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __BF___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BF___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __BG___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __BG___ 6.1.17 Wipe down all surfaces of the robot.

 __BG___ 6.1.18 Clean end effector vacuum chuck air port.

 __BG___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
         	NOTE: No point of use filters.

 __TL___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
      		
 _BG_TL_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __BG___ 6.1.23 Check Neslab TCU for leaks.

 __BG___ 6.1.24 Check Neslab TCU temperature readout.

 __BG___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __BG___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __BG___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: 

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
8.66WW XX - Weekly completedSUBPAC::LANDRYTue Nov 12 1996 10:5270
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 11/12/96   SYSTEM RTC CODE: cmp.a2   EQUIP. TECH.: TL,BG,BF

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___85___

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___28___
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  6.1.20 N/A = No point of use filters on this system
8.67WW21 Weekly PMFABSIX::R_POIRIERMon Nov 18 1996 04:5071
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 11/18/96   SYSTEM RTC CODE: cmp.a2   EQUIP. TECH.: B Shift 

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___85___

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___28___
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  6.1.20 N/A = No point of use filters on this system
8.68WEEKLY WW22FABSIX::M_RIDLONEliminate the obliviousMon Nov 25 1996 05:1177
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 11/25/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Ridlon
 INITIAL

 __XX___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100___

                                         Post-adjust:________

 __XX___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:____84__

                                         Post-adjust:________

 __XX___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___37___
  
 __XX___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __XX___ 6.1.5  Check all tubing and fittings for leaks. 

 __XX___ 6.1.6  Check all tubing and fittings for air leaks.

 __XX___ 6.1.7  Check all indicator lights.

 __XX___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __XX___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __XX___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __XX___ 6.1.11 Wipe down pad conditioning arm.

 __XX___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __XX___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __XX___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __XX___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __XX___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __XX___ 6.1.17 Wipe down all surfaces of the robot.

 __XX___ 6.1.18 Clean end effector vacuum chuck air port.

 __XX___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __XX___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __XX___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __XX___ 6.1.23 Check Neslab TCU for leaks.

 __XX___ 6.1.24 Check Neslab TCU temperature readout.

 __XX___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __XX___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __XX___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
8.69SEMI-ANNUAL PM COMPLETED FOR WW23FABSIX::O_WHITFORDQuticherwhinin&#039;Thu Dec 05 1996 23:44195
    
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semi-annual Preventive Maintenance Check Sheet, REV. C

 DATE: 12/5/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: JUBINVILLE
                                                         WHITFORD

JUBINVILLE 6.3.1  Perform Weekly and Monthly PM's in addition to this  
                  Semi-Annual list.


WHITFORD   6.3.2  Check all safety interlocked doors for proper operation.  
JUBINVILLE

JUBINVILLE 6.3.2  Check all EMO's for proper operation.

N/A        6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.

N/A        6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.

N/A        6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.

 COMMENTS:  
            RE: 6.3.3, 6.3.4 and 6.3.5: Per Jim Tooker, the oil in 
            the gear boxes are just to be checked for proper level, 
            not changed


           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 12/5/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: JUBINVILLE
                                                         WHITFORD
 INITIAL

JUBINVILLE 6.2.1  Perform weekly PM checks in addition to this monthly list.

 WHITFORD 6.2.2  Replace the fluid lines on the peristaltic pumps.  

JUBINVILLE 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

JUBINVILLE 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout: .001

JUBINVILLE 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: .001

                Left Spindle Runout: .001

JUBINVILLE 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: .001

                Left Spindle Hub Runout: .002

JUBINVILLE 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: PRE: 1.1   POST: N/C

                Right Spindle Force Error: PRE: -3.2  POST: .02

                Left Spindle Calibration Variable:

                     Pre-adjust: 148.87  Post-adjust: N/C

                Right Spindle Calibration Variable:

                     Pre-adjust: 152.78  Post-adjust: 154.74

JUBINVILLE 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

JUBINVILLE 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

JUBINVILLE 6.2.10 Check shuttle travel.  Adjust if necessary.

 WHITFORD 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 23.98 VDC   Post-adjust: 23.98 VDC

 WHITFORD 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 15.02 VDC   Post-adjust: 15.02
 
 WHITFORD 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 5.00 VDC   Post-adjust: 5.00 VDC

 WHITFORD 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust: 12 VAC   Post-adjust: 12 VAC

 WHITFORD 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
 JUBINVILLE      necessary using Shell Tellus 10 or equivalent.

JUBINVILLE 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

JUBINVILLE 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

JUBINVILLE 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 12/5/96   SYSTEM RTC CODE: CMP.A2      EQUIP. TECH.: BRIAN JUBINVILLE
                                                             DAVE WHITFORD
 INITIAL

 WHITFORD 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 PSI

                                         Post-adjust: 100 PSI

 WHITFORD 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  85 PSI

                                         Post-adjust:  85 PSI

 WHITFORD 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 30 PSI	
  
 WHITFORD 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                 contamination found.  


 WHITFORD 6.1.5  Check all tubing and fittings for leaks. 

 WHITFORD 6.1.6  Check all tubing and fittings for air leaks.

 WHITFORD 6.1.7  Check all indicator lights.

 WHITFORD 6.1.8  Check all stations/components for slurry, debris, or  
 JUBINVILLE      any contaminants.  Clean if necessary.  

JUBINVILLE 6.1.9  Wipe down polish table, tub, and splash ring.

JUBINVILLE 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

JUBINVILLE 6.1.11 Wipe down pad conditioning arm.

JUBINVILLE 6.1.12 Remove, rinse, and replace diamond conditioning disk.

JUBINVILLE 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

JUBINVILLE 6.1.14 Wipe down outer surface of both spindle hubs.

JUBINVILLE 6.1.15 Remove and clean O-rings, replace if necessary.

JUBINVILLE 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

JUBINVILLE 6.1.17 Wipe down all surfaces of the robot.

JUBINVILLE 6.1.18 Clean end effector vacuum chuck air port.

JUBINVILLE 6.1.19 Inspect and clean end effector air nozzle.

N/A        6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

N/A        6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

JUBINVILLE 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

JUBINVILLE 6.1.23 Check Neslab TCU for leaks.

JUBINVILLE 6.1.24 Check Neslab TCU temperature readout.

JUBINVILLE 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

JUBINVILLE 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

JUBINVILLE 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  6.1.20 and 6.1.21 were eliminated from the tool a year ago
 
8.70WW 24 - Weekly completedSUBPAC::LANDRYSun Dec 08 1996 17:3670
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 12/8/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Gee  /  Landry

 INITIAL

 __XX___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100___

                                         Post-adjust:________

 __XX___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:____80__

                                         Post-adjust:___85___

 __XX___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___38___
  
 __XX___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __XX___ 6.1.5  Check all tubing and fittings for leaks. 

 __XX___ 6.1.6  Check all tubing and fittings for air leaks.

 __XX___ 6.1.7  Check all indicator lights.

 __XX___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __XX___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __XX___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __XX___ 6.1.11 Wipe down pad conditioning arm.

 __XX___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __XX___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __XX___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __XX___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __XX___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __XX___ 6.1.17 Wipe down all surfaces of the robot.

 __XX___ 6.1.18 Clean end effector vacuum chuck air port.

 __XX___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __XX___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __XX___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __XX___ 6.1.23 Check Neslab TCU for leaks.

 __XX___ 6.1.24 Check Neslab TCU temperature readout.

 __XX___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __XX___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __XX___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:   6.1.20  No longer utilizes said filters
8.71WW 25 - Weekly completedFABSIX::R_GEESun Dec 15 1996 17:5076
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 12/15/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Gee, Finn, Landry

 INITIAL

 __XX___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100___

                                         Post-adjust:________

 __XX___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:____80__

                                         Post-adjust:___85___

 __XX___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___41___
  
 __XX___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __XX___ 6.1.5  Check all tubing and fittings for leaks. 

 __XX___ 6.1.6  Check all tubing and fittings for air leaks.

 __XX___ 6.1.7  Check all indicator lights.

 __XX___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __XX___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __XX___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __XX___ 6.1.11 Wipe down pad conditioning arm.

 __XX___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __XX___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __XX___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __XX___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __XX___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __XX___ 6.1.17 Wipe down all surfaces of the robot.

 __XX___ 6.1.18 Clean end effector vacuum chuck air port.

 __XX___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __XX___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __XX___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __XX___ 6.1.23 Check Neslab TCU for leaks.

 __XX___ 6.1.24 Check Neslab TCU temperature readout.

 __XX___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __XX___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __XX___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:   6.1.20  No longer utilizes said filters
    
    	     Changed the Polish Pad, rebuilt the right carrier, changed the
             conditioning disk.
    
             Cleaned up oil (from oiler) in drip pan
                                                    
8.72WW 26 - Weekly completedSUBPAC::LANDRYSun Dec 22 1996 10:4575
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 12/22/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Gee, Landry

 INITIAL

 __XX___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100___

                                         Post-adjust:________

 __XX___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:____82__

                                         Post-adjust:___85___

 __XX___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___42___
  
 __XX___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __XX___ 6.1.5  Check all tubing and fittings for leaks. 

 __XX___ 6.1.6  Check all tubing and fittings for air leaks.

 __XX___ 6.1.7  Check all indicator lights.

 __XX___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __XX___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __XX___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __XX___ 6.1.11 Wipe down pad conditioning arm.

 __XX___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __XX___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __XX___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __XX___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __XX___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __XX___ 6.1.17 Wipe down all surfaces of the robot.

 __XX___ 6.1.18 Clean end effector vacuum chuck air port.

 __XX___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __XX___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __XX___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __XX___ 6.1.23 Check Neslab TCU for leaks.

 __XX___ 6.1.24 Check Neslab TCU temperature readout.

 __XX___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __XX___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __XX___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:   6.1.20  No longer utilizes said filters
    
    	     Changed the Polish Pad.
    
             Cleaned up oil (from oiler) in drip pan
                                                    
8.73WW27 Weekly PM completedFABSIX::R_POIRIERTue Dec 31 1996 02:1678
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 12/29/96   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Roger Poirier
							   Mitch Ridlon
 INITIAL

 __RP___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100___

                                         Post-adjust:________

 __RP___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:____84__

                                         Post-adjust:_______

 __RP___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___43___
  
 __RP___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __RP___ 6.1.5  Check all tubing and fittings for leaks. 

 __RP___ 6.1.6  Check all tubing and fittings for air leaks.

 _MR/RP_ 6.1.7  Check all indicator lights.

 _MR/RP_ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __RP___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __RP___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __RP___ 6.1.11 Wipe down pad conditioning arm.

 __MR___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __RP___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __RP___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __RP___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __MR___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __MR___ 6.1.17 Wipe down all surfaces of the robot.

 __MR___ 6.1.18 Clean end effector vacuum chuck air port.

 __MR___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __MR___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __RP___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __RP___ 6.1.23 Check Neslab TCU for leaks.

 __RP___ 6.1.24 Check Neslab TCU temperature readout.

 __MR___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __MR___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __MR___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: N/A 6.1.20  No longer utilizes said filters
    
	   Engineer informed of all N/A

	   Changed the Polish Pad/conditioning disk
    
           Cleaned up oil (from oiler) in drip pan
                                                    
8.74CMP.A2 shutdown checksheet completedFABSIX::R_GEETue Dec 31 1996 15:2840
			

                    CMP.A1 & CMP.A2 SHUTDOWN CHECKSHEET	 Tech: _Tim Landry_
                    -----------------------------------        _Bob Gee____
							

                                                        Tech.       Date
                                                       -------     -------
  1.  Remove all wafer carriers.  Do not re-use.
      Ensure that there are a sufficient ammount
      of re-built carriers to support the startup.      ___X___     _12/31/96

  2.  Remove all wafer cassettes and drain Send
      and Receive DI Water tanks.                       ___X___     _12/31/96

  3.  Purge both slurry lines with DI Water.            ___X___     _12/31/96

  4.  Remove and discard all polishing pads.            ___X___     _12/31/96

  5.  Remove all PVA scrub brushes and submerge
      in a mixture of DI water and H2O2.                ___X___     _12/31/96

  6.  Perform a complete clean of each system
      to remove dried slurry.  Wipe down and dry
      all wet surfaces.                                 ___X___     _12/31/96

  7.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing to UDR.           ___X___     _12/31/96

  8.  Disconnect incoming DI Water line and purge
      system DI Water lines with N2.  Re-connect
      DI Water line when finished.

  9.  Power down each system.                           ___X___     _12/31/96

 10.  Power down each vacuum pump cabinet.              ___X___     _12/31/96

 11.  Power down each Neslab TCU.                       ___X___     _12/31/96

 12.  Enter checksheet into CMP Notesfile.		___X___     _12/31/96
8.75CMP.A2 START-UP COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Jan 02 1997 07:3834
                    CMP.A1 & CMP.A2 STARTUP CHECKSHEET
                    ----------------------------------

                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are           BJ       1/2/97
      available and ready to use.                       

  2.  Power up each system.                              BJ       1/2/97

  3.  Power up each vacuum pump cabinet.                 BJ       1/2/97

  4.  Power up each Neslab TCU.                          BJ       1/2/97

  5.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing into the tool      BJ       1/2/97

  6.  Place cassettes in left and right send
      and receive stations to fill DI Water
      tanks.                                             BJ       1/2/97

  7.  Install new polishing pads.                        LS       1/2/97

  8.  Install new wafer carriers.                        BJ       1/2/97

  9.  Re-install PVA scrub brushes.                      LS       1/2/97

 10.  Place systems in wet idle mode.                    LS       1/2/97

 11.  Notify Operations that the systems are ready
      for pad break-in & MQC.                            LS       1/2/97

 12.  Enter checksheet into notesfile.                   BJ       1/2/97
8.76WW 28 - Monthly completedSUBPAC::LANDRYTue Jan 07 1997 14:26169
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:   1-7-97   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH:  Tim Landry   (TL)
                                                           Bob Gee      (BG)
                                                           Jim Sadin    (JS)
                                                           Brendan Finn (BF)

 INITIAL

 __JS___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 _TL/JS_ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 _TL/JS_ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 _TL/JS_ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:___.002______

 _TL/JS_ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:____.001______

                Left Spindle Runout:______.001______

 _TL/JS_ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:_pre.005_ post.001______

                Left Spindle Hub Runout:__pre.004- post.001_______

 _TL/JS_ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:    +.04

                Right Spindle Force Error:   +.24

                Left Spindle Calibration Variable:

                     Pre-adjust:   148.87      Post-adjust:   148.83

                Right Spindle Calibration Variable:

                     Pre-adjust:   154.74      Post-adjust:   150.02

 _TL/JS_ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 _TL/JS_ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 __BF___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 _TL/JS_ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:___23.97_____   Post-adjust:___NONE_________

 _TL/JS_ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +15.01/-15.01   Post-adjust:___NONE______
 
 _TL/JS_ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:___4.99_____   Post-adjust:___NONE____

 _TL/JS_ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:___12.17___   Post-adjust:__NONE____

 _BF/BG_ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 _TL/JS_ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 _TL/JS_ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 _TL/JS_ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connections.

COMMENTS:    Added softwater to the Neslab TCU


================================================================================

  
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 1-7-97   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Tim Landry   (TL)
                                                         Jim Sadin    (JS)
                                                         Bob Gee      (BG)
                                                         Brendan Finn (BF)

 INITIAL

 __BG___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100 PSI

                                         Post-adjust:  None

 __BG___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   81 PSI

                                         Post-adjust:  85 PSI

 __BG___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  40 PSI
  
 __BF___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __BF___ 6.1.5  Check all tubing and fittings for leaks. 

 __BF___ 6.1.6  Check all tubing and fittings for air leaks.

 _BG/BF_ 6.1.7  Check all indicator lights.

 TL_BG_BF 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __JS___ 6.1.9  Wipe down polish table, tub, and splash ring.

 _TL_BG_ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __JS___ 6.1.11 Wipe down pad conditioning arm.

 __JS___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __JS___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __BF___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BF___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __BG___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __BG___ 6.1.17 Wipe down all surfaces of the robot.

 __BG___ 6.1.18 Clean end effector vacuum chuck air port.

 __BG___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
         	NOTE: No point of use filters.

 __TL___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
      		
 _BG_TL_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __BG___ 6.1.23 Check Neslab TCU for leaks.

 __BG___ 6.1.24 Check Neslab TCU temperature readout.

 __BG___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __BG___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __BG___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:   6.1.20  The system no longer utilizes said filter.  Equip Eng has
                     been notified.

      	     6.1.2   N2 supply to the room is at 81 PSI, which is also what
                     the system is reading.  Equip Eng has been notified.
8.77WW29 Weekly PMFABSIX::R_POIRIERSun Jan 12 1997 21:4379
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 01/12/97   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Roger Poirier
							   Mitch Ridlon
 INITIAL

 __RP___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100___

                                         Post-adjust:__100___

 __RP___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:____84__

                                         Post-adjust:___85__

 __RP___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___42___
  
 __RP___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __RP___ 6.1.5  Check all tubing and fittings for leaks. 

 __RP___ 6.1.6  Check all tubing and fittings for air leaks.

 _MR/RP_ 6.1.7  Check all indicator lights.

 _MR/RP_ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 _MR/RP_ 6.1.9  Wipe down polish table, tub, and splash ring.

 __RP___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __RP___ 6.1.11 Wipe down pad conditioning arm.

 __MR___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __RP___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __RP___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __RP___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __MR___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __MR___ 6.1.17 Wipe down all surfaces of the robot.

 __MR___ 6.1.18 Clean end effector vacuum chuck air port.

 __MR___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __RP___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __RP___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __RP___ 6.1.23 Check Neslab TCU for leaks.

 __RP___ 6.1.24 Check Neslab TCU temperature readout.

 __MR___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __MR___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __MR___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: N/A 6.1.20  No longer utilizes said filters
    
	   Engineer informed of all N/A

	   Changed the Polish Pad/Carriers/Conditioning Disk
    
           Cleaned up oil (from oiler) in drip pan
                                                    
	   Re-calibrated Slurry Flow 2. (From 1.2 to 1.1)
8.78WW30 weekly pmFABSIX::J_SADINFreedom isn&#039;t free.Mon Jan 20 1997 14:3577
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 01/20/97   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: James Sadin
							   Brendan Finn
 INITIAL                                                   Tim Landry

 __JS___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100___

                                         Post-adjust:__100___

 __JS___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:____84__

                                         Post-adjust:___84__

 __JS___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___42___
  
 __BF___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __JS___ 6.1.5  Check all tubing and fittings for leaks. 

 __JS___ 6.1.6  Check all tubing and fittings for air leaks.

 _TL/BF_ 6.1.7  Check all indicator lights.

 _JS/BF_ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 _JS/TL_ 6.1.9  Wipe down polish table, tub, and splash ring.

 __BF___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __BF___ 6.1.11 Wipe down pad conditioning arm.

 __JS___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __TL___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __JS___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __JS___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __JS___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __TL___ 6.1.17 Wipe down all surfaces of the robot.

 __TL___ 6.1.18 Clean end effector vacuum chuck air port.

 __BF___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __BF___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _TL/BF_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __JS___ 6.1.23 Check Neslab TCU for leaks.

 __JS___ 6.1.24 Check Neslab TCU temperature readout.

 __BF___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __BF___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
   
 __TL___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: N/A 6.1.20  No longer utilizes said filters
    
	   Engineer informed of all N/A

           6.1.2 - N2 pressure not adjustable any higher

           
8.79ww 31 weekly p.m. completedFABSIX::R_GEESun Jan 26 1997 15:4875
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:1/26/97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH:  Tim Landry   (TL)
                                                         Brendan Finn (BF)
                                                         Jim Sadin    (JS)
 INITIAL						 Bob Gee      (BG)

 __BG___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __BG___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  85

 __BG___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   38
  
 __BF___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __TL___ 6.1.5  Check all tubing and fittings for leaks. 

 __TL___ 6.1.6  Check all tubing and fittings for air leaks.

 __JS___ 6.1.7  Check all indicator lights.

 JS/TL/BF/BG 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __TL___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __BF___ 6.1.11 Wipe down pad conditioning arm.

 __TL___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __BG___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __BF___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BG___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __JS___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __BF___ 6.1.17 Wipe down all surfaces of the robot.

 __BF___ 6.1.18 Clean end effector vacuum chuck air port.

 __BF___ 6.1.19 Inspect and clean end effector air nozzle.

 __NA___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __TL___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __TL___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __BF___ 6.1.23 Check Neslab TCU for leaks.
                                               
 __BF___ 6.1.24 Check Neslab TCU temperature readout.

 __BG___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.


 __BG___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __BG___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

6.1.3  System unable to reach 40 PSI, Equip Eng notified
6.1.20 Point of use slurry filters no longer used, Equip Eng notified
8.80WW32 Monthly PMFABSIX::R_POIRIERSun Feb 02 1997 05:02170
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:   2-2-97   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH:  Mitch Ridlon (MR)
                                                           Roger Poirier (RP)


 INITIAL

 _MR/RP 6.2.1  Perform weekly PM checks in addition to this monthly list.

 __MR__ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 __RP__ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 __MR/RP__ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:___.002______

 __MR/RP__ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:____.001______

                Left Spindle Runout:______.001______

 __MR/RP__ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:_pre.005_ post.001______

                Left Spindle Hub Runout:__pre.004- post.001_______

 __MR/RP__ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:    .60

                Right Spindle Force Error:   -.85

                Left Spindle Calibration Variable:

                     Pre-adjust:   144.26      Post-adjust:   143.66

                Right Spindle Calibration Variable:

                     Pre-adjust:   149.52  Post-adjust:  149.62

 __MR/RP__ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 __MR/RP__ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 __MR___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 __MR/RP__ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:___24.03_____   Post-adjust:___NONE_________

 __MR/RP__ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +15.03/-15.02   Post-adjust:___NONE______
 
 __MR/RP__ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:___5.00_____   Post-adjust:___NONE____

 __MR/RP__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:___12.26___   Post-adjust:__NONE____

 __MR__ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 __RP__ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 __RP__ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 __RP_ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connections.

COMMENTS: 


================================================================================

  
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

 DATE:   2-2-97   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH:  Mitch Ridlon (MR)
                                                           Roger Poirier (RP)

 INITIAL

 __RP___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100 PSI

                                         Post-adjust:  None

 __RP___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   81 PSI

                                         Post-adjust:  81 PSI

 __RP___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  40 PSI
  
 __MR/RP___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __RP/MR___ 6.1.5  Check all tubing and fittings for leaks. 

 __RP/MR___ 6.1.6  Check all tubing and fittings for air leaks.

 __RP__ 6.1.7  Check all indicator lights.

 __RP__ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 _MR/RP 6.1.9  Wipe down polish table, tub, and splash ring.

 _MR/PR 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __MR__ 6.1.11 Wipe down pad conditioning arm.

 __MR__ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __MR__ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __MR__ 6.1.14 Wipe down outer surface of both spindle hubs.

 __MR__ 6.1.15 Remove and clean O-rings, replace if necessary.

 __MR__ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __RP__ 6.1.17 Wipe down all surfaces of the robot.

 __RP__ 6.1.18 Clean end effector vacuum chuck air port.

 __RP__ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
         	NOTE: No point of use filters.

 __MR__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
      		

 __RP__ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __RP___ 6.1.23 Check Neslab TCU for leaks.

 __RP___ 6.1.24 Check Neslab TCU temperature readout.

 __RP___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __RP___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __RP___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:   6.1.20  The system no longer utilizes said filter.  Equip Eng has
                     been notified.

      	     6.1.2   N2 supply to the room is at 81 PSI, which is also what
                     the system is reading.  Equip Eng has been notified.

	     6.1.12  The conditioning disk was replaced 50 wafers ago. Still
	             plenty of life in it so it was not replaced.		
8.81WW33 Weekly PMFABSIX::R_POIRIERMon Feb 10 1997 05:0976
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:02-10-97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Roger Poirier (RP)

 INITIAL						 

 __RP___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __RP___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   82

                                         Post-adjust:  82

 __RP___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   42
  
 __RP___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __RP___ 6.1.5  Check all tubing and fittings for leaks. 

 __RP___ 6.1.6  Check all tubing and fittings for air leaks.

 __RP___ 6.1.7  Check all indicator lights.

 __RP___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __RP___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __RP___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __RP___ 6.1.11 Wipe down pad conditioning arm.

 __RP___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __RP___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __RP___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __RP___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __RP___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __RP___ 6.1.17 Wipe down all surfaces of the robot.

 __RP___ 6.1.18 Clean end effector vacuum chuck air port.

 __RP___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __RP___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __RP___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __RP___ 6.1.23 Check Neslab TCU for leaks.
                                               
 __RP___ 6.1.24 Check Neslab TCU temperature readout.

 __RP___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.


 __RP___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __RP___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  Found small pool of oil under Polish table. Cleaned and notified
	    Equip. Engineer.
	
	6.1.20 N/A Point of use slurry filters no longer used.
	       Equip Eng notified
8.82WW 34 - Weekly completedSUBPAC::LANDRYSun Feb 16 1997 18:1976
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:02-16-97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Brendan Finn   (BF)
                                                         James Sadin    (JS)
                                                         Timothy Landry (TL)

 INITIAL						 

 __TL___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __TL___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  85

 __TL___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   37
  
 __BF___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __BF___ 6.1.5  Check all tubing and fittings for leaks. 

 __BF___ 6.1.6  Check all tubing and fittings for air leaks.

 __JS___ 6.1.7  Check all indicator lights.

 TL/JS/BF 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __JS___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __JS___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __BF___ 6.1.11 Wipe down pad conditioning arm.

 __BF___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __BF___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __TL___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __JS___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __TL___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __TL___ 6.1.17 Wipe down all surfaces of the robot.

 __TL___ 6.1.18 Clean end effector vacuum chuck air port.

 __TL___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __JS___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __BF___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __BF___ 6.1.23 Check Neslab TCU for leaks.
                                               
 __BF___ 6.1.24 Check Neslab TCU temperature readout.

 __JS___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __JS___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __JS___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:   6.1.20 N/A Point of use slurry filters no longer used.
	            Equip Eng notified

      	     A new pad and two new carriers were re-installed
8.83WW35 - weekly completedFABSIX::J_SADINFreedom isn&#039;t free.Sun Feb 23 1997 16:3076
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:02-23-97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Robert Gee     (BG)
                                                         James Sadin    (JS)
                                                         Timothy Landry (TL)

 INITIAL						 

 __JS___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __JS___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  85

 __JS___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   42
  
 __BG___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _BG__ 6.1.5  Check all tubing and fittings for leaks. 

 __BG___ 6.1.6  Check all tubing and fittings for air leaks.

 __JS/TL/BG___ 6.1.7  Check all indicator lights.

 TL/JS/BG 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __TL___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __TL___ 6.1.11 Wipe down pad conditioning arm.

 __BG___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __TL___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __JS___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __JS___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __BG___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __BG___ 6.1.17 Wipe down all surfaces of the robot.

 __BG___ 6.1.18 Clean end effector vacuum chuck air port.

 __BG___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __JS___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _TL/JS___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __JS___ 6.1.23 Check Neslab TCU for leaks.
                                               
 __JS___ 6.1.24 Check Neslab TCU temperature readout.

 __TL___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __BG___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __TL___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:   6.1.20 N/A Point of use slurry filters no longer used.
	            Equip Eng notified

      	     A new pad and conditioner were installed.
8.84WW36 monthly pm completedFABSIX::B_WESTPHALFri Mar 07 1997 19:25182
                                                                           
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 3/6/97   SYSTEM RTC CODE: CMP.A2    EQUIP. TECH.: Dave Whitford    (DW)
        3/7/97                                            Leon Shkolnikov  (LS)
                                                          John Poirier     (JP)
                                                          Brad Westphal    (BW)
  INITIAL

      DW 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100


      DW 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   83

                                         Post-adjust:  83


      DW  6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42
  
      JP  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

      JP  6.1.5  Check all tubing and fittings for leaks. 

      JP  6.1.6  Check all tubing and fittings for air leaks.

      JP  6.1.7  Check all indicator lights.

      JP  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

      JP  6.1.9  Wipe down polish table, tub, and splash ring.

      JP  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

      JP  6.1.11 Wipe down pad conditioning arm.

      BW   6.1.12 Remove, rinse, and replace diamond conditioning disk.

      BW 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

      BW 6.1.14 Wipe down outer surface of both spindle hubs.

   *1 BW 6.1.15 Remove and clean O-rings, replace if necessary.

      JP 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

      BW 6.1.17 Wipe down all surfaces of the robot.

      BW 6.1.18 Clean end effector vacuum chuck air port.

      BW 6.1.19 Inspect and clean end effector air nozzle.

   N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.


      JP 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

   N/A * 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

      JP 6.1.23 Check Neslab TCU for leaks.

      JP 6.1.24 Check Neslab TCU temperature readout.

      JP 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

      JP 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

      JP 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: 

        6.1.15 * 1 o-ring from each spindle was bad but we only had 1 spare 
	         part w/ none in stock. shortage was filled out (06-12122-00)

        6.1.20   The point of use slurry filters are no longer used.

        6.1.22   The slurry pump hoses will be replaced and the pumps 
                 recalibrated when the monthly portion of the pm is performed.

-------------------------------------------------------------------------------
-------------------------------------------------------------------------------

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 3/7/97   SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: John Poirier   (JP)
                                                        Brad Westphal  (BW) 

 INITIAL

   JP/BW 6.2.1  Perform weekly PM checks in addition to this monthly list.

    * BW 6.2.2  Replace the fluid lines on the peristaltic pumps.  

      JP 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

   JP/BW 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:__.0008__________

   JP/BW 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:__.001__________

                Left Spindlele Runout:__.001__________
  
   JP/BW 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:_.001___________

                Left Spindle Hub Runout:__.001__________


   JP/BW 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:   .8%

                Right Spindle Force Error:  .5%

                Left Spindle Calibration Variable:

                     Pre-adjust: 148.5        Post-adjust: 148.5

                Right Spindle Calibration Variable:

                     Pre-adjust: 149.62        Post-adjust: 156.31

     JP  6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

     JP  6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

     JP  6.2.10 Check shuttle travel.  Adjust if necessary.

         6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.
     BW
                Pre-adjust:_24.01v_____   Post-adjust:____N/A_____

         6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

     BW         Pre-adjust:+15.01v/-15.02   Post-adjust:___N/A______
 
         6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

     BW         Pre-adjust:_4.98v______   Post-adjust:____N/A_____

         6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.
            

     BW         Pre-adjust:_12.01___________   Post-adjust:____n/a________

      JP 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

      JP 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

      JP  6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

      JP  6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:_6.2.2 The pumps were recalibrated when the hoses were replaced.

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
8.85WW37 weekly pm completeFABSIX::J_SADINFreedom isn&#039;t free.Sun Mar 09 1997 11:1883
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:03-09-97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Robert Gee     (BG)
                                                         James Sadin    (JS)
                                                         Timothy Landry (TL)
                                                         Brendan Finn   (BF)   

 INITIAL						 

 __JS___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __JS___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  85

 __JS___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   40
  
 __BF___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _BG__ 6.1.5  Check all tubing and fittings for leaks. 

 __BG___ 6.1.6  Check all tubing and fittings for air leaks.

 __JS/TL/BG/BF___ 6.1.7  Check all indicator lights.

 TL/JS/BG/BF 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __TL___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __TL___ 6.1.11 Wipe down pad conditioning arm.

 __BG___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __TL___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __JS___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BF___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __BG___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __BF___ 6.1.17 Wipe down all surfaces of the robot.

 __BG___ 6.1.18 Clean end effector vacuum chuck air port.

 __BG___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __JS___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _TL/JS___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __BF___ 6.1.23 Check Neslab TCU for leaks.
                                               
 __BF___ 6.1.24 Check Neslab TCU temperature readout.

 __TL___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __BG___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __TL___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:   6.1.20 N/A Point of use slurry filters no longer used.
	            Equip Eng notified

      	     A new pad was installed.

        ** - Found gear box oil leaking out of all gearbox bolts.
             Checked gearbox oil level, drained 1/2 pint.
    	     Tightened all lower gearbox bolts.  
           - tightened all exhaust bellows clamps. 

8.86WW38 weekly pm completed.FABSIX::J_SADINFreedom isn&#039;t free.Sun Mar 16 1997 16:5082
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:03-16-97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Robert Gee     (BG)
                                                         James Sadin    (JS)
                                                         Timothy Landry (TL)
                                                         Brendan Finn   (BF)   

 INITIAL						 

 __JS___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __JS___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  85

 __JS___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   40
  
 __BF___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _BG__ 6.1.5  Check all tubing and fittings for leaks. 

 __BG___ 6.1.6  Check all tubing and fittings for air leaks.

 __JS/TL/BG/BF___ 6.1.7  Check all indicator lights.

 TL/JS/BG/BF 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __TL___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __TL___ 6.1.11 Wipe down pad conditioning arm.

 __BG___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __TL___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __JS___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BF___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __BG___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __BF___ 6.1.17 Wipe down all surfaces of the robot.

 __BG___ 6.1.18 Clean end effector vacuum chuck air port.

 __BG___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __JS___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _TL/JS___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __BF___ 6.1.23 Check Neslab TCU for leaks.
                                               
 __BF___ 6.1.24 Check Neslab TCU temperature readout.

 __TL___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __BG___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __TL___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:   6.1.20 N/A Point of use slurry filters no longer used.
	            Equip Eng notified

      	     A new pad, carriers and conditoner were installed.

    	     a small puddle of oil was found under the motor/gearbox
    coupling for the table. wiped clean and eng informed.
    
    
8.87WW39 Weekly PM completedFABSIX::R_POIRIERTue Mar 25 1997 07:0184
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:03-25-97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Roger Poirier (RP)
                                                         Mitch Ridlon (MR)
                                                         Al Quillen   (AQ)
                                                            

 INITIAL						 

 __RP___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __RP___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  85

 __RP___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   41
  
 RP/MR/AQ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 RP/AQ/MR 6.1.5  Check all tubing and fittings for leaks. 

 __RP___ 6.1.6  Check all tubing and fittings for air leaks.

 _RP/MR/AQ 6.1.7  Check all indicator lights.

 __RP___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 _AQ/RP_ 6.1.9  Wipe down polish table, tub, and splash ring.

 __RP___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __RP___ 6.1.11 Wipe down pad conditioning arm.

 _AQ/RP___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __RP___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __RP___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __RP___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __RP___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __RP___ 6.1.17 Wipe down all surfaces of the robot.

 __RP___ 6.1.18 Clean end effector vacuum chuck air port.

 __RP___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __RP___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __RP__ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __RP___ 6.1.23 Check Neslab TCU for leaks.
                                               
 __RP___ 6.1.24 Check Neslab TCU temperature readout.

 __AQ___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __RP___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __RP___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:   6.1.20 N/A Point of use slurry filters no longer used.
	            Equip Eng notified

      	     A new pad, and conditoner were installed.

    	     a small puddle of oil was found under the motor/gearbox
             coupling for the table. wiped clean and eng informed.
    
	     A large amount of water was found in lower drip pan.
	     Found a loose connector, tightened and drained the water.
    
8.88WW40 weekly pm completedFABSIX::J_SADINFreedom isn&#039;t free.Sun Mar 30 1997 17:1577
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:03-30-97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: James Sadin
                                                         Brendan Finn
                                                         Timothy Landry
   
 INITIAL						 

 __JS___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __JS___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  85

 __JS___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   42
  
 _TL/BF_  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _TL/BF_  6.1.5  Check all tubing and fittings for leaks. 

 __JS___ 6.1.6  Check all tubing and fittings for air leaks.

 _TL/JS_   6.1.7  Check all indicator lights.

 __BF__  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 JS/BF/TL6.1.9  Wipe down polish table, tub, and splash ring.

 _TL/BF_ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __TL__  6.1.11 Wipe down pad conditioning arm.

 _JS___    6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __TL___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __BF___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BF___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __JS___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __JS___ 6.1.17 Wipe down all surfaces of the robot.

 __TL___ 6.1.18 Clean end effector vacuum chuck air port.

 __TL___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __JS___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __JS__ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 _BF____ 6.1.23 Check Neslab TCU for leaks.
                                               
 __BF___ 6.1.24 Check Neslab TCU temperature readout.

 __TL___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __BF___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __JS___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:   6.1.20 N/A Point of use slurry filters no longer used.
	            Equip Eng notified

      	     A new pad, and conditoner were installed.

8.89WW41 monthly PM completedFABSIX::J_SADINFreedom isn&#039;t free.Tue Apr 08 1997 15:31175
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:_04-08-97_   SYSTEM RTC CODE:_cmp.a2___   EQUIP. TECH.: brendan finn
                                                               james sadin

 INITIAL

 __js___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100__

                                         Post-adjust:__100___

 __js___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___85___

                                         Post-adjust:__85____

 __js___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__40____
  
 __bf___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __bf___ 6.1.5  Check all tubing and fittings for leaks. 

 __bf___ 6.1.6  Check all tubing and fittings for air leaks.

 __js___ 6.1.7  Check all indicator lights.

 __js___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __js___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __js___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __bf___ 6.1.11 Wipe down pad conditioning arm.

 __bf___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __bf___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __js___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __bf___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __js___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __js___ 6.1.17 Wipe down all surfaces of the robot.

 __js___ 6.1.18 Clean end effector vacuum chuck air port.

 __js___ 6.1.19 Inspect and clean end effector air nozzle.

 __na___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __bf___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __bf___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __js___ 6.1.23 Check Neslab TCU for leaks.

 __js___ 6.1.24 Check Neslab TCU temperature readout.

 __bf___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __bf___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __bf___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:___6.1.12 - filters no longer in use______________________________

 _____replaced 2.75" spindle o-ring on right spindle________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________




           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:__04-08-97   SYSTEM RTC CODE:_cmp.a2___   EQUIP. TECH.:_brendan finn____
                                                              james sadin

 INITIAL

 __js/bf 6.2.1  Perform weekly PM checks in addition to this monthly list.

 __bf___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 __bf___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 _js/bf_ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:___<.001____

 _js/bf_ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:___<.001____ (adjusted from .004)

                Left Spindle Runout:____<.001__

 _js/bf_ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:___<.001____

                Left Spindle Hub Runout:____<.001___

 _js/bf_ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:__.18________

                Right Spindle Force Error:___.61______

                Left Spindle Calibration Variable:

                     Pre-adjust:___148.53___  Post-adjust:___153.14___

                Right Spindle Calibration Variable:

                     Pre-adjust:__156.31____  Post-adjust:___155.70___

 __js/bf 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 _js/bf_ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 _js/bf_ 6.2.10 Check shuttle travel.  Adjust if necessary.

 __BF___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 24.00 vdc  Post-adjust: 24.00 vdc

 __BF___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +15.05   - 15.05   Post-adjust: + 15.05  -15.05
    
 __BF___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:  5.00 vdc   Post-adjust: 5.00 vdc
   
 __BF___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____12.05___   Post-adjust     12.05 vac

 __js  ___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 __js___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 __js___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 __bf___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
8.90WW42 Weekly PM ChecksheetASDG::POIRIERThu Apr 17 1997 13:1881
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:4/17/97_____   SYSTEM RTC CODE:CMP.A2____   EQUIP. TECH.:John Poirier JP
                                                                Mike Standing MS
 INITIAL

 _JP____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:_100____

                                         Post-adjust:_100____

 _JP____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:_85 ____

                                         Post-adjust:_85_____

 _JP____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:_42_____
  
 _JP____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _JP____ 6.1.5  Check all tubing and fittings for leaks. 

 _JP____ 6.1.6  Check all tubing and fittings for air leaks.

 _JP____ 6.1.7  Check all indicator lights.

 _JP____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 _JP____ 6.1.9  Wipe down polish table, tub, and splash ring.

 _JP____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 _JP____ 6.1.11 Wipe down pad conditioning arm.

 _MS____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 _MS____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 _JP____ 6.1.14 Wipe down outer surface of both spindle hubs.

 _JP____ 6.1.15 Remove and clean O-rings, replace if necessary.

 _JP____ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 _  MS__ 6.1.17 Wipe down all surfaces of the robot.

 ___MS__ 6.1.18 Clean end effector vacuum chuck air port.

 ___MS__ 6.1.19 Inspect and clean end effector air nozzle.

 ___N/A  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___JP__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___MS__ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___MS__ 6.1.23 Check Neslab TCU for leaks.

 ___MS__ 6.1.24 Check Neslab TCU temperature readout.

 ___JP__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 
  JP_ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __JP___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:N/A 6.1.20 Point of use slurry filters have been removed from
                     the tool.

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
8.91CMP.A2 WW43 WEEKLY PM COMPLETEDFABSIX::J_SADINFreedom isn&#039;t free.Sun Apr 20 1997 10:5381
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


  DATE:04/20/97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH:  BRENDAN FINN
                                                          JAMES SADIN
                                                          TIMOTHY LANDRY


 INITIAL						 

  JS    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                        Post-adjust: 100

  JS    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                        Post-adjust:  85

  JS  * 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  37 PSI

  TL    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  TL    6.1.5  Check all tubing and fittings for leaks. 

  BF    6.1.6  Check all tubing and fittings for air leaks.

  BF    6.1.7  Check all indicator lights.

  BF    6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

  JS    6.1.9  Wipe down polish table, tub, and splash ring.

  JS    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  JS    6.1.11 Wipe down pad conditioning arm.

  BF    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  JS    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

  TL    6.1.14 Wipe down outer surface of both spindle hubs.

  TL    6.1.15 Remove and clean O-rings, replace if necessary.

  BF    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  JS    6.1.17 Wipe down all surfaces of the robot.

  JS    6.1.18 Clean end effector vacuum chuck air port.

  JS    6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  JS    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  TL/JS 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

  BF    6.1.23 Check Neslab TCU for leaks.

  BF    6.1.24 Check Neslab TCU temperature readout.

  TL    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  TL    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  BF    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  *     6.1.3  System unable to reach 40 PSI, Equip Eng notified.

  N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.
    
    * found small puddle of oil under motor/gearbox mating point. cleaned
    up. 
8.92CMP.A2 WW44 WEEKLY PM COMPLETED.FABSIX::J_SADINFreedom isn&#039;t free.Sun Apr 27 1997 17:0184
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


  DATE:04/27/97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Bob Gee
                                                         Timothy Landry
                                                         James Sadin 


 INITIAL						 

  JS    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                        Post-adjust: 100

  JS    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                        Post-adjust:  85

  JS  * 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  37 PSI

  TL    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  TL    6.1.5  Check all tubing and fittings for leaks. 

  BG    6.1.6  Check all tubing and fittings for air leaks.

  BG    6.1.7  Check all indicator lights.

  BG    6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

  JS    6.1.9  Wipe down polish table, tub, and splash ring.

  JS    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  JS    6.1.11 Wipe down pad conditioning arm.

  BG    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  JS    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

  TL    6.1.14 Wipe down outer surface of both spindle hubs.

  TL    6.1.15 Remove and clean O-rings, replace if necessary.

  BG    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  JS    6.1.17 Wipe down all surfaces of the robot.

  JS    6.1.18 Clean end effector vacuum chuck air port.

  JS    6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  JS    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  TL/JS 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

  BG    6.1.23 Check Neslab TCU for leaks.

  BG    6.1.24 Check Neslab TCU temperature readout.

  TL    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  TL    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  BG    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  *     6.1.3  System unable to reach 40 PSI, Equip Eng notified.

  N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.
    
    * found small puddle of oil under motor/gearbox mating point. cleaned
    up. 

    * lots of bridge oil under polish table. cleaned up and refilled oil
        reservoir.
8.93Monthy PM for WW45 completedSUBPAC::BJUBINVILLECMP Equipment EngineeringFri May 09 1997 04:56164

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 05.09.97   SYSTEM RTC CODE: CMP.A2   EQUIP. TECH.: Leon Shkolnikov  ls


 INITIAL

 __ls__  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100__

                                         Post-adjust:__100__

 __ls__ 6.1.2   N2 pressure @ 85 PSI:    Pre-adjust:___85___

                                         Post-adjust:__85___

 __ls__  6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__40__
  
 __ls__  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __ls__  6.1.5  Check all tubing and fittings for leaks. 

 __ls__  6.1.6  Check all tubing and fittings for air leaks.

 __ls__  6.1.7  Check all indicator lights.

 __ls__  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __ls__  6.1.9  Wipe down polish table, tub, and splash ring.

 __ls__  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __ls__  6.1.11 Wipe down pad conditioning arm.

 __ls___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __ls___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __ls___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __ls___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __ls___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __ls___ 6.1.17 Wipe down all surfaces of the robot.

 __ls___ 6.1.18 Clean end effector vacuum chuck air port.

 __ls___ 6.1.19 Inspect and clean end effector air nozzle.

 __**___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __ls___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __ls___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __ls___ 6.1.23 Check Neslab TCU for leaks.

 __ls___ 6.1.24 Check Neslab TCU temperature readout.

 __ls___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __ls___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __ls___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: ** Not in use any more. EE notified.

 ___________________________________________________________________________




           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:  05.09.97   SYSTEM RTC CODE: CMP.A2  EQUIP. TECH.: Leon Shkolnikov  ls
                                                          Brian Jubinville BJ

 INITIAL

 __ls__  6.2.1  Perform weekly PM checks in addition to this monthly list.

 __ls__  6.2.2  Replace the fluid lines on the peristaltic pumps.  

 __ls__  6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.
       
 __ls__  6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:   <.001    

 __ls__  6.2.5  Measure and record right and left spindle runout.
        
                Right Spindle Runout:   <.001                          

                Left Spindle Runout:    <.001  

  bj/ls  6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:    .001    

                Left Spindle Hub Runout:  pre: .005  post: 0005       

  bj     6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: pre: -8.38  post: -.9             

                Right Spindle Force Error: pre: -11.61  post: .15            

                Left Spindle Calibration Variable:

                     Pre-adjust: 153.14       Post-adjust: 161.52      

                Right Spindle Calibration Variable:

                     Pre-adjust: 155.7        Post-adjust: 163.91      

 __ls__  6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 __ls__  6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 __ls__  6.2.10 Check shuttle travel.  Adjust if necessary.

 __ls__  6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 23.98 vdc  Post-adjust: 23.98 vdc

 __ls__  6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +/-15.01           Post-adjust: +/-15.01       
    
 __ls__  6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:  5.00 vdc   Post-adjust: 5.00 vdc
   
 __ls__  6.2.17 Check the   ~ 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:  12.05      Post-adjust     12.05 vac

 __ls__  6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 __ls___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 __ls___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 __ls___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 
8.94ww46 weekly p.m. completedFABSIX::R_GEETue May 13 1997 18:4577
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


  DATE:05/13/97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Bob Gee
                                                         Timothy Landry
                                                         James Sadin 


 INITIAL						 

  JS    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                        Post-adjust: 100

  JS    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                        Post-adjust:  85

  JS    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  40 PSI

  TL    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  TL    6.1.5  Check all tubing and fittings for leaks. 

  BG    6.1.6  Check all tubing and fittings for air leaks.

  BG    6.1.7  Check all indicator lights.

  BG    6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

  TL    6.1.9  Wipe down polish table, tub, and splash ring.

  JS    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  JS    6.1.11 Wipe down pad conditioning arm.

  BG    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  JS    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

  TL    6.1.14 Wipe down outer surface of both spindle hubs.

  TL    6.1.15 Remove and clean O-rings, replace if necessary.

  BG    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  JS    6.1.17 Wipe down all surfaces of the robot.

  JS    6.1.18 Clean end effector vacuum chuck air port.

  JS    6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  JS    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  TL/JS 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

  BG    6.1.23 Check Neslab TCU for leaks.

  BG    6.1.24 Check Neslab TCU temperature readout.

  TL    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  TL    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  BG    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.
    
8.95ww47 weekly pm completedFABSIX::J_SADINFreedom isn&#039;t free.Sun May 18 1997 11:3877
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


  DATE:05/18/97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH: Bob Gee
                                                         Dave Whitford
                                                         James Sadin 


 INITIAL						 

  JS    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                        Post-adjust: 100

  JS    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                        Post-adjust:  85

  JS    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  40 PSI

  DW    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  DW    6.1.5  Check all tubing and fittings for leaks. 

  BG    6.1.6  Check all tubing and fittings for air leaks.

  BG    6.1.7  Check all indicator lights.

  BG    6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

  DW    6.1.9  Wipe down polish table, tub, and splash ring.

  JS    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  JS    6.1.11 Wipe down pad conditioning arm.

  BG    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  JS    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

  DW    6.1.14 Wipe down outer surface of both spindle hubs.

  DW    6.1.15 Remove and clean O-rings, replace if necessary.

  BG    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  JS    6.1.17 Wipe down all surfaces of the robot.

  JS    6.1.18 Clean end effector vacuum chuck air port.

  JS    6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  JS    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  DW/JS 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

  BG    6.1.23 Check Neslab TCU for leaks.

  BG    6.1.24 Check Neslab TCU temperature readout.

  DW    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  DW    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  BG    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.
    
8.96ww48 weekly pm completed.FABSIX::J_SADINFreedom isn&#039;t free.Tue May 27 1997 10:2181
--------------------------------------------------------------------------------

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


  DATE:05/25/97    SYSTEM RTC CODE: CMP.A2   EQUIP TECH:  James Sadin
                                                          Bob Gee
                                                          Tim Landry
                                                          Brendan Finn

 INITIAL						 

  JS     6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100

                                        Post-adjust: 100

  JS     6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  85

                                        Post-adjust:  85

  JS    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  40 PSI  

  BG    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  

  BG/TL 6.1.5  Check all tubing and fittings for leaks. 

  BG/TL 6.1.6  Check all tubing and fittings for air leaks.
    
  BF    6.1.7  Check all indicator lights.
    
  BG/TL 6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

  TL/BF 6.1.9  Wipe down polish table, tub, and splash ring.

  TL/JS 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  BF/BG 6.1.11 Wipe down pad conditioning arm.

  TL    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  TL/JS 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
    
  BF/JS 6.1.14 Wipe down outer surface of both spindle hubs.

  TL/BG 6.1.15 Remove and clean O-rings, replace if necessary.

  JS/TL 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  BG    6.1.17 Wipe down all surfaces of the robot.

  BG/TL 6.1.18 Clean end effector vacuum chuck air port.

  BG    6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  BG/JS 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  JS/BG 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

  BG/JS 6.1.23 Check Neslab TCU for leaks.

  BG/JS 6.1.24 Check Neslab TCU temperature readout.
     
  TL/BG 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  BG/TL 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  BF/BG 6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  
* N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.

            
8.97CMP.A2 SHUTDOWN AND STARTUP CHECKSHEETSFABSIX::J_SADINFreedom isn&#039;t free.Tue May 27 1997 11:0484

				CMP.A2


               CMP.A1 & CMP.A2 SHUTDOWN CHECKSHEET FOR 5/26/97
               -----------------------------------------------
							AL QUILLEN  (AQ)
							BRUCE DURGIN  (BD)
                                                        ROGER POIRIER (RP)

                                                        Tech.       Date
                                                       -------     -------
  1.  Change Workstream tool status to NON-SCHEDULED
      DOWN.  If Workstream will not let the tools go
      to NON-SCHEDULED, leave the tools at UP IDLE.
      DO NOT put any tools to SCHEDULED or UNSCHEDULED  RP          5-26
      DOWN.                                            _______     _______

  2.  Remove all wafer carriers.  Do not re-use.
      Ensure that there are a sufficient ammount        AQ,BD       5-26
      of re-built carriers to support the startup.     _______     _______

  3.  Remove all wafer cassettes and drain Send        BD,AQ        5-26
      and Receive DI Water tanks.                      _______     _______
                                                        AQ,BD       5-26
  4.  Purge both slurry lines with DI Water.           _______     _______
                                                        AQ,BD       5-26
  5.  Remove and discard all polishing pads.           _______     _______

  6.  Remove all PVA scrub brushes and submerge         AQ,BD       5-26
      in a mixture of DI water and H2O2.               _______     _______

  7.  Perform a complete clean of each system
      to remove dried slurry.  Wipe down and dry        BD,AQ       5-26
      all wet surfaces.                                _______     _______

  8.  Rotate main incoming DI Water valves 180 deg.     AQ,BD       5-26
      so that all DI water is flowing to UDR.          _______     _______
                                                        AQ,BD       5-26
  9.  Power down each system.                          _______     _______
                                                        AQ,BD       5-26
 10.  Power down each vacuum pump cabinet.             _______     _______
                                                        AQ,BD       5-26
 11.  Power down each Neslab TCU.                      _______     _______

 12.  Enter checksheet into CMP Notesfile.               RP         5-26
							-------    -------



             CMP.A1 & CMP.A2 STARTUP CHECKSHEET FOR 5/27
             -------------------------------------------

                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are         js/tl/bg       5/27
      available and ready to use.                      _______     _______
                                                       js/tl/bg       5/27
  2.  Power up each system.                            _______     _______
                                                       js/tl/bg       5/27
  3.  Power up each vacuum pump cabinet.               _______     _______
                                                       js/tl/bg       5/27
  4.  Power up each Neslab TCU.                        _______     _______

  5.  Rotate main incoming DI Water valves 180 deg.    js/tl/bg       5/27
      so that all DI water is flowing into the tool    _______     _______

  6.  Place cassettes in left and right send           js/tl/bg       5/27
      and receive stations to fill DI Water
      tanks.                                           _______     _______
                                                       js/tl/bg       5/27
  7.  Install new polishing pads.                      _______     _______
                                                       js/tl/bg       5/27
  8.  Install new wafer carriers.                      _______     _______
                                                       js/tl/bg       5/27
  9.  Re-install PVA scrub brushes.                    _______     _______
                                                       js/tl/bg       5/27
 10.  Perform polish pad breakin.                      _______     _______

 11.  Notify Operations that the systems are ready     js/tl/bg       5/27
      MQC's.                                           _______     _______
                                                       js/tl/bg       5/27
 12.  Enter checksheet into notesfile.
8.98ww49 Annual p.m. completedFABSIX::R_GEESun Jun 01 1997 15:38213
 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Annual Preventive Maintenance Check Sheet, REV. C

 DATE: 6-1-97   SYSTEM RTC CODE: CMP.A2       SHIFT(S): Bob Gee      (BG)
                                                        Tim Landry   (TL)
							Jim Sadin    (JS)
							Brendan Finn (BF)
 INITIAL

BF/BG/JS/TL 6.4.1  Perform Weekly, Monthly, and Semi-Annual PM's in  addition to
                this Annual list

 _TL___ 6.4.2  Perform Bridge Position calibration.

 _BF___ 6.4.3  Check Robot Position Alignment.  Calibrate if necessary.

 _JS___ 6.4.4  Check Robot Travel position.  Adjust if necessary.

 _BG___ 6.4.5  Check Robot Arm position.  Adjust if necessary.

 _TL___ 6.4.6  Check Elevator Height position.  Adjust if necessary.



           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semi-annual Preventive Maintenance Check Sheet, REV. C

 INITIAL

BF/BG/JS/TL 6.3.1  Perform Weekly and Monthly PM's in addition to this Semi-Annual
                list.

 _BG___ 6.3.2  Check all safety interlocked doors for proper operation.  

 _BF___ 6.3.2  Check all EMO's for proper operation.

 _BG/TL_ 6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.
	
 __BG__ 6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.
		
 __BG__ 6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.


Comments:  6.3.3, 6.3.4, 6.3.5 Checked oil levels only per. EE.

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:__6-1-97_   SYSTEM RTC CODE:CMP.A2       EQUIP. TECH.: Bob Gee      (BG)
                                                             Tim Landry   (TL)
                                                             Jim Sadin    (JS)
                                                             Brendan Finn (BF)

 INITIAL

 BF/BG/JS/TL 6.2.1  Perform weekly PM checks in addition to this monthly list.

 _JS___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 __BF__ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 _BF/BG_ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:___ .00075 _________

 _BF/BG/JS/TL_ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:___ .001 _________

                Left Spindlele Runout:__ .001 __________

 _BG/JS_ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:___ .001 _________

                Left Spindle Hub Runout:___ .001 _________

BF/BG/JS/TL 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:___1.78_________

                Right Spindle Force Error:__.04______

                Left Spindle Calibration Variable:

                     Pre-adjust:____1.06_______  Post-adjust:____1.05_______

                Right Spindle Calibration Variable:

                     Pre-adjust:____1.06________  Post-adjust:___1.05_________

 _JS___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 _BG___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 _BF___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 __TL__ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____23.97____   Post-adjust:_____23.99___

 __TL__ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:___ -15.01 __   Post-adjust:__ -15.01 ___  
                Pre-adjust:___ +15.00 __   Post-adjust:__ +15.00 ___  
   
 __TL__ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:____4.99____   Post-adjust:____4.99____

 __TL__ 6.2.17 Check the ~ 12   Volt power supply.  Calibrate if necessary.

                Pre-adjust:___11.82___   Post-adjust:____11.82________

 __JS__ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 __JS__ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 __JS__ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 __JS__ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

Comments:  6.2.17  There is no adjustment for this item.  The reading is
                   for reference ONLY.  EE has been notified



           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 6-1-97      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH:  Bob Gee      (BG)
                                                             Tim Landry   (TL)
                                                             Jim Sadin    (JS)
                                                             Brendan Finn (BF)

 INITIAL

 __BF__     6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 __BF__     6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 82 psi

                                         Post-adjust:_N/A____

 __BF__     6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 43 psi
  
 __BG__     6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  

 __BG__     6.1.5  Check all tubing and fittings for leaks. 

 __JS__     6.1.6  Check all tubing and fittings for air leaks.

 __JS__     6.1.7  Check all indicator lights.

 BG/JS/BF/TL  6.1.8  Check all stations/components for slurry, debris, or  
                     any contaminants.  Clean if necessary.  

 __JS__     6.1.9  Wipe down polish table, tub, and splash ring.

 __JS__     6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __BG__     6.1.11 Wipe down pad conditioning arm.

 __BG__     6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __BG__     6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __BF__     6.1.14 Wipe down outer surface of both spindle hubs.

 __BF__     6.1.15 Remove and clean O-rings, replace if necessary.

 __TL__     6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __TL__     6.1.17 Wipe down all surfaces of the robot.

 __TL__     6.1.18 Clean end effector vacuum chuck air port.
   
 __TL__     6.1.19 Inspect and clean end effector air nozzle.

  N/A       6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
 
 _JS__      6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _BG/JS_    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                   necessary.

 __JS__     6.1.23 Check Neslab TCU for leaks.

 __JS__     6.1.24 Check Neslab TCU temperature readout.

 __TL__     6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __TL__     6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __TL__     6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


Comments: 6.1.20 no point of use slurry filters.