6.0. "CMP.A1 PM CHECKSHEETS" by SUBPAC::SADIN (Freedom isn't free.) Sun Nov 05 1995 12:15

          <<< ASDG::DISK$SYS_DATA:[NOTES$LIBRARY]FILMS_ONLY.NOTE;1 >>>
                                -< Films Only! >-
================================================================================
Note 57.0                    (CMP.A1) PM CHECKSHEETS                  21 replies
ASDG::POIRIER                                         7 lines  13-JUL-1995 10:54
--------------------------------------------------------------------------------
    
    
          THIS NOTE WILL BE USED FOR POSTING PM CHECKSHEETS ON
    
     
                                CMP.A1
           
================================================================================
Note 57.1                    (CMP.A1) PM CHECKSHEETS                     1 of 21
SUBPAC::TOOKER                                       78 lines  13-JUL-1995 14:52
                       -< Weekly PM Checksheet Template >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:__________   SYSTEM RTC CODE:__________   EQUIP. TECH.:_______________

 INITIAL

 _______ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:________

                                         Post-adjust:________

 _______ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:________

                                         Post-adjust:________

 _______ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:________
  
 _______ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _______ 6.1.5  Check all tubing and fittings for leaks. 

 _______ 6.1.6  Check all tubing and fittings for air leaks.

 _______ 6.1.7  Check all indicator lights.

 _______ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 _______ 6.1.9  Wipe down polish table, tub, and splash ring.

 _______ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 _______ 6.1.11 Wipe down pad conditioning arm.

 _______ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 _______ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 _______ 6.1.14 Wipe down outer surface of both spindle hubs.

 _______ 6.1.15 Remove and clean O-rings, replace if necessary.

 _______ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 _______ 6.1.17 Wipe down all surfaces of the robot.

 _______ 6.1.18 Clean end effector vacuum chuck air port.

 _______ 6.1.19 Inspect and clean end effector air nozzle.

 _______ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 _______ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _______ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 _______ 6.1.23 Check Neslab TCU for leaks.

 _______ 6.1.24 Check Neslab TCU temperature readout.

 _______ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 _______ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 _______ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 57.2                    (CMP.A1) PM CHECKSHEETS                     2 of 21
SUBPAC::TOOKER                                       90 lines  13-JUL-1995 14:52
                      -< Monthly PM Checksheet Template >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:__________   SYSTEM RTC CODE:__________   EQUIP. TECH.:_________________

 INITIAL

 _______ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 _______ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 _______ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 _______ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:____________

 _______ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:____________

                Left Spindlele Runout:____________

 _______ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:____________

                Left Spindle Hub Runout:____________

 _______ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:____________

                Right Spindle Force Error:____________

                Left Spindle Calibration Variable:

                     Pre-adjust:____________  Post-adjust:____________

                Right Spindle Calibration Variable:

                     Pre-adjust:____________  Post-adjust:____________

 _______ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 _______ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 _______ 6.2.10 Check shuttle travel.  Adjust if necessary.

 _______ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 _______ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________
 
 _______ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:____________   Post-adjust:____________

 _______ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 _______ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 _______ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 _______ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 _______ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 57.3                    (CMP.A1) PM CHECKSHEETS                     3 of 21
SUBPAC::TOOKER                                       30 lines  13-JUL-1995 14:53
                    -< Semi-Annual PM Checksheet Template >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semmi-annual Preventive Maintenance Check Sheet, REV. C

 INITIAL

 _______ 6.3.1  Perform Weekly and Monthly PM's in addition to this Semi-Annual
                list.

 _______ 6.3.2  Check all safety interlocked doors for proper operation.  

 _______ 6.3.2  Check all EMO's for proper operation.

 _______ 6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.

 _______ 6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.

 _______ 6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 57.4                    (CMP.A1) PM CHECKSHEETS                     4 of 21
SUBPAC::TOOKER                                       27 lines  13-JUL-1995 14:54
                       -< Annual PM Checksheet Template >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Annual Preventive Maintenance Check Sheet, REV. C

 INITIAL

 _______ 6.4.1  Perform Weekly, Monthly, and Semi-Annual PM's in  addition to
                this Annual list

 _______ 6.4.2  Perform Bridge Position calibration.

 _______ 6.4.3  Check Robot Position Alignment.  Calibrate if necessary.

 _______ 6.4.4  Check Robot Travel position.  Adjust if necessary.

 _______ 6.4.5  Check Robot Arm position.  Adjust if necessary.

 _______ 6.4.6  Check Elevator Height position.  Adjust if necessary.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 57.5                    (CMP.A1) PM CHECKSHEETS                     5 of 21
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              78 lines  14-JUL-1995 01:58
                         -< WW2 weekly PM checksheet >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 7/14/95   SYSTEM RTC CODE:  CMP.A1   EQUIP. TECH.: LEON, BJ

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 PSI

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 PSI

                                         Post-adjust: 85 PSI

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 35 PSI
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 57.6                    (CMP.A1) PM CHECKSHEETS                     6 of 21
ASDG::POIRIER                                       176 lines  20-JUL-1995 17:04
                           -< Monthly PM Checksheet >-
--------------------------------------------------------------------------------



           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 7/18/95      SYSTEM RTC CODE: CMP.A1      EQUIP. TECH.:Bob, John &
                                                               Jim T.
 INITIAL


  __X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:_100____

                                         Post-adjust:________

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__85____

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__37____
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.

 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 ___x___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________


           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:_7/18/95___   SYSTEM RTC CODE:_CMP.A1__   EQUIP. TECH.:_Bob, John &
                                                              Jim T.
 INITIAL

 ___x___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___x___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___x___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:_.0002______

 ___x___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:_.0010_______ Adjusted __.0002__

                Left Spindle Runout:__.0001__________

 ___x___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:____.0004___

                Left Spindle Hub Runout:_____.0001___

 ___x___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:   -0.96 (average)

                Right Spindle Force Error:  -1.52 (average)

                Left Spindle Calibration Variable:

                     Pre-adjust:___n/a_______  Post-adjust:_146.67____

                Right Spindle Calibration Variable:

                     Pre-adjust:___n/a______  Post-adjust:___136.4____

 ___X____ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X____ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___x___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:___24.01_______   Post-adjust:____________

 ___x___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:_____15.0_____   Post-adjust:____________
 
 ___x___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:____5.02______   Post-adjust:____________

 __n/a___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 ___x___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___x___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___x___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___x___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________


================================================================================
Note 57.7                    (CMP.A1) PM CHECKSHEETS                     7 of 21
SUBPAC::LANDRY                                       78 lines  29-JUL-1995 12:18
                              -< WW IV - Weekly  >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:  7/29/95   SYSTEM RTC CODE:  CMP.A1   EQUIP. TECH.:  Landry

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:   100

                                         Post-adjust:  N/A

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:    85

                                         Post-adjust:  N/A

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  37
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 ___X___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 57.8                    (CMP.A1) PM CHECKSHEETS                     8 of 21
PATE::GEE                                            85 lines   1-AUG-1995 02:39
                         -< work week 05 weekly  p.m. >-
--------------------------------------------------------------------------------


--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:  8/1/95   SYSTEM RTC CODE:  CMP.A1   EQUIP. TECH.:  Gee/Leon

 INITIAL

 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:   100

                                         Post-adjust:  N/A

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:    85

                                         Post-adjust:  N/A

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  37
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.

 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 ___x___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: Found an exhaust hose under the elevators had fell off.

 No point of use slurry filter needed.
 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

================================================================================
Note 57.9                    (CMP.A1) PM CHECKSHEETS                     9 of 21
PATE::GEE                                            78 lines   8-AUG-1995 00:29
                         -< work week 06 weekly p.m. >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:  8/08/95   SYSTEM RTC CODE:  CMP.A2   EQUIP. TECH.:  Gee

 INITIAL

 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:   100

                                         Post-adjust:  N/A

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:    95

                                         Post-adjust:  85

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38 psi
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x__ 6.1.5  Check all tubing and fittings for leaks. 

 ___x__ 6.1.6  Check all tubing and fittings for air leaks.

 ___x__ 6.1.7  Check all indicator lights.

 ___x__ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x__ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x__ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x__ 6.1.11 Wipe down pad conditioning arm.

 ___x__ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___x__ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x__ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x__ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x__ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___x__ 6.1.17 Wipe down all surfaces of the robot.

 ___x__ 6.1.18 Clean end effector vacuum chuck air port.

 ___x__ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x__ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___x__ 6.1.23 Check Neslab TCU for leaks.

 ___x__ 6.1.24 Check Neslab TCU temperature readout.

 ___x__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:
            No point of use filter currently in stock, there on order.

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

================================================================================
Note 57.10                   (CMP.A1) PM CHECKSHEETS                    10 of 21
ASDG::POIRIER                                        83 lines  22-AUG-1995 17:38
                     -< Monthly P.M. Checksheet for WW07 >-
--------------------------------------------------------------------------------


           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:  8/19/95   SYSTEM RTC CODE:  CMP.A1   EQUIP. TECH.:  BJ / Doc 
                                                            JP/ BF
 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___x____ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout: .00005

 ___X___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: .0001

                Left Spindlele Runout: .0001

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: .00015

                Left Spindle Hub Runout:   .0002

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: .08

                Right Spindle Force Error:  .5

                Left Spindle Calibration Variable:

                     Pre-adjust: 146.67  Post-adjust: 141.43

                Right Spindle Calibration Variable:

                     Pre-adjust: 136.4  Post-adjust: 143.89

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:__ 24.02 ___   Post-adjust:____None_____

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:  +15.02 / -14.99   Post-adjust:___None____
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:___ 4.99 ____   Post-adjust:___None_____

 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
               fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:    Both the left and right downforces were out of spec.
 
              Found the Hub adjustment Set Screws & Jam Nuts loose.
              . 
================================================================================
Note 57.11                   (CMP.A1) PM CHECKSHEETS                    11 of 21
FABSIX::R_POIRIER                                    80 lines  24-AUG-1995 22:00
                               -< WW8 WEEKLY PM >-
--------------------------------------------------------------------------------
                         -< WW8 weekly PM checksheet >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 8/24/95   SYSTEM RTC CODE:  CMP.A1   EQUIP. TECH.: BJ,ROGER

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 PSI

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 89 PSI

                                         Post-adjust: 85 PSI

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 36 PSI
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 57.12                   (CMP.A1) PM CHECKSHEETS                    12 of 21
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              78 lines   2-SEP-1995 06:09
                        -< WEEKLY PM FOR WW9 COMPLETED >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 9/2/95    SYSTEM RTC CODE: CMP.A1   EQUIP. TECH: BJ

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100 PSI

                                         Post-adjust: N/A

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  85 PSI

                                         Post-adjust: N/A

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 35 PSI
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
    
 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 _______ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  Roger, could you grab the elevator lead screws?

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 57.13                   (CMP.A1) PM CHECKSHEETS                    13 of 21
FABSIX::R_POIRIER                                    78 lines   3-SEP-1995 21:57
                              -< WEEKLY PM WW10 >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:_9-3-95_   SYSTEM RTC CODE:_CMP.A1___   EQUIP. TECH.:_ Gee/Poirier 

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100 PSI

                                         Post-adjust:_N/A__

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:_85 PSI

                                         Post-adjust:__N/A___

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___37 PSI
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 ___X___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__FILLED BRIDGE OIL RESOVIOR______________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 57.14                   (CMP.A1) PM CHECKSHEETS                    14 of 21
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              72 lines  13-SEP-1995 21:49
                       -< Weekly PM for WW11 completewd >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 9/13/95   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: BJ

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 PSI

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 86

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading 35 PSI
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  
    
 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 ___X___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___*___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: * - Someone with small hands like Roger will have to do this Sat.
           night.
               
================================================================================
Note 57.15                   (CMP.A1) PM CHECKSHEETS                    15 of 21
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              32 lines  27-SEP-1995 06:07
                       -< ANNUAL PM FROM WW12 COMPLETED >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Annual Preventive Maintenance Check Sheet, REV. C
  
 DATE: 9/24-9/27   SYSTEM RTC CODE: CMP.A1  EQUIP. TECH.: A, B and D shifts
    
 INITIAL

 ___X___ 6.4.1  Perform Weekly, Monthly, and Semi-Annual PM's in  addition to
                this Annual list

 ___X___ 6.4.2  Perform Bridge Position calibration.

 ___X___ 6.4.3  Check Robot Position Alignment.  Calibrate if necessary.

 ___X___ 6.4.4  Check Robot Travel position.  Adjust if necessary.

 ___X___ 6.4.5  Check Robot Arm position.  Adjust if necessary.

 ___X___ 6.4.6  Check Elevator Height position.  Adjust if necessary.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________


 
================================================================================
Note 57.16                   (CMP.A1) PM CHECKSHEETS                    16 of 21
FABSIX::B_FINN                                       89 lines   1-OCT-1995 19:25
                                 -< weekly pm >-
--------------------------------------------------------------------------------


          <<< ASDG::DISK$SYS_DATA:[NOTES$LIBRARY]FILMS_ONLY.NOTE;1 >>>
                                -< Films Only! >-
================================================================================
Note 57.1                    (CMP.A1) PM CHECKSHEETS                     1 of 13
SUBPAC::TOOKER                                       78 lines  13-JUL-1995 14:52
                       -< Weekly PM Checksheet Template >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:10/1/95__________   SYSTEM RTC CODE:cmp.a1  EQUIP. TECH.:Landry/Finn

 INITIAL

 __X_____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:________ 100

                                         Post-adjust:________

 ___X____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:________85

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:_37_______
  
 __X_____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __X____ 6.1.5  Check all tubing and fittings for leaks. 

 __X____ 6.1.6  Check all tubing and fittings for air leaks.

 __X____ 6.1.7  Check all indicator lights.

 __x____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __X____ 6.1.9  Wipe down polish table, tub, and splash ring.

 __X____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __X____ 6.1.11 Wipe down pad conditioning arm.

 __X____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __X____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __X____ 6.1.14 Wipe down outer surface of both spindle hubs.

 __X____ 6.1.15 Remove and clean O-rings, replace if necessary.

 __X____ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __X____ 6.1.17 Wipe down all surfaces of the robot.

 __X____ 6.1.18 Clean end effector vacuum chuck air port.

 __X____ 6.1.19 Inspect and clean end effector air nozzle.

 __X____ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __X____ 6.1.23 Check Neslab TCU for leaks.

 __X____ 6.1.24 Check Neslab TCU temperature readout.

 __X____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __X____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___Both slurry pumps needed calibration changes____________________


 Found Residual oil, from oiler on bridge, in catch pan

 ___________________________________________________________________________

 ___________________________________________________________________________

================================================================================
Note 57.17                   (CMP.A1) PM CHECKSHEETS                    17 of 21
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              76 lines  11-OCT-1995 21:54
                       -< Weekly PM for 10/11 completed >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 10/11/95   SYSTEM RTC CODE: CMP.A1  EQUIP. TECH.: Leon and BJ

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 85 psi

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 35/40
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  Wether is was a slurry pressure problem in the loop or 
            just unknown, both slurry pumps were off by 60 ml/sec.
            Both pumps were recalibrated and brought into spec.  The
            pumps were checked last week and they had been in spec.
    
    
    
================================================================================
Note 57.18                   (CMP.A1) PM CHECKSHEETS                    18 of 21
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              91 lines  18-OCT-1995 23:17
                      -< Monthly PM completed for 10/18 >-
--------------------------------------------------------------------------------

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 10-17-95   SYSTEM RTC CODE:  CMP.A1   EQUIP. TECH.: A + D shift

 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout: .0015

 ___X___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:  .001

                Left Spindlle Runout:  .002

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: .001

                Left Spindle Hub Runout:  .001

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: -.31

                Right Spindle Force Error: .83

                Left Spindle Calibration Variable:

                     Pre-adjust: 157.5  Post-adjust: 163.19

                Right Spindle Calibration Variable:

                     Pre-adjust: 158.7  Post-adjust: 152.16

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:___24.03____   Post-adjust:___N/A______

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 15.00/-15.01  Post-adjust:____N/A______
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:__5.00______   Post-adjust:___N/A______

 __N/A__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:___N/A______   Post-adjust:___N/A______

 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
================================================================================
Note 57.19                   (CMP.A1) PM CHECKSHEETS                    19 of 21
PATE::GEE                                            77 lines  23-OCT-1995 07:23
                            -< weekly p.m. 9/23/95 >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:  10/23/95   SYSTEM RTC CODE:  CMP.A1   EQUIP. TECH.:  Gee/RPoirier


 __x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:   100

                                         Post-adjust:  N/A

 __x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:    85

                                         Post-adjust:  na

 __x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 37 psi
  
 __x__ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __x__ 6.1.5  Check all tubing and fittings for leaks. 

 __x__ 6.1.6  Check all tubing and fittings for air leaks.

 __x__ 6.1.7  Check all indicator lights.

 __x__ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __x__ 6.1.9  Wipe down polish table, tub, and splash ring.

 __x__ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __x__ 6.1.11 Wipe down pad conditioning arm.

 _n/a_ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __x__ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __x__ 6.1.14 Wipe down outer surface of both spindle hubs.

 __x__ 6.1.15 Remove and clean O-rings, replace if necessary.

 __x__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __x__ 6.1.17 Wipe down all surfaces of the robot.

 __x__ 6.1.18 Clean end effector vacuum chuck air port.

 __x__ 6.1.19 Inspect and clean end effector air nozzle.

 _n/a____ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __x__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __x__ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __x__ 6.1.23 Check Neslab TCU for leaks.

 __x__ 6.1.24 Check Neslab TCU temperature readout.

 __x__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __x__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __x__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:
 		Filled the bridge oiler.
		No point of use slurry filters in stock. 
___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

================================================================================
Note 57.20                   (CMP.A1) PM CHECKSHEETS                    20 of 21
FABSIX::B_FINN                                       75 lines  29-OCT-1995 12:52
                            -< weekly pm completed >-
--------------------------------------------------------------------------------

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:10/29/95   SYSTEM RTC CODE: CMP.A1  EQUIP. TECH: Landry/Finn

 INITIAL

 __X_____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:________ 100

                                         Post-adjust:________

 ___X____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:________85

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:_37______
  
 __X_____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __X____ 6.1.5  Check all tubing and fittings for leaks. 

 __X____ 6.1.6  Check all tubing and fittings for air leaks.

 __X____ 6.1.7  Check all indicator lights.

 __x____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __X____ 6.1.9  Wipe down polish table, tub, and splash ring. 

 __X____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __X____ 6.1.11 Wipe down pad conditioning arm.

 __X____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __X____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __X____ 6.1.14 Wipe down outer surface of both spindle hubs.

 __X____ 6.1.15 Remove and clean O-rings, replace if necessary.

 __X____ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __X____ 6.1.17 Wipe down all surfaces of the robot.

 __X____ 6.1.18 Clean end effector vacuum chuck air port.

 __X____ 6.1.19 Inspect and clean end effector air nozzle.
 
 __X____ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __X____ 6.1.23 Check Neslab TCU for leaks.

 __X____ 6.1.24 Check Neslab TCU temperature readout.

 __X____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __X____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 slurry pump 1+2  needed calibration changes


================================================================================
Note 57.21                   (CMP.A1) PM CHECKSHEETS                    21 of 21
FABSIX::R_POIRIER                                    75 lines   5-NOV-1995 07:19
                         -< WW19 weekly PM completed >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:_ 11-05-95  SYSTEM RTC CODE: CMP.A1    EQUIP. TECH.: POIRIER/RIDLON

 INITIAL

 _______ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:_ 100 PSI __

                                         Post-adjust:_N/A____

 _______ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__85 PSI____

                                         Post-adjust:__N/A___

 _______ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__37 PSI___
  
 __X____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __X____ 6.1.5  Check all tubing and fittings for leaks. 

 __X____ 6.1.6  Check all tubing and fittings for air leaks.

 __X____ 6.1.7  Check all indicator lights.

 __X____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __X____ 6.1.9  Wipe down polish table, tub, and splash ring.

 __X____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __X____ 6.1.11 Wipe down pad conditioning arm.

 __X____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __X____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __X____ 6.1.14 Wipe down outer surface of both spindle hubs.

 __X____ 6.1.15 Remove and clean O-rings, replace if necessary.

 __X____ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __X____ 6.1.17 Wipe down all surfaces of the robot.

 __X____ 6.1.18 Clean end effector vacuum chuck air port.

 __X____ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __X____ 6.1.23 Check Neslab TCU for leaks.

 __X____ 6.1.24 Check Neslab TCU temperature readout.

 __X____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __X____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:___Slurry flow needed adjustment on both lines. 
	     Slurry 1 from .9 to 1.2
	     Slurry 2 from .875 to 1.0
 ___________________________________________________________________________

 ___________________________________________________________________________
T.RTitleUserPersonal
Name
DateLines
6.1Weekly PM Checksheet TemplateSUBPAC::BJUBINVILLENFD Fire - RescueWed Nov 08 1995 20:5978
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:__________   SYSTEM RTC CODE:__________   EQUIP. TECH.:_______________

 INITIAL

 _______ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:________

                                         Post-adjust:________

 _______ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:________

                                         Post-adjust:________

 _______ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:________
  
 _______ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _______ 6.1.5  Check all tubing and fittings for leaks. 

 _______ 6.1.6  Check all tubing and fittings for air leaks.

 _______ 6.1.7  Check all indicator lights.

 _______ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 _______ 6.1.9  Wipe down polish table, tub, and splash ring.

 _______ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 _______ 6.1.11 Wipe down pad conditioning arm.

 _______ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 _______ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 _______ 6.1.14 Wipe down outer surface of both spindle hubs.

 _______ 6.1.15 Remove and clean O-rings, replace if necessary.

 _______ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 _______ 6.1.17 Wipe down all surfaces of the robot.

 _______ 6.1.18 Clean end effector vacuum chuck air port.

 _______ 6.1.19 Inspect and clean end effector air nozzle.

 _______ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 _______ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _______ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 _______ 6.1.23 Check Neslab TCU for leaks.

 _______ 6.1.24 Check Neslab TCU temperature readout.

 _______ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 _______ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 _______ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
6.2Monthly PM Checksheet TemplateSUBPAC::BJUBINVILLENFD Fire - RescueWed Nov 08 1995 21:0194
Note 57.2                    (CMP.A1) PM CHECKSHEETS                     2 of 21
SUBPAC::TOOKER                                       90 lines  13-JUL-1995 14:52
                      -< Monthly PM Checksheet Template >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:__________   SYSTEM RTC CODE:__________   EQUIP. TECH.:_________________

 INITIAL

 _______ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 _______ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 _______ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 _______ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:____________

 _______ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:____________

                Left Spindlele Runout:____________

 _______ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:____________

                Left Spindle Hub Runout:____________

 _______ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:____________

                Right Spindle Force Error:____________

                Left Spindle Calibration Variable:

                     Pre-adjust:____________  Post-adjust:____________

                Right Spindle Calibration Variable:

                     Pre-adjust:____________  Post-adjust:____________

 _______ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 _______ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 _______ 6.2.10 Check shuttle travel.  Adjust if necessary.

 _______ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 _______ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________
 
 _______ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:____________   Post-adjust:____________

 _______ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 _______ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 _______ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 _______ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 _______ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
6.3Semi-annual PM Checksheet TemplateSUBPAC::BJUBINVILLENFD Fire - RescueWed Nov 08 1995 21:0532
    
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semmi-annual Preventive Maintenance Check Sheet, REV. C

 INITIAL

 _______ 6.3.1  Perform Weekly and Monthly PM's in addition to this Semi-Annual
                list.

 _______ 6.3.2  Check all safety interlocked doors for proper operation.  

 _______ 6.3.2  Check all EMO's for proper operation.

 _______ 6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.

 _______ 6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.

 _______ 6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
6.4Annual PM Checksheet TemplateSUBPAC::BJUBINVILLENFD Fire - RescueWed Nov 08 1995 21:0627
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Annual Preventive Maintenance Check Sheet, REV. C

 INITIAL

 _______ 6.4.1  Perform Weekly, Monthly, and Semi-Annual PM's in  addition to
                this Annual list

 _______ 6.4.2  Perform Bridge Position calibration.

 _______ 6.4.3  Check Robot Position Alignment.  Calibrate if necessary.

 _______ 6.4.4  Check Robot Travel position.  Adjust if necessary.

 _______ 6.4.5  Check Robot Arm position.  Adjust if necessary.

 _______ 6.4.6  Check Elevator Height position.  Adjust if necessary.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
6.5A1 MONTHLY COMPLETED FOR 11/15SUBPAC::BJUBINVILLENFD Fire - RescueFri Nov 17 1995 02:0895
    
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 11/15/95  SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: D SHIFT

 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout: >.001

 ___X___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: >.001

                Left Spindlele Runout: >.001

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: >.001

                Left Spindle Hub Runout: >.001

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: DONE AND RECORDED BY C SHIFT 
                                          LAST WEEK

                Right Spindle Force Error: DONE AND RECORDED BY C SHIFT

                Left Spindle Calibration Variable:

                     Pre-adjust: DONE AND RECORDED BY C SHIFT
                                 LAST WEEK

                Right Spindle Calibration Variable:

                     Pre-adjust: DONE AND RECORDED BY C SHIFT
                                 LAST WEEK

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 24.0V   Post-adjust:____________

 ___X___ 6.2.15 Check the -15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: -14.9V   Post-adjust: -15.0V
 
 ___X___ 6.2.16 Check the +15 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 14.6V   Post-adjust: 15.0V

 _N/A___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
6.6Weekly PM completedSUBPAC::LANDRYSat Nov 25 1995 18:1774
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:  11/25/95   SYSTEM RTC CODE:  CMP.A1   EQUIP. TECH:  JP  /  Doc

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:   100

                                         Post-adjust:  N/A

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:    86

                                         Post-adjust:  N/A

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  37
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 
 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 
___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  A piece of the DI water gun tubing was severly kinked.  Cut out
            bad section and re-attached gun.

      	    Tightened up the conditioner air cylinder jam nut.
6.7WEEKLY PM FOR 11/28 COMPLETEDSUBPAC::BJUBINVILLENFD Fire - RescueTue Nov 28 1995 22:3378
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 11/28/95   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: Leon & BJ

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 37 psi
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
6.8WEEKLY P.M. FABSIX::R_GEEMon Dec 04 1995 23:5278
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 12/05/95   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: BG/MR

 INITIAL

 __x____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 __x____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi

                                         Post-adjust:________

 __x____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 37 psi
  
 __x____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __x____ 6.1.5  Check all tubing and fittings for leaks. 

 __x____ 6.1.6  Check all tubing and fittings for air leaks.

 __x____ 6.1.7  Check all indicator lights.

 __x____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __x____ 6.1.9  Wipe down polish table, tub, and splash ring.

 __x____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __x____ 6.1.11 Wipe down pad conditioning arm.
 
 __x____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                  Conditioning disk was replaced 12/3/95
 __x____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __x____ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

  __X____ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
6.9weekly p.m.FABSIX::R_GEESun Dec 10 1995 01:5478
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 12/10/95   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: BG/MR

 INITIAL

 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 85 psi

                                         Post-adjust:________

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 37 psi
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.
 
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
6.11No PM necessary for WW26 FY96SUBPAC::TOOKERThu Dec 21 1995 15:046
Due to the scheduled FAB6 shutdown for Work Week 26 Fiscal Year 1996, no PM will be performed
on CMP.A1


       Jim Tooker
       CMP Equipment Engineer
6.12A1 MONTHLY PM COMPLETEDSUBPAC::BJUBINVILLENFD Fire - RescueFri Dec 22 1995 05:3386
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 12/19-21/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: B and D shift

 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout: .002

 ___X___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: .001

                Left Spindle Runout: .001

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: .0005

                Left Spindle Hub Runout: .001

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: 1.28

                Right Spindle Force Error: -1.46

                Left Spindle Dead Weight Variable:

                     Pre-adjust: 150.26 Post-adjust: 169.52

                Right Spindle Calibration Variable: 146.27

                     Pre-adjust: 142.37 Post-adjust: 

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 24.01V   Post-adjust:____________

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +15.01V/-15.0V   Post-adjust:____________
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 5V   Post-adjust:____________

 __N/A__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:  Slurry filters weren't changed due slurry purge this weekend.
    
            TCU auto-fill looked at.  Running but auto-fill still off
            line until it can be further investigated.
    
6.13CMP.A1 - WW27 - WEEKLY PM CHECKSHEETASDG::POIRIERSat Jan 06 1996 16:5992
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
                              Week Ending 1-6-96  WW27

  DATE: 1-6-9          SYSTEM RTC CODE: CMP.A1        EQUIP. TECH: JP & BW

 INITIAL

 __BW___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 __BW___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 85 psi

                                         Post-adjust:_N/A____

 __BW___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38 psi
  
 __BW___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __BW___ 6.1.5  Check all tubing and fittings for leaks. 

 __BW___ 6.1.6  Check all tubing and fittings for air leaks.

 __JP___ 6.1.7  Check all indicator lights.

 __JP___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __JP___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __JP___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __JP___ 6.1.11 Wipe down pad conditioning arm.

 __JP___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
 (See Comment "D")

 __JP___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __JP___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __JP___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __JP___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __JP___ 6.1.17 Wipe down all surfaces of the robot.

 __BW___ 6.1.18 Clean end effector vacuum chuck air port.
   
 __BW___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
  (See Comment "C")

 __JP___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __JP___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __BW___ 6.1.23 Check Neslab TCU for leaks.

 __BW___ 6.1.24 Check Neslab TCU temperature readout.

 __JP___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.
 (See Comment "A)"

 __JP___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.
 (See Comment "B)"

 __JP___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.




 COMMENT: A) The Robot Lead Screw was lubricated with Mobil Velocite #6 oil
             as recommended by Strasbaugh.

          B) All Elevator Lead Screws were lubricated with Permatex Industrial
             "Super Lube". This Multi-Purpose Synthetic Lubricant lasts longer  
             and does not cake-up like the NSK #2 grease. Please update spec on
             the next rev.

          C) The point-of use slurry filter is being removed per EE 
             instructions. Please update the spec on next rev.


          D) The Conditioning Disk was replaced on "D" Shift last night
             due to exessive wear. See note 3.9
6.14WW 28 - WeeklySUBPAC::LANDRYSun Jan 07 1996 10:4771
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 1-7-96          SYSTEM RTC CODE: CMP.A1        EQUIP. TECH: Landry

 INITIAL

 __TL___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 __TL___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi

                                         Post-adjust:_N/A____

 __TL___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 34 psi
  
 __TL___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __TL___ 6.1.5  Check all tubing and fittings for leaks. 

 __TL___ 6.1.6  Check all tubing and fittings for air leaks.

 __TL___ 6.1.7  Check all indicator lights.

 __TL___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __TL___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __TL___ 6.1.11 Wipe down pad conditioning arm.

 __TL___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __TL___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __TL___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __TL___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __TL___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __TL___ 6.1.17 Wipe down all surfaces of the robot.

 __TL___ 6.1.18 Clean end effector vacuum chuck air port.
   
 __TL___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __TL___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __TL___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __TL___ 6.1.23 Check Neslab TCU for leaks.

 __TL___ 6.1.24 Check Neslab TCU temperature readout.

 __TL___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __TL___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __TL___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:
6.15monthly PM waivedSUBPAC::TOOKERFri Jan 19 1996 10:257
Due to robot and software upgrade causing excessive down time this week, the
monthly PM scheduled to take place this week will not be performed.  Instead,
a weekly PM has been performed and the monthly PM will be re-scheduled for next 
week.

Thanks,
Jim Tooker
6.16monthly delayed, weekly performedFABSIX::B_FINNFri Jan 19 1996 12:2173
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
                              Week Ending 1-20-96  WW29

  DATE: 1-18-96          SYSTEM RTC CODE: CMP.A1        EQUIP. TECH: A+D shift

 INITIAL   TL= Tim Landry  BJ= Brian Jubinville

 __TL___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 __TL___ 6.1.2  N2 pressure @ 87 PSI:    Pre-adjust: 90 psi

                                         Post-adjust:_N/A____

 __TL___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 35 psi
  
 __TL___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __TL___ 6.1.5  Check all tubing and fittings for leaks. 

 __TL___ 6.1.6  Check all tubing and fittings for air leaks.

 __TL___ 6.1.7  Check all indicator lights.

 __TL___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __TL___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __TL___ 6.1.11 Wipe down pad conditioning arm.

 __TL___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __TL___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __TL___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BJ___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __TL___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __TL___ 6.1.17 Wipe down all surfaces of the robot.

 __TL___ 6.1.18 Clean end effector vacuum chuck air port.
   
 __TL___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __TL___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __TL___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __TL___ 6.1.23 Check Neslab TCU for leaks.

 __TL___ 6.1.24 Check Neslab TCU temperature readout.

 __TL___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __TL___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __TL___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:  Slurry pump 1 was adjusted, was on the low side.
6.17A1 MONTHLY COMPLETEDSUBPAC::BJUBINVILLENFD Fire - RescueThu Jan 25 1996 00:3785
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 1/26/95  SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: A, C and D shifts

 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___X____ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:___0.001"________

 ___X____ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:____.002"________

                Left Spindle Runout:_____.004"_________

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:_____0.0005"_______


                Left Spindle Hub Runout:______0.001______

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.


                Left Spindle Force Error:   -.97

                Right Spindle Force Error:  .84
                                                        
                Left Spindle Calibration Variable:

                     Pre-adjust: 169.52 Post-adjust: N/C

                Right Spindle Calibration Variable:

                     Pre-adjust: 146.27 Post-adjust: 165.83

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X____ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____24.04v_   Post-adjust:_same_____

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:_15.02v____   Post-adjust:_same______
 
 ___X____ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:__5.06v__________   Post-adjust:_same______

 ___N/A____ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:__N/A______   Post-adjust:__N/A____

 *__X____ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X____ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:   Resevoir is 2/3 full.

6.18A1 WEEKLY PM COMPLETEDSUBPAC::BJUBINVILLENFD Fire - RescueThu Feb 01 1996 05:4072
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 2/1/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: BJ
              
 INITIAL

 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi

                                         Post-adjust:________

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 35 psi
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.
 
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 _______ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  found 1/8"line on end effector split, looks like the problem
            vacuum.
    
6.19weekly ww32STRATA::RIDLONEliminate the obviousSun Feb 04 1996 01:3370
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 2/4/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: B-shift
              
 INITIAL

 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi

                                         Post-adjust:________

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 34 psi
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.
 
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 _______ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: Replaced the 2.75X150 orings on both hubs.    
6.20Monthly SUBPAC::LANDRYWed Feb 14 1996 08:3093
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 02-13-96   SYSTEM RTC CODE:  CMP.A1   EQUIP. TECH.: Doc / Jim T

 INITIAL

 __TL___ 6.2.1  Perform weekly PM checks in addition to this monthly list.


 __TL___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 __TL___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 __TL____ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:__ .001 ___

 __TL____ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:___ .002 ___

                Left Spindle Runout:__ .001 ____

 __TL____ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:__ .001 _____

                Left Spindle Hub Runout:__ .001 _____

 _JT/TL_  6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:   -1.56

                Right Spindle Force Error:  0.6 

                Left Spindle Calibration Variable:

                     Pre-adjust:  166.87      Post-adjust:    165.04   

                Right Spindle Calibration Variable:  

                     Pre-adjust:  167.82      Post-adjust:  167.84 

 __TL___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 __TL___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 __TL___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 __TL___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:___24.03____   Post-adjust:___N/A______

 __TL___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +15.02/-15.12  Post-adjust:__ -15.00 ______
 
 __TL___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:__5.14______   Post-adjust:___5.01______

 __TL___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:___N/A______   Post-adjust:___N/A______

 __TL___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 __TL___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 __TL___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 __TL___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:  *  Added ~1/2 gallon of fluid to TCU

       	    *  Cleaned up some oil in the drip pan.  The oil is from the
               "oiler", NOT the gear box oil.

      	    *  Found and replaced a broken plastic fitting on Slurry Pump
               # 1.  It was found broken off where it would normally enter
               the teflon block.  The only thing holding it in place was a
               large buildup of hardened slurry.

            *  A new pad and 2 new carriers were installed after this PM.
6.21WeeklyFABSIX::L_SHKOLNIKOVThu Feb 22 1996 22:1871
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:_02.22.96_   SYSTEM RTC CODE:_CMP.A1_      EQUIP. TECH.:_B.J. LEON_

 INITIAL

 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___

                                         Post-adjust:________

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___85___

                                         Post-adjust:________

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___35___
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.

 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

6.22ww35 weekly p.m.FABSIX::R_GEESun Feb 25 1996 22:0272
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 02/26/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: B shift

 INITIAL

 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi

                                         Post-adjust:_85_____

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 36 psi Max.
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.
 
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:
          Found the polish table exhaust full of water / slurry (3gls +)
 drained and cleaned.
6.23ww36 weekly p.m.FABSIX::R_GEESun Mar 03 1996 00:0371
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 03/03/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: B shift

 INITIAL

 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi

                                         Post-adjust:_85_____

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 35 psi Max.
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.
 
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:
          
6.24weekly p.m. FABSIX::R_GEEMon Mar 11 1996 21:3371
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 03/11/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: B shift

 INITIAL

 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:__98_____

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 90 psi

                                         Post-adjust:_86_____

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 34
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.
 
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:
	replaced the carriers and pad due to poor uniformity.
6.25Semi-Annual complete.....A & B shiftSUBPAC::LANDRYTue Mar 19 1996 18:03192
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 3-18-96      SYSTEM RTC CODE: CMP.A2    EQUIP. TECH: A & B shifts

 INITIAL

 _TL/BF_ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 _TL/BF_ 6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 87 psi

                                         Post-adjust:_N/A____

 _TL/BF_ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 42 psi
  
 _TL/BF_ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _TL/BF_ 6.1.5  Check all tubing and fittings for leaks. 

 _TL/BF_ 6.1.6  Check all tubing and fittings for air leaks.

 _TL/BF_ 6.1.7  Check all indicator lights.

 __TL___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __TL___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __TL___ 6.1.11 Wipe down pad conditioning arm.

 __TL___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __TL___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __TL___ 6.1.14 Wipe down outer surface of both spindle hubs.

 _TL/BF_ 6.1.15 Remove and clean O-rings, replace if necessary.

 __TL___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __TL___ 6.1.17 Wipe down all surfaces of the robot.

 __TL___ 6.1.18 Clean end effector vacuum chuck air port.
   
 __TL___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 _TL/BF_ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __TL___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 _TL/BF_ 6.1.23 Check Neslab TCU for leaks.

 _TL/BF_ 6.1.24 Check Neslab TCU temperature readout.

 __TL___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __TL___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __TL___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:


           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 3/18/96   SYSTEM RTC CODE:  CMP.A1   EQUIP. TECH.: A & B Shift

 INITIAL

 __TL___ 6.2.1  Perform weekly PM checks in addition to this monthly list.


 _TL/BF_ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 _TL/BF_ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 _TL/BF_ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:__ .001 ___

 _TL/BF_ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:___ .0005"  (was  .009")___

                Left Spindle Runout:__ .0015" ____

 _TL/BF_ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:__.001 _____

                Left Spindle Hub Runout:__ .001 _____

 _A / B_ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:   -0.96

                Right Spindle Force Error:  -1.96

                Left Spindle Calibration Variable:

                     Pre-adjust: 165.04       Post-adjust: 155.07

                Right Spindle Calibration Variable:  

                     Pre-adjust: 167.31       Post-adjust: 156.18  

 __TL___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 __JT___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 __TL___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 _TL/BF_ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:__24.03______   Post-adjust:__24.03_______

 _TL/BF_ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:__15.0______   Post-adjust:__15.0______
 
 _TL/BF_ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:__4.99_______   Post-adjust:___4.99________

 __N/A__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:___N/A______   Post-adjust:___N/A______

 _TL/BF_ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 _TL/BF_ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 _TL/BF_ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 _TL/BF_ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:  


           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semmi-annual Preventive Maintenance Check Sheet, REV. C

DATE:  3-19-96		SYSTEM:  CMP.A1		TECHS:  B Shift

 INITIAL

 __TL___ 6.3.1  Perform Weekly and Monthly PM's in addition to this Semi-Annual
                list.

 _RP/MR_ 6.3.2  Check all safety interlocked doors for proper operation.  

 _RP/MR_ 6.3.2  Check all EMO's for proper operation.

 _RP/MR_ 6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.


 __N/A__ 6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.

 __N/A__ 6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.

 COMMENTS:__________________________________________________________________
      Oil level in left and right spindles looked ok. We didn't change it
 ___________________________________________________________________________
      Oil in Conditioner gear box was changed because it was very dirty.
 ___________________________________________________________________________
      Oil level in polish table was ok.
 ___________________________________________________________________________

 ___________________________________________________________________________
6.26WW39 Weekly PMFABSIX::R_POIRIERWed Mar 27 1996 06:5072
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 03/27/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: B shift

 INITIAL

 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:__N/A____

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 84 psi

                                         Post-adjust:_N/A_____

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 35
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.
 
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:
	replaced the carriers and pad due wafer crash.

6.27ww40 Weekly p.m.FABSIX::R_GEETue Apr 02 1996 03:1471
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 04/02/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: B shift


 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_______

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 85 psi

                                         Post-adjust:_______

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 44
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.
 
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:
	replaced the carriers and pad due to engineering work. 
	Filled the bridge fluid.
6.28Weekly PM for WW41 completedSUBPAC::BJUBINVILLENFD Fire - RescueMon Apr 08 1996 10:2769
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 04/08/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: A shift


 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_______

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 85 psi

                                         Post-adjust:_______

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.
 
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:
6.29ww42 monthly completedFABSIX::B_FINNMon Apr 15 1996 19:55178
                      -< Monthly PM Checksheet Template >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:4/15/95  SYSTEM RTC CODE: CMP.A1 	EQUIP. TECH.: A SHIFT

 INITIAL

 _BF/TL_  6.2.1  Perform weekly PM checks in addition to this monthly list.

 _BF/TL_ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 _BF/TL_ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 _BF/TL_ 6.2.4  Measure and record polish table alignment runout. 

                 Polish Table Runout:__+0.001______
 
 _BF/TL__ 6.2.5  Measure and record right and left spindle runout.

                 Right Spindle Runout:___was 0.006 adj to 0.001_________
 
                 Left Spindlele Runout:__0.001__________

 _BF/TL__ 6.2.6  Measure and record right and left spindle hub runout.

 _BF/TL__        Right Spindle Hub Runout: 0.00075
 

 _BF/TL__        Left Spindle Hub Runout: 0.0005


 _BF/TL__ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: 
                                 
                       Pre adjust = .98 Post adjust= 1.07

                Right Spindle Force Error:

                       Pre adjust = .95 Post adjust= 1.10

                Left Spindle Calibration Variable:

                     Pre-adjust: 155.07  Post-adjust: 163.3

                Right Spindle Calibration Variable:

                     Pre-adjust: 156.18  Post-adjust: 170.81

 _BF/TL_  6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 _BF/TL_  6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 _BF/TL_ 6.2.10 Check shuttle travel.  Adjust if necessary.

 _BF/TL_ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:  +24.03   Post-adjust:  N/A

 _BF/TL_ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:  15.00 / -14.72   Post-adjust:  N/A / -14.99
 
 _BF/TL_ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:  4.99   Post-adjust:  N/A

 __N/A__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 _BF/TL_ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 _BF/TL_ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 _BF/TL_ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 _BF/TL_ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________


           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:4/15/96   SYSTEM RTC CODE: CMP.A1      EQUIP. TECH.: A shift

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 99

                                         Post-adjust: 100

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 85

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 39
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X__ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
6.30WW43 weekly PMFABSIX::L_SHKOLNIKOVFri Apr 26 1996 00:0669
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 04/24/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: D shift


 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_______

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 85 psi

                                         Post-adjust:_______

 ___x___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 40
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___x___ 6.1.5  Check all tubing and fittings for leaks. 

 ___x___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___x___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x___ 6.1.11 Wipe down pad conditioning arm.
 
 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.
                 
 ___x___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___x___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___x___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___x___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.
 
 ___x___ 6.1.23 Check Neslab TCU for leaks.

 ___x___ 6.1.24 Check Neslab TCU temperature readout.

 ___x__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___x__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___x__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:
6.31WW 44 - WeeklySUBPAC::LANDRYSun Apr 28 1996 20:2971
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 4-28-96      SYSTEM RTC CODE: CMP.A1    EQUIP. TECH: "A" shift

 INITIAL

 _TL/BF_ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 _TL/BF_ 6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi

                                         Post-adjust:_N/A____

 _TL/BF_ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 37 psi
  
 _TL/BF_ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _TL/BF_ 6.1.5  Check all tubing and fittings for leaks. 

 _TL/BF_ 6.1.6  Check all tubing and fittings for air leaks.

 _TL/BF_ 6.1.7  Check all indicator lights.

 _TL/BF_ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 _TL/BF_ 6.1.9  Wipe down polish table, tub, and splash ring.

 _TL/BF_ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 _TL/BF_ 6.1.11 Wipe down pad conditioning arm.

 _TL/BF_ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 _TL/BF_ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 _TL/BF_ 6.1.14 Wipe down outer surface of both spindle hubs.

 _TL/BF_ 6.1.15 Remove and clean O-rings, replace if necessary.

 _TL/BF_ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 _TL/BF_ 6.1.17 Wipe down all surfaces of the robot.

 _TL/BF_ 6.1.18 Clean end effector vacuum chuck air port.
   
 _TL/BF_ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 _TL/BF_ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _TL/BF_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 _TL/BF_ 6.1.23 Check Neslab TCU for leaks.

 _TL/BF_ 6.1.24 Check Neslab TCU temperature readout.

 _TL/BF_ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 _TL/BF_ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 _TL/BF_ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:  
6.32WW45 Weekly PMFABSIX::R_POIRIERMon May 06 1996 01:5974
 ------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 5-5-96     SYSTEM RTC CODE: CMP.A1    EQUIP. TECH:  B shift

 INITIAL

 __X__  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 __X__  6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi

                                         Post-adjust:_N/A____

 __X__  6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 37 psi
  
 __X__  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __X__  6.1.5  Check all tubing and fittings for leaks. 

 __X__  6.1.6  Check all tubing and fittings for air leaks.

 __X__  6.1.7  Check all indicator lights.

 __X__  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __X__  6.1.9  Wipe down polish table, tub, and splash ring.

 __X__  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __X__  6.1.11 Wipe down pad conditioning arm.

 __X__  6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __X__  6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __X__  6.1.14 Wipe down outer surface of both spindle hubs.

 __X__  6.1.15 Remove and clean O-rings, replace if necessary.

 __X__  6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __X__  6.1.17 Wipe down all surfaces of the robot.

 __X__  6.1.18 Clean end effector vacuum chuck air port.
   
 __X__  6.1.19 Inspect and clean end effector air nozzle.

 __N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X__  6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X__  6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __X__  6.1.23 Check Neslab TCU for leaks.

 __X__  6.1.24 Check Neslab TCU temperature readout.

 __X__  6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __X__  6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X__  6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:  Found and wiped up oil in drip pan, under polish table.

	   Also, needed to calibrate Slurry flow for both 1 & 2 by .03.
6.33Monthly PM for WW46 completedSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu May 16 1996 08:17157
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 5/15/96   SYSTEM RTC CODE: CMP.A1   SHIFT: C and D

 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___x___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___x___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___x___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:   +0.001   

 ___X___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: .001

                Left Spindle Runout: .001

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: .001

                Left Spindle Hub Runout: .001

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:  -.7

                Right Spindle Force Error: .67

                Left Spindle Calibration Variable: Dead Weight

                     Pre-adjust: 160.57   Post-adjust: n/c

                Right Spindle Calibration Variable:

                     Pre-adjust: 158.79   Post-adjust: n/c

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 24.0  Post-adjust: N/A

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: -15.0/15.1  Post-adjust: N/C
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 4.99   Post-adjust: 5.0

 ___X___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust: 9.8   Post-adjust: not adjustable, will see EE.

 ___x___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.



           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 5/15/96   SYSTEM RTC CODE: CMP.A1   SHIFT: C and D

 INITIAL

 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___

                                         Post-adjust:________

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__85____

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___x___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___x___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___x____ 6.1.11 Wipe down pad conditioning arm.

 ___x___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___x____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___x___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___x___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___x___ 6.1.17 Wipe down all surfaces of the robot.

 ___x___ 6.1.18 Clean end effector vacuum chuck air port.

 ___x___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __N/A__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

     
6.34WW 47 - WeeklySUBPAC::LANDRYSun May 19 1996 13:2671
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 5-19-96     SYSTEM RTC CODE: CMP.A1    EQUIP. TECH:  A shift

 INITIAL

 __X__  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 __X__  6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi

                                         Post-adjust:_N/A____

 __X__  6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 37 psi
  
 __X__  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __X__  6.1.5  Check all tubing and fittings for leaks. 

 __X__  6.1.6  Check all tubing and fittings for air leaks.

 __X__  6.1.7  Check all indicator lights.

 __X__  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __X__  6.1.9  Wipe down polish table, tub, and splash ring.

 __X__  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __X__  6.1.11 Wipe down pad conditioning arm.

 __X__  6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __X__  6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __X__  6.1.14 Wipe down outer surface of both spindle hubs.

 __X__  6.1.15 Remove and clean O-rings, replace if necessary.

 __X__  6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __X__  6.1.17 Wipe down all surfaces of the robot.

 __X__  6.1.18 Clean end effector vacuum chuck air port.
   
 __X__  6.1.19 Inspect and clean end effector air nozzle.

 __N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X__  6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X__  6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __X__  6.1.23 Check Neslab TCU for leaks.

 __X__  6.1.24 Check Neslab TCU temperature readout.

 __X__  6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __X__  6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X__  6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:  Slurry Pump # 1 was adjusted from .76 to .69
6.35SHUTDOWN CHECKSHEET STRATA::RIDLONEliminate the obviousMon May 27 1996 07:3439
                    CMP.A1 & CMP.A2 SHUTDOWN CHECKSHEET
                    -----------------------------------


                                                        Tech.       Date
                                                       -------     -------


  1.  Change RTC status to SCHEDULED DOWN.             ___B___     _5/27__

  2.  Remove all wafer carriers.  If possible
      keep them wet.  If not ensure that there
      are enough carriers with new films for
      startup.                                         ___B___     _5/27__

  3.  Remove all wafer cassettes and drain Send
      and Receive DI Water tanks.                      ___B___     _5/27__

  4.  Purge both slurry lines with DI Water.           ___B___     _5/27__

  5.  Remove and discard all polishing pads.           ___B___     _5/27__

  6.  Remove all PVA scrub brushes and submerge
      in DI water.                                     ___B___     _5/27__

  7.  Perform a complete clean of each system
      to remove dried slurry.  Wipe down and dry
      all wet surfaces.                                ___B___     _5/27__

  8.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing to UDR.          ___B___     _5/27__

  9.  Power down each system.                          ___B___     _5/27__

 10.  Power down each vacuum pump cabinet.             ___B___     _5/27__

 11.  Power down each Neslab TCU.                      ___B___     _5/27__

 12.  Enter checksheet into notesfile.
6.37Startup ChecksheetSUBPAC::LANDRYTue May 28 1996 19:4833
                         CMP.A1 STARTUP CHECKSHEET
                    ----------------------------------

                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are
      available and ready to use.                      B shift     5/28/96

  2.  Power up each system.                            A shift     5/28/96

  3.  Power up each vacuum pump cabinet.               A shift     5/28/96

  4.  Power up each Neslab TCU.                        A shift     5/28/96

  5.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing into the tool    A shift     5/28/96

  7.  Install wafer carriers.                          A shift     5/28/96

  8.  Place cassettes in left and right send
      and receive stations to fill DI Water
      tanks.                                           A shift     5/28/96

  9.  Install new polishing pads.                      A shift     5/28/96

 10.  Re-install PVA scrub brushes.                    A shift     5/28/96

 11.  Place systems in wet idle mode.                  A shift     5/28/96

 12.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for pad break-in & MQC.                          A shift     5/28/96
6.38weekly completedSTRATA::FINNTue May 28 1996 19:5969
  DATE: 5-27-96     SYSTEM RTC CODE: CMP.A1    EQUIP. TECH:  A+B shift

 INITIAL

 __X__  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 __X__  6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi

                                         Post-adjust:_N/A____

 __X__  6.1.3  DI Water pressure @ 36 PSI:   Actual Reading:  42 psi
  
 __X__  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __X__  6.1.5  Check all tubing and fittings for leaks. 

 __X__  6.1.6  Check all tubing and fittings for air leaks.

 __X__  6.1.7  Check all indicator lights.

 __X__  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __X__  6.1.9  Wipe down polish table, tub, and splash ring.

 __X__  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __X__  6.1.11 Wipe down pad conditioning arm.

 __X__  6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __X__  6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __X__  6.1.14 Wipe down outer surface of both spindle hubs.

 __X__  6.1.15 Remove and clean O-rings, replace if necessary.

 __X__  6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __X__  6.1.17 Wipe down all surfaces of the robot.

 __X__  6.1.18 Clean end effector vacuum chuck air port.
   
 __X__  6.1.19 Inspect and clean end effector air nozzle.

 __N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X__  6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X__  6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __X__  6.1.23 Check Neslab TCU for leaks.

 __X__  6.1.24 Check Neslab TCU temperature readout.

 __X__  6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __X__  6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X__  6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:  Slurry Pumps required cal

6.39WW49 Weekly PMFABSIX::R_POIRIERWed Jun 05 1996 07:0869
--------------------------------------------------------------------------------
  DATE: 06-04-96    SYSTEM RTC CODE: CMP.A1    EQUIP. TECH:  B shift

 INITIAL

 __X__  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 __X__  6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 85 psi

                                         Post-adjust:_N/A____

 __X__  6.1.3  DI Water pressure @ 36 PSI:   Actual Reading:  39 psi
  
 __X__  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __X__  6.1.5  Check all tubing and fittings for leaks. 

 __X__  6.1.6  Check all tubing and fittings for air leaks.

 __X__  6.1.7  Check all indicator lights.

 __X__  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __X__  6.1.9  Wipe down polish table, tub, and splash ring.

 __X__  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __X__  6.1.11 Wipe down pad conditioning arm.

 __X__  6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __X__  6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __X__  6.1.14 Wipe down outer surface of both spindle hubs.

 __X__  6.1.15 Remove and clean O-rings, replace if necessary.

 __X__  6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  __X__  6.1.17 Wipe down all surfaces of the robot.

 __X__  6.1.18 Clean end effector vacuum chuck air port.
   
 __X__  6.1.19 Inspect and clean end effector air nozzle.

 __N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X__  6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X__  6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __X__  6.1.23 Check Neslab TCU for leaks.

 __X__  6.1.24 Check Neslab TCU temperature readout.

 __X__  6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __X__  6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X__  6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:  
6.40ww50 weekly pmSTRATA::FINNTue Jun 11 1996 21:3168
  DATE: 06-11-96    SYSTEM RTC CODE: CMP.A1    EQUIP. TECH:  A shift

 INITIAL

 __X__  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:_N/A____

 __X__  6.1.2  N2 pressure @ 80 PSI:    Pre-adjust: 84 psi

                                         Post-adjust:_N/A____

 __X__  6.1.3  DI Water pressure @ 36 PSI:   Actual Reading:  39 psi
  
 __X__  6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __X__  6.1.5  Check all tubing and fittings for leaks. 

 __X__  6.1.6  Check all tubing and fittings for air leaks.

 __X__  6.1.7  Check all indicator lights.

 __X__  6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __X__  6.1.9  Wipe down polish table, tub, and splash ring.

 __X__  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __X__  6.1.11 Wipe down pad conditioning arm.

 __X__  6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __X__  6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
     
 __X__  6.1.14 Wipe down outer surface of both spindle hubs.

 __X__  6.1.15 Remove and clean O-rings, replace if necessary.

 __X__  6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  __X__  6.1.17 Wipe down all surfaces of the robot.

 __X__  6.1.18 Clean end effector vacuum chuck air port.
   
 __X__  6.1.19 Inspect and clean end effector air nozzle.

 __N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X__  6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X__  6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __X__  6.1.23 Check Neslab TCU for leaks.

 __X__  6.1.24 Check Neslab TCU temperature readout.

 __X__  6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __X__  6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X__  6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.


COMMENTS:  Slurry pumps needed cal, water was added to chiller.
6.41WW 51 - Monthly versionSUBPAC::LANDRYTue Jun 18 1996 19:42153
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 6/18/96      SYSTEM RTC CODE: CMP.A1        EQUIP TECH:  A shift

 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___x___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___x___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:   +0.001   

 ___X___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: .001

                Left Spindle Runout:  <.001

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: <.001

                Left Spindle Hub Runout: <.0005

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:  1.03

                Right Spindle Force Error: -.31

                Left Spindle Calibration Variable: Dead Weight

                     Pre-adjust: _____   Post-adjust: 158.75

                Right Spindle Calibration Variable:

                     Pre-adjust: _____   Post-adjust: 157.95

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 24.02  Post-adjust: N/A

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: -15.1/15.0  Post-adjust: N/C
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 5.01   Post-adjust: 5.0

 ___X___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust: 9.8   Post-adjust: not adjustable, will see EE.

 ___X__ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.



           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 6/18/96     SYSTEM RTC CODE: CMP.A1      EQUIP TECH:  A shift

 INITIAL

 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___

                                         Post-adjust:________

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__85____

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  The Hub groumets were changed during this PM.
6.42Weekly PM doneSUBPAC::LANDRYSun Jun 23 1996 14:1270
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 6/23/96     SYSTEM RTC CODE: CMP.A1      EQUIP TECH:  A shift

 INITIAL

 ___x___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___

                                         Post-adjust:________

 ___x___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__85____

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38
  
 ___x___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___x___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  lowered calibration variable values by .05 on both slurry pumps
6.43WW#1 weekly completedFABSIX::B_FINNWed Jul 03 1996 20:2471
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 7/3/96     SYSTEM RTC CODE: CMP.A1      EQUIP TECH:  A shift

 INITIAL

 __X____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___

                                         Post-adjust:________

 __X____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__85____

                                         Post-adjust:________

 __X____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 38
  
 __X____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __X____ 6.1.5  Check all tubing and fittings for leaks. 

 __X____ 6.1.6  Check all tubing and fittings for air leaks.

 __X____ 6.1.7  Check all indicator lights.

 __X____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __X____ 6.1.9  Wipe down polish table, tub, and splash ring.

 __X____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __X____ 6.1.11 Wipe down pad conditioning arm.

 __X____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __X____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __X____ 6.1.14 Wipe down outer surface of both spindle hubs.

 __X____ 6.1.15 Remove and clean O-rings, replace if necessary.

 __X____ 6.1.16 Wipe down inside and outside of loaD/cleaning station buckets.

 __X____ 6.1.17 Wipe down all surfaces of the robot.

 __X____ 6.1.18 Clean end effector vacuum chuck air port.

 __X____ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __X____ 6.1.23 Check Neslab TCU for leaks.

 __X____ 6.1.24 Check Neslab TCU temperature readout.

 __X____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __X____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: Oil in drip pan - added water to chiller - lowered slurry 
           Pump #1 by 0.03
6.44CMP.A1 Shutdown ChecksheetFABSIX::L_SHKOLNIKOVThu Jul 04 1996 00:4540
                                                              
                    CMP.A1   shutdown CHECKSHEET
                    -----------------------------------


              Date 07.04.96               Tech. LS
                           

  1.  Change RTC status to SCHEDULED DOWN.             _n/a___

  2.  Remove all wafer carriers.  If possible
      keep them wet.  If not ensure that there
      are enough carriers with new films for
      startup.                                         __X___

  3.  Remove all wafer cassettes and drain Send
      and Receive DI Water tanks.                      __X___ 

  4.  Purge both slurry lines with DI Water.           __X___

  5.  Remove and discard all polishing pads.           __X___ 

  6.  Remove all PVA scrub brushes and submerge
      in DI water.                                     __X___

  7.  Perform a complete clean of each system
      to remove dried slurry.  Wipe down and dry
      all wet surfaces.                                __X___ 

  8.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing to UDR.          __X___

  9.  Power down   system.                             __X___ 

 10.  Power down vacuum pump cabinet.                  __X___

 11.  Power down Neslab TCU.                           __X___ 


6.45A1 START-UPFABSIX::L_SHKOLNIKOVSat Jul 06 1996 07:3835
                    CMP.A1 STARTUP CHECKSHEET
                    -------------------------              

                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are
      available and ready to use.                      __LS___     07-06-96

  2.  Power up each system.                            __LS___     07-06-96

  3.  Power up each vacuum pump cabinet.               __LS___     07-06-96

  4.  Power up each Neslab TCU.                        __LS___     07-06-96

  5.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing into the tool    __LS___     07-06-96

  6.  Place cassettes in left and right send
      and receive stations to fill DI Water
      tanks.                                           __LS___     07-06-96

  7.  Install new polishing pads.                      __LS___     07-06-96

  8.  Install wafer carriers.                          __LS___     07-06-96

  9.  Re-install PVA scrub brushes.                    __LS___     07-06-96

 10.  Place systems in wet idle mode.                  __LS___     07-06-96

 11.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for pad break-in & MQC.                          __LS___     07-06-96


6.46WW 2 / 1997 - WeeklySUBPAC::LANDRYSun Jul 07 1996 13:4671
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 7/7/96     SYSTEM RTC CODE: CMP.A1      EQUIP TECH: A shift / Jim S

 INITIAL

 __X____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___

                                         Post-adjust:________

 __X____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__85____

                                         Post-adjust:________

 __X____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 35
  
 __X____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __X____ 6.1.5  Check all tubing and fittings for leaks. 

 __X____ 6.1.6  Check all tubing and fittings for air leaks.

 __X____ 6.1.7  Check all indicator lights.

 __X____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __X____ 6.1.9  Wipe down polish table, tub, and splash ring.

 __X____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __X____ 6.1.11 Wipe down pad conditioning arm.

 __X____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __X____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __X____ 6.1.14 Wipe down outer surface of both spindle hubs.

 __X____ 6.1.15 Remove and clean O-rings, replace if necessary.

 __X____ 6.1.16 Wipe down inside and outside of loaD/cleaning station buckets.

 __X____ 6.1.17 Wipe down all surfaces of the robot.

 __X____ 6.1.18 Clean end effector vacuum chuck air port.

 __X____ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __X____ 6.1.23 Check Neslab TCU for leaks.

 __X____ 6.1.24 Check Neslab TCU temperature readout.

 __X____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __X____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:    Slurry Pump 1 variable lowered to .68
              Slurry Pump 2 variable lowered to .73
6.47WW03 Monthly PMFABSIX::R_POIRIERMon Jul 15 1996 06:41154
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 7/14/96      SYSTEM RTC CODE: CMP.A1        EQUIP TECH:  B shift

 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___x___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___x___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:   +0.001   

 ___X___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: <.001

                Left Spindle Runout:  <.001

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: <.001

                Left Spindle Hub Runout: <.002

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:  -0.65

                Right Spindle Force Error: 1.03

                Left Spindle Calibration Variable: Dead Weight

                     Pre-adjust: 158.75   Post-adjust: 159.32

                Right Spindle Calibration Variable:

                     Pre-adjust: 157.95  Post-adjust: 162.19

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 24.02  Post-adjust: N/A

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: -14.94/15.8  Post-adjust: N/C
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 5.00   Post-adjust: N/C

 ___X___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust: N/A  Post-adjust: N/A

 ___X__ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 7/14/96     SYSTEM RTC CODE: CMP.A1      EQUIP TECH: B Shift 

 INITIAL

 __X____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__98____

                                         Post-adjust:________

 __X____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__86____

                                         Post-adjust:________

 __X____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 37
  
 __X____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __X____ 6.1.5  Check all tubing and fittings for leaks. 

 __X____ 6.1.6  Check all tubing and fittings for air leaks.

 __X____ 6.1.7  Check all indicator lights.

 __X____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __X____ 6.1.9  Wipe down polish table, tub, and splash ring.

 __X____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __X____ 6.1.11 Wipe down pad conditioning arm.

 __X____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __X____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __X____ 6.1.14 Wipe down outer surface of both spindle hubs.

 __X____ 6.1.15 Remove and clean O-rings, replace if necessary.

 __X____ 6.1.16 Wipe down inside and outside of loaD/cleaning station buckets.

 __X____ 6.1.17 Wipe down all surfaces of the robot.

 __X____ 6.1.18 Clean end effector vacuum chuck air port.

 __X____ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __x____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                 necessary.

 __x____ 6.1.23 Check Neslab TCU for leaks.

 __X____ 6.1.24 Check Neslab TCU temperature readout.

 __X____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __X____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:    
              
6.48WEEKLY COMPLETED WW4STRATA::FINNSat Jul 27 1996 14:0771
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:7/27/96   SYSTEM RTC CODE:CMP.A1 	EQUIP. TECH.:BRAD/BRENDAN

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100_____

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__84______

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__40___
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X__ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: Added water to Neslab, CALIBRATED BOTH SLURRY PUMPS
6.49WW5 WEEKLY COMPLETESTRATA::WESTPHALThu Aug 01 1996 19:3173
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:7/27/96   SYSTEM RTC CODE:CMP.A1 	EQUIP. TECH.:BRAD/BRENDAN

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100_____

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__84______

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__37___
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X__ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: 


6.50ww6 weekly completedFABSIX::L_SHKOLNIKOVSat Aug 10 1996 08:0173
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:8/09/96   SYSTEM RTC CODE:CMP.A1 	EQUIP. TECH.: LEON

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:___100_____

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__86______

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__38___
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X__ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: 



6.51ww07 monthly p.m.FABSIX::R_GEEMon Aug 12 1996 06:30156
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 8/12/96      SYSTEM RTC CODE: CMP.A1        EQUIP TECH:  B shift

 INITIAL

 __x___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 __x___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 __x___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 __x___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:   +0.001   

 __x___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: <.002

                Left Spindle Runout:  <.001

 __x___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: <.001

                Left Spindle Hub Runout: <.002

 __x___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:   0.39

                Right Spindle Force Error:  0.03

                Left Spindle Calibration Variable: Dead Weight

                     Pre-adjust: 158.67    Post-adjust: 160.51

                Right Spindle Calibration Variable:

                     Pre-adjust: 162.19  Post-adjust: 162.19

 ___x___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___x___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___x___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___x___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 24.03  Post-adjust: N/A

 ___x___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: -15.01/+15.0  Post-adjust: N/C
 
 ___x___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 5.01   Post-adjust: N/C

 _n/a___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust: N/A  Post-adjust: N/A

 ___X___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 8/12/96     SYSTEM RTC CODE: CMP.A1      EQUIP TECH: B Shift 

 INITIAL

 __X____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__n/a____

                                         Post-adjust:________

 __X____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__n/a___

                                         Post-adjust:________

 __X____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 37
  
 __X____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __X____ 6.1.5  Check all tubing and fittings for leaks. 

 __X____ 6.1.6  Check all tubing and fittings for air leaks.

 __X____ 6.1.7  Check all indicator lights.

 __X____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __X____ 6.1.9  Wipe down polish table, tub, and splash ring.

 __X____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __X____ 6.1.11 Wipe down pad conditioning arm.

 __X____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __X____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __X____ 6.1.14 Wipe down outer surface of both spindle hubs.

 __X____ 6.1.15 Remove and clean O-rings, replace if necessary.

 __X____ 6.1.16 Wipe down inside and outside of loaD/cleaning station buckets.

 __X____ 6.1.17 Wipe down all surfaces of the robot.

 __X____ 6.1.18 Clean end effector vacuum chuck air port.

 __X____ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __X____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __x____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                 necessary.

 __x____ 6.1.23 Check Neslab TCU for leaks.

 __X____ 6.1.24 Check Neslab TCU temperature readout.

 __x___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __x____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: 
        added 1 pint of bridge oil.
    
    	adjusted the left spindle height to match the right.     
              
6.52ww08 weekly p.mFABSIX::L_SHKOLNIKOVThu Aug 22 1996 01:1373
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

 DATE:  8/22/96      SYSTEM RTC CODE:  CMP.A1      EQUIP TECH: D shift

 INITIAL

   _X_   6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  _100_    

                                         Post-adjust: N/A

   _X_   6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  _86_   

                                         Post-adjust: N/A

   _X_   6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__37__ 
  
   _X_   6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

   _X_   6.1.5  Check all tubing and fittings for leaks. 

   _X_   6.1.6  Check all tubing and fittings for air leaks.

   _X_   6.1.7  Check all indicator lights.

   _X_   6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

   _X_   6.1.9  Wipe down polish table, tub, and splash ring.

   _X_   6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

   _X_   6.1.11 Wipe down pad conditioning arm.

   _X_   6.1.12 Remove, rinse, and replace diamond conditioning disk.

   _X_   6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

   _X_  6.1.14 Wipe down outer surface of both spindle hubs.

   _X_   6.1.15 Remove and clean O-rings, replace if necessary.

   _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.

   _X_   6.1.17 Wipe down all surfaces of the robot.

   _X_   6.1.18 Clean end effector vacuum chuck air port.

   _X_   6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

   _X_   6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

   _X_   6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

   _X_   6.1.23 Check Neslab TCU for leaks.

   _X_   6.1.24 Check Neslab TCU temperature readout.

   _X_   6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

   _X_   6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

   _X_   6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  Replaced inner O-ring inside left hub.
                                                                


6.53WW IX - Weekly VersionSUBPAC::LANDRYSun Aug 25 1996 12:1373
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

 DATE:  8/25/96      SYSTEM RTC CODE:  CMP.A1      EQUIP TECH: A shift

 INITIAL

   _X_   6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  _100_    

                                         Post-adjust: N/A

   _X_   6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  _86_   

                                         Post-adjust: N/A

   _X_   6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__37__ 
  
   _X_   6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

   _X_   6.1.5  Check all tubing and fittings for leaks. 

   _X_   6.1.6  Check all tubing and fittings for air leaks.

   _X_   6.1.7  Check all indicator lights.

   _X_   6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

   _X_   6.1.9  Wipe down polish table, tub, and splash ring.

   _X_   6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

   _X_   6.1.11 Wipe down pad conditioning arm.

   _X_   6.1.12 Remove, rinse, and replace diamond conditioning disk.

   _X_   6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

   _X_   6.1.14 Wipe down outer surface of both spindle hubs.

   _X_   6.1.15 Remove and clean O-rings, replace if necessary.

   _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.

   _X_   6.1.17 Wipe down all surfaces of the robot.

   _X_   6.1.18 Clean end effector vacuum chuck air port.

   _X_   6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

   _X_   6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

   _X_   6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

   _X_   6.1.23 Check Neslab TCU for leaks.

   _X_   6.1.24 Check Neslab TCU temperature readout.

   _X_   6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

   _X_   6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

   _X_   6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  Adjusted Slurry pump #2's variable number from .8 to .727  
                                                                


6.54WW X - Weekly versionSUBPAC::LANDRYSun Sep 01 1996 13:1973
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

 DATE:  9/1/96      SYSTEM RTC CODE:  CMP.A1      EQUIP TECH: A shift

 INITIAL

   _X_   6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  _100_    

                                         Post-adjust: N/A

   _X_   6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  _86_   

                                         Post-adjust: N/A

   _X_   6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__38__ 
  
   _X_   6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

   _X_   6.1.5  Check all tubing and fittings for leaks. 

   _X_   6.1.6  Check all tubing and fittings for air leaks.

   _X_   6.1.7  Check all indicator lights.

   _X_   6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

   _X_   6.1.9  Wipe down polish table, tub, and splash ring.

   _X_   6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

   _X_   6.1.11 Wipe down pad conditioning arm.

   _X_   6.1.12 Remove, rinse, and replace diamond conditioning disk.

   _X_   6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

   _X_   6.1.14 Wipe down outer surface of both spindle hubs.

   _X_   6.1.15 Remove and clean O-rings, replace if necessary.

   _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.

   _X_   6.1.17 Wipe down all surfaces of the robot.

   _X_   6.1.18 Clean end effector vacuum chuck air port.

   _X_   6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

   _X_   6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

   _X_   6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

   _X_   6.1.23 Check Neslab TCU for leaks.

   _X_   6.1.24 Check Neslab TCU temperature readout.

   _X_   6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

   _X_   6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

   _X_   6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:    
                                                                


6.55CMP.A1 SHUTDOWN CHECKSHEETFABSIX::R_POIRIERMon Sep 02 1996 02:4936
                    CMP.A1 & CMP.A2 SHUTDOWN CHECKSHEET
                    -----------------------------------


                                                        Tech.       Date
                                                       -------     -------

  1.  Remove all wafer carriers.  If possible
      keep them wet.  If not ensure that there
      are enough carriers with new films for
      startup.                                         ___B___     _9/1/96_

  2.  Remove all wafer cassettes and drain Send
      and Receive DI Water tanks.                      ___B___     _9/1/96_

  3.  Purge both slurry lines with DI Water.           ___B___     _9/1/96_

  4.  Remove and discard all polishing pads.           ___B___     _9/1/96_

  5.  Remove all PVA scrub brushes and submerge
      in DI water.                                     ___B___     _9/1/96_

  6.  Perform a complete clean of each system
      to remove dried slurry.  Wipe down and dry
      all wet surfaces.                                ___B___     _9/1/96_

  7.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing to UDR.          ___B___     _9/1/96_

  8.  Power down each system.                          ___B___     _9/1/96_

  9.  Power down each vacuum pump cabinet.             ___B___     _9/1/96_

 10.  Power down each Neslab TCU.                      ___B___     _9/1/96_

 11.  Enter checksheet into notesfile.		       ___B___     _9/1/96_    
6.56startup checksheetSUBPAC::LANDRYTue Sep 03 1996 20:1035
                    CMP.A1 STARTUP CHECKSHEET
                    -------------------------              

                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are
      available and ready to use.                      ___A___     09-03-96

  2.  Power up each system.                            ___A___     09-03-96

  3.  Power up each vacuum pump cabinet.               ___A___     09-03-96

  4.  Power up each Neslab TCU.                        ___A___     09-03-96

  5.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing into the tool    ___A___     09-03-96

  6.  Place cassettes in left and right send
      and receive stations to fill DI Water
      tanks.                                           ___A___     09-03-96

  7.  Install new polishing pads.                      ___A___     09-03-96

  8.  Install wafer carriers.                          ___A___     09-03-96

  9.  Re-install PVA scrub brushes.                    ___A___     09-03-96

 10.  Place systems in wet idle mode.                  ___A___     09-03-96

 11.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for pad break-in & MQC.                          ___A___     09-03-96


6.57ww 11 weekly pmFABSIX::L_SHKOLNIKOVThu Sep 12 1996 01:3073
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

 DATE:  9/13/96      SYSTEM RTC CODE:  CMP.A1      EQUIP TECH: d shift

 INITIAL

   _x_   6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  _100_    

                                         Post-adjust: N/A

   _x_   6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  _85_   

                                         Post-adjust: N/A

   _x_   6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__36__ 
  
   _x_   6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

   _x_   6.1.5  Check all tubing and fittings for leaks. 

   _x_   6.1.6  Check all tubing and fittings for air leaks.

   _x_   6.1.7  Check all indicator lights.

   _x_   6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

   _x_   6.1.9  Wipe down polish table, tub, and splash ring.

   _x_   6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

   _x_   6.1.11 Wipe down pad conditioning arm.

   _x_   6.1.12 Remove, rinse, and replace diamond conditioning disk.

   _x_   6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

   _x_   6.1.14 Wipe down outer surface of both spindle hubs.

   _x_   6.1.15 Remove and clean O-rings, replace if necessary.

   _x_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.

   _x_   6.1.17 Wipe down all surfaces of the robot.

   _x_   6.1.18 Clean end effector vacuum chuck air port.

   _x_   6.1.19 Inspect and clean end effector air nozzle.

  _N/A_  6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

   _x_   6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

   _x_   6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

   _x_   6.1.23 Check Neslab TCU for leaks.

   _x_   6.1.24 Check Neslab TCU temperature readout.

   _x_   6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

   _x_   6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

   _x_   6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:    
                                                                


6.58WW12 Annual PMFABSIX::R_POIRIERTue Sep 17 1996 07:55217
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 09/16/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: A/B Shift

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:____100____

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___36____

                                         Post-adjust:__85____

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__38____
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: Calibrated both slurry pumps
	   Replaced Middle O-Ring on both spindles.

------------------------------------------------------------------------------

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 09/16/96 SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: A/B Shifts

 INITIAL

 ___X___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 ___X___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ___X___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 ___X___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout: 0.001"

 ___X___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: 0.001"

                Left Spindlele Runout: 0.0015"

 ___X___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: 0.001

                Left Spindle Hub Runout:  0.00075

 ___X___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: 1.07

                Right Spindle Force Error:1.08

                Left Spindle Calibration Variable:

                     Pre-adjust: 160.51  Post-adjust: 162.18

                Right Spindle Calibration Variable:

                     Pre-adjust: 162.19  Post-adjust: 162.62

 ___X___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 ___X___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 ___X___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ___X___ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:24.03 Post-adjust:24.03

 ___X___ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:15.00 Post-adjust:15.00
 
 ___X___ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:5.00  Post-adjust:5.00

 _N/A___ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 ___X____ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 ___X___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 ___X___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 ___X___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:___ADDED BRIDGE OIL
    
------------------------------------------------------------------------------
 
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semmi-annual Preventive Maintenance Check Sheet, REV. C

  DATE: 09/16/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: A/B Shift

 INITIAL

 ___X___ 6.3.1  Perform Weekly and Monthly PM's in addition to this Semi-Annual
                list.

 ___X___ 6.3.2  Check all safety interlocked doors for proper operation.  

 ___X___ 6.3.2  Check all EMO's for proper operation.

 ___X___ 6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.

 ___X___ 6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.

 ___X___ 6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

                                    -< CMP >-
--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Annual Preventive Maintenance Check Sheet, REV. C

  DATE: 09/16/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: A/B Shift

 INITIAL

 ___X___ 6.4.1  Perform Weekly, Monthly, and Semi-Annual PM's in  addition to
                this Annual list

 ___X___ 6.4.2  Perform Bridge Position calibration.

 ___X___ 6.4.3  Check Robot Position Alignment.  Calibrate if necessary.

 ___X___ 6.4.4  Check Robot Travel position.  Adjust if necessary.

 ___X___ 6.4.5  Check Robot Arm position.  Adjust if necessary.

 ___X___ 6.4.6  Check Elevator Height position.  Adjust if necessary.

 COMMENTS: Adjusted robot Arm theta and R postions

6.59WW XIII - WeeklySUBPAC::LANDRYMon Sep 23 1996 17:0382
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

 DATE:  9/23/96      SYSTEM RTC CODE:  CMP.A1      EQUIP TECH: A shift

 INITIAL

   _X_   6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  _100_    

                                         Post-adjust: N/A

   _X_   6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  _85_   

                                         Post-adjust: N/A

   _X_   6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__37__ 
  
   _X_   6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

   _X_   6.1.5  Check all tubing and fittings for leaks. 

   _X_   6.1.6  Check all tubing and fittings for air leaks.

   _X_   6.1.7  Check all indicator lights.

   _X_   6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

   _X_   6.1.9  Wipe down polish table, tub, and splash ring.

   _X_   6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

   _X_   6.1.11 Wipe down pad conditioning arm.

   _X_   6.1.12 Remove, rinse, and replace diamond conditioning disk.

   _X_   6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

   _X_   6.1.14 Wipe down outer surface of both spindle hubs.

   _X_   6.1.15 Remove and clean O-rings, replace if necessary.

   _X_   6.1.16 Wipe down inside and outside of load/cleaning station buckets.

   _X_   6.1.17 Wipe down all surfaces of the robot.

   _X_   6.1.18 Clean end effector vacuum chuck air port.

   _X_   6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

   _X_   6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

   _X_   6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

   _X_   6.1.23 Check Neslab TCU for leaks.

   _X_   6.1.24 Check Neslab TCU temperature readout.

   _X_   6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

   _X_   6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

   _X_   6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:   Found the temperature on the Neslab at 65 degrees C.  The set
             point pot was jumping around.  Cleaned up best as possible.
             Temp set point has stabilized.

             Found the SS slurry distribution tubes clogged.  Unclogged, 
             cleaned up dried slurry all around the polish table area and
             carrier/hubs, and then performed slurry cal.  No variable 
             adjustment necessary.

      	     Found the "dog_dish" not draining correctly.  Drain hose was 
             "humped" above the dish height.  Re-positioned
                                                                
      	     Cleaned conditioner disk, NOT CHANGED.  New disk installed 9/22
6.60ww14 weekly STRATA::RIDLONEliminate the obliviousSun Sep 29 1996 04:0273
    
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
    
  DATE:_9/29/96___   SYSTEM RTC CODE:__CMP.A1__   EQUIP. TECH.:  B Shift

 INITIAL

 ___X_____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100______

                                         Post-adjust:___100_____

 ___X_____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___84_____

                                         Post-adjust:__________

 ___X_____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:_38~42_____
  
 ___X_____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X_____ 6.1.5  Check all tubing and fittings for leaks. 

 ___X_____ 6.1.6  Check all tubing and fittings for air leaks.

 ___X_____ 6.1.7  Check all indicator lights.

 ___X_____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X____ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X____ 6.1.11 Wipe down pad conditioning arm.

 ___X____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X_____ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X_____ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X_____ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X_____ 6.1.17 Wipe down all surfaces of the robot.

 ___X_____ 6.1.18 Clean end effector vacuum chuck air port.

 ___X_____ 6.1.19 Inspect and clean end effector air nozzle.

 __NA_____ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X_____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X_____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X_____ 6.1.23 Check Neslab TCU for leaks.

 ___X_____ 6.1.24 Check Neslab TCU temperature readout.  (38 C)

 ___X_____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X_____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X_____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  
          
6.61ww15 weekly p.m. completedFABSIX::R_GEETue Oct 08 1996 20:0973
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
    
  DATE:_10/07/96___   SYSTEM RTC CODE:__CMP.A1__   EQUIP. TECH.:  A Shift

 INITIAL

 ___X____ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100______

                                         Post-adjust:________

 ___X____ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___86_____

                                         Post-adjust:__________

 ___X____ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___39_____
  
 ___X____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X____ 6.1.5  Check all tubing and fittings for leaks. 

 ___X____ 6.1.6  Check all tubing and fittings for air leaks.

 ___X____ 6.1.7  Check all indicator lights.

 ___X_____ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X____ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X____ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X____ 6.1.11 Wipe down pad conditioning arm.

 ___X____ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X____ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X____ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X____ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X____ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 ___X____ 6.1.17 Wipe down all surfaces of the robot.

 ___X____ 6.1.18 Clean end effector vacuum chuck air port.

 ___X____ 6.1.19 Inspect and clean end effector air nozzle.

 __NA_____ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ___X____ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ___X_____ 6.1.23 Check Neslab TCU for leaks.

 ___X_____ 6.1.24 Check Neslab TCU temperature readout.  (38 C)

 ___X____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: Calibrated the Fairchild regulators and spindle downforce due to
	   poor head to head removal.
          
6.62MONTHLY PM COMPLETED FOR WW16FABSIX::L_SHKOLNIKOVWed Oct 16 1996 08:04153
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 10/16/96    SYSTEM RTC CODE: CMP.A1      EQUIP. TECH.: D - shift

 INITIAL

 __x__   6.2.1  Perform weekly PM checks in addition to this monthly list.

 __x__   6.2.2  Replace the fluid lines on the peristaltic pumps.  

 __x__   6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 __x__   6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout: .002       

 __x____ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: .002

                Left Spindle   Runout: .002

 __x____ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: .001

                Left Spindle Hub Runout: .0005

 __x____ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: pre: -4.31  post: -.3

                Right Spindle Force Error: pre: -11.77 post: -.27

                Left Spindle Calibration Variable:

                     Pre-adjust: .98          Post-adjust: .96

                Right Spindle Calibration Variable:

                     Pre-adjust: .98          Post-adjust: .95

 __x____ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 __x__   6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 __x__   6.2.10 Check shuttle travel.  Adjust if necessary.

 __x__   6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 24.03         Post-adjust: 24.03      

 __x__   6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +15.0/-15.1   Post-adjust:+15.0/-15.1 
 
 __x__   6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 5.03          Post-adjust: 5.03       

 __x__   6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust: 9.91 AC       Post-adjust:____________

 __x__   6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 __x__   6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 __x__   6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 __x__   6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.


           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

 INITIAL

 __x__   6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100    

                                         Post-adjust:________

 __x__   6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 86     

                                         Post-adjust:________

 __x__   6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 36     
  
 __x____ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __x____ 6.1.5  Check all tubing and fittings for leaks. 

 __x____ 6.1.6  Check all tubing and fittings for air leaks.

 __x__   6.1.7  Check all indicator lights.

 __x__   6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __x__   6.1.9  Wipe down polish table, tub, and splash ring.

 __x__   6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __x__   6.1.11 Wipe down pad conditioning arm.

 __x__   6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __x__   6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __x____ 6.1.14 Wipe down outer surface of both spindle hubs.

 __x____ 6.1.15 Remove and clean O-rings, replace if necessary.

 __x____ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __x____ 6.1.17 Wipe down all surfaces of the robot.

 __x____ 6.1.18 Clean end effector vacuum chuck air port.

 __x____ 6.1.19 Inspect and clean end effector air nozzle.

 _n/a_   6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
                (p.o.u. filters no longer used on tool)

 __x__   6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __x____ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __x__   6.1.23 Check Neslab TCU for leaks.

 __x__   6.1.24 Check Neslab TCU temperature readout.

 __x____ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __x____ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __x____ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________
6.63ww17 weekly pm.FABSIX::L_SHKOLNIKOVFri Oct 25 1996 06:5571
        
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
    
  DATE: 10/23/96      SYSTEM RTC CODE:  CMP.A1     EQUIP. TECH.:  D Shift

 INITIAL

 _ls__    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100__

                                         Post-adjust:

 _ls__    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___86__

                                         Post-adjust:

 _ls__    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__37__
  
 _ls__    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                 contamination found.  

 _ls__    6.1.5  Check all tubing and fittings for leaks. 
       
 _ls__    6.1.6  Check all tubing and fittings for air leaks.

 _ls__    6.1.7  Check all indicator lights.

 _ls__    6.1.8  Check all stations/components for slurry, debris, or  
                 any contaminants.  Clean if necessary.  

 _ls__    6.1.9  Wipe down polish table, tub, and splash ring.

 _ls__    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 _ls__    6.1.11 Wipe down pad conditioning arm.

 _ls__    6.1.12 Remove, rinse, and replace diamond conditioning disk.

 _ls__    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 _ls__    6.1.14 Wipe down outer surface of both spindle hubs.

 _ls__    6.1.15 Remove and clean O-rings, replace if necessary.

 _ls__    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 _ls__    6.1.17 Wipe down all surfaces of the robot.

 _ls__    6.1.18 Clean end effector vacuum chuck air port.

 _ls__    6.1.19 Inspect and clean end effector air nozzle.

 _n/a_    6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
                         (no longer in use)
 _ls__    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _ls__    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 _ls__    6.1.23 Check Neslab TCU for leaks.

 _ls__    6.1.24 Check Neslab TCU temperature readout.  (38 C)

 _ls__    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 _ls__    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 _ls__    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: 
6.64WW XVIII - Weekly CompletedSUBPAC::LANDRYSun Oct 27 1996 18:5174
        
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C
    
  DATE: 10/27/96      SYSTEM RTC CODE:  CMP.A1     EQUIP. TECH.:  Landry

 INITIAL

 __X__    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100__

                                         Post-adjust:

 __X__    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___86__

                                         Post-adjust:

 __X__    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__36__
  
 __X__    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                 contamination found.  

 __X__    6.1.5  Check all tubing and fittings for leaks. 
       
 __X__    6.1.6  Check all tubing and fittings for air leaks.

 __X__    6.1.7  Check all indicator lights.

 __X__    6.1.8  Check all stations/components for slurry, debris, or  
                 any contaminants.  Clean if necessary.  

 __X__    6.1.9  Wipe down polish table, tub, and splash ring.

 __X__    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __X__    6.1.11 Wipe down pad conditioning arm.

 __X__    6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __X__    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __X__    6.1.14 Wipe down outer surface of both spindle hubs.

 __X__    6.1.15 Remove and clean O-rings, replace if necessary.

 __X__    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __X__    6.1.17 Wipe down all surfaces of the robot.

 __X__    6.1.18 Clean end effector vacuum chuck air port.

 __X__    6.1.19 Inspect and clean end effector air nozzle.

 _n/a_    6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
                         (no longer in use)
 __X__    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __X__    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __X__    6.1.23 Check Neslab TCU for leaks.

 __X__    6.1.24 Check Neslab TCU temperature readout.  (38 C)

 __X__    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __X__    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __X__    6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS: 6.1.20  N/A due to this filter is no longer utilized with this
           system.
    
    	   The system received a pad and both carriers change at this PM
6.65WW19 Weekly PMFABSIX::R_POIRIERSun Nov 03 1996 04:5876
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 11/03/96   SYSTEM RTC CODE: CMP.A1  EQUIP. TECH.: R_Poirier, M_Ridlon

 INITIAL

 ___X___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___

                                         Post-adjust:________

 ___X___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___84___

                                         Post-adjust:________

 ___X___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___38.5_
  
 ___X___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 ___X___ 6.1.5  Check all tubing and fittings for leaks. 

 ___X___ 6.1.6  Check all tubing and fittings for air leaks.

 ___X___ 6.1.7  Check all indicator lights.

 ___X___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ___X___ 6.1.9  Wipe down polish table, tub, and splash ring.

 ___X___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 ___X___ 6.1.11 Wipe down pad conditioning arm.

 ___X___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 ___X___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ___X___ 6.1.14 Wipe down outer surface of both spindle hubs.

 ___X___ 6.1.15 Remove and clean O-rings, replace if necessary.

 ___X___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ___X___ 6.1.17 Wipe down all surfaces of the robot.

 ___X___ 6.1.18 Clean end effector vacuum chuck air port.

 ___X___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
	(No point of use filters)

 ___X___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 ___X___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

     BOTH NEEDED CONSIDERABLE ADJUSTMENTS TO BRING IN FLOW.
     PUMP 1 FROM .89 TO .75 / PUMP 2 FROM .9 TO .74
	
 ___X___ 6.1.23 Check Neslab TCU for leaks.

 ___X___ 6.1.24 Check Neslab TCU temperature readout.

 ___X___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ___X___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ___X___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:_FOUND SOME OIL IN DRIP PAN, CLEANED IT UP.

6.66WW 20 - Monthly completedSUBPAC::LANDRYSun Nov 10 1996 13:39160
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:  11/10/96   SYSTEM RTC CODE:  CMP.A1   EQUIP. TECH.: Finn, Sadin, Landry

 INITIAL

BF/TL/JS 6.2.1  Perform weekly PM checks in addition to this monthly list.

 __JS___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 __JS___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 _BF/JS_ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:   .003"

 _BF/JS_ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:    0.0005"

                Left Spindlele Runout:   0.001"

 _BF/JS_ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: .001"

                Left Spindle Hub Runout:  .0015"

BF/TL/JS 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:   pre .96    post .99

                Right Spindle Force Error:  pre .95    post .99

                Left Spindle Calibration Variable:

                     Pre-adjust: 144.53     Post-adjust:  150.03

                Right Spindle Calibration Variable:

                     Pre-adjust: 141.94     Post-adjust:  149.68

 __JS___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 __JS___ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 __TL___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 _TL/JS_ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:  24.02   Post-adjust:  None

 _TL/JS_ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +15.01 / -15.00   Post-adjust:   None
 
 _TL/JS_ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:  5.00   Post-adjust:  None

 _TL/JS_ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:  +10.22   Post-adjust:  Can't be done

 __JS___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 __TL___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 __TL___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 __TL___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:  Added oil to the bridge resevoir


================================================================================


           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 11/10/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: Finn, Sadin, Landry

 INITIAL

 __TL___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100 PSI

                                         Post-adjust:  None

 __TL___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   86

                                         Post-adjust:  None

 __TL___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   37
  
 __TL___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __TL___ 6.1.5  Check all tubing and fittings for leaks. 

 __TL___ 6.1.6  Check all tubing and fittings for air leaks.

 __TL___ 6.1.7  Check all indicator lights.

 __JS___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __JS___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __JS___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __JS___ 6.1.11 Wipe down pad conditioning arm.

 __JS___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __JS___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __JS___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BF___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __TL___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __TL___ 6.1.17 Wipe down all surfaces of the robot.

 __TL___ 6.1.18 Clean end effector vacuum chuck air port.

 __TL___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __JS___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _BF/JS_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __TL___ 6.1.23 Check Neslab TCU for leaks.

 __TL___ 6.1.24 Check Neslab TCU temperature readout.

 __BF___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __BF___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __TL___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  6.1.20 N/A = No longer use the point of use filters

      *  Found chiller pressure set 4 lbs above acceptable limit.  Also, the
         temperature was reading 15 degrees C.  
6.67WW 21 - Weekly completedSUBPAC::LANDRYMon Nov 18 1996 19:1773
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 11/18/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: Finn, Gee, Landry

 INITIAL

 __TL___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100 PSI

                                         Post-adjust:  None

 __TL___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   86

                                         Post-adjust:  None

 __TL___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   39
  
 __TL___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __BF___ 6.1.5  Check all tubing and fittings for leaks. 

 __BF___ 6.1.6  Check all tubing and fittings for air leaks.

 __BF___ 6.1.7  Check all indicator lights.

 _BG/BF_ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __BG___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __BG___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __BG___ 6.1.11 Wipe down pad conditioning arm.

 __TL___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __TL___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __BF___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BF___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __TL___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __TL___ 6.1.17 Wipe down all surfaces of the robot.

 __TL___ 6.1.18 Clean end effector vacuum chuck air port.

 __TL___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __BF___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __BF___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __BG___ 6.1.23 Check Neslab TCU for leaks.

 __BG___ 6.1.24 Check Neslab TCU temperature readout.

 __BF___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __BF___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __TL___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  6.1.20 N/A = No longer use the point of use filters

            6.1.22  Slight adjustments made to the slurry variables on both
                    pumps.
6.68WW-22 WEEKLY PM COMPLETEDFABSIX::B_FINNSun Nov 24 1996 10:1672
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 11/24/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: Landry,Finn 

 INITIAL

 __BF___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100 PSI

                                         Post-adjust:  None

 __BF___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   86

                                         Post-adjust:  None

 __BF___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   38
  
 __TL___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __TL___ 6.1.5  Check all tubing and fittings for leaks. 

 __BF___ 6.1.6  Check all tubing and fittings for air leaks.

 __TL___ 6.1.7  Check all indicator lights.

 __TL___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __BF___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __BF___ 6.1.11 Wipe down pad conditioning arm.

 __BF___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __BF___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __TL___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __TL___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __TL___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __BF___ 6.1.17 Wipe down all surfaces of the robot.

 __BF___ 6.1.18 Clean end effector vacuum chuck air port.

 __BF___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __BF___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __TL___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __BF___ 6.1.23 Check Neslab TCU for leaks.

 __BF___ 6.1.24 Check Neslab TCU temperature readout.

 __TL___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __TL___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __BF___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  6.1.20 N/A = No longer use the point of use filters

     
6.69WW 23 - Weekly completedSUBPAC::LANDRYSun Dec 01 1996 18:3972
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 12/1/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: Landry/Finn/Gee 

 INITIAL

 __BG___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100 PSI

                                         Post-adjust:  None

 __BG___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   86

                                         Post-adjust:  None

 __BG___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   38
  
 __TL___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __TL___ 6.1.5  Check all tubing and fittings for leaks. 

 __TL___ 6.1.6  Check all tubing and fittings for air leaks.

 __TL___ 6.1.7  Check all indicator lights.

 __TL___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __BF___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __BF___ 6.1.11 Wipe down pad conditioning arm.

 __BF___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __BF___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __TL___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BG___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __BG___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __TL___ 6.1.17 Wipe down all surfaces of the robot.

 __TL___ 6.1.18 Clean end effector vacuum chuck air port.

 __TL___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __TL___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __TL___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __BF___ 6.1.23 Check Neslab TCU for leaks.

 __BF___ 6.1.24 Check Neslab TCU temperature readout.

 __BG___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __TL___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __BG___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:  6.1.20 N/A = No longer use the point of use filters

     
6.70WW24 WEEKLY FABSIX::M_RIDLONEliminate the obliviousTue Dec 10 1996 05:3872
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 12/10/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: Ridlon/Poirier

 INITIAL

 __RP___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100 PSI

                                         Post-adjust:  None

 __RP___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  None

 __RP___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   38
  
 __RP___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __RP___ 6.1.5  Check all tubing and fittings for leaks. 

 __RP___ 6.1.6  Check all tubing and fittings for air leaks.

 __RP___ 6.1.7  Check all indicator lights.

 __MR___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __MR___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __MR___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __MR___ 6.1.11 Wipe down pad conditioning arm.

 __MR___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __MR___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __MR___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __MR___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __RP___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __RP___ 6.1.17 Wipe down all surfaces of the robot.

 __RP___ 6.1.18 Clean end effector vacuum chuck air port.

 __RP___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __MR___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __MR___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __RP___ 6.1.23 Check Neslab TCU for leaks.

 __RP___ 6.1.24 Check Neslab TCU temperature readout.

 __RP___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __RP___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __RP___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                 elevator DI Water tanks.

 COMMENTS:  6.1.20 N/A = No longer use the point of use filters
            6.1.4  Found and cleaned small pool of oil in drip pan
     
6.71MONTHLY PM COMPLETED FOR WW25SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringFri Dec 20 1996 03:17163
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 12/20/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: BJ - JUBINVILLE
                                                          LS - SHKOLNIKOV
                                                          DW - WHITFORD

 INITIAL

         6.2.1  Perform weekly PM checks in addition to this monthly list.

 LS      6.2.2  Replace the fluid lines on the peristaltic pumps.  

 LS      6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 BJ      6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout: .002

 BJ      6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout: .001

                Left Spindle Runout: .001

 BJ      6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout: .0005

                Left Spindle Hub Runout: .002

 BJ/DW   6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: Pre: -3.11 Post: .14

                Right Spindle Force Error: Pre: 5.11 Post: .03

                Left Spindle Calibration Variable:

                     Pre-adjust: 150.03  Post-adjust: 154.15

                Right Spindle Calibration Variable:

                     Pre-adjust: 149.68  Post-adjust: 149.79

 BJ/LS   6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 BJ/LS   6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 BJ/LS   6.2.10 Check shuttle travel.  Adjust if necessary.

 DW      6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 24.2   Post-adjust:____________

 DW      6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: 15.1   Post-adjust:____________
 
 DW      6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust: 5.1   Post-adjust:____________

 DW      6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust: 10   Post-adjust:____________

 LS      6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 LS      6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 LS      6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 BJ      6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.


           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


 INITIAL

 LS      6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100 psi

                                         Post-adjust:________

 LS      6.1.2  N2 pressure @ 85 PSI:    Pre-adjust: 100 psi

                                         Post-adjust:________

 LS      6.1.3  DI Water pressure @ 40 PSI:   Actual Reading: 36 psi
  
 BJ      6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 LS      6.1.5  Check all tubing and fittings for leaks. 

 LS      6.1.6  Check all tubing and fittings for air leaks.

 LS      6.1.7  Check all indicator lights.

 LS      6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 LS      6.1.9  Wipe down polish table, tub, and splash ring.

 LS      6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 LS      6.1.11 Wipe down pad conditioning arm.

 LS      6.1.12 Remove, rinse, and replace diamond conditioning disk.

 LS      6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 BJ      6.1.14 Wipe down outer surface of both spindle hubs.

 BJ      6.1.15 Remove and clean O-rings, replace if necessary.

 BJ      6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 LS      6.1.17 Wipe down all surfaces of the robot.

 LS      6.1.18 Clean end effector vacuum chuck air port.

 LS      6.1.19 Inspect and clean end effector air nozzle.

  N/A    6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
         (Tool no longer uses p.o.u. filter)

 LS      6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 LS      6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 LS     6.1.23 Check Neslab TCU for leaks.

 LS     6.1.24 Check Neslab TCU temperature readout.

 LS     6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 LS     6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 LS     6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
6.72WW 26 - Weekly completedSUBPAC::LANDRYSun Dec 22 1996 10:4475
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 12/22/96   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: Gee/Landry

 INITIAL

 __XX___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100 PSI

                                         Post-adjust:  None

 __XX___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  None

 __xx___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   38
  
 __xx___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __xx___ 6.1.5  Check all tubing and fittings for leaks. 

 __xx___ 6.1.6  Check all tubing and fittings for air leaks.

 __xx___ 6.1.7  Check all indicator lights.

 __xx___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __xx___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __xx___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __xx___ 6.1.11 Wipe down pad conditioning arm.

 __xx___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __xx___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __xx___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __xx___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __xx___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __xx___ 6.1.17 Wipe down all surfaces of the robot.

 __xx___ 6.1.18 Clean end effector vacuum chuck air port.

 __xx___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __xx___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __xx___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __xx___ 6.1.23 Check Neslab TCU for leaks.

 __xx___ 6.1.24 Check Neslab TCU temperature readout.

 __xx___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __xx___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __xx___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                 elevator DI Water tanks.

 COMMENTS:  6.1.20 N/A = No longer use the point of use filters
            6.1.4  Found and cleaned small pool of oil in drip pan
     
      	    Replaced the pad and carriers.

      	    Replaced 1 right hub o-ring (inside).
6.73CMP.A1 shutdown checksheet completed.FABSIX::R_GEETue Dec 31 1996 15:2740
			

                    CMP.A1 & CMP.A2 SHUTDOWN CHECKSHEET	 Tech: _Tim Landry_
                    -----------------------------------        _Bob Gee____
							

                                                        Tech.       Date
                                                       -------     -------
  1.  Remove all wafer carriers.  Do not re-use.
      Ensure that there are a sufficient ammount
      of re-built carriers to support the startup.      ___X___     _12/31/96

  2.  Remove all wafer cassettes and drain Send
      and Receive DI Water tanks.                       ___X___     _12/31/96

  3.  Purge both slurry lines with DI Water.            ___X___     _12/31/96

  4.  Remove and discard all polishing pads.            ___X___     _12/31/96

  5.  Remove all PVA scrub brushes and submerge
      in a mixture of DI water and H2O2.                ___X___     _12/31/96

  6.  Perform a complete clean of each system
      to remove dried slurry.  Wipe down and dry
      all wet surfaces.                                 ___X___     _12/31/96

  7.  Rotate main incoming DI Water valves 180 deg.
      so that all DI water is flowing to UDR.           ___X___     _12/31/96

  8.  Disconnect incoming DI Water line and purge
      system DI Water lines with N2.  Re-connect
      DI Water line when finished.

  9.  Power down each system.                           ___X___     _12/31/96

 10.  Power down each vacuum pump cabinet.              ___X___     _12/31/96

 11.  Power down each Neslab TCU.                       ___X___     _12/31/96

 12.  Enter checksheet into CMP Notesfile.		___X___     _12/31/96
6.74WEEKLY PM COMPLETED FOR WW27SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Jan 02 1997 22:0776
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 1/2/97   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: 
                                                       Brian Jubinville (BJ)
                                                       Leon Shkolnikov (LS)
 INITIAL

 __BJ___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100 PSI

                                         Post-adjust:  None

 __BJ___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  None

 __BJ___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   40
  
 __BJ___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __BJ___ 6.1.5  Check all tubing and fittings for leaks. 

 __BJ___ 6.1.6  Check all tubing and fittings for air leaks.

 __BJ___ 6.1.7  Check all indicator lights.

 __BJ___ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __BJ___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __BJ___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __BJ___ 6.1.11 Wipe down pad conditioning arm.

 __BJ___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __BJ___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __BJ___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BJ___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __BJ___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __LS___ 6.1.17 Wipe down all surfaces of the robot.

 __LS___ 6.1.18 Clean end effector vacuum chuck air port.

 __BJ___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 _N/A___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __BJ___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __BJ___ 6.1.23 Check Neslab TCU for leaks.

 __BJ___ 6.1.24 Check Neslab TCU temperature readout.

 __LS___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __LS___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __BJ___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                 elevator DI Water tanks.

 COMMENTS:  6.1.20 N/A = No longer use the point of use filters
            6.1.21 N/A = No longer uses compression fittings
     
      	    Replaced the pad.

      	   
6.75weekly ww28FABSIX::M_RIDLONEliminate the obliviousMon Jan 06 1997 04:1277
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:1/6/97    SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.:MITCH RIDLON
                                                        ALBERT QUILLEN
 INITIAL

 _MR,AQ_ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___

                                         Post-adjust:_100____

 _MR,AQ_ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:___83___

                                         Post-adjust:__84____

 _MR,AQ_ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:___36___
  
 _MR,AQ_ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _MR,AQ_ 6.1.5  Check all tubing and fittings for leaks. 

 _MR,AQ_ 6.1.6  Check all tubing and fittings for air leaks.

 _MR,AQ_ 6.1.7  Check all indicator lights.

 _MR,AQ_ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 _MR,AQ_ 6.1.9  Wipe down polish table, tub, and splash ring.

 _MR,AQ_ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 _MR,AQ_ 6.1.11 Wipe down pad conditioning arm.

 _MR,AQ_ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 _MR,AQ_ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 _MR,AQ_ 6.1.14 Wipe down outer surface of both spindle hubs.

 _MR,AQ_ 6.1.15 Remove and clean O-rings, replace if necessary.

 _MR,AQ_ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 _MR,AQ_ 6.1.17 Wipe down all surfaces of the robot.

 _MR,AQ_ 6.1.18 Clean end effector vacuum chuck air port.

 _MR,AQ_ 6.1.19 Inspect and clean end effector air nozzle.

 __NA___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 _MR,AQ_ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _MR,AQ_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 _MR,AQ_ 6.1.23 Check Neslab TCU for leaks.

 _MR,AQ_ 6.1.24 Check Neslab TCU temperature readout.

 _MR,AQ_ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.


 _MR,AQ_ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 _MR,AQ_ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

6.1.2  Highest N2 pressure attainable was 84psi.
6.1.3  Highest DI water pressure attainable was 36psi.
6.1.20 Point of use slurry filters no longer used.

Engineer notified.
6.76ww29 monthly completedFABSIX::B_FINNTue Jan 14 1997 15:08177
    
        
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 1-14-97 SYSTEM RTC CODE: CMP.A1  EQUIP. TECH: James Sadin  (JS)
                                                     Brendan Finn (BF)
                                                     Timothy Landry (TL)
                                                     Bob Gee     (BG)
 INITIAL

 __JS___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 __TL__ 6.2.2   Replace the fluid lines on the peristaltic pumps.  

 __BF__ 6.2.3   Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

JS/BF/TL 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:___.002______

JS/BF/TL 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:____.001______

                Left Spindle Runout:______.001______

JS/BF/TL 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:_pre.001_ post.001______

                Left Spindle Hub Runout:__pre.001- post.001_______

 _TL/BG_ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:    +.25

                Right Spindle Force Error:   +1.9

                Left Spindle Calibration Variable:

                     Pre-adjust:   153.56      Post-adjust:   150.02

                Right Spindle Calibration Variable:

                     Pre-adjust:   149.43      Post-adjust:   147.88

 __BG__ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 __BG__ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 __BG__ 6.2.10 Check shuttle travel.  Adjust if necessary.

 _TL/JS_ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:___24.00_____   Post-adjust:___NONE_________

 __TL__ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +15.00/-15.00   Post-adjust:___NONE______
 
 _TL/JS_ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:___5.09_____   Post-adjust:___5.00____

 _TL/BF_ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:___9.9___   Post-adjust:__none available____

 __BG__  6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 __TL__  6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 _TL/BF_ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 __BF__  6.2.21 Check the system vacuum cabinet for any loose fittings or
                connections.

COMMENTS:    6.2.19 Added softwater to the Neslab TCU
	            Engineer notified.

	     6.2.16 Five volt supply found to be 5.09 adjusted to 5.0 
                    volts. Engineer Notified.

	     6.2.17 Twelve volt supply found at 9.9 volts, no adjustment 
                    available.  Engineer Notified.

================================================================================

  
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE: 1-14-97   SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.:Tim Landry   (TL)
                                                         Jim Sadin    (JS)
                                                         Bob Gee      (BG)
                                                         Brendan Finn (BF)

 INITIAL

 __BF___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100 PSI

                                         Post-adjust:  None

 __BF___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85 PSI

                                         Post-adjust:  85 PSI

 __BF___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  37 PSI
  
 _BF/TL___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __TL___ 6.1.5  Check all tubing and fittings for leaks. 

 __BF___ 6.1.6  Check all tubing and fittings for air leaks.

 __BG__  6.1.7  Check all indicator lights.

TL_BG_BF 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __JS___ 6.1.9  Wipe down polish table, tub, and splash ring.

 _TL/BF_ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __JS___ 6.1.11 Wipe down pad conditioning arm.

 __JS___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __JS___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __BF___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BF___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __BG___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __BF___ 6.1.17 Wipe down all surfaces of the robot.

 __BF___ 6.1.18 Clean end effector vacuum chuck air port.

 __BF___ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.
         	NOTE: No point of use filters.

 __TL___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.
      		
 _BF/TL_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __BG___ 6.1.23 Check Neslab TCU for leaks.

 __BG___ 6.1.24 Check Neslab TCU temperature readout.

 __BG___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __BG___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __BG___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:   6.1.20  The system no longer utilizes said filter.  Equip Eng has
                     been notified.

      	     6.1.3   Water supply is at 37 PSI, spec called for 40 psi.  
                     Could not increase. Equip Eng has been notified.

	     
6.77WW XXX - Weekly completedSUBPAC::LANDRYSun Jan 19 1997 19:3375
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:1/19/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  Tim Landry   (TL)
                                                         Brendan Finn (BF)
                                                         Jim Sadin    (JS)
 INITIAL

 __JS___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __JS___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   82

                                         Post-adjust:  85

 __JS___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   38
  
 __BF___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __TL___ 6.1.5  Check all tubing and fittings for leaks. 

 __TL___ 6.1.6  Check all tubing and fittings for air leaks.

 __JS___ 6.1.7  Check all indicator lights.

 JS/TL/BF 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __TL___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __BF___ 6.1.11 Wipe down pad conditioning arm.

 __TL___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __TL___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __BF___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BF___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __JS___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __BF___ 6.1.17 Wipe down all surfaces of the robot.

 __BF___ 6.1.18 Clean end effector vacuum chuck air port.

 __BF___ 6.1.19 Inspect and clean end effector air nozzle.

 __NA___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __TL___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __TL___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __BF___ 6.1.23 Check Neslab TCU for leaks.

 __BF___ 6.1.24 Check Neslab TCU temperature readout.

 __JS___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.


 __JS___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __BF___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

6.1.3  System unable to reach 40 PSI, Equip Eng notified
6.1.20 Point of use slurry filters no longer used, Equip Eng notified
6.78ww 31 weekly p.m. completedFABSIX::R_GEESun Jan 26 1997 15:2975
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:1/26/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  Tim Landry   (TL)
                                                         Brendan Finn (BF)
                                                         Jim Sadin    (JS)
 INITIAL						 Bob Gee      (BG)

 __BG___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __BG___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   80

                                         Post-adjust:  85

 __BG___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   36
  
 __BF___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __TL___ 6.1.5  Check all tubing and fittings for leaks. 

 __TL___ 6.1.6  Check all tubing and fittings for air leaks.

 __JS___ 6.1.7  Check all indicator lights.

 JS/TL/BF/BG 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __TL___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __TL___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __BF___ 6.1.11 Wipe down pad conditioning arm.

 __TL___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __BG___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __BF___ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BG___ 6.1.15 Remove and clean O-rings, replace if necessary.

 __JS___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __BG___ 6.1.17 Wipe down all surfaces of the robot.

 __BG___ 6.1.18 Clean end effector vacuum chuck air port.

 __BG___ 6.1.19 Inspect and clean end effector air nozzle.

 __NA___ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __TL___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __TL___ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __BF___ 6.1.23 Check Neslab TCU for leaks.

 __BF___ 6.1.24 Check Neslab TCU temperature readout.

 __BG___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.


 __BG___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __BG___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

6.1.3  System unable to reach 40 PSI, Equip Eng notified
6.1.20 Point of use slurry filters no longer used, Equip Eng notified
6.79WW32 Weekly PM completedFABSIX::R_POIRIERTue Feb 04 1997 02:5876
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:2/03/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  Mitch Ridlon (MR)
                                                         Roger Poirier (RP)

 INITIAL						 

 __RP__ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __RP__ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  85

 __RP__ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   38
  
 __RP__ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __RP__ 6.1.5  Check all tubing and fittings for leaks. 

 __RP__ 6.1.6  Check all tubing and fittings for air leaks.

 __RP__ 6.1.7  Check all indicator lights.

 __RP__ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __RP__ 6.1.9  Wipe down polish table, tub, and splash ring.

 __RP__ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __RP__ 6.1.11 Wipe down pad conditioning arm.

 __RP__ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __RP__ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __RP__ 6.1.14 Wipe down outer surface of both spindle hubs.

 __RP__ 6.1.15 Remove and clean O-rings, replace if necessary.

 __RP__ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __RP__ 6.1.17 Wipe down all surfaces of the robot.

 __RP__ 6.1.18 Clean end effector vacuum chuck air port.

 __RP__ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __RP__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __RP__ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __RP__ 6.1.23 Check Neslab TCU for leaks.

 __RP__ 6.1.24 Check Neslab TCU temperature readout.

 __RP__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.


 __RP__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __RP__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

6.1.3  System unable to reach 40 PSI, Equip Eng notified
6.1.20 Point of use slurry filters no longer used, Equip Eng notified
6.80WW 33 - Weekly completedSUBPAC::LANDRYSun Feb 09 1997 16:1676
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:2/09/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  Tim Landry    (TL)
                                                         Brendan Finn  (BF)
                                                         Jim Sadin     (JS)

 INITIAL						 

 __TL__ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __TL__ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  85

 __TL__ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   36
  
 __JS__ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __BF__ 6.1.5  Check all tubing and fittings for leaks. 

 __BF__ 6.1.6  Check all tubing and fittings for air leaks.

 _JS/BF_6.1.7  Check all indicator lights.

TL/JS/BF 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __TL__ 6.1.9  Wipe down polish table, tub, and splash ring.

 __JS__ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __JS__ 6.1.11 Wipe down pad conditioning arm.

 __JS__ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __BF__ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __BF__ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BF__ 6.1.15 Remove and clean O-rings, replace if necessary.

 __BF__ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __TL__ 6.1.17 Wipe down all surfaces of the robot.

 __TL__ 6.1.18 Clean end effector vacuum chuck air port.

 __TL__ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __JS__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __JS__ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __TL__ 6.1.23 Check Neslab TCU for leaks.

 __TL__ 6.1.24 Check Neslab TCU temperature readout.

 _TL/BF_ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.


 _TL/BF_ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __BF__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

6.1.3  System unable to reach 40 PSI (36 at PM), Equip Eng notified
6.1.20 Point of use slurry filters no longer used, Equip Eng notified
6.80MONTHLY PM COMPLETED FOR WW33SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Feb 13 1997 23:26167
        
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 2-13-97 SYSTEM RTC CODE: CMP.A1  EQUIP. TECH: James Sadin  (JS)
                                                     Brendan Finn (BF)
                                                     Timothy Landry (TL)
                                                     Brian Jubinville (BJ)
 INITIAL                                             Jim Tooker (JT)

JS/BF/TL 6.2.1  Perform weekly PM checks in addition to this monthly list.

 __BJ__ 6.2.2   Replace the fluid lines on the peristaltic pumps.  

 __BF__ 6.2.3   Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 __TL__ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:___.002_____

 __BF__ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:___.001_______

                Left Spindle Runout:_____.001_______

 __JS__ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:____.001______

                Left Spindle Hub Runout:_____.001______

 _BJ/JT_ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: < 3   

                Right Spindle Force Error: < 3  

                Left Spindle Calibration Variable:

                     Pre-adjust: 148.65   Post-adjust: 148.65  

                Right Spindle Calibration Variable:

                     Pre-adjust: 141.85   Post-adjust: 141.85 

 __JS___ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 __JS____ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 __BF____ 6.2.10 Check shuttle travel.  Adjust if necessary.

 __TL__ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:___24.02_____   Post-adjust:___NONE_________

 __TL__ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +15.01/-15.01   Post-adjust:___NONE______
 
 __TL__ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:___5.00_____   Post-adjust:___5.00____

 __TL__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:___9.9___   Post-adjust:__none available____

 __BF__  6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 __TL__  6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 __BF__ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 __BF__  6.2.21 Check the system vacuum cabinet for any loose fittings or
                connections.

COMMENTS:    6.2.17 Twelve volt power supply is not equipped with adjust-
                    ment capabilities.  Read is taken for a reference only.

             6.1.18  The Glycol solution was emptied and a new batch was 
                     installed

================================================================================

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:2/09/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  Tim Landry    (TL)
                                                         Brendan Finn  (BF)
                                                         Jim Sadin     (JS)

 INITIAL						 

 __TL__ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __TL__ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  85

 __TL__ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   36
  
 __JS__ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __BF__ 6.1.5  Check all tubing and fittings for leaks. 

 __BF__ 6.1.6  Check all tubing and fittings for air leaks.

 _JS/BF_6.1.7  Check all indicator lights.

TL/JS/BF 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __TL__ 6.1.9  Wipe down polish table, tub, and splash ring.

 __JS__ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __JS__ 6.1.11 Wipe down pad conditioning arm.

 __JS__ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __BF__ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __BF__ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BF__ 6.1.15 Remove and clean O-rings, replace if necessary.

 __BF__ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __TL__ 6.1.17 Wipe down all surfaces of the robot.

 __TL__ 6.1.18 Clean end effector vacuum chuck air port.

 __TL__ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __JS__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __JS__ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __TL__ 6.1.23 Check Neslab TCU for leaks.

 __TL__ 6.1.24 Check Neslab TCU temperature readout.

 _TL/BF_ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.


 _TL/BF_ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __BF__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

6.1.20 Point of use slurry filters no longer used, Equip Eng notified
6.81WW33 weekly pm completed.FABSIX::J_SADINFreedom isn&#039;t free.Sun Feb 16 1997 19:4276
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:2/16/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH: Brendan Finn (BF) 
                                                        Tim Landry   (TL)
                                                        Jim Sadin    (JS)
 INITIAL						 

 __BF__ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __BF__ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  85

 __JS__ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   38
  
 __JS__ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __BF__ 6.1.5  Check all tubing and fittings for leaks. 

 __BF__ 6.1.6  Check all tubing and fittings for air leaks.

 __TL/JS__ 6.1.7  Check all indicator lights.

 __TL__ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __TL__ 6.1.9  Wipe down polish table, tub, and splash ring.

 __BF__ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __JS__ 6.1.11 Wipe down pad conditioning arm.

 __TL__ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __TL__ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __TL__ 6.1.14 Wipe down outer surface of both spindle hubs.

 __JS__ 6.1.15 Remove and clean O-rings, replace if necessary.

 __BF__ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __BF__ 6.1.17 Wipe down all surfaces of the robot.

 __JS__ 6.1.18 Clean end effector vacuum chuck air port.

 __JS__ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __TL__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 __BF__ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __JS__ 6.1.23 Check Neslab TCU for leaks.

 __JS__ 6.1.24 Check Neslab TCU temperature readout.

 __TL__ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.


 __BF__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __BF__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

6.1.3  System unable to reach 40 PSI, Equip Eng notified
6.1.20 Point of use slurry filters no longer used, Equip Eng notified
6.82WW35 WEEKLY PMFABSIX::R_POIRIERSun Feb 23 1997 06:5477
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:2/23/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  Mitch Ridlon (MR)
                                                         Roger Poirier (RP)
							 Albert Quillen (AQ)

 INITIAL						 

 __RP_ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __RP_ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  85

 __RP_ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   36
  

 __MR_ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  
 MR/RP 6.1.5  Check all tubing and fittings for leaks. 

 MR/RP 6.1.6  Check all tubing and fittings for air leaks.

 MR/RP 6.1.7  Check all indicator lights.

 AQ/RP/MR 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __MR_ 6.1.9  Wipe down polish table, tub, and splash ring.

 __MR_ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __MR_ 6.1.11 Wipe down pad conditioning arm.

 __MR_ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __MR_ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __MR_ 6.1.14 Wipe down outer surface of both spindle hubs.

 __MR_ 6.1.15 Remove and clean O-rings, replace if necessary.

 MR/AQ 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

 __MR_ 6.1.17 Wipe down all surfaces of the robot.

 __MR_ 6.1.18 Clean end effector vacuum chuck air port.

 __MR_ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __RP_ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 AQ/RP/MR 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __RP_ 6.1.23 Check Neslab TCU for leaks.

 __RP_ 6.1.24 Check Neslab TCU temperature readout.

 __MR_ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __MR_ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __RP_ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

6.1.3  System unable to reach 40 PSI, Equip Eng notified
6.1.20 Point of use slurry filters no longer used, Equip Eng notified

6.83WW36 WEEKLY PM CHECKSHEETASDG::POIRIERWed Mar 05 1997 18:4778
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


  DATE:4/5/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  John Poirier - JP
                                                        John Swenson - JS	
		

 INITIAL						 

  JS    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                        Post-adjust: 100

  JS    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                        Post-adjust:  85

  JS  * 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  35 PSI

  JP    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  JP    6.1.5  Check all tubing and fittings for leaks. 

  JP    6.1.6  Check all tubing and fittings for air leaks.

  JP    6.1.7  Check all indicator lights.

  JS    6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

  JS    6.1.9  Wipe down polish table, tub, and splash ring.

  JS    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  JP    6.1.11 Wipe down pad conditioning arm.

  JP    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  JP    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

  JP    6.1.14 Wipe down outer surface of both spindle hubs.

  JS    6.1.15 Remove and clean O-rings, replace if necessary.

  JS    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  JS    6.1.17 Wipe down all surfaces of the robot.

  JS    6.1.18 Clean end effector vacuum chuck air port.

  JS    6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  JP    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  JP/JS 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

  JP    6.1.23 Check Neslab TCU for leaks.

  JP    6.1.24 Check Neslab TCU temperature readout.

  JP    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  JP    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  JP    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  *     6.1.3  System unable to reach 40 PSI, Equip Eng notified.

  N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.

6.84ww37 weekly p.m. completedFABSIX::R_GEESun Mar 09 1997 19:2575
  DATE:4/9/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  Bob Gee - BG
                                                        	
		

 INITIAL						 

  BG    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                        Post-adjust: 100

  BG    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                        Post-adjust:  85

  BG  * 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  35 PSI

  BG    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  BG    6.1.5  Check all tubing and fittings for leaks. 

  BG    6.1.6  Check all tubing and fittings for air leaks.

  BG    6.1.7  Check all indicator lights.

  BG    6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

  BG    6.1.9  Wipe down polish table, tub, and splash ring.

  BG    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  BG    6.1.11 Wipe down pad conditioning arm.

  BG    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  BG    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

  BG    6.1.14 Wipe down outer surface of both spindle hubs.

  BG    6.1.15 Remove and clean O-rings, replace if necessary.

  BG    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  BG    6.1.17 Wipe down all surfaces of the robot.

  BG    6.1.18 Clean end effector vacuum chuck air port.

  BG    6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  BG    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  BG    6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

  BG    6.1.23 Check Neslab TCU for leaks.

  BG    6.1.24 Check Neslab TCU temperature readout.

  BG    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  BG    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  BG    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  *     6.1.3  System unable to reach 40 PSI, Equip Eng notified.

  N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.

  
6.85WW38 SEMI-ANNUAL PM COMPLETEDFABSIX::R_POIRIERTue Mar 18 1997 06:56217
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

DATE: 03-17-97  SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  BRENDAN FINN (BF)
                                                       BOB GEE      (BG)
                                                       TIM LANDRY   (TL)     
                                                       JAMES SADIN  (JS)
                                                       MITCH RIDLON (MR)
                                                       AL QUILLEN   (AQ)
                                                       ROGER POIRIER (RP)
                                                        
 INITIAL

 __JS___ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:__100___

                                         Post-adjust:_100____

 __JS___ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:__80____

                                         Post-adjust:_80*_____

 __JS___ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__36*___
  
 __AQ___ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __BF___ 6.1.5  Check all tubing and fittings for leaks. 

 __BG___ 6.1.6  Check all tubing and fittings for air leaks.

 __BF___ 6.1.7  Check all indicator lights.

 __MR____6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __AQ___ 6.1.9  Wipe down polish table, tub, and splash ring.

 __AQ___ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 __AQ___ 6.1.11 Wipe down pad conditioning arm.

 __AQ___ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __AQ___ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __BG___ 6.1.14 Wipe down outer surface of both spindle hubs.

 _BG/BF_ 6.1.15 Remove and clean O-rings, replace if necessary.

 __AQ___ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __AQ___ 6.1.17 Wipe down all surfaces of the robot.

 __AQ___ 6.1.18 Clean end effector vacuum chuck air port.

 __AQ___ 6.1.19 Inspect and clean end effector air nozzle.

 __N/A__ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __JS___ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _JS/TL_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __JS___ 6.1.23 Check Neslab TCU for leaks.

 __JS___ 6.1.24 Check Neslab TCU temperature readout.

 __TL___ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 __TL___ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __MR___ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 _________6.1.3 MAX AT 36, CAN'T GET 40._(ENG INFORMED)_____________________

 _________6.1.2 MAX AT 80, CAN'T GET 85._(ENG INFORMED)_____________________

 _________6.1.20 SYSTEM HAS NO POINT OF USE SLURRY FILTERS(ENG INFORMED)

 ___________________________________________________________________________

--------------------------------------------------------------------------------
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

DATE: 03-17-97  SYSTEM RTC CODE: CMP.A1   EQUIP TECH: BRENDAN FINN  (BF)
                                                      BOB GEE       (BG)
                                                      TIM LANDRY    (TL)
                                                      JAMES SADIN   (JS)
                                                      MITCH RIDLON  (MR)
                                                      AL QUILLEN    (AQ)
                                                      ROGER POIRIER (RP)
 INITIAL

 __RP___ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 __JS___ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 __BG___ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 __BF___ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:___.001"____

 __BF___ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:___0.025 ADJUSTED TO .001"__

                Left Spindlele Runout:__.001"_____

 __BF___ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:___.001"____

                Left Spindle Hub Runout:_____.001"__

 __RP___ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:____-0.18___

                Right Spindle Force Error:___-0.22____

                Left Spindle Calibration Variable:

                     Pre-adjust:___.99______  Post-adjust:___1.00_____

                Right Spindle Calibration Variable:

                     Pre-adjust:___.99 _____  Post-adjust:___1.00_____

 _AQ/RP_ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 _AQ/RP_ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 __RP___ 6.2.10 Check shuttle travel.  Adjust if necessary.

 _TL/JS_ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:__24.03V____   Post-adjust:___24.03V___

 _TL/JS_ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +15V/-15.01V Post-adjust:  +15V/-15.01V
 
 _TL/JS_ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:___4.99V____   Post-adjust:____4.99V___

 _TL/JS_ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____9.91ACV         POST-AJDUST:____9.91V*__

 __BG___ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 __BG___ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 __BG___ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 __BF___ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 __________6.2.17 - NON ADJUSTABLE - REFERENCE READING ONLY_________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
    
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semmi-annual Preventive Maintenance Check Sheet, REV. C

DATE: 03-17-97   SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  BRENDAN FINN  (BF)
                                                        JAMES SADIN   (JS)
							ROGER POIRIER (RP)
 INITIAL

 __RP___ 6.3.1  Perform Weekly and Monthly PM's in addition to this Semi-Annual
                list.

 __MR___ 6.3.2  Check all safety interlocked doors for proper operation.  

 __MR___ 6.3.2  Check all EMO's for proper operation.

 _BF/JS_ 6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.

 _BF/JS_ 6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.

 _BF/JS_ 6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.

 COMMENTS:__________________________________________________________________

 ___________LEFT ROTARY UNION FOUND TO BE BAD. REPLACED. ___________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
6.86WW39 weekly pm completedFABSIX::J_SADINFreedom isn&#039;t free.Mon Mar 24 1997 09:2980
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


  DATE:03/24/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  BRENDAN FINN
                                                          JAMES SADIN
                                                          TIMOTHY LANDRY
                                                          BOB GEE


 INITIAL						 

  JS    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                        Post-adjust: 100

  JS    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                        Post-adjust:  85

  JS  * 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  37 PSI

  TL    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  BG    6.1.5  Check all tubing and fittings for leaks. 

  BG    6.1.6  Check all tubing and fittings for air leaks.

  BF    6.1.7  Check all indicator lights.

  BF    6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

  JS    6.1.9  Wipe down polish table, tub, and splash ring.

  JS    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  JS    6.1.11 Wipe down pad conditioning arm.

  BF    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  JS    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

  TL    6.1.14 Wipe down outer surface of both spindle hubs.

  TL    6.1.15 Remove and clean O-rings, replace if necessary.

  BF    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  BG    6.1.17 Wipe down all surfaces of the robot.

  BG    6.1.18 Clean end effector vacuum chuck air port.

  BG    6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  JS    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  TL/JS 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

  JS    6.1.23 Check Neslab TCU for leaks.

  JS    6.1.24 Check Neslab TCU temperature readout.

  TL    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  TL    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  BF    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  *     6.1.3  System unable to reach 40 PSI, Equip Eng notified.

  N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.

6.87WW40 weekly pm completedFABSIX::J_SADINFreedom isn&#039;t free.Sun Mar 30 1997 11:5879
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


  DATE:03/30/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  BRENDAN FINN
                                                          JAMES SADIN
                                                          TIMOTHY LANDRY


 INITIAL						 

  JS    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                        Post-adjust: 100

  JS    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                        Post-adjust:  85

  JS  * 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  37 PSI

  TL    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  TL    6.1.5  Check all tubing and fittings for leaks. 

  BF    6.1.6  Check all tubing and fittings for air leaks.

  BF    6.1.7  Check all indicator lights.

  BF    6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

  JS    6.1.9  Wipe down polish table, tub, and splash ring.

  JS    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  JS    6.1.11 Wipe down pad conditioning arm.

  BF    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  JS    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

  TL    6.1.14 Wipe down outer surface of both spindle hubs.

  TL    6.1.15 Remove and clean O-rings, replace if necessary.

  BF    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  JS    6.1.17 Wipe down all surfaces of the robot.

  JS    6.1.18 Clean end effector vacuum chuck air port.

  JS    6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  JS    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  TL/JS 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

  BF    6.1.23 Check Neslab TCU for leaks.

  BF    6.1.24 Check Neslab TCU temperature readout.

  TL    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  TL    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  BF    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  *     6.1.3  System unable to reach 40 PSI, Equip Eng notified.

  N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.

6.88WW41 weekly pm completedFABSIX::J_SADINFreedom isn&#039;t free.Sun Apr 06 1997 13:1179
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


  DATE:04/06/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  BRENDAN FINN
                                                          JAMES SADIN
                                                          TIMOTHY LANDRY


 INITIAL						 

  JS    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                        Post-adjust: 100

  JS    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                        Post-adjust:  85

  JS  * 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  37 PSI

  TL    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  
  TL    6.1.5  Check all tubing and fittings for leaks. 

  BF    6.1.6  Check all tubing and fittings for air leaks.

  BF    6.1.7  Check all indicator lights.

  BF    6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

  JS    6.1.9  Wipe down polish table, tub, and splash ring.

  JS    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  JS    6.1.11 Wipe down pad conditioning arm.

  BF    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  JS    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

  TL    6.1.14 Wipe down outer surface of both spindle hubs.

  TL    6.1.15 Remove and clean O-rings, replace if necessary.

  BF    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  JS    6.1.17 Wipe down all surfaces of the robot.

  JS    6.1.18 Clean end effector vacuum chuck air port.

  JS    6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  JS    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  TL/JS 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

  BF    6.1.23 Check Neslab TCU for leaks.

  BF    6.1.24 Check Neslab TCU temperature readout.

  TL    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  TL    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  BF    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  *     6.1.3  System unable to reach 40 PSI, Equip Eng notified.

  N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.

6.89WW42 - Monthly completedSUBPAC::LANDRYWed Apr 16 1997 08:05165
        
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 04-15-97 SYSTEM RTC CODE: CMP.A1  EQUIP. TECH:   James Sadin (JS)
                                                       Brendan Finn (BF)
                                                     Timothy Landry (TL)
                                                     
 INITIAL                                             

 BF/JS/TL 6.2.1  Perform weekly PM checks in addition to this monthly list.

 __TL__ 6.2.2   Replace the fluid lines on the peristaltic pumps.  

 __TL__ 6.2.3   Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 __JS__ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:___.002_____

 __JS__ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:___.001_______

                Left Spindle Runout:_____.001_______

 __JS__ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:____.001______

                Left Spindle Hub Runout:_____.001______

 _TL/JS_ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: -.75 

                Right Spindle Force Error: -.81  

                Left Spindle Calibration Variable:

                     Pre-adjust: 151.00   Post-adjust: 159.24  

                Right Spindle Calibration Variable:

                     Pre-adjust: 149.21   Post-adjust: 153.47 

 __BF__ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 __BF__ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 __BF__ 6.2.10 Check shuttle travel.  Adjust if necessary.

 __TL__ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:___24.05_____   Post-adjust:___NONE_________

 __TL__ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +15.00/-15.01   Post-adjust:___NONE______
 
 __TL__ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:___5.00_____   Post-adjust:___5.00____

 __TL__ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:___9.9___   Post-adjust:__none available____

 __JS__  6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 __BF__  6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
     	        Adjust level if necessary.

 __BF__ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 __BF__  6.2.21 Check the system vacuum cabinet for any loose fittings or
                connections.

COMMENTS:    6.2.17 Twelve volt power supply is not equipped with adjust-
                    ment capabilities.  Read is taken for a reference only.


================================================================================

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:04-15-97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  Tim Landry    (TL)
                                                         Brendan Finn  (BF)
                                                         Jim Sadin     (JS)

 INITIAL						 

 __BF__ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:  100

                                         Post-adjust: 100

 __BF__ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:   85

                                         Post-adjust:  85

 __BF__ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:   36
  
 __JS__ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 __TL__ 6.1.5  Check all tubing and fittings for leaks. 

 __TL__ 6.1.6  Check all tubing and fittings for air leaks.
     
 __BF__ 6.1.7  Check all indicator lights.

 TL/JS/BF 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 __JS__ 6.1.9  Wipe down polish table, tub, and splash ring.

 __TL__ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.
     
 __JS__ 6.1.11 Wipe down pad conditioning arm.
    
 __JS__ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 __JS__ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 __BF__ 6.1.14 Wipe down outer surface of both spindle hubs.

 __BF__ 6.1.15 Remove and clean O-rings, replace if necessary.

 __TL__ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 __JS__ 6.1.17 Wipe down all surfaces of the robot.
    
 __JS__ 6.1.18 Clean end effector vacuum chuck air port.

 __JS__ 6.1.19 Inspect and clean end effector air nozzle.

 _N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 __TL__ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _JS/TL_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 __BF__ 6.1.23 Check Neslab TCU for leaks.

 __BF__ 6.1.24 Check Neslab TCU temperature readout.

 __JS_ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.


 __JS__ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 __BF__ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

6.1.20 Point of use slurry filters no longer used, Equip Eng notified
6.90Weekly PM completedFABSIX::R_POIRIERMon Apr 21 1997 07:4681
--------------------------------------------------------------------------------

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


  DATE:04/20/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  Roger Poirier (RP)
                                                          Bruce Durgun  (BD)
                                                          Al Quillen    (AQ)    


 INITIAL						 

  RP/BD  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100

                                        Post-adjust: 100

  RP/BD  6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  85

                                        Post-adjust:  85

  RP/BD 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  37 PSI *

  RP/BD 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  

  RP/BD 6.1.5  Check all tubing and fittings for leaks. 

  RP/BD 6.1.6  Check all tubing and fittings for air leaks.

  RP/BD 6.1.7  Check all indicator lights.

  RP/BD 6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

  RP/BD/AQ  6.1.9  Wipe down polish table, tub, and splash ring.

  RP/BD/AQ  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  RP/BD/AQ  6.1.11 Wipe down pad conditioning arm.

  AQ    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  BD    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

  RP    6.1.14 Wipe down outer surface of both spindle hubs.

  RP    6.1.15 Remove and clean O-rings, replace if necessary.

  RP    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  RP    6.1.17 Wipe down all surfaces of the robot.

  RP    6.1.18 Clean end effector vacuum chuck air port.

  RP    6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  RP    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  RP/BD 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

  RP    6.1.23 Check Neslab TCU for leaks.

  RP    6.1.24 Check Neslab TCU temperature readout.

  RP    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  RP    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  RP    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  *     6.1.3  System unable to reach 40 PSI, Equip Eng notified.

  N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.

6.91Weekly PM for WW44 completed.FABSIX::J_SADINFreedom isn&#039;t free.Sun Apr 27 1997 11:2681
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


  DATE:04/27/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH: James Sadin 
                                                         Timothy Landry
                                                         Bob Gee
 INITIAL						 

  js/bg  6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100

                                        Post-adjust: 100

  js/bg  6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  85

                                        Post-adjust:  85

  js/bg 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  37 PSI *

   tl   6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  

   bg   6.1.5  Check all tubing and fittings for leaks. 

   bf   6.1.6  Check all tubing and fittings for air leaks.

  tl/js 6.1.7  Check all indicator lights.

  tl/js 6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

  tl/js/bg  6.1.9  Wipe down polish table, tub, and splash ring.

  tl/js/bg  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

    js      6.1.11 Wipe down pad conditioning arm.

  js    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  js    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

  tl    6.1.14 Wipe down outer surface of both spindle hubs.

 *tl    6.1.15 Remove and clean O-rings, replace if necessary.

  tl    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  bg    6.1.17 Wipe down all surfaces of the robot.

  bg    6.1.18 Clean end effector vacuum chuck air port.

  bg    6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  js    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  js/tl 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

  js    6.1.23 Check Neslab TCU for leaks.

  js    6.1.24 Check Neslab TCU temperature readout.

  tl    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  tl    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  tl    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  *     6.1.3  System unable to reach 40 PSI, Equip Eng notified.

  *     6.1.15 Replaced innermost o-ring on both spindles. Equip eng
        notified.

  N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.

6.92ww45 weekly pm.FABSIX::L_SHKOLNIKOVSat May 10 1997 00:0879
--------------------------------------------------------------------------------

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


  DATE:05/09/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  Leon Shkolnikov ls
                                                          Dave Morin      DM


 INITIAL						 

   ls    6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100

                                        Post-adjust: 100

   ls    6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  85

                                        Post-adjust:  85

   ls   6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  40 PSI  

   DM   6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  

   ls   6.1.5  Check all tubing and fittings for leaks. 

   ls   6.1.6  Check all tubing and fittings for air leaks.

   ls   6.1.7  Check all indicator lights.

  ls/DM 6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

  DM    6.1.9  Wipe down polish table, tub, and splash ring.

  DM    6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  DM    6.1.11 Wipe down pad conditioning arm.

  DM    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  ls    6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

  ls/DM 6.1.14 Wipe down outer surface of both spindle hubs.

  ls/DM 6.1.15 Remove and clean O-rings, replace if necessary.

  ls/DM 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  ls    6.1.17 Wipe down all surfaces of the robot.

  ls    6.1.18 Clean end effector vacuum chuck air port.

  ls    6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  ls    6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  ls/DM 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

  ls    6.1.23 Check Neslab TCU for leaks.

  ls    6.1.24 Check Neslab TCU temperature readout.

  ls    6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  ls    6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  ls    6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  
* N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.

6.93ww 46 monthly p.m. completedFABSIX::J_SWENSONWed May 14 1997 19:46164
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE: 5/14/97  SYSTEM RTC CODE: CMP.A1   EQUIP. TECH.: Brian Jubinville (BJ)
                                                        Dave Morin (DM)
                                                        John Swenson (JS)
 INITIAL            BJ/DM                               Mike Standing (MS)

 JS/MS__ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 JS_____ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 ____JS_ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 _JS/MS_ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:_.002"_

_JS/MS__ 6.2.5  Measure and record right and left spindle runout.

		Right Spindle Runout:_.0015"__

                Left Spindlele Runout:_.0005"__

 __JS/MS 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:_.002"__

                Left Spindle Hub Runout:__.001"_____

  BJ/DM  6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error: pre: -8.69  post: -1.6

                Right Spindle Force Error: pre: .3    post: .3

                Left Spindle Calibration Variable:

                     Pre-adjust: 159.02       Post-adjust: 167.71

                Right Spindle Calibration Variable:

                     Pre-adjust: 155.19       Post-adjust: 155.19     

 JS/MS__ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 JS/MS__ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 JS/MS__ 6.2.10 Check shuttle travel.  Adjust if necessary.

 ____JS_ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:___24.05_________   Post-adjust:____24.05________

 ____JS_ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust: +15.00/-14.94   Post-adjust: +15.00/-14.94
 
 ____JS_ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary       

                Pre-adjust: +4.99   Post-adjust: +4.99

 ____JS_ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:10vac____________   Post-adjust:10vac____________

 _____JS_ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 _____JS_ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 _____JS_ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 _____JS_ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:6.2.17 There is no adj. capabilities, reading is used only as a 
                 reference.

    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:__________   SYSTEM RTC CODE:__________   EQUIP. TECH.:_______________

 INITIAL

 ____JS_ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:________100

                                         Post-adjust:_______100_

 ____JS_ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:________89

                                         Post-adjust:________85

 ____JS_ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:__38psi___
  
 ____JS_ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

_____JS_ 6.1.5  Check all tubing and fittings for leaks. 

 ____JS_ 6.1.6  Check all tubing and fittings for air leaks.

_____JS_ 6.1.7  Check all indicator lights.

 ____MS_ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 ____MS_ 6.1.9  Wipe down polish table, tub, and splash ring.

 ____MS_ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

_____MS_ 6.1.11 Wipe down pad conditioning arm.

_____MS_ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

_____MS_ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 ____MS_ 6.1.14 Wipe down outer surface of both spindle hubs.

 ____MS_ 6.1.15 Remove and clean O-rings, replace if necessary.

 ____MS_ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 ____JS_ 6.1.17 Wipe down all surfaces of the robot.

 ____JS_ 6.1.18 Clean end effector vacuum chuck air port.

 ____JS_ 6.1.19 Inspect and clean end effector air nozzle.

 ___N/A_ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 ____JS_ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _JS/MS_ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 ____JS_ 6.1.23 Check Neslab TCU for leaks.

 ____JS_ 6.1.24 Check Neslab TCU temperature readout.

 ____JS_ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 ____JS_ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 ____JS_ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:6.1.20 :: No longer use filters

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
6.94WW47 weekly pm completedFABSIX::J_SADINFreedom isn&#039;t free.Sun May 18 1997 17:3180
--------------------------------------------------------------------------------

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


  DATE:05/18/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  James Sadin
                                                          Bob Gee
                                                          Dave Whitford

 INITIAL						 

  JS     6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100

                                        Post-adjust: 100

 JS      6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  85

                                        Post-adjust:  85

 JS     6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  36 PSI* 

 BG     6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  

 BG     6.1.5  Check all tubing and fittings for leaks. 

        6.1.6  Check all tubing and fittings for air leaks.
 BG 
        6.1.7  Check all indicator lights.
    
 JS/DW  6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

 JS/DW  6.1.9  Wipe down polish table, tub, and splash ring.

 JS/DW  6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  BG    6.1.11 Wipe down pad conditioning arm.

  BG    6.1.12 Remove, rinse, and replace diamond conditioning disk.

   BG   6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
    
  JS/BG 6.1.14 Wipe down outer surface of both spindle hubs.

  JS/BG 6.1.15 Remove and clean O-rings, replace if necessary.

  DW    6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  DW    6.1.17 Wipe down all surfaces of the robot.

  BG/DW 6.1.18 Clean end effector vacuum chuck air port.

  BG/DW 6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  JS/DW 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  JS/DW 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

   BG   6.1.23 Check Neslab TCU for leaks.

   BG   6.1.24 Check Neslab TCU temperature readout.

   BG   6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

   BG   6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

   BG   6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  
* N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.

6.1.3 - CAN'T REACH 40PSI. ENG NOTIFIED.
6.95WW48 weekly pm completedFABSIX::J_SADINFreedom isn&#039;t free.Tue May 27 1997 10:2180
--------------------------------------------------------------------------------

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


  DATE:05/25/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  James Sadin
                                                          Bob Gee
                                                          Tim Landry
                                                          Brendan Finn

 INITIAL						 

  JS     6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100

                                        Post-adjust: 100

  JS     6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  85

                                        Post-adjust:  85

  JS    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  40 PSI  

  BG    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  

  BG/TL 6.1.5  Check all tubing and fittings for leaks. 

  BG/TL 6.1.6  Check all tubing and fittings for air leaks.
    
  BF    6.1.7  Check all indicator lights.
    
  BG/TL 6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

  TL/BF 6.1.9  Wipe down polish table, tub, and splash ring.

  TL/JS 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  BF/BG 6.1.11 Wipe down pad conditioning arm.

  TL    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  TL/JS 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
    
  BF/JS 6.1.14 Wipe down outer surface of both spindle hubs.

  TL/BG 6.1.15 Remove and clean O-rings, replace if necessary.

  JS/TL 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  BG    6.1.17 Wipe down all surfaces of the robot.

  BG/TL 6.1.18 Clean end effector vacuum chuck air port.

  BG    6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  BG/JS 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  JS/BG 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

  BG/JS 6.1.23 Check Neslab TCU for leaks.

  BG/JS 6.1.24 Check Neslab TCU temperature readout.
     
  TL/BG 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  BG/TL 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  BF/BG 6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  
* N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.

6.96CMP.A1 SHUTDOWN AND STARTUP CHECKSHEETSFABSIX::J_SADINFreedom isn&#039;t free.Tue May 27 1997 11:0483

				CMP.A1


               CMP.A1 & CMP.A2 SHUTDOWN CHECKSHEET FOR 5/26/97
               -----------------------------------------------
							ROGER POIRIER (RP)
							BRUCE DURGIN  (BD)

                                                        Tech.       Date
                                                       -------     -------
  1.  Change Workstream tool status to NON-SCHEDULED
      DOWN.  If Workstream will not let the tools go
      to NON-SCHEDULED, leave the tools at UP IDLE.
      DO NOT put any tools to SCHEDULED or UNSCHEDULED  RP          5-26
      DOWN.                                            _______     _______

  2.  Remove all wafer carriers.  Do not re-use.
      Ensure that there are a sufficient ammount        RP          5-26
      of re-built carriers to support the startup.     _______     _______

  3.  Remove all wafer cassettes and drain Send        BD,RP        5-26
      and Receive DI Water tanks.                      _______     _______
                                                         RP         5-26
  4.  Purge both slurry lines with DI Water.           _______     _______
                                                         RP         5-26
  5.  Remove and discard all polishing pads.           _______     _______

  6.  Remove all PVA scrub brushes and submerge          RP         5-26
      in a mixture of DI water and H2O2.               _______     _______

  7.  Perform a complete clean of each system
      to remove dried slurry.  Wipe down and dry        BD,RP       5-26
      all wet surfaces.                                _______     _______

  8.  Rotate main incoming DI Water valves 180 deg.      RP         5-26
      so that all DI water is flowing to UDR.          _______     _______
                                                         RP         5-26
  9.  Power down each system.                          _______     _______
                                                         RP         5-26
 10.  Power down each vacuum pump cabinet.             _______     _______
                                                         RP         5-26
 11.  Power down each Neslab TCU.                      _______     _______

 12.  Enter checksheet into CMP Notesfile.



             CMP.A1 & CMP.A2 STARTUP CHECKSHEET FOR 5/27
             -------------------------------------------

                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are         js/tl       5/27
      available and ready to use.                      _______     _______
                                                       js/tl       5/27
  2.  Power up each system.                            _______     _______
                                                       js/tl       5/27
  3.  Power up each vacuum pump cabinet.               _______     _______
                                                       js/tl       5/27
  4.  Power up each Neslab TCU.                        _______     _______

  5.  Rotate main incoming DI Water valves 180 deg.    js/tl       5/27
      so that all DI water is flowing into the tool    _______     _______

  6.  Place cassettes in left and right send
      and receive stations to fill DI Water            js/tl       5/27
      tanks.                                           _______     _______
                                                       js/tl       5/27
  7.  Install new polishing pads.                      _______     _______
                                                       js/tl       5/27
  8.  Install new wafer carriers.                      _______     _______
                                                       js/tl       5/27
  9.  Re-install PVA scrub brushes.                    _______     _______
                                                       js/tl       5/27
 10.  Perform polish pad breakin.                      _______     _______

 11.  Notify Operations that the systems are ready     js/tl       5/27
      MQC's.                                           _______     _______

 12.  Enter checksheet into notesfile.                 js/tl       5/27

6.97WW49 weekly pm completedFABSIX::J_SADINFreedom isn&#039;t free.Sun Jun 01 1997 11:4080
--------------------------------------------------------------------------------

           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C


  DATE:06/01/97    SYSTEM RTC CODE: CMP.A1   EQUIP TECH:  James Sadin
                                                          Bob Gee
                                                          Tim Landry
                                                          

 INITIAL						 

  JS     6.1.1  CDA pressure @ 100 PSI:  Pre-adjust: 100

                                        Post-adjust: 100

  JS     6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:  85

                                        Post-adjust:  85

  JS    6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:  40 PSI  

  BG    6.1.4  Check drip pan for any slurry/moisture.  Clean any    
               contamination found.  

  BG/TL 6.1.5  Check all tubing and fittings for leaks. 

  BG/TL 6.1.6  Check all tubing and fittings for air leaks.
    
  JS    6.1.7  Check all indicator lights.
    
  BG/TL 6.1.8  Check all stations/components for slurry, debris, or  
               any contaminants.  Clean if necessary.  

  TL/JS 6.1.9  Wipe down polish table, tub, and splash ring.

  TL/JS 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

  JS/BG 6.1.11 Wipe down pad conditioning arm.

  TL    6.1.12 Remove, rinse, and replace diamond conditioning disk.

  TL/JS 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.
    
  BG/JS 6.1.14 Wipe down outer surface of both spindle hubs.

  TL/BG 6.1.15 Remove and clean O-rings, replace if necessary.

  JS/TL 6.1.16 Wipe down inside and outside of load/cleaning station buckets.

  BG    6.1.17 Wipe down all surfaces of the robot.

  BG/TL 6.1.18 Clean end effector vacuum chuck air port.

  BG    6.1.19 Inspect and clean end effector air nozzle.

  N/A * 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

  BG/JS 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

  JS/BG 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
               necessary.

  BG/JS 6.1.23 Check Neslab TCU for leaks.

  BG/JS 6.1.24 Check Neslab TCU temperature readout.
     
  TL/BG 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

  BG/TL 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

  JS/BG 6.1.27 Drain and wipe down inside and outside surfaces of all
               elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

  
* N/A   6.1.20 Point of use slurry filters no longer used, Equip Eng notified.