[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Conference asdg::cmp

Title:CMP
Notice:Welcome to the CMP notesfile
Moderator:FABSIX::B_TOWERLLE
Created:Tue Oct 31 1995
Last Modified:Fri Jun 06 1997
Last Successful Update:Fri Jun 06 1997
Number of topics:94
Total number of notes:6381

18.0. "CMP.B1 PM CHECKSHEETS" by SUBPAC::SADIN (Freedom isn't free.) Sun Nov 05 1995 12:18

          <<< ASDG::DISK$SYS_DATA:[NOTES$LIBRARY]FILMS_ONLY.NOTE;1 >>>
                                -< Films Only! >-
================================================================================
Note 61.0                    (CMP.B1) PM CHECKSHEETS                  20 replies
ASDG::POIRIER                                         7 lines  13-JUL-1995 11:16
--------------------------------------------------------------------------------
    
    
             THIS NOTE WILL BE USED FOR POSTING PM CHECKSHEETS ON
    
    
    
                                 (CMP.B1)
================================================================================
Note 61.1                    (CMP.B1) PM CHECKSHEETS                     1 of 20
SUBPAC::TOOKER                                       60 lines  13-JUL-1995 14:57
                       -< Weekly PM Checksheet Template >-
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE:_______    SYSTEM RTC CODE:_________    EQUIP. TECH:__________________

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI   Pre-adjust:

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:

6.1.18 Check system for fluid leaks			Completed:

6.1.19 Check tubing/fittings for leaks			Completed:

6.1.20 Check system for pneumatic leaks			Completed:

6.1.21 Check system indicator lamps			Completed:

6.1.22 Check stations/components for contamination	Completed:

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI	Pre-adjust:

6.1.24 Clean and lubricate the Scrubber rails		Completed:

6.1.25 Clean and lubricate the Paddle rails		Completed:

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:

Comments:_____________________________________________________________________

______________________________________________________________________________
================================================================================
Note 61.2                    (CMP.B1) PM CHECKSHEETS                     2 of 20
SUBPAC::TOOKER                                       24 lines  13-JUL-1995 14:58
                      -< Monthly PM Checksheet Template >-
--------------------------------------------------------------------------------
         SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
              Monthly Preventative Maintenance Check Sheet, Rev C


6.2.1  Perform Weekly PM Tasks				Completed:	

6.2.2  Change Peristaltic Pump Lines			Completed:

6.2.3  Clean Polish area drain tub			Completed:

6.2.4  Check Polish Table Belt for defects		Completed:

6.2.5  Check the Neslab water level			Completed:

6.2.6  Check the Neslab fittings for leaks              Completed:

6.2.7  Check Scrubber Brushes for contaminates/defects	Completed:

6.2.8  Check the Load Flipper alignment			Completed:

6.2.9  Check the Unload Flipper alignment		Completed:

Comments:____________________________________________________________________
_____________________________________________________________________________
================================================================================
Note 61.3                    (CMP.B1) PM CHECKSHEETS                     3 of 20
SUBPAC::TOOKER                                       23 lines  13-JUL-1995 14:59
                     -< Quarterly PM Checksheet Template >-
--------------------------------------------------------------------------------
         SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
              Quarterly Preventative Maintenance Check Sheet, Rev C


6.3.1  Perform the Weekly + Monthly PM Tasks		Completed:

6.3.2  Check the 24 Volt power supply			Pre-adjust:

6.3.3  Check the 15 Volt power supply			Pre-adjust:

6.3.4  Check the 5 Volt power supply			Pre-adjust:

6.3.5  Check Table Rotation Speed			Completed:

6.3.6  Check Vacuum Pump Diaphrams			Completed:

6.3.7  Check Vacuum Tank/Pump lines			Completed:

6.3.8  Check Load Cup alignment				Completed:

Comments:____________________________________________________________________

_____________________________________________________________________________
================================================================================
Note 61.4                    (CMP.B1) PM CHECKSHEETS                     4 of 20
SUBPAC::TOOKER                                       28 lines  13-JUL-1995 14:59
                    -< Semi-Annual PM Checksheet Template >-
--------------------------------------------------------------------------------
         SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
           Semi-Annual Preventative Maintenance Check Sheet, Rev C

6.4.1  Perform Wkly, Mntly, Qrtly PM Tasks		Completed:

6.4.2  Check all interlocks for functionality		Completed:

6.4.3  Check all EMO's for functionality		Completed:

6.4.4  Check Robot alignment				Completed:

6.4.5  Lubricate the Rotary Union			Completed:

6.4.6  Lubricate the Lead Screw				Completed:

6.4.7  Lubricate the Linear Guide Rails			Completed:

6.4.8  Lubricate the Idler Pulley			Completed:

6.4.9  Change the Conditioner Wheel			Completed:

6.4.10 Check the Polish Table runout			Completed:

6.4.11 Check Spindle to Table planarity			Completed:

Comments:_____________________________________________________________________

______________________________________________________________________________
================================================================================
Note 61.5                    (CMP.B1) PM CHECKSHEETS                     5 of 20
SUBPAC::LANDRY                                       61 lines  13-JUL-1995 17:33
                               -< Weekly - 7/13 >-
--------------------------------------------------------------------------------
    
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE:  7/13/95    SYSTEM RTC CODE:  CMP.B1    EQUIP. TECH:  Tim Landry

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:   98

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:   90

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   20

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   45

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   65

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   4.2

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   30

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   45

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:  8

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   60

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 8

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:_____________________________________________________________________

______________________________________________________________________________
================================================================================
Note 61.6                    (CMP.B1) PM CHECKSHEETS                     6 of 20
SUBPAC::LANDRY                                       61 lines  22-JUL-1995 14:44
                        -< Work Week III >>>--> Weekly >-
--------------------------------------------------------------------------------
    
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE:  7/22/95    SYSTEM RTC CODE:  CMP.B1    EQUIP. TECH:  Tim Landry

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:   98

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:   95

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   17

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   45

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   65

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   4.2

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   30

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   45

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:  8

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   60

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 7

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:_____________________________________________________________________

______________________________________________________________________________
================================================================================
Note 61.7                    (CMP.B1) PM CHECKSHEETS                     7 of 20
SUBPAC::LANDRY                                       60 lines  26-JUL-1995 17:19
                        -< WW IV check sheet - Weekly >-
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE:  7/26/95    SYSTEM RTC CODE:  CMP.B1    EQUIP. TECH:  Doc, Roger, John

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:   95

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  100

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   20

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   45

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   65

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   4.2

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   30

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   45

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:  8

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   60

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 8

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  Found some ( < a pint ) of water in the containment pan.  Also,
           found a couple drops of lubricant (gear oil) under the Index Table
           gear box.  This will need to be checked for any further drips.
================================================================================
Note 61.8                    (CMP.B1) PM CHECKSHEETS                     8 of 20
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              25 lines   4-AUG-1995 22:14
                           -< MONTHLY PM COMPLETED >-
--------------------------------------------------------------------------------
         SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
              Monthly Preventative Maintenance Check Sheet, Rev C

    ENTITY - CMP.B1     DATE - 8/3 & 8/4    TECHS - DOC, ROGER and BJ

6.2.1  Perform Weekly PM Tasks				Completed:  X	

6.2.2  Change Peristaltic Pump Lines			Completed:  X

6.2.3  Clean Polish area drain tub			Completed:  X

6.2.4  Check Polish Table Belt for defects		Completed:  X

6.2.5  Check the Neslab water level			Completed:  X

6.2.6  Check the Neslab fittings for leaks              Completed:  X

6.2.7  Check Scrubber Brushes for contaminates/defects	Completed:  X

6.2.8  Check the Load Flipper alignment			Completed:  X

6.2.9  Check the Unload Flipper alignment		Completed:  X

Comments:____________________________________________________________________
_____________________________________________________________________________
================================================================================
Note 61.9                    (CMP.B1) PM CHECKSHEETS                     9 of 20
SUBPAC::LANDRY                                       59 lines   9-AUG-1995 19:20
                              -< WW IV - Weekly >-
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE:  8/9/95    SYSTEM RTC CODE: CMP.B1   EQUIP. TECH: Landry/JPoirier

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  100

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   22

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   45

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   65

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   4.2

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   30

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   45

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:  8

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   60

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 8

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  Some items were already completed from the wafer breakage incident
           which occurred last night.
================================================================================
Note 61.10                   (CMP.B1) PM CHECKSHEETS                    10 of 20
SUBPAC::LANDRY                                       58 lines  19-AUG-1995 16:14
                        -< WW IIV Checksheet - Weekly  >-
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE:  8/19/95    SYSTEM RTC CODE:  CMP.B1    EQUIP. TECH:  Landry

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  100

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   22

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   45

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   65

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   5.6

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   30

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   45

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:  8

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   60

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 8

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  
================================================================================
Note 61.11                   (CMP.B1) PM CHECKSHEETS                    11 of 20
PATE::GEE                                            60 lines  22-AUG-1995 21:47
                             -< ww08 weekly p.m. >-
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE:  8/22/95    SYSTEM RTC CODE:  CMP.B1    EQUIP. TECH:  RP/Gee

6.1.1  Check incoming CDA pressure for (>) 80 PSI	  Pre-adjust:  100

6.1.2  Check incoming N2 pressure for (>)80 PSI           Pre-adjust:  100

6.1.3  Check incoming DI Water pressure for(~) 20 PSI     Pre-adjust:   22

6.1.4  Check Load Cup pressure for 45 PSI		  Pre-adjust:   46

6.1.5  Check Pad Condition Balance pressure for 23 PSI	  Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	  Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		  Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40(>60) PSI	  Pre-adjust:  >60

6.1.9  Check Head Balance pressure for 4.2 PSI		  Pre-adjust:   5.5

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	  Pre-adjust:   38

6.1.11 Check Transport Paddle U/D pressure for 45(20) PSI Pre-adjust:   20

6.1.12 Check Open Load Flipper pressure for 50 PSI	  Pre-adjust:   45

6.1.13 Check Open Unload Flipper pressure for 45(50) PSI  Pre-adjust:   50

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:   10

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	  Pre-adjust:   90

6.1.16 Check Scrubber In/Out pressure for 50 PSI	  Pre-adjust:   50

6.1.17 Check MHTA pressure for 60(80) PSI		  Pre-adjust:   75

6.1.18 Check system for fluid leaks			  Completed:    X

6.1.19 Check tubing/fittings for leaks			  Completed:    X

6.1.20 Check system for pneumatic leaks			  Completed:    X

6.1.21 Check system indicator lamps			  Completed:    X

6.1.22 Check stations/components for contamination	  Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust:   8

6.1.24 Clean and lubricate the Scrubber rails		  Completed:    X

6.1.25 Clean and lubricate the Paddle rails		  Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	  Completed:    X

Comments:  

================================================================================
Note 61.12                   (CMP.B1) PM CHECKSHEETS                    12 of 20
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              24 lines   1-SEP-1995 03:19
                      -< Quarterly PM completed for WW9 >-
--------------------------------------------------------------------------------
         SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
              Quarterly Preventative Maintenance Check Sheet, Rev C


6.3.1  Perform the Weekly + Monthly PM Tasks		Completed:   X

6.3.2  Check the 24 Volt power supply			Pre-adjust:  24V

6.3.3  Check the 15 Volt power supply			Pre-adjust:  15V

6.3.4  Check the 5 Volt power supply			Pre-adjust:  N/A

6.3.5  Check Table Rotation Speed			Completed:   X

6.3.6  Check Vacuum Pump Diaphrams			Completed:   X

6.3.7  Check Vacuum Tank/Pump lines			Completed:   X

6.3.8  Check Load Cup alignment				Completed:   X

Comments:____________________________________________________________________

_____________________________________________________________________________
                                                                      
================================================================================
Note 61.13                   (CMP.B1) PM CHECKSHEETS                    13 of 20
SUBPAC::LANDRY                                       58 lines   7-SEP-1995 17:51
                        -< Weekly PM performed on 9/5 >-
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE:  9/5/95    SYSTEM RTC CODE:  CMP.B1    EQUIP. TECH:  Landry

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:   98

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:   98

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   20

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   45

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   65

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   5.2

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   30

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   45

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:  8

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   60

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 8

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  PM was performed during Polish Pad and Carrier change
================================================================================
Note 61.14                   (CMP.B1) PM CHECKSHEETS                    14 of 20
SUBPAC::LANDRY                                       58 lines  13-SEP-1995 18:21
                              -< Weekly PM done >-
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE:  9/13/95    SYSTEM RTC CODE:  CMP.B1    EQUIP. TECH:  Landry

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:   97

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:   96

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   20

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   45

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   65

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   5.2

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   30

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   45

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:  8

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   60

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 7

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  PM was performed during Polish Pad change
================================================================================
Note 61.15                   (CMP.B1) PM CHECKSHEETS                    15 of 20
SUBPAC::LANDRY                                       61 lines  18-SEP-1995 18:50
                            -< Weekly PM performed >-
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE:  9/18/95    SYSTEM RTC CODE:  CMP.B1    EQUIP. TECH:  Landry/Finn

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:   98

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:   94

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   45

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   65

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   5.2

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   30

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   45

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:  8

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   60

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 5

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  PM was performed during Polish Pad change.

      	   Small amount of gear box oil was found under the index table
           motor gear box
================================================================================
Note 61.17                   (CMP.B1) PM CHECKSHEETS                    17 of 20
FABSIX::B_FINN                                       82 lines   7-OCT-1995 18:54
                           -< FINISHED  MONTHLY PM >-
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE: 10/5,7/95   SYSTEM RTC CODE: CMP.B1    EQUIP. TECH: BJ/FINN/BRAD

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  90 psi

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  90 psi

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  22 psi

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  45 psi

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:  23 psi

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  35 psi

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30 psi

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  <40 psi

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:  5 psi

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  30 psi

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:  45 psi

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  50 psi

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:  45 psi

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI   Pre-adjust: 10 psi

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80 psi

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 50 psi

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust: 60 psi

6.1.18 Check system for fluid leaks			Completed: X

6.1.19 Check tubing/fittings for leaks			Completed: X

6.1.20 Check system for pneumatic leaks			Completed: X

6.1.21 Check system indicator lamps			Completed:  X

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI Pre-adjust:  10 psi

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:  X
                                                                       

         SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
              Monthly Preventative Maintenance Check Sheet, Rev C


6.2.1  Perform Weekly PM Tasks				Completed: X	

6.2.2  Change Peristaltic Pump Lines			Completed: X

6.2.3  Clean Polish area drain tub			Completed:  X

6.2.4  Check Polish Table Belt for defects		Completed:  X

6.2.5  Check the Neslab water level			Completed:  X

6.2.6  Check the Neslab fittings for leaks              Completed:  X

6.2.7  Check Scrubber Brushes for contaminates/defects	Completed:  X

6.2.8  Check the Load Flipper alignment			Completed:  X

6.2.9  Check the Unload Flipper alignment		Completed:  X

Comments:     

================================================================================
Note 61.18                   (CMP.B1) PM CHECKSHEETS                    18 of 20
SUBPAC::LANDRY                                       58 lines  18-OCT-1995 17:13
                              -< Weekly PM check >-
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE: 10/18/95 SYSTEM RTC CODE: CMP.B1 EQUIP. TECH:  Landry/Westphal/JP

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:   98

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   21

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   45

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   65

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   5.2

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   30

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   45

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:  8

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   60

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 3

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  PM was performed during Polish Pad change.
================================================================================
Note 61.19                   (CMP.B1) PM CHECKSHEETS                    19 of 20
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              60 lines  27-OCT-1995 06:54
              -< Weekly PM almost completed, see below not done >-
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE: 10/27/95 SYSTEM RTC CODE: CMP.B1   EQUIP. TECH: BJ

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 85psi

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85psi

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 20psi

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45psi

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust: 23psi

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35psi

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30psi

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: <40psi

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust: 5psi

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30psi

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust: 20psi

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60psi

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust: 60psi

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI   Pre-adjust: 8psi

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80psi

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 58psi

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust: 80psi

6.1.18 Check system for fluid leaks			Completed:  X	

6.1.19 Check tubing/fittings for leaks			Completed:  x

6.1.20 Check system for pneumatic leaks			Completed:  x

6.1.21 Check system indicator lamps			Completed:  x

6.1.22 Check stations/components for contamination	Completed:  x

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI Pre-adjust:  10psi

6.1.24 Clean and lubricate the Scrubber rails		Completed:

6.1.25 Clean and lubricate the Paddle rails		Completed:

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:

Comments:_____________________________________________________________________

______________________________________________________________________________
================================================================================
Note 61.20                   (CMP.B1) PM CHECKSHEETS                    20 of 20
FABSIX::B_FINN                                       24 lines  30-OCT-1995 16:04
                             -< Monthly completed >-
--------------------------------------------------------------------------------
         SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
              Monthly Preventative Maintenance Check Sheet, Rev C

    Date: 10-30-95           RTC - CMP.B1         Techs: Doc/Brendan

6.2.1  Perform Weekly PM Tasks				Completed: Done	

6.2.2  Change Peristaltic Pump Lines			Completed: Done

6.2.3  Clean Polish area drain tub			Completed: Done

6.2.4  Check Polish Table Belt for defects		Completed: Done

6.2.5  Check the Neslab water level			Completed: Done

6.2.6  Check the Neslab fittings for leaks              Completed: Done

6.2.7  Check Scrubber Brushes for contaminates/defects	Completed: Done

6.2.8  Check the Load Flipper alignment			Completed: Done

6.2.9  Check the Unload Flipper alignment		Completed: Done

Comments:
T.RTitleUserPersonal
Name
DateLines
18.5Weekly PM almost completedSUBPAC::BJUBINVILLENFD Fire - RescueWed Nov 08 1995 21:2161
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE: 11/8/95    SYSTEM RTC CODE: CMP.B1  EQUIP. TECH: BJ

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  100 psi

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  100 psi

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  20 psi

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  25 psi

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:  23 psi

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  35 psi

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30 psi

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  70 psi

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:  5.2 psi

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  40 psi

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:  20 psi

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  50 psi

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:  50 psi

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI   Pre-adjust: 10 psi

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  80 psi

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  58 psi

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:  80 psi

6.1.18 Check system for fluid leaks			Completed:   X

6.1.19 Check tubing/fittings for leaks			Completed:   X

6.1.20 Check system for pneumatic leaks			Completed:   X

6.1.21 Check system indicator lamps			Completed:   X

6.1.22 Check stations/components for contamination	Completed:   X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI Pre-adjust:  10 psi

6.1.24 Clean and lubricate the Scrubber rails		Completed:

6.1.25 Clean and lubricate the Paddle rails		Completed:

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:

Comments:_____________________________________________________________________

______________________________________________________________________________
                                                                        
18.6WW 19 pmSUBPAC::LANDRYSat Nov 11 1995 15:1358
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE: 11/11/95    SYSTEM RTC CODE: CMP.B1    EQUIP. TECH:  Landry/Westphal

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  100

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   21

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   25

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   65

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   5.2

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   30

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   45

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:  8

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   60

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 3

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  Found a small amount of gear oil under the Index Table gear box.
18.7SUBPAC::LANDRYTue Nov 14 1995 18:3458
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE: 11/14/95    SYSTEM RTC CODE: CMP.B1    EQUIP. TECH:  Landry / Finn

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  100

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   21

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   25

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   65

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   5.2

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   30

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   45

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:  8

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   60

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 3

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  
18.8Weekly PM for 11/22 completedSUBPAC::BJUBINVILLENFD Fire - RescueWed Nov 22 1995 06:1358
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE: 11/22/95    SYSTEM RTC CODE: CMP.B1    EQUIP. TECH:  Gwen - BJ 

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  100

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   20

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   25

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   70

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   4.8

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   40

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   20

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   60

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   60

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:  8

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   58

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   80

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 4

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X 11/20

Comments:  
18.9WEEKLY PM ALMOST COMPLETE, SEMI-ANNUAL WAIVED PER T. DYERSUBPAC::BJUBINVILLENFD Fire - RescueThu Nov 30 1995 05:1760
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE: 11/22/95    SYSTEM RTC CODE: CMP.B1    EQUIP. TECH:  Gwen BJ 

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:   100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:   95

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   22

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   25

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   70

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   4.8

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   40

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   20

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   60

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   60

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:  5

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   48

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   80

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 5

6.1.24 Clean and lubricate the Scrubber rails		Completed:    

6.1.25 Clean and lubricate the Paddle rails		Completed:    

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    

Comments:  no NKS #2 grease in stock, shortage request made.
     
           System unavailable for cleaning, currently running
18.10Weekly PM completedSUBPAC::LANDRYMon Dec 04 1995 15:4058
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE: 12/04/95    SYSTEM RTC CODE: CMP.B1    EQUIP. TECH:  Landry / Finn

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:   85

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   18

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   25

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   65

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   5.2

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   30

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   45

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:  8

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   60

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 3

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  
18.11weekly completedSTRATA::FINNMon Dec 11 1995 18:2360

          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE: 12/11/95    SYSTEM RTC CODE: CMP.B1  EQUIP. TECH:Finn/Sadin/Camilletti

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:   98

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   22

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   25

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   >65

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   4.8

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   40

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   20

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   60

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   60

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust:  9

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   80

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 3

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  
18.12Weekly completedSUBPAC::LANDRYSun Dec 17 1995 12:3658
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

    DATE: 12/17/95        SYSTEM RTC CODE: CMP.B1     EQUIP. TECH:  Landry 

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:   92

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   20

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   25

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   60

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   4.8

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   40

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   45

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust: 15

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   60

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 4

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  
18.13B1 weekly pm completedSUBPAC::BJUBINVILLENFD Fire - RescueWed Jan 03 1996 23:3459
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

    DATE: 1/3/96        SYSTEM RTC CODE: CMP.B1     EQUIP. TECH: BJ 

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:   90

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   20

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   25

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   60

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   4.5

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   20

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   40

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   60

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   60

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust: 12

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   60

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   80

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 4

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  
                                                                        
18.14WW 28 - WeeklySUBPAC::LANDRYTue Jan 09 1996 13:0458
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE: 1/9/96    SYSTEM RTC CODE: CMP.B1    EQUIP. TECH:  Landry 

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:   92

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   20

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   25

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   60

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   4.8

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   40

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   45

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust: 15

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   60

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 4

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  
18.15WW28 Monthly PM ChecksheetASDG::POIRIERWed Jan 10 1996 17:3828
     
--------------------------------------------------------------------------------
         SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
              Monthly Preventative Maintenance Check Sheet, Rev C
              -------
   WW28              1/9/96 & 1/10/96           Tim Landry & John Poirier
 ------------------------------------------------------------------------------

6.2.1  Perform Weekly PM Tasks				Completed: TL	
      (See Comment )

6.2.2  Change Peristaltic Pump Lines			Completed: JP

6.2.3  Clean Polish area drain tub			Completed: TL

6.2.4  Check Polish Table Belt for defects		Completed: TL

6.2.5  Check the Neslab water level			Completed: TL

6.2.6  Check the Neslab fittings for leaks              Completed: TL

6.2.7  Check Scrubber Brushes for contaminates/defects	Completed: TL

6.2.8  Check the Load Flipper alignment			Completed: TL

6.2.9  Check the Unload Flipper alignment		Completed: TL

Comments: The Weekly PM Checksheet has been posted in reply #18.14.
18.161/19/96 weekly performedFABSIX::B_FINNFri Jan 19 1996 19:1959
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE: 1/19/96    SYSTEM RTC CODE: CMP.B1    EQUIP. TECH: Brendan/Brad

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:   92

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   20

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   25

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   60

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   4.8

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   40

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   45

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust: 15

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   50

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   60

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 4

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  
18.17WEEKLY COMPLETEDFABSIX::B_WESTPHALSat Jan 27 1996 18:2066
================================================================================
Note 61.1                    (CMP.B1) PM CHECKSHEETS                     1 of 20
SUBPAC::TOOKER                                       60 lines  13-JUL-1995 14:57
                       -< Weekly PM Checksheet Template >-
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE: 27 JAN 96   SYSTEM RTC CODE:_________    EQUIPTECH:JUBINVILLE/WESTPHAL 

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 82

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 21

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 50

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust: 4.1

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust: 20

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust: 60

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI   Pre-adjust: 15

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  60

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:  80

6.1.18 Check system for fluid leaks			Completed:   x

6.1.19 Check tubing/fittings for leaks			Completed:   x

6.1.20 Check system for pneumatic leaks			Completed:   x

6.1.21 Check system indicator lamps			Completed:   x

6.1.22 Check stations/components for contamination	Completed:   x

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI	Pre-adjust: x

6.1.24 Clean and lubricate the Scrubber rails		Completed:   x

6.1.25 Clean and lubricate the Paddle rails		Completed:   X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:  *X

Comments:_COMPLETED THE PM WHICH WAS STARTED ON B SHIFT. __* WAS NOT LUBED.____
            
_______________________________________________________________________________

18.18weekly ww31STRATA::RIDLONEliminate the obviousTue Jan 30 1996 05:2459
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE: 1/30/96    SYSTEM RTC CODE: CMP.B1    EQUIP. TECH: B shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:   97

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:   94

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   23

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   45

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   50

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   4.2

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   20

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   60

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   60

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust: 15

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   60

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   80

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 4

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  
18.19Monthly PM almost completed, 3 outstanding items leftSUBPAC::BJUBINVILLENFD Fire - RescueSat Feb 03 1996 04:2828
         SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
              Monthly Preventative Maintenance Check Sheet, Rev C

DATE: 1/30,2/3    SYSTEM RTC CODE: CMP.B1    EQUIP. TECH: B and D shift

6.2.1  Perform Weekly PM Tasks				Completed:  B	

6.2.2  Change Peristaltic Pump Lines			Completed:  

6.2.3  Clean Polish area drain tub			Completed:  

6.2.4  Check Polish Table Belt for defects		Completed:  

6.2.5  Check the Neslab water level			Completed:  D

6.2.6  Check the Neslab fittings for leaks              Completed:  D

6.2.7  Check Scrubber Brushes for contaminates/defects	Completed:  D

6.2.8  Check the Load Flipper alignment			Completed:  D

6.2.9  Check the Unload Flipper alignment		Completed:  D

Comments:____________________________________________________________________

_____________________________________________________________________________

                                                                    
18.20(WW31) Monthly P.M.ASDG::POIRIERSat Feb 03 1996 17:0229
         SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
              Monthly Preventative Maintenance Check Sheet, Rev C

DATE: 1/30,2/3    SYSTEM RTC CODE: CMP.B1    Shift: B, D & C

6.2.1  Perform Weekly PM Tasks				Completed:  B	

6.2.2  Change Peristaltic Pump Lines			Completed:  C

6.2.3  Clean Polish area drain tub			Completed:  C

6.2.4  Check Polish Table Belt for defects		Completed:  C

6.2.5  Check the Neslab water level			Completed:  D

6.2.6  Check the Neslab fittings for leaks              Completed:  D

6.2.7  Check Scrubber Brushes for contaminates/defects	Completed:  D

6.2.8  Check the Load Flipper alignment			Completed:  D

6.2.9  Check the Unload Flipper alignment		Completed:  D

Comments:____________________________________________________________________

_____________________________________________________________________________

                                                                    
18.21WW32 Weekly PMFABSIX::R_POIRIERTue Feb 06 1996 05:0159
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE: 2/06/96    SYSTEM RTC CODE: CMP.B1    EQUIP. TECH: B shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:   96

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:   94

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:   23

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:   45

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust:   23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:   35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:   30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:   50

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust:   4.2

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:   30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust:   20

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:   60

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust:   60

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust: 10

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:   80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:   60

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust:   80

6.1.18 Check system for fluid leaks			Completed:    X

6.1.19 Check tubing/fittings for leaks			Completed:    X

6.1.20 Check system for pneumatic leaks			Completed:    X

6.1.21 Check system indicator lamps			Completed:    X

6.1.22 Check stations/components for contamination	Completed:    X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 4

6.1.24 Clean and lubricate the Scrubber rails		Completed:    X

6.1.25 Clean and lubricate the Paddle rails		Completed:    X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:    X

Comments:  Found a small oil puddle under the index table. 
18.22WW33 weekly PMFABSIX::R_POIRIERMon Feb 12 1996 00:4766
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C
				Work Week 33

 DATE: 2-12-96       SYSTEM RTC CODE: CMP.B1    EQUIP. TECH: B Shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 98 psi

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 94 psi

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 21 psi

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45 psi

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust: 23 psi

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35 psi

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30 psi

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 50 psi

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust: 4.2 psi

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30 psi

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust: 20 psi

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60 psi

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust: 60 psi

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI   Pre-adjust: 10 psi

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80 psi

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60 psi

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust: 80 psi

6.1.18 Check system for fluid leaks			Completed: Done

6.1.19 Check tubing/fittings for leaks			Completed: Done

6.1.20 Check system for pneumatic leaks			Completed: Done

6.1.21 Check system indicator lamps			Completed: Done

6.1.22 Check stations/components for contamination	Completed: Done

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 4 psi

6.1.24 Clean and lubricate the Scrubber rails		Completed: Done

6.1.25 Clean and lubricate the Paddle rails		Completed: Done

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed: Done
------------------------------------------------------------------------------
Comments: Found a small oil leak under the Index table. Wiped up and will
          continue to monitor. 
          
	  Also, DI Water gauge in cabinet not working. Gauge on outside 
          of cabinet reading 21 psi.

______________________________________________________________________________
18.23ww34 weekly pm completedFABSIX::B_FINNMon Feb 19 1996 14:4965
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C
				Work Week 34

 DATE: 2-19-96       SYSTEM RTC CODE: CMP.B1    EQUIP. TECH: A Shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 98 psi

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 95 psi

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 20 psi

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 34 psi

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust: 23 psi

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35 psi

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30 psi

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 50 psi

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust: 4.2 psi

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30 psi

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust: 20 psi

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60 psi

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust: 60 psi

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust: 8 psi

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80 psi

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60 psi

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust: 80 psi

6.1.18 Check system for fluid leaks			Completed: Done

6.1.19 Check tubing/fittings for leaks			Completed: Done

6.1.20 Check system for pneumatic leaks			Completed: Done

6.1.21 Check system indicator lamps			Completed: Done

6.1.22 Check stations/components for contamination	Completed: Done

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 6 psi

6.1.24 Clean and lubricate the Scrubber rails		Completed: Done

6.1.25 Clean and lubricate the Paddle rails		Completed: Done

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed: Done
------------------------------------------------------------------------------
Comments: Found a small oil leak under the Index table. Wiped up , Tim 
          has rebuild kit on order.
          
	  Also, DI Water gauge in cabinet not working. Gauge on outside 
          of cabinet reading 21 psi.

	  Only cleaned Conditioner Gimbal ASS.
18.24WW35 Quarterly PMFABSIX::R_POIRIERMon Feb 26 1996 06:44110
_____________________________________________________________________________
         SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
              Quarterly Preventative Maintenance Check Sheet, Rev C

 DATE:_2/26/96___    SYSTEM RTC CODE:_CMP.B1_    EQUIP. TECH:_B Shift____

6.3.1  Perform the Weekly + Monthly PM Tasks		Completed: Done

6.3.2  Check the 24 Volt power supply			Pre-adjust: 23.79

6.3.3  Check the 15 Volt power supply			Pre-adjust: 14.79

6.3.4  Check the 5 Volt power supply			Pre-adjust:  4.79

6.3.5  Check Table Rotation Speed			Completed: Done

6.3.6  Check Vacuum Pump Diaphrams			Completed: Done

6.3.7  Check Vacuum Tank/Pump lines			Completed: Done

6.3.8  Check Load Cup alignment				Completed: Done


Comments:__Load cup alignments were off and had to be calibrated.

Weekly and Monthly PM checksheets follow below.
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE:_2/26/96___    SYSTEM RTC CODE:_CMP.B1_    EQUIP. TECH:_B Shift____

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 96

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 96

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 44

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 50

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust: 4.2

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust: 20

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust: 49

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI   Pre-adjust: 12

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust: 80

6.1.18 Check system for fluid leaks			Completed:  Done

6.1.19 Check tubing/fittings for leaks			Completed:  Done

6.1.20 Check system for pneumatic leaks			Completed:  Done

6.1.21 Check system indicator lamps			Completed:  Done

6.1.22 Check stations/components for contamination	Completed:  Done

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI	Pre-adjust: 4 

6.1.24 Clean and lubricate the Scrubber rails		Completed:  Done

6.1.25 Clean and lubricate the Paddle rails		Completed:  Done

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:  Done

Comments:____Found a small puddle of oil under index table motor.
--------------------------------------------------------------------------------
         SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
              Monthly Preventative Maintenance Check Sheet, Rev C


6.2.1  Perform Weekly PM Tasks				Completed:  Done	

6.2.2  Change Peristaltic Pump Lines			Completed: N/A

6.2.3  Clean Polish area drain tub			Completed: Done

6.2.4  Check Polish Table Belt for defects		Completed: Done

6.2.5  Check the Neslab water level			Completed: Done

6.2.6  Check the Neslab fittings for leaks              Completed: Done

6.2.7  Check Scrubber Brushes for contaminates/defects	Completed: Done

6.2.8  Check the Load Flipper alignment			Completed: Done

6.2.9  Check the Unload Flipper alignment		Completed: Done

Comments:____________________________________________________________________
18.25Weekly PM completed for WW36SUBPAC::BJUBINVILLENFD Fire - RescueTue Mar 05 1996 22:5963
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C
				Work Week 34

 DATE: 3-5-96       SYSTEM RTC CODE: CMP.B1    EQUIP. TECH: D Shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 98 psi

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 95 psi

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 20 psi

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45 psi

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust: 23 psi

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35 psi

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30 psi

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60 psi

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust: 4.2 psi

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30 psi

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust: 20 psi

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 58 psi

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust: 60 psi

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust: 10 psi

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80 psi

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 64 psi

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust: 80 psi

6.1.18 Check system for fluid leaks			Completed: Done

6.1.19 Check tubing/fittings for leaks			Completed: Done

6.1.20 Check system for pneumatic leaks			Completed: Done

6.1.21 Check system indicator lamps			Completed: Done

6.1.22 Check stations/components for contamination	Completed: Done

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 4 psi

6.1.24 Clean and lubricate the Scrubber rails		Completed: Done

6.1.25 Clean and lubricate the Paddle rails		Completed: Done

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed: N/A
    
          
	  DI Water gauge in cabinet not working. Gauge on outside 
          of cabinet reading 20 psi.  I will be removing the gauge 
          gaurd in the tool.

18.26WW37 Weekly PMFABSIX::R_POIRIERWed Mar 13 1996 01:0863
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C
				Work Week 37

 DATE: 3-13-96       SYSTEM RTC CODE: CMP.B1    EQUIP. TECH: B Shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 98 psi

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 95 psi

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 25 psi

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 48 psi

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust: 23 psi

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35 psi

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30 psi

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60 psi

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust: 4.2 psi

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30 psi

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust: 20 psi

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60 psi

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust: 56 psi

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust: 12 psi

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80 psi

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65 psi

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust: 80 psi

6.1.18 Check system for fluid leaks			Completed: Done

6.1.19 Check tubing/fittings for leaks			Completed: Done

6.1.20 Check system for pneumatic leaks			Completed: Done

6.1.21 Check system indicator lamps			Completed: Done

6.1.22 Check stations/components for contamination	Completed: Done

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 4 psi

6.1.24 Clean and lubricate the Scrubber rails		Completed: Done

6.1.25 Clean and lubricate the Paddle rails		Completed: Done

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed: N/A
    


Note: Found and cleaned oil leak under index table.

18.27Weekly PM for WW38 completedSUBPAC::BJUBINVILLENFD Fire - RescueWed Mar 20 1996 03:2064
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C
				Work Week 37

 DATE: 3-20-96       SYSTEM RTC CODE: CMP.B1    EQUIP. TECH: BJ

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 95 psi

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 95 psi

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 15 psi

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 48 psi

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust: 26 psi

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35 psi

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30 psi

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60 psi

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust: 4.2 psi

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30 psi

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust: 20 psi

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60 psi

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust: 60 psi

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust: 10 psi

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80 psi

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65 psi

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust: 80 psi

6.1.18 Check system for fluid leaks			Completed: Done

6.1.19 Check tubing/fittings for leaks			Completed: Done

6.1.20 Check system for pneumatic leaks			Completed: Done

6.1.21 Check system indicator lamps			Completed: Done

6.1.22 Check stations/components for contamination	Completed: Done

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 4.1 psi

6.1.24 Clean and lubricate the Scrubber rails		Completed: Done

6.1.25 Clean and lubricate the Paddle rails		Completed: Done

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed: N/A
    


Note: Found and cleaned oil leak under index table
      Incoming DI won't get over 15 psi
      

18.28Weekly PM started... some items outstandingSUBPAC::BJUBINVILLENFD Fire - RescueMon Mar 25 1996 11:0064
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C
				Work Week 37

 DATE: 3-25-96       SYSTEM RTC CODE: CMP.B1    EQUIP. TECH: A shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 95 psi

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 90 psi

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 20 psi

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 44 psi

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust: 23 psi

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35 psi

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30 psi

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60 psi

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust: 4.2 psi

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30 psi

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust: 18 psi

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60 psi

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust: 58 psi

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust: 10 psi

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80 psi

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 64 psi

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust: 80 psi

6.1.18 Check system for fluid leaks			Completed: no

6.1.19 Check tubing/fittings for leaks			Completed: no

6.1.20 Check system for pneumatic leaks			Completed: no

6.1.21 Check system indicator lamps			Completed: Done

6.1.22 Check stations/components for contamination	Completed: no

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 6 psi

6.1.24 Clean and lubricate the Scrubber rails		Completed: no

6.1.25 Clean and lubricate the Paddle rails		Completed: no

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed: N/A
    


Note: 
      
      

18.29Monthly completedSUBPAC::LANDRYTue Apr 02 1996 14:2231
         SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
              Monthly Preventative Maintenance Check Sheet, Rev C

 DATE:  4-2-96       SYSTEM RTC CODE:  CMP.B1   EQUIP TECH:  A Shift

6.2.1  Perform Weekly PM Tasks				Completed:  TL

6.2.2  Change Peristaltic Pump Lines			Completed:  TL

6.2.3  Clean Polish area drain tub			Completed:  TL

6.2.4  Check Polish Table Belt for defects		Completed:  TL

6.2.5  Check the Neslab water level			Completed:  TL

6.2.6  Check the Neslab fittings for leaks              Completed:  TL

6.2.7  Check Scrubber Brushes for contaminates/defects	Completed:  TL

6.2.8  Check the Load Flipper alignment			Completed:  TL

6.2.9  Check the Unload Flipper alignment		Completed:  TL

Comments:  Found the polish tables bottom drain ring was clogged.  Removed
           and cleaned the flex tubing under polish table.  snaked all the
           remaining hard_plumbed tubing as best as possible.  Most (if not
           all) of the restrictions have been eliminated.

           Gear box oil (~10 CC's) was found.  Reps to address this problem.
                                                                    
18.30Weekly PM for WW41 completedSUBPAC::BJUBINVILLENFD Fire - RescueWed Apr 10 1996 22:4166
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C
				Work Week 37

 DATE: 3-10-96       SYSTEM RTC CODE: CMP.B1    EQUIP. TECH: BJ

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 90 psi

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85 psi

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 25 psi

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45 psi

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust: 23 psi

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35 psi

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30 psi

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60 psi

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust: 4.2 psi

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30 psi

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust: 20 psi

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60 psi

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust: 60 psi

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI Pre-adjust: 10 psi

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80 psi

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 62 psi

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust: 80 psi

6.1.18 Check system for fluid leaks			Completed: Done

6.1.19 Check tubing/fittings for leaks			Completed: Done

6.1.20 Check system for pneumatic leaks			Completed: Done

6.1.21 Check system indicator lamps			Completed: Done

6.1.22 Check stations/components for contamination	Completed: Done

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI  Pre-adjust: 5 psi

6.1.24 Clean and lubricate the Scrubber rails		Completed: Done

6.1.25 Clean and lubricate the Paddle rails		Completed: Done

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed: Done
    


Note:  Found DI leak under inside bottom of tool on the right side.
       Source unknown at this time, my head is too big.  A bucket
       was placed under the drip for now.
      
      

18.31Weekly PM for WW42 completedFABSIX::L_SHKOLNIKOVWed Apr 17 1996 08:1481
                 
                           Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

    DATE: 4-17-96       SYSTEM RTC CODE: CMP.B1    EQUIP. TECH: BJ/LS
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 90

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 22

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 10

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 64

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  DONE 

6.1.20 Check tubing/fittings for fluid leaks            Completed:  DONE 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  DONE 

6.1.22 Check stations/components for contamination	Completed:  DONE 

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 3 

6.1.24 Clean and lubricate the Scrubber rails		Completed:  DONE

6.1.25 Clean and lubricate the Paddle rails		Completed:  DONE 

6.1.26 Clean Conditioning Wheel and Housing             Completed:  DONE

6.1.27 Scrub clean the Polish area tub and walls        Completed:  DONE

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  DONE

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  DONE

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  DONE 

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  DONE

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  DONE

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   DONE

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  DONE

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  DONE 

Comments:

       ____________________________________________________________
    
18.32WW 43 PM completed - WeeklySUBPAC::LANDRYWed Apr 24 1996 17:5280
                 
                           Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 4-24-96    SYSTEM RTC CODE: CMP.B1    EQUIP TECH:  A Shift/Swenson

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 96

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 32

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 10

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X 

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X 

6.1.22 Check stations/components for contamination	Completed:  X 

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 7 

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X 

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X

Comments:  Found small amount of gear box oil underneath the Index Table
           gear box.  
18.33Monthly PM completed for WW44SUBPAC::BJUBINVILLECMP Equipment EngineeringWed May 01 1996 08:04143
                           Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev D

DATE: 5/1/96      TOOL: CMP.B1         TECH/SHIFT: A, B and D  


6.2.1  Change Peristaltic Pump Lines			Completed:  X

6.2.2  Clean Polish area tub drains			Completed:  X

6.2.3  Check Polish Table Belt for defects		Completed:  X

6.2.4  Perform Down Force Calibration on all 5 heads    Completed:  X

       Down Frc: Head 1 Pre-Adj: 390 Post-adj: 377

                 Head 2 Pre-Adj: 400 Post-adj: 377

                 Head 3 Pre-Adj: 390 Post-adj: 378

                 Head 4 Pre-Adj: 353 Post-adj: 377

                 Head 5 Pre-Adj: 389 Post-adj: 376

6.2.5  Perform Down Force Calibration on Conditioner    Completed:  X

       Actual Down Force Pre-Adj:  79.1@100%  50@67%      

       Actual Down Force Post-Adj: 

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed:  X

6.2.7  Check the Load Flipper alignment			Completed:  X

6.2.8  Check the Unload Flipper alignment		Completed:  X

6.2.9  Check the Elevator alignment                     Completed:  X

6.2.10 Check wafer unload, from Index table to cassette Completed:  X

6.2.11 Check the +24 Volt power supply                  Pre-Adjust: X

6.2.12 Check the +/- 15 Volt power supply               Pre-Adjust: X

6.2.13 Check the +5 Volt power supply                   Pre-Adjust: X

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed:  X

6.2.15 Check Vacuum Pump Diaphrams			Completed:  X

6.2.16 Check Vacuum Tank/Pump lines			Completed:  X

6.2.17 Check Load Cup Position alignment		Completed:  X

6.2.18 Check Load Cup Height alignment                  Completed:  X

6.2.19 Check Robot alignments			        Completed:  X

6.2.20 Check Muffin Fans for proper operation           Completed:  X

Comments:

                                                                   
                 
                           Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D


6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 96

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 32

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 10

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X 

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X 

6.1.22 Check stations/components for contamination	Completed:  X 

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 7 

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X 

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X

Comments: 
18.34Weekly PM Checksheet - WW45ASDG::POIRIERSat May 11 1996 18:1079
                 
                           Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 5/8/96    SYSTEM RTC CODE: CMP.B1    EQUIP TECH:  BJ

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 95

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 10

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 64

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  x 

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X 

6.1.22 Check stations/components for contamination	Completed:  X 

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 2.5 

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X 

6.1.26 Clean Conditioning Wheel and Housing             Completed:  x

6.1.27 Scrub clean the Polish area tub and walls        Completed:  x

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  x 

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  x

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  x

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   x

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  x

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X

Comments: 
18.35Weekly PM completed for WW46FABSIX::L_SHKOLNIKOVSat May 18 1996 06:2479
                 
                           Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 5/18/96    SYSTEM RTC CODE: CMP.B1    EQUIP TECH:  D - shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 90

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 20

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 22

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 10

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 64

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 65
                                                                    
6.1.19 Check Drip Pan for moisture/contamination        Completed:  X 

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X 

6.1.22 Check stations/components for contamination	Completed:  X 

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 3.0 

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X 

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X 

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X

Comments: 
18.36WW47 weekly pmFABSIX::L_SHKOLNIKOVFri May 24 1996 23:4082
                     
                           Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 5/24/96    SYSTEM RTC CODE: CMP.B1    EQUIP TECH:  D - shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 95

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 30

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 10

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 64

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80
                                                                    
6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X 

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 3.0 

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X

Comments: Oil spot about 5-6 in diameter was detected on very bottom of tool
      under the index table motor. Everything wiped out. Will check for oil
      leaks on the next week. 
                                                                     
18.37SHUTDOWN CHECKSHEETSTRATA::RIDLONEliminate the obviousMon May 27 1996 07:3625



                        CMP.B SHUT DOWN CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
								 INIT / DATE
1) SCRUB SIDES OF CARRIERS					___B__/5/27__
2) RUN CARRIER BLOW OFF FOR 30 SECONDS				___B__/______
3) REMOVE ALL CARRIERS						___B__/______
4) PLACE WIPES UNDER CARRIER FILMS AND LAY CARRIERS DI TANK	___B__/______
5) IF POWER TO SLURRY SYSTEM IS GOING TO BE LOST, CONTACT 
   ASHLAND CHEMICAL AND HAVE SLURRY SYSTEM PURGED AND CHARGED 
   WITH DI WATER.						___B__/______
6) CLEAN ENTIRE SYSTEM OF DRIED SLURRY 			        ___B__/______
7) REMOVE CONDITIONER AND CLEAN					___B__/______
8) CYCLE/RINSE ALL DI FUNCTIONS: SPRAY NOZZLES, SLURRY PUMPS,
   CONDITIONER RINSE, ELEVATOR TANKS.				___B__/______
9) SHUT OFF DI BEHIND SYSTEM (ROTATE 3W VLV TO FULL RETURN)     ___B__/______ 
10) DRAIN ELEVATOR AND CONDITIONER TUBE				___B__/______
11) REMOVE PADS, AND CLEAN AND DRY TABLES			___B__/______
12) REMOVE SCRUBBER BRUSHES AND SOAK IN DI			___B__/______
13) DRY ENTIRE SYSTEM OF ANY STANDING WATER			___B__/______
14) POWER DOWN SYSTEM.

18.38Startup ChecksheetSUBPAC::LANDRYTue May 28 1996 20:0019
                        CMP.B START UP CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
                                                                 INIT / DATE
1) TURN ON DI WATER (ROTATE 3W VLV TO FULLY TO POLISHER.        A shift  5/28
2) POWER ON SYSTEM.						A shift  5/28
3) CYCLE/RUN ALL DI FUNCTIONS FOR 15 MINUTES			A shift  5/28
4) WIPE DOWN SYSTEM CLEAN ALL DRIED SLURRY	                A shift  5/28
5) DRY TABLES, INSTALL PADS					A shift  5/28
6) INSTALL SCRUBBER BRUSHES					A shift  5/28
7) INSTALL CONDITIONER						A shift  5/28
8) INSTALL CARRIERS						A shift  5/28
9) RUN WET IDLE PROGRAM FOR 15 MIN. (ENOUGH TO CLEAN CARRIERS)  A shift  5/28
10) IF SLURRY SYSTEM WAS SHUT DOWN, CONTACT ASHLAND CHEMICAL,
    REQUEST DI TO BE PURGE FROM SLURRY SYSTEM AND CHARGED WITH 
    SLURRY AND REQUEST A NEW SLURRY FILTER BE INSTALLED.	    N/A
11) CALIBRATE SLURRY FLOW					A shift  5/28
12) PUT IN WET IDLE AND TURN OVER TO MFG FOR MQC		A shift  5/28

18.39B1 Monthly completed for WW48SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed May 29 1996 07:24144

                           Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev D

DATE: 5/29/96        ENTITY: CMP.B1      TECH/SHIFT: D shift

6.2.1  Change Peristaltic Pump Lines			Completed:  X

6.2.2  Clean Polish area tub drains			Completed:  X

6.2.3  Check Polish Table Belt for defects		Completed:  X

6.2.4  Perform Down Force Calibration on all 5 heads    Completed:  X

       Down Frc: Head 1 Pre-Adj: 388 Post-adj: 377

                 Head 2 Pre-Adj: 370 Post-adj: 376

                 Head 3 Pre-Adj: 385 Post-adj: 377

                 Head 4 Pre-Adj: 375 Post-adj: 377

                 Head 5 Pre-Adj: 407 Post-adj: 377

6.2.5  Perform Down Force Calibration on Conditioner    Completed:  X

       Actual Down Force Pre-Adj: 57 @ 67%

       Actual Down Force Post-Adj: N/A

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed:  X

6.2.7  Check the Load Flipper alignment			Completed:  X

6.2.8  Check the Unload Flipper alignment		Completed:  X

6.2.9  Check the Elevator alignment                     Completed:  X

6.2.10 Check wafer unload, from Index table to cassette Completed:  X

6.2.11 Check the +24 Volt power supply                  Pre-Adjust: +24.00

6.2.12 Check the +/- 15 Volt power supply               Pre-Adjust: +15.3/-15.1

6.2.13 Check the +5 Volt power supply                   Pre-Adjust: +4.96

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed:  x

6.2.15 Check Vacuum Pump Diaphrams			Completed:  X

6.2.16 Check Vacuum Tank/Pump lines			Completed:  X

6.2.17 Check Load Cup Position alignment		Completed:  X

6.2.18 Check Load Cup Height alignment                  Completed:  X

6.2.19 Check Robot alignments			        Completed:

6.2.20 Check Muffin Fans for proper operation           Completed:  X


                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 5/29/96        ENTITY: CMP.B1      TECH/SHIFT: D shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 90

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 86

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 30

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.0

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 10

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 62

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 3.0

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X

Comments:

                                                                     
18.40ww49 weekly pm completedFABSIX::L_SHKOLNIKOVFri Jun 07 1996 00:0082
                     
                           Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 6/06/96    SYSTEM RTC CODE: CMP.B1    EQUIP TECH:  D - shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 94

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 88

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 28

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 22

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 10

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80
                                                                    
6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X 

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 3.0 

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X
 
Comments: During the PM this night I noticed that index table gearbox 
          still leaking. The leak appears to be in couple places.
    
                                  
18.41ww50 weekly pmFABSIX::L_SHKOLNIKOVThu Jun 13 1996 00:2981
                     
                           Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 6/12/96    SYSTEM RTC CODE: CMP.B1    EQUIP TECH:  D - shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 96

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 23

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 58

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 30

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 10

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80
                                                                    
6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X 

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 3.8 

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X
 
Comments: 
    
                                  
18.42WW 51 - Weekly versionSUBPAC::LANDRYMon Jun 17 1996 12:5388
                           Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 6/17/96    SYSTEM RTC CODE: CMP.B1    EQUIP TECH: A shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 95

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 23

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 58

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.0

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 30

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 10

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80
                                                                    
6.1.19 Check Drip Pan for moisture/contamination        Completed:  x

6.1.20 Check tubing/fittings for fluid leaks            Completed:  x 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  x

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 6.5

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  x

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  x

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   x

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:  x

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X
 
Comments: 1)  Repaired chilled water leaks fluid cabinet, retaped the elbow
              fitting on both the on and off valves.

          2)  Found residual oil under Index Table motor gear box

          3)  Found small fragment in unload cup # 3.  Had to rub agressively
              with wipe to remove from cup.

          4)  Found a small amount of water in the main drip pan around the
              vacuum tank area.  Cleaned up, unable to identify the source
              of the leak.
18.43ww52 weekly pmFABSIX::L_SHKOLNIKOVWed Jun 26 1996 06:0281
                               Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 6/25/96    SYSTEM RTC CODE: CMP.B1    EQUIP TECH: D shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 95

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 22

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.0

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 10

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80
                                                                    
6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  x 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  x

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 4

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  x

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X
 
Comments: Found couple oil spots under Index Table motor gear box
          and small amount of water in the main drip pan around the
          vacuum tank area. Will try to identify the source of the leak.
                                                                     
18.44B1 weekly PM completed for WW1SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Jul 04 1996 03:2479
                               Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 7/3/96    SYSTEM RTC CODE: CMP.B1    EQUIP TECH: D shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 94

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 86

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 26

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 40

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 3.8

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 15

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80
                                                                    
6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  x 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  x

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 2.2

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  x

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X
 
Comments: Found couple oil spots under Index Table motor gear box
         
18.45B1 SHUT-DOWN COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Jul 04 1996 03:2726
                        CMP.B1 SHUT DOWN CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
							        SHIFT / DATE
1) SCRUB SIDES OF CARRIERS					  D    7/3/96
2) RUN CARRIER BLOW OFF FOR 30 SECONDS				  D    7/3/96
3) REMOVE ALL CARRIERS						  D    7/3/96
4) PLACE WIPES UNDER CARRIER FILMS AND LAY CARRIERS DI TANK	  D    7/3/96
5) IF POWER TO SLURRY SYSTEM IS GOING TO BE LOST, CONTACT 
   ASHLAND CHEMICAL AND HAVE SLURRY SYSTEM PURGED AND CHARGED 
   WITH DI WATER.						  D    7/3/96
6) CLEAN ENTIRE SYSTEM OF DRIED SLURRY 			          D    7/3/96
7) REMOVE CONDITIONER AND CLEAN					  D    7/3/96
8) CYCLE/RINSE ALL DI FUNCTIONS: SPRAY NOZZLES, SLURRY PUMPS,
   CONDITIONER RINSE, ELEVATOR TANKS.			          D    7/3/96
9) SHUT OFF DI BEHIND SYSTEM (ROTATE 3W VLV TO FULL RETURN)       D    7/3/96 
10) DRAIN ELEVATOR AND CONDITIONER TUBE				  D    7/3/96
11) REMOVE PADS, AND CLEAN AND DRY TABLES	        	  D    7/3/96
12) REMOVE SCRUBBER BRUSHES AND SOAK IN DI			  D    7/3/96
13) DRY ENTIRE SYSTEM OF ANY STANDING WATER			  D    7/3/96
14) POWER DOWN SYSTEM.                                            D    7/3/96

    
    
                              
                              
18.46B1 STARTUP COMPLETEDFABSIX::L_SHKOLNIKOVSat Jul 06 1996 04:3221

                        CMP.B1 START UP CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
                                                                 INIT / DATE

1) TURN ON DI WATER (ROTATE 3W VLV TO FULLY TO POLISHER.	__LS__/7-6-96
2) POWER ON SYSTEM.						__LS__/7-6-96
3) CYCLE/RUN ALL DI FUNCTIONS FOR 15 MINUTES			__LS__/7-6-96
4) WIPE DOWN SYSTEM CLEAN ALL DRIED SLURRY	                __LS__/7-6-96
5) DRY TABLES, INSTALL PADS					__LS__/7-6-96
6) INSTALL SCRUBBER BRUSHES					__LS__/7-6-96
7) INSTALL CONDITIONER						__LS__/7-6-96
8) INSTALL CARRIERS						__LS__/7-6-96
9) RUN WET IDLE PROGRAM FOR 15 MIN. (ENOUGH TO CLEAN CARRIERS)  __LS__/7-6-96
10) IF SLURRY SYSTEM WAS SHUT DOWN, CONTACT ASHLAND CHEMICAL,
    REQUEST DI TO BE PURGE FROM SLURRY SYSTEM AND CHARGED WITH 
    SLURRY AND REQUEST A NEW SLURRY FILTER BE INSTALLED.	__LS__/7-6-96
11) CALIBRATE SLURRY FLOW					__LS__/7-6-96
12) PUT IN WET IDLE AND TURN OVER TO MFG FOR MQC		__LS__/7-6-96

18.47SEMI-ANNUAL PM FOR WW2 COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringSat Jul 13 1996 00:30173
    
    
                           Speedfam Corp. CMP-V Planarizer

             Semi-Annual Preventative Maintenance Check Sheet, Rev D

DATE: 7/12/96         ENTITY: CMP.B1              TECH/SHIFT: C + D
    
6.4.1  Check all interlocks for functionality		Completed:  X

6.4.2  Check all EMO's for functionality		Completed:  X

6.4.3  Lubricate the Rotary Union			Completed:  X

6.4.4  Lubricate the Lead Screw				Completed:  X

6.4.5  Lubricate the Linear Guide Rails			Completed:  X

6.4.6  Lubricate the Idler Pulley			Completed:  X

Comments:




                           Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev D

                                           	

6.2.1  Change Peristaltic Pump Lines			Completed:  X

6.2.2  Clean Polish area tub drains			Completed:  X

6.2.3  Check Polish Table Belt for defects		Completed:  X

6.2.4  Perform Down Force Calibration on all 5 heads    Completed:  X

       Down Frc: Head 1 Pre-Adj:407.0_ Post-adj:375.6

                 Head 2 Pre-Adj:424.6_ Post-adj:375.6_

                 Head 3 Pre-Adj:386.0_ Post-adj:377.9_

                 Head 4 Pre-Adj:410.0_ Post-adj:375.9_

                 Head 5 Pre-Adj:379.4_ Post-adj:379.4_

6.2.5  Perform Down Force Calibration on Conditioner    Completed:  X 

       Actual Down Force Pre-Adj:__66.8____________

       Actual Down Force Post-Adj:_77.1___________

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed:  X

6.2.7  Check the Load Flipper alignment			Completed:  X

6.2.8  Check the Unload Flipper alignment		Completed:  X

6.2.9  Check the Elevator alignment                     Completed:  X

6.2.10 Check wafer unload, from Index table to cassette Completed:  X

6.2.11 Check the +24 Volt power supply                  Pre-Adjust: 24.1

6.2.12 Check the +/- 15 Volt power supply               Pre-Adjust:+15/-15.2

6.2.13 Check the +5 Volt power supply                   Pre-Adjust: 4.99

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed:  29.9

6.2.15 Check Vacuum Pump Diaphrams			Completed:  X

6.2.16 Check Vacuum Tank/Pump lines			Completed:  X

6.2.17 Check Load Cup Position alignment		Completed:  X

6.2.18 Check Load Cup Height alignment                  Completed:  X

6.2.19 Check Robot alignments			        Completed:  X

6.2.20 Check Muffin Fans for proper operation           Completed:  X

Comments:





                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 88

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 22

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 59

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 55

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 18

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: X

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: n/a

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X *

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  X

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X

Comments:
* Brush was alittle worn but not bad enough to replace, just turned it 15 
  degrees.



18.48WEEKLY PM COMPLETED FOR WW3FABSIX::L_SHKOLNIKOVWed Jul 17 1996 22:5179
                               Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 7/17/96    SYSTEM RTC CODE: CMP.B1    EQUIP TECH: D shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 88

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 28

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 3.4

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 22

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 18

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80
                                                                    
6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  x 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  x

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 3.8

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  x

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X
 
Comments: Found couple oil spots under Index Table motor gear box
         
18.49ww4 weekly pm completed.FABSIX::L_SHKOLNIKOVWed Jul 24 1996 08:2879
                               Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 7/24/96    SYSTEM RTC CODE: CMP.B1    EQUIP TECH: D shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 86

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 28

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 3.0

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 22

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 18

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80
                                                                    
6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  x 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  x

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 3.0

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  x

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X
 
Comments: Found couple oil spots under Index Table motor gear box
         
18.50CMP.B1 Monthly P.M. Checksheet for WW5.ASDG::POIRIERFri Aug 02 1996 20:10146

                           Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev D

DATE: 8/2/96        ENTITY: CMP.B1      TECH/SHIFT: C shift

6.2.1  Change Peristaltic Pump Lines			Completed:  x

6.2.2  Clean Polish area tub drains			Completed:  x

6.2.3  Check Polish Table Belt for defects		Completed:  x

6.2.4  Perform Down Force Calibration on all 5 heads    Completed:  X

       Down Frc: Head 1 Pre-Adj: 382.5     	Post-adj: 377.2   

                 Head 2 Pre-Adj: 381.6    	Post-adj: 378.0

                 Head 3 Pre-Adj: 376.5    	Post-adj: No Adj Necessary   

                 Head 4 Pre-Adj: 376.7    	Post-adj: "              "

                 Head 5 Pre-Adj: 390.0    	Post-adj: 376.2   

6.2.5  Perform Down Force Calibration on Conditioner    Completed: X 

       Actual Down Force Pre-Adj:  87.6 lbs.

       Actual Down Force Post-Adj: 76.9 lbs.

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: X

6.2.7  Check the Load Flipper alignment			Completed: X  

6.2.8  Check the Unload Flipper alignment		Completed: X 

6.2.9  Check the Elevator alignment                     Completed: X 

6.2.10 Check wafer unload, from Index table to cassette Completed: X 

6.2.11 Check the +24 Volt power supply                  Pre-Adjust: 23.7 vdc   

6.2.12 Check the +/- 15 Volt power supply               Pre-Adjust: 15.10 vdc   

6.2.13 Check the +5 Volt power supply                   Pre-Adjust: 4.98 vdc   

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed:  X  29.9 rpm 

6.2.15 Check Vacuum Pump Diaphrams			Completed: N/A  

6.2.16 Check Vacuum Tank/Pump Lines                     COmpleted:  X

6.2.17 Check Load Cup Position alignment		Completed:  X

6.2.18 Check Load Cup Height alignment                  Completed:  X

6.2.19 Check Robot alignments			        Completed:  X

6.2.20 Check Muffin Fans for proper operation           Completed:  X


                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 8/2/96        ENTITY: CMP.B1      TECH/SHIFT: C shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 20

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 58

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 3.8

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 18

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  x *

6.1.20 Check tubing/fittings for fluid leaks            Completed:  x

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  x

6.1.22 Check stations/components for contamination	Completed:  x

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 3.0

6.1.24 Clean and lubricate the Scrubber rails		Completed:  x

6.1.25 Clean and lubricate the Paddle rails		Completed:  x

6.1.26 Clean Conditioning Wheel and Housing             Completed:  x

6.1.27 Scrub clean the Polish area tub and walls        Completed:  x

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  x

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  x

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  x

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  x

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   x

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  x

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  x


Comments: * The Index motor was leaking oil.  Found a puddle that was about 5"
	    diameter.

                                                                     
18.51WW06 Weekly PMFABSIX::R_POIRIERMon Aug 05 1996 04:1380
--------------------------------------------------------------------------------
                               Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 8/5/96    SYSTEM RTC CODE: CMP.B1    EQUIP TECH: B shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 86

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 27

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 50

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 21

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 58

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 17

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 68

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80
                                                                    
6.1.19 Check Drip Pan for moisture/contamination        Completed:  x

6.1.20 Check tubing/fittings for fluid leaks            Completed:  x 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  x

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 9

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  x

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X
 
Comments: Found one oil spot under Index Table motor gear box
         
18.52B1 weekly PM completedSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringFri Aug 16 1996 01:2982
                               Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 8/15/96    SYSTEM RTC CODE: CMP.B1    EQUIP TECH: BJ,LS,DW

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 52

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 20

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 70

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80
                                                                    
6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  x 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  x

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X
 
Comments:  A large puddle of either DI or city water was found in the
           drip pan under index table and on the floor under the tool.
           We need a 2 year old to slide under the table to find the
           source as I am too fat and Leon is blind.
         
18.54ww08 weekly completedFABSIX::L_SHKOLNIKOVWed Aug 21 1996 02:0981
--------------------------------------------------------------------------------
                               Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 8/21/96    SYSTEM RTC CODE: CMP.B1    EQUIP TECH: D shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 88

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 28

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 52

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 55

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 18

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 8x
                                                                    
6.1.19 Check Drip Pan for moisture/contamination        Completed:  x

6.1.20 Check tubing/fittings for fluid leaks            Completed:  x 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  x

6.1.22 Check stations/components for contamination	Completed:  x

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10

6.1.24 Clean and lubricate the Scrubber rails		Completed:  x

6.1.25 Clean and lubricate the Paddle rails		Completed:  x

6.1.26 Clean Conditioning Wheel and Housing             Completed:  x

6.1.27 Scrub clean the Polish area tub and walls        Completed:  x

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  x

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  x

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  x

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  x

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   x

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:  x

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  x
 
Comments: Found one oil spot under Index Table motor gear box
          about 5".
          
18.55ww09 weekly pm completed.FABSIX::L_SHKOLNIKOVThu Aug 29 1996 01:3781
--------------------------------------------------------------------------------
                               Speedfam Corp. CMP-V Planarizer
                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 8/28/96    SYSTEM RTC CODE: CMP.B1    EQUIP TECH: D shift

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 88

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 32

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 55

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 18

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 18

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80
                                                                    
6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X
 
Comments: Found one oil spot under Index Table motor gear box
          about 3".
          
18.56CPM.B1 SHUTDOWN CHECKSHEETFABSIX::R_POIRIERMon Sep 02 1996 02:5030
                        CMP.B1 SHUT DOWN CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
							        SHIFT / DATE
1) SCRUB SIDES OF CARRIERS					  B    9-1-96
2) RUN CARRIER BLOW OFF FOR 30 SECONDS				  B    9-1-96
3) REMOVE ALL CARRIERS						  B    9-1-96
4) PLACE WIPES UNDER CARRIER FILMS AND LAY CARRIERS DI TANK	  B    9-1-96
5) IF POWER TO SLURRY SYSTEM IS GOING TO BE LOST, CONTACT 
   ASHLAND CHEMICAL AND HAVE SLURRY SYSTEM PURGED AND CHARGED 
   WITH DI WATER.						  B    9-1-96
6) CLEAN ENTIRE SYSTEM OF DRIED SLURRY 			          B    9-1-96
7) REMOVE CONDITIONER AND CLEAN					  B    9-1-96
8) CYCLE/RINSE ALL DI FUNCTIONS: SPRAY NOZZLES, SLURRY PUMPS,
   CONDITIONER RINSE, ELEVATOR TANKS.			          B    9-1-96
9) JUMPER DI PRESSURES SWITCHES                                   B    9-1-96
10) SHUT OFF DI BEHIND SYSTEM (ROTATE 3W VLV TO FULL RETURN)      B    9-1-96 
11) DRAIN ELEVATOR AND CONDITIONER TUBE				  B    9-1-96
12) REMOVE PADS, AND CLEAN AND DRY TABLES	        	  B    9-1-96
13) REMOVE SCRUBBER BRUSHES AND SOAK IN DI			  B    9-1-96
14) DRY ENTIRE SYSTEM OF ANY STANDING WATER			  B    9-1-96
15) TURN OFF CHILLER					          B    9-1-96


  ** DO NOT TURN POWER OFF TO POLISHER **

  ** THE MAIN PCW VALES ARE TO BE SHUT IN THE PIPE GALLERY  **
    
    
                              
18.57WW10 Monthly P.M. Check SheetASDG::POIRIERFri Sep 06 1996 20:12146
                           Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev D

                                           	

6.2.1  Change Peristaltic Pump Lines			Completed: X

6.2.2  Clean Polish area tub drains			Completed: X   

6.2.3  Check Polish Table Belt for defects		Completed: X

6.2.4  Perform Down Force Calibration on all 5 heads    Completed: X

       Down Frc: Head 1 Pre-Adj: 395.1        Post-adj: 378.0

                 Head 2 Pre-Adj: 378.1        Post-adj: n/a

                 Head 3 Pre-Adj: 376.6        Post-adj: n/a

                 Head 4 Pre-Adj: 377.9        Post-adj: n/a

                 Head 5 Pre-Adj: 409.0        Post-adj: 375.7

6.2.5  Perform Down Force Calibration on Conditioner    Completed: X

       Actual Down Force Pre-Adj:  94.2

       Actual Down Force Post-Adj: 77.1

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: X

6.2.7  Check the Load Flipper alignment			Completed: X

6.2.8  Check the Unload Flipper alignment		Completed: X

6.2.9  Check the Elevator alignment                     Completed: X

6.2.10 Check wafer unload, from Index table to cassette Completed: X

6.2.11 Check the +24 Volt power supply                  Pre-Adjust: 23.73

6.2.12 Check the +/- 15 Volt power supply               Pre-Adjust: 15.79

6.2.13 Check the +5 Volt power supply                   Pre-Adjust:  4.97

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed:  29.9 RPM

6.2.15 Check Vacuum Pump Diaphrams			Completed: N/A

6.2.16 Check Vacuum Tank/Pump lines			Completed: X

6.2.17 Check Load Cup Position alignment		Completed: X

6.2.18 Check Load Cup Height alignment                  Completed: X

6.2.19 Check Robot alignments			        Completed: X

6.2.20 Check Muffin Fans for proper operation           Completed: X

Comments:

    
--------------------------------------------------------------------------------

                                                                    

                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 87

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 22

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 55

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  4

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 15

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 48

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 18

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 70

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 9 psi

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: X

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments:

18.58WW XI - WeeklySUBPAC::LANDRYTue Sep 10 1996 20:3079
                           Speedfam Corp. CMP-V Planarizer          
                Weekly Preventative Maintenance Check Sheet, Rev D
    
DATE: 9/10/96        TOOL: CMP.B1           TECH/SHIFT:   A shifts
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 88

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 100

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35  

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.0

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: n/a 

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 15

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 28  
                                                                       
6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 50

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed:  N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X

Comments: 
18.59CMP.B1 WEEKLY COMPLETEDSTRATA::WESTPHALWed Sep 18 1996 19:4765
                                 (CMP.B1)
================================================================================
Note 61.1                    (CMP.B1) PM CHECKSHEETS                     1 of 20
SUBPAC::TOOKER                                       60 lines  13-JUL-1995 14:57
                       -< Weekly PM Checksheet Template >-
--------------------------------------------------------------------------------
          SpeedFam CMP-V Planarizer Maintenance Procedures HF6O-0172
             Weekly Preventative Maintenance Check Sheet, Rev C

 DATE:18 SEPT 96   SYSTEM RTC CODE:_CMP.B1__    EQUIP. TECH:_BRAD/JIM S.______

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 20

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure for 23 PSI	Pre-adjust: 22

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 60

6.1.9  Check Head Balance pressure for 4.2 PSI		Pre-adjust: 4.0

6.1.10 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.11 Check Transport Paddle U/D pressure for 45 PSI	Pre-adjust: 20

6.1.12 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.13 Check Open Unload Flipper pressure for 45 PSI	Pre-adjust: 60

6.1.14 Check Vacuum Tank Blowout pressure for <"<">10 PSI   Pre-adjust:  18

6.1.15 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.16 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 70

6.1.17 Check MHTA pressure for 60 PSI			Pre-adjust: 80

6.1.18 Check system for fluid leaks			Completed:  X

6.1.19 Check tubing/fittings for leaks			Completed:  X

6.1.20 Check system for pneumatic leaks			Completed:  X

6.1.21 Check system indicator lamps			Completed:  X

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <"<">10 PSI	Pre-adjust: 9

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean and lubricate the Conditioner Gimbal Ass.	Completed:  NA

Comments:_____________________________________________________________________

18.60WW13 WEEKLY PM CHECKSHEETASDG::POIRIERFri Sep 27 1996 20:2187
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE
    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

                       Shift: C     Tech/s: JP

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 100

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  85

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust:  22

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  60

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:   4

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust:  18

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:  30

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust:  50

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust:  15

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  65

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust:  80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 8

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X

6.1.25 Clean and lubricate the Paddle rails		Completed:  X

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X
                                                                   
6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed: N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X

Comments:

       REPLACED THE SPRINGS ON THE (LEFT SIDE/MIDDLE) MULTIHEAD
       LEAD SCREW COVER.
       
    
18.61WW14 Monthly PMFABSIX::R_POIRIERSun Sep 29 1996 07:41152
--------------------------------------------------------------------------------

                           Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev D

                                           	

6.2.1  Change Peristaltic Pump Lines			Completed: X

6.2.2  Clean Polish area tub drains			Completed: X   

6.2.3  Check Polish Table Belt for defects		Completed: X

6.2.4  Perform Down Force Calibration on all 5 heads    Completed: X

       Down Frc: Head 1 Pre-Adj: 381.7        Post-adj: 377

                 Head 2 Pre-Adj: 367.0        Post-adj: 377

                 Head 3 Pre-Adj: 367.7        Post-adj: 377

                 Head 4 Pre-Adj: 365.0        Post-adj: 377

                 Head 5 Pre-Adj: 381.5        Post-adj: 377

	NOTE: On head 5 the initial actual df on the screen didn't equal the 
	      the sensotec reading. All other heads were the same on sensotec
	      and screen. Head 5 was reading 402 actual. 

6.2.5  Perform Down Force Calibration on Conditioner    Completed: X

       Actual Down Force Pre-Adj:  84.0

       Actual Down Force Post-Adj: na 

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: X

6.2.7  Check the Load Flipper alignment			Completed: X

6.2.8  Check the Unload Flipper alignment		Completed: X

6.2.9  Check the Elevator alignment                     Completed: X

6.2.10 Check wafer unload, from Index table to cassette Completed: X

6.2.11 Check the +24 Volt power supply                  Pre-Adjust: 23.73

6.2.12 Check the +/- 15 Volt power supply               Pre-Adjust: +15.7
								    -15.1

6.2.13 Check the +5 Volt power supply                   Pre-Adjust:  4.98

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed:  29.9 RPM

6.2.15 Check Vacuum Pump Diaphrams			Completed: N/A

6.2.16 Check Vacuum Tank/Pump lines			Completed: X

6.2.17 Check Load Cup Position alignment		Completed: X

6.2.18 Check Load Cup Height alignment                  Completed: X

6.2.19 Check Robot alignments			        Completed: X

6.2.20 Check Muffin Fans for proper operation           Completed: X

Comments:

    
--------------------------------------------------------------------------------

                                                                    

                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 25

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 50

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  4

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 15

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 48

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 18

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 7 psi

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: X

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments:

18.62ww15 weekly PM.FABSIX::L_SHKOLNIKOVFri Oct 11 1996 06:1685
             
         SPEC# HF60-0172  REV-D   SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D
    
DATE: 10/11/96       TOOL: CMP.B1           TECH/SHIFT:  D shift   
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 20

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 50

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 14

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 18

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  BJ

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  BJ

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10

6.1.24 Clean and lubricate the Scrubber rails		Completed:  BJ

6.1.25 Clean and lubricate the Paddle rails		Completed:  BJ

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  X
                 ( water separator)
6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed: N/A*
                                                        * there is no slurry
                                                          tube on this tool
    
6.1.36 Check chiller fluid resevoir for proper level    Completed: BJ

Comments:   BJ - found small leak in the fluids cabinet under DI in valve.
            Found small paddle of oil under the index table.
18.63ww16 weekly pm.LUDWIG::RIDLONEliminate the obliviousTue Oct 15 1996 02:2590
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 88

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 25

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 50

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  4

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 18

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 55

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 15

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 68

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed: B-shift

6.1.20 Check tubing/fittings for fluid leaks            Completed: B-shift

    NOTE: DI return manual shutoff valve leaking.

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: B-shift

6.1.22 Check stations/components for contamination	Completed: B-shift

6.1.23 Ch eck incoming Chilled Water pressure <10 PSI	Pre-adjust: 10psi

6.1.24 Clean and lubricate the Scrubber rails		Completed: B-shift

6.1.25 Clean and lubricate the Paddle rails		Completed: B-shift

6.1.26 Clean Conditioning Wheel and Housing             Completed: B-shift

6.1.27 Scrub clean the Polish area tub and walls        Completed: B-shift

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: B-shift

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: B-shift

6.1.30 Check slurry pump hoses and connectors for leaks Completed: B-shift

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: NA
     
     It has been removed.

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: B-shift

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: B-shift

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: B-shift

6.1.35 Clean the slurry delivery tube                   Completed: NA

     Not applicable to this tool.

6.1.36 Check chiller fluid resevoir for proper level    Completed: B-shift

Comments: Changed vacuum filter.

       ____________________________________________________________
    
18.64WEEKLY PM FOR WW17 COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringFri Oct 25 1996 22:2790
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

6.1.1  Check incoming CDA pressure for 80 PSI      	Pre-adjust: 80 Brian J. 

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 50 Brian J.

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 20 Brian J.

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40 Brian J.

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23 Brian J.

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35  Brian J

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30  Brian J

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 50  Brian J

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 3.2 Brian J.

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 17 Brian J.

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30 Brian J.

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20 Brian J.

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50 Brian J.

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60 Brian J.

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 17 Brian J.

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80 Brian J.

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60 Brian J.

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80 Brian J.

6.1.19 Check Drip Pan for moisture/contamination        Completed:  JS 

6.1.20 Check tubing/fittings for fluid leaks            Completed:  Brian J.

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  Brian J.

6.1.22 Check stations/components for contamination	Completed:  JS

6.1.23 Check incoming Chilled Water pressure <10 PSI	     10psi  Brian J.

6.1.24 Clean and lubricate the Scrubber rails		Completed:  JS

6.1.25 Clean and lubricate the Paddle rails		Completed:  Brian J.

6.1.26 Clean Conditioning Wheel and Housing             Completed:  Brendan f.

6.1.27 Scrub clean the Polish area tub and walls        Completed:  BF,JP,JS

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  JP,BW

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  JS

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  Brian J.

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: NA
     
     It has been removed.

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  Brian J.

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed:  JS,JP

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  JS,JP

6.1.35 Clean the slurry delivery tube                   Completed: NA

     Not applicable to this tool.

6.1.36 Check chiller fluid resevoir for proper level    Completed:  Brian J.

Comments:6.1.19 Found oil under index table. 
                 JS = John Swenson
                 JP = John Poirier
                 BF = brendan Finn
                 BW = Bradley Westphal
                 Brian J. = Brian Jubinville
18.65WW18 Monthly PM completeFABSIX::O_WHITFORDQuticherwhinin&#039;Fri Nov 01 1996 21:26165
SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev D

BJ = Brian Jubinville
LS = Leon Shkolnikov
TL = Tim Landry
BG = Bob Gee                                           	
JS = John Swenson
BW = Brad Wesphal
JP = John Poirier
DW = Dave Whitford


6.2.1  Change Peristaltic Pump Lines			Completed: JS 

6.2.2  Clean Polish area tub drains			Completed: BJ 

6.2.3  Check Polish Table Belt for defects		Completed: JS

6.2.4  Perform Down Force Calibration on all 5 heads    Completed: JS/JP

       Down Frc: Head 1 Pre-Adj: 376.8 Post-adj: 376.8

                 Head 2 Pre-Adj: 377.1 Post-adj: 377.1

                 Head 3 Pre-Adj: 377.8 Post-adj: 377.8

                 Head 4 Pre-Adj: 374.2 Post-adj: 377.1

                 Head 5 Pre-Adj: 373.6 Post-adj: 376.8

6.2.5  Perform Down Force Calibration on Conditioner    Completed: LS
 
       Actual Down Force Pre-Adj: 73lbs @ 67% 

       Actual Down Force Post-Adj: 77lbs @ 67% 

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: BJ *

6.2.7  Check the Load Flipper alignment			Completed: BJ

6.2.8  Check the Unload Flipper alignment		Completed: BJ

6.2.9  Check the Elevator alignment                     Completed: BJ

6.2.10 Check wafer unload, from Index table to cassette Completed: BJ

6.2.11 Check the +24 Volt power supply                  Pre-Adjust:23.97 BJ/LS 

6.2.12 Check the +/- 15 Volt power supply               Pre-Adjust:15.01 BJ/LS 

6.2.13 Check the +5 Volt power supply                   Pre-Adjust: 5.02 BJ/LS

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed: 30  LS/DW

6.2.15 Check Vacuum Pump Diaphrams			Completed: n/a

6.2.16 Check Vacuum Tank/Pump lines			Completed: JS

6.2.17 Check Load Cup Position alignment		Completed: JS/BW

6.2.18 Check Load Cup Height alignment                  Completed: DW/LS

6.2.19 Check Robot alignments			        Completed: BJ/LS 

6.2.20 Check Muffin Fans for proper operation           Completed: BJ/LS 

Comments: *-Asked Kevin if he could get us one last week.  I will
            speak to him to see if one is available soon.

       

SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 85/BJ

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85/BJ

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 17/BJ

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45/BJ

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23/BJ

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35/BJ

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30/BJ

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 50/BJ

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2/BJ

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 16/BJ

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30/BJ

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20/BJ

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50/BJ

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50/BJ

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 17/BJ

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 85/BJ

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60/BJ

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80/BJ

6.1.19 Check Drip Pan for moisture/contamination        Completed:  BJ/LS 

6.1.20 Check tubing/fittings for fluid leaks            Completed:  BJ

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  BJ

6.1.22 Check stations/components for contamination	Completed:  BJ/LS 

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10psi/BJ

6.1.24 Clean and lubricate the Scrubber rails		Completed:  BJ

6.1.25 Clean and lubricate the Paddle rails		Completed:  BJ

6.1.26 Clean Conditioning Wheel and Housing             Completed:  LS

6.1.27 Scrub clean the Polish area tub and walls        Completed:  LS/BJ

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  JS

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  BJ/LS 

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  JS

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  N/A *
       (Tool no longer uses a check valve)

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  BJ *

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   JS

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  JS

6.1.35 Clean the slurry delivery tube                   Completed:  N/A
       (Tool doesn't use delivery tube)

6.1.36 Check chiller fluid resevoir for proper level    Completed:  BJ


Comments: *-Asked Kevin if he could get us one last week.  I will
            speak to him to see if one is available soon.
          Found sensor for load cup Five busted, rumaged through stockroom
          and could not locate a duplicate, repaired original. Will need to
          monitor for any water leaks. 


                                                                    
18.66ww19 weekly pm.FABSIX::L_SHKOLNIKOVThu Nov 07 1996 06:3084
             
         SPEC# HF60-0172  REV-D   SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D
    
DATE: 11/07/96       TOOL: CMP.B1           TECH/SHIFT:  Leon      
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 82

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 26

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 50

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 15

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 18

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 65

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X*

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X 

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X 

6.1.25 Clean and lubricate the Paddle rails		Completed:  X 

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  X
                 ( water separator)
6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed: N/A*
                                                        * there is no slurry
                                                          tube on this tool
    
6.1.36 Check chiller fluid resevoir for proper level    Completed:  X

Comments: *Oil leak from index table gearbox.
18.67WW XX - Weekly completedSUBPAC::LANDRYSun Nov 10 1996 16:5082
             
         SPEC# HF60-0172  REV-D   SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D
    
DATE: 11/10/96       TOOL: CMP.B1           TECH/SHIFT: Finn / Landry      
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 50

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 15

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 17

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 62

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X 

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 8

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X 

6.1.25 Clean and lubricate the Paddle rails		Completed:  X 

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  X
                 ( water separator)
6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed: N/A
    
6.1.36 Check chiller fluid resevoir for proper level    Completed:  X

Comments: 6.1.35  The system has been modified, with this feature removed
18.68ww21 weekly pm.FABSIX::M_RIDLONEliminate the obliviousWed Nov 20 1996 00:1788
             
         SPEC# HF60-0172  REV-D   SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D
    
DATE: 11/20/96       TOOL: CMP.B1           TECH/SHIFT: R.Poirier, Ridlon     
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 27

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 50

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 15

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 17

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 62

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X 

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X 

6.1.25 Clean and lubricate the Paddle rails		Completed:  X 

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  X
                 ( water separator)
6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed: N/A
    
6.1.36 Check chiller fluid resevoir for proper level    Completed:  X


Comments: 6.1.35  The system has been modified, with this feature removed

I/O CABLE #1 BULKHEAD PLUG (RIGHT SIDE BULKHEAD MOUNT) IS BROKEN. OBVIOUSLY
THE TOOL IS STILL FUNCTIONAL BUT THIS SHOULD PROBABLY BE CHANGED IN THE NEAR 
FUTURE.
                                                                      
18.69WW22 MONTHLY PM COMPLETE.FABSIX::L_SHKOLNIKOVWed Nov 27 1996 23:36179

SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev D


          Shift: C+D    Work Week: 22     Tech/s: John Poirier = JP
                                                John Swenson = JS   	
                                                Dave Whitford- DW
                                                Leon Shkolnikov-LS
                                                SEE COMMNETS = *


6.2.1  Change Peristaltic Pump Lines			Completed: DW

6.2.2  Clean Polish area tub drains			Completed: LS,DW

6.2.3  Check Polish Table Belt for defects		Completed: X  JS

6.2.4  Perform Down Force Calibration on all 5 heads    Completed: LS,DW

       Down Frc: Head 1 Pre-Adj: 383   Post-adj: 377 lb

                 Head 2 Pre-Adj: 382   Post-adj: 377 lb

                 Head 3 Pre-Adj: 375   Post-adj: 377 lb

                 Head 4 Pre-Adj: 379   Post-adj: 377 lb

                 Head 5 Pre-Adj: 379   Post-adj: 377 lb

6.2.5  Perform Down Force Calibration on Conditioner    Completed: LS,DW

       Actual Down Force Pre-Adj:  79.5  lb   


       Actual Down Force Post-Adj: 77.0  lb     

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: X  JP

6.2.7  Check the Load Flipper alignment			Completed: LS

6.2.8  Check the Unload Flipper alignment		Completed: LS

6.2.9  Check the Elevator alignment                     Completed: LS

6.2.10 Check wafer unload, from Index table to cassette Completed: LS

6.2.11 Check the +24 Volt power supply                  Pre-Adjust: X  23.79 JP

6.2.12 Check the +/- 15 Volt power supply               Pre-Adjust: X  15.78 JP

6.2.13 Check the +5 Volt power supply                   Pre-Adjust: X   4.97 JP

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed:  X  29.9  JP

6.2.15 Check Vacuum Pump Diaphrams			Completed: N/A  JP *

6.2.16 Check Vacuum Tank/Pump lines			Completed: X  JS *

6.2.17 Check Load Cup Position alignment		Completed: X  JS

6.2.18 Check Load Cup Height alignment                  Completed: X  JS

6.2.19 Check Robot alignments			        Completed: LS

6.2.20 Check Muffin Fans for proper operation           Completed: X   JS

Comments:
6.2.15 The Vacuum Pump diaphrams are no longer cleaned due to the addition 
       of the filter trap that was installed at the pump inlet.
    
6.2.16 The main vacuum line (thin walled black tubing) leading from the
       bulkhead fitting to the pump, is partially collapsed due to a 
       tight bend radius.





--------------------------------------------------------------------------------



SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

         Shift: C       Work Week: 22        Tech/s: John Poirier = JP
                                                     John Swenson = JS
                                          (Speedfam) Dave Rocha   = DR
                                                     SEE COMMENTS = *
                                        
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80 JS

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82 JS

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24 JS

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 44 JS

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23 JS

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35 JS 

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30 JS

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 52 JS

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4  JS

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 15 JS

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30 JS

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20 JS

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50 JS

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50 JS

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 15 JS

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80 JS

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 63 JS

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80 JS

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X  JS

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X  JP

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X  JP

6.1.22 Check stations/components for contamination	Completed:  X  JP

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 6  JP

6.1.24 Clean and lubricate the Scrubber rails		Completed: X  JP

6.1.25 Clean and lubricate the Paddle rails		Completed: X  JP

6.1.26 Clean Conditioning Wheel and Housing             Completed: X  JS

6.1.27 Scrub clean the Polish area tub and walls        Completed: X  LS

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X  JP,DR,JS

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X  JP

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X  JP

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: N/A  JP

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X  JP

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: X  JP

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X  JP

6.1.35 Clean the slurry delivery tube                   Completed: N/A  JP

6.1.36 Check chiller fluid resevoir for proper level    Completed: X  JP

Comments:

 6.1.19  I/O #2 bulkhead fitting is damaged. 

 6.1.19  Small puddle of oil in base under Index Table gearbox.

 6.1.31  Check Valve no longer in use.

 6.1.35  Cleaning of the slurry delivery tube applies to CMP.B2 only.
18.70ww-23 weekly pm completedFABSIX::B_FINNSun Dec 01 1996 18:4985
             
         SPEC# HF60-0172  REV-D   SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D
    
DATE: 12/1/96       TOOL: CMP.B1      TECH/SHIFT: Finn=bf,Gee=rg,Landry=tl     
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 27

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 51

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 15

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 17

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 62

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed: bf*

6.1.20 Check tubing/fittings for fluid leaks            Completed: tl  

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: tl  

6.1.22 Check stations/components for contamination	Completed: rg

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10

6.1.24 Clean and lubricate the Scrubber rails		Completed:  bf  

6.1.25 Clean and lubricate the Paddle rails		Completed:  bf 

6.1.26 Clean Conditioning Wheel and Housing             Completed:  bf

6.1.27 Scrub clean the Polish area tub and walls        Completed:  tl

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  rg

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  bf

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  rg

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  bf
                 ( water separator)
6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  tl

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   rg

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  bf

6.1.35 Clean the slurry delivery tube                   Completed: N/A
    
6.1.36 Check chiller fluid resevoir for proper level    Completed:  tl

Comments: 6.1.35  The system has been modified, with this feature removed
	  6.1.19  Small amount of oil (~1 ts full) found under index 
                  table motor      
                                                                 
18.71WW 24 - Weekly completedSUBPAC::LANDRYSun Dec 08 1996 13:3983
             
         SPEC# HF60-0172  REV-D   SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D
    
DATE: 12/8/96       TOOL: CMP.B1      TECH/SHIFT: Gee, Landry     
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 27

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 52

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 15

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 17

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 62

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X  

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X  

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 8

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X  

6.1.25 Clean and lubricate the Paddle rails		Completed:  X 

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  X
                 ( water separator)
6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed: N/A
    
6.1.36 Check chiller fluid resevoir for proper level    Completed:  X

Comments: 6.1.35  The system has been modified, with this feature removed
                                                                 
18.72WW XXV - Weekly completedSUBPAC::LANDRYSun Dec 15 1996 17:4384
             
         SPEC# HF60-0172  REV-D   SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D
    
DATE: 12/15/96       TOOL: CMP.B1      TECH/SHIFT: Gee, Finn, Landry     
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 52

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 17

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 17

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 62

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X  

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X  

6.1.22 Check stations/components for contamination	Completed:  X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 8

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X  

6.1.25 Clean and lubricate the Paddle rails		Completed:  X 

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  X
                 ( water separator)
6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed: N/A
    
6.1.36 Check chiller fluid resevoir for proper level    Completed:  X

Comments: 6.1.35  The system has been modified, with this feature removed

      *  Found a small amount of gear box oil under the Index Table gear box.
18.73ww26 weekly pm.FABSIX::L_SHKOLNIKOVThu Dec 26 1996 20:5984
             
         SPEC# HF60-0172  REV-D   SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D
    
DATE: 12/26/96       TOOL: CMP.B1      TECH/SHIFT:  L.SHKOLNIKOV          
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 84

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 52

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 4.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 15

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 15

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 80

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  x

6.1.20 Check tubing/fittings for fluid leaks            Completed:  x  

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  x  

6.1.22 Check stations/components for contamination	Completed:  x

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10

6.1.24 Clean and lubricate the Scrubber rails		Completed:  x  

6.1.25 Clean and lubricate the Paddle rails		Completed:  x 

6.1.26 Clean Conditioning Wheel and Housing             Completed:  x

6.1.27 Scrub clean the Polish area tub and walls        Completed:  x

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  x

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  x

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  x

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  x
                 ( water separator)
6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  x

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   x

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  x

6.1.35 Clean the slurry delivery tube                   Completed: N/A
    
6.1.36 Check chiller fluid resevoir for proper level    Completed:  x

Comments: 6.1.35  The system has been modified, with this feature removed

      *  Found a small amount of gear box oil under the Index Table gear box.
18.74CMP.B1 shutdown checksheet completedFABSIX::R_GEETue Dec 31 1996 15:3928
SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE




                        CMP.B SHUT DOWN CHECK SHEET         Tech: _Tim Landry
								  _Bob Gee
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
								 INIT / DATE
1) SCRUB SIDES OF CARRIERS				       TL_BG_/_12/31/96
2) RUN CARRIER BLOW OFF FOR 30 SECONDS			       TL_BG_/_12/31/96
3) REMOVE ALL CARRIERS					       TL_BG_/_12/31/96
4) PLACE WIPES UNDER CARRIER FILMS AND LAY CARRIERS DI TANK    TL_BG_/_12/31/96
5) IF POWER TO SLURRY SYSTEM IS GOING TO BE LOST, CONTACT 
   ASHLAND CHEMICAL AND HAVE SLURRY SYSTEM PURGED AND CHARGED 
   WITH DI WATER.					       TL_BG_/_12/31/96
6) CLEAN ENTIRE SYSTEM OF DRIED SLURRY 			       TL_BG_/_12/31/96
7) REMOVE CONDITIONER AND CLEAN				       TL_BG_/_12/31/96
8) CYCLE/RINSE ALL DI FUNCTIONS: SPRAY NOZZLES, SLURRY PUMPS,
   CONDITIONER RINSE, ELEVATOR TANKS.			       TL_BG_/_12/31/96
9) SHUT OFF DI BEHIND SYSTEM (ROTATE 3W VLV TO FULL RETURN)    TL_BG_/_12/31/96
10) DRAIN ELEVATOR AND CONDITIONER TUBE			       TL_BG_/_12/31/96
11) REMOVE PADS, AND CLEAN AND DRY TABLES		       TL_BG_/_12/31/96
12) REMOVE SCRUBBER BRUSHES AND SOAK IN DI		       TL_BG_/_12/31/96
13) DRY ENTIRE SYSTEM OF ANY STANDING WATER		       TL_BG_/_12/31/96
14) POWER DOWN SYSTEM.

18.75B1 ALMOST COMPLETE, SEE #11SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Jan 02 1997 08:2021

                        CMP.B1 START UP CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
                                                                 INIT / DATE

1) TURN ON DI WATER (ROTATE 3W VLV TO FULLY TO POLISHER.	 LS / 1/2/97
2) POWER ON SYSTEM.						 BJ / 1/2/97
3) CYCLE/RUN ALL DI FUNCTIONS FOR 15 MINUTES			 LS / 1/2/97
4) WIPE DOWN SYSTEM CLEAN ALL DRIED SLURRY	                 BJ / 1/2/97
5) DRY TABLES, INSTALL PADS					 LS / 1/2/97
6) INSTALL SCRUBBER BRUSHES					 LS / 1/2/97
7) INSTALL CONDITIONER						 BJ / 1/2/97
8) INSTALL CARRIERS						 LS / 1/2/97
9) RUN WET IDLE PROGRAM FOR 15 MIN. (ENOUGH TO CLEAN CARRIERS)   LS / 1/2/97
10) IF SLURRY SYSTEM WAS SHUT DOWN, CONTACT ASHLAND CHEMICAL,
    REQUEST DI TO BE PURGE FROM SLURRY SYSTEM AND CHARGED WITH 
    SLURRY AND REQUEST A NEW SLURRY FILTER BE INSTALLED.         BJ / 1/2/97
11) CALIBRATE SLURRY FLOW					
12) PUT IN WET IDLE AND TURN OVER TO MFG FOR MQC		 LS / 1/2/97

18.76SEMI-ANNUAL PM COMPLETED FOR WW27SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Jan 02 1997 22:03179
SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

             Semi-Annual Preventative Maintenance Check Sheet, Rev D
DATE: 1/2/97        TOOL: CMP.B1      TECH/SHIFT: Brian Jubinville (BJ) 
                                                  Leon Shkolnikov  (LS)
                                                  Olin Whitford    (OW)
    
6.4.1  Check all interlocks for functionality		Completed: BJ

6.4.2  Check all EMO's for functionality		Completed: BJ

6.4.3  Lubricate the Rotary Union			Completed: BJ

6.4.4  Lubricate the Lead Screw				Completed: BJ

6.4.5  Lubricate the Linear Guide Rails			Completed: BJ

6.4.6  Lubricate the Idler Pulley			Completed: BJ

Comments:

--------------------------------------------------------------------------------

SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev D

                                           	

6.2.1  Change Peristaltic Pump Lines and checked
          flow.                   			Completed: BJ

6.2.2  Clean Polish area tub drains			Completed: BJ

6.2.3  Check Polish Table Belt for defects		Completed: BJ

6.2.4  Perform Down Force Calibration on all 5 heads    Completed: BJ,LS,OW
                                                         
                                                         

       Down Frc: Head 1 Pre-Adj: 367 Post-adj: 377

                 Head 2 Pre-Adj: 358 Post-adj: 377

                 Head 3 Pre-Adj: 356 Post-adj: 377

                 Head 4 Pre-Adj: 359 Post-adj: 377

                 Head 5 Pre-Adj: 357.5 Post-adj: 377

6.2.5  Perform Down Force Calibration on Conditioner    Completed: BJ

       Actual Down Force Pre-Adj: 85

       Actual Down Force Post-Adj: 77

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: BJ

6.2.7  Check the Load Flipper alignment			Completed: BJ

6.2.8  Check the Unload Flipper alignment		Completed: BJ

6.2.9  Check the Elevator alignment                     Completed: BJ

6.2.10 Check wafer unload, from Index table to cassette Completed: BJ

6.2.11 Check the +24 Volt power supply                  Pre-Adjust: 24.1/BJ

6.2.12 Check the +/- 15 Volt power supply               Pre-Adjust:-15.1/15/BJ
                                                                     
6.2.13 Check the +5 Volt power supply                   Pre-Adjust: 4.99/BJ

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed: BJ

6.2.15 Check Vacuum Pump Diaphrams			Completed: BJ

6.2.16 Check Vacuum Tank/Pump lines			Completed: BJ

6.2.17 Check Load Cup Position alignment		Completed: BJ,LS
    
6.2.18 Check Load Cup Height alignment                  Completed: BJ

6.2.19 Check Robot alignments			        Completed: BJ

6.2.20 Check Muffin Fans for proper operation           Completed: BJ

Comments:  
    

SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 86/BJ

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 88/BJ

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24/BJ

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45/BJ

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23/BJ

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35/BJ

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30/BJ

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 52/BJ

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6/BJ

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20/BJ

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:30/BJ

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:20/BJ

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50/BJ

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50/BJ

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 15/BJ

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 20/BJ

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60/BJ

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80/BJ

6.1.19 Check Drip Pan for moisture/contamination        Completed: BJ

6.1.20 Check tubing/fittings for fluid leaks            Completed: BJ

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: BJ

6.1.22 Check stations/components for contamination	Completed: BJ

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10/BJ

6.1.24 Clean and lubricate the Scrubber rails		Completed: BJ

6.1.25 Clean and lubricate the Paddle rails		Completed: BJ

6.1.26 Clean Conditioning Wheel and Housing             Completed: BJ

6.1.27 Scrub clean the Polish area tub and walls        Completed: BJ

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: BJ

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: BJ

6.1.30 Check slurry pump hoses and connectors for leaks Completed: BJ

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: BJ

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: BJ

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: BJ

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: BJ

6.1.35 Clean the slurry delivery tube                   Completed: n/a/BJ
       (This model tool doesn't have this option)

6.1.36 Check chiller fluid resevoir for proper level    Completed: BJ

Comments:


    
                                                                      
    
18.77WEEKLY PM FOR WW28 COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Jan 08 1997 23:2895
    

SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer
    
                Weekly Preventative Maintenance Check Sheet, Rev D
    
DATE: 1/8/97      TOOL ENTITY: CMP.B1       TECH(S): Brian Jubinville (BJ)
                                                     Olin Witford (OW)
            
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 85/BJ

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85/BJ

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 23/BJ

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45/BJ

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23/BJ

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35/BJ

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30/BJ

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 52/BJ

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6/BJ

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20/BJ

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:30/BJ

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:20/BJ

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50/BJ

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50/BJ

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 15/BJ

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: * 20/BJ
       * Engineer aware of change *

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60/BJ

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80/BJ

6.1.19 Check Drip Pan for moisture/contamination        Completed: BJ

6.1.20 Check tubing/fittings for fluid leaks            Completed: BJ

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: BJ

6.1.22 Check stations/components for contamination	Completed: BJ

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10/BJ

6.1.24 Clean and lubricate the Scrubber rails		Completed: BJ

6.1.25 Clean and lubricate the Paddle rails		Completed: BJ

6.1.26 Clean Conditioning Wheel and Housing             Completed: BJ/OW

6.1.27 Scrub clean the Polish area tub and walls        Completed: BJ

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: BJ

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: BJ

6.1.30 Check slurry pump hoses and connectors for leaks Completed: BJ

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: BJ

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: BJ

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: BJ

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: BJ

6.1.35 Clean the slurry delivery tube                   Completed: n/a/BJ
       (This model tool doesn't have this option)
    
       * Engineer notified and aware of change *

6.1.36 Check chiller fluid resevoir for proper level    Completed: BJ

Comments:  The M5 screws that connect the conditioner wheel to the
           bearing assembly were all stripped.  All (6) helicoils
           were removed and new ones installed by Mr. Whitford.


    
                                                                      
    
18.78ww 29 weekly p.m. completedFABSIX::R_GEEMon Jan 13 1997 08:1786
SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer
    
                Weekly Preventative Maintenance Check Sheet, Rev D
    
DATE: 1/12/97      TOOL ENTITY: CMP.B1       TECH(S): Bob Gee (BG)
                                                      Tim Landry (TL)
            
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 85/TL

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 85/TL

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24/TL

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45/BG

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 23/BG

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35/BG

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30/BG

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 52/BG

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 5.8/BG

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20/BG

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30/BG

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20/BG

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50/BG

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50/BG

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 15/BG

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 25/BG

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60/BG

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80/BG

6.1.19 Check Drip Pan for moisture/contamination        Completed: TL

6.1.20 Check tubing/fittings for fluid leaks            Completed: TL

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: TL

6.1.22 Check stations/components for contamination	Completed: BG/TL

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10/BG

6.1.24 Clean and lubricate the Scrubber rails		Completed: TL

6.1.25 Clean and lubricate the Paddle rails		Completed: TL

6.1.26 Clean Conditioning Wheel and Housing             Completed: BG

6.1.27 Scrub clean the Polish area tub and walls        Completed: TL

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: TL/BG

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: TL

6.1.30 Check slurry pump hoses and connectors for leaks Completed: BG/TL

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: BG

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: BG

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: TL

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: BG

6.1.35 Clean the slurry delivery tube                   Completed: na/BG

6.1.36 Check chiller fluid resevoir for proper level    Completed: TL

Comments:  6.1.35  System not equiped with this feature
    
           6.1.16  Notified Equip Eng of this.                 
    
18.79WW30 weekly pm completed.FABSIX::L_SHKOLNIKOVTue Jan 21 1997 23:5386
SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer
    
                Weekly Preventative Maintenance Check Sheet, Rev D
    
DATE: 1/21/97      TOOL ENTITY: CMP.B1       TECH(S): Leon Shkolnikov - LS
                                                                     
            
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 84/LS

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82/LS

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 25/LS

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45/LS

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 20/LS

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35/LS

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30/LS

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 50/LS

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6.0/LS

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20/LS

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30/LS

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20/LS

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50/LS

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50/LS

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 15/LS

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 25/LS

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60/LS

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80/LS

6.1.19 Check Drip Pan for moisture/contamination        Completed: LS

6.1.20 Check tubing/fittings for fluid leaks            Completed: LS

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: LS

6.1.22 Check stations/components for contamination	Completed: LS   

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10/LS

6.1.24 Clean and lubricate the Scrubber rails		Completed: LS

6.1.25 Clean and lubricate the Paddle rails		Completed: LS

6.1.26 Clean Conditioning Wheel and Housing             Completed: LS

6.1.27 Scrub clean the Polish area tub and walls        Completed: LS

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: LS    

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: LS

6.1.30 Check slurry pump hoses and connectors for leaks Completed: LS   

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: LS

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: LS

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: LS

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: LS

6.1.35 Clean the slurry delivery tube                   Completed: na/LS

6.1.36 Check chiller fluid resevoir for proper level    Completed: LS

Comments:  6.1.35  System not equiped with this feature
    
           6.1.16  Notified Equip Eng of this.                 
    
18.80MONTHLY PM COMPLETED FOR WW31SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Jan 30 1997 06:43162
SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev D

DATE: 1/30/97         TOOL ENTITY: CMP.B1      TECH(S): Brian Jubinville (BJ)
                                                        Leon Shkolnikov (LS)
                                                        Dave Whitford (DW)


6.2.1  Change Peristaltic Pump Lines and checked
          flow.                   			Completed: LS

6.2.2  Clean Polish area tub drains			Completed: DW

6.2.3  Check Polish Table Belt for defects		Completed: LS

6.2.4  Perform Down Force Calibration on all 5 heads    Completed: BJ,DW
                                                         
                                                         

       Down Frc: Head 1 Pre-Adj: 388 Post-adj: 377

                 Head 2 Pre-Adj: 363 Post-adj: 377

                 Head 3 Pre-Adj: 379 Post-adj: 377

                 Head 4 Pre-Adj: 384 Post-adj: 377

                 Head 5 Pre-Adj: 374 Post-adj: 377

6.2.5  Perform Down Force Calibration on Conditioner    Completed: BJ,DW

       Actual Down Force Pre-Adj: 74

       Actual Down Force Post-Adj: 77

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: LS

6.2.7  Check the Load Flipper alignment			Completed: BJ

6.2.8  Check the Unload Flipper alignment		Completed: BJ

6.2.9  Check the Elevator alignment                     Completed: BJ

6.2.10 Check wafer unload, from Index table to cassette Completed: BJ

6.2.11 Check the +24 Volt power supply                  Pre-Adjust: 23.75BJ

6.2.12 Check the +/- 15 Volt power supply               Pre-Adjust:-15.1/15/BJ
                                                                     
6.2.13 Check the +5 Volt power supply                   Pre-Adjust: 4.98/BJ

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed: BJ

6.2.15 Check Vacuum Pump Diaphrams			Completed: LS

6.2.16 Check Vacuum Tank/Pump lines			Completed: LS

6.2.17 Check Load Cup Position alignment		Completed: BJ,LS,DW
    
6.2.18 Check Load Cup Height alignment                  Completed: BJ

6.2.19 Check Robot alignments			        Completed: BJ

6.2.20 Check Muffin Fans for proper operation           Completed: LS

Comments:  
    

SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 86/DW

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80/DW

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 20/DW

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45/DW

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 20/DW

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35/DW

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30/DW

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 52/DW

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6/DW

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20/DW

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: 30/DW

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 20/DW

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50/DW

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50/DW

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 18/DW

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 25/DW*

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 40/DW

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80/DW

6.1.19 Check Drip Pan for moisture/contamination        Completed: LS

6.1.20 Check tubing/fittings for fluid leaks            Completed: LS

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: LS

6.1.22 Check stations/components for contamination	Completed: BJ,DW,LS

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10/LS

6.1.24 Clean and lubricate the Scrubber rails		Completed: BJ

6.1.25 Clean and lubricate the Paddle rails		Completed: LS

6.1.26 Clean Conditioning Wheel and Housing             Completed: DW

6.1.27 Scrub clean the Polish area tub and walls        Completed: DW

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: BJ,DW,LS

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: LS

6.1.30 Check slurry pump hoses and connectors for leaks Completed: LS

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: N/A/BJ

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: BJ

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: BJ,DW

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: BJ,DW

6.1.35 Clean the slurry delivery tube                   Completed: n/a/BJ
       (This model tool doesn't have this option)

6.1.36 Check chiller fluid resevoir for proper level    Completed: LS

Comments:
            6.1.16 New setting per Eng.  Eng. notified

            6.1.31 Tool no longer uses a check valve.
                   New spec being signed off.  This check
                   will be removed.  Eng. notified.
                   
            6.1.35 New spec being signed off.  This check
                   will be removed.  Eng. notified.
                                                                      
    
18.81WEEKLY PM FOR WW32 COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Feb 06 1997 06:31106
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:2/5/97       TOOL ENTITY:CMP.B1        TECH(S): John Poirier = JP
                                                     John Swenson = JS
                                                     Brian Jubinville = BJ
                                                     Leon Shkolnikov = LS
    
START TIME:3:30 p.m.       COMPLETED TIME:5:15p.m.

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 81 JP

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55 JP

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 22 JP

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 45 JP

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 20 JP

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 JP

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 JP

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 50 JP

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6 JP

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: 30 JP
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 JP

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 JP

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 JP

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 18 JP

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 JP

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 18 JP

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45 JP

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 JP

6.1.19 Check Drip Pans for moisture/contamination        Completed: X  JP  

6.1.20 Check tubing/fittings for fluid leaks             Completed: X  JP 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: X  JP 

6.1.22 Check stations/components for contamination	 Completed: X  JP 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: X  JP

6.1.24 Clean and lubricate the Scrubber rails		 Completed: X  JP

6.1.25 Clean and lubricate the Paddle rails		 Completed: X  JP

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: X  JP

6.1.27 Scrub clean the Polish area tub and walls         Completed: X  JP

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: BJ/LS

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: X  JP

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: X  JP

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: X  JS

6.1.32 Check Carrier clean brushes for defects           Completed: X  JP
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: X  JP

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: X  JP

6.1.35 Check chiller fluid resevoir for proper level     Completed: X  JP

6.1.36 Check the chiller readout for 24 degrees C.       Completed: BJ/LS 

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: X  JP 

6.1.38 Check the slurry flow alarm.                      Completed: X  JP 



Comments: 



                                                                         
18.82WEEKLY PM FOR WW33 COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Feb 13 1997 22:56106
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:2/13/97       TOOL ENTITY:CMP.B1        TECH(S): Dave Whitford = DW
                                                      Brian Jubinville = BJ   
                                                     
                                              
    
START TIME: 8:30 p.m.       COMPLETED TIME: 10:45p.m.

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80 DW

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55 DW

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 20 DW

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 48 DW

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 20 DW

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 DW

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 DW

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 50 DW

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6 DW

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: 30 DW
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 DW

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 DW

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 DW

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 27 DW

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 DW

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20 DW

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45 DW

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 DW

6.1.19 Check Drip Pans for moisture/contamination        Completed: BJ  

6.1.20 Check tubing/fittings for fluid leaks             Completed: BJ  

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: BJ  

6.1.22 Check stations/components for contamination	 Completed: BJ  

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: BJ 

6.1.24 Clean and lubricate the Scrubber rails		 Completed: BJ 

6.1.25 Clean and lubricate the Paddle rails		 Completed: BJ 

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: BJ 

6.1.27 Scrub clean the Polish area tub and walls         Completed: BJ 

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: BJ

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: BJ 

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: BJ/DW *

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: BJ 

6.1.32 Check Carrier clean brushes for defects           Completed: BJ 
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: BJ 

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: BJ 

6.1.35 Check chiller fluid resevoir for proper level     Completed: BJ 

6.1.36 Check the chiller readout for 24 degrees C.       Completed: BJ

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: BJ/DW   

6.1.38 Check the slurry flow alarm.                      Completed: BJ  



Comments: Slurry lines found split.  Replaced both lines and checked flow



                                                                         
18.83WW34 Weekly PM completedFABSIX::R_POIRIERMon Feb 17 1997 04:47107
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:2/17/97       TOOL ENTITY:CMP.B1        TECH(S): Roger Poirier (RP)
                                                      Albert Quillen (AQ)
                                                     
                       
START TIME: 2:40 AM 			COMPLETED TIME: 4:20 AM

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80 RP AQ 

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55 RP AQ

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 20 RP AQ

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 44 RP AQ

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 20 RP AQ

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 RP AQ

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 RP AQ

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 50 RP AQ

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6 RP AQ

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: 30 RP AQ
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 RP AQ

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 RP AQ

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 RP AQ

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30 RP AQ

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 RP AQ

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 18 RP AQ

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45 RP AQ

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 RP AQ

6.1.19 Check Drip Pans for moisture/contamination        Completed: RP AQ

6.1.20 Check tubing/fittings for fluid leaks             Completed: RP AQ

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: RP AQ

6.1.22 Check stations/components for contamination	 Completed: RP AQ

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 9 RP AQ

6.1.24 Clean and lubricate the Scrubber rails		 Completed: RP AQ

6.1.25 Clean and lubricate the Paddle rails		 Completed: RP AQ

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: AQ RP

6.1.27 Scrub clean the Polish area tub and walls         Completed: AQ

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: RP AQ

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: RP

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: RP AQ

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: RP AQ

6.1.32 Check Carrier clean brushes for defects           Completed: RP AQ
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: RP AQ

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: RP AQ

6.1.35 Check chiller fluid resevoir for proper level     Completed: RP AQ

6.1.36 Check the chiller readout for 24 degrees C.       Completed: RP AQ

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: RP AQ

6.1.38 Check the slurry flow alarm.                      Completed:   RP



Comments: Found small pool of oil under Index table gear box. 
	  Cleaned up oil and informed EE.




                                                                         
18.84WW35 Weekly PM Check SheetASDG::POIRIERThu Feb 27 1997 17:17103
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE: 2/27/97   TOOL ENTITY: CMP.B1    TECHNICIAN(S): John Poirier  - JP
                                                      Brad Westphal - BW

START TIME: 3:20 p.m.       COMPLETED TIME: 5:00 P.M.

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80 JP

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55 JP

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 25 JP

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 45 JP

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 20 JP

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 JP

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 JP

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 50 JP

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6 JP

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: 30 JP
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 JP

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 JP

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 JP

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 28 JP

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 28 JP

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20 JP

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 40 JP

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 JP

6.1.19 Check Drip Pans for moisture/contamination        Completed: X  JP  *

6.1.20 Check tubing/fittings for fluid leaks             Completed: X  JP

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: X  JP

6.1.22 Check stations/components for contamination	 Completed: X  JP

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 8  JP

6.1.24 Clean and lubricate the Scrubber rails		 Completed: X  JP

6.1.25 Clean and lubricate the Paddle rails		 Completed: X  JP

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: X  BW

6.1.27 Scrub clean the Polish area tub and walls         Completed: X  BW 

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: X  JP

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: X  BW

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: X  JP

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: X  JP

6.1.32 Check Carrier clean brushes for defects           Completed: X  BW
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: X  JP

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: X  BW

6.1.35 Check chiller fluid resevoir for proper level     Completed: X  BW

6.1.36 Check the chiller readout for 24 degrees C.       Completed: X  BW

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: X  BW

6.1.38 Check the slurry flow alarm.                      Completed: X  BW

Comments:
          6.1.19 - Found small puddle of gear oil on drip pan under index 
                   table gearbox.



18.85WW36 Monthly PM CheckSheetASDG::POIRIERThu Mar 06 1997 22:08190
                     SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           SPEC# HF60-0172  REV-E 

                        Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev. E 


DATE: 03/06/97       TOOL ENTITY: CMP.B1      TECHNICIAN(S): DW Dave Whitford
                                                             LS Leon Shkolnikov
                                                             JS John Swenson
START TIME: 05:45 am   COMPLETED TIME: 09:20 am              JP John Poirier


6.2.1  Change Peristaltic Pump Lines and check flow     Completed: JS         
                                                                    
6.2.2  Clean Polish area tub drains for clogs		Completed: DW/LS

6.2.3  Check all table belts for defects		Completed: JS

6.2.4  Perform Down Force Calibration on all 5 heads   
       to read at +/- 1lbs of 354 lbs.
       NOTE:  The target is 23 lbs. below the actual
       377 lbs. due to the carrier weight minus the
       alignment fixture using the point-to-point
       method as described in the downforce procedure
       in 6.2.4.1 through 6.2.4.13.                     Completed: DW/LS

       Down Frc: Head 1 Pre-Adj: 358   Post-adj: 354  

                 Head 2 Pre-Adj: 323   Post-adj: 354  

                 Head 3 Pre-Adj: 360   Post-adj: 354  

                 Head 4 Pre-Adj: 340   Post-adj: 354  

                 Head 5 Pre-Adj: 356   Post-adj: 354  

6.2.5  Perform Down Force Calibration on Conditioner    Completed: DW/LS
       to read +/- .5 lbs of 77lbs.
 
       Actual Down Force Pre-Adj:  88.1

       Actual Down Force Post-Adj: 76.8

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: LS

6.2.7  Check the Load Flipper alignment			Completed: LS

6.2.8  Check the Unload Flipper alignment		Completed: LS

6.2.9  Check Elevator alignments			Completed: LS

6.2.10 Check wafer unload, from Index table to cassette Completed: LS

6.2.11 Check the +24 Volt power supply for +/- 1V 
       of 24 volts.                      Pre:23.8  Post:23.8 Tech: LS

6.2.12 Check the +/- 15 Volt power supply for +/- 1V
       of 15V                            Pre: 15.8 Post:15.3 Tech: LS

6.2.13 Check the +5 Volt power supply for 4.5 to
       5.5 v.                              Pre:4.9 Post:4.9  Tech: LS

6.2.14 Check Table Rotation Speed for +/- 1.5 of 30RPM  Completed: 29.9 LS

6.2.15 Check Vacuum Pump Diaphrams			Completed: JP

6.2.16 Replace liquid separator filter element          Completed: LS

6.2.17 Check Vacuum Tank/Pump lines			Completed: LS

6.2.18 Check carrier to Load Cup Position alignments    Completed: JS 

6.2.19 Check Load Cup Height to carrier alignments      Completed: LS

6.2.20  Check the Robot alignments                      Completed: LS
                                         
6.2.21 Check Muffin Fans for proper operation           Completed: LS

Comments:

========================================================================



                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE: 03.06.97 TOOL ENTITY: CMP.B1      TECHNICIAN(S): DW Dave Whitford
                                                       LS Leon Shkolnikov
                                                       JS John Swenson
START TIME: 05:45 am.   COMPLETED TIME: 09:20 am.      JP John Poirier
                                                       BW Brad Westphal

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: JS 82

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: JS 55

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: JS 24 

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: JS 44

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: JS 20

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: JS 35

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: JS 30 

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: JS 50

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed: JS  6 

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: JS 30 

       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: JS 20 

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: JS 45

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: JS 50

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: JS 30

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: JS 25

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: JS 20

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: JS 50

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: JS 80    

6.1.19 Check Drip Pans for moisture/contamination        Completed: JS 

6.1.20 Check tubing/fittings for fluid leaks             Completed: JP 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: JP 

6.1.22 Check stations/components for contamination	 Completed: LS/DW 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: JS 9

6.1.24 Clean and lubricate the Scrubber rails		 Completed: LS

6.1.25 Clean and lubricate the Paddle rails		 Completed: LS

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: LS/DW

6.1.27 Scrub clean the Polish area tub and walls         Completed: LS/DW

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: BW

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: LS

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: JS

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: LS

6.1.32 Check Carrier clean brushes for defects           Completed: LS
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: JP

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: JP

6.1.35 Check chiller fluid resevoir for proper level     Completed: LS

6.1.36 Check the chiller readout for 24 degrees C.       Completed: BW

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: LS

6.1.38 Check the slurry flow alarm.                      Completed: LS 

Comments:



18.86ww37 weekly pm completed.FABSIX::L_SHKOLNIKOVNo more experiments with freedomThu Mar 13 1997 02:03103
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE: 3/13/97   TOOL ENTITY: CMP.B1    TECHNICIAN : Leon Shkolnikov   LS


START TIME: 10:20 p.m.      COMPLETED TIME: 1:30 a.m.

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80 LS

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55 LS

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 22 LS

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 45 LS

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 20 LS

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 LS

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 LS

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 50 LS

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6 LS

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: 30 LS
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 LS

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 LS

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 LS

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 28 LS

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 LS

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20 LS

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 50 LS

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 LS

6.1.19 Check Drip Pans for moisture/contamination        Completed: X  LS  *

6.1.20 Check tubing/fittings for fluid leaks             Completed: X  LS

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: X  LS

6.1.22 Check stations/components for contamination	 Completed: X  LS

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 8  LS

6.1.24 Clean and lubricate the Scrubber rails		 Completed: X  LS

6.1.25 Clean and lubricate the Paddle rails		 Completed: X  LS

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: X  LS

6.1.27 Scrub clean the Polish area tub and walls         Completed: X  LS 

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: X  LS

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: X  LS

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: X  LS

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: X  LS

6.1.32 Check Carrier clean brushes for defects           Completed: X  LS
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: X  LS

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: X  LS

6.1.35 Check chiller fluid resevoir for proper level     Completed: X  LS

6.1.36 Check the chiller readout for 24 degrees C.       Completed: X  LS

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: X  LS

6.1.38 Check the slurry flow alarm.                      Completed: X  LS

Comments:
          6.1.19 - Found small puddle of gear oil on drip pan under index 
                   table gearbox.



18.86ww37 weekly pm.FABSIX::L_SHKOLNIKOVThu Mar 13 1997 22:28103
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE: 3/13/97   TOOL ENTITY: CMP.B1    TECHNICIAN : Leon Shkolnikov   LS


START TIME: 10:20 p.m.      COMPLETED TIME: 1:30 a.m.

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80 LS

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55 LS

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 22 LS

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 45 LS

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 20 LS

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 LS

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 LS

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 50 LS

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6 LS

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: 30 LS
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 LS

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 LS

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 LS

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 28 LS

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 LS

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20 LS

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 50 LS

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 LS

6.1.19 Check Drip Pans for moisture/contamination        Completed: X  LS  *

6.1.20 Check tubing/fittings for fluid leaks             Completed: X  LS

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: X  LS

6.1.22 Check stations/components for contamination	 Completed: X  LS

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 8  LS

6.1.24 Clean and lubricate the Scrubber rails		 Completed: X  LS

6.1.25 Clean and lubricate the Paddle rails		 Completed: X  LS

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: X  LS

6.1.27 Scrub clean the Polish area tub and walls         Completed: X  LS 

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: X  LS

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: X  LS

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: X  LS

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: X  LS

6.1.32 Check Carrier clean brushes for defects           Completed: X  LS
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: X  LS

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: X  LS

6.1.35 Check chiller fluid resevoir for proper level     Completed: X  LS

6.1.36 Check the chiller readout for 24 degrees C.       Completed: X  LS

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: X  LS

6.1.38 Check the slurry flow alarm.                      Completed: X  LS

Comments:
          6.1.19 - Found small puddle of gear oil on drip pan under index 
                   table gearbox.



18.87<< WW38 Weekly PM >>FABSIX::O_WHITFORDLead, follow or step aside.Wed Mar 19 1997 06:53107
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:03-19-97     TOOL ENTITY: CMP.B1      TECHNICIAN(S):Brian Jubinville (BJ)
                                                         Leon Shkolnikov  (LS)  
START TIME: 04:20      COMPLETED TIME: 06:50             Dave Whitford    (DW)


6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80  (DW)

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55  (DW)

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 20  (DW)

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 44  (DW)

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 20  (DW)

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35  (DW)

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30  (DW)

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 50  (DW)

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6  (DW)

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: 30  (DW)
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20  (DW)

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50  (DW)

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50  (DW)

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 26  (DW)

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25  (DW)

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20  (DW)

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 55  (DW)

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80  (DW)

6.1.19 Check Drip Pans for moisture/contamination        Completed:  (DW)

6.1.20 Check tubing/fittings for fluid leaks             Completed:  (DW)

6.1.21 Check tubing/fittings for pneumatic leaks         Completed:  (DW)


6.1.22 Check stations/components for contamination	 Completed:  (DW)

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: @5  (DW)

6.1.24 Clean and lubricate the Scrubber rails		 Completed: (DW)

6.1.25 Clean and lubricate the Paddle rails		 Completed: (DW)

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: (DW)

6.1.27 Scrub clean the Polish area tub and walls         Completed: (DW) 

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: (DW)

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: (DW)

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: (DW)

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: (DW)

6.1.32 Check Carrier clean brushes for defects           Completed: (DW)
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: (DW)

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: (DW)

6.1.35 Check chiller fluid resevoir for proper level     Completed: (DW)

6.1.36 Check the chiller readout for 24 degrees C.       Completed: (BJ)

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed:  (DW,BJ)

6.1.38 Check the slurry flow alarm.                      Completed:  (DW)

Comments:
 1) Considerable oil leak from the index table motor/gearbox assembly 
    @ 2 tblspoons since last week...

 2) Oil leak developing in the polish table motor/gearbox assembly. Several 
    droplets forming on the lower fins of the motor housing.
    
 3) Replaced INFRANOR oscillation arm #3, it never came back from the 
    wafer detect test.....
18.88WEEKLY PM COMPLETED FOR WW39SUBPAC::BJUBINVILLECMP Equipment EngineeringThu Mar 27 1997 00:13106
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:03-26-97     TOOL ENTITY: CMP.B1      TECHNICIAN(S):Brian Jubinville (BJ)
                                                         Leon Shkolnikov  (LS)  
START TIME: 22:15     COMPLETED TIME: 00:15              Dave Whitford    (DW)


6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80 BJ 

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55 BJ 

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 20 BJ 

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 45 BJ

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 20 BJ 

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 BJ

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 BJ 

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 50 BJ 

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6 BJ

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: 30 BJ 
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 BJ 

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 BJ 

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 BJ 

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 17 BJ 

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 BJ

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20 BJ 

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45 BJ 

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 BJ 

6.1.19 Check Drip Pans for moisture/contamination        Completed: BJ

6.1.20 Check tubing/fittings for fluid leaks             Completed: BJ 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: BJ 


6.1.22 Check stations/components for contamination	 Completed: DW/BJ 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 7 BJ

6.1.24 Clean and lubricate the Scrubber rails		 Completed: BJ

6.1.25 Clean and lubricate the Paddle rails		 Completed: BJ

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: BJ

6.1.27 Scrub clean the Polish area tub and walls         Completed: DW/BJ

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: DW/BJ

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: LS

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: DW *

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: BJ

6.1.32 Check Carrier clean brushes for defects           Completed: BJ
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: BJ/LS

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: BJ/LS

6.1.35 Check chiller fluid resevoir for proper level     Completed: DW

6.1.36 Check the chiller readout for 24 degrees C.       Completed: BJ

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: BJ/LS 

6.1.38 Check the slurry flow alarm.                      Completed: LS/DW 

Comments:
 *  - Both slurry lines ready to blow open....  replaced them both!

 1) Considerable oil leak from the index table motor/gearbox assembly 
    @ 2 tblspoons since last week...

 2) Oil leak developing in the polish table motor/gearbox assembly. Several 
    droplets forming on the lower fins of the motor housing.
    
18.89MONTHLY PM FOR WW40 COMPLETEDSUBPAC::BJUBINVILLECMP Equipment EngineeringThu Apr 03 1997 00:48180
                     SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           SPEC# HF60-0172  REV-E 

                        Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev. E 

DATE:04/02/97     TOOL ENTITY: CMP.B1      TECHNICIAN(S):Brian Jubinville (BJ)
                                                         Leon Shkolnikov (LS)  
START TIME: 20:00    COMPLETED TIME: 23:30

6.2.1  Change Peristaltic Pump Lines and check flow     Completed: BJ

6.2.2  Clean Polish area tub drains for clogs		Completed: BJ/LS

6.2.3  Check all table belts for defects		Completed: BJ

6.2.4  Perform Down Force Calibration on all 5 heads   
       to read at +/- 1lbs of 354 lbs.
       NOTE:  The target is 23 lbs. below the actual
       377 lbs. due to the carrier weight minus the
       alignment fixture using the point-to-point
       method as described in the downforce procedure
       in 6.2.4.1 through 6.2.4.13.                     Completed: BJ

       Down Frc: Head 1 Pre-Adj: 356 Post-adj: 354

                 Head 2 Pre-Adj: 366 Post-adj: 354

                 Head 3 Pre-Adj: 350 Post-adj: 354

                 Head 4 Pre-Adj: 354 Post-adj: 354

                 Head 5 Pre-Adj: 350 Post-adj: 354

6.2.5  Perform Down Force Calibration on Conditioner    Completed: BJ
       to read +/- .5 lbs of 77lbs.
 
       Actual Down Force Pre-Adj: 67

       Actual Down Force Post-Adj: 77

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: BJ

6.2.7  Check the Load Flipper alignment			Completed: BJ

6.2.8  Check the Unload Flipper alignment		Completed: BJ

6.2.9  Check Elevator alignments			Completed: BJ

6.2.10 Check wafer unload, from Index table to cassette Completed: BJ

6.2.11 Check the +24 Volt power supply for +/- 1V 
       of 24 volts.                    Pre: 23.7 Post: 23.7  Tech: BJ

6.2.12 Check the +/- 15 Volt power supply for +/- 1V
       of 15V                          Pre: 15.1 Post: 15.1  Tech: BJ

6.2.13 Check the +5 Volt power supply for 4.5 to
       5.5 v.                          Pre: 4.98 Post: 4.98  Tech: BJ

6.2.14 Check Table Rotation Speed for +/- 1.5 of 30RPM  Completed: BJ 

6.2.15 Check Vacuum Pump Diaphrams			Completed: BJ

6.2.16 Replace liquid separator filter element          Completed: BJ

6.2.17 Check Vacuum Tank/Pump lines			Completed: BJ

6.2.18 Check carrier to Load Cup Position alignments    Completed: BJ

6.2.19 Check Load Cup Height to carrier alignments      Completed: BJ

6.2.20  Check the Robot alignments                      Completed: BJ
                                         
6.2.21 Check Muffin Fans for proper operation           Completed: BJ/LS

Comments:

========================================================================

                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:04/02/97     TOOL ENTITY: CMP.B1      TECHNICIAN(S):Brian Jubinville (BJ)
                                                         Leon Shkolnikov (LS)  


6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80 BJ 

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55 BJ 

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 20 BJ 

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 45 BJ

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 20 BJ 

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 BJ

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 BJ 

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 50 BJ 

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6 BJ

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: 30 BJ 
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 BJ 

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 BJ 

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 BJ 

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 17 BJ 

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 BJ

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20 BJ 

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45 BJ 

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 BJ 

6.1.19 Check Drip Pans for moisture/contamination        Completed: BJ

6.1.20 Check tubing/fittings for fluid leaks             Completed: BJ 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: BJ 

6.1.22 Check stations/components for contamination	 Completed: BJ/LS

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 5 BJ

6.1.24 Clean and lubricate the Scrubber rails		 Completed: LS

6.1.25 Clean and lubricate the Paddle rails		 Completed: LS

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: LS

6.1.27 Scrub clean the Polish area tub and walls         Completed: LS/BJ

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: BJ/LS

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: BJ

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: BJ

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: BJ

6.1.32 Check Carrier clean brushes for defects           Completed: BJ
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: BJ/LS
                                                                       
6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: BJ/LS

6.1.35 Check chiller fluid resevoir for proper level     Completed: BJ

6.1.36 Check the chiller readout for 24 degrees C.       Completed: BJ

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: BJ/LS 

6.1.38 Check the slurry flow alarm.                      Completed: BJ/LS 

Comments:  Area of 8" of oil found under index table gear box

18.90WW41 WEEKLY PM CHECK SHEETASDG::POIRIERFri Apr 11 1997 16:02102
    
    
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE: 4/11/97         TOOL ENTITY: CMP.B1   TECHNICIAN(S): JOHN POIRIER  (JP)
                                                           MIKE STANDING (MS)
START TIME: 1:00 P.M.  COMPLETED TIME: 2:50 P.M.

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80  JP

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55  JP

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 22  JP

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 44  JP

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 20  JP

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35  JP

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30  JP

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 50  JP

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6  JP

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: 30  JP
       (Applicable for CMP.B1 only)
                                                                       
6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20  JP

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50  JP

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50  JP

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 15  JP

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25  JP

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20  JP

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 50  JP

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80  JP

6.1.19 Check Drip Pans for moisture/contamination        Completed: MS 

6.1.20 Check tubing/fittings for fluid leaks             Completed: MS 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: MS 

6.1.22 Check stations/components for contamination	 Completed: MS 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 9

6.1.24 Clean and lubricate the Scrubber rails		 Completed: JP

6.1.25 Clean and lubricate the Paddle rails		 Completed: JP 

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: MS

6.1.27 Scrub clean the Polish area tub and walls         Completed: JP

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: JP & MS

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: JP

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: MS

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: JP

6.1.32 Check Carrier clean brushes for defects           Completed: JP
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: JP

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: MS

6.1.35 Check chiller fluid resevoir for proper level     Completed: JP

6.1.36 Check the chiller readout for 24 degrees C.       Completed: JP

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: JP 

6.1.38 Check the slurry flow alarm.                      Completed: JP 

Comments:



18.91WW 42 weekly PM completeFABSIX::O_WHITFORDLead, follow or step aside.Wed Apr 16 1997 23:48103
                                                                   
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E
    
DATE: 4/16/97    TOOL ENTITY: CMP.B1    TECHNICIAN(S): Brian Jubinville (BJ)
                                                       Dave Whitford    (DW)
                                                       Leon Shkolnikov  (LS)  
START TIME: 21:30      COMPLETED TIME: 23:00 


6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80  DW

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55  DW

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 20  DW

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 45  DW

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 20  DW

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35  DW

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30  DW

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 50  DW

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6  DW

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: 30  DW 
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20  DW

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50  DW

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50  DW

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 15  DW

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25  DW

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20  DW

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 50  DW

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80  DW

6.1.19 Check Drip Pans for moisture/contamination        Completed: BJ 

6.1.20 Check tubing/fittings for fluid leaks             Completed: BJ 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: BJ 

6.1.22 Check stations/components for contamination	 Completed: BJ 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: BJ

6.1.24 Clean and lubricate the Scrubber rails		 Completed: DW

6.1.25 Clean and lubricate the Paddle rails		 Completed: DW

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: BJ


6.1.27 Scrub clean the Polish area tub and walls         Completed: BJ

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: BJ

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: DW

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: BJ/LS

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: DW

6.1.32 Check Carrier clean brushes for defects           Completed: BJ
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: BJ

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: BJ

6.1.35 Check chiller fluid resevoir for proper level     Completed: BJ

6.1.36 Check the chiller readout for 24 degrees C.       Completed: BJ

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed:  BJ/LS/DW

6.1.38 Check the slurry flow alarm.                      Completed:  BJ

Comments:

Small puddle of gear oil under index table gearbox

18.92PMS WAIVEDSUBPAC::MJONESSun Apr 20 1997 03:111