22.0. "CMP.B3 PM CHECKSHEETS" by STRATA::TDYER () Tue Mar 26 1996 08:08

    
    THIS NOTE IS FOR CMP.B3 PM CHECK SHEETS
T.RTitleUserPersonal
Name
DateLines
22.1SHUTDOWN CHECKSHEETSTRATA::RIDLONEliminate the obviousMon May 27 1996 07:3725



                        CMP.B SHUT DOWN CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
								 INIT / DATE
1) SCRUB SIDES OF CARRIERS					___B__/5/27__
2) RUN CARRIER BLOW OFF FOR 30 SECONDS				___B__/______
3) REMOVE ALL CARRIERS						___B__/______
4) PLACE WIPES UNDER CARRIER FILMS AND LAY CARRIERS DI TANK	___B__/______
5) IF POWER TO SLURRY SYSTEM IS GOING TO BE LOST, CONTACT 
   ASHLAND CHEMICAL AND HAVE SLURRY SYSTEM PURGED AND CHARGED 
   WITH DI WATER.						___B__/______
6) CLEAN ENTIRE SYSTEM OF DRIED SLURRY 			        ___B__/______
7) REMOVE CONDITIONER AND CLEAN					___B__/______
8) CYCLE/RINSE ALL DI FUNCTIONS: SPRAY NOZZLES, SLURRY PUMPS,
   CONDITIONER RINSE, ELEVATOR TANKS.				___B__/______
9) SHUT OFF DI BEHIND SYSTEM (ROTATE 3W VLV TO FULL RETURN)     ___B__/______ 
10) DRAIN ELEVATOR AND CONDITIONER TUBE				___B__/______
11) REMOVE PADS, AND CLEAN AND DRY TABLES			___B__/______
12) REMOVE SCRUBBER BRUSHES AND SOAK IN DI			___B__/______
13) DRY ENTIRE SYSTEM OF ANY STANDING WATER			___B__/______
14) POWER DOWN SYSTEM.

22.2Startup ChecksheetSUBPAC::LANDRYTue May 28 1996 20:0219
                        CMP.B START UP CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
                                                                 INIT / DATE
1) TURN ON DI WATER (ROTATE 3W VLV TO FULLY TO POLISHER.        A shift  5/28
2) POWER ON SYSTEM.						A shift  5/28
3) CYCLE/RUN ALL DI FUNCTIONS FOR 15 MINUTES			A shift  5/28
4) WIPE DOWN SYSTEM CLEAN ALL DRIED SLURRY	                A shift  5/28
5) DRY TABLES, INSTALL PADS					A shift  5/28
6) INSTALL SCRUBBER BRUSHES					A shift  5/28
7) INSTALL CONDITIONER						A shift  5/28
8) INSTALL CARRIERS						A shift  5/28
9) RUN WET IDLE PROGRAM FOR 15 MIN. (ENOUGH TO CLEAN CARRIERS)  A shift  5/28
10) IF SLURRY SYSTEM WAS SHUT DOWN, CONTACT ASHLAND CHEMICAL,
    REQUEST DI TO BE PURGE FROM SLURRY SYSTEM AND CHARGED WITH 
    SLURRY AND REQUEST A NEW SLURRY FILTER BE INSTALLED.	    N/A
11) CALIBRATE SLURRY FLOW					A shift  5/28
12) PUT IN WET IDLE AND TURN OVER TO MFG FOR MQC		A shift  5/28

22.3weekly pm completedFABSIX::R_GEEWed Jun 19 1996 00:3682
    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 30

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: n/a

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 17

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 25

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 22

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 50

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed: X

6.1.20 Check tubing/fittings for fluid leaks            Completed: X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: X

6.1.22 Check stations/components for contamination	Completed: X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: X	

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: X

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: X

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments: No pressures changed.

          The pad needed to be changed
       ____________________________________________________________
    
22.4Weekly PM for WW52 completedSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Jun 27 1996 01:0286
    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 6/25/96     SYSTEM RTC CODE: CMP.B3              SHIFT/TECH: D
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 84

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 34

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: n/a

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 15

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 30

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 22

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed: X

6.1.20 Check tubing/fittings for fluid leaks            Completed: X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: X

6.1.22 Check stations/components for contamination	Completed: X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 1.5

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: X	

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: X

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: X

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments:   A small puddle of gear box oil found under tool.  Cleaned
          up and checked for source of leak.
      
            Head #3 rotation Infranor blew out at boot-up after
          panel were installed.  None in stock.  Reps have and will
          bring it in in the a.m.  
                                                                     
22.5B3 weekly PM completed for WW1SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Jul 04 1996 02:5281
   
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 7/3/96     SYSTEM RTC CODE: CMP.B3              SHIFT/TECH: D
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 85

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 28

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: n/a

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 15

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 30

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 25

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed: X

6.1.20 Check tubing/fittings for fluid leaks            Completed: X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: X

6.1.22 Check stations/components for contamination	Completed: X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 1.5

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: X	

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: X

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: X

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments:   A large puddle of gear box oil found.  Per EE, left as is.
    
22.6B3 SHUT-DOWN COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Jul 04 1996 02:5426


                        CMP.B SHUT DOWN CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
							        SHIFT / DATE
1) SCRUB SIDES OF CARRIERS					  D    7/3/96
2) RUN CARRIER BLOW OFF FOR 30 SECONDS				  D    7/3/96
3) REMOVE ALL CARRIERS						  D    7/3/96
4) PLACE WIPES UNDER CARRIER FILMS AND LAY CARRIERS DI TANK	  D    7/3/96
5) IF POWER TO SLURRY SYSTEM IS GOING TO BE LOST, CONTACT 
   ASHLAND CHEMICAL AND HAVE SLURRY SYSTEM PURGED AND CHARGED 
   WITH DI WATER.						  D    7/3/96
6) CLEAN ENTIRE SYSTEM OF DRIED SLURRY 			          D    7/3/96
7) REMOVE CONDITIONER AND CLEAN					  D    7/3/96
8) CYCLE/RINSE ALL DI FUNCTIONS: SPRAY NOZZLES, SLURRY PUMPS,
   CONDITIONER RINSE, ELEVATOR TANKS.			          D    7/3/96
9) SHUT OFF DI BEHIND SYSTEM (ROTATE 3W VLV TO FULL RETURN)       D    7/3/96 
10) DRAIN ELEVATOR AND CONDITIONER TUBE				  D    7/3/96
11) REMOVE PADS, AND CLEAN AND DRY TABLES	        	  D    7/3/96
12) REMOVE SCRUBBER BRUSHES AND SOAK IN DI			  D    7/3/96
13) DRY ENTIRE SYSTEM OF ANY STANDING WATER			  D    7/3/96
14) POWER DOWN SYSTEM.                                            D    7/3/96

    
    
22.7B3 STARTUP COMPLETEDFABSIX::L_SHKOLNIKOVSat Jul 06 1996 04:3421

                        CMP.B3 START UP CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
                                                                 INIT / DATE

1) TURN ON DI WATER (ROTATE 3W VLV TO FULLY TO POLISHER.	__LS__/7-6-96
2) POWER ON SYSTEM.						__LS__/7-6-96
3) CYCLE/RUN ALL DI FUNCTIONS FOR 15 MINUTES			__LS__/7-6-96
4) WIPE DOWN SYSTEM CLEAN ALL DRIED SLURRY	                __LS__/7-6-96
5) DRY TABLES, INSTALL PADS					__LS__/7-6-96
6) INSTALL SCRUBBER BRUSHES					__LS__/7-6-96
7) INSTALL CONDITIONER						__LS__/7-6-96
8) INSTALL CARRIERS						__LS__/7-6-96
9) RUN WET IDLE PROGRAM FOR 15 MIN. (ENOUGH TO CLEAN CARRIERS)  __LS__/7-6-96
10) IF SLURRY SYSTEM WAS SHUT DOWN, CONTACT ASHLAND CHEMICAL,
    REQUEST DI TO BE PURGE FROM SLURRY SYSTEM AND CHARGED WITH 
    SLURRY AND REQUEST A NEW SLURRY FILTER BE INSTALLED.	__LS__/7-6-96
11) CALIBRATE SLURRY FLOW					__LS__/7-6-96
12) PUT IN WET IDLE AND TURN OVER TO MFG FOR MQC		__LS__/7-6-96

22.8work week #2 weekly p.m.FABSIX::R_GEEMon Jul 08 1996 05:5881
   
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 7/8/96     SYSTEM RTC CODE: CMP.B3              SHIFT/TECH: B
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 82

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 29

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: n/a

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 15

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 30

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 22

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed: X

6.1.20 Check tubing/fittings for fluid leaks            Completed: X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: X

6.1.22 Check stations/components for contamination	Completed: X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 8

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: X	

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: X

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: X

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments:   A large puddle of gear box oil found.  Per EE, left as is.
    
22.9MONTHLY COMPLETEDSTRATA::WESTPHALFri Jul 19 1996 20:32154
              <<< ASDG::DISK$SYS_DATA:[NOTES$LIBRARY]CMP.NOTE;1 >>>
                                    -< CMP >-
================================================================================
Note 30.1                        IN-COMPLETE PMs                          1 of 1
FABSIX::L_SHKOLNIKOV                                143 lines  19-JUL-1996 07:42
                     -< b3 monthly incomplete checksheet >-
--------------------------------------------------------------------------------

                           Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev D

DATE: 7/18/96       SYSTEM RTC CODE: CMP.B3        SHIFT/TECH: C+D

6.2.1  Change Peristaltic Pump Lines			Completed: X

6.2.2  Clean Polish area tub drains			Completed: X

6.2.3  Check Polish Table Belt for defects		Completed: X

6.2.4  Perform Down Force Calibration on all 5 heads    Completed: X

       Down Frc: Head 1 Pre-Adj:408___ Post-adj:375.1_

                 Head 2 Pre-Adj:389.1_ Post-adj:377.9_

                 Head 3 Pre-Adj:369.6_ Post-adj:375.1_

                 Head 4 Pre-Adj:391.2_ Post-adj:378.6_

                 Head 5 Pre-Adj:387.6_ Post-adj:375.9_

6.2.5  Perform Down Force Calibration on Conditioner    Completed:

       Actual Down Force Pre-Adj:___76.6______

       Actual Down Force Post-Adj:__76.6______

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed:  X

6.2.7  Check the Load Flipper alignment			Completed:  X

6.2.8  Check the Unload Flipper alignment		Completed:  X

6.2.9  Check the Elevator alignment                     Completed:  X

6.2.10 Check wafer unload, from Index table to cassette Completed:  X

6.2.11 Check the +24 Volt power supply                  Pre-Adjust: 24.07

6.2.12 Check the +/- 15 Volt power supply               Pre-Adjust: +15.1/-14.97

6.2.13 Check the +5 Volt power supply                   Pre-Adjust: 5.04

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed:  31

6.2.15 Check Vacuum Pump Diaphrams			Completed:  X

6.2.16 Check Vacuum Tank/Pump lines			Completed:  X

6.2.17 Check Load Cup Position alignment		Completed:  X

6.2.18 Check Load Cup Height alignment                  Completed:  X

6.2.19 Check Robot alignments			        Completed:  X

6.2.20 Check Muffin Fans for proper operation           Completed:  X


--------------------------------------------------------------------------------


                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 82

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 30

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 34

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 25

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: n/a

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 18

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 55

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 30

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 25

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed: X

6.1.20 Check tubing/fittings for fluid leaks            Completed: X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: X

6.1.22 Check stations/components for contamination	Completed: X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 1.5

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: X

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: X

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed  X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: X

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments:  Oil still coming out from main polish table gearbox.
           Per EE left as is.
    
           ** EP REGULATOR FOR CARRIER #1 DF IS OUT OF CAL.
              CAL PROCEDURE/INFO WILL BE FAXED FROM SPEEDFAM AT 9AM.
    
22.10weekly p.m.FABSIX::R_GEEMon Jul 22 1996 22:4380
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 7/23/96     SYSTEM RTC CODE: CMP.B3              SHIFT/TECH: B
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 85

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 29

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: n/a

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 15

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 30

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 22

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed: X

6.1.20 Check tubing/fittings for fluid leaks            Completed: X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: X

6.1.22 Check stations/components for contamination	Completed: X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 8

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: X	

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: X

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: X

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments:   A large puddle of gear box oil found.  Per EE, left as is.
    
22.11WEEKLY PM FOR WW5 COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Jul 31 1996 23:4682
                           Speedfam Corp. CMP-V Planarizer         

                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 7/31/96     SYSTEM RTC CODE: CMP.B3              SHIFT/TECH: D
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 85

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 25

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: n/a

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 10

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 58

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 30

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 24

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 58

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed: X

6.1.20 Check tubing/fittings for fluid leaks            Completed: X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: X

6.1.22 Check stations/components for contamination	Completed: X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 2.5

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: X	

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: n/a

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: n/a

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments:   A large puddle under polish table gear box (old news)
     
                               Per EE, left as is.
    
22.12WEEKLY PM FOR WW6 COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringMon Aug 05 1996 18:3882
                           Speedfam Corp. CMP-V Planarizer         

                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 8/5/96     SYSTEM RTC CODE: CMP.B3              SHIFT/TECH: A 
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 85

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 20

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 17

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: n/a

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 17

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 30

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 20

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed: X

6.1.20 Check tubing/fittings for fluid leaks            Completed: X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: X

6.1.22 Check stations/components for contamination	Completed: X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 2.5

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: X	

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: n/a

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: n/a

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments:    puddle under polish table gear box (old news)
     
                               Per EE, left as is.
    
22.13 B3 MONTHLY P.M. COMPLETED FOR WW07STRATA::SWENSONSat Aug 17 1996 16:53150
                                                                    
                           Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev D

DATE: 8/17/96      RTC ENTITY: CMP.B3            SHIFT/TECH: C/D shift  

    
6.2.1  Change Peristaltic Pump Lines			Completed: X

6.2.2  Clean Polish area tub drains			Completed: X

6.2.3  Check Polish Table Belt for defects		Completed: X

6.2.4  Perform Down Force Calibration on all 5 heads    Completed: X

       Down Frc: Head 1 Pre-Adj: 408.0 Post-adj: 378.0

                 Head 2 Pre-Adj: 397.0 Post-adj: 375.1

                 Head 3 Pre-Adj: 411.0 Post-adj: 375.1

                 Head 4 Pre-Adj: 390.0 Post-adj: 378.4

                 Head 5 Pre-Adj: 409.5 Post-adj: 379.0

6.2.5  Perform Down Force Calibration on Conditioner    Completed: X

       Actual Down Force Pre-Adj:_____________  66.1

       Actual Down Force Post-Adj:____________  76.4

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: X

6.2.7  Check the Load Flipper alignment			Completed: X

6.2.8  Check the Unload Flipper alignment		Completed: X
                                                                   
6.2.9  Check the Elevator alignment                     Completed: X

6.2.10 Check wafer unload, from Index table to cassette Completed: X

6.2.11 Check the +24 Volt power supply                  Pre-Adjust: 23.84

6.2.12 Check the +/- 15 Volt power supply               Pre-Adjust: +/- 15.04

6.2.13 Check the +5 Volt power supply                   Pre-Adjust: 4.85

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed:  31.6

6.2.15 Check Vacuum Pump Diaphrams			Completed: n/a

6.2.16 Check Vacuum Tank/Pump lines			Completed:  X

6.2.17 Check Load Cup Position alignment		Completed:  X

6.2.18 Check Load Cup Height alignment                  Completed:  X
  
6.2.19 Check Robot alignments			        Completed:  X

6.2.20 Check Muffin Fans for proper operation           Completed:  X

Comments:
                                                               
                           Speedfam Corp. CMP-V Planarizer         

                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 8/17/96     SYSTEM RTC CODE: CMP.B3              SHIFT/TECH: C/D SHIFT
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 85

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: n/a

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 14

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 30

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 22
                                                                     
6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 82

6.1.19 Check Drip Pan for moisture/contamination        Completed: X

6.1.20 Check tubing/fittings for fluid leaks            Completed: X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: X

6.1.22 Check stations/components for contamination	Completed: X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: X	

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: n/a

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: n/a

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments:   Large puddle of oil found under 1st table gear box and
            was cleaned up.
    
            
     
                        
    
                        
22.14WEEKLY PM FOR WW8 COMPLETEDFABSIX::L_SHKOLNIKOVSat Aug 24 1996 08:1982
                               Speedfam Corp. CMP-V Planarizer         

                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 8/24/96     SYSTEM RTC CODE: CMP.B3              SHIFT/TECH: D shift
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: n/a

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 15

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 20

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 25

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed: X

6.1.20 Check tubing/fittings for fluid leaks            Completed: X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: X

6.1.22 Check stations/components for contamination	Completed: X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10 

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: X	

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: n/a

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: n/a

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments:    puddle under polish table gear box (old news)
             but it is very little at this time.
                               Per EE, left as is.
    
22.15WW IX - Weekly versionSUBPAC::LANDRYTue Aug 27 1996 19:2880
                               Speedfam Corp. CMP-V Planarizer         

                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 8/27/96     SYSTEM RTC CODE: CMP.B3              SHIFT/TECH: A shift
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 80

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 21

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: n/a

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 17

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 20

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 25

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 60

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed: X

6.1.20 Check tubing/fittings for fluid leaks            Completed: X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: X

6.1.22 Check stations/components for contamination	Completed: X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 8 psi

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: X	

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: n/a

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: n/a

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments:  a small oil spot under the polish table gear box.
    
22.16CMP.B3 SHUTDOWN CHECKSHEETFABSIX::R_POIRIERMon Sep 02 1996 02:5130
                        CMP.B3 SHUT DOWN CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
							        SHIFT / DATE
1) SCRUB SIDES OF CARRIERS					  B    9-1-96
2) RUN CARRIER BLOW OFF FOR 30 SECONDS				  B    9-1-96
3) REMOVE ALL CARRIERS						  B    9-1-96
4) PLACE WIPES UNDER CARRIER FILMS AND LAY CARRIERS DI TANK	  B    9-1-96
5) IF POWER TO SLURRY SYSTEM IS GOING TO BE LOST, CONTACT 
   ASHLAND CHEMICAL AND HAVE SLURRY SYSTEM PURGED AND CHARGED 
   WITH DI WATER.						  B    9-1-96
6) CLEAN ENTIRE SYSTEM OF DRIED SLURRY 			          B    9-1-96
7) REMOVE CONDITIONER AND CLEAN					  B    9-1-96
8) CYCLE/RINSE ALL DI FUNCTIONS: SPRAY NOZZLES, SLURRY PUMPS,
   CONDITIONER RINSE, ELEVATOR TANKS.			          B    9-1-96
9) JUMPER DI PRESSURES SWITCHES                                   B    9-1-96
10) SHUT OFF DI BEHIND SYSTEM (ROTATE 3W VLV TO FULL RETURN)      B    9-1-96 
11) DRAIN ELEVATOR AND CONDITIONER TUBE				  B    9-1-96
12) REMOVE PADS, AND CLEAN AND DRY TABLES	        	  B    9-1-96
13) REMOVE SCRUBBER BRUSHES AND SOAK IN DI			  B    9-1-96
14) DRY ENTIRE SYSTEM OF ANY STANDING WATER			  B    9-1-96
15) TURN OFF CHILLER					          B    9-1-96


  ** DO NOT TURN POWER OFF TO POLISHER **

  ** THE MAIN PCW VALES ARE TO BE SHUT IN THE PIPE GALLERY  **
    
    
                              
22.17ww10 weekly pmFABSIX::L_SHKOLNIKOVFri Sep 06 1996 08:1380
                               Speedfam Corp. CMP-V Planarizer         

                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 9/6/96     SYSTEM RTC CODE: CMP.B3              SHIFT/TECH: D shift
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 86

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: n/a

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 16

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 20

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 25

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 50

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed: X

6.1.20 Check tubing/fittings for fluid leaks            Completed: X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: X

6.1.22 Check stations/components for contamination	Completed: X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 8 psi

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: X	

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: n/a

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: n/a

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments:  a small oil spot under the polish table gear box.
    
22.18WW 11 MONTHLY P.M. COMPLETEDSTRATA::SWENSONSat Sep 14 1996 17:23150
                                                                    
                Speedfam Corp. CMP-V Planarizer SPEC# HF6O-0172

                Monthly Preventative Maintenance Check Sheet, Rev D

DATE: 9/14/96      RTC ENTITY: CMP.B3            SHIFT/TECH:  C/D shift  

    
6.2.1  Change Peristaltic Pump Lines			Completed:   X

6.2.2  Clean Polish area tub drains			Completed:   X

6.2.3  Check Polish Table Belt for defects		Completed:   X

6.2.4  Perform Down Force Calibration on all 5 heads    Completed:   X

       Down Frc: Head 1 Pre-Adj: 371.4       Post-adj: 376.5

                 Head 2 Pre-Adj: 374.9       Post-adj: 377.5      

                 Head 3 Pre-Adj: 374.7       Post-adj: 377.5

                 Head 4 Pre-Adj: 373.2       Post-adj: 377.8

                 Head 5 Pre-Adj: 376.7       Post-adj: 376.7

6.2.5  Perform Down Force Calibration on Conditioner    Completed: X  

       Actual Down Force Pre-Adj:  77.8       

       Actual Down Force Post-Adj: 77.8     

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: X 

6.2.7  Check the Load Flipper alignment			Completed: X 

6.2.8  Check the Unload Flipper alignment		Completed: X 
                                                                   
6.2.9  Check the Elevator alignment                     Completed: X 

6.2.10 Check wafer unload, from Index table to cassette Completed: X 

6.2.11 Check the +24 Volt power supply                  Pre-Adjust: 23.89 vdc   

6.2.12 Check the +/- 15 Volt power supply               Pre-Adjust: 15.12 vdc   

6.2.13 Check the +5 Volt power supply                   Pre-Adjust:  4.88 vdc  

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed:  31.6 rpm   

6.2.15 Check Vacuum Pump Diaphrams			Completed: n/a

6.2.16 Check Vacuum Tank/Pump lines			Completed: X  

6.2.17 Check Load Cup Position alignment		Completed: X

6.2.18 Check Load Cup Height alignment                  Completed: X  
  
6.2.19 Check Robot alignments			        Completed: X  

6.2.20 Check Muffin Fans for proper operation           Completed: X  

Comments: While inspecting belt found belt filings to be present on
          bottom of tool.
                                                               
                Speedfam Corp. CMP-V Planarizer SPEC# HF6O-0172         

                Weekly Preventative Maintenance Check Sheet, Rev D

DATE: 9/14/96     SYSTEM RTC CODE: CMP.B3              SHIFT/TECH:  C/D  SHIFT
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 86

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 26

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: n/a

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 15

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 15

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 22
                                                                     
6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 50

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 85

6.1.19 Check Drip Pan for moisture/contamination        Completed:   X

6.1.20 Check tubing/fittings for fluid leaks            Completed:   X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:   X

6.1.22 Check stations/components for contamination	Completed:   X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust:  8 

6.1.24 Clean and lubricate the Scrubber rails		Completed:   X

6.1.25 Clean and lubricate the Paddle rails		Completed:   X	

6.1.26 Clean Conditioning Wheel and Housing             Completed:   X

6.1.27 Scrub clean the Polish area tub and walls        Completed:   X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:   X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:   X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:   X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: n/a

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:   X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed:   X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:   X

6.1.35 Clean the slurry delivery tube                   Completed: n/a

6.1.36 Check chiller fluid resevoir for proper level    Completed:   X

Comments:
    
* Still leaking significant amounts of gear oil from main polish table gearbox
     
                        
    
                        
22.19WW 12 WEEKLY P.M. COMPLETEDFABSIX::J_SWENSONThu Sep 19 1996 13:4887
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

                                               Techs: Kevin,C/D Shift 

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 87

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 82 

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 11

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30 

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 18

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: N/A

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 15

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 18

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 25

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 50

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  x

6.1.20 Check tubing/fittings for fluid leaks            Completed:  x

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  x

6.1.22 Check stations/components for contamination	Completed:  x

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 8

6.1.24 Clean and lubricate the Scrubber rails		Completed:  x

6.1.25 Clean and lubricate the Paddle rails		Completed:  n/a

6.1.26 Clean Conditioning Wheel and Housing             Completed: x

6.1.27 Scrub clean the Polish area tub and walls        Completed: x

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: x

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: x

6.1.30 Check slurry pump hoses and connectors for leaks Completed: DW  LS

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: n/a

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: x

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: x

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: x

6.1.35 Clean the slurry delivery tube                   Completed: n/a

6.1.36 Check chiller fluid resevoir for proper level    Completed: x


Comments: Found signifcant slurry leak from pump #1. Replced lines 
          for pumps 1,2,& 3 and checked flow rates.

    
22.20WW13 Weekly PMASDG::POIRIERFri Sep 27 1996 18:4186
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

                          Shift: C      Tech/s: JP & RB

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 86

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 30

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  6

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: n/a

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 15

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 52

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 61

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 18

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 25

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 50

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 85

6.1.19 Check Drip Pan for moisture/contamination        Completed: X

6.1.20 Check tubing/fittings for fluid leaks            Completed: X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: X

6.1.22 Check stations/components for contamination	Completed: X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 8

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: X

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: n/a

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed  X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: n/a

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments:

       Replaced springs on Multihead leadscrew cover (left side/middle cover).
    
22.21carrier 5STRATA::RIDLONEliminate the obliviousTue Oct 01 1996 05:314
    Slipped a wafer out of carrier 5 due to no slurry. Replaced the carrier
    and gave it back once slurry came back up.
    
    						B-shift
22.22WW14 Weekly P.M. Check SheetASDG::POIRIERThu Oct 03 1996 16:3788
      SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                         Speedfam Corp. CMP-V Planarizer

                WEEKLY Preventative Maintenance Check Sheet, Rev D

                 SHIFT: C                     TECH/S: JP,BW,JS
--------------------------------------------------------------------------------

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 86

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 22

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  6

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 40

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: N/A

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 18

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 20

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 21 *

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 50

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed: X

6.1.20 Check tubing/fittings for fluid leaks            Completed: X

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: X

6.1.22 Check stations/components for contamination	Completed: X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 7

6.1.24 Clean and lubricate the Scrubber rails		Completed: X

6.1.25 Clean and lubricate the Paddle rails		Completed: N/A

6.1.26 Clean Conditioning Wheel and Housing             Completed: X

6.1.27 Scrub clean the Polish area tub and walls        Completed: X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: X

6.1.30 Check slurry pump hoses and connectors for leaks Completed: X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed: X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed  X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed: X

6.1.35 Clean the slurry delivery tube                   Completed: N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed: X

Comments:

      * The Scrubber Down pressure is listed as 80 PSI in item 6.1.16.
        The gage for this pressure is reading 21 PSI. The Scrubber is
        performing normally.
    
22.23B3 Weekly Complete FABSIX::J_SWENSONSat Oct 12 1996 19:3291
      SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                         Speedfam Corp. CMP-V Planarizer

                WEEKLY Preventative Maintenance Check Sheet, Rev D
                
           Shift/S  C/D                                    Tech/S  C/BJ

                    
--------------------------------------------------------------------------------
    
6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 85

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 24

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 45

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: N/A*
                                                        *this model doesn't
                                                        use air drive motor
    
6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 16

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 22

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 22 

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 50

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80

6.1.19 Check Drip Pan for moisture/contamination        Completed:  X

6.1.20 Check tubing/fittings for fluid leaks            Completed: BJ
    
6.1.21 Check tubing/fittings for pneumatic leaks        Completed: BJ

6.1.22 Check stations/components for contamination	Completed: X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 10

6.1.24 Clean and lubricate the Scrubber rails		Completed: BJ

6.1.25 Clean and lubricate the Paddle rails		Completed: BJ

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X 

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X 

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  X

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  X

6.1.35 Clean the slurry delivery tube                   Completed: N/A*
                                                        *Tool doesn't have
                                                         slurry tube
    
6.1.36 Check chiller fluid resevoir for proper level    Completed: BJ

Comments: Found a considerable amount of oil and belt filings on bottom
          of tool.

22.24WW XVII - Weekly completedSUBPAC::LANDRYMon Oct 21 1996 17:0590
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

Date:  10/21/96		RTC #:  CMP.B3		Techs:  Gee / Landry

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  86

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  27

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust:  10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  6.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust:  20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  N/A

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:  17

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust:  60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust:  18

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  22

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  50

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust:  80

6.1.19 Check Drip Pan for moisture/contamination        Completed:   X see
                                                                   comments

6.1.20 Check tubing/fittings for fluid leaks            Completed:   X  

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:   X

6.1.22 Check stations/components for contamination	Completed:   X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust:  8

6.1.24 Clean and lubricate the Scrubber rails		Completed:   X

6.1.25 Clean and lubricate the Paddle rails		Completed:   X

6.1.26 Clean Conditioning Wheel and Housing             Completed:   X

6.1.27 Scrub clean the Polish area tub and walls        Completed:   X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:   X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:   X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:   X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:   X

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:   X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed    X

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:   X

6.1.35 Clean the slurry delivery tube                   Completed:   N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:   X

Comments:

      6.1.11  There is no pressure gauge on this system

      6.1.19  Found oil from the table drive motor assembly in spill pan

      6.1.35  There is no delivery tube on this system
22.25ww18 - weekly PM.FABSIX::L_SHKOLNIKOVWed Oct 30 1996 05:1687
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

Date:  10/30/96		RTC #:  CMP.B3		Techs:  Dave/ Leon  

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  88

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  26

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust:  10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  6.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust:  20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  N/A

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:  17

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust:  60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust:  18

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  22

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  50

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust:  80

6.1.19 Check Drip Pan for moisture/contamination        Completed:   X**   
                                                                   
6.1.20 Check tubing/fittings for fluid leaks            Completed:   X ** 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:   X

6.1.22 Check stations/components for contamination	Completed:   X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust:  8

6.1.24 Clean and lubricate the Scrubber rails		Completed:   X

6.1.25 Clean and lubricate the Paddle rails		Completed:   X

6.1.26 Clean Conditioning Wheel and Housing             Completed:   X

6.1.27 Scrub clean the Polish area tub and walls        Completed:   X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:   X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:   X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:   X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:   X

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:   X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed    X

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:   X

6.1.35 Clean the slurry delivery tube                   Completed:   N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:   X

Comments: **Found oil from the table drive motor assembly in spill pan
          Small amount of ware was found in a slurry pump box. Leak
          sensor was in water but tool wasn't alarming. Leak detection 
          circuit has been reset and tested for functionality.
                                                            
22.26ww19 weekly pm.FABSIX::L_SHKOLNIKOVFri Nov 08 1996 07:1885
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

Date:  11/08/96		RTC #:  CMP.B3		Techs: Leon  

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  88

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  82

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  28

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  40

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust:  10

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  35

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  40

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  6.2

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust:  20

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  N/A

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:  15

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  50

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust:  60

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust:  30

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  20

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  60

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust:  80

6.1.19 Check Drip Pan for moisture/contamination        Completed:   X **   
                                                                   
6.1.20 Check tubing/fittings for fluid leaks            Completed:   X ** 

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:   X

6.1.22 Check stations/components for contamination	Completed:   X

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust:  8

6.1.24 Clean and lubricate the Scrubber rails		Completed:   X

6.1.25 Clean and lubricate the Paddle rails		Completed:   X

6.1.26 Clean Conditioning Wheel and Housing             Completed:   X

6.1.27 Scrub clean the Polish area tub and walls        Completed:   X

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:   X

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:   X

6.1.30 Check slurry pump hoses and connectors for leaks Completed:   X

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:   X

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:   X

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed    X

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:   X

6.1.35 Clean the slurry delivery tube                   Completed:   N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:   X

Comments: **Found oil from the Polish table gearbox assembly in spill pan 
            and on the floor under the tool. (Tool has warning)
          **Line for slurry pump#3 was replaced due to water leak. 
22.27WW20 MONTHLY PM CHECKSHEETASDG::POIRIERWed Nov 13 1996 18:30171
    
SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev 
    
    
DATE: 11/12/96          TOOL: CMP.B3       TECH/SHIFT: Brian Jubinville (BJ)
                                                       Leon Shkolnikov (LS)
                                                       John Poirier (JP)
                                                       Bradly Westphal (BW)
                                                       John Swenson (JS)
                                                       Jim Sadin (JPS)
                                                       Rich Barrett (RB)
                                                      
6.2.1  Change Peristaltic Pump Lines			Completed:  LS

6.2.2  Clean Polish area tub drains			Completed:  RB

6.2.3  Check Polish Table Belt for defects		Completed:  BJ

6.2.4  Perform Down Force Calibration on all 5 heads    Completed:  JS/JPS/BW
                                                                    RB/JP

       Down Frc: Head 1 Pre-Adj: 380.3 lbs.         Post-adj: 377.2 lbs.

                 Head 2 Pre-Adj: 390.1 lbs.         Post-adj: 377.0 lbs.

                 Head 3 Pre-Adj: 374.3 lbs.         Post-adj: 376.7 lbs.

                 Head 4 Pre-Adj: 375.0 lbs.         Post-adj: 376.5 lbs.

                 Head 5 Pre-Adj: 383.0 lbs.         Post-adj: 377.7 lbs.

6.2.5  Perform Down Force Calibration on Conditioner    Completed: JPS/JS

       Actual Down Force Pre-Adj:  81.6 lbs.

       Actual Down Force Post-Adj: 77.7 lbs.

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: BJ

6.2.7  Check the Load Flipper alignment			Completed: BJ

6.2.8  Check the Unload Flipper alignment		Completed: BJ

6.2.9  Check the Elevator alignment                     Completed: BJ

6.2.10 Check wafer unload, from Index table to cassette Completed: BJ 

6.2.11 Check the +24 Volt power supply                  Pre-Adjust: 24.1 v BJ  

6.2.12 Check the +/- 15 Volt power supply        Pre-Adjust: 14.6/-14.8 v BJ
                                                 Post-adjust: 15.1/-15.2 v BJ
    
6.2.13 Check the +5 Volt power supply                   Pre-Adjust: 4.89 v BJ 

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed: 31.6 rpm
                                                                   JPS/JS

6.2.15 Check Vacuum Pump Diaphrams			Completed:  N/A JP
       (Vacuum good, pump disassembly not necessary.) 

6.2.16 Check Vacuum Tank/Pump lines			Completed: BW 

6.2.17 Check Load Cup Position alignment		Completed: JPS/BW  

6.2.18 Check Load Cup Height alignment                  Completed: JPS/JS  

6.2.19 Check Robot alignments			        Completed: BJ

6.2.20 Check Muffin Fans for proper operation           Completed: RB 

Comments:


 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

Date:  11/12/96		RTC #:  CMP.B3		Techs: Brian Jubinville (BJ)  
                                                       Leon Shkolnikov (LS)
                                                       Bradly Westphal (BW)
                                                       John Poirier (JP)
                                                       Rich Barrett (RB)
                                                       John Swenson (JS)
                                                       Jim Sadin (JPS)

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  85 BJ 

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  80 BJ 

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  20 BJ 

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  40 BJ 

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust:  10 BJ 

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  35 BJ 

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30 BJ 

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  40 BJ 

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  6.2 BJ 

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust:  20 BJ 

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  N/A BJ 
       (paddle motor driven now, no longer air)

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:  17 BJ 

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  50 BJ 

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust:  60 BJ 

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust:  30 BJ 

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  20 BJ 

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  55 BJ 

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust:  80 BJ 

6.1.19 Check Drip Pan for moisture/contamination        Completed:   BJ 
                                                                   
6.1.20 Check tubing/fittings for fluid leaks            Completed:   LS/BJ  

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:   BJ 

6.1.22 Check stations/components for contamination	Completed:   BJ

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust:  10 BJ 

6.1.24 Clean and lubricate the Scrubber rails		Completed:   BJ 

6.1.25 Clean and lubricate the Paddle rails		Completed:   BJ 

6.1.26 Clean Conditioning Wheel and Housing             Completed:   RB

6.1.27 Scrub/clean the Polish area tub and walls        Completed:   RB

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:   BW

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:   JS

6.1.30 Check slurry pump hoses and connectors for leaks Completed:   LS/BJ 

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:   N/A JP
       (This activity is no longer necessary, the 
        check valve has been eliminated) 

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:   BJ 

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed    JPS

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:   JS

6.1.35 Clean the slurry delivery tube                   Completed:   N/A BJ  
       (Tool doesn't use tube)

6.1.36 Check chiller fluid resevoir for proper level    Completed:   BJ   
    
          
Comments: Lot of oil from the gear box, one on order.        
                 
22.28WEEKLY PM COMPLETED FOR WW21SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Nov 21 1996 05:3790
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

Date:  11/21/96		RTC #:  CMP.B3		Techs: Jubinville (BJ)
                                                       Whitford   (DW)
                                                       Shkolnikov (LS)  

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  88 DW

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  82 DW

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  25 DW

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  40 DW

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust:  10 DW

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  35 DW

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30 DW

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  40 DW

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  6.2 DW

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust:  20 DW

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  N/A DW
       (L/R paddle motor driver, doesn't use air)

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:  17 DW

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  50 DW

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust:  60 DW

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust:  30 DW

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  22 DW

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  55 DW

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust:  80 DW

6.1.19 Check Drip Pan for moisture/contamination        Completed:   LS **   
                                                                   
6.1.20 Check tubing/fittings for fluid leaks            Completed: LS/BJ/DW   

6.1.21 Check tubing/fittings for pneumatic leaks        Completed: LS/BJ/DW  

6.1.22 Check stations/components for contamination	Completed: LS/BJ/DW  

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust:  8 BJ

6.1.24 Clean and lubricate the Scrubber rails		Completed: DW  

6.1.25 Clean and lubricate the Paddle rails		Completed: DW  

6.1.26 Clean Conditioning Wheel and Housing             Completed: BJ 

6.1.27 Scrub clean the Polish area tub and walls        Completed: LS/BJ/DW  

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: LS/DW  

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: DW  

6.1.30 Check slurry pump hoses and connectors for leaks Completed: LS  

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: LS  
       (Liquid separator)
    
6.1.32 Check Carrier clean brushes for defects, rotate  Completed: LS/BJ/DW  

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed LS/BJ/DW  

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed: LS/BJ/DW  

6.1.35 Clean the slurry delivery tube                   Completed: N/A BJ
       (Tool doesn't use slurry tube)

6.1.36 Check chiller fluid resevoir for proper level    Completed: BJ

Comments: **Found oil from the Polish table gearbox assembly in spill pan 
            and on the floor under the tool. (Tool has warning)
    
22.29WW 22 - Weekly completedSUBPAC::LANDRYSun Nov 24 1996 19:1486
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

Date:  11/24/96		RTC #:  CMP.B3		Techs: Finn, Landry

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  88 TL

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  82 TL

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  28 TL

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  40 BF

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust:  10 BF

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  35 BF

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30 BF

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  40 TL

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  6.2 TL

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust:  20 BF

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  N/A 

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:  17 BF

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  50 BF

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust:  60 TL

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust:  30 TL

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  22 TL

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  55 BF

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust:  80 BF

6.1.19 Check Drip Pan for moisture/contamination        Completed:   TL   
                                                                   
6.1.20 Check tubing/fittings for fluid leaks            Completed:   BF   

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:   BF  

6.1.22 Check stations/components for contamination	Completed:   TL  

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust:  8 BF

6.1.24 Clean and lubricate the Scrubber rails		Completed: TL

6.1.25 Clean and lubricate the Paddle rails		Completed: TL  

6.1.26 Clean Conditioning Wheel and Housing             Completed: BF 

6.1.27 Scrub clean the Polish area tub and walls        Completed: BF

6.1.28 Remove all Load and Unload cups and scrub clean  Completed: TL  

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed: TL  

6.1.30 Check slurry pump hoses and connectors for leaks Completed: BF  

6.1.31 Remove and clean the Vacuum system Check Valve   Completed: BF
    
6.1.32 Check Carrier clean brushes for defects, rotate  Completed: TL  

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed: BF

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed: TL/BF  

6.1.35 Clean the slurry delivery tube                   Completed: N/A 

6.1.36 Check chiller fluid resevoir for proper level    Completed: TL

Comments:   Found oil from the Polish table gearbox assembly in spill pan 
            and on the floor under the tool. 
    
            6.1.11  System is equipped with a motorized drive
            6.1.35  System is not equipped with this feature
22.30ww23 Weekly PM.FABSIX::L_SHKOLNIKOVThu Dec 05 1996 05:4383
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

Date:  12/05/96		RTC #:  CMP.B3		Techs: BJ-B.JUBINVILLE
                                                       LS-L.SHKOLNIKOV

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  88 ls

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  80 ls

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  28 ls

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  40 ls  

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust:  10 ls  

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  35 ls  

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30 ls  

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  40 ls  

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  6.2 ls  

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust:  20 ls  

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  N/A 

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:  17 ls  

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  50 ls  

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust:  60 ls  

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust:  30 ls  

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  25 ls

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  50 ls  

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust:  80 ls  

6.1.19 Check Drip Pan for moisture/contamination        Completed:   ls   
                                                                   
6.1.20 Check tubing/fittings for fluid leaks            Completed:   bj   

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:   bj  

6.1.22 Check stations/components for contamination	Completed:   bj  

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust:  8 ls

6.1.24 Clean and lubricate the Scrubber rails		Completed:   ls

6.1.25 Clean and lubricate the Paddle rails		Completed:   ls

6.1.26 Clean Conditioning Wheel and Housing             Completed:   bj

6.1.27 Scrub clean the Polish area tub and walls        Completed:   bj

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:   bj

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:   ls

6.1.30 Check slurry pump hoses and connectors for leaks Completed:   ls

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:   bj
    
6.1.32 Check Carrier clean brushes for defects, rotate  Completed:   bj

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed:   bj

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:   bj   

6.1.35 Clean the slurry delivery tube                   Completed: N/A 

6.1.36 Check chiller fluid resevoir for proper level    Completed: ls

Comments:   The main polish table gearbox is not leaking so far.
22.31Monthly PM completeFABSIX::O_WHITFORDQuticherwhinin&#039;Wed Dec 11 1996 04:44172
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

                                   <<  WW 24  >>
Leon Shkolnikov
Dave Whitford

6.1.1  Check incoming CDA pressure for 80 PSI		80     Whitford

6.1.2  Check incoming N2 pressure for 80 PSI            48     Whitford


6.1.3  Check incoming DI Water pressure for 20 PSI      25     Whitford

6.1.4  Check Load Cup pressure for 45 PSI		40     Whitford

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	10     Whitford

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	35     Whitford

6.1.7  Check Carrier Up pressure for 30 PSI		30     Whitford

6.1.8  Check Miscellaneous pressure for 40 PSI		40     Whitford

6.1.9  Check Head Balance pressure for 2-6 PSI		6.2    Whitford

6.1.10 Check Alignment Fixture pressure for 20 PSI      20     Whitford

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	n/a *

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	17     Whitford

6.1.13 Check Open Load Flipper pressure for 50 PSI	50     Whitford

6.1.14 Check Open Unload Flipper pressure for 50 PSI	60     Whitford

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    28     Whitford

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	25     Whitford

6.1.17 Check Scrubber In/Out pressure for 50 PSI	55     Whitford

6.1.18 Check MHTA pressure for 80 PSI			80     Whitford

6.1.19 Check Drip Pan for moisture/contamination        Completed:   Whitford

6.1.20 Check tubing/fittings for fluid leaks            Completed:   Whitford

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:   Whitford

6.1.22 Check stations/components for contamination	Completed:   Whitford

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust:  Whitford 

6.1.24 Clean and lubricate the Scrubber rails		Completed:   Shkolnikov

6.1.25 Clean and lubricate the Paddle rails		Completed:   Shkolnikov

6.1.26 Clean Conditioning Wheel and Housing             Completed:   Shkolnikov

6.1.27 Scrub clean the Polish area tub and walls        Completed:   Shkolnikov
                                                                     Whitford

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:   Whitford
                                                                     Shkolnikov

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:   Shkolnikov

6.1.30 Check slurry pump hoses and connectors for leaks Completed:   Shkolnikov

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:   Whitford 

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:   Whitford

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed:   Whitford

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:   Shkolnikov

6.1.35 Clean the slurry delivery tube                   Completed:   n/a**

6.1.36 Check chiller fluid resevoir for proper level    Completed:   Whitford

Comments:

       *  6.1.11 This tool has no provision to read pressure on the xfer
                 paddle L/R move

      **  6.1.35 This tool is equipped with "hard plumbed" slurry delivery
    


SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev D

Dave Whitford
Leon Shkolnikov                                           	

6.2.1  Change Peristaltic Pump Lines			Completed: Shkolnikov

6.2.2  Clean Polish area tub drains			Completed: Shkolnikov 
                                                                   Whitford  
                                                                
6.2.3  Check Polish Table Belt for defects		Completed: Whitford

6.2.4  Perform Down Force Calibration on all 5 heads    Completed: Whitford

       Down Frc: Head 1 Pre-Adj: 370.4  Post-adj: 377.5

                 Head 2 Pre-Adj: 368    Post-adj: 376.8

                 Head 3 Pre-Adj: 378.5  Post-adj: 377.0

                 Head 4 Pre-Adj: 378.9  Post-adj: 376.9

                 Head 5 Pre-Adj: 376.4  Post-adj: 376.4

6.2.5  Perform Down Force Calibration on Conditioner    Completed: Whitford

       Actual Down Force Pre-Adj:   82 PSI

       Actual Down Force Post-Adj:  78 PSI

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: Shkolnikov

6.2.7  Check the Load Flipper alignment			Completed: Shkolnikov
                                                                   Whitford

6.2.8  Check the Unload Flipper alignment		Completed: Whitford
                                                                   Shkolnikov

6.2.9  Check the Elevator alignment                     Completed: Shkolnikov

6.2.10 Check wafer unload, from Index table to cassette Completed: Shkolnikov

6.2.11 Check the +24 Volt power supply                  Pre-Adjust: +24.3

6.2.12 Check the +/- 15 Volt power supply               Pre-Adjust: +15.2/-15.3

6.2.13 Check the +5 Volt power supply                   Pre-Adjust: +4.92

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed: Whitford
                                                                   Shkolnikov

6.2.15 Check Vacuum Pump Diaphrams			Completed: Whitford

6.2.16 Check Vacuum Tank/Pump lines			Completed: Whitford

6.2.17 Check Load Cup Position alignment		Completed: Whitford

6.2.18 Check Load Cup Height alignment                  Completed: Shkolnikov
                                                                   Whitford

6.2.19 Check Robot alignments			        Completed: Whitford
                                                                   Shkolnikov 

6.2.20 Check Muffin Fans for proper operation           Completed: Whitford

Comments:

         Monthly P.M Complete

    

                                                
22.32WW25 Weekly PMFABSIX::R_POIRIERTue Dec 17 1996 05:1492
--------------------------------------------------------------------------------
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

Date:  12/17/96 (WW25)	RTC #:  CMP.B3		Techs: MR M Ridlon
                                                       RP R Poirier

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  88 RP

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  80 RP

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  24 RP

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  40 RP  

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust:  10 RP  

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  35 RP  

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30 RP  

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  40 RP  

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  6.2 RP  

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust:  20 RP 

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  N/A 

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:  17 RP  

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  52 RP  

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust:  62 RP  

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust:  30 RP  

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  25 RP

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  50 RP  

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust:  80 RP  

6.1.19 Check Drip Pan for moisture/contamination        Completed:   MR
                                                                   
6.1.20 Check tubing/fittings for fluid leaks            Completed:   RP   

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:   RP  

6.1.22 Check stations/components for contamination	Completed:   RP/MR

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust:  8 RP

6.1.24 Clean and lubricate the Scrubber rails		Completed:   MR

6.1.25 Clean and lubricate the Paddle rails		Completed:   MR

6.1.26 Clean Conditioning Wheel and Housing             Completed:   MR

6.1.27 Scrub clean the Polish area tub and walls        Completed:   MR

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:   RP

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:   MR

6.1.30 Check slurry pump hoses and connectors for leaks Completed:   RP

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:   N/A
    
6.1.32 Check Carrier clean brushes for defects, rotate  Completed:   RP

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed:   MR

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:   MR

6.1.35 Clean the slurry delivery tube                   Completed: N/A 

6.1.36 Check chiller fluid resevoir for proper level    Completed:   RP


Comments:   The main polish table gearbox is not leaking so far.


N/A  6.1.11 CMP.B3 does not have a Check Transport Paddle L/R Gauge.
 
N/A  6.1.31 CMP.B3 Vacuum system Check Valve removed.

N/A  6.1.35 CMP.B3 Slurry Delivery tube removed
22.33WEEKLY WW26FABSIX::M_RIDLONEliminate the obliviousSun Dec 22 1996 03:5692
--------------------------------------------------------------------------------
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

Date:  12/22/96 (WW26)	RTC #:  CMP.B3		Techs: MR M Ridlon
                                                       RP R Poirier

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  79 RP

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  80 RP

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  24 RP

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  40 RP  

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust:  10 RP  

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  35 RP  

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30 RP  

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  40 RP  

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  6.0 RP  

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust:  20 RP 

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  N/A 

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:  15 RP  

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  52 RP  

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust:  60 RP  

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust:  30 RP  

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  25 RP

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  55 RP  

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust:  78 RP  

6.1.19 Check Drip Pan for moisture/contamination        Completed:   MR
                                                                   
6.1.20 Check tubing/fittings for fluid leaks            Completed:   MR   

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:   MR  

6.1.22 Check stations/components for contamination	Completed:   RP/MR

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust:  9 RP

6.1.24 Clean and lubricate the Scrubber rails		Completed:   RP

6.1.25 Clean and lubricate the Paddle rails		Completed:   RP

6.1.26 Clean Conditioning Wheel and Housing             Completed:   MR

6.1.27 Scrub clean the Polish area tub and walls        Completed:   MR

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:   MR

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:   RP

6.1.30 Check slurry pump hoses and connectors for leaks Completed:   RP

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:   N/A
                     
6.1.32 Check Carrier clean brushes for defects, rotate  Completed:   MR

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed:   MR/RP

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:   MR/RP

6.1.35 Clean the slurry delivery tube                   Completed: N/A 

6.1.36 Check chiller fluid resevoir for proper level    Completed:   RP


Comments:   The main polish table gearbox is not leaking so far.


N/A  6.1.11 CMP.B3 does not have a Check Transport Paddle L/R Gauge.
 
N/A  6.1.31 CMP.B3 Vacuum system Check Valve removed.

N/A  6.1.35 CMP.B3 Slurry Delivery tube removed
22.34WW27 Weekly PM completedFABSIX::R_POIRIERTue Dec 31 1996 02:1994
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

Date:  12/30/96 (WW27)	RTC #:  CMP.B3		Techs: Mitch Ridlon
                                                       Roger Poirier

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  84 RP

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  80 RP

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  24 RP

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  40 RP  

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust:  10 RP  

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  35 RP  

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30 RP  

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  40 RP  

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  6.2 RP  

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust:  22 RP 

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  N/A 

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:  16 RP  

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  52 RP  

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust:  54 RP  

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust:  28 RP  

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  24 RP

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  54 RP  

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust:  78 RP  

6.1.19 Check Drip Pan for moisture/contamination        Completed:   MR
                                                                   
6.1.20 Check tubing/fittings for fluid leaks            Completed:   MR   

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:   MR  

6.1.22 Check stations/components for contamination	Completed:   RP/MR

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust:  9 RP

6.1.24 Clean and lubricate the Scrubber rails		Completed:   MR

6.1.25 Clean and lubricate the Paddle rails		Completed:   MR

6.1.26 Clean Conditioning Wheel and Housing             Completed:   RP

6.1.27 Scrub clean the Polish area tub and walls        Completed:   MR/RP

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:   MR/RP

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:   RP

6.1.30 Check slurry pump hoses and connectors for leaks Completed:   RP

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:   N/A
                     
6.1.32 Check Carrier clean brushes for defects, rotate  Completed:   MR

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed:   MR/RP

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:   MR/RP

6.1.35 Clean the slurry delivery tube                   Completed:   N/A 

6.1.36 Check chiller fluid resevoir for proper level    Completed:   RP


Comments:   


N/A  6.1.11 CMP.B3 does not have a Check Transport Paddle L/R Gauge.
 
N/A  6.1.31 CMP.B3 Vacuum system Check Valve removed.

N/A  6.1.35 CMP.B3 Slurry Delivery tube removed.

Engineer has been informed of all N/A's

22.35CMP.B3 shutdown checksheet completedFABSIX::R_GEETue Dec 31 1996 15:4028
SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE




                        CMP.B SHUT DOWN CHECK SHEET         Tech: _Tim Landry
								  _Bob Gee
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
								 INIT / DATE
1) SCRUB SIDES OF CARRIERS				       TL_BG_/_12/31/96
2) RUN CARRIER BLOW OFF FOR 30 SECONDS			       TL_BG_/_12/31/96
3) REMOVE ALL CARRIERS					       TL_BG_/_12/31/96
4) PLACE WIPES UNDER CARRIER FILMS AND LAY CARRIERS DI TANK    TL_BG_/_12/31/96
5) IF POWER TO SLURRY SYSTEM IS GOING TO BE LOST, CONTACT 
   ASHLAND CHEMICAL AND HAVE SLURRY SYSTEM PURGED AND CHARGED 
   WITH DI WATER.					       TL_BG_/_12/31/96
6) CLEAN ENTIRE SYSTEM OF DRIED SLURRY 			       TL_BG_/_12/31/96
7) REMOVE CONDITIONER AND CLEAN				       TL_BG_/_12/31/96
8) CYCLE/RINSE ALL DI FUNCTIONS: SPRAY NOZZLES, SLURRY PUMPS,
   CONDITIONER RINSE, ELEVATOR TANKS.			       TL_BG_/_12/31/96
9) SHUT OFF DI BEHIND SYSTEM (ROTATE 3W VLV TO FULL RETURN)    TL_BG_/_12/31/96
10) DRAIN ELEVATOR AND CONDITIONER TUBE			       TL_BG_/_12/31/96
11) REMOVE PADS, AND CLEAN AND DRY TABLES		       TL_BG_/_12/31/96
12) REMOVE SCRUBBER BRUSHES AND SOAK IN DI		       TL_BG_/_12/31/96
13) DRY ENTIRE SYSTEM OF ANY STANDING WATER		       TL_BG_/_12/31/96
14) POWER DOWN SYSTEM.

22.36WEEKLY WW28FABSIX::M_RIDLONEliminate the obliviousMon Jan 06 1997 03:0595
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

Date:  1/6/97 (WW28)	RTC #:  CMP.B3		Techs: Mitch Ridlon
                                                       Albert Quillen

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  88 MR,AQ

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  80 MR,AQ

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  28 MR,AQ

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  40 MR,AQ

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust:  11 MR,AQ

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  35 MR,AQ

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30 MR,AQ

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  40 MR,AQ

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  6.0 MR,AQ

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust:  20 MR,AQ

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  N/A 

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:  16 MR,AQ

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  50 MR,AQ

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust:  62 MR,AQ

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust:  18 MR,AQ

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  24 MR,AQ

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  54 MR,AQ

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust:  77 MR,AQ

6.1.19 Check Drip Pan for moisture/contamination        Completed:   MR,AQ
                                                                   
6.1.20 Check tubing/fittings for fluid leaks            Completed:   MR,AQ   

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:   MR,AQ  

6.1.22 Check stations/components for contamination	Completed:   MR,AQ

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust:  9 MR,AQ

6.1.24 Clean and lubricate the Scrubber rails		Completed:   MR,AQ

6.1.25 Clean and lubricate the Paddle rails		Completed:   MR,AQ

6.1.26 Clean Conditioning Wheel and Housing             Completed:   MR,AQ

6.1.27 Scrub clean the Polish area tub and walls        Completed:   MR,AQ

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:   MR,AQ

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:   MR,AQ

6.1.30 Check slurry pump hoses and connectors for leaks Completed:   MR,AQ

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:   N/A
                     
6.1.32 Check Carrier clean brushes for defects, rotate  Completed:   MR,AQ

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed:   MR,AQ

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:   MR,AQ

6.1.35 Clean the slurry delivery tube                   Completed:   N/A 

6.1.36 Check chiller fluid resevoir for proper level    Completed:   MR,AQ



Comments:   


N/A  6.1.11 CMP.B3 does not have a Check Transport Paddle L/R Gauge.
 
N/A  6.1.31 CMP.B3 Vacuum system Check Valve removed.

N/A  6.1.35 CMP.B3 Slurry Delivery tube removed.

Engineer has been informed of all N/A's

22.37ww29 monthly pm completed.FABSIX::L_SHKOLNIKOVSat Jan 18 1997 01:46159
--------------------------------------------------------------------------------

SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev D

     Date: 1/17/97          Shift: C & D       Techs: John Poirier    - JP
                                                      Brad Westphal   - BW
                                                      John Swenson    - JS
                                                      Dave Whitford   - DW
                                                      Leon Shkolnikov - LS


6.2.1  Change Peristaltic Pump Lines			Completed: X JS

6.2.2  Clean Polish area tub drains			Completed: X BW

6.2.3  Check Polish Table Belt for defects		Completed: X LS

6.2.4  Perform Down Force Calibration on all 5 heads    Completed: DW *

       Down Frc: Head 1 Pre-Adj: 345 lbs    Post-adj:  353 lbs

                 Head 2 Pre-Adj: 363 lbs    Post-adj:  353 lbs

                 Head 3 Pre-Adj: 340 lbs    Post-adj:  353 lbs

                 Head 4 Pre-Adj: 363 lbs    Post-adj:  353 lbs

                 Head 5 Pre-Adj: 369 lbs    Post-adj:  353 lbs

6.2.5  Perform Down Force Calibration on Conditioner    Completed: LS

       Actual Down Force Pre-Adj:   90   lbs   

       Actual Down Force Post-Adj:  77.0 lbs  

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: X LS

6.2.7  Check the Load Flipper alignment			Completed: X LS

6.2.8  Check the Unload Flipper alignment		Completed: X LS

6.2.9  Check the Elevator alignment                     Completed: X LS

6.2.10 Check wafer unload, from Index table to cassette Completed: X LS

6.2.11 Check the +24 Volt power supply                  Pre-Adjust: 24.12 BW

6.2.12 Check the +/- 15 Volt power supply               Pre-Adjust: 15.51 BW

6.2.13 Check the +5 Volt power supply                   Pre-Adjust:  4.78 BW

6.2.14 Check Table Rotation Speed @ 30 RPM              Completed:  31 LS

6.2.15 Check Vacuum Pump Diaphrams			Completed: X LS

6.2.16 Check Vacuum Tank/Pump lines			Completed: X LS

6.2.17 Check Load Cup Position alignment		Completed: X LS

6.2.18 Check Load Cup Height alignment                  Completed: X LS

6.2.19 Check Robot alignments			        Completed: X LS

6.2.20 Check Muffin Fans for proper operation           Completed: X LS

--------------------------------------------------------------------------------



SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust: 87  JS

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust: 80  JS

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust: 26  JS

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust: 40  JS

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust: 10  JS

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust: 35  JS

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust: 30  JS

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust: 40  JS

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust: 6   JS

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust: 22  JS

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust: N/A JP

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust: 24  JS

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust: 46  JS

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust: 44  JS

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust: 20  JS

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust: 25  JS

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust: 44  JS

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust: 80  JS

6.1.19 Check Drip Pan for moisture/contamination        Completed:  x   JP

6.1.20 Check tubing/fittings for fluid leaks            Completed:  X   JP

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:  X   JP

6.1.22 Check stations/components for contamination	Completed:  X   JP

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust: 9   JS

6.1.24 Clean and lubricate the Scrubber rails		Completed:  X   JP

6.1.25 Clean and lubricate the Paddle rails		Completed:  X   JP

6.1.26 Clean Conditioning Wheel and Housing             Completed:  X   JP

6.1.27 Scrub clean the Polish area tub and walls        Completed:  X   BW

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:  X   LS/DW

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:  X   JP

6.1.30 Check slurry pump hoses and connectors for leaks Completed:  X   JP

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:  X   BW

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:  X   LS

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed   X   JP

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:  X   JP

6.1.35 Clean the slurry delivery tube                   Completed:  n/a*

6.1.36 Check chiller fluid resevoir for proper level    Completed:  X   JS

Comments:

  6.1.11  N/A  The Transfer Paddle L/R motion is not air driven on this tool.
               This line item refers to CMP.B1 only.

  6.1.35  N/A  There is no slurry delivery tube on this tool.
    
  6.2.4  performed with no carriers on the tool.
22.38weekly ww30FABSIX::M_RIDLONEliminate the obliviousMon Jan 20 1997 23:0095
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

    
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D

Date:  1/20/97 (WW30)	RTC #:  CMP.B3		Techs: Mitch Ridlon
                                                       Roger Poirier

6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  88 MR

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  80 MR

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  30 MR

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  40 MR

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust:  10 MR

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  35 MR

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30 MR

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  40 MR

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:  6.0 MR

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust:  20 MR

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  N/A 

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:  16 MR

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  52 MR

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust:  42 MR

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust:  20 MR

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  25 MR

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  40 MR

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust:  80 MR

6.1.19 Check Drip Pan for moisture/contamination        Completed:   MR
                                                                   
6.1.20 Check tubing/fittings for fluid leaks            Completed:   MR   

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:   MR  

6.1.22 Check stations/components for contamination	Completed:   MR,RP

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust:  9 MR

6.1.24 Clean and lubricate the Scrubber rails		Completed:   RP

6.1.25 Clean and lubricate the Paddle rails		Completed:   RP

6.1.26 Clean Conditioning Wheel and Housing             Completed:   MR

6.1.27 Scrub clean the Polish area tub and walls        Completed:   MR

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:   MR,RP

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:   RP

6.1.30 Check slurry pump hoses and connectors for leaks Completed:   MR

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:   N/A
                     
6.1.32 Check Carrier clean brushes for defects, rotate  Completed:   MR

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed:   RP

6.1.34 Wipe the Process Area Plexiglas doors w/Iso      Completed:   MR,RP

6.1.35 Clean the slurry delivery tube                   Completed:   N/A 

6.1.36 Check chiller fluid resevoir for proper level    Completed:   MR



Comments:   


N/A  6.1.11 CMP.B3 does not have a Check Transport Paddle L/R Gauge.
 
N/A  6.1.31 CMP.B3 Vacuum system Check Valve removed.

N/A  6.1.35 CMP.B3 Slurry Delivery tube removed.

Engineer has been informed of all N/A's

22.39CMP.B3 WEEKLY CHECK SHEET (WW31)ASDG::POIRIERFri Jan 31 1997 13:5690
 SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE


  Date: 1/30/97   WW31       RTC Entity: CMP.B3    Tech(s): John Poirier  = JP
                                                            Brad Westphal = BW
   
                           Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev D


6.1.1  Check incoming CDA pressure for 80 PSI		Pre-adjust:  88 BW

6.1.2  Check incoming N2 pressure for 80 PSI            Pre-adjust:  80 BW

6.1.3  Check incoming DI Water pressure for 20 PSI      Pre-adjust:  32 BW

6.1.4  Check Load Cup pressure for 45 PSI		Pre-adjust:  40 BW

6.1.5  Check Pad Condition Balance pressure 15-30 PSI	Pre-adjust:  10 BW

6.1.6  Check Pad Conditioner Up pressure for 35 PSI	Pre-adjust:  34 BW

6.1.7  Check Carrier Up pressure for 30 PSI		Pre-adjust:  30 BW

6.1.8  Check Miscellaneous pressure for 40 PSI		Pre-adjust:  40 BW

6.1.9  Check Head Balance pressure for 2-6 PSI		Pre-adjust:   6 BW

6.1.10 Check Alignment Fixture pressure for 20 PSI      Pre-adjust:  20 BW

6.1.11 Check Transport Paddle L/R pressure for 30 PSI	Pre-adjust:  N/A BW

6.1.12 Check Transport Paddle U/D pressure for 20 PSI	Pre-adjust:  20 BW

6.1.13 Check Open Load Flipper pressure for 50 PSI	Pre-adjust:  50 BW

6.1.14 Check Open Unload Flipper pressure for 50 PSI	Pre-adjust:  40 BW

6.1.15 Check Vacuum Tank Blowout pressure for 15 PSI    Pre-adjust:  20 BW

6.1.16 Check Wafer Scrub Down pressure for 80 PSI	Pre-adjust:  25 BW

6.1.17 Check Scrubber In/Out pressure for 50 PSI	Pre-adjust:  40 BW

6.1.18 Check MHTA pressure for 80 PSI			Pre-adjust:  80 BW

6.1.19 Check Drip Pan for moisture/contamination        Completed:   JP

6.1.20 Check tubing/fittings for fluid leaks            Completed:   JP

6.1.21 Check tubing/fittings for pneumatic leaks        Completed:   JP

6.1.22 Check stations/components for contamination	Completed:   JP

6.1.23 Check incoming Chilled Water pressure <10 PSI	Pre-adjust:  10

6.1.24 Clean and lubricate the Scrubber rails		Completed:   BW

6.1.25 Clean and lubricate the Paddle rails		Completed:   BW

6.1.26 Clean Conditioning Wheel and Housing             Completed:   BW

6.1.27 Scrub clean the Polish area tub and walls        Completed:   BW

6.1.28 Remove all Load and Unload cups and scrub clean  Completed:   BW

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO     Completed:   JP

6.1.30 Check slurry pump hoses and connectors for leaks Completed:   JP

6.1.31 Remove and clean the Vacuum system Check Valve   Completed:   N/A

6.1.32 Check Carrier clean brushes for defects, rotate  Completed:   JP

6.1.33 Wipe the MHTA and covers with Isopropyl          Completed    JP

6.1.34 Wipe the Process Area plexiglas doors w/Iso      Completed:   JP

6.1.35 Clean the slurry delivery tube                   Completed:   N/A

6.1.36 Check chiller fluid resevoir for proper level    Completed:   JP


Comments: N/A 6.1.11 - This line item refers to CMP.B1 only.

          N/A 6.1.31 - The check valve is no longer used.
    
          N/A 6.1.35 - The slurry delivery tube is not used on this tool.
22.40WW32 WEEKLY PM CHECKSHEETASDG::POIRIERThu Feb 06 1997 15:19102
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE: 2/6/97     TOOL ENTITY: CMP.B3     TECHNICIAN(S): LS - Leon Shkolnikov
                                                        JP - John Poirier
                                                        JS - John Swenson
START TIME: 2:00 P.M.           END TIME: 3:20 P.M.

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80 LS 

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55 LS

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 26 LS

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 40 LS

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 11 LS

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 LS

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 LS

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 40 LS

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6 LS 

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: X  LS
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 LS

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 LS

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 LS

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 20 LS

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 LS

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20 LS

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45 LS


6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 LS

6.1.19 Check Drip Pans for moisture/contamination        Completed: X  JP 

6.1.20 Check tubing/fittings for fluid leaks             Completed: X  JP 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: X  JP 

6.1.22 Check stations/components for contamination	 Completed: X  JP 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 9  LS

6.1.24 Clean and lubricate the Scrubber rails		 Completed: X  JP

6.1.25 Clean and lubricate the Paddle rails		 Completed: X  JP      

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: X  JS

6.1.27 Scrub clean the Polish area tub and walls         Completed: X  JS

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: X  JS

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: X  JP

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: X  JP

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: X  JS

6.1.32 Check Carrier clean brushes for defects           Completed: X  JP
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: X  JP

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: X  JP

6.1.35 Check chiller fluid resevoir for proper level     Completed: X  LS

6.1.36 Check the chiller readout for 24 degrees C.       Completed: X  JP

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: X  JP 

6.1.38 Check the slurry flow alarm.                      Completed: X  JS 

Comments:



22.41WW33 Monthly PM CheckSheetASDG::POIRIERSat Feb 15 1997 13:16184
                     SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           SPEC# HF60-0172  REV-E 

                        Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev. E 

DATE:02.15.97       TOOL ENTITY: CMP.B3    TECHNICIAN(S): Leon Shkolnikov - LS
                                                          Dave Whitford   - DW
START TIME: 07:00 am   COMPLETED TIME:  1:15 pm           John Poirier    - JP
                                                          John Swenson    - JS

6.2.1  Change Peristaltic Pump Lines and check flow     Completed: DW

6.2.2  Clean Polish area tub drains for clogs		Completed: JP

6.2.3  Check all table belts for defects		Completed: JP

6.2.4  Perform Down Force Calibration on all 5 heads   
       to read at +/- 1lbs of 354 lbs.
       NOTE:  The target is 23 lbs. below the actual
       377 lbs. due to the carrier weight minus the
       alignment fixture using the point-to-point
       method as described in the downforce procedure
       in 6.2.4.1 through 6.2.4.13.                     Completed: JS/JP

       Down Frc: Head 1 Pre-Adj: 364.0 Post-adj: 354.9

                 Head 2 Pre-Adj: 354.6 Post-adj: WITHIN SPEC

                 Head 3 Pre-Adj: 367.8 Post-adj: 354.1

                 Head 4 Pre-Adj: 359.9 Post-adj: 354.7

                 Head 5 Pre-Adj: 346.1 Post-adj: 354.4

6.2.5  Perform Down Force Calibration on Conditioner    Completed: JS/JP
       to read +/- .5 lbs of 77 lbs.
 
       Actual Down Force Pre-Adj: 77.7

       Actual Down Force Post-Adj: WITHIN SPEC

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: LS

6.2.7  Check the Load Flipper alignment			Completed: JP/JS

6.2.8  Check the Unload Flipper alignment		Completed: JP/JS

6.2.9  Check Elevator alignments			Completed: JP/JS

6.2.10 Check wafer unload, from Index table to cassette Completed: JP/JS

6.2.11 Check the +24 Volt power supply for +/- 1V 
       of 24 volts.                      Pre: +23.87   Post:N/A  Tech: JS

6.2.12 Check the +/- 15 Volt power supply for +/- 1V
       of 15V               Pre: +15.24  Pre: -15.37   Post:N/A  Tech: JS

6.2.13 Check the +5 Volt power supply for 4.5 to
       5.5 v.                            Pre: +4.86    Post:N/A  Tech: JS

6.2.14 Check Table Rotation Speed for +/- 1.5 of 30RPM  Completed: 31.6 JS 

6.2.15 Check Vacuum Pump Diaphrams			Completed: JP

6.2.16 Replace liquid separator filter element          Completed: JS

6.2.17 Check Vacuum Tank/Pump lines			Completed: JS

6.2.18 Check carrier to Load Cup Position alignments    Completed: JP/JS *

6.2.19 Check Load Cup Height to carrier alignments      Completed: JP/JS

6.2.20  Check the Robot alignments                      Completed: JP/JS
                                         
6.2.21 Check Muffin Fans for proper operation           Completed: JP

Comments: Carrier to cup alignment on head #3 adjusted. 

========================================================================



                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:         TOOL ENTITY:             TECHNICIAN(S):

START TIME:       COMPLETED TIME:
6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80 ls

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 54 ls

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 24 ls

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 40 ls

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 10 ls

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 ls

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 ls

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 40 ls

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed: 6.0 ls

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: n/a   
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 ls

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 ls

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 ls

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30 ls

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 ls

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20 ls

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45 ls

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 ls

6.1.19 Check Drip Pans for moisture/contamination        Completed: JP/JS 

6.1.20 Check tubing/fittings for fluid leaks             Completed: JS 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: JS 

6.1.22 Check stations/components for contamination	 Completed: JP 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 10 ls

6.1.24 Clean and lubricate the Scrubber rails		 Completed: ls

6.1.25 Clean and lubricate the Paddle rails		 Completed: ls

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: JP

6.1.27 Scrub clean the Polish area tub and walls         Completed: JP/JS

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: JP/JS

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: JP

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: DW

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: JS

6.1.32 Check Carrier clean brushes for defects           Completed: ls
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: JP

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: JP

6.1.35 Check chiller fluid resevoir for proper level     Completed: ls

6.1.36 Check the chiller readout for 24 degrees C.       Completed: ls

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: JS 

6.1.38 Check the slurry flow alarm.                      Completed: JP 

Comments:



22.42WW34 WEEKLY PM CHECKSHEETASDG::POIRIERThu Feb 20 1997 19:08101
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:2/20/97         TOOL ENTITY:CMP.B3        TECHNICIAN(S):John Poirier  - JP
                                                             John Swenson  - JS
START TIME:5:30PM       COMPLETED TIME:7:00PM                Brad Westphal - BW


6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80  JS

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55  JS

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 30  JS

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 40  JS

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 11  JS

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35  JS

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30  JS

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 40  JS

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6  JS

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A JS
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20  JS

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50  JS

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50  JS

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30  JS

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25  JS

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20  JS

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45  JS

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80  JS

6.1.19 Check Drip Pans for moisture/contamination        Completed: X   JP

6.1.20 Check tubing/fittings for fluid leaks             Completed: X   JS

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: X   JS

6.1.22 Check stations/components for contamination	 Completed: X   JP

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 9   JS

6.1.24 Clean and lubricate the Scrubber rails		 Completed: X   JP

6.1.25 Clean and lubricate the Paddle rails		 Completed: X   JP

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: X   BW

6.1.27 Scrub clean the Polish area tub and walls         Completed: X   BW

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: X   BW

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: X   JP

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: X   JP

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: X   JP

6.1.32 Check Carrier clean brushes for defects           Completed: X   JP
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: X   JP

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: X   JP

6.1.35 Check chiller fluid resevoir for proper level     Completed: X   JP

6.1.36 Check the chiller readout for 24 degrees C.       Completed: X   JS

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: X  BW 

6.1.38 Check the slurry flow alarm.                      Completed: X  BW 

Comments:



22.43WW35 Weekly PM Check SheetASDG::POIRIERFri Feb 28 1997 10:04102
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:2/28/97    TOOL ENTITY: CMP.B3     TECHNICIAN(S): Dave Whitford  (DW)
                                                       John Poirier   (JP)
                                                       John Swenson   (JS)
                                                       Dave Rocha     (DR)
START TIME: 7:20 a.m.        COMPLETED TIME: 10:00 a.m.             

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80  DW 

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55  DW

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 26  DW

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 40  DW

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 10  DW

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35  DW

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30  JS

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 40  DW

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6  DW

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed:    N/A 
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20  DW

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50  DW

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50  DW

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30  DW

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25  DW

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 22  DW

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 43  DW

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80  DW

6.1.19 Check Drip Pans for moisture/contamination        Completed: X   JP

6.1.20 Check tubing/fittings for fluid leaks             Completed: X   JP 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: X   JP

6.1.22 Check stations/components for contamination	 Completed: X   JP 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed:  9  JS

6.1.24 Clean and lubricate the Scrubber rails		 Completed: X   JP

6.1.25 Clean and lubricate the Paddle rails		 Completed: X   JP

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: X   JS

6.1.27 Scrub clean the Polish area tub and walls         Completed: X   JS

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: X  JP/JS/DR

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: X   JS

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: X   JP

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: X   JP

6.1.32 Check Carrier clean brushes for defects           Completed: X   JP
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: X   JS

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: X   JS

6.1.35 Check chiller fluid resevoir for proper level     Completed: X   JP

6.1.36 Check the chiller readout for 24 degrees C.       Completed: X   JP

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: X   JP/DR 

6.1.38 Check the slurry flow alarm.                      Completed: X   JP 

Comments:
          6.1.10 - Applies to CMP.B1 only.


22.44ww 36 weekly p.m. completedFABSIX::R_GEEMon Mar 03 1997 19:14102
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:3/03/97    TOOL ENTITY: CMP.B3     TECHNICIAN(S): James Sadin    (JS)
                                                       Tim Landry     (TL)
                                                       Brendan Finn   (BF)
                                                       Bob Gee        (BG)
             

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 90  JS

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 60  JS

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 24  JS

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 40  BG

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 10  BG

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35  BG

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30  BF

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 40  BF

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6  BF

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed:    N/A 
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20  TL

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50  TL

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50  TL

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30  JS

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25  BG

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 25  BF

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45  TL

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 82  JS

6.1.19 Check Drip Pans for moisture/contamination        Completed: X   BF

6.1.20 Check tubing/fittings for fluid leaks             Completed: X   BF 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: X   BG

6.1.22 Check stations/components for contamination	 Completed: X   TL 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed:  9  JS

6.1.24 Clean and lubricate the Scrubber rails		 Completed: X   JS

6.1.25 Clean and lubricate the Paddle rails		 Completed: X   BG

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: X   TL

6.1.27 Scrub clean the Polish area tub and walls         Completed: X   BF

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                        Completed: X BF/TL/JS/BG

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: X   JS

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: X   BF

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: X   TL

6.1.32 Check Carrier clean brushes for defects           Completed: X   BF
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: X   BG

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: X   BG

6.1.35 Check chiller fluid resevoir for proper level     Completed: X   JS

6.1.36 Check the chiller readout for 24 degrees C.       Completed: X   JS

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: X   BF/TL 

6.1.38 Check the slurry flow alarm.                      Completed: X   BF 

Comments:
          6.1.10 - Applies to CMP.B1 only, EE notified.


22.45MONTHLY COMPLETEDFABSIX::B_FINNSun Mar 09 1997 19:44195
                     SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           SPEC# HF60-0172  REV-E 

                        Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev. E 

DATE: 3/9/97        TOOL ENTITY:cmp.b3   TECHNICIAN(S): MR=Mitch Ridlon
                                                        RP=Roger Poirier
                                                        AQ=Albert Quillen
						        BF=Brendan Finn
						        TL=Tim Landry
							BG=Bob Gee
							JS=Jim Sadin

START TIME:0500AM        COMPLETED TIME: 1530 HOURS  


6.2.1  Change Peristaltic Pump Lines and check flow     Completed:BG

6.2.2  Clean Polish area tub drains for clogs		Completed:JS 

6.2.3  Check all table belts for defects		Completed:BF,TL

6.2.4  Perform Down Force Calibration on all 5 heads   
       to read at +/- 1lbs of 354 lbs.
       NOTE:  The target is 23 lbs. below the actual
       377 lbs. due to the carrier weight minus the
       alignment fixture using the point-to-point
       method as described in the downforce procedure
       in 6.2.4.1 through 6.2.4.13.                     Completed:MR,AQ
								  TL,BF
								  BG,JS
       Down Frc: Head 1 Pre-Adj: 344   Post-adj: 353.9

                 Head 2 Pre-Adj: 348   Post-adj: 354.1

                 Head 3 Pre-Adj: 343   Post-adj: 354.2

                 Head 4 Pre-Adj: 344   Post-adj: 354.2

                 hEAD 5 pRE-aDJ: 351   pOST-ADJ: 354.1

NOTE: The spec states a deviation of +/- 5 lbs. 


6.2.5  Perform Down Force Calibration on Conditioner    Completed:BG,TL,BF,JS
       to read +/- .5 lbs of 77lbs.
 
       Actual Down Force Pre-Adj: 69

       Actual Down Force Post-Adj:77.2

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed:TL

6.2.7  Check the Load Flipper alignment			Completed:JS,BF,TL

6.2.8  Check the Unload Flipper alignment		Completed:JS,BF,TL

6.2.9  Check Elevator alignments			Completed:JS,BF,TL

6.2.10 Check wafer unload, from Index table to cassette Completed:JS,BF,TL

6.2.11 Check the +24 Volt power supply for +/- 1V 
       of 24 volts.                      Pre:24.34 Post:24.34 Tech:JS

6.2.12 Check the +/- 15 Volt power supply for +/- 1V
       of 15V                            Pre:-15.38 +15.25    
                                        Post:-15.38 +15.25    Tech:JS

6.2.13 Check the +5 Volt power supply for 4.5 to
       5.5 v.                              Pre:4.89    Post:4.89  Tech:JS

6.2.14 Check Table Rotation Speed for +/- 1.5 of 30RPM  Completed:BF,JS,TL,BG  

6.2.15 Check Vacuum Pump Diaphrams			Completed:BF,JS,TL,BG

6.2.16 Replace liquid separator filter element          Completed:BF,BG 

6.2.17 Check Vacuum Tank/Pump lines			Completed:BG,TL 

6.2.18 Check carrier to Load Cup Position alignments    Completed:BF,JS,TL,BG

6.2.19 Check Load Cup Height to carrier alignments      Completed:BF,JS,TL

6.2.20  Check the Robot alignments                      Completed:BG,TL,JS
                                         
6.2.21 Check Muffin Fans for proper operation           Completed:BG,BF

Comments:
6.2.15 Changed Exhaust Diaphram
========================================================================



                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E



6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed:BF 

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed:BF  

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed:BF 

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed:BF  

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed:BF 

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed:BF  

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed:BF  

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed:BF  

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:BF   

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed:BF  
       (Applicable for CMP.B1 only)   

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed:BF  

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed:BF  

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed:BF   

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed:BF   

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed:BF 

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed:BF  

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed:BF  

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed:BF  

6.1.19 Check Drip Pans for moisture/contamination        Completed:TL   

6.1.20 Check tubing/fittings for fluid leaks             Completed:JS,BG,TL   

6.1.21 Check tubing/fittings for pneumatic leaks         Completed:BG,TL

6.1.22 Check stations/components for contamination	 Completed:BG,TL,JS,BF  

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed:BF,TL

6.1.24 Clean and lubricate the Scrubber rails		 Completed:JS 

6.1.25 Clean and lubricate the Paddle rails		 Completed:BG

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: RP

6.1.27 Scrub clean the Polish area tub and walls         Completed: RP

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed:BG,TL,BF

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed:TL,BF 

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: RP

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed:BF,BG

6.1.32 Check Carrier clean brushes for defects           Completed:TL 
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed:JS,BF

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: RP

6.1.35 Check chiller fluid resevoir for proper level     Completed:BG 

6.1.36 Check the chiller readout for 24 degrees C.       Completed:BG

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed:TL,JS

6.1.38 Check the slurry flow alarm.                      Completed:TL,BF,BG

Comments:

6.1.37 Adjusted Wafer Detect Sensor #2

6.1.38 Adjusted Slurry detect sensor to sense loss of slurry
22.46ww38 weekly pm.FABSIX::L_SHKOLNIKOVWed Mar 19 1997 06:44100
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:3/19/97    TOOL ENTITY: CMP.B3     TECHNICIAN(S): Leon Shkolnikov   ls 
                                                       Brian Jubinville  BJ
             

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 90  ls

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 60  ls

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 24  ls

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 40  ls

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 11  ls

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35  ls

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30  ls

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 40  ls

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6  ls

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed:    N/A 
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20  ls

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50  ls

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50  ls

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30  ls

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25  ls

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20  ls

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45  ls

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80  ls

6.1.19 Check Drip Pans for moisture/contamination        Completed: X   ls

6.1.20 Check tubing/fittings for fluid leaks             Completed: X   ls 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: X   ls

6.1.22 Check stations/components for contamination	 Completed: X   BJ/ls

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed:  9  ls

6.1.24 Clean and lubricate the Scrubber rails		 Completed: X   ls

6.1.25 Clean and lubricate the Paddle rails		 Completed: X   ls

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: X   BJ

6.1.27 Scrub clean the Polish area tub and walls         Completed: X   BJ/ls

6.1.28 Remove all Load and Unload cups and scrub clean                    
       with hydrogen peroxide.                           Completed: X   ls

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: X   ls

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: X   ls

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: X   ls

6.1.32 Check Carrier clean brushes for defects           Completed: X   ls
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: X   ls

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: X   ls

6.1.35 Check chiller fluid resevoir for proper level     Completed: X   ls
                                                                          
6.1.36 Check the chiller readout for 24 degrees C.       Completed: X   ls

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: X   ls    
                                                                             
6.1.38 Check the slurry flow alarm.                      Completed: X   ls 

Comments:
          6.1.10 - Applies to CMP.B1 only, EE notified.


22.47WW39 WEEKLY PM COMPLETED.FABSIX::J_SADINFreedom isn&#039;t free.Sun Mar 23 1997 10:23102
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:3/23/97    TOOL ENTITY: CMP.B3     TECHNICIAN(S): BRENDAN FINN
                                                       JAMES SADIN
                                                       TIMOTHY LANDRY
                                                       BOB GEE 

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 88

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 60

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 26

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 40

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 10

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30  

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 40  

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6  

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed:    N/A 
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20  

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50  

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50  

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30  

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25  

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20  

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80  

6.1.19 Check Drip Pans for moisture/contamination        Completed: BG

6.1.20 Check tubing/fittings for fluid leaks             Completed: BG/JS 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: BG/JS

6.1.22 Check stations/components for contamination	 Completed: JS/BF/TL/BG

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: JS

6.1.24 Clean and lubricate the Scrubber rails		 Completed: BF

6.1.25 Clean and lubricate the Paddle rails		 Completed: BF

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: JS

6.1.27 Scrub clean the Polish area tub and walls         Completed: JS/TL/BF

6.1.28 Remove all Load and Unload cups and scrub clean                    
       with hydrogen peroxide.                           Completed: JS/BF

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: JS

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: BG

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: JS

6.1.32 Check Carrier clean brushes for defects           Completed: BF
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: BF/TL

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: BF/TL 

6.1.35 Check chiller fluid resevoir for proper level     Completed: JS
                                                                          
6.1.36 Check the chiller readout for 24 degrees C.       Completed: JS

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: JS/BG    
                                                                             
6.1.38 Check the slurry flow alarm.                      Completed: JS** 

Comments:
          6.1.10 - Applies to CMP.B1 only, EE notified.

          6.1.38 - switch broken and jumpered out. Waiting on parts.

22.48WW40 Weekly PM completedFABSIX::R_POIRIERTue Apr 01 1997 05:2499
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:04/01/97    TOOL ENTITY: CMP.B3     TECHNICIAN(S): Roger Poirier (RP)


6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 88 RP

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 60 RP

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 26 RP

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 40 RP

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 10 RP

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 RP

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 RP

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 40 RP

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6 RP

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed:    N/A 
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 RP

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 RP

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 RP

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 18 RP

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 RP

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 25 RP

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45 RP

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 RP

6.1.19 Check Drip Pans for moisture/contamination        Completed: RP

6.1.20 Check tubing/fittings for fluid leaks             Completed: RP

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: RP

6.1.22 Check stations/components for contamination	 Completed: RP

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 9.0 RP

6.1.24 Clean and lubricate the Scrubber rails		 Completed: RP

6.1.25 Clean and lubricate the Paddle rails		 Completed: RP

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: RP

6.1.27 Scrub clean the Polish area tub and walls         Completed: RP

6.1.28 Remove all Load and Unload cups and scrub clean                    
       with hydrogen peroxide.                           Completed: RP

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: RP

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: RP

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: RP

6.1.32 Check Carrier clean brushes for defects           Completed: RP
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: RP

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: RP

6.1.35 Check chiller fluid resevoir for proper level     Completed: RP
                                                                          
6.1.36 Check the chiller readout for 24 degrees C.       Completed: RP

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: RP
                                                                             
6.1.38 Check the slurry flow alarm.                      Completed: RP** 

Comments:
          6.1.10 - Applies to CMP.B1 only, EE notified.

          6.1.38 - switch broken and jumpered out. Waiting on parts.

22.49WEEKLY PM FOR WW41 COMPLETEDSUBPAC::BJUBINVILLECMP Equipment EngineeringThu Apr 10 1997 00:4796
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:04/9/97    TOOL ENTITY: CMP.B3     TECHNICIAN(S): Brian Jubinville (BJ)
                                                       Leon Shkolnikov (LS)


6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 88 BJ

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55 BJ
                                                                        
6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 25 BJ

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 40 BJ

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 10 BJ

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 BJ

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 BJ

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 40 BJ

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6 BJ

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A BJ
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 BJ

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 BJ

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 BJ

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 18 BJ

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 BJ

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 25 BJ

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45 BJ

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 BJ

6.1.19 Check Drip Pans for moisture/contamination        Completed: BJ/LS 

6.1.20 Check tubing/fittings for fluid leaks             Completed: BJ/LS 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: BJ/LS 

6.1.22 Check stations/components for contamination	 Completed: BJ/LS 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 10 BJ

6.1.24 Clean and lubricate the Scrubber rails		 Completed: LS

6.1.25 Clean and lubricate the Paddle rails		 Completed: LS

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: BJ

6.1.27 Scrub clean the Polish area tub and walls         Completed: BJ

6.1.28 Remove all Load and Unload cups and scrub clean                    
       with hydrogen peroxide.                           Completed: BJ

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: LS

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: BJ *

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: BJ

6.1.32 Check Carrier clean brushes for defects           Completed: BJ
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: BJ

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: BJ

6.1.35 Check chiller fluid resevoir for proper level     Completed: LS
                                                                          
6.1.36 Check the chiller readout for 24 degrees C.       Completed: LS

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: BJ/LS 
                                                                             
6.1.38 Check the slurry flow alarm.                      Completed: BJ/LS  

Comments:  Found slurry line #1 leaking - liquid detect sensor turned off
22.50ww42 monthly pm complete.FABSIX::L_SHKOLNIKOVFri Apr 18 1997 01:21191
    
                     SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           SPEC# HF60-0172  REV-E 

                        Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev. E 

DATE:4/17/97  TOOL ENTITY:CMP.B3   TECHNICIAN(S): John Poirier (JP)
                                                  Brad Westphal(BW)
                                                  Mike Standing(MS)
                                                  Dave Whitford (DW)
                                                  Leon Shkolnikov  (ls)
                                                  Brian Jubinville (BJ)
START TIME: 5:35 p.m.          COMPLETED TIME:

6.2.1  Change Peristaltic Pump Lines and check flow     Completed: DW

6.2.2  Clean Polish area tub drains for clogs		Completed: JP

6.2.3  Check all table belts for defects		Completed: JP

6.2.4  Perform Down Force Calibration on all 5 heads   
       to read at +/- 1lbs of 354 lbs.
       NOTE:  The target is 23 lbs. below the actual
       377 lbs. due to the carrier weight minus the
       alignment fixture using the point-to-point
       method as described in the downforce procedure
       in 6.2.4.1 through 6.2.4.13.                     Completed: JP,BW,MS

       Down Frc: Head 1 Pre-Adj: 353.9   Post-adj: 353.9

                 Head 2 Pre-Adj: 354.2   Post-adj: 354.2

                 Head 3 Pre-Adj: 356.1   Post-adj: 354.7

                 Head 4 Pre-Adj: 355.8   Post-adj: 354.1

                 Head 5 Pre-Adj: 355.0   Post-adj: 353.7

6.2.5  Perform Down Force Calibration on Conditioner    Completed: DW
       to read +/- .5 lbs of 77lbs.
 
       Actual Down Force Pre-Adj:  68.1 PSI

       Actual Down Force Post-Adj: 77.4 Psi

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: JP

6.2.7  Check the Load Flipper alignment			Completed: DW

6.2.8  Check the Unload Flipper alignment		Completed: DW

6.2.9  Check Elevator alignments			Completed: ls

6.2.10 Check wafer unload, from Index table to cassette Completed: DW

6.2.11 Check the +24 Volt power supply for +/- 1V 
       of 24 volts.                 Pre: 24.05V   Post: 24.05V  Tech: MS

6.2.12 Check the +/- 15 Volt power supply for +/- 1V
       of 15V                       Pre: 15.24V   Post: 15.24V  Tech: MS

6.2.13 Check the +5 Volt power supply for 4.5 to
       5.5 v.                       Pre: 4.84V    Post: 4.84V   Tech: MS

6.2.14 Check Table Rotation Speed for +/- 1.5 of 30RPM  Completed: BJ/ls**  

6.2.15 Check Vacuum Pump Diaphrams			Completed: DW

6.2.16 Replace liquid separator filter element          Completed: JP

6.2.17 Check Vacuum Tank/Pump lines			Completed: JP

6.2.18 Check carrier to Load Cup Position alignments    Completed: LS/DW

6.2.19 Check Load Cup Height to carrier alignments      Completed: LS

6.2.20  Check the Robot alignments                      Completed: ls
                                         
6.2.21 Check Muffin Fans for proper operation           Completed: JP

Comments:

========================================================================



                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:4/17/97   TOOL ENTITY:CMP.B1   TECHNICIAN(S): JOHN POIRIER (JP)
                                                   BRAD WESTPHAL(BW)
                                                   MIKE STANDING(MS)

START TIME: 5:35 P.M.       COMPLETED TIME:

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: JP 85

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: JP 65

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: JP 30

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: JP 40

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: JP 10

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: JP 35

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: JP 30

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: JP 40

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed: JP  6 

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A 
       (Applicable for CMP.B1 only)                                 SEE NOTE

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: JP 20

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: JP 50

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: JP 50

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: JP 15

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: JP 25

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: JP 20

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: JP 40

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: JP 80

6.1.19 Check Drip Pans for moisture/contamination        Completed: BW 

6.1.20 Check tubing/fittings for fluid leaks             Completed: BW 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: BW 

6.1.22 Check stations/components for contamination	 Completed: BW 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: JP  9

6.1.24 Clean and lubricate the Scrubber rails		 Completed: JP

6.1.25 Clean and lubricate the Paddle rails		 Completed: JP

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: DW

6.1.27 Scrub clean the Polish area tub and walls         Completed: ls/BJ

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: MS

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: MS

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: JP

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: JP

6.1.32 Check Carrier clean brushes for defects           Completed: JP
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: MS

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: MS

6.1.35 Check chiller fluid resevoir for proper level     Completed: JP

6.1.36 Check the chiller readout for 24 degrees C.       Completed: JP

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: ls/BJ 

6.1.38 Check the slurry flow alarm.                      Completed: JP 

Comments:
        *  The door fasteners were treated with loctite to prevent loosening.
       **  The actual polish table table speed is 32.7 rpm. Engineer
           notified.

22.50MONTHLY PM COMPLETED FOR WW42SUBPAC::BJUBINVILLECMP Equipment EngineeringFri Apr 18 1997 07:24193
    
                     SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           SPEC# HF60-0172  REV-E 

                        Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev. E 

DATE:4/17/97  TOOL ENTITY:CMP.B3   TECHNICIAN(S): John Poirier (JP)
                                                  Brad Westphal(BW)
                                                  Mike Standing(MS)
                                                  Dave Whitford (DW)
                                                  Leon Shkolnikov  (ls)
                                                  Brian Jubinville (BJ)
START TIME: 5:35 p.m.          COMPLETED TIME:

6.2.1  Change Peristaltic Pump Lines and check flow     Completed: DW

6.2.2  Clean Polish area tub drains for clogs		Completed: JP

6.2.3  Check all table belts for defects		Completed: JP

6.2.4  Perform Down Force Calibration on all 5 heads   
       to read at +/- 1lbs of 354 lbs.
       NOTE:  The target is 23 lbs. below the actual
       377 lbs. due to the carrier weight minus the
       alignment fixture using the point-to-point
       method as described in the downforce procedure
       in 6.2.4.1 through 6.2.4.13.                     Completed: JP,BW,MS

       Down Frc: Head 1 Pre-Adj: 353.9   Post-adj: 353.9

                 Head 2 Pre-Adj: 354.2   Post-adj: 354.2

                 Head 3 Pre-Adj: 356.1   Post-adj: 354.7

                 Head 4 Pre-Adj: 355.8   Post-adj: 354.1

                 Head 5 Pre-Adj: 355.0   Post-adj: 353.7

6.2.5  Perform Down Force Calibration on Conditioner    Completed: DW
       to read +/- .5 lbs of 77lbs.
 
       Actual Down Force Pre-Adj:  68.1 PSI

       Actual Down Force Post-Adj: 77.4 Psi

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: JP

6.2.7  Check the Load Flipper alignment			Completed: DW

6.2.8  Check the Unload Flipper alignment		Completed: DW

6.2.9  Check Elevator alignments			Completed: ls

6.2.10 Check wafer unload, from Index table to cassette Completed: DW

6.2.11 Check the +24 Volt power supply for +/- 1V 
       of 24 volts.                 Pre: 24.05V   Post: 24.05V  Tech: MS

6.2.12 Check the +/- 15 Volt power supply for +/- 1V
       of 15V                       Pre: 15.24V   Post: 15.24V  Tech: MS

6.2.13 Check the +5 Volt power supply for 4.5 to
       5.5 v.                       Pre: 4.84V    Post: 4.84V   Tech: MS

6.2.14 Check Table Rotation Speed for +/- 1.5 of 30RPM  Completed: BJ/ls**  

6.2.15 Check Vacuum Pump Diaphrams			Completed: DW

6.2.16 Replace liquid separator filter element          Completed: JP

6.2.17 Check Vacuum Tank/Pump lines			Completed: JP

6.2.18 Check carrier to Load Cup Position alignments    Completed: LS/DW

6.2.19 Check Load Cup Height to carrier alignments      Completed: LS

6.2.20  Check the Robot alignments                      Completed: ls
                                         
6.2.21 Check Muffin Fans for proper operation           Completed: JP

Comments:

========================================================================



                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:4/18/97   TOOL ENTITY:CMP.B3   TECHNICIAN(S): JOHN POIRIER (JP)
                                                   BRAD WESTPHAL(BW)
                                                   MIKE STANDING(MS)
                                                  Leon Shkolnikov  (ls)
                                                  Brian Jubinville (BJ)
    

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: JP 85

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: JP 65

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: JP 30

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: JP 40

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: JP 10

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: JP 35

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: JP 30

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: JP 40

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed: JP  6 

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A BJ
       (Applicable for CMP.B1 only)                                 

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: JP 20

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: JP 50

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: JP 50

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: JP 15

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: JP 25

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: JP 20

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: JP 45

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: JP 80

6.1.19 Check Drip Pans for moisture/contamination        Completed: BW 

6.1.20 Check tubing/fittings for fluid leaks             Completed: BW 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: BW 

6.1.22 Check stations/components for contamination	 Completed: BW 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: JP  9

6.1.24 Clean and lubricate the Scrubber rails		 Completed: JP

6.1.25 Clean and lubricate the Paddle rails		 Completed: JP

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: DW

6.1.27 Scrub clean the Polish area tub and walls         Completed: ls/BJ

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: MS

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: MS

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: JP

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: JP

6.1.32 Check Carrier clean brushes for defects           Completed: JP
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: MS

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: MS

6.1.35 Check chiller fluid resevoir for proper level     Completed: JP

6.1.36 Check the chiller readout for 24 degrees C.       Completed: JP

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: ls/BJ 

6.1.38 Check the slurry flow alarm.                      Completed: JP 

Comments:
    6.2.14  The actual polish table table speed is 32.7 rpm. Engineer
            notified.

    
    FYI -  The door fasteners were treated with loctite to prevent loosening.
22.51cmp.b3 weekly p.m. completed for ww 43FABSIX::J_SWENSONThu Apr 24 1997 19:41101
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:4/24/97         TOOL ENTITY:CMP.B3       TECHNICIAN(S):MIKE STANDING (MS)
                                                            JOHN SWENSON  (JS)

START TIME:10:30 A.M. COMPLETED TIME:1:00 P.M.

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed:MS/JS

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed:MS/JS

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed:MS/JS

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed:MS/JS

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed:MS/JS

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed:MS/JS

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed:MS/JS

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed:MS/JS

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:MS/JS

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed:MS/JS
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed:MS/JS

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed:MS/JS

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed:MS/JS

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed:MS/JS

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed:MS/JS

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed:MS/JS

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed:MS/JS

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed:MS/JS

6.1.19 Check Drip Pans for moisture/contamination        Completed: MS/JS

6.1.20 Check tubing/fittings for fluid leaks             Completed: MS/JS

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: MS/JS

6.1.22 Check stations/components for contamination	 Completed: MS/JS

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed:MS/JS   

6.1.24 Clean and lubricate the Scrubber rails		 Completed:MS/JS

6.1.25 Clean and lubricate the Paddle rails		 Completed:MS/JS

6.1.26 Remove and clean conditioning Wheel and Housing   Completed:MS/JS

6.1.27 Scrub clean the Polish area tub and walls         Completed:MS/JS

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed:MS/JS

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed:MS/JS

6.1.30 Check slurry pump hoses and connectors for leaks  Completed:MS/JS

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed:MS/JS

6.1.32 Check Carrier clean brushes for defects           Completed:MS/JS
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed:MS/JS

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed:MS/JS

6.1.35 Check chiller fluid resevoir for proper level     Completed:MS/JS

6.1.36 Check the chiller readout for 24 degrees C.       Completed:MS/JS

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed:MS/JS

6.1.38 Check the slurry flow alarm.                      Completed: MS/JS

Comments:



22.52Weekly PM completedFABSIX::R_POIRIERMon Apr 28 1997 03:33102
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:4/27/97         TOOL ENTITY:CMP.B3       TECHNICIAN(S):Roger Poirier (RP)
                                                            Bruce Durgin  (BD)

START TIME: 9:30 P.M. COMPLETED TIME: 12:00 P.M.

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 86 RP/BD

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 60 RP/BD

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 23 RP/BD

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 40 RP/BD

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 11 RP/BD

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 RP/BD

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 RP/BD

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 40 RP/BD

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed: 6 RP/BD

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A *
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 RP/BD

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 RP/BD

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 RP/BD

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 15 RP/BD

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 RP/BD

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20 RP/BD

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45 RP/BD

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 RP/BD

6.1.19 Check Drip Pans for moisture/contamination        Completed: RP/BD

6.1.20 Check tubing/fittings for fluid leaks             Completed: RP/BD

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: RP/BD

6.1.22 Check stations/components for contamination	 Completed: RP/BD

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 9 RP

6.1.24 Clean and lubricate the Scrubber rails		 Completed: RP

6.1.25 Clean and lubricate the Paddle rails		 Completed: RP

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: BD

6.1.27 Scrub clean the Polish area tub and walls         Completed: RP/BD

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: RP/BD

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: RP

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: RP/BD

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: RP

6.1.32 Check Carrier clean brushes for defects           Completed: RP/BD
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: RP/BD

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: RP/BD

6.1.35 Check chiller fluid resevoir for proper level     Completed: RP/BD

6.1.36 Check the chiller readout for 24 degrees C.       Completed: RP/BD

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: RP/BD

6.1.38 Check the slurry flow alarm.                      Completed: RP/BD

Comments:

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI *
       (Applicable to CMP.B1 only) EE Notified

22.53SEMI-ANNUAL PM COMPLETED FOR WW45SUBPAC::BJUBINVILLECMP Equipment EngineeringFri May 09 1997 03:09218
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                               SPEC# HF60-0172  REV-E    

                         Speedfam Corp. CMP-V Planarizer

             Semi-Annual Preventative Maintenance Check Sheet, Rev. E

DATE: 5/9/97       TOOL ENTITY: CMP.B3   TECHNICIAN(S): Brian Jubinville (BJ)
                                                        Dave Morin (DM)
START TIME: 3:15 p.m.      COMPLETED TIME: 02:00
                                                        
6.4.1  Check all interlocks for functionality		Completed: BJ

6.4.2  Check all EMO's for functionality		Completed: BJ 

6.4.3  Lubricate the Rotary Union			Completed: BJ 

6.4.4  Lubricate the Lead Screw				Completed: BJ

6.4.5  Lubricate the Linear Guide Rails			Completed: BJ

6.4.6  Lubricate the Idler Pulley			Completed: BJ

6.4.7  Rebuild the vacuum pump using the appropriate    
       rebuild kit.                                     Completed: BJ/DM        
                                                

Comments:

=======================================================================


                     SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           SPEC# HF60-0172  REV-E 

                        Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev. E 

DATE: 5/9/97  TOOL ENTITY: CMP.B3    TECHNICIAN(S): John Poirier (JP)
                                                    Brian Jubinville (BJ)
                                                    Dave Morin (DM)
                                                    

6.2.1  Change Peristaltic Pump Lines and check flow     Completed:  BJ/DM

6.2.2  Clean Polish area tub drains for clogs		Completed:  JP

6.2.3  Check all table belts for defects		Completed:  JP

6.2.4  Perform Down Force Calibration on all 5 heads   
       to read at +/- 1lbs of 354 lbs.
       NOTE:  The target is 23 lbs. below the actual
       377 lbs. due to the carrier weight minus the
       alignment fixture using the point-to-point
       method as described in the downforce procedure
       in 6.2.4.1 through 6.2.4.13.                     Completed: BJ/DM 

       Down Frc: Head 1 Pre-Adj: 36.1  Post-adj: 354

                 Head 2 Pre-Adj: 363.3 Post-adj: 354

                 Head 3 Pre-Adj: 361   Post-adj: 354 

                 Head 4 Pre-Adj: 357   Post-adj: 354

                 Head 5 Pre-Adj: 357.6 Post-adj: 354  

6.2.5  Perform Down Force Calibration on Conditioner    Completed: BJ/DM 
       to read +/- .5 lbs of 77lbs.
 
       Actual Down Force Pre-Adj: 84

       Actual Down Force Post-Adj: 77

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed:    JP

6.2.7  Check the Load Flipper alignment			Completed: BJ/DM 

6.2.8  Check the Unload Flipper alignment		Completed: BJ/DM 

6.2.9  Check Elevator alignments			Completed: BJ/DM 

6.2.10 Check wafer unload, from Index table to cassette Completed: BJ/DM 

6.2.11 Check the +24 Volt power supply for +/-1V
       of  24V.          Pre: 23.81 V     Post: IN SPEC      Tech:    JP

6.2.12 Check the +/- 15 Volt power supply for +/- 1V
       of 15V.           Pre: 15.23 V     Post: IN SPEC      Tech:    JP

6.2.13 Check the +5 Volt power supply for 4.5 to
       5.5 v.            Pre: 4.84 V      Post: IN SPEC      Tech:    JP

6.2.14 Check Table Rotation Speed for +/- 1.5 of 30RPM  Completed: BJ/DM  

6.2.15 Check Vacuum Pump Diaphrams			Completed: BJ/DM 

6.2.16 Replace liquid separator filter element          Completed: BJ/DM 

6.2.17 Check Vacuum Tank/Pump lines			Completed:  BJ/DM 

6.2.18 Check carrier to Load Cup Position alignments    Completed:  BJ/DM 

6.2.19 Check Load Cup Height to carrier alignments      Completed:  BJ/DM 

6.2.20 Check the Robot alignments                       Completed:  BJ/DM 
                                         
6.2.21 Check Muffin Fans for proper operation           Completed:  BJ/DM 

Comments:

========================================================================



                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:5/9/97     TOOL ENTITY:CMP.B3   TECHNICIAN(S): John Poirier (JP)
                                                    Brian Jubinville (BJ)
                                                    Dave Morin (DM)
                                                    

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 88 JP 

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 60 JP

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 30 JP

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 40 JP

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 10 JP

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 JP

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 JP

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 40 JP

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6 JP 

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A JP
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 JP

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 45 JP

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 45 JP

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30 JP

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 JP

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20 JP

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45 JP

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 JP

6.1.19 Check Drip Pans for moisture/contamination        Completed:    JP 

6.1.20 Check tubing/fittings for fluid leaks             Completed:    JP 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed:    JP 

6.1.22 Check stations/components for contamination	 Completed:    JP 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed:  9 JP

6.1.24 Clean and lubricate the Scrubber rails		 Completed:    JP

6.1.25 Clean and lubricate the Paddle rails		 Completed:    JP 

6.1.26 Remove and clean conditioning Wheel and Housing   Completed:    JP

6.1.27 Scrub clean the Polish area tub and walls         Completed:    JP

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed:    JP

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed:    JP

6.1.30 Check slurry pump hoses and connectors for leaks  Completed:    JP

6.1.31 Remove and clean the Vacuum system filter                       
       element and replaced as needed.                   Completed:    JP

6.1.32 Check Carrier clean brushes for defects           Completed:    JP
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed:    JP

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed:    JP

6.1.35 Check chiller fluid resevoir for proper level     Completed:    JP

6.1.36 Check the chiller readout for 24 degrees C.       Completed: BJ/DM 

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed:  BJ/DM 


6.1.38 Check the slurry flow alarm.                      Completed:  BJ/DM 

Comments:  * 6.1.28 - REPLACED BROKEN SPRINGS ON MHTA LEAD SCREW COVER.
                      (LEFT SIDE/MIDDLE COVER)
22.54WW46 WEEKLY P.M. COMPLETEDSUBPAC::LANDRYTue May 13 1997 16:24102
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:5/13/97         TOOL ENTITY:CMP.B3       TECHNICIAN(S):  Bob Gee    (BG)
                                                              Tim Landry (TL)
      							      Jim Sadin  (JS)

START TIME: 2:30 P.M. COMPLETED TIME: 3:30 P.M.

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 86 TL

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 60 TL

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 23 TL

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 40 TL

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 10 TL

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 TL

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 TL

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 40 BG

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed: 6 BG

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A *
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 JS

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 BG

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 BG

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 28 TL

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 TL

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20 TL

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 42 TL

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 TL 

6.1.19 Check Drip Pans for moisture/contamination        Completed: BG

6.1.20 Check tubing/fittings for fluid leaks             Completed: BG

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: BG

6.1.22 Check stations/components for contamination	 Completed: TL

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 9 

6.1.24 Clean and lubricate the Scrubber rails		 Completed: BG

6.1.25 Clean and lubricate the Paddle rails		 Completed: TL

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: BG

6.1.27 Scrub clean the Polish area tub and walls         Completed: BG

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: TL / BG

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: BG

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: BG

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: BG

6.1.32 Check Carrier clean brushes for defects           Completed: TL
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: JS

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: BG

6.1.35 Check chiller fluid resevoir for proper level     Completed: BG

6.1.36 Check the chiller readout for 24 degrees C.       Completed: BG

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: TL

6.1.38 Check the slurry flow alarm.                      Completed: TL

Comments:

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI *
       (Applicable to CMP.B1 only) EE Notified

22.55ww47 weekly pm completed.FABSIX::L_SHKOLNIKOVFri May 23 1997 04:15101
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:5/21/97         TOOL ENTITY:CMP.B3       TECH(S): Brian Jubinville (BJ)
                                                       Leon Shkolnikov   ls
                                                       Dave Morin       (DM)
START TIME: 1:15am    COMPLETED TIME: 3:00am        

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 85 BJ  

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55 BJ  

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 29 BJ  

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 40 BJ  

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 10 BJ  

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 BJ  

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 BJ  

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 40 BJ

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed: 6 BJ

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A * BJ
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 BJ  

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 BJ

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 BJ

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30 BJ   

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 BJ  

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20 BJ  

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45 BJ  

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 BJ   

6.1.19 Check Drip Pans for moisture/contamination        Completed: ls   

6.1.20 Check tubing/fittings for fluid leaks             Completed: ls   

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: ls  

6.1.22 Check stations/components for contamination	 Completed: ls  

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 10 BJ

6.1.24 Clean and lubricate the Scrubber rails		 Completed: ls  

6.1.25 Clean and lubricate the Paddle rails		 Completed: ls  

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: DM   

6.1.27 Scrub clean the Polish area tub and walls         Completed: DM  

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: ls/DM    

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: DM  

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: ls  
                                                                         
6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: ls   

6.1.32 Check Carrier clean brushes for defects           Completed: ls   
       (On CMP.B1, rotate position)                                   

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: ls/DM

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: ls/DM

6.1.35 Check chiller fluid resevoir for proper level     Completed: BJ    

6.1.36 Check the chiller readout for 24 degrees C.       Completed: BJ   

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: ls/DM

6.1.38 Check the slurry flow alarm.                      Completed: ls/DM

Comments:

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI *
       (Applicable to CMP.B1 only) EE Notified

22.56CMP.B3 SHUTDOWN AND STARTUP CHECKSHEETSFABSIX::J_SADINFreedom isn&#039;t free.Tue May 27 1997 10:5252
--------------------------------------------------------------------------------
        
SPEC# HF60-0172  REV-E       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

				CMP.B3


                        CMP.B SHUT DOWN CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
								 INIT / DATE
1) SCRUB SIDES OF CARRIERS				      RP,AQ,BD/5-26-97
2) RUN CARRIER BLOW OFF FOR 30 SECONDS			      RP,AQ,BD/5-26-97
3) REMOVE ALL CARRIERS					      RP,AQ,BD/5-26-97
4) PLACE WIPES UNDER CARRIER FILMS AND LAY CARRIERS DI TANK   RP,AQ,BD/5-26-97
5) IF POWER TO SLURRY SYSTEM IS GOING TO BE LOST, CONTACT 
   ASHLAND CHEMICAL AND HAVE SLURRY SYSTEM PURGED AND CHARGED 
   WITH DI WATER.					      RP,AQ,BD/5-26-97
6) CLEAN ENTIRE SYSTEM OF DRIED SLURRY 			      RP,AQ,BD/5-26-97
7) REMOVE CONDITIONER AND CLEAN				      RP,AQ,BD/5-26-97
8) CYCLE/RINSE ALL DI FUNCTIONS: SPRAY NOZZLES, SLURRY PUMPS,
   CONDITIONER RINSE, ELEVATOR TANKS.			      RP,AQ,BD/5-26-97
9) SHUT OFF DI BEHIND SYSTEM (ROTATE 3W VLV TO FULL RETURN)   RP,AQ,BD/5-26-97
10) DRAIN ELEVATOR AND CONDITIONER TUBE			      RP,AQ,BD/5-26-97
11) REMOVE PADS, AND CLEAN AND DRY TABLES		      RP,AQ,BD/5-26-97
12) REMOVE SCRUBBER BRUSHES AND SOAK IN DI		      RP,AQ,BD/5-26-97
13) DRY ENTIRE SYSTEM OF ANY STANDING WATER		      RP,AQ,BD/5-26-97
14) POWER DOWN SYSTEM.



SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE


                        CMP.B START UP CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
                                                                 INIT / DATE
1) TURN ON DI WATER (ROTATE 3W VLV TO FULLY TO POLISHER.	_js/tl/5/27__
2) POWER ON SYSTEM.						_js/tl/5/27__
3) CYCLE/RUN ALL DI FUNCTIONS FOR 15 MINUTES			_js/tl/5/27__
4) WIPE DOWN SYSTEM CLEAN ALL DRIED SLURRY	                _js/tl/5/27__
5) DRY TABLES, INSTALL PADS					_js/tl/5/27__
6) INSTALL SCRUBBER BRUSHES					_js/tl/5/27__
7) INSTALL CONDITIONER						_js/tl/5/27__
8) INSTALL CARRIERS						_js/tl/5/27__
9) RUN WET IDLE PROGRAM FOR 15 MIN. (ENOUGH TO CLEAN CARRIERS)  _js/tl/5/27__
10) IF SLURRY SYSTEM WAS SHUT DOWN, CONTACT ASHLAND CHEMICAL,
    REQUEST DI TO BE PURGE FROM SLURRY SYSTEM AND CHARGED WITH 
    SLURRY AND REQUEST A NEW SLURRY FILTER BE INSTALLED.	_js/tl/5/27__
11) CALIBRATE SLURRY FLOW					_NA___/______
12) PUT IN WET IDLE AND TURN OVER TO MFG FOR MQC		_js/tl/5/27__

                                                                 
22.57WW48 weekly pm completedFABSIX::J_SADINFreedom isn&#039;t free.Tue May 27 1997 18:36102
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:5/27/97         TOOL ENTITY:CMP.B3       TECHNICIAN(S):  Bob Gee    (BG)
                                                              Tim Landry (TL)
      							      Jim Sadin  (JS)
                                                              Brendan Finn(BF)


6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 86 TL

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 60 TL

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 23 TL

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 40 TL

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 10 TL

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 TL

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 TL

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 40 BG

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed: 6 BG

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A *
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 JS

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 BF

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 BG

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 28 TL

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 TL

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20 TL

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 42 TL

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 TL 

6.1.19 Check Drip Pans for moisture/contamination        Completed: BF

6.1.20 Check tubing/fittings for fluid leaks             Completed: BG

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: BG

6.1.22 Check stations/components for contamination	 Completed: TL

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 9 

6.1.24 Clean and lubricate the Scrubber rails		 Completed: BF

6.1.25 Clean and lubricate the Paddle rails		 Completed: TL

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: BG

6.1.27 Scrub clean the Polish area tub and walls         Completed: BG

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: TL / BF

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: BG

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: BG

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: BG

6.1.32 Check Carrier clean brushes for defects           Completed: TL
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: JS

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: BF

6.1.35 Check chiller fluid resevoir for proper level     Completed: BG

6.1.36 Check the chiller readout for 24 degrees C.       Completed: BG

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: TL

6.1.38 Check the slurry flow alarm.                      Completed: TL

Comments:

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI *
       (Applicable to CMP.B1 only) EE Notified

22.58WW49 Weekly PM completedFABSIX::R_POIRIERMon Jun 02 1997 22:49103
--------------------------------------------------------------------------------
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:6/02/97         TOOL ENTITY:CMP.B3       TECHNICIAN(S): Roger Poirier (RP)
                                                             Bruce Durgin (BD)
      							     
                                                             


6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 88 RP/BD 

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55 RP/BD

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 28 RP/BD

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 40 RP/BD

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 10 RP/BD

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 RP/BD

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 RP/BD

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 40 RP/BD

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed: 6 RP/BD

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A *
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 RP/BD

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50 RP/BD

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 RP/BD

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30 RP/BD

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 RP/BD

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 25 RP/BD

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 50 RP/BD

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 RP/BD

6.1.19 Check Drip Pans for moisture/contamination        Completed: RP/BD

6.1.20 Check tubing/fittings for fluid leaks             Completed: RP/BD

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: RP/BD

6.1.22 Check stations/components for contamination	 Completed: RP/BD

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 9 RP/BD

6.1.24 Clean and lubricate the Scrubber rails		 Completed: RP

6.1.25 Clean and lubricate the Paddle rails		 Completed: RP

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: RP/BD

6.1.27 Scrub clean the Polish area tub and walls         Completed: RP/BD

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: RP/BD

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: BD

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: BD

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: RP/BD

6.1.32 Check Carrier clean brushes for defects           Completed: RP
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: RP/BD

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: BD

6.1.35 Check chiller fluid resevoir for proper level     Completed: RP/BD

6.1.36 Check the chiller readout for 24 degrees C.       Completed: RP

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: RP/BD

6.1.38 Check the slurry flow alarm.                      Completed: RP/BD

Comments:

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI *
       (Applicable to CMP.B1 only) EE Notified