[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Conference asdg::cmp

Title:CMP
Notice:Welcome to the CMP notesfile
Moderator:FABSIX::B_TOWERLLE
Created:Tue Oct 31 1995
Last Modified:Fri Jun 06 1997
Last Successful Update:Fri Jun 06 1997
Number of topics:94
Total number of notes:6381

48.0. "CMP-SCRUB.A2 PM CHECKSHEETS" by SUBPAC::SADIN (Freedom isn't free.) Sun Nov 05 1995 12:18

          <<< ASDG::DISK$SYS_DATA:[NOTES$LIBRARY]FILMS_ONLY.NOTE;1 >>>
                                -< Films Only! >-
================================================================================
Note 60.0                 (CMP-SCRUB.A2) PM CHECKSHEETS               20 replies
ASDG::POIRIER                                         7 lines  13-JUL-1995 11:13
--------------------------------------------------------------------------------
    
    
    
             THIS NOTE WILL BE USED FOR POSTING PM CHECKSHEETS ON
    
    
                                (CMP-SCRUB.A2)
================================================================================
Note 60.1                 (CMP-SCRUB.A2) PM CHECKSHEETS                  1 of 20
SUBPAC::TOOKER                                       26 lines  13-JUL-1995 14:47
                       -< Weekly PM Checksheet Template >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:__________   SYSTEM RTC CODE:__________  TECH. NAME:__________________

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__________

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__________

  6.1.3  Check the Drip Pan for contamination           Completed:___________

  6.1.4  Check all tubing/fittings for leaks		Completed:___________

  6.1.5  Check all wafer transport belts		Completed:___________

  6.1.6  Clean the Send module and Scrub modules  	Completed:___________

  6.1.7  Check scrub brushes for contamination		Completed:___________

  6.1.8  Check scrub brush height in both modules	Completed:___________

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
================================================================================
Note 60.2                 (CMP-SCRUB.A2) PM CHECKSHEETS                  2 of 20
SUBPAC::TOOKER                                       21 lines  13-JUL-1995 14:47
                     -< Quarterly PM Checksheet Template >-
--------------------------------------------------------------------------------
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D

 DATE:__________   SYSTEM RTC CODE:__________  TECH. NAME:__________________


  6.3.1  Check muffin fans for functionality		Completed:___________

  6.3.2  Check motor drive belts for defects		Completed:___________

  6.3.3  Check the robot knife for loose hardware	Completed:___________

  6.3.4  Check the spin station grippers		Completed:___________

  6.3.5  Check the motor speed output readings		Completed:___________

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
================================================================================
Note 60.3                 (CMP-SCRUB.A2) PM CHECKSHEETS                  3 of 20
SUBPAC::TOOKER                                       42 lines  13-JUL-1995 14:48
                    -< Semi-Annual PM Checksheet Template >-
--------------------------------------------------------------------------------
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
            Semi-Annual Preventative Maintenance Check Sheet, Rev D


 DATE:__________   SYSTEM RTC CODE:__________  TECH. NAME:__________________


  6.4.1  Check all EMO's for functionality		Completed:___________

  6.4.2  Check all interlocks for functionality  	Completed:___________

  6.4.3  Check heat lamp housing/wiring for defects	Completed:___________

  6.4.4  Check the robot hardware/wiring for defects	Completed:___________

  6.4.5  Check the spindle bearings/bushings		Completed:___________

  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed:___________

  6.4.7  Check the brush sta. drive bearings/bushings	Completed:___________

  6.4.8  Check the +5 VDC power supply			Pre-Adjust:__________

							Post-Adjust:_________

  6.4.9  Check the -12 VDC power supply			Pre-Adjust:__________

  6.4.10 Check the +12 VDC power supply			Pre-Adjust:__________

  6.4.11 Check the +24 VDC power supply			Pre-Adjust:__________

							Post-Adjust:_________

  6.4.12 Check the +48 VDC power supply			Pre-Adjust:__________

							Post-Adjust:_________

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
================================================================================
Note 60.4                 (CMP-SCRUB.A2) PM CHECKSHEETS                  4 of 20
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              26 lines  13-JUL-1995 23:38
                        -< WEEKLY PM FOR WW2 COMPLETED >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 7/13/95   SYSTEM RTC CODE: CMP.A1  TECH. NAME: B. Jubinville

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___X______

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___X______

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:__________________________________________________________________

           __________________________________________________________________
                                                                       
           __________________________________________________________________
================================================================================
Note 60.5                 (CMP-SCRUB.A2) PM CHECKSHEETS                  5 of 20
FABSIX::L_SHKOLNIKOV                                 26 lines  20-JUL-1995 06:30
                        -< WEEKLY PM FOR WW3 COMPLETED >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:__07.20.95___  SYSTEM RTC CODE:  cmp-scrub.a2_TECH. NAME:Leon___________

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___X______

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___X______

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
================================================================================
Note 60.6                 (CMP-SCRUB.A2) PM CHECKSHEETS                  6 of 20
SUBPAC::LANDRY                                       26 lines  27-JUL-1995 16:46
                              -< WW IV - Weekly >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:  7/27/95   SYSTEM RTC CODE:  CMP-SCRUB.A2  TECH. NAME:  Roger / Doc

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____50____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__34/37___

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
================================================================================
Note 60.7                 (CMP-SCRUB.A2) PM CHECKSHEETS                  7 of 20
FABSIX::R_POIRIER                                    27 lines  31-JUL-1995 19:55
                              -< WW05 WEEKLY PM >-
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:_31-JUL-95___   SYSTEM RTC CODE:_CMP-SCRUB.A2 TECH. NAME:_ R POIRIER

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__50______

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_33/35____

  6.1.3  Check the Drip Pan for contamination           Completed:__OK_______

  6.1.4  Check all tubing/fittings for leaks		Completed:__OK_______

  6.1.5  Check all wafer transport belts		Completed:__OK_______

  6.1.6  Clean the Send module and Scrub modules  	Completed:__OK_______

  6.1.7  Check scrub brushes for contamination		Completed:__OK_______

  6.1.8  Check scrub brush height in both modules	Completed:__OK_______

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
================================================================================
Note 60.8                 (CMP-SCRUB.A2) PM CHECKSHEETS                  8 of 20
PATE::GEE                                            32 lines   8-AUG-1995 04:11
                             -< WW06 Weekly p.m. >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:_08-AUG-95___   SYSTEM RTC CODE:_CMP-SCRUB.A2 TECH. NAME:_ GEE

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___50____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__32/36___

  6.1.3  Check the Drip Pan for contamination           Completed:___x______

  6.1.4  Check all tubing/fittings for leaks		Completed:___x______

  6.1.5  Check all wafer transport belts		Completed:___x______

  6.1.6  Clean the Send module and Scrub modules  	Completed:___x______

  6.1.7  Check scrub brushes for contamination		Completed:___x______

  6.1.8  Check scrub brush height in both modules	Completed:___x______

		Outside			INSIDE
		-------			------
	Front	  300			  310
	Rear	  310			  310

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________

================================================================================
Note 60.9                 (CMP-SCRUB.A2) PM CHECKSHEETS                  9 of 20
PATE::GEE                                            33 lines  15-AUG-1995 03:47
                             -< ww07 weekly p.m. >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:_15-AUG-95___   SYSTEM RTC CODE:_CMP-SCRUB.A2 TECH. NAME:_ GEE/Leon

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___50____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_34/37_max.

  6.1.3  Check the Drip Pan for contamination           Completed:___x______

  6.1.4  Check all tubing/fittings for leaks		Completed:___x______

  6.1.5  Check all wafer transport belts		Completed:___x______

  6.1.6  Clean the Send module and Scrub modules  	Completed:___x______

  6.1.7  Check scrub brushes for contamination		Completed:___x______

  6.1.8  Check scrub brush height in both modules	Completed:___x______

		Outside			INSIDE
		-------			------
	Front     300                     310
	Rear	  310			  310

  Comments: Repaired 3 small DI water leaks.
	   __________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________

================================================================================
Note 60.10                (CMP-SCRUB.A2) PM CHECKSHEETS                 10 of 20
PATE::GEE                                            33 lines  24-AUG-1995 05:31
                             -< ww08 weekly p.m. >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:_23-AUG-95___   SYSTEM RTC CODE:_CMP-SCRUB.A2 TECH. NAME:_ GEE/BJ/RP

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___50____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_34/37_max.

  6.1.3  Check the Drip Pan for contamination           Completed:___x______

  6.1.4  Check all tubing/fittings for leaks		Completed:___x______

  6.1.5  Check all wafer transport belts		Completed:___x______

  6.1.6  Clean the Send module and Scrub modules  	Completed:___x______

  6.1.7  Check scrub brushes for contamination		Completed:___x______

  6.1.8  Check scrub brush height in both modules	Completed:___x______

		Outside			INSIDE
		-------			------
	Front     380                     345
	Rear	  380			  360     

  Comments: 
	   __________________________________________________________________
                                             
           __________________________________________________________________

           __________________________________________________________________

================================================================================
Note 60.11                (CMP-SCRUB.A2) PM CHECKSHEETS                 11 of 20
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              26 lines   1-SEP-1995 03:21
                        -< WEEKLY PM COMPLETED FOR WW9 >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 8/31/95   SYSTEM RTC CODE:  CMP-SCRUB.A2  TECH. NAME: BJ

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 30-35

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
                                                                      
  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
================================================================================
Note 60.12                (CMP-SCRUB.A2) PM CHECKSHEETS                 12 of 20
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              26 lines   1-SEP-1995 03:24
                        -< WEEKLY PM FOR WW9 COMPLETED >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 8/30/95   SYSTEM RTC CODE:  CMP-SCRUB.A2  TECH. NAME: BJ

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 30-35

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
                                                                      
  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
================================================================================
Note 60.13                (CMP-SCRUB.A2) PM CHECKSHEETS                 13 of 20
STRATA::FINN                                         29 lines   4-SEP-1995 15:53
                  -< Weekly PM checksheet WW10 CMP-SCRUB.A2 >-
--------------------------------------------------------------------------------
                       -< Weekly PM Checksheet Template >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:__9/4/95__   SYSTEM RTC CODE. CMP-SCRUB.A2_  TECH. NAME: Brendan Finn____

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__50________

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__34/36_____

  6.1.3  Check the Drip Pan for contamination           Completed:___Done_ ____

  6.1.4  Check all tubing/fittings for leaks		Completed:___Done______

  6.1.5  Check all wafer transport belts		Completed:___Done______

  6.1.6  Clean the Send module and Scrub modules  	Completed:___Done______

  6.1.7  Check scrub brushes for contamination		Completed:___Done______

  6.1.8  Check scrub brush height in both modules	Completed:___Done______

  Comments:__________________________________________________________________
	      Max water pressure is 34/36 at manifold 
	   __________________________________________________________________
           
	   __________________________________________________________________

================================================================================
Note 60.14                (CMP-SCRUB.A2) PM CHECKSHEETS                 14 of 20
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              89 lines  13-SEP-1995 06:26
                      -< Quartley PM for WW11 completed >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:__9/12/95__   SYSTEM RTC CODE. CMP-SCRUB.A2_  TECH. NAME:Finn/Tooker/BJ

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__50________

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__34/36_____

  6.1.3  Check the Drip Pan for contamination           Completed:___Done_ ____

  6.1.4  Check all tubing/fittings for leaks		Completed:___Done______

  6.1.5  Check all wafer transport belts		Completed:___Done______

  6.1.6  Clean the Send module and Scrub modules  	Completed:___Done______

  6.1.7  Check scrub brushes for contamination		Completed:___Done______

  6.1.8  Check scrub brush height in both modules	Completed:___Done______

  Comments:__________________________________________________________________
	      Max water pressure is 34/36 at manifold 
	   __________________________________________________________________
                Removed 3 gal. of water from drip tray.
		
           	Repaired MANY water and ammonia  
                
	   __________________________________________________________________
    
    
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D

 DATE:9/12/95_____   SYSTEM RTC CODE:CMP-scrub.a2  TECH.NAME:__Finn/Tooker/BJ


  6.3.1  Check muffin fans for functionality		Completed:_____done

  6.3.2  Check motor drive belts for defects		Completed:____ done

  6.3.3  Check the robot knife for loose hardware	Completed:_____done

  6.3.4  Check the spin station grippers		Completed:_____done

  6.3.5  Check the motor speed output readings		Completed:_____done
                                                                           
    -----
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
            Semi-Annual Preventative Maintenance Check Sheet, Rev D


 DATE:_9/12/95__   SYSTEM RTC CODE:_CMP_SCRUB.A2_ TECH. NAME:Finn/Tooker/BJ


  6.4.1  Check all EMO's for functionality		Completed:__Done_____

  6.4.2  Check all interlocks for functionality  	Completed:__Done_____

  6.4.3  Check heat lamp housing/wiring for defects	Completed:__Done_____

  6.4.4  Check the robot hardware/wiring for defects	Completed:__Done____

  6.4.5  Check the spindle bearings/bushings		Completed:__Done___

  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed:__Done____

  6.4.7  Check the brush sta. drive bearings/bushings	Completed:__Done____

  6.4.8  Check the +5 VDC power supply			Pre-Adjust:_5.14_____

							Post-Adjust:_5.0________

  6.4.9  Check the -12 VDC power supply			Pre-Adjust:_Fixed 
                                                        adjusts with 5 volt 
                                                        supply acording to 
                                                        manual___

  6.4.10 Check the +12 VDC power supply			Pre-Adjust: adjust with 
                                                         5 volt supply

  6.4.11 Check the +24 VDC power supply			Pre-Adjust:___23.73___

							Post-Adjust:__24_______

  6.4.12 Check the +48 VDC power supply			Pre-Adjust:__47.62______

							Post-Adjust:_48____
                                                                         
================================================================================
Note 60.15                (CMP-SCRUB.A2) PM CHECKSHEETS                 15 of 20
FABSIX::R_POIRIER                                    31 lines  19-SEP-1995 05:21
                              -< WW12 weekly PM >-
--------------------------------------------------------------------------------
                       -< Weekly PM Checksheet Template >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:_9-19-95   SYSTEM RTC CODE:_CMP-SCRUB.A2  TECH. NAME:_ R POIRIER 

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_50 PSI___

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_34/37____

  6.1.3  Check the Drip Pan for contamination           Completed:__Done_____

  6.1.4  Check all tubing/fittings for leaks		Completed:__Done_____

  6.1.5  Check all wafer transport belts		Completed:__Done_____

  6.1.6  Clean the Send module and Scrub modules  	Completed:__Done_____

  6.1.7  Check scrub brushes for contamination		Completed:__Done_____

  6.1.8  Check scrub brush height in both modules	Completed:__Done_____

  Comments:__Brush heights are as follows 

		Outside Front 354  Rear 329
		 Inside Front 344  Rear 330


	Max water pressure is 34/37 at manifold

================================================================================
Note 60.16                (CMP-SCRUB.A2) PM CHECKSHEETS                 16 of 20
SUBPAC::LANDRY                                       23 lines   4-OCT-1995 16:13
                            -< Weekly PM performed >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:  10/4/95   SYSTEM RTC CODE:  CMP-SCRUB.A2  TECH. NAME:  Landry/Finn

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____54____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__35/37___

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:   Changed out defective lamp in the "stop" switch.

================================================================================
Note 60.17                (CMP-SCRUB.A2) PM CHECKSHEETS                 17 of 20
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"              24 lines  18-OCT-1995 06:00
                             -< Week PM completed >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:  10/16/95   SYSTEM RTC CODE:  CMP-SCRUB.A2  TECH. NAME: BJ

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____50____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__35/37___

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______
                                                                         
         Left DI gauge guard leaking.  Waiting to hear from ENG about
         getting rid of them.
                                            
================================================================================
Note 60.18                (CMP-SCRUB.A2) PM CHECKSHEETS                 18 of 20
SUBPAC::LANDRY                                       23 lines  22-OCT-1995 18:36
                            -< Weekly PM Completed >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:  10/22/95   SYSTEM RTC CODE:  CMP-SCRUB.A2  TECH. NAME:  Landry/Finn

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____52____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__38/38___

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:  Repaired small leak from tubing to the distribution manifold

================================================================================
Note 60.19                (CMP-SCRUB.A2) PM CHECKSHEETS                 19 of 20
PATE::GEE                                            29 lines  29-OCT-1995 21:15
                                -< weekly p.m. >-
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:  10/29/95   SYSTEM RTC CODE:  CMP-SCRUB.A2  TECH. NAME:  

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____50____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__38/39___

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

		inside       outside
	front	 319	       354
	back     330	       329

  Comments:  
		Brush height check is an observation only


================================================================================
Note 60.20                (CMP-SCRUB.A2) PM CHECKSHEETS                 20 of 20
FABSIX::R_POIRIER                                    29 lines   5-NOV-1995 07:20
                         -< WW19 weekly PM completed >-
--------------------------------------------------------------------------------

        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:_11-05-95   SYSTEM RTC CODE:_ CMP-SCRUB.A2  TECH. NAME:_POIRIER/RIDLON

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_50 PSI___

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_39/40 PSI

  6.1.3  Check the Drip Pan for contamination           Completed:_DONE______

  6.1.4  Check all tubing/fittings for leaks		Completed:_DONE______

  6.1.5  Check all wafer transport belts		Completed:_DONE______

  6.1.6  Clean the Send module and Scrub modules  	Completed:_DONE______

  6.1.7  Check scrub brushes for contamination		Completed:_DONE______

  6.1.8  Check scrub brush height in both modules	Completed:_DONE______

  Comments:____Brush heights Outer Front-354 Rear-329 _______________________

           __________________Inner Front-319 Rear-330 _______________________

           _______ Found and cleaned puddle in Drip-pan below IB Entry Rinse
	   _______ connector. Also found small leak on IB front roller shaft.

T.RTitleUserPersonal
Name
DateLines
48.1Weekly PM Checksheet TemplateSUBPAC::BJUBINVILLENFD Fire - RescueWed Nov 08 1995 21:1026
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:__________   SYSTEM RTC CODE:__________  TECH. NAME:__________________

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__________

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__________

  6.1.3  Check the Drip Pan for contamination           Completed:___________

  6.1.4  Check all tubing/fittings for leaks		Completed:___________

  6.1.5  Check all wafer transport belts		Completed:___________

  6.1.6  Clean the Send module and Scrub modules  	Completed:___________

  6.1.7  Check scrub brushes for contamination		Completed:___________

  6.1.8  Check scrub brush height in both modules	Completed:___________

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
48.4WW XXSUBPAC::LANDRYSun Nov 12 1995 18:5423
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:  11/12/95   SYSTEM RTC CODE:  CMP-SCRUB.A2  TECH. NAME:  Landry/Finn

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____52____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__37/37___

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:  

48.5Weekly PM for 11/21 completedSUBPAC::BJUBINVILLENFD Fire - RescueTue Nov 21 1995 23:0928
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 11/21/95   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: BJ

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 psi

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40 psi

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:  INSIDE - 319-F  330-R
             OUTSIDE - 354-F  329-R
    
             There is still a leak in the front/inside of the outside
             brush station.  The source is still unknown.
    
    
48.6Weekly PM for WW22 completedFABSIX::L_SHKOLNIKOVWed Nov 29 1995 07:2123
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:  29/11/95   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME:  BJ/LEON

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____50____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:____38____

  6.1.3  Check the Drip Pan for contamination           Completed:_____X_____

  6.1.4  Check all tubing/fittings for leaks		Completed:_____X_____

  6.1.5  Check all wafer transport belts		Completed:_____X_____

  6.1.6  Clean the Send module and Scrub modules  	Completed:_____X_____

  6.1.7  Check scrub brushes for contamination		Completed:_____X_____

  6.1.8  Check scrub brush height in both modules	Completed:_____X_____

  Comments: There is still a leak in the front/inside of the outside
                 brush station.
48.7weekly p.m. FABSIX::R_GEEMon Dec 04 1995 21:0323
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:  12/04/95   SYSTEM RTC CODE:  CMP-SCRUB.A2  TECH. NAME:  BG/MR

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____50____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__38/38___

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:  Brush heights  Out Front - 354 Rear - 329
			    In  Front - 319 Rear - 330
48.8WEEKLY PM WW24LUDWIG::RIDLONEliminate the obviousSun Dec 10 1995 04:0723
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:  12/10/95   SYSTEM RTC CODE:  CMP-SCRUB.A2  TECH. NAME:  BG/MR

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____53____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__38/38___

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:  Brush heights  Out Front - 354 Rear - 329
			    In  Front - 319 Rear - 330
48.9QUARTERLY PM WW24LUDWIG::RIDLONEliminate the obviousSun Dec 10 1995 04:0721
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D

 DATE: 12/10/95   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: MR/BG


  6.3.1  Check muffin fans for functionality		Completed:_____X_____

  6.3.2  Check motor drive belts for defects		Completed:_____X_____

  6.3.3  Check the robot knife for loose hardware	Completed:_____X_____

  6.3.4  Check the spin station grippers		Completed:_____X_____

  6.3.5  Check the motor speed output readings		Completed:_____X_____

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
48.10Weekly completedSUBPAC::LANDRYSun Dec 17 1995 13:1223
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:  12/17/95   SYSTEM RTC CODE:  CMP-SCRUB.A2  TECH. NAME:  Landry

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____51____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__37/37___

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:  

48.11No PM necessary for WW26 FY96SUBPAC::TOOKERThu Dec 21 1995 15:116
Due to the scheduled FAB6 shutdown during Work Week 26 Fiscal Year 1996, no PM will be performed
on CMP-SCRUB.A2.


     Jim Tooker
     CMP Equipment Engineer
48.12WW27 Weekly PMFABSIX::R_POIRIERMon Jan 01 1996 21:4929
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:_1-1-96___   SYSTEM RTC CODE:_CMP-SCRUB.A2  TECH. NAME:_ "B" SHIFT_____

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__50PSI___

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_32/32_____

  6.1.3  Check the Drip Pan for contamination           Completed:___Done____

  6.1.4  Check all tubing/fittings for leaks		Completed:___Done____

  6.1.5  Check all wafer transport belts		Completed:___Done____

  6.1.6  Clean the Send module and Scrub modules  	Completed:___Done____

  6.1.7  Check scrub brushes for contamination		Completed:___Done____

  6.1.8  Check scrub brush height in both modules	Completed:___Done____

  Comments:        Outside front 306  Outside rear  311
		   Inside  front 303  Inside  rear  331
           __________________________________________________________________

           __________________________________________________________________


48.13WW 28 - WeeklySUBPAC::LANDRYMon Jan 08 1996 15:5024
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:  1/8/96   SYSTEM RTC CODE:  CMP-SCRUB.A2  TECH. NAME:  Landry

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____51____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__37/38___

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:  

                                                                          
48.14WEEKLY PM FOR WW29SUBPAC::BJUBINVILLENFD Fire - RescueWed Jan 17 1996 21:5329
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/17/96   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: LEON, BJ

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_____X____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___37_____

  6.1.3  Check the Drip Pan for contamination           Completed:______X____

  6.1.4  Check all tubing/fittings for leaks		Completed:______X____

  6.1.5  Check all wafer transport belts		Completed:______X____

  6.1.6  Clean the Send module and Scrub modules  	Completed:______X____

  6.1.7  Check scrub brushes for contamination		Completed:______X____

  6.1.8  Check scrub brush height in both modules	Completed:______X____

  Comments:   Inside brush heights  - Front -  303  rear - 381           
              Outside brush heights - Front -  306  rear - 311
    
    __________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
48.15forgot to post, weekly PM for WW30SUBPAC::BJUBINVILLENFD Fire - RescueFri Jan 26 1996 20:2224
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/24/96   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: BJ

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_____X____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___35_____

  6.1.3  Check the Drip Pan for contamination           Completed:______X____

  6.1.4  Check all tubing/fittings for leaks		Completed:______X____

  6.1.5  Check all wafer transport belts		Completed:______X____

  6.1.6  Clean the Send module and Scrub modules  	Completed:______X____

  6.1.7  Check scrub brushes for contamination		Completed:______X____

  6.1.8  Check scrub brush height in both modules	Completed:______X____

  Comments:   Inside brush heights  - Front -  360  rear - 335           
              Outside brush heights - Front -  375  rear - 355
                                                              
48.16weekly ww31STRATA::RIDLONEliminate the obviousTue Jan 30 1996 00:0524
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/29/96   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: b shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_____X____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___36_____

  6.1.3  Check the Drip Pan for contamination           Completed:______X____

  6.1.4  Check all tubing/fittings for leaks		Completed:______X____

  6.1.5  Check all wafer transport belts		Completed:______X____

  6.1.6  Clean the Send module and Scrub modules  	Completed:______X____

  6.1.7  Check scrub brushes for contamination		Completed:______X____

  6.1.8  Check scrub brush height in both modules	Completed:______X____

  Comments:   Inside brush heights  - Front -  360  rear - 335           
              Outside brush heights - Front -  375  rear - 355
                                                              
48.172/5/95 weekly completedFABSIX::B_FINNMon Feb 05 1996 19:3224
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 2/05/96   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: a shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___50_____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___36_____

  6.1.3  Check the Drip Pan for contamination           Completed:______X____

  6.1.4  Check all tubing/fittings for leaks		Completed:______X____

  6.1.5  Check all wafer transport belts		Completed:______X____

  6.1.6  Clean the Send module and Scrub modules  	Completed:______X____

  6.1.7  Check scrub brushes for contamination		Completed:______X____

  6.1.8  Check scrub brush height in both modules	Completed:______X____

  Comments:   Inside brush heights  - Front -  360  rear - 335           
              Outside brush heights - Front -  375  rear - 355
                                                              
48.18WW33 Weekly PMFABSIX::R_POIRIERSun Feb 11 1996 03:4226
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:_2-11-96   SYSTEM RTC CODE:CMP-SCRUB.A2   TECH. NAME: B SHIFT

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 35/36

  6.1.3  Check the Drip Pan for contamination           Completed:___Done____

  6.1.4  Check all tubing/fittings for leaks		Completed:___Done____

  6.1.5  Check all wafer transport belts		Completed:___Done____

  6.1.6  Clean the Send module and Scrub modules  	Completed:___Done____

  6.1.7  Check scrub brushes for contamination		Completed:___Done____

  6.1.8  Check scrub brush height in both modules	Completed:___Done____

  Comments:____Brush heights  Outside Rear 355 Outside front 375
	                       Inside rear 335  Inside front 360

           ______Replaced bearings on Outside lower brush ___________________
48.19WEEKLY PM COMPLETED FOR WW34SUBPAC::BJUBINVILLENFD Fire - RescueFri Feb 23 1996 04:5424
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 2/22/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: BJ

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 35

  6.1.3  Check the Drip Pan for contamination           Completed:___Done____

  6.1.4  Check all tubing/fittings for leaks		Completed:___Done____

  6.1.5  Check all wafer transport belts		Completed:___Done____

  6.1.6  Clean the Send module and Scrub modules  	Completed:___Done____

  6.1.7  Check scrub brushes for contamination		Completed:___Done____

  6.1.8  Check scrub brush height in both modules	Completed:___Done____

  Comments:____Brush heights  Outside Rear 355 Outside front 375
	                       Inside rear 335  Inside front 360
                                                                       
48.20WW35 Weekly PMFABSIX::R_POIRIERMon Feb 26 1996 00:5325
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 2/25/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: B Shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 36/36

  6.1.3  Check the Drip Pan for contamination           Completed:___Done____

  6.1.4  Check all tubing/fittings for leaks		Completed:___Done____

  6.1.5  Check all wafer transport belts		Completed:___Done____

  6.1.6  Clean the Send module and Scrub modules  	Completed:___Done____

  6.1.7  Check scrub brushes for contamination		Completed:___Done____

  6.1.8  Check scrub brush height in both modules	Completed:___Done____

  Comments:____Brush heights  Outside Rear 355 Outside front 375
	                       Inside rear 335  Inside front 360
                                                                       
48.21WEEKLY PM COMPLETED FOR WW36SUBPAC::BJUBINVILLENFD Fire - RescueWed Mar 06 1996 04:2825
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 3/6/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: BJ

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 35 psi

  6.1.3  Check the Drip Pan for contamination           Completed:___Done____

  6.1.4  Check all tubing/fittings for leaks		Completed:___Done____

  6.1.5  Check all wafer transport belts		Completed:___Done____

  6.1.6  Clean the Send module and Scrub modules  	Completed:___Done____

  6.1.7  Check scrub brushes for contamination		Completed:___Done____

  6.1.8  Check scrub brush height in both modules	Completed:___Done____

  Comments:____Brush heights  Outside Rear 355 Outside front 375
	                       Inside rear 335  Inside front 360
                                                                       
                       
48.22SEMI-ANNUAL PM FOR WW37 COMPLETEDSUBPAC::BJUBINVILLENFD Fire - RescueThu Mar 14 1996 04:2743
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
            Semi-Annual Preventative Maintenance Check Sheet, Rev D


 DATE: 3/13/96   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: D shift

  Weekly and Quarterly checksheets                      Completed:_____X_____  
    
  6.4.1  Check all EMO's for functionality		Completed:_____X_____ 

  6.4.2  Check all interlocks for functionality  	Completed:_____X_____

  6.4.3  Check heat lamp housing/wiring for defects	Completed:_____X_____

  6.4.4  Check the robot hardware/wiring for defects	Completed:_____X_____

  6.4.5  Check the spindle bearings/bushings		Completed:_____X_____

  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed:_____X_____

  6.4.7  Check the brush sta. drive bearings/bushings	Completed:_____X_____

  6.4.8  Check the +5 VDC power supply			Pre-Adjust: 5.0

							Post-Adjust:_________

  6.4.9  Check the -12 VDC power supply			Pre-Adjust:  -12.6

  6.4.10 Check the +12 VDC power supply			Pre-Adjust:  +12.6

  6.4.11 Check the +24 VDC power supply			Pre-Adjust:  +24

							Post-Adjust:_________

  6.4.12 Check the +48 VDC power supply			Pre-Adjust:  +48

							Post-Adjust:_________


  Comments:____Brush heights  Outside Rear 355 Outside front 375
	                       Inside rear 335  Inside front 360
                                                                       
                       
48.23weekly ww38STRATA::RIDLONEliminate the obviousSun Mar 17 1996 21:5126
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 3/17/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: B shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 60 psi 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 36 psi

  6.1.3  Check the Drip Pan for contamination           Completed:___x____

  6.1.4  Check all tubing/fittings for leaks		Completed:___x____

  6.1.5  Check all wafer transport belts		Completed:___x____

  6.1.6  Clean the Send module and Scrub modules  	Completed:___x____

  6.1.7  Check scrub brushes for contamination		Completed:___x____

  6.1.8  Check scrub brush height in both modules	Completed:___x____


  Comments:    Brush heights  Outside Rear 355 Outside front 375
	                       Inside rear 335  Inside front 360

                                                                       
48.24WW39 Weekly PMFABSIX::R_POIRIERSun Mar 24 1996 01:1226
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 3/24/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: B shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 35 psi

  6.1.3  Check the Drip Pan for contamination           Completed:___x____

  6.1.4  Check all tubing/fittings for leaks		Completed:___x____

  6.1.5  Check all wafer transport belts		Completed:___x____

  6.1.6  Clean the Send module and Scrub modules  	Completed:___x____

  6.1.7  Check scrub brushes for contamination		Completed:___x____

  6.1.8  Check scrub brush height in both modules	Completed:___x____


  Comments:    Brush heights  Outside Rear 355 Outside front 375
	                       Inside rear 335  Inside front 360

                                                                       
48.25WW40 Weekly PMFABSIX::R_POIRIERTue Apr 02 1996 05:2927
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 04/02/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: B shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 35 psi

  6.1.3  Check the Drip Pan for contamination           Completed:___x____

  6.1.4  Check all tubing/fittings for leaks		Completed:___x____

  6.1.5  Check all wafer transport belts		Completed:___x____

  6.1.6  Clean the Send module and Scrub modules  	Completed:___x____

  6.1.7  Check scrub brushes for contamination		Completed:___x____

  6.1.8  Check scrub brush height in both modules	Completed:___x____


  Comments:    Brush heights  Outside Rear 355 Outside front 375
	                       Inside rear 335  Inside front 360

                                                                       
48.26WW41 Weekly PMFABSIX::R_POIRIERMon Apr 08 1996 04:1227
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 04/08/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: B shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 35 psi

  6.1.3  Check the Drip Pan for contamination           Completed:___x____

  6.1.4  Check all tubing/fittings for leaks		Completed:___x____

  6.1.5  Check all wafer transport belts		Completed:___x____

  6.1.6  Clean the Send module and Scrub modules  	Completed:___x____

  6.1.7  Check scrub brushes for contamination		Completed:___x____

  6.1.8  Check scrub brush height in both modules	Completed:___x____


  Comments:    Brush heights  Outside Rear 355 Outside front 375
	                       Inside rear 335  Inside front 360

                                                                       
48.27ww42 weekly pmFABSIX::L_SHKOLNIKOVTue Apr 16 1996 22:5927
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 04/16/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: D shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 38 psi

  6.1.3  Check the Drip Pan for contamination           Completed:___x____

  6.1.4  Check all tubing/fittings for leaks		Completed:___x____

  6.1.5  Check all wafer transport belts		Completed:___x____

  6.1.6  Clean the Send module and Scrub modules  	Completed:___x____

  6.1.7  Check scrub brushes for contamination		Completed:___x____

  6.1.8  Check scrub brush height in both modules	Completed:___x____


  Comments:    Brush heights  Outside Rear 355 Outside front 375
	                       Inside rear 335  Inside front 360

                                                                       
48.28ww43 weekly pmFABSIX::L_SHKOLNIKOVWed Apr 24 1996 23:3527
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 04/24/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: D shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 37 psi

  6.1.3  Check the Drip Pan for contamination           Completed:___x____

  6.1.4  Check all tubing/fittings for leaks		Completed:___x____

  6.1.5  Check all wafer transport belts		Completed:___x____

  6.1.6  Clean the Send module and Scrub modules  	Completed:___x____

  6.1.7  Check scrub brushes for contamination		Completed:___x____

  6.1.8  Check scrub brush height in both modules	Completed:___x____


  Comments:    Brush heights  Outside Rear 355 Outside front 375
	                       Inside rear 335  Inside front 360

                                                                       
48.29WEEKLY PM COMPLETED FOR WW44SUBPAC::BJUBINVILLECMP Equipment EngineeringTue Apr 30 1996 23:5935
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 04/30/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: D shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 40 psi

  6.1.3  Check the Drip Pan for contamination           Completed:___x____

  6.1.4  Check all tubing/fittings for leaks		Completed:___x____

  6.1.5  Check all wafer transport belts		Completed:___x____

  6.1.6  Clean the Send module and Scrub modules  	Completed:___x____

  6.1.7  Check scrub brushes for contamination		Completed:___x____

  6.1.8  Check scrub brush height in both modules	Completed:___x____


  Comments:    Brush heights  Outside Rear 355 Outside front 375
	                       Inside rear 335  Inside front 360

                   Found DI water on top of the gear pulley above 
               the motor for the rollers in the inside brush station.
               The o-ring on the shaft was replaced to start.  If
               in still leaks, the shaft will have to be pulled out.
 
                   Found lower rear roller arm in the inside brush
               cracked while removing it to get to the o-ring, replaced
               arm.

               
48.30WW 45 - WeeklySUBPAC::LANDRYMon May 06 1996 12:2827
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 05/6/96      SYSTEM RTC CODE: CMP-SCRUB.A2       TECH. NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 60 psi 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40 psi

  6.1.3  Check the Drip Pan for contamination           Completed:___x____

  6.1.4  Check all tubing/fittings for leaks		Completed:___x____

  6.1.5  Check all wafer transport belts		Completed:___x____

  6.1.6  Clean the Send module and Scrub modules  	Completed:___x____

  6.1.7  Check scrub brushes for contamination		Completed:___x____

  6.1.8  Check scrub brush height in both modules	Completed:___x____


  Comments:    Brush heights  Outside rear 355    Outside front 375
	                       Inside rear 335     Inside front 360

  	       Adjusted the CDA to it's desired 50 PSI level
                                                        
48.31WW 46 - WeeklyFABSIX::L_SHKOLNIKOVFri May 17 1996 00:2526
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:  5/16/96   SYSTEM RTC CODE:  CMP-SCRUB.A2  TECH. NAME:  D shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___50___

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___38___

  6.1.3  Check the Drip Pan for contamination           Completed:____X____

  6.1.4  Check all tubing/fittings for leaks		Completed:____X____ 

  6.1.5  Check all wafer transport belts		Completed:____X____

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X____

  6.1.7  Check scrub brushes for contamination		Completed:____X____

  6.1.8  Check scrub brush height in both modules	Completed:____X____

  Comments:  BRUSH HEIGHTS: IB_F = 360    OB_F = 375
                            IB_R = 335    OB_R = 355
      				

                                                    
48.32WW 47 - WeeklySUBPAC::LANDRYTue May 21 1996 14:5626
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:  5/21/96   SYSTEM RTC CODE:  CMP-SCRUB.A2  TECH. NAME:  A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___50___

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  38/37

  6.1.3  Check the Drip Pan for contamination           Completed:____X____

  6.1.4  Check all tubing/fittings for leaks		Completed:____X____ 

  6.1.5  Check all wafer transport belts		Completed:____X____

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X____

  6.1.7  Check scrub brushes for contamination		Completed:____X____

  6.1.8  Check scrub brush height in both modules	Completed:____X____

  Comments:  BRUSH HEIGHTS: IB_F = 360    OB_F = 375
                            IB_R = 335    OB_R = 355
      				

                                                    
48.33SHUTDOWN CHECKSHEETSTRATA::RIDLONEliminate the obviousMon May 27 1996 07:3922
                CMP-SCRUB.A1 & CMP-SRUB.A2 SHUTDOWN CHECKSHEET
                ----------------------------------------------

                                                        Tech.       Date
                                                       -------     -------

  1.  Change RTC status to SCHEDULED DOWN.             ___B___     __5/27_

  2.  Remove all PVA scrub brushes and discard.         __B____     _______

  3.  Perform a complete wipe down and dry of
      all wet surfaces.                                ___B___     _______

  4.  Close main incoming DI Water valve to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                  ___B___     _______

  5.  Power down each system.                          ___B___     _______

  6.  Enter checksheet into notesfile.
48.34Weekly PM ** note new brushes/heightsSUBPAC::LANDRYTue May 28 1996 19:4025
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 5/28/96    SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: A & B shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40/41

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  New Brushes installed at this PM.  

      	     Brush Heights:    OB-front = 620          OB-rear = 615
                               IB-front = 570          IB-rear = 535
48.35Startup ChecksheetSUBPAC::LANDRYTue May 28 1996 19:5620
                       CMP-SCRUB.A2 STARTUP CHECKSHEET
                ----------------------------------------------

                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are
      available and ready to use.                      A shift     5/28/96

  2.  Power up each system.                            A shift     5/28/96

  3.  Open incoming DI Water Valve to each
      system.                                          A shift     5/28/96  

  4.  Close UDR valve at each system.                  A shift     5/28/96

  5.  Re-install new PVA scrub brushes.                A shift     5/28/96

  6.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for MQC.                                         A shift     5/28/96
48.36WW 49 - WeeklySUBPAC::LANDRYTue Jun 04 1996 14:2523
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 6/4/96    SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 42/43

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  Brush Heights:    OB-front = 620          OB-rear = 615
                               IB-front = 570          IB-rear = 535
48.2Quarterly PM Checksheet TemplateSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringTue Jun 11 1996 23:5736
       OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Quarterly Preventative Maintenance Check Sheet, Rev D

 DATE:__________   SYSTEM RTC CODE:__________  TECH. NAME:__________________

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__________

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__________

  6.1.3  Check the Drip Pan for contamination           Completed:___________

  6.1.4  Check all tubing/fittings for leaks		Completed:___________

  6.1.5  Check all wafer transport belts		Completed:___________

  6.1.6  Clean the Send module and Scrub modules  	Completed:___________

  6.1.7  Check scrub brushes for contamination		Completed:___________

  6.1.8  Check scrub brush height in both modules	Completed:___________

  6.3.1  Check muffin fans for functionality		Completed:___________

  6.3.2  Check motor drive belts for defects		Completed:___________

  6.3.3  Check the robot knife for loose hardware	Completed:___________

  6.3.4  Check the spin station grippers		Completed:___________

  6.3.5  Check the motor speed output readings		Completed:___________

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
48.3Semi-Annual PM Checksheet TemplateSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringTue Jun 11 1996 23:5866
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
         Semi-Annual Preventative Maintenance Check Sheet, Rev D

 DATE:__________   SYSTEM RTC CODE:__________  TECH. NAME:__________________

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__________

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__________

  6.1.3  Check the Drip Pan for contamination           Completed:___________

  6.1.4  Check all tubing/fittings for leaks		Completed:___________

  6.1.5  Check all wafer transport belts		Completed:___________

  6.1.6  Clean the Send module and Scrub modules  	Completed:___________

  6.1.7  Check scrub brushes for contamination		Completed:___________

  6.1.8  Check scrub brush height in both modules	Completed:___________

  6.3.1  Check muffin fans for functionality		Completed:___________

  6.3.2  Check motor drive belts for defects		Completed:___________

  6.3.3  Check the robot knife for loose hardware	Completed:___________

  6.3.4  Check the spin station grippers		Completed:___________

  6.3.5  Check the motor speed output readings		Completed:___________

  6.4.1  Check all EMO's for functionality		Completed:___________

  6.4.2  Check all interlocks for functionality  	Completed:___________

  6.4.3  Check heat lamp housing/wiring for defects	Completed:___________

  6.4.4  Check the robot hardware/wiring for defects	Completed:___________

  6.4.5  Check the spindle bearings/bushings		Completed:___________

  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed:___________

  6.4.7  Check the brush sta. drive bearings/bushings	Completed:___________

  6.4.8  Check the +5 VDC power supply			Pre-Adjust:__________

							Post-Adjust:_________

  6.4.9  Check the -12 VDC power supply			Pre-Adjust:__________

  6.4.10 Check the +12 VDC power supply			Pre-Adjust:__________

  6.4.11 Check the +24 VDC power supply			Pre-Adjust:__________

							Post-Adjust:_________

  6.4.12 Check the +48 VDC power supply			Pre-Adjust:__________

							Post-Adjust:_________

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
48.37Quarterly PM for WW50 completedSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Jun 12 1996 00:1034
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Quarterly Preventative Maintenance Check Sheet, Rev D

 DATE: 6/11/96  SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: BJ

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  6.3.1  Check muffin fans for functionality		Completed:____X______

  6.3.2  Check motor drive belts for defects		Completed:____X______

  6.3.3  Check the robot knife for loose hardware	Completed:____X______

  6.3.4  Check the spin station grippers		Completed:____X______

  6.3.5  Check the motor speed output readings		Completed:____X______

  Comments:   Brush heights:  Outside: Front-570, Rear-535  
                              Inside:  Front-620, Rear-615
                          
48.38Weekly p.m. completedFABSIX::R_GEEWed Jun 19 1996 04:5328
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 6/18/96    SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: B shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
     
  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  Brush Heights:    OB-front = 570          OB-rear = 535
                               IB-front = 620          IB-rear = 615

             Adjusted the IB station rollers down to keep the back of 
	     the wafers from hitting the belts.

	     Replaced the four bearings in the IB station top brush core.        
48.39Weekly PM doneSUBPAC::LANDRYSun Jun 23 1996 17:1823
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 6/23/96    SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 39/40

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
     
  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  Brush Heights:    OB-front = 570          OB-rear = 535
                               IB-front = 620          IB-rear = 615
48.40weekly p.m. completedFABSIX::R_GEETue Jul 02 1996 02:3123
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 7/03/96    SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: B shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 38/39

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
     
  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  Brush Heights:    OB-front = 570          OB-rear = 535
                               IB-front = 620          IB-rear = 615
48.41SCRUB.A2 SHUT-DOWN COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Jul 04 1996 03:3124

                CMP-SCRUB.A2 SHUTDOWN CHECKSHEET
                --------------------------------

                                                        Tech        Date
                                                       -------     -------

  1.  Change RTC status to SCHEDULED DOWN.               BJ         7/3/96

  2.  Close main incoming DI Water valve(s) to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                    BJ         7/3/96

  3.  Remove all PVA scrub brushes and submerge          BJ         7/3/96
      in DI water.

  4.  Perform a complete wipe down and dry of
      all wet surfaces.                                  BJ         7/3/96

  5.  Power down each system.                            BJ         7/3/96

  6.  Enter checksheet into notesfile.                   BJ         7/3/96
48.42STARTUP after SHUTDOWN.FABSIX::L_SHKOLNIKOVFri Jul 05 1996 23:5024
                            
                CMP-SCRUB.A2 STARTUP CHECKSHEET
                --------------------------------                

 DATE 7/5/96                                    TECH. NAME: Leon

  1.  Ensure that all necessary facilities are
      available and ready to use.                      ___X___

  2.  Power up system.                                 ___X___

  3.  Re-install PVA scrub brushes.                    ___X____

  4.  Open incoming DI Water Valve(s) 
      system.                                          ___X___

  5.  Close UDR valve at system.                       ___X___


  6.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for MQC.                                         ___X___

                                      
48.43WW 2 / FY97 - WeeklySUBPAC::LANDRYSun Jul 07 1996 14:1126
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 7/7/96   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: A shift / Jim S

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  52

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 30/30

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
     
  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  Brush Heights:    OB-front = 570          OB-rear = 535
                               IB-front = 620          IB-rear = 615

      	     Found brush "splash guards" in bottom of both the IB and OB
             stations.  Re-installed.
48.44ww03 weekly pmFABSIX::R_POIRIERWed Jul 17 1996 05:2225
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 7/17/96   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: B Shift 

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37/37

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
     
  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  Brush Heights:    OB-front = 570          OB-rear = 535
                               IB-front = 620          IB-rear = 615

48.45ww04 weekly pmFABSIX::L_SHKOLNIKOVFri Jul 26 1996 01:4225
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 7/26/96   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: D Shift 

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40    

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
     
  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  Brush Heights:        OB      IB
                            front  570     620
                            rear   535     615
48.46WW V - Weekly SUBPAC::LANDRYMon Jul 29 1996 14:2224
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 7/29/96   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: A Shift 

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  53

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 38 / 39    

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
     
  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  Brush Heights:        OB      IB
                            front  570     620
                            rear   535     615
48.47WW06 Weekly PMFABSIX::R_POIRIERMon Aug 05 1996 04:4025
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:08/05/96    SYSTEM RTC CODE:CMP_SCRUB.B2  TECH. NAME:  D shift          

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_50_ 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_38/38_

  6.1.3  Check the Drip Pan for contamination           Completed:__X__

  6.1.4  Check all tubing/fittings for leaks		Completed:__X__

  6.1.5  Check all wafer transport belts		Completed:__X__

  6.1.6  Clean the Send module and Scrub modules  	Completed:__X__

  6.1.7  Check scrub brushes for contamination		Completed:__X__

  6.1.8  Check scrub brush height in both modules	Completed:__X__

  Comments: BRUSH HEIGHTS    OB   IB
                          R  535  615
                          F  570  620
48.48Weekly PM for WW7 completedSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Aug 14 1996 22:1225
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 08/14/96   SYSTEM RTC CODE: CMP_SCRUB.A2  TECH. NAME:  Leon        

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_50_ 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_38

  6.1.3  Check the Drip Pan for contamination           Completed:__X__

  6.1.4  Check all tubing/fittings for leaks		Completed:__X__

  6.1.5  Check all wafer transport belts		Completed:__X__

  6.1.6  Clean the Send module and Scrub modules  	Completed:__X__

  6.1.7  Check scrub brushes for contamination		Completed:__X__

  6.1.8  Check scrub brush height in both modules	Completed:__X__

  Comments: BRUSH HEIGHTS    OB   IB
                          R  535  615
                          F  570  620
                              
48.49WW08 Weekly PMFABSIX::R_POIRIERTue Aug 20 1996 00:1926
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 08/19/96   SYSTEM RTC CODE: CMP_SCRUB.A2  TECH. NAME: B Shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_50_ 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_38/38

  6.1.3  Check the Drip Pan for contamination           Completed:__X__

  6.1.4  Check all tubing/fittings for leaks		Completed:__X__

  6.1.5  Check all wafer transport belts		Completed:__X__

  6.1.6  Clean the Send module and Scrub modules  	Completed:__X__

  6.1.7  Check scrub brushes for contamination		Completed:__X__

  6.1.8  Check scrub brush height in both modules	Completed:__X__

  Comments: BRUSH HEIGHTS    OB   IB
                          R  535  615
                          F  570  620
                              
48.50WW IX - Weekly versionSUBPAC::LANDRYSun Aug 25 1996 13:4826
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 8/25/96      SYSTEM RTC CODE: CMP-SCRUB.A2    TECH. NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  52

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 39 / 38

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  Found a puddle on frame underneath IB station.

                                 OB      IB
      	   Brush Heights: Front  570     620
                          Rear   535     615
48.51CMP-SCRUB.A2 SHUTDOWN CHECKSHEETFABSIX::R_POIRIERMon Sep 02 1996 02:5620
                CMP-SCRUB.A1/.A1/.A3/.C1-7 SHUTDOWN CHECKSHEET
                ----------------------------------------------

                                                        Tech.       Date
                                                       -------     -------
  1.  Close main incoming DI Water valve to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                  ___B___     _9/1/96_

  2.  Remove all PVA scrub brushes and submerge
      in DI water. Label each brush with the
      tool name.                                       ___B___     _9/1/96_
  3.  Perform a complete wipe down and dry of
      all wet surfaces.                                ___B___     _9/1/96_

  4.  Power down each system.                          ___B___     _9/1/96_

  5.  Enter checksheet into notesfile.                 ___B___     _9/1/96_
48.52FABSIX::B_FINNTue Sep 03 1996 20:1824
                CMP-SCRUB.A2 STARTUP CHECKSHEET
                --------------------------------                

 DATE 9/3/96                                    TECH. NAME: A shift

  1.  Ensure that all necessary facilities are
      available and ready to use.                      ___X___

  2.  Power up system.                                 ___X___

  3.  Re-install PVA scrub brushes.                    ___X____

  4.  Open incoming DI Water Valve(s) 
      system.                                          ___X___

  5.  Close UDR valve at system.                       ___X___


  6.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for MQC.                                         ___X___

                                      
48.53WEEKLY PM COMPLETEDFABSIX::B_FINNTue Sep 03 1996 20:3126
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 9/3/96      SYSTEM RTC CODE: CMP-SCRUB.A2    TECH. NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  52

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 39
    
  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  Found a puddle on frame underneath IB station.

                                 OB      IB
      	   Brush Heights: Front  570     620
                          Rear   535     615
48.54Semi ww11LUDWIG::RIDLONEliminate the obviousWed Sep 11 1996 05:2669
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
         Semi-Annual Preventative Maintenance Check Sheet, Rev D

 DATE: 9/11/96   SYSTEM RTC CODE:cmp-scrub.a2   TECH. NAME: B-shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____50____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:____40____

  6.1.3  Check the Drip Pan for contamination           Completed:_____X_____

  6.1.4  Check all tubing/fittings for leaks		Completed:_____X_____

  6.1.5  Check all wafer transport belts		Completed:_____X_____

  6.1.6  Clean the Send module and Scrub modules  	Completed:_____X_____

  6.1.7  Check scrub brushes for contamination		Completed:_____X_____

  6.1.8  Check scrub brush height in both modules	Completed:_____X_____

     Outside Front 570   Rear 535
      Inside Front 620   Rear 615

  6.3.1  Check muffin fans for functionality		Completed:_____X_____

  6.3.2  Check motor drive belts for defects		Completed:_____X_____

  6.3.3  Check the robot knife for loose hardware	Completed:_____X_____

  6.3.4  Check the spin station grippers		Completed:_____X_____

  6.3.5  Check the motor speed output readings		Completed:_____X_____

  6.4.1  Check all EMO's for functionality		Completed:_____X_____

  6.4.2  Check all interlocks for functionality  	Completed:_____X_____

  6.4.3  Check heat lamp housing/wiring for defects	Completed:_____X_____

  6.4.4  Check the robot hardware/wiring for defects	Completed:_____X_____

  6.4.5  Check the spindle bearings/bushings		Completed:_____X_____

  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed:_____X_____

  6.4.7  Check the brush sta. drive bearings/bushings	Completed:_____X_____

  6.4.8  Check the +5 VDC power supply			Pre-Adjust:___5.00___

							Post-Adjust:_________

  6.4.9  Check the -12 VDC power supply			Pre-Adjust:_-12.96___

  6.4.10 Check the +12 VDC power supply			Pre-Adjust:__12.64___

  6.4.11 Check the +24 VDC power supply			Pre-Adjust:__24.0____

							Post-Adjust:_________

  6.4.12 Check the +48 VDC power supply			Pre-Adjust:___48.0___

							Post-Adjust:_________

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
48.55WW XII - WeeklySUBPAC::LANDRYSun Sep 15 1996 18:5025
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 9/15/96      SYSTEM RTC CODE: CMP-SCRUB.A2    TECH. NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  52

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40 / 40
    
  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  
                                 OB      IB
      	   Brush Heights: Front  570     620
                          Rear   535     615
48.56WW XIII - WeeklySUBPAC::LANDRYWed Sep 25 1996 19:5925
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 9/25/96      SYSTEM RTC CODE: CMP-SCRUB.A2    TECH. NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  52

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40 / 40
    
  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  
                                 OB      IB
      	   Brush Heights: Front  570     620
                          Rear   535     615
48.57ww14 weekly pmFABSIX::L_SHKOLNIKOVFri Oct 04 1996 01:0725
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 10/04/96      SYSTEM RTC CODE: CMP-SCRUB.A2    TECH. NAME: D shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40 / 40
    
  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  
                                 OB     IB
      	   Brush Heights: Rear   535    615
                          Front  570    620
48.58WW XV - Weekly completedSUBPAC::LANDRYWed Oct 09 1996 11:5825
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 10/09/96      SYSTEM RTC CODE: CMP-SCRUB.A2    TECH. NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40
    
  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  
                                 OB     IB
      	   Brush Heights: Rear   535    615
                          Front  570    620
48.59WW16 weekly p.m. completedFABSIX::R_GEEMon Oct 14 1996 18:2327
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 10/14/96      SYSTEM RTC CODE: CMP-SCRUB.A2    TECH. NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  42
    
  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  
                                 OB     IB
      	   Brush Heights: Rear   535    615
                          Front  570    620


48.60WW XVII - Weekly completedSUBPAC::LANDRYSun Oct 20 1996 18:1827
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 10/20/96    SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: Gee / Landry

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  41
    
  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  
                                 OB     IB
      	   Brush Heights: Rear   535    615
                          Front  570    620


48.61WW XVIII - Weekly completedSUBPAC::LANDRYSun Oct 27 1996 09:4627
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 10/27/96    SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME:   Landry

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  52

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 41/41
    
  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  
                                 OB     IB
      	   Brush Heights: Rear   535    615
                          Front  570    620


48.62WW 19 - Weekly completedSUBPAC::LANDRYTue Nov 05 1996 13:0927
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 11/5/96    SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: Gee / Landry

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40/39
    
  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  
                                 OB     IB
      	   Brush Heights: Rear   535    615
                          Front  570    620


48.63WEEKLY PM FOR WW20 COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringTue Nov 12 1996 21:2131
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 11/12/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: Jubinville BJ
          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40/40 BJ

  6.1.3  Check the Drip Pan for contamination           Completed:   BJ

  6.1.4  Check all tubing/fittings for leaks		Completed:   BJ

  6.1.5  Check all wafer transport belts		Completed:   BJ

  6.1.6  Clean the Send module and Scrub modules  	Completed:   BJ

  6.1.7  Check scrub brushes for contamination		Completed:   BJ

  6.1.8  Check scrub brush height in both modules	Completed:   BJ

  Comments:	    
                                  OB      IB
      	   Brush Heights: Front   570     620
                          Rear    535     615

     BRUSHES CHANGED ON 10/21 HENCE THE DIFFERENCE IN BRUSH
     HEIGHTS FROM LAST WEEKS WEEKLY PM. 
           ----------------------------------

48.64WW 21 weekly p.m. completedFABSIX::R_GEEMon Nov 18 1996 18:5125
 DATE: 11/18/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: BG
          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40/40

  6.1.3  Check the Drip Pan for contamination           Completed:   BG

  6.1.4  Check all tubing/fittings for leaks		Completed:   BG

  6.1.5  Check all wafer transport belts		Completed:   BG

  6.1.6  Clean the Send module and Scrub modules  	Completed:   BG

  6.1.7  Check scrub brushes for contamination		Completed:   BG

  6.1.8  Check scrub brush height in both modules	Completed:   BG

  Comments:	    
                                  OB      IB
      	   Brush Heights: Front   570     620
                          Rear    535     615

	* Replaced the 4 bearings in the OB station top brush core.
48.65ww22 weekly pm completedFABSIX::B_FINNSun Nov 24 1996 13:4327
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 11/24/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: Landry,Finn
          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40/40

  6.1.3  Check the Drip Pan for contamination           Completed:   BF/TL

  6.1.4  Check all tubing/fittings for leaks		Completed:   BF/TL

  6.1.5  Check all wafer transport belts		Completed:   BF/TL

  6.1.6  Clean the Send module and Scrub modules  	Completed:   BF/TL

  6.1.7  Check scrub brushes for contamination		Completed:   BF/TL

  6.1.8  Check scrub brush height in both modules	Completed:   BF/TL

  Comments:	    
                                  OB      IB
      	   Brush Heights: Front   570     620
                          Rear    535     615

48.66WW 23 - Weekly completedSUBPAC::LANDRYSun Dec 01 1996 18:3427
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 12/1/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: Landry/Gee/Finn
          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40/40

  6.1.3  Check the Drip Pan for contamination           Completed:     X

  6.1.4  Check all tubing/fittings for leaks		Completed:     X

  6.1.5  Check all wafer transport belts		Completed:     X

  6.1.6  Clean the Send module and Scrub modules  	Completed:     X

  6.1.7  Check scrub brushes for contamination		Completed:     X

  6.1.8  Check scrub brush height in both modules	Completed:     X

  Comments:	    
                                  OB      IB
      	   Brush Heights: Front   570     620
                          Rear    535     615

48.67QUARTERLY PM FOR WW24 COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringTue Dec 10 1996 22:4547
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D

 DATE: 12/10/96   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: JUBINVILLE


  6.1    Perform Weekly PM                              Completed: JUBINVILLE

  6.3.1  Check muffin fans for functionality		Completed: JUBINVILLE

  6.3.2  Check motor drive belts for defects		Completed: JUBINVILLE

  6.3.3  Check the robot knife for loose hardware	Completed: JUBINVILLE

  6.3.4  Check the spin station grippers		Completed: JUBINVILLE

  6.3.5  Check the motor speed output readings		Completed: JUBINVILLE

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________

        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 12/10/96   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: JUBINVILLE

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 PSI

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40/40

  6.1.3  Check the Drip Pan for contamination           Completed: JUBINVILLE

  6.1.4  Check all tubing/fittings for leaks		Completed: JUBINVILLE

  6.1.5  Check all wafer transport belts		Completed: JUBINVILLE

  6.1.6  Clean the Send module and Scrub modules  	Completed: JUBINVILLE

  6.1.7  Check scrub brushes for contamination		Completed: JUBINVILLE

  6.1.8  Check scrub brush height in both modules	Completed: JUBINVILLE

  Comments:          Inside Brush  F-620 R-615
                    Outside Brush  F-570 R-535
48.68WW XXV - Weekly completedSUBPAC::LANDRYSun Dec 15 1996 14:4328
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 12/15/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: Landry/Gee/Finn
          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  39/39

  6.1.3  Check the Drip Pan for contamination           Completed:     X

  6.1.4  Check all tubing/fittings for leaks		Completed:     X

  6.1.5  Check all wafer transport belts		Completed:     X

  6.1.6  Clean the Send module and Scrub modules  	Completed:     X

  6.1.7  Check scrub brushes for contamination		Completed:     X

  6.1.8  Check scrub brush height in both modules	Completed:     X

  Comments:	    
                                  OB      IB
                                 ----    ----
      	   Brush Heights: Front   570     620
                          Rear    535     615

48.69WW26 Weekly PMFABSIX::R_POIRIERMon Dec 23 1996 00:5929
--------------------------------------------------------------------------------

         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 12/23/96   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: R Poirier
          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50 RP

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40/40 RP

  6.1.3  Check the Drip Pan for contamination           Completed:     RP

  6.1.4  Check all tubing/fittings for leaks		Completed:     RP

  6.1.5  Check all wafer transport belts		Completed:     RP

  6.1.6  Clean the Send module and Scrub modules  	Completed:     RP

  6.1.7  Check scrub brushes for contamination		Completed:     RP

  6.1.8  Check scrub brush height in both modules	Completed:     RP

  Comments:	    
                                  OB      IB
                                 ----    ----
      	   Brush Heights: Front   570     620 
                          Rear    535     615

48.70cmp-scrub.a2 shutdown checkseet completedFABSIX::R_GEETue Dec 31 1996 16:0023
                CMP-SCRUB.A1/.A2/.A3/.C1-7 SHUTDOWN CHECKSHEET  Tech: Tim Landry
                ----------------------------------------------        Bob Gee

                                                        Tech.       Date
                                                       -------     -------

  1.  Close main incoming DI Water valve(s) to each    Bob Gee     12/31/96
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                 

  2.  Remove all PVA scrub brushes and submerge        Tim Landry  12/31/96
      in a mixture of DI water and H2O2.  Label 
      each brush with the tool name and brush box
      location.

  3.  Perform a complete wipe down and dry of
      all wet surfaces.                                Bob Gee     12/31/96

  4.  Power down each system.                          Bob Gee     12/31/96

  5.  Enter checksheet into notesfile.                 Tim Landry  12/31/96
48.71WEEKLY PM COMPLETED FOR WW27SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Jan 02 1997 07:3929
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/2/97   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH. NAME: Olin Whitford (OW)
                                                         Brian Jubinville (BJ)

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/OW

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40/40/BJ

  6.1.3  Check the Drip Pan for contamination           Completed:     BJ

  6.1.4  Check all tubing/fittings for leaks		Completed:     BJ

  6.1.5  Check all wafer transport belts		Completed:     BJ

  6.1.6  Clean the Send module and Scrub modules  	Completed:     BJ

  6.1.7  Check scrub brushes for contamination		Completed:     BJ

  6.1.8  Check scrub brush height in both modules	Completed:     OW

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front  570     620    
                          Rear   535     615

  Comments:  
48.72WEEKLY PM COMPLETED FOR WW28SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Jan 08 1997 06:0729
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/8/97   SYSTEM RTC CODE: CMP-SCRUB.A2   TECH: Brian Jubinville (BJ) 
                                                        

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/BJ

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40/40/BJ

  6.1.3  Check the Drip Pan for contamination           Completed:     BJ

  6.1.4  Check all tubing/fittings for leaks		Completed:     BJ

  6.1.5  Check all wafer transport belts		Completed:     BJ

  6.1.6  Clean the Send module and Scrub modules  	Completed:     BJ

  6.1.7  Check scrub brushes for contamination		Completed:     BJ

  6.1.8  Check scrub brush height in both modules	Completed:     BJ

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front  570     620    
                          Rear   535     615

  Comments:                                           
48.73Weekly PM complete for WW29FABSIX::O_WHITFORDQuticherwhinin&#039;Wed Jan 15 1997 21:2032
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/15/1997   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: DAVE WHITFORD (DW)

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50   DW

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37*  DW

  6.1.3  Check the Drip Pan for contamination           Completed:  DW

  6.1.4  Check all tubing/fittings for leaks		Completed:  DW

  6.1.5  Check all wafer transport belts		Completed:  DW

  6.1.6  Clean the Send module and Scrub modules  	Completed:  DW

  6.1.7  Check scrub brushes for contamination		Completed:  DW

  6.1.8  Check scrub brush height in both modules	Completed:  DW

  Comments: BRUSH HEIGHTS

                  OUTER STATION
                                INSIDE  = .570
                                OUTSIDE = .535
           
                  INNER STATION
                                INSIDE  = .620
                                OUTSIDE = .615

NOTE: EE WAS NOTIFIED OF DI WATER PRESSURE DISCREPANCY
48.74WW30 Weeklu PM completedFABSIX::R_POIRIERSun Jan 19 1997 22:3534
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/19/97   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: ROGER POIRIER (RP)

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50   RP

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37 * RP 

  6.1.3  Check the Drip Pan for contamination           Completed:  RP

  6.1.4  Check all tubing/fittings for leaks		Completed:  RP

  6.1.5  Check all wafer transport belts		Completed:  RP

  6.1.6  Clean the Send module and Scrub modules  	Completed:  RP

  6.1.7  Check scrub brushes for contamination		Completed:  RP

  6.1.8  Check scrub brush height in both modules	Completed:  RP

  Comments: BRUSH HEIGHTS

                  OUTER STATION
                                FRONT  = .570
                                BACK   = .535
           
                  INNER STATION
                                FRONT   = .620
                                BACK    = .615

NOTE: 6.1.2 DI WATER PRESSURE @37
	EE INFORMED ABOUT D.I. WATER PRESSURE
48.75WEEKLY PM COMPLETED FOR WW31SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Jan 29 1997 21:4930
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/29/97   SYSTEM RTC CODE: CMP-SCRUB.A2 TECH: Brian Jubinville (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/BJ

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 38/BJ

  6.1.3  Check the Drip Pan for contamination           Completed:     BJ

  6.1.4  Check all tubing/fittings for leaks		Completed:     BJ

  6.1.5  Check all wafer transport belts		Completed:     BJ

  6.1.6  Clean the Send module and Scrub modules  	Completed:     BJ

  6.1.7  Check scrub brushes for contamination		Completed:     BJ

  6.1.8  Check scrub brush height in both modules	Completed:     BJ

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 570      620
                          Rear  535      615

  Comments:  6.1.2 - Engineer notified
                                                                         
48.76WW32 WEEKLY PM COMPLETEDFABSIX::J_SADINFreedom isn&#039;t free.Sun Feb 02 1997 17:5729
    
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 2/2/97   SYSTEM RTC CODE: CMP-SCRUB.A2 TECH: Jim Sadin
    						    Doc Landry
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/JS

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:   40/JS

  6.1.3  Check the Drip Pan for contamination           Completed:     TL

  6.1.4  Check all tubing/fittings for leaks		Completed:     TL

  6.1.5  Check all wafer transport belts		Completed:     JS

  6.1.6  Clean the Send module and Scrub modules  	Completed:    JS/TL

  6.1.7  Check scrub brushes for contamination		Completed:    JS/TL

  6.1.8  Check scrub brush height in both modules	Completed:     JS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 570      620
                          Rear  535      615

48.77WEEEEEEKLY WW33333333FABSIX::M_RIDLONEliminate the obliviousMon Feb 10 1997 02:5929
    
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 2/10/97   SYSTEM RTC CODE: CMP-SCRUB.A2 TECH: AL QUILLEN
    	       					    MITCH RIDLON
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   52/AQ

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:   39/AQ

  6.1.3  Check the Drip Pan for contamination           Completed:    AQ/MR
  
  6.1.4  Check all tubing/fittings for leaks		Completed:    AQ/MR

  6.1.5  Check all wafer transport belts		Completed:    AQ/MR

  6.1.6  Clean the Send module and Scrub modules  	Completed:    AQ/MR

  6.1.7  Check scrub brushes for contamination		Completed:    AQ/MR

  6.1.8  Check scrub brush height in both modules	Completed:     AQ

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 570      620
                          Rear  535      615

48.78WW 34 - Weekly completedSUBPAC::LANDRYTue Feb 18 1997 13:5229
    
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 2/18/97   SYSTEM RTC CODE: CMP-SCRUB.A2 EQUIP TECH: Bob Gee      (BG)
    	       					           Tim Landry   (TL)
                                                           Brendan Finn (BF)
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50  BG

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:   39/40 BG

  6.1.3  Check the Drip Pan for contamination           Completed:    TL
  
  6.1.4  Check all tubing/fittings for leaks		Completed:    BG

  6.1.5  Check all wafer transport belts		Completed:    BG

  6.1.6  Clean the Send module and Scrub modules  	Completed:    TL

  6.1.7  Check scrub brushes for contamination		Completed:    TL

  6.1.8  Check scrub brush height in both modules	Completed:    BF

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 570      620
                          Rear  535      615

48.79WW 35 - Weekly PM CompletedFABSIX::A_QUILLENNobody will get away with anythingMon Feb 24 1997 02:5729
    
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 2/24/97   SYSTEM RTC CODE: CMP-SCRUB.A2 EQUIP TECH: Al Quillen   
    	       					           Mitch Ridlon 
                                                           
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 51 AQ 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37 MR

  6.1.3  Check the Drip Pan for contamination           Completed:  MR
  
  6.1.4  Check all tubing/fittings for leaks		Completed:  AQ

  6.1.5  Check all wafer transport belts		Completed:  MR

  6.1.6  Clean the Send module and Scrub modules  	Completed:  AQ

  6.1.7  Check scrub brushes for contamination		Completed:  AQ

  6.1.8  Check scrub brush height in both modules	Completed:  MR

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 570      620
                          Rear  535      615

48.79ww35 weeklyFABSIX::M_RIDLONEliminate the obliviousWed Feb 26 1997 07:3729
    
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 2/24/97   SYSTEM RTC CODE: CMP-SCRUB.A2 EQUIP TECH: Al Quillen   
    	       					           Mitch Ridlon 
                                                           
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 51 AQ 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37 MR

  6.1.3  Check the Drip Pan for contamination           Completed:  MR
  
  6.1.4  Check all tubing/fittings for leaks		Completed:  AQ

  6.1.5  Check all wafer transport belts		Completed:  MR

  6.1.6  Clean the Send module and Scrub modules  	Completed:  AQ

  6.1.7  Check scrub brushes for contamination		Completed:  AQ

  6.1.8  Check scrub brush height in both modules	Completed:  MR

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 570      620
                          Rear  535      615

48.80WW36 weeklyFABSIX::J_SADINFreedom isn&#039;t free.Sun Mar 02 1997 16:5331
    
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 03/02/97   SYSTEM RTC CODE: CMP-SCRUB.A2 EQUIP TECH: James Sadin   
    	       					            Brendan Finn
                                                            Tim Landry
                                                            Bob Gee 
                                                           
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 JS 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37 JS

  6.1.3  Check the Drip Pan for contamination           Completed:  TL/BG
  
  6.1.4  Check all tubing/fittings for leaks		Completed:  TL/BG

  6.1.5  Check all wafer transport belts		Completed:  BF

  6.1.6  Clean the Send module and Scrub modules  	Completed:  BF

  6.1.7  Check scrub brushes for contamination		Completed:  BF

  6.1.8  Check scrub brush height in both modules	Completed:  JS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 570      620
                          Rear  535      615

48.81S/A PM COMPLETED.FABSIX::L_SHKOLNIKOVSat Mar 15 1997 04:0695
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170 
            Semi-Annual Preventative Maintenance Check Sheet, Rev D


 DATE: 03.14.97  SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: DW/Dave Whitford 
                                                            BJ Brian Jubinville
                                                            LS Leon Shkolnikov


  6.1    Perform Weekly PM                              Completed: X LS
                                                        
  6.3    Perform Quarterly PM                           Completed: X DW/BJ

  6.4.1  Check all EMO's for functionality		Completed: X BJ

  6.4.2  Check all interlocks for functionality  	Completed: X BJ

  6.4.3  Check heat lamp housing/wiring for defects	Completed: X LS

  6.4.4  Check the robot hardware/wiring for defects	Completed: X BJ

  6.4.5  Check the spindle bearings/bushings		Completed: X LS

  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed: X LS

  6.4.7  Check the brush sta. drive bearings/bushings	Completed: X BJ/LS

  6.4.8  Check the +5 VDC power supply		       Pre-Adjust: 5.1   BJ

						      Post-Adjust: 5.1   BJ

  6.4.9  Check the -12 VDC power supply		       Pre-Adjust: -12.3 BJ

  6.4.10 Check the +12 VDC power supply		       Pre-Adjust: +12.0 BJ

  6.4.11 Check the +24 VDC power supply		       Pre-Adjust: 23.9  BJ

						      Post-Adjust: 23.9  BJ

  6.4.12 Check the +48 VDC power supply		       Pre-Adjust: 47.7  BJ

						      Post-Adjust: 47.7  BJ

  Comments:


           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D


  6.1    Perform Weekly PM                              Completed: LS

  6.3.1  Check muffin fans for functionality		Completed: LS

  6.3.2  Check motor drive belts for defects		Completed: LS

  6.3.3  Check the robot knife for loose hardware	Completed: LS

  6.3.4  Check the spin station grippers		Completed: LS

  6.3.5  Check the motor speed output readings		Completed: DW/BJ

  Comments:__________________________________________________________________



        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D


  6.1.1  Check the CDA pressure for 50 PSI	       Pre-Adjust: 50 LS *

  6.1.2  Check the D.I. Water pressure for 40 PSI      Pre-Adjust: 40 LS

  6.1.3  Check the Drip Pan for contamination           Completed: DW/LS

  6.1.4  Check all tubing/fittings for leaks		Completed: DW/LS

  6.1.5  Check all wafer transport belts		Completed: DW/LS

  6.1.6  Clean the Send module and Scrub modules  	Completed: DW/LS

  6.1.7  Check scrub brushes for contamination		Completed: DW/LS **

  6.1.8  Check scrub brush height in both modules	Completed: LS ***

   
  Comments:*  Adj. the CDA to it's desired 50 PSI.
          **  At this time, new brushes were installed per EE request. 
                                                  OB     IB
                                                 ----   ----
         ***  The new brush heights are: Front   375    360
                                          Rear   355    335
   

48.82WW38 weekly pm completed.FABSIX::J_SADINFreedom isn&#039;t free.Sun Mar 16 1997 13:1729
    
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 03/16/97   SYSTEM RTC CODE: CMP-SCRUB.A2 EQUIP TECH: James Sadin   
    	       					            Tim Landry
                                                            
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 JS 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37 JS

  6.1.3  Check the Drip Pan for contamination           Completed:  TL/JS
  
  6.1.4  Check all tubing/fittings for leaks		Completed:  TL/JS

  6.1.5  Check all wafer transport belts		Completed:  TL

  6.1.6  Clean the Send module and Scrub modules  	Completed:  TL/JS

  6.1.7  Check scrub brushes for contamination		Completed:  TL

  6.1.8  Check scrub brush height in both modules	Completed:  JS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 375      360
                          Rear  355      335

48.83WW39 weekly pm completed.FABSIX::J_SADINFreedom isn&#039;t free.Tue Mar 25 1997 12:5632
                                            
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:03/25/97   SYSTEM RTC CODE: CMP-SCRUB.A1 TECH: Timothy Landry (TL)
                                                     James Sadin    (JS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 JS

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 38 JS

  6.1.3  Check the Drip Pan for contamination           Completed: TL

  6.1.4  Check all tubing/fittings for leaks		Completed: TL

  6.1.5  Check all wafer transport belts		Completed: JS

  6.1.6  Clean the Send module and Scrub modules  	Completed: TL/JS

  6.1.7  Check scrub brushes for contamination		Completed: TL

  6.1.8  Check scrub brush height in both modules	Completed: JS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 375	 360
                          Rear  355      335

  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
48.84WW40 weekly pm completed.FABSIX::J_SADINFreedom isn&#039;t free.Mon Mar 31 1997 10:3232
                                                             
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:03/31/97   SYSTEM RTC CODE: CMP-SCRUB.A2 TECH: Timothy Landry (TL)
                                                     James Sadin    (JS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 JS

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 37 JS

  6.1.3  Check the Drip Pan for contamination           Completed: TL

  6.1.4  Check all tubing/fittings for leaks		Completed: TL

  6.1.5  Check all wafer transport belts		Completed: JS

  6.1.6  Clean the Send module and Scrub modules  	Completed: TL/JS

  6.1.7  Check scrub brushes for contamination		Completed: TL

  6.1.8  Check scrub brush height in both modules	Completed: JS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 375      360
                          Rear  355      335

  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
48.85WW41 weekly pm completedFABSIX::J_SADINFreedom isn&#039;t free.Wed Apr 09 1997 10:5535
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:04/09/97   SYSTEM RTC CODE: CMP-SCRUB.A2 TECH: Timothy Landry (TL)
                                                     James Sadin    (JS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 JS

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 37 JS

  6.1.3  Check the Drip Pan for contamination           Completed: TL

  6.1.4  Check all tubing/fittings for leaks		Completed: TL

  6.1.5  Check all wafer transport belts		Completed: JS

  6.1.6  Clean the Send module and Scrub modules  	Completed: TL/JS

  6.1.7  Check scrub brushes for contamination		Completed: TL

  6.1.8  Check scrub brush height in both modules	Completed: JS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 375      360
                          Rear  355      335

  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        

    	found small puddle of water under machine. could not determine
    source. cleaned up water.
    
48.86WEEKLY PM FOR WW42 COMPLETEDSUBPAC::BJUBINVILLECMP Equipment EngineeringFri Apr 18 1997 07:0734
                                                             
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:04/18/97   SYSTEM RTC CODE: CMP-SCRUB.A2 TECH: Brian Jubinville (BJ)
                                                
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BJ

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40 BJ

  6.1.3  Check the Drip Pan for contamination           Completed: BJ

  6.1.4  Check all tubing/fittings for leaks		Completed: BJ

  6.1.5  Check all wafer transport belts		Completed: BJ

  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ

  6.1.7  Check scrub brushes for contamination		Completed: BJ

  6.1.8  Check scrub brush height in both modules	Completed: BJ

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 375      360
                          Rear  355      335
    
  Comments: Found rather large puddle of water in pan but it looks
            like run-off from loading wafers.
    
            Outside scrub station cover has a crack in it....
                                                                
48.87Weekly PM completedFABSIX::R_POIRIERMon Apr 21 1997 07:4536
                                                             
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:04/20/97   SYSTEM RTC CODE: CMP-SCRUB.A2 TECH: Roger Poirier (RP)
                                                     Bruce Durgin  (BD)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 RP BD

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40 RP BD

  6.1.3  Check the Drip Pan for contamination           Completed: RP BD

  6.1.4  Check all tubing/fittings for leaks		Completed: RP BD

  6.1.5  Check all wafer transport belts		Completed: RP BD

  6.1.6  Clean the Send module and Scrub modules  	Completed: RP BD

  6.1.7  Check scrub brushes for contamination		Completed: RP BD

  6.1.8  Check scrub brush height in both modules	Completed: 

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 375      360
                          Rear  355      335
    
  Comments: Found rather large puddle of water in pan but it looks
            like run-off from between Outside and Inside modules.
    
            Outside scrub station cover has a crack in it....
                                                                
	Informed EE.

48.88WW44 weekly pm completedFABSIX::O_WHITFORDLead, follow or step aside.Sun Apr 27 1997 13:3345
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 4/27/97  SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: Dave Whitford (DW)
                                                           

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40

  6.1.3  Check the Drip Pan for contamination           Completed:  DW*

  6.1.4  Check all tubing/fittings for leaks		Completed:  DW

  6.1.5  Check all wafer transport belts		Completed:  DW

  6.1.6  Clean the Send module and Scrub modules  	Completed:  DW

  6.1.7  Check scrub brushes for contamination		Completed:  DW

  6.1.8  Check scrub brush height in both modules	Completed:  DW



  Comments: *6.1.3 Found a SERIOUS amount of water in the drip pan, coming from
 the front shaft of the outer brush station, and from the vicinity of the rear
 shaft of the inner brush staion. Found the upper shaft seal on the outer brush
 station had been installed upside down. (spring side UP) Replaced shaft. 

                   Noted leak on inner brush station appears to be a breach in
the plexi "collar" for the shaft mount and the base of the tub itself. Will
monitor theis to verify the location of the leak before replacing any more
parts.

                   Brush heights

                         OUTER

                            Front    .375
                            Rear     .355

                        INNER 

                            Front    .360
                            Rear     .335
48.89WW45 WEEKLY PM COMPLETEDFABSIX::J_SADINFreedom isn&#039;t free.Tue May 06 1997 13:1738
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 05/06/97  SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: JAMES SADIN
                                                            TIMOTHY LANDRY
                                                           

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37*

  6.1.3  Check the Drip Pan for contamination           Completed:  JS

  6.1.4  Check all tubing/fittings for leaks		Completed:  TL

  6.1.5  Check all wafer transport belts		Completed:  JS

  6.1.6  Clean the Send module and Scrub modules  	Completed:  TL

  6.1.7  Check scrub brushes for contamination		Completed:  JS

  6.1.8  Check scrub brush height in both modules	Completed:  TL

                   Brush heights

                         OUTER

                            Front    .375
                            Rear     .355

                        INNER 

                            Front    .360
                            Rear     .335

        * 6.1.2 - CANNOT ADJUST HIGHER. EQUIP ENG NOTIFIED.


48.90WW46 weekly pm completedFABSIX::B_DURGINTue May 13 1997 03:5238
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 05/12/97  SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME:bd=Bruce Durgin
                                                           
                                                           

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40

  6.1.3  Check the Drip Pan for contamination           Completed:  bd

  6.1.4  Check all tubing/fittings for leaks		Completed:  bd

  6.1.5  Check all wafer transport belts		Completed:  bd

  6.1.6  Clean the Send module and Scrub modules  	Completed:  bd

  6.1.7  Check scrub brushes for contamination		Completed:  bd

  6.1.8  Check scrub brush height in both modules	Completed:  bd

                   Brush heights

                         OUTER

                            Front    .375
                            Rear     .335

                        INNER 

                            Front    .405
                            Rear     .422

       


48.91Current brush heights as of 5/13/97SUBPAC::BJUBINVILLECMP Equipment EngineeringTue May 13 1997 22:488
    
             The below brush height readings are the current
          ones on the tool and have been verified.  Please make
          note of them in the next weekly PM.
    
                            Front     Rear
                 Inside     .395      .385
                Outside     .375      .332
48.92WW46 Weekly PMFABSIX::R_POIRIERMon May 19 1997 22:1239
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 05/12/97  SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME:bd=Bruce Durgin
                                                           

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40

  6.1.3  Check the Drip Pan for contamination           Completed:  bd

  6.1.4  Check all tubing/fittings for leaks		Completed:  bd

  6.1.5  Check all wafer transport belts		Completed:  bd

  6.1.6  Clean the Send module and Scrub modules  	Completed:  bd

  6.1.7  Check scrub brushes for contamination		Completed:  bd

  6.1.8  Check scrub brush height in both modules	Completed:  bd

                   Brush heights

                         OUTER

                            Front    .375
                            Rear     .335

                        INNER 

                            Front    .405
                            Rear     .422

       


48.93WW47 Weekly PM completedFABSIX::R_POIRIERTue May 20 1997 04:5738
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 05/20/97  SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: Roger Poirier (RP)
                                                           

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 RP

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40 RP

  6.1.3  Check the Drip Pan for contamination           Completed:  RP

  6.1.4  Check all tubing/fittings for leaks		Completed:  RP

  6.1.5  Check all wafer transport belts		Completed:  RP

  6.1.6  Clean the Send module and Scrub modules  	Completed:  RP

  6.1.7  Check scrub brushes for contamination		Completed:  RP

  6.1.8  Check scrub brush height in both modules	Completed:  RP

                   Brush heights

                         OUTER

                            Front    .375
                            Rear     .327

                        INNER 

                            Front    .395
                            Rear     .385

       


48.94CMP-SCRUB.A2 SHUTDOWN AND STARTUP CHECKSHEETSFABSIX::J_SADINFreedom isn&#039;t free.Tue May 27 1997 11:1059
				Scrub.A2

          CMP-SCRUB.A1/.A2/.A3/.C1 SHUTDOWN CHECKSHEET FOR 5/26/97
          --------------------------------------------------------

                                                        Tech.       Date
                                                       -------     -------

  1.  Change Workstream tool status to NON_SCHEDULED  
      DOWN.  If Workstream will not let the tools go
      to NON-SCHEDULED, leave the tools at UP IDLE.
      DO NO put any tools to SCHEDULED or UNSCHEDULED     RP        5-26-97
       DOWN.                                            _______     _______

  2.  Close main incoming DI Water valve(s) to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water       RP        5-26-97
      to flow to UDR.                                  _______     _______

  3.  Remove all PVA scrub brushes and submerge
      in a mixture of DI water and H2O2.  Label 
      each brush with the tool name and brush box         RP        5-26-97
      location.                                        _______     _______

  4.  Perform a complete wipe down and dry of             RP       5-26-97
      all wet surfaces.                                _______     _______
              						  RP       5-26-97
  5.  Power down each system.                          _______     _______

  6.  Enter checksheet into notesfile.


           CMP-SCRUB.A1/.A2/.A3/.C1-7 STARTUP CHECKSHEET FOR 5/27/97
           ---------------------------------------------------------

                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are           tl        5/27
      available and ready to use.                      _______     _______
                                                         tl        5/27
  2.  Power up each system.                            _______     _______
                                                         tl        5/27
  3.  Re-install PVA scrub brushes.                    _______     _______

  4.  Open incoming DI Water Valve(s) to each            tl        5/27
      system.                                          _______     _______  
                                                         tl        5/27
  5.  Close UDR valve at each system.                  _______     _______

  6.  Cycle a minimum of 25 wafers through each          tl        5/27
      tool to verify proper operation.                 _______     _______

  7.  Notify Operations that the systems are ready       tl        5/27
      for MQC.                                         _______     _______

  8.  Enter checksheet into notesfile.                     tl        5/27


48.95WW 48 - Weekly completedSUBPAC::LANDRYTue May 27 1997 15:4831
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 05/25/97  SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: Tim Landry  (TL)
                                                            Jim Sadin   (JS)
                                                           

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40 

  6.1.3  Check the Drip Pan for contamination           Completed:  TL

  6.1.4  Check all tubing/fittings for leaks		Completed:  JS

  6.1.5  Check all wafer transport belts		Completed:  JS

  6.1.6  Clean the Send module and Scrub modules  	Completed:  TL

  6.1.7  Check scrub brushes for contamination		Completed:  JS

  6.1.8  Check scrub brush height in both modules	Completed:  TL/JS

        Brush heights       OUTER                     INNER

                            Front    375             Front   395
                            Rear     327             Rear    385

       


48.96WW 49 - Weekly completedSUBPAC::LANDRYSun Jun 01 1997 19:5628
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 06/1/97  SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: Tim Landry  (TL)
                                                           Jim Sadin   (JS)
                                                           

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40 / 41 

  6.1.3  Check the Drip Pan for contamination           Completed:  TL

  6.1.4  Check all tubing/fittings for leaks		Completed:  JS

  6.1.5  Check all wafer transport belts		Completed:  JS

  6.1.6  Clean the Send module and Scrub modules  	Completed:  TL

  6.1.7  Check scrub brushes for contamination		Completed:  JS

  6.1.8  Check scrub brush height in both modules	Completed:  TL/JS

        Brush heights       OUTER                     INNER

                            Front    375             Front   395
                            Rear     327             Rear    385