[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Conference asdg::cmp

Title:CMP
Notice:Welcome to the CMP notesfile
Moderator:FABSIX::B_TOWERLLE
Created:Tue Oct 31 1995
Last Modified:Fri Jun 06 1997
Last Successful Update:Fri Jun 06 1997
Number of topics:94
Total number of notes:6381

55.0. "CMP-SCRUB.C1 PM CHECKSHEETS" by SUBPAC::BJUBINVILLE (CMP-6 Equipment Engineering) Wed Jan 29 1997 21:13

    
        THIS NOTE IS DESIGNATED FOR THE PM COMPLETED PM CHECKSHEETS
      FOR:
                                    CMP-SCRUB.C1
    
T.RTitleUserPersonal
Name
DateLines
55.2WW9 WEEKLY PM CHECKSHEETASDG::POIRIERSat Aug 31 1996 17:4431
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 8/31/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: J.P.

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___49_____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___40_____

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:__________________________________________________________________

            BRUSH HEIGHTS:  OUTSIDE BRUSH STATION 
                            FRONT = .336"  REAR = .407"

        
                            INSIDE BRUSH STATION
                            FRONT = .334"  REAR = .365"

           
55.3CMP-SCRUB.C1-7 SHUTDOWN CHECKSHEETFABSIX::R_POIRIERMon Sep 02 1996 02:5720
                CMP-SCRUB.A1/.A1/.A3/.C1-7 SHUTDOWN CHECKSHEET
                ----------------------------------------------

                                                        Tech.       Date
                                                       -------     -------
  1.  Close main incoming DI Water valve to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                  ___B___     _9/1/96_

  2.  Remove all PVA scrub brushes and submerge
      in DI water. Label each brush with the
      tool name.                                       ___B___     _9/1/96_
  3.  Perform a complete wipe down and dry of
      all wet surfaces.                                ___B___     _9/1/96_

  4.  Power down each system.                          ___B___     _9/1/96_

  5.  Enter checksheet into notesfile.                 ___B___     _9/1/96_
55.4startupFABSIX::B_FINNTue Sep 03 1996 20:1924
                CMP-SCRUB.C1-7 STARTUP CHECKSHEET
                --------------------------------                

 DATE 9/3/96                                    TECH. NAME: A shift

  1.  Ensure that all necessary facilities are
      available and ready to use.                      ___X___

  2.  Power up system.                                 ___X___

  3.  Re-install PVA scrub brushes.                    ___X____

  4.  Open incoming DI Water Valve(s) 
      system.                                          ___X___

  5.  Close UDR valve at system.                       ___X___


  6.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for MQC.                                         ___X___

                                      
55.5WEEKLY PM COMPLETEDFABSIX::B_FINNTue Sep 03 1996 20:3330
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 9/3/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: A SHIFT

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___49_____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___40_____

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:__________________________________________________________________

            BRUSH HEIGHTS:  OUTSIDE BRUSH STATION 
                            FRONT = 341  REAR = 407

                            INSIDE BRUSH STATION
                            FRONT = 334  REAR = 365

           
55.6WW 11 weekly p.m.FABSIX::R_GEEWed Sep 11 1996 06:1630
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 9/11/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: A SHIFT

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___50_____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___40_____

  6.1.3  Check the Drip Pan for contamination           Completed:____X______

  6.1.4  Check all tubing/fittings for leaks		Completed:____X______

  6.1.5  Check all wafer transport belts		Completed:____X______

  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______

  6.1.7  Check scrub brushes for contamination		Completed:____X______

  6.1.8  Check scrub brush height in both modules	Completed:____X______

  Comments:__________________________________________________________________

            BRUSH HEIGHTS:  OUTSIDE BRUSH STATION 
                            FRONT = 435  REAR = 345

                            INSIDE BRUSH STATION
                            FRONT = 350  REAR = 375

           
55.7ww12 weekly pmFABSIX::L_SHKOLNIKOVWed Sep 18 1996 05:5929
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 9/18/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: D SHIFT

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__50__   

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__42__   

  6.1.3  Check the Drip Pan for contamination           Completed:___X___

  6.1.4  Check all tubing/fittings for leaks		Completed:___X___

  6.1.5  Check all wafer transport belts		Completed:___X___

  6.1.6  Clean the Send module and Scrub modules  	Completed:___X___

  6.1.7  Check scrub brushes for contamination		Completed:___X___

  6.1.8  Check scrub brush height in both modules	Completed:___X___

  Comments: The brush heights has been changed since last week.
            The new numbers are listed below.

            BRUSH HEIGHTS:    O    I
                          R  345  375
                          F  443  375

           
55.8WW XIII - WeeklySUBPAC::LANDRYMon Sep 23 1996 18:1727
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 9/23/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50   

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  41

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:    

      	Brush Heights:    OB =  Front 443      IB =  Front 375
                                 Rear 345             Rear 375

           
55.9ww14 weekly pmFABSIX::L_SHKOLNIKOVFri Oct 04 1996 06:0128
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 10/04/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: D shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50   

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  42

  6.1.3  Check the Drip Pan for contamination           Completed:   X **

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:    

      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375

**  A lot of wafer pieces was found in and around spin station. 
55.10Weekly Pm WW#15 completeFABSIX::O_WHITFORDThu Oct 10 1996 05:2328
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 10/10/96   SYSTEM RTC CODE: CMP-SCRUB.C1-7 TECH. NAME: D. Whitford

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 PSI

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  42 PSI

  6.1.3  Check the Drip Pan for contamination           Completed:    DW

  6.1.4  Check all tubing/fittings for leaks		Completed:    DW

  6.1.5  Check all wafer transport belts		Completed:    DW

  6.1.6  Clean the Send module and Scrub modules  	Completed:    DW

  6.1.7  Check scrub brushes for contamination		Completed:    DW

  6.1.8  Check scrub brush height in both modules	Completed:    DW

  Comments:

          Brush heights:                   Front         Rear

                Outer brush station         .445         .345

                Inner brush station         .375         .375
55.11ww16 weekly pm.FABSIX::L_SHKOLNIKOVTue Oct 15 1996 23:5326
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 10/15/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: D shift 

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50   

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  42

  6.1.3  Check the Drip Pan for contamination           Completed:   X   

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:    

      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
55.12ww17 weekly pm.FABSIX::L_SHKOLNIKOVThu Oct 24 1996 00:1626
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 10/23/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: D shift 

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50   

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40

  6.1.3  Check the Drip Pan for contamination           Completed:   X   

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:    

      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
55.13WW XVIII - Weekly CompletedSUBPAC::LANDRYSun Oct 27 1996 14:2926
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 10/27/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME:   Landry 

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50   

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  39

  6.1.3  Check the Drip Pan for contamination           Completed:   X   

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:    

      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
55.14WW 19 - Weekly completedSUBPAC::LANDRYWed Nov 06 1996 19:1326
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 11/06/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: Gee/Landry 

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50   

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 29 / 28

  6.1.3  Check the Drip Pan for contamination           Completed:   X   

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:    

      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
55.15WEEKLY PM COMPLETED FOR WW20SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringTue Nov 12 1996 21:0027
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 11/12/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: Jubinville

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 BJ  

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 30/30 BJ

  6.1.3  Check the Drip Pan for contamination           Completed:   BJ  

  6.1.4  Check all tubing/fittings for leaks		Completed:   BJ

  6.1.5  Check all wafer transport belts		Completed:   BJ

  6.1.6  Clean the Send module and Scrub modules  	Completed:   BJ

  6.1.7  Check scrub brushes for contamination		Completed:   BJ

  6.1.8  Check scrub brush height in both modules	Completed:   BJ

  Comments:    

      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
                                   
55.16WEEKLY PM FOR WW21 COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Nov 20 1996 23:0627
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 11/20/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: Shkolnikov

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 LS  

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40/40 LS

  6.1.3  Check the Drip Pan for contamination           Completed: LS *  

  6.1.4  Check all tubing/fittings for leaks		Completed: LS

  6.1.5  Check all wafer transport belts		Completed: LS

  6.1.6  Clean the Send module and Scrub modules  	Completed: LS

  6.1.7  Check scrub brushes for contamination		Completed: LS

  6.1.8  Check scrub brush height in both modules	Completed: LS

  Comments:  * Found small puddle of water in drip pan under solenoid valves.  

      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
                                   
55.17ww22 weekly PM.FABSIX::L_SHKOLNIKOVWed Nov 27 1996 04:3226
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 11/27/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: Leon      

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 LS  

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40/40 LS

  6.1.3  Check the Drip Pan for contamination           Completed: LS    

  6.1.4  Check all tubing/fittings for leaks		Completed: LS

  6.1.5  Check all wafer transport belts		Completed: LS

  6.1.6  Clean the Send module and Scrub modules  	Completed: LS

  6.1.7  Check scrub brushes for contamination		Completed: LS

  6.1.8  Check scrub brush height in both modules	Completed: LS

  Comments: 
      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
                                   
55.18ww23 weekly PM.FABSIX::L_SHKOLNIKOVThu Dec 05 1996 00:1326
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 12/05/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: Leon      

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 LS  

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40/40 LS

  6.1.3  Check the Drip Pan for contamination           Completed: LS    

  6.1.4  Check all tubing/fittings for leaks		Completed: LS

  6.1.5  Check all wafer transport belts		Completed: LS

  6.1.6  Clean the Send module and Scrub modules  	Completed: LS

  6.1.7  Check scrub brushes for contamination		Completed: LS

  6.1.8  Check scrub brush height in both modules	Completed: LS

  Comments: 
      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
                                   
55.19ww24 weekly p.m. completedFABSIX::R_GEESun Dec 08 1996 13:4026
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 12/08/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: A shift  

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50   

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40/40 

  6.1.3  Check the Drip Pan for contamination           Completed: TL

  6.1.4  Check all tubing/fittings for leaks		Completed: TL

  6.1.5  Check all wafer transport belts		Completed: BG

  6.1.6  Clean the Send module and Scrub modules  	Completed: BG

  6.1.7  Check scrub brushes for contamination		Completed: BG

  6.1.8  Check scrub brush height in both modules	Completed: TL

  Comments: 
      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
                                   
55.20cmp-scrub.c7 weekly PMFABSIX::O_WHITFORDQuticherwhinin'Wed Dec 18 1996 22:2033
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D


                             <WW25>


 DATE: 12/18/96      SYSTEM RTC CODE:CMP-SCRUB.C7  TECH. NAME:  Dave Whitford

  6.1.1  Check the CDA pressure for 50 PSI           Pre-Adjust:  50 Whitford

  6.1.2  Check the D.I. Water pressure for 40 PSI    Pre-Adjust:  40 Whitford

  6.1.3  Check the Drip Pan for contamination           Completed:   Whitford

  6.1.4  Check all tubing/fittings for leaks		Completed:   Whitford

  6.1.5  Check all wafer transport belts		Completed:   Whitford

  6.1.6  Clean the Send module and Scrub modules  	Completed:   Whitford

  6.1.7  Check scrub brushes for contamination		Completed:   Whitford

  6.1.8  Check scrub brush height in both modules	Completed:   Whitford

  Comments: Outer brush station outer mic = .345
                                inner mic = .445

            Inner brush station outer mic = .375
                                inner mic = .375

PM complete
                                                                    
55.21ww 26 quarterly p.m. completedFABSIX::R_GEESun Dec 22 1996 16:4037
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Quarterly Preventative Maintenance Check Sheet, Rev D

 DATE:12/22/96   SYSTEM RTC CODE: CMP-SCRUB.C1-7  TECH/SHIFT:  LANDRY / GEE

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 42

  6.1.3  Check the Drip Pan for contamination           Completed:  __X__       

  6.1.4  Check all tubing/fittings for leaks		Completed:  __X__

  6.1.5  Check all wafer transport belts		Completed:  __X__

  6.1.6  Clean the Send module and Scrub modules  	Completed:  __X__

  6.1.7  Check scrub brushes for contamination		Completed:  __X__

  6.1.8  Check scrub brush height in both modules	Completed:  __X__ 

  6.3.1  Check muffin fans for functionality		Completed:  __X__  
     
  6.3.2  Check motor drive belts for defects		Completed:  __X__  
    
  6.3.3  Check the robot knife for loose hardware	Completed:  __X__ 

  6.3.4  Check the spin station grippers		Completed:  __X__

  6.3.5  Check the motor speed output readings		Completed:  __X__  
     

  Comments: Brush heights     O    I                                  
                           R 345  375
                           F 445  375                                 
    
     
55.22cmp-scrub.c1-7 shutdown checksheet completedFABSIX::R_GEETue Dec 31 1996 16:0323
                CMP-SCRUB.A1/.A2/.A3/.C1-7 SHUTDOWN CHECKSHEET  Tech: Tim Landry
                ----------------------------------------------        Bob Gee

                                                        Tech.       Date
                                                       -------     -------

  1.  Close main incoming DI Water valve(s) to each    Bob Gee     12/31/96
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                 

  2.  Remove all PVA scrub brushes and submerge        Tim Landry  12/31/96
      in a mixture of DI water and H2O2.  Label 
      each brush with the tool name and brush box
      location.

  3.  Perform a complete wipe down and dry of
      all wet surfaces.                                Bob Gee     12/31/96

  4.  Power down each system.                          Bob Gee     12/31/96

  5.  Enter checksheet into notesfile.                 Tim Landry  12/31/96
55.23WEEKLY PM COMPLETED FOR WW27SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Jan 02 1997 22:0130
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/2/97   SYSTEM RTC CODE: CMP-SCRUB.C1-7 TECH: Leon Shkolnikov (LS)
                                                      Brian Jubinville (BJ)
                                                      Brad Westphal (BW)
    
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/LS

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:   42/BW

  6.1.3  Check the Drip Pan for contamination           Completed:     LS

  6.1.4  Check all tubing/fittings for leaks		Completed:     LS

  6.1.5  Check all wafer transport belts		Completed:     LS

  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS

  6.1.7  Check scrub brushes for contamination		Completed:     BW

  6.1.8  Check scrub brush height in both modules	Completed:     BW

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 445      375
                          Rear  345      375

  Comments:  
55.24WEEKLY PM COMPLETED FOR WW28SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Jan 08 1997 05:4329
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/8/97   SYSTEM RTC CODE: CMP-SCRUB.C1-7 TECH: Leon Shkolnikov (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/LS

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 30/LS

  6.1.3  Check the Drip Pan for contamination           Completed:     LS

  6.1.4  Check all tubing/fittings for leaks		Completed:     LS

  6.1.5  Check all wafer transport belts		Completed:     LS

  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS

  6.1.7  Check scrub brushes for contamination		Completed:     LS

  6.1.8  Check scrub brush height in both modules	Completed:     LS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 445      375
                          Rear  345      375

  Comments:  6.1.2 - Engineer notified
55.25ww29 weekly pm completed.FABSIX::L_SHKOLNIKOVFri Jan 17 1997 00:4129
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/17/97   SYSTEM RTC CODE: CMP-SCRUB.C1-7 TECH: Leon Shkolnikov (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/LS

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 30/LS

  6.1.3  Check the Drip Pan for contamination           Completed:     LS

  6.1.4  Check all tubing/fittings for leaks		Completed:     LS

  6.1.5  Check all wafer transport belts		Completed:     LS

  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS

  6.1.7  Check scrub brushes for contamination		Completed:     LS

  6.1.8  Check scrub brush height in both modules	Completed:     LS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 445      375
                          Rear  345      375

  Comments:  6.1.2 - Engineer notified
55.26WW30 weekly PM completedFABSIX::B_WESTPHALFri Jan 24 1997 16:2633
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 24 JAN 97 SYSTEM RTC CODE: SCRUB-CMP.C1-7 TECH. NAME: Bradley J. Westphal


  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_49 BW____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_30_BW *__

  6.1.3  Check the Drip Pan for contamination           Completed:_BW________

  6.1.4  Check all tubing/fittings for leaks		Completed:_BW________

  6.1.5  Check all wafer transport belts		Completed:_BW________

  6.1.6  Clean the Send module and Scrub modules  	Completed:_BW________

  6.1.7  Check scrub brushes for contamination		Completed:_BW________

  6.1.8  Check scrub brush height in both modules	Completed:_BW________

                             Front    Back 
                        IBS   375      375

			OBS   470      370

  Comments:  * Found that the pressure was at only 30 PSI and that is all that

	       the room is being supplied with.  Informed the Engineer.


55.27WEEKLY PM FOR WW31 COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Jan 29 1997 21:0930
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/29/97   SYSTEM RTC CODE: CMP-SCRUB.C1 TECH: Brian Jubinville (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/BJ

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 30/BJ

  6.1.3  Check the Drip Pan for contamination           Completed:     BJ

  6.1.4  Check all tubing/fittings for leaks		Completed:     BJ

  6.1.5  Check all wafer transport belts		Completed:     BJ

  6.1.6  Clean the Send module and Scrub modules  	Completed:     BJ

  6.1.7  Check scrub brushes for contamination		Completed:     BJ

  6.1.8  Check scrub brush height in both modules	Completed:     BJ

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 445      375
                          Rear  345      375

  Comments:  6.1.2 - Engineer notified
                                                                         
55.1CMP-SCRUB.C1 EE/PE PASSDOWNSSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Jan 29 1997 21:125
        THIS NOTE IS DESIGNATED FOR THE EQUIPMENT AND PROCESS
      ENGINEERING PASSDOWNS FOR:
    
                                         CMP-SCRUB.C1
55.28WW32 WEEKLY PM COMPLETED.FABSIX::L_SHKOLNIKOVWed Feb 05 1997 06:0230
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:02/05/97   SYSTEM RTC CODE: CMP-SCRUB.C1 TECH: Leon shkolnikov  (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/BJ

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 30/BJ

  6.1.3  Check the Drip Pan for contamination           Completed:     LS

  6.1.4  Check all tubing/fittings for leaks		Completed:     LS

  6.1.5  Check all wafer transport belts		Completed:     LS

  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS

  6.1.7  Check scrub brushes for contamination		Completed:     LS

  6.1.8  Check scrub brush height in both modules	Completed:     LS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 345      375
                          Rear  445      375

  Comments:  6.1.2 - Engineer notified
                                                                         
55.29WW33 weekly pm.FABSIX::L_SHKOLNIKOVThu Feb 13 1997 06:0633
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:02/13/97   SYSTEM RTC CODE: CMP-SCRUB.C1 TECH: Leon shkolnikov  (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50   

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 30   

  6.1.3  Check the Drip Pan for contamination           Completed:     LS

  6.1.4  Check all tubing/fittings for leaks		Completed:  ** LS

  6.1.5  Check all wafer transport belts		Completed:     LS

  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS

  6.1.7  Check scrub brushes for contamination		Completed:     LS

  6.1.8  Check scrub brush height in both modules	Completed:     LS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 345      375
                          Rear  445      375

  Comments: * 6.1.2 - Engineer notified
           **                                                            
              6.1.4 - Outside brush station - Water coming out through
                      the motor shafts (front and rear). Will try to get
                      it fixed ASAP.
55.30ww34 weekly pm.FABSIX::L_SHKOLNIKOVWed Feb 19 1997 22:2230
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:02/19/97   SYSTEM RTC CODE: CMP-SCRUB.C1 TECH: Leon shkolnikov  (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:    50   

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:    40   

  6.1.3  Check the Drip Pan for contamination           Completed:     LS

  6.1.4  Check all tubing/fittings for leaks		Completed:     LS

  6.1.5  Check all wafer transport belts		Completed:     LS

  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS

  6.1.7  Check scrub brushes for contamination		Completed:     LS

  6.1.8  Check scrub brush height in both modules	Completed:     LS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 345      375
                          Rear  445      375

  Comments: Outside brush station, rear roller shaft has been replaced last
            week, no leaks so far.
55.31ww35 weekly pm.FABSIX::L_SHKOLNIKOVThu Feb 27 1997 05:0631
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:02/27/97   SYSTEM RTC CODE: CMP-SCRUB.C1 TECH: Leon shkolnikov  (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:    50   

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:    30   

  6.1.3  Check the Drip Pan for contamination           Completed:     LS

  6.1.4  Check all tubing/fittings for leaks		Completed:     LS

  6.1.5  Check all wafer transport belts		Completed:     LS

  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS

  6.1.7  Check scrub brushes for contamination		Completed:     LS

  6.1.8  Check scrub brush height in both modules	Completed:     LS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 345      375
                          Rear  445      375

  Comments:  EE has been notified that DI water pressure can't be 
             adjusted up to 40 psi.
                                                                        
55.32ww36 weekly pm completed.FABSIX::L_SHKOLNIKOVNo more experiments with freedomTue Mar 04 1997 23:1629
           
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:03/04/97   SYSTEM RTC CODE: CMP-SCRUB.C1 TECH: Leon shkolnikov  (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:    50   

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:    40   

  6.1.3  Check the Drip Pan for contamination           Completed:     LS

  6.1.4  Check all tubing/fittings for leaks		Completed:     LS

  6.1.5  Check all wafer transport belts		Completed:     LS

  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS

  6.1.7  Check scrub brushes for contamination		Completed:     LS

  6.1.8  Check scrub brush height in both modules	Completed:     LS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 345      375
                          Rear  445      375

  Comments:
55.33ww37 weekly pmFABSIX::L_SHKOLNIKOVThu Mar 13 1997 22:5429
           
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:03/13/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Leon shkolnikov  (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:    50   

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:    40   

  6.1.3  Check the Drip Pan for contamination           Completed:     LS

  6.1.4  Check all tubing/fittings for leaks		Completed:     LS

  6.1.5  Check all wafer transport belts		Completed:     LS

  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS

  6.1.7  Check scrub brushes for contamination		Completed:     LS

  6.1.8  Check scrub brush height in both modules	Completed:     LS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 345      375
                          Rear  445      375

  Comments:
55.34ww38 weekly pm.FABSIX::L_SHKOLNIKOVTue Mar 18 1997 21:3429
           
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:03/18/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Leon shkolnikov  (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:    50   

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:    40   

  6.1.3  Check the Drip Pan for contamination           Completed:     LS

  6.1.4  Check all tubing/fittings for leaks		Completed:     LS

  6.1.5  Check all wafer transport belts		Completed:     LS

  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS

  6.1.7  Check scrub brushes for contamination		Completed:     LS

  6.1.8  Check scrub brush height in both modules	Completed:     LS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 345      375
                          Rear  445      375

  Comments:
55.35SEMI-ANNUAL PM COMPLETED FOR WW39SUBPAC::BJUBINVILLECMP Equipment EngineeringThu Mar 27 1997 06:5596
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
            Semi-Annual Preventative Maintenance Check Sheet, Rev D


 DATE: 3/27/97   SYSTEM RTC CODE: CMP-SCRUB.C1  TECH. NAME: Dave Whitford (DW)
                                                         Brian Jubinville (BJ)


  6.1    Perform Weekly PM                              Completed: DW/BJ
                                                        
  6.3    Perform Quarterly PM                           Completed: DW/BJ

  6.4.1  Check all EMO's for functionality		Completed: DW

  6.4.2  Check all interlocks for functionality  	Completed: DW

  6.4.3  Check heat lamp housing/wiring for defects	Completed: DW

  6.4.4  Check the robot hardware/wiring for defects	Completed: DW

  6.4.5  Check the spindle bearings/bushings		Completed: DW

  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed: DW

  6.4.7  Check the brush sta. drive bearings/bushings	Completed: DW

  6.4.8  Check the +5 VDC power supply			Pre-Adjust: +5.1 DW

							Post-Adjust: +5.1 DW

  6.4.9  Check the -12 VDC power supply			Pre-Adjust: -12.6 DW

  6.4.10 Check the +12 VDC power supply			Pre-Adjust: +12.4 DW

  6.4.11 Check the +24 VDC power supply			Pre-Adjust: +23.94 DW

							Post-Adjust: +24.2 DW

  6.4.12 Check the +48 VDC power supply			Pre-Adjust:  +48.4 DW

							Post-Adjust: +48.4 DW


           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D

 DATE: 3/27/97   SYSTEM RTC CODE: CMP-SCRUB.C1  TECH. NAME: Dave Whitford (DW)
                                                         Brian Jubinville (BJ)


  6.1    Perform Weekly PM                              Completed: DW   

  6.3.1  Check muffin fans for functionality		Completed: DW

  6.3.2  Check motor drive belts for defects		Completed: DW

  6.3.3  Check the robot knife for loose hardware	Completed: DW

  6.3.4  Check the spin station grippers		Completed: DW

  6.3.5  Check the motor speed output readings		Completed: DW/BJ

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________

        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 3/27/97   SYSTEM RTC CODE: CMP-SCRUB.C1  TECH. NAME: Dave Whitford (DW)
                                                         Brian Jubinville (BJ)


  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 DW

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 32.5 * DW

  6.1.3  Check the Drip Pan for contamination           Completed:  DW

  6.1.4  Check all tubing/fittings for leaks		Completed: DW

  6.1.5  Check all wafer transport belts		Completed: DW

  6.1.6  Clean the Send module and Scrub modules  	Completed: DW

  6.1.7  Check scrub brushes for contamination		Completed: DW

  6.1.8  Check scrub brush height in both modules	Completed: BJ

=============================================================================

   6.1.2 - DI pressure below spec.  E.E. notified.... 


55.36WW40 Weekly PM CompletedFABSIX::R_POIRIERTue Apr 01 1997 02:2232
           
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:04/01/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Roger Poirier (RP)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:    50 RP

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:    32 RP   

  6.1.3  Check the Drip Pan for contamination           Completed:     RP

  6.1.4  Check all tubing/fittings for leaks		Completed:     RP

  6.1.5  Check all wafer transport belts		Completed:     RP

  6.1.6  Clean the Send module and Scrub modules  	Completed:     RP

  6.1.7  Check scrub brushes for contamination		Completed:     RP

  6.1.8  Check scrub brush height in both modules	Completed:     RP

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 318      375
                          Rear  360      375

  Comments: 6.1.2 Water Pressure low. Engineer informed.

	    Found small puddle of water. Cleaned it up. Tightened
	    Sender spray connector. Engineer informed.
55.37WEEKLY PM FOR WW41 COMPLETEDSUBPAC::BJUBINVILLECMP Equipment EngineeringThu Apr 10 1997 06:0730
          
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:04/10/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Brian Jubinville (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 BJ

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: *  34 BJ    

  6.1.3  Check the Drip Pan for contamination           Completed: BJ    

  6.1.4  Check all tubing/fittings for leaks		Completed: BJ   

  6.1.5  Check all wafer transport belts		Completed: BJ   

  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ   

  6.1.7  Check scrub brushes for contamination		Completed: BJ   

  6.1.8  Check scrub brush height in both modules	Completed: BJ

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 335      375
                          Rear  395      390

  Comments: 6.1.2 Water Pressure low. Engineer informed.
                                            
55.38WEEKLY PM COMPLETED FOR WW42SUBPAC::BJUBINVILLECMP Equipment EngineeringThu Apr 17 1997 05:3328
          
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:04/17/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Brian Jubinville (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 BJ

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 BJ    

  6.1.3  Check the Drip Pan for contamination           Completed: BJ    

  6.1.4  Check all tubing/fittings for leaks		Completed: BJ   

  6.1.5  Check all wafer transport belts		Completed: BJ   

  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ   

  6.1.7  Check scrub brushes for contamination		Completed: BJ   

  6.1.8  Check scrub brush height in both modules	Completed: BJ

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 335      375
                          Rear  400      395
                                            
55.39WEEKLY PM FOR WW43 COMPLETEDSUBPAC::BJUBINVILLECMP Equipment EngineeringWed Apr 23 1997 22:1729
          
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:04/23/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Brian Jubinville (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 BJ

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 BJ    

  6.1.3  Check the Drip Pan for contamination           Completed: BJ    

  6.1.4  Check all tubing/fittings for leaks		Completed: BJ   

  6.1.5  Check all wafer transport belts		Completed: BJ   

  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ   

  6.1.7  Check scrub brushes for contamination		Completed: BJ   

  6.1.8  Check scrub brush height in both modules	Completed: BJ

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 335      375
                          Rear  400      390
                                            
                                            
55.40ww44 weekly pm completed.FABSIX::L_SHKOLNIKOVTue Apr 29 1997 22:4132
              
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:04/29/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Leon Shkolnikov  (ls)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 ls

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 ls    

  6.1.3  Check the Drip Pan for contamination           Completed: ls    

  6.1.4  Check all tubing/fittings for leaks		Completed: ls*  

  6.1.5  Check all wafer transport belts		Completed: ls   

  6.1.6  Clean the Send module and Scrub modules  	Completed: ls   

  6.1.7  Check scrub brushes for contamination		Completed: ls   

  6.1.8  Check scrub brush height in both modules	Completed: ls

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 335      375
                          Rear  400      390
                                            
                                            
  * Found small amount of DI water under the rear shaft of the outside
    brush station. Will notify EE in the morning to schedule down time for
    repair.
55.41Weekly PM completed for WW45SUBPAC::BJUBINVILLECMP Equipment EngineeringWed May 07 1997 23:4337
              
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:05/7/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Brian Jubinville (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 BJ

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 BJ   

  6.1.3  Check the Drip Pan for contamination           Completed: BJ      

  6.1.4  Check all tubing/fittings for leaks		Completed: BJ     

  6.1.5  Check all wafer transport belts		Completed: BJ     

  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ     

  6.1.7  Check scrub brushes for contamination		Completed: BJ     

  6.1.8  Check scrub brush height in both modules	Completed: * BJ *   

                                 OB      IB
                                ----    ----
               were at:   Front 335      390
                          Rear  400      440
                                            
               now back   Front 335      375
               at:        Rear  400      390
                                                  
      * alot of wafer debris found in the spin station.  It was
        was definetly an un-document crash in the spin station.
        All of the wafer pieces were removed and spin are cleaned.
    
      
     * this checksheet was forwarded to Jim T., E.E.
55.42Weekly pm completed for ww46FABSIX::R_GEETue May 13 1997 10:2429
              
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:05/13/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Bob Gee (BG)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 BG

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 BG   

  6.1.3  Check the Drip Pan for contamination           Completed: BG

  6.1.4  Check all tubing/fittings for leaks		Completed: BG     

  6.1.5  Check all wafer transport belts		Completed: BG     

  6.1.6  Clean the Send module and Scrub modules  	Completed: BG     

  6.1.7  Check scrub brushes for contamination		Completed: BG     

  6.1.8  Check scrub brush height in both modules	Completed: BG   

                                 OB      IB
                                ----    ----
                          Front 335      395
                          Rear  400      390
                                                  
 
55.43ww47 weekly pm.FABSIX::L_SHKOLNIKOVWed May 21 1997 23:5830
              
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:05/21/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Leon Shkolnikov  ls
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 ls

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 ls   

  6.1.3  Check the Drip Pan for contamination           Completed: ls

  6.1.4  Check all tubing/fittings for leaks		Completed: ls     

  6.1.5  Check all wafer transport belts		Completed: ls     

  6.1.6  Clean the Send module and Scrub modules  	Completed: ls     

  6.1.7  Check scrub brushes for contamination		Completed: ls     

  6.1.8  Check scrub brush height in both modules	Completed: ls   

                                 OB      IB
                                ----    ----
                          Front 335      395
                          Rear  400      390
                                                  
 
                                 
55.44WW48 weekly PM completedFABSIX::R_GEETue May 27 1997 14:0929
            OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:05/27/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Bob Gee  bg
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 bg

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 bg   

  6.1.3  Check the Drip Pan for contamination           Completed: bg

  6.1.4  Check all tubing/fittings for leaks		Completed: bg     

  6.1.5  Check all wafer transport belts		Completed: bg     

  6.1.6  Clean the Send module and Scrub modules  	Completed: bg     

  6.1.7  Check scrub brushes for contamination		Completed: bg     

  6.1.8  Check scrub brush height in both modules	Completed: bg   

                                 OB      IB
                                ----    ----
                          Front 337      396
                          Rear  400      390
                                                  
 
                                 
55.45scruber c1 start upFABSIX::B_FINNTue May 27 1997 19:3826
           CMP-SCRUB.A1/.A2/.A3/.C1-7 STARTUP CHECKSHEET FOR 5/27/97
           ---------------------------------------------------------

                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are
      available and ready to use.                       BF/TL      5/27/97

  2.  Power up each system.                             BF/TL	   5/27/97

  3.  Re-install PVA scrub brushes.                     BF/TL	   5/27/97     

  4.  Open incoming DI Water Valve(s) to each
      system.                                           BF/TL	   5/27/97

  5.  Close UDR valve at each system.                   BF/TL	   5/27/97

  6.  Cycle a minimum of 25 wafers through each
      tool to verify proper operation.                  BF/TL	   5/27/97

  7.  Notify Operations that the systems are ready
      for MQC.                                          BF/TL	   5/27/97

  8.  Enter checksheet into notesfile.                  BF/TL	   5/27/97

55.46WW49 WEEKLY P.M. COMPLETEDFABSIX::R_GEETue Jun 03 1997 19:1829
            OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:06/03/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Bob Gee  bg
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 bg

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 bg   

  6.1.3  Check the Drip Pan for contamination           Completed: bg

  6.1.4  Check all tubing/fittings for leaks		Completed: bg     

  6.1.5  Check all wafer transport belts		Completed: bg     

  6.1.6  Clean the Send module and Scrub modules  	Completed: bg     

  6.1.7  Check scrub brushes for contamination		Completed: bg     

  6.1.8  Check scrub brush height in both modules	Completed: bg   

                                 OB      IB
                                ----    ----
                          Front 337      396
                          Rear  400      390