[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Conference asdg::cmp

Title:CMP
Notice:Welcome to the CMP notesfile
Moderator:FABSIX::B_TOWERLLE
Created:Tue Oct 31 1995
Last Modified:Fri Jun 06 1997
Last Successful Update:Fri Jun 06 1997
Number of topics:94
Total number of notes:6381

50.0. "CMP-SCRUB.A3 PM CHECKSHEETS " by SUBPAC::BJUBINVILLE (CMP-6 Equipment Engineering) Wed Jun 12 1996 00:02

    
        THIS NOTE IS DESIGNATED FOR THE PM COMPLETED PM CHECKSHEETS
      FOR:
                                    CMP-SCRUB.A3
    
T.RTitleUserPersonal
Name
DateLines
50.1Weekly PM Checksheet Template SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Jun 12 1996 00:0426
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:__________   SYSTEM RTC CODE:__________  TECH. NAME:__________________

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__________

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__________

  6.1.3  Check the Drip Pan for contamination           Completed:___________

  6.1.4  Check all tubing/fittings for leaks		Completed:___________

  6.1.5  Check all wafer transport belts		Completed:___________

  6.1.6  Clean the Send module and Scrub modules  	Completed:___________

  6.1.7  Check scrub brushes for contamination		Completed:___________

  6.1.8  Check scrub brush height in both modules	Completed:___________

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
50.2Quarterly PM Checksheet Template SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Jun 12 1996 00:0636
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Quarterly Preventative Maintenance Check Sheet, Rev D

 DATE:__________   SYSTEM RTC CODE:__________  TECH. NAME:__________________

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__________

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__________

  6.1.3  Check the Drip Pan for contamination           Completed:___________

  6.1.4  Check all tubing/fittings for leaks		Completed:___________

  6.1.5  Check all wafer transport belts		Completed:___________

  6.1.6  Clean the Send module and Scrub modules  	Completed:___________

  6.1.7  Check scrub brushes for contamination		Completed:___________

  6.1.8  Check scrub brush height in both modules	Completed:___________

  6.3.1  Check muffin fans for functionality		Completed:___________

  6.3.2  Check motor drive belts for defects		Completed:___________

  6.3.3  Check the robot knife for loose hardware	Completed:___________

  6.3.4  Check the spin station grippers		Completed:___________

  6.3.5  Check the motor speed output readings		Completed:___________

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
50.3Semi-Annual PM Checksheet Template SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Jun 12 1996 00:0666
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
         Semi-Annual Preventative Maintenance Check Sheet, Rev D

 DATE:__________   SYSTEM RTC CODE:__________  TECH. NAME:__________________

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__________

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__________

  6.1.3  Check the Drip Pan for contamination           Completed:___________

  6.1.4  Check all tubing/fittings for leaks		Completed:___________

  6.1.5  Check all wafer transport belts		Completed:___________

  6.1.6  Clean the Send module and Scrub modules  	Completed:___________

  6.1.7  Check scrub brushes for contamination		Completed:___________

  6.1.8  Check scrub brush height in both modules	Completed:___________

  6.3.1  Check muffin fans for functionality		Completed:___________

  6.3.2  Check motor drive belts for defects		Completed:___________

  6.3.3  Check the robot knife for loose hardware	Completed:___________

  6.3.4  Check the spin station grippers		Completed:___________

  6.3.5  Check the motor speed output readings		Completed:___________

  6.4.1  Check all EMO's for functionality		Completed:___________

  6.4.2  Check all interlocks for functionality  	Completed:___________

  6.4.3  Check heat lamp housing/wiring for defects	Completed:___________

  6.4.4  Check the robot hardware/wiring for defects	Completed:___________

  6.4.5  Check the spindle bearings/bushings		Completed:___________

  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed:___________

  6.4.7  Check the brush sta. drive bearings/bushings	Completed:___________

  6.4.8  Check the +5 VDC power supply			Pre-Adjust:__________

							Post-Adjust:_________

  6.4.9  Check the -12 VDC power supply			Pre-Adjust:__________

  6.4.10 Check the +12 VDC power supply			Pre-Adjust:__________

  6.4.11 Check the +24 VDC power supply			Pre-Adjust:__________

							Post-Adjust:_________

  6.4.12 Check the +48 VDC power supply			Pre-Adjust:__________

							Post-Adjust:_________

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
50.4WW5 WEEKLY PMFABSIX::L_SHKOLNIKOVThu Aug 01 1996 00:2024
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:07/31/96    SYSTEM RTC CODE:CMP_SCRUB.B3  TECH. NAME:  D shift          

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_50_ 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_34_

  6.1.3  Check the Drip Pan for contamination           Completed:__X__

  6.1.4  Check all tubing/fittings for leaks		Completed:__X__

  6.1.5  Check all wafer transport belts		Completed:__X__

  6.1.6  Clean the Send module and Scrub modules  	Completed:__X__

  6.1.7  Check scrub brushes for contamination		Completed:__X__

  6.1.8  Check scrub brush height in both modules	Completed:__X__

  Comments: BRUSH HEIGHTS    OB   IB
                          R  448  505
                          F  440  473
50.5WW06 Weekly PMFABSIX::R_POIRIERMon Aug 05 1996 05:1025
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:08/05/96     SYSTEM RTC CODE:CMP_SCRUB.B3  TECH. NAME:  B shift          

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_50_ 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_34_

  6.1.3  Check the Drip Pan for contamination           Completed:__X__

  6.1.4  Check all tubing/fittings for leaks		Completed:__X__

  6.1.5  Check all wafer transport belts		Completed:__X__

  6.1.6  Clean the Send module and Scrub modules  	Completed:__X__

  6.1.7  Check scrub brushes for contamination		Completed:__X__

  6.1.8  Check scrub brush height in both modules	Completed:__X__

  Comments: BRUSH HEIGHTS    OB   IB
                          R  448  505
                          F  440  473
50.6WW VII - Weekly versionSUBPAC::LANDRYSun Aug 11 1996 14:0425
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:  08/11/96     SYSTEM RTC CODE: CMP_SCRUB.B3   TECH NAME:  A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  33

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments: BRUSH HEIGHTS    OB   IB
                          R  435  487
                          F  440  473
    
50.7QUARTERLY PM FOR WW8 COMPLETED.FABSIX::L_SHKOLNIKOVFri Aug 23 1996 08:1839
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Quarterly Preventative Maintenance Check Sheet, Rev D

 DATE: 8/23/96   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH/SHIFT: D

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 32   

  6.1.3  Check the Drip Pan for contamination           Completed:  __X__       

  6.1.4  Check all tubing/fittings for leaks		Completed:  __X__

  6.1.5  Check all wafer transport belts		Completed:  __X__

  6.1.6  Clean the Send module and Scrub modules  	Completed:  __X__

  6.1.7  Check scrub brushes for contamination		Completed:  __X__

  6.1.8  Check scrub brush height in both modules	Completed:  __X__ 

  6.3.1  Check muffin fans for functionality		Completed:  __X__  
     

  6.3.2  Check motor drive belts for defects		Completed:  __X__  
    
  6.3.3  Check the robot knife for loose hardware	Completed:  __X__ 

  6.3.4  Check the spin station grippers		Completed:  __X__

  6.3.5  Check the motor speed output readings		Completed:  __X__  
     

  Comments: Brush heights     O    I                                  
                           R 435  487
                           F 440  473                                 
    
            INSIDE BRUSH ST. FRONT LOWER ROLLER ARM BROKEN.WILL REPLACE IT
            TONIGHT.
50.8WW IX - Weekly versionSUBPAC::LANDRYSun Aug 25 1996 14:0526
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 8/25/96      SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  32

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  Found a puddle on frame underneath IB station.

                                 OB      IB
      	   Brush Heights: Front  435     473
                          Rear   435     487
50.9CMP-SCRUB.A3 SHUTDOWN CHECKSHEETFABSIX::R_POIRIERMon Sep 02 1996 02:5720
                CMP-SCRUB.A1/.A1/.A3/.C1-7 SHUTDOWN CHECKSHEET
                ----------------------------------------------

                                                        Tech.       Date
                                                       -------     -------
  1.  Close main incoming DI Water valve to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                  ___B___     _9/1/96_

  2.  Remove all PVA scrub brushes and submerge
      in DI water. Label each brush with the
      tool name.                                       ___B___     _9/1/96_
  3.  Perform a complete wipe down and dry of
      all wet surfaces.                                ___B___     _9/1/96_

  4.  Power down each system.                          ___B___     _9/1/96_

  5.  Enter checksheet into notesfile.                 ___B___     _9/1/96_
50.10FABSIX::B_FINNTue Sep 03 1996 20:1824
                CMP-SCRUB.A3 STARTUP CHECKSHEET
                --------------------------------                

 DATE 9/3/96                                    TECH. NAME: A shift

  1.  Ensure that all necessary facilities are
      available and ready to use.                      ___X___

  2.  Power up system.                                 ___X___

  3.  Re-install PVA scrub brushes.                    ___X____

  4.  Open incoming DI Water Valve(s) 
      system.                                          ___X___

  5.  Close UDR valve at system.                       ___X___


  6.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for MQC.                                         ___X___

                                      
50.11WW X - Weekly versionSUBPAC::LANDRYTue Sep 03 1996 20:2925
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 9/3/96      SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  30

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  
                                 OB      IB
      	   Brush Heights: Front  440     473
                          Rear   435     487
50.12WW XI - WeeklySUBPAC::LANDRYSun Sep 08 1996 18:2125
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 9/8/96      SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  32

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:  
                                 OB      IB
      	   Brush Heights: Front  440     473
                          Rear   435     487
50.13Scrub .A3 Weekly PM completeFABSIX::O_WHITFORDThu Sep 19 1996 00:4829
                                    -< CMP >-
================================================================================
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 9/18/96         SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME:Dave Whitford

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 32

  6.1.3  Check the Drip Pan for contamination           Completed:  DW 

  6.1.4  Check all tubing/fittings for leaks		Completed:  DW

  6.1.5  Check all wafer transport belts		Completed:  DW

  6.1.6  Clean the Send module and Scrub modules  	Completed:  DW

  6.1.7  Check scrub brushes for contamination		Completed:  DW

  6.1.8  Check scrub brush height in both modules	Completed:  DW

  Comments: Outer Brush height     .440"
              
            Inner Brush height     .473"

P.M. Copmplete    
    
50.14WW XIII - WeeklySUBPAC::LANDRYMon Sep 23 1996 17:2624
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 9/23/96         SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 30

  6.1.3  Check the Drip Pan for contamination           Completed:  X 

  6.1.4  Check all tubing/fittings for leaks		Completed:  X

  6.1.5  Check all wafer transport belts		Completed:  X

  6.1.6  Clean the Send module and Scrub modules  	Completed:  X

  6.1.7  Check scrub brushes for contamination		Completed:  X

  6.1.8  Check scrub brush height in both modules	Completed:  X

  Comments: 	OB =  Front  440	IB =  Front 473
                       Rear  435               Rear 487
    
50.15Weekly PM completed for WW14FABSIX::B_JUBINVILLEFri Oct 04 1996 06:1733
    
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 10/3/96   SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: D. Whitford

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 PSI

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  27 PSI

  6.1.3  Check the Drip Pan for contamination           Completed:    DW

  6.1.4  Check all tubing/fittings for leaks		Completed:    DW

  6.1.5  Check all wafer transport belts		Completed:    DW

  6.1.6  Clean the Send module and Scrub modules  	Completed:    DW
                                             
  6.1.7  Check scrub brushes for contamination		Completed:    DW 

  6.1.8  Check scrub brush height in both modules	Completed:    DW

  Comments: Outer Brush Station Brush height  F-440     R-435
            Inner Brush Station brush height  F-473     R-487

           Incoming DI supply is @ 13 PSI lower than spec.  Re-filled
           gauge gaurd and PSI went to 37 PSI
           __________________________________________________________________

           __________________________________________________________________

Weekly PM complete              Dave Whitford

50.16WW XV - Weekly completedSUBPAC::LANDRYWed Oct 09 1996 11:5527
    
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 10/9/96   SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  35

  6.1.3  Check the Drip Pan for contamination           Completed:    X

  6.1.4  Check all tubing/fittings for leaks		Completed:    X

  6.1.5  Check all wafer transport belts		Completed:    X

  6.1.6  Clean the Send module and Scrub modules  	Completed:    X
                                             
  6.1.7  Check scrub brushes for contamination		Completed:    X

  6.1.8  Check scrub brush height in both modules	Completed:    X

  Comments: 

      			OB	IB
      		Rear   435	487
      		Front  440	473
50.17WW 16 weekly p.m. completedFABSIX::R_GEEMon Oct 14 1996 18:3527
    
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 10/14/96   SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: A shift

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  35

  6.1.3  Check the Drip Pan for contamination           Completed:    X

  6.1.4  Check all tubing/fittings for leaks		Completed:    X

  6.1.5  Check all wafer transport belts		Completed:    X

  6.1.6  Clean the Send module and Scrub modules  	Completed:    X
                                             
  6.1.7  Check scrub brushes for contamination		Completed:    X

  6.1.8  Check scrub brush height in both modules	Completed:    X

  Comments: 

      			OB	IB
      		Rear   435	487
      		Front  440	473
50.18WW XVII - Weekly completedSUBPAC::LANDRYSun Oct 20 1996 18:1927
    
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 10/20/96   SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: Gee / Landry

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  34

  6.1.3  Check the Drip Pan for contamination           Completed:    X

  6.1.4  Check all tubing/fittings for leaks		Completed:    X

  6.1.5  Check all wafer transport belts		Completed:    X

  6.1.6  Clean the Send module and Scrub modules  	Completed:    X
                                             
  6.1.7  Check scrub brushes for contamination		Completed:    X

  6.1.8  Check scrub brush height in both modules	Completed:    X

  Comments: 

      			OB	IB
      		Rear   435	487
      		Front  440	473
50.19WW XVIII - Weekly CompletedSUBPAC::LANDRYSun Oct 27 1996 10:1626
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 10/27/96   SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME:  Landry

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  35

  6.1.3  Check the Drip Pan for contamination           Completed:    X

  6.1.4  Check all tubing/fittings for leaks		Completed:    X

  6.1.5  Check all wafer transport belts		Completed:    X

  6.1.6  Clean the Send module and Scrub modules  	Completed:    X
                                             
  6.1.7  Check scrub brushes for contamination		Completed:    X

  6.1.8  Check scrub brush height in both modules	Completed:    X

  Comments: 

      			OB	IB
      		Rear   435	487
      		Front  440	473
50.20WW 19 - Weekly completedSUBPAC::LANDRYTue Nov 05 1996 13:0926
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 11/5/96   SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: Gee / Landry

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  34

  6.1.3  Check the Drip Pan for contamination           Completed:    X

  6.1.4  Check all tubing/fittings for leaks		Completed:    X

  6.1.5  Check all wafer transport belts		Completed:    X

  6.1.6  Clean the Send module and Scrub modules  	Completed:    X
                                             
  6.1.7  Check scrub brushes for contamination		Completed:    X

  6.1.8  Check scrub brush height in both modules	Completed:    X

  Comments: 

      			OB	IB
      		Rear   435	487
      		Front  440	473
50.21WEEKLY PM FOR WW20 COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringTue Nov 12 1996 21:2331
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 11/12/96   SYSTEM RTC CODE: CMP-SCRUB.A3   TECH. NAME: Jubinville BJ
          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  34/34 BJ

  6.1.3  Check the Drip Pan for contamination           Completed:   BJ

  6.1.4  Check all tubing/fittings for leaks		Completed:   BJ

  6.1.5  Check all wafer transport belts		Completed:   BJ

  6.1.6  Clean the Send module and Scrub modules  	Completed:   BJ

  6.1.7  Check scrub brushes for contamination		Completed:   BJ

  6.1.8  Check scrub brush height in both modules	Completed:   BJ

  Comments:	    
                                  OB      IB
      	   Brush Heights: Front   440     473
                          Rear    435     487

     BRUSHES CHANGED ON 10/21 HENCE THE DIFFERENCE IN BRUSH
     HEIGHTS FROM LAST WEEKS WEEKLY PM. 
           ----------------------------------

50.22SEMI PM WW21FABSIX::M_RIDLONEliminate the obliviousWed Nov 20 1996 01:0891
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 11/20/96  SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: R.Poirier, Ridlon

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 43

  6.1.3  Check the Drip Pan for contamination           Completed:  XX

  6.1.4  Check all tubing/fittings for leaks		Completed:  XX

  6.1.5  Check all wafer transport belts		Completed:  XX

  6.1.6  Clean the Send module and Scrub modules  	Completed:  XX

  6.1.7  Check scrub brushes for contamination		Completed:  XX

  6.1.8  Check scrub brush height in both modules	Completed: SEE BELOW

  Comments: IF = 473     IB = 487
            OF = 440     OB = 425
           __________________________________________________________________

           __________________________________________________________________

           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D

 
  6.1    Perform Weekly PM                              Completed:  XX

  6.3.1  Check muffin fans for functionality		Completed:  XX

  6.3.2  Check motor drive belts for defects		Completed:  XX

  6.3.3  Check the robot knife for loose hardware	Completed:  XX

  6.3.4  Check the spin station grippers		Completed:  XX

  6.3.5  Check the motor speed output readings		Completed:  XX

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
            Semi-Annual Preventative Maintenance Check Sheet, Rev D


  6.1    Perform Weekly PM                              Completed:  XX
                                                        
  6.3    Perform Quarterly PM                           Completed:  XX

  6.4.1  Check all EMO's for functionality		Completed:  XX

  6.4.2  Check all interlocks for functionality  	Completed:  XX

  6.4.3  Check heat lamp housing/wiring for defects	Completed:  XX

  6.4.4  Check the robot hardware/wiring for defects	Completed:  XX

  6.4.5  Check the spindle bearings/bushings		Completed:  XX

  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed:  XX

  6.4.7  Check the brush sta. drive bearings/bushings	Completed:  XX

  6.4.8  Check the +5 VDC power supply			Pre-Adjust:  4.94

							Post-Adjust:

  6.4.9  Check the -12 VDC power supply			Pre-Adjust: -13.01

  6.4.10 Check the +12 VDC power supply			Pre-Adjust:  12.94

  6.4.11 Check the +24 VDC power supply			Pre-Adjust:  24.35

							Post-Adjust:

  6.4.12 Check the +48 VDC power supply			Pre-Adjust:  48.2

							Post-Adjust:

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
50.23WW 22 - Weekly completedSUBPAC::LANDRYSun Nov 24 1996 13:3327
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 11/24/96   SYSTEM RTC CODE: CMP-SCRUB.A3   TECH. NAME: Finn, Landry
          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  34

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:	    
                                  OB      IB
      	   Brush Heights: Front   440     473
                          Rear    435     487

50.24WW 23 - Weekly completedSUBPAC::LANDRYSun Dec 01 1996 18:3527
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 12/1/96   SYSTEM RTC CODE: CMP-SCRUB.A3   TECH. NAME: Landry/Finn/Gee
          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  33

  6.1.3  Check the Drip Pan for contamination           Completed:   X

  6.1.4  Check all tubing/fittings for leaks		Completed:   X

  6.1.5  Check all wafer transport belts		Completed:   X

  6.1.6  Clean the Send module and Scrub modules  	Completed:   X

  6.1.7  Check scrub brushes for contamination		Completed:   X

  6.1.8  Check scrub brush height in both modules	Completed:   X

  Comments:	    
                                  OB      IB
      	   Brush Heights: Front   440     473
                          Rear    435     487

50.25WEEKLY PM FOR WW24 COMPLETEDSUBPAC::BJUBINVILLECMP-6 Equipment EngineeringWed Dec 11 1996 00:1928
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 12/11/96   SYSTEM RTC CODE: CMP-SCRUB.A3   TECH. NAME: JUBINVILLE
          
  6.1.1  Check the CDA pressure for 50 PSI             Pre-Adjust: 50 JUBINVILLE

  6.1.2  Check the D.I. Water pressure for 40 PSI      Pre-Adjust: 33 JUBINVILLE

  6.1.3  Check the Drip Pan for contamination          Completed: JUBINVILLE  
                                                      
  6.1.4  Check all tubing/fittings for leak            Completed: JUBINVILLE  

  6.1.5  Check all wafer transport belts	       Completed: JUBINVILLE 

  6.1.6  Clean the Send module and Scrub modules       Completed: JUBINVILLE  

  6.1.7  Check scrub brushes for contamination	       Completed: JUBINVILLE   

  6.1.8  Check scrub brush height in both modules      Completed: JUBINVILLE  

  Comments: Replaced the rear (left) roller arm in the OUTSIDE brush
            station.	    
                                      OB      IB
       	       Brush Heights: Front   440     473
                              Rear    435     487

50.26WW XXV - Weekly completedSUBPAC::LANDRYSun Dec 15 1996 14:4432
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 12/15/96   SYSTEM RTC CODE: CMP-SCRUB.A3   TECH. NAME: Finn / Landry
          
  6.1.1  Check the CDA pressure for 50 PSI             Pre-Adjust: 50 

  6.1.2  Check the D.I. Water pressure for 40 PSI      Pre-Adjust: 32

  6.1.3  Check the Drip Pan for contamination          Completed:   X
                                                      
  6.1.4  Check all tubing/fittings for leak            Completed:   X

  6.1.5  Check all wafer transport belts	       Completed:   X

  6.1.6  Clean the Send module and Scrub modules       Completed:   X

  6.1.7  Check scrub brushes for contamination	       Completed:   X

  6.1.8  Check scrub brush height in both modules      Completed:   X

  Comments:  Found water in the drip pan in several places.  Tightened fittings
             on distribution manifold.  Also noticed water dripping from the 
             send station, location is on the wafer exit side.  Water appears 
             to be coming from the wafer exit slot.

                                      OB      IB
                                     ----    ----
       	       Brush Heights: Front   440     473
                              Rear    435     487

50.27weekly ww26FABSIX::M_RIDLONEliminate the obliviousMon Dec 23 1996 01:5829
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 12/23/96   SYSTEM RTC CODE: CMP-SCRUB.A3   TECH. NAME: Ridlon 
          
  6.1.1  Check the CDA pressure for 50 PSI             Pre-Adjust: 50 

  6.1.2  Check the D.I. Water pressure for 40 PSI      Pre-Adjust: 32.5

  6.1.3  Check the Drip Pan for contamination          Completed:   X
                                                      
  6.1.4  Check all tubing/fittings for leak            Completed:   X

  6.1.5  Check all wafer transport belts	       Completed:   X

  6.1.6  Clean the Send module and Scrub modules       Completed:   X

  6.1.7  Check scrub brushes for contamination	       Completed:   X

  6.1.8  Check scrub brush height in both modules      Completed:   X 

                                      OB      IB
                                     ----    ----
       	       Brush Heights: Front   440     473
                              Rear    435     487

  Comments:  Found and repaired a small leak coming from the union fitting on  
             NH4OH pressure gauge. 
50.28cmp-scrub.a3 shutdown checksheet completedFABSIX::R_GEETue Dec 31 1996 16:0123
                CMP-SCRUB.A1/.A2/.A3/.C1-7 SHUTDOWN CHECKSHEET  Tech: Tim Landry
                ----------------------------------------------        Bob Gee

                                                        Tech.       Date
                                                       -------     -------

  1.  Close main incoming DI Water valve(s) to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                  Tim Landry  12/31/96

  2.  Remove all PVA scrub brushes and submerge        Bob Gee     12/31/96
      in a mixture of DI water and H2O2.  Label 
      each brush with the tool name and brush box
      location.

  3.  Perform a complete wipe down and dry of
      all wet surfaces.                                Tim Landry  12/31/96

  4.  Power down each system.                          Tim Landry  12/31/96

  5.  Enter checksheet into notesfile.                 Bob Gee     12/31/96
50.29WEEKLY PM COMPLETED FOR WW27SUBPAC::BJUBINVILLECMP-6 Equipment EngineeringThu Jan 02 1997 07:4029
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/1/97   SYSTEM RTC CODE: CMP-SCRUB.A3   TECH. NAME: Olin Whitford (OW)
                                                         Brian Jubinville (BJ)

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/OW

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40/38/BJ

  6.1.3  Check the Drip Pan for contamination           Completed:     BJ

  6.1.4  Check all tubing/fittings for leaks		Completed:     BJ

  6.1.5  Check all wafer transport belts		Completed:     BJ

  6.1.6  Clean the Send module and Scrub modules  	Completed:     BJ

  6.1.7  Check scrub brushes for contamination		Completed:     BJ

  6.1.8  Check scrub brush height in both modules	Completed:     OW

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front  440     473    
                          Rear   435     488

  Comments:  
50.30weekly ww28FABSIX::M_RIDLONEliminate the obliviousTue Jan 07 1997 02:2330
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/7/97   SYSTEM RTC CODE:CMP-SCRUB.A3  TECH. NAME: Mitch Ridlon
                                                          Albert Quillen

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____52____

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:____34____

  6.1.3  Check the Drip Pan for contamination           Completed:___MR,AQ___

  6.1.4  Check all tubing/fittings for leaks		Completed:___MR,AQ___

  6.1.5  Check all wafer transport belts		Completed:___MR,AQ___

  6.1.6  Clean the Send module and Scrub modules  	Completed:___MR,AQ___

  6.1.7  Check scrub brushes for contamination		Completed:___MR,AQ___

  6.1.8  Check scrub brush height in both modules	Completed:___MR,AQ___

                                    OUTSIDE  INSIDE
                             FRONT    440     473
                             REAR     435     487

  Comments:
6.1.2 The DI water gauge was replaced due to nonfunctionality.

ENGINEER INFORMED.
50.31Weekly PM complete for WW29FABSIX::O_WHITFORDQuticherwhinin&#039;Wed Jan 15 1997 21:2232
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/15/1997   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: DAVE WHITFORD (DW)

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50   DW

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 36*  DW

  6.1.3  Check the Drip Pan for contamination           Completed:  DW

  6.1.4  Check all tubing/fittings for leaks		Completed:  DW

  6.1.5  Check all wafer transport belts		Completed:  DW

  6.1.6  Clean the Send module and Scrub modules  	Completed:  DW

  6.1.7  Check scrub brushes for contamination		Completed:  DW

  6.1.8  Check scrub brush height in both modules	Completed:  DW

  Comments:  BRUSH HEIGHTS

                   OUTER STATION
                                  INSIDE = .430
                                 OUTSIDE = .435

                   INNER STATION  
                                  INSIDE = .473
                                 OUTSIDE = .487

NOTE: EE WAS NOTIFIED OF DI WATER PRESSURE DISCREPANCY  
50.32WW30 WEEKLY PM COMPLETEDFABSIX::R_POIRIERMon Jan 20 1997 21:4133
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/20/97   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: ROGER POIRIER(RP)

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50  RP

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 33* RP 

  6.1.3  Check the Drip Pan for contamination           Completed:  RP

  6.1.4  Check all tubing/fittings for leaks		Completed:  RP

  6.1.5  Check all wafer transport belts		Completed:  RP

  6.1.6  Clean the Send module and Scrub modules  	Completed:  RP

  6.1.7  Check scrub brushes for contamination		Completed:  RP

  6.1.8  Check scrub brush height in both modules	Completed:  RP

  Comments:  BRUSH HEIGHTS

                   OUTER STATION
                                  FRONT  = .435
                                  BACK   = .430

                   INNER STATION  
                                  FRONT  = .473
                                  BACK   = .487

* NOTE: 6.1.2 EE HAS BEEN NOTIFIED OF DI WATER PRESSURE DISCREPANCY  
50.33WW31 Weekly PMFABSIX::R_POIRIERWed Jan 29 1997 07:1237
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 1/28/97   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: ROGER POIRIER(RP)

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50  RP

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 32* RP 

  6.1.3  Check the Drip Pan for contamination           Completed:  RP/MR

  6.1.4  Check all tubing/fittings for leaks		Completed:  RP

  6.1.5  Check all wafer transport belts		Completed:  RP

  6.1.6  Clean the Send module and Scrub modules  	Completed:  RP

  6.1.7  Check scrub brushes for contamination		Completed:  RP

  6.1.8  Check scrub brush height in both modules	Completed:  RP

  Comments:  BRUSH HEIGHTS

                   OUTER STATION
                                  FRONT  = .440
                                  BACK   = .435

                   INNER STATION  
                                  FRONT  = .473
                                  BACK   = .487

* NOTE: 6.1.2 EE HAS BEEN NOTIFIED OF DI WATER PRESSURE DISCREPANCY  

  NOTE: Small water leak found under Outside Brush Exit Pneumatic valve.
	Tightened teflon screw and leak stopped. Wiped up excess water.


50.34WW32 WEEKLY PMFABSIX::J_SADINFreedom isn&#039;t free.Sun Feb 02 1997 18:0237
    
    
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 2/2/97   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: JIM SADIN
    							   DOC LANDRY

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50  JS

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 32* JS 

  6.1.3  Check the Drip Pan for contamination           Completed:  TL/JS

  6.1.4  Check all tubing/fittings for leaks		Completed:  TL/JS

  6.1.5  Check all wafer transport belts		Completed:  JS

  6.1.6  Clean the Send module and Scrub modules  	Completed:  JS

  6.1.7  Check scrub brushes for contamination		Completed:  JS

  6.1.8  Check scrub brush height in both modules	Completed:  TL

  Comments:  BRUSH HEIGHTS

                   OUTER STATION
                                  FRONT  = 440
                                  BACK   = 435

                   INNER STATION  
                                  FRONT  = 473
                                  BACK   = .87

    
    
    * ENG NOTIFIED
50.35WW #33 weekly PMFABSIX::O_WHITFORDLead, follow or step aside.Thu Feb 13 1997 06:0139
              
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 2/13/95   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: Dave Whitford

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50  DW

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 32* DW

  6.1.3  Check the Drip Pan for contamination           Completed: DW

  6.1.4  Check all tubing/fittings for leaks		Completed: DW

  6.1.5  Check all wafer transport belts		Completed: DW

  6.1.6  Clean the Send module and Scrub modules  	Completed: DW

  6.1.7  Check scrub brushes for contamination		Completed: DW

  6.1.8  Check scrub brush height in both modules	Completed: DW

  Comments:

          Brush heights
                
                Outer Station

                      Inside = .441
                      Outside= .435

                Inner Station

                      Inside = .473
                      Outside= .435

* Equipment engineer has been made aware that the DI pressure cannot be 
adjusted up to the specified 40 PSI
              
50.36ww34 Quarterly PM completed.FABSIX::L_SHKOLNIKOVWed Feb 19 1997 01:5245
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D

 DATE: 02/19/97   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: Leon Shkolnikov LS


  6.1    Perform Weekly PM                              Completed: LS

  6.3.1  Check muffin fans for functionality		Completed: LS

  6.3.2  Check motor drive belts for defects		Completed: LS

  6.3.3  Check the robot knife for loose hardware	Completed: LS

  6.3.4  Check the spin station grippers		Completed: LS

  6.3.5  Check the motor speed output readings		Completed: LS

  Comments: Outside brush station: Roller motor speed has been adjusted.      



        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 02/19/96   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: Leon Shkolnikov LS

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 psi

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40 psi

  6.1.3  Check the Drip Pan for contamination           Completed: LS

  6.1.4  Check all tubing/fittings for leaks		Completed: LS

  6.1.5  Check all wafer transport belts		Completed: LS

  6.1.6  Clean the Send module and Scrub modules  	Completed: LS

  6.1.7  Check scrub brushes for contamination		Completed: LS

  6.1.8  Check scrub brush height in both modules	Completed: LS

  Comments:          Inside Brush  F-440 R-435
                    Outside Brush  F-473 R-487
50.37ww35 weekly p.m. completedFABSIX::R_GEEMon Feb 24 1997 18:1542
              
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 2/24/95   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME:Brendan Finn (BF)
							   Tim Landry   (TL) 
							   Jim Sadin    (JS)
                                                           Bob Gee      (BG)

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50  BG

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 32* BG

  6.1.3  Check the Drip Pan for contamination           Completed: JS

  6.1.4  Check all tubing/fittings for leaks		Completed: JS

  6.1.5  Check all wafer transport belts		Completed: TL

  6.1.6  Clean the Send module and Scrub modules  	Completed: TL

  6.1.7  Check scrub brushes for contamination		Completed: BF

  6.1.8  Check scrub brush height in both modules	Completed: BF

  Comments:

          Brush heights
                
                Outer Station

                      Front = .441
                      back  = .435

                Inner Station

                      Front = .473
                      Back  = .487

* Equipment engineer has been made aware that the DI pressure cannot be 
  adjusted up to the specified 40 PSI
              
50.38ww36 weeklyFABSIX::J_SADINFreedom isn&#039;t free.Sun Mar 02 1997 16:5538
              
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE: 03/02/97   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME:Brendan Finn (BF)
							   Tim Landry   (TL) 
							   Jim Sadin    (JS)
                                                           Bob Gee      (BG)

  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50  BG

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37  BG

  6.1.3  Check the Drip Pan for contamination           Completed: JS

  6.1.4  Check all tubing/fittings for leaks		Completed: JS

  6.1.5  Check all wafer transport belts		Completed: TL

  6.1.6  Clean the Send module and Scrub modules  	Completed: TL

  6.1.7  Check scrub brushes for contamination		Completed: BF

  6.1.8  Check scrub brush height in both modules	Completed: BF

  Comments:

          Brush heights
                
                Outer Station

                      Front = .440
                      back  = .435

                Inner Station

                      Front = .473
                      Back  = .487
50.39WEEKLY PM FOR WW37 COMPLETEDSUBPAC::BJUBINVILLECMP Equipment EngineeringThu Mar 13 1997 21:2931
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:03/13/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: Brian Jubinville  (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BJ

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 36 BJ

  6.1.3  Check the Drip Pan for contamination           Completed: BJ

  6.1.4  Check all tubing/fittings for leaks		Completed: BJ

  6.1.5  Check all wafer transport belts		Completed: BJ

  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ

  6.1.7  Check scrub brushes for contamination		Completed: BJ

  6.1.8  Check scrub brush height in both modules	Completed: BJ

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487

  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
50.40ww38 weekly pm.FABSIX::L_SHKOLNIKOVWed Mar 19 1997 04:5532
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:03/19/97  SYSTEM RTC CODE: CMP-SCRUB.A3  TECH: Leon Shkolnikov - (ls)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 ls

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 36 ls

  6.1.3  Check the Drip Pan for contamination           Completed: ls

  6.1.4  Check all tubing/fittings for leaks		Completed: ls

  6.1.5  Check all wafer transport belts		Completed: ls

  6.1.6  Clean the Send module and Scrub modules  	Completed: ls

  6.1.7  Check scrub brushes for contamination		Completed: ls

  6.1.8  Check scrub brush height in both modules	Completed: ls

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487

  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
                                                                 
50.41ww39 weekly p.m. completedFABSIX::R_GEEMon Mar 24 1997 08:4032
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:03/24/97  SYSTEM RTC CODE: CMP-SCRUB.A3  TECH: Bob Gee  - (BG)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BG

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 34 BG

  6.1.3  Check the Drip Pan for contamination           Completed: BG

  6.1.4  Check all tubing/fittings for leaks		Completed: BG

  6.1.5  Check all wafer transport belts		Completed: BG

  6.1.6  Clean the Send module and Scrub modules  	Completed: BG

  6.1.7  Check scrub brushes for contamination		Completed: BG

  6.1.8  Check scrub brush height in both modules	Completed: BG

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487

  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
                                                                 
50.42WW40 weekly pm completed.FABSIX::J_SADINFreedom isn&#039;t free.Mon Mar 31 1997 10:5532
                                                             
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:03/31/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: Timothy Landry (TL)
                                                     James Sadin    (JS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 JS

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 34 JS

  6.1.3  Check the Drip Pan for contamination           Completed: TL

  6.1.4  Check all tubing/fittings for leaks		Completed: TL

  6.1.5  Check all wafer transport belts		Completed: JS

  6.1.6  Clean the Send module and Scrub modules  	Completed: TL/JS

  6.1.7  Check scrub brushes for contamination		Completed: TL

  6.1.8  Check scrub brush height in both modules	Completed: JS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487

  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
50.43WW41 weekly pm completedFABSIX::J_SADINFreedom isn&#039;t free.Wed Apr 09 1997 10:5934
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:04/09/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: Timothy Landry (TL)
                                                     James Sadin    (JS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 JS

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 34 JS

  6.1.3  Check the Drip Pan for contamination           Completed: TL

  6.1.4  Check all tubing/fittings for leaks		Completed: TL

  6.1.5  Check all wafer transport belts		Completed: JS

  6.1.6  Clean the Send module and Scrub modules  	Completed: TL/JS

  6.1.7  Check scrub brushes for contamination		Completed: TL

  6.1.8  Check scrub brush height in both modules	Completed: JS

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487

  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        

    
           
50.44WEEKLY PM COMPLETED FOR WW42SUBPAC::BJUBINVILLECMP Equipment EngineeringThu Apr 17 1997 05:3034
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:04/17/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: Brian Jubinville (BJ)
                                                    
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BJ

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 34 BJ 

  6.1.3  Check the Drip Pan for contamination           Completed: BJ

  6.1.4  Check all tubing/fittings for leaks		Completed: BJ

  6.1.5  Check all wafer transport belts		Completed: BJ

  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ

  6.1.7  Check scrub brushes for contamination		Completed: BJ

  6.1.8  Check scrub brush height in both modules	Completed: BJ

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
              
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        

    
           
50.45WEEKLY PM COMPLETED FOR WW43SUBPAC::BJUBINVILLECMP Equipment EngineeringWed Apr 23 1997 22:4635
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:04/23/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: Brian Jubinville (BJ)
                                                    
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BJ

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 36 BJ 

  6.1.3  Check the Drip Pan for contamination           Completed: BJ

  6.1.4  Check all tubing/fittings for leaks		Completed: BJ

  6.1.5  Check all wafer transport belts		Completed: BJ

  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ

  6.1.7  Check scrub brushes for contamination		Completed: BJ

  6.1.8  Check scrub brush height in both modules	Completed: BJ

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
              
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        

    
           
                                                   
50.46WW44 weekly pm completed FABSIX::B_JUBINVILLEWed Apr 30 1997 06:3037
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:04/30/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: Brian Jubinville (BJ)
                                                    
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BJ

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  36 BJ
    * 

  6.1.3  Check the Drip Pan for contamination           Completed: BJ

  6.1.4  Check all tubing/fittings for leaks		Completed: BJ

  6.1.5  Check all wafer transport belts		Completed: BJ

  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ

  6.1.7  Check scrub brushes for contamination		Completed: BJ

  6.1.8  Check scrub brush height in both modules	Completed: BJ

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
              
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        

    
           
                                                   
     
50.47WW45 WEEKLY PM COMPLETEDFABSIX::J_SADINFreedom isn&#039;t free.Tue May 06 1997 13:1732
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:05/06/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: JAMES SADIN 
                                                     TIMOTHY LANDRY
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  36 
    * 

  6.1.3  Check the Drip Pan for contamination           Completed: JS

  6.1.4  Check all tubing/fittings for leaks		Completed: TL

  6.1.5  Check all wafer transport belts		Completed: JS

  6.1.6  Clean the Send module and Scrub modules  	Completed: TL

  6.1.7  Check scrub brushes for contamination		Completed: JS

  6.1.8  Check scrub brush height in both modules	Completed: TL

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
              
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                       
50.48WW46 weekly pm completed.FABSIX::J_SADINFreedom isn&#039;t free.Tue May 13 1997 10:1635
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:05/13/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: JAMES SADIN 
                                                     TIMOTHY LANDRY
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  34 
    * 

  6.1.3  Check the Drip Pan for contamination           Completed: JS

  6.1.4  Check all tubing/fittings for leaks		Completed: TL

  6.1.5  Check all wafer transport belts		Completed: JS

  6.1.6  Clean the Send module and Scrub modules  	Completed: TL

  6.1.7  Check scrub brushes for contamination		Completed: JS

  6.1.8  Check scrub brush height in both modules	Completed: TL

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
              
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                       
                Found mucho water in drip pan (due to known leak between send
        station and outside brush station). Cleaned up water and notified
        EE of situation.
50.49CMP-SCRUB.A3 SHUTDOWN AND STARTUP CHECKSHEETSFABSIX::J_SADINFreedom isn&#039;t free.Tue May 27 1997 11:1157
				Scrub.A3

          CMP-SCRUB.A1/.A2/.A3/.C1 SHUTDOWN CHECKSHEET FOR 5/26/97
          --------------------------------------------------------

                                                        Tech.       Date
                                                       -------     -------

  1.  Change Workstream tool status to NON_SCHEDULED  
      DOWN.  If Workstream will not let the tools go
      to NON-SCHEDULED, leave the tools at UP IDLE.
      DO NO put any tools to SCHEDULED or UNSCHEDULED     RP        5-26-97
       DOWN.                                            _______     _______

  2.  Close main incoming DI Water valve(s) to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water       RP        5-26-97
      to flow to UDR.                                  _______     _______

  3.  Remove all PVA scrub brushes and submerge
      in a mixture of DI water and H2O2.  Label 
      each brush with the tool name and brush box         RP        5-26-97
      location.                                        _______     _______

  4.  Perform a complete wipe down and dry of             RP       5-26-97
      all wet surfaces.                                _______     _______
              						  RP       5-26-97
  5.  Power down each system.                          _______     _______

  6.  Enter checksheet into notesfile.


           CMP-SCRUB.A1/.A2/.A3/.C1-7 STARTUP CHECKSHEET FOR 5/27/97
           ---------------------------------------------------------

                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are           tl        5/27
      available and ready to use.                      _______     _______
                                                         tl        5/27
  2.  Power up each system.                            _______     _______
                                                         tl        5/27
  3.  Re-install PVA scrub brushes.                    _______     _______

  4.  Open incoming DI Water Valve(s) to each            tl        5/27
      system.                                          _______     _______  
                                                         tl        5/27
  5.  Close UDR valve at each system.                  _______     _______

  6.  Cycle a minimum of 25 wafers through each          tl        5/27
      tool to verify proper operation.                 _______     _______

  7.  Notify Operations that the systems are ready       tl        5/27
      for MQC.                                         _______     _______

  8.  Enter checksheet into notesfile.                   tl        5/27
50.50SEMI-ANNUAL PM FOR WW47 COMPLETEDSUBPAC::BJUBINVILLECMP Equipment EngineeringWed May 28 1997 07:2747
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
            Semi-Annual Preventative Maintenance Check Sheet, Rev D


 DATE:5/28/97     TOOL: :CMP-SCRUB.A3  TECH. NAME: John Poirier (JP)
                                                   Brian Jubinville (BJ)
                                                            

  6.1    Perform Weekly PM                              Completed: BJ
                                                        
  6.3    Perform Quarterly PM                           Completed: BJ

  6.4.1  Check all EMO's for functionality		Completed: JP

  6.4.2  Check all interlocks for functionality  	Completed: JP

  6.4.3  Check heat lamp housing/wiring for defects	Completed: JP

  6.4.4  Check the robot hardware/wiring for defects	Completed: BJ

  6.4.5  Check the spindle bearings/bushings		Completed: BJ

  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed: BJ

  6.4.7  Check the brush sta. drive bearings/bushings	Completed: BJ

  6.4.8  Check the +5 VDC power supply			Pre-Adjust: 5.01 BJ

							Post-Adjust: 5.01 BJ

  6.4.9  Check the -12 VDC power supply			Pre-Adjust: -12.6 BJ

  6.4.10 Check the +12 VDC power supply			Pre-Adjust: 12.6 BJ

  6.4.11 Check the +24 VDC power supply			Pre-Adjust: 23.7 BJ

							Post-Adjust: 23.7 BJ

  6.4.12 Check the +48 VDC power supply			Pre-Adjust: 48.3 BJ

							Post-Adjust: 48.3 BJ

  Comments:__________________________________________________________________

           __________________________________________________________________

           __________________________________________________________________
50.51WEEKLY PM FOR WW48 COMPLETEDSUBPAC::BJUBINVILLECMP Equipment EngineeringWed May 28 1997 07:3231
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:05/28/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: Brian Jubinville (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BJ
                                                 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: * 34 * BJ

  6.1.3  Check the Drip Pan for contamination           Completed: BJ    

  6.1.4  Check all tubing/fittings for leaks		Completed: BJ

  6.1.5  Check all wafer transport belts		Completed: BJ

  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ

  6.1.7  Check scrub brushes for contamination		Completed: BJ

  6.1.8  Check scrub brush height in both modules	Completed: BJ

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
              
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                       
 
50.52WW49 weekly pm completed.FABSIX::J_SADINFreedom isn&#039;t free.Mon Jun 02 1997 10:3633
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D

 DATE:06/02/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: JAMES SADIN 
                                                     TIMOTHY LANDRY
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 

  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  34 
    * 

  6.1.3  Check the Drip Pan for contamination           Completed: JS

  6.1.4  Check all tubing/fittings for leaks		Completed: TL

  6.1.5  Check all wafer transport belts		Completed: JS

  6.1.6  Clean the Send module and Scrub modules  	Completed: TL

  6.1.7  Check scrub brushes for contamination		Completed: JS

  6.1.8  Check scrub brush height in both modules	Completed: TL

                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
              
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.