24.0. "CMP.B4 PM CHECKSHEETS" by SUBPAC::BJUBINVILLE (CMP-6 Equipment Engineering) Sat Dec 14 1996 05:48

    
    
              THIS NOTE WILL BE USED FOR POSTING PM CHECKSHEETS ON:
    
    
                                  CMP.B4
    
T.RTitleUserPersonal
Name
DateLines
24.1WEEKLY PM FOR WW43 COMPLETEDSUBPAC::BJUBINVILLECMP Equipment EngineeringThu Apr 24 1997 04:34107
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE: 4/24/97    TOOL ENTITY: CMP.B4    TECHNICIAN(S): Brian Jubinville (BJ)
                                                       Dave Morin (DM)
                                                       Leon Shkolnikov (LS)

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80 BJ/DM

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55 BJ/DM

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 22 BJ/DM

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 45 BJ/DM

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 15 BJ/DM

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 BJ/DM

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 BJ/DM

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 45 BJ/DM

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed: 6 BJ/DM 

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A BJ/DM
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 BJ/DM

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 45 BJ/DM

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 50 BJ/DM

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30 BJ/DM

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25 BJ/DM

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20 BJ/DM

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 50 BJ/DM

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 BJ/DM

6.1.19 Check Drip Pans for moisture/contamination        Completed: BJ/DM/LS * 

6.1.20 Check tubing/fittings for fluid leaks             Completed: BJ/DM 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: BJ/DM 

6.1.22 Check stations/components for contamination	 Completed: BJ/DM/LS 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 10 BJ 

6.1.24 Clean and lubricate the Scrubber rails		 Completed: LS

6.1.25 Clean and lubricate the Paddle rails		 Completed: LS

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: BJ **

6.1.27 Scrub clean the Polish area tub and walls         Completed: BJ/DM

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: BJ/DM

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: LS

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: BJ

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: BJ

6.1.32 Check Carrier clean brushes for defects           Completed: BJ
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: BJ/LS

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: BJ/LS

6.1.35 Check chiller fluid resevoir for proper level     Completed: BJ

6.1.36 Check the chiller readout for 24 degrees C.       Completed: BJ

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: BJ/LS/DM 

6.1.38 Check the slurry flow alarm.                      Completed: BJ/LS/DM 

Comments:  * DI WAS RUNNING AT 36 PSI
 
           ** 4 OUT THE 6 HELICOILS/SCREWS THAT HOLD THE CONDITIONER ON
              WERE ALL STRIPPED OUT.  HOW IT WAS HOLDING I'LL NEVER KNOW.
              WE DON'T HAVE ANY HELICOILS AND WE ONLY STOCK THE OLD STYLE
              ADAPTORS SO I PUT THE OLD STYLE ON AND RE-CAL'ED THE 
              DOWNFORCE. 



                                                                    
24.2WW44 WEEKLY PM COMPLETEDASDG::MORINThe Quest is onWed Apr 30 1997 07:48102
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE: 4/30/97    TOOL ENTITY: CMP.B4    TECHNICIAN(S): Brian Jubinville (BJ)
                                                       Dave Morin (DM)
                                                       Leon Shkolnikov (LS)

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80 LS/DM

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55 LS/DM

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 20 LS/DM

6.1.4  Check Load Cup pressure for 40-50 PSI	       	 Completed: 45 LS/DM

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 15 LS/DM

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35 LS/DM

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30 LS/DM

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 45 LS/DM

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed: 6  LS/DM 

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A BJ/DM
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20 LS/DM

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 45 LS/DM

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 55 LS/DM

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30 LS/DM

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 30 LS/DM

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20 LS/DM

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 50 LS/DM

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80 LS/DM

6.1.19 Check Drip Pans for moisture/contamination        Completed: BJ/DM/LS * 

6.1.20 Check tubing/fittings for fluid leaks             Completed: BJ/DM/LS 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: BJ/DM/LS

6.1.22 Check stations/components for contamination	 Completed: BJ/DM/LS 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 3 BJ/DM 

6.1.24 Clean and lubricate the Scrubber rails		 Completed: LS

6.1.25 Clean and lubricate the Paddle rails		 Completed: LS

6.1.26 Remove and clean conditioning Wheel and Housing   Completed:  LS/DM
                                                         
6.1.27 Scrub clean the Polish area tub and walls         Completed:  LS/DM

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed:  LS

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed:  LS

6.1.30 Check slurry pump hoses and connectors for leaks  Completed:  LS/DM

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed:  LS/DM

6.1.32 Check Carrier clean brushes for defects           Completed: BJ
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: LS

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: LS

6.1.35 Check chiller fluid resevoir for proper level     Completed: BJ/DM

6.1.36 Check the chiller readout for 24 degrees C.       Completed: BJ/DM

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: BJ/LS/DM 

6.1.38 Check the slurry flow alarm.                      Completed: BJ/LS/DM 

Comments:  *  FOUND ELEVATOR DRIP PAN WITH WATER LEAK/CLEANED/UNABLE TO
              REPAIR AT THIS TIME,EE NOTIFIED.
 
          

                                                                    
24.3WW45 weekly pm completedFABSIX::J_SADINFreedom isn&#039;t free.Sun May 04 1997 17:15100
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE: 5/04/97    TOOL ENTITY: CMP.B4    TECHNICIAN(S):  James Sadin
                                                        Timothy Landry
                                                        Brendan Finn


6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 90js/tl 

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55js/tl

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 20js/tl

6.1.4  Check Load Cup pressure for 40-50 PSI	       	 Completed: 45js/tl

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 15js/tl

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35js/tl

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30js/tl

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 45js/tl

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed: 6 js/tl 

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A 
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20js/tl

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 50js/tl

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 55js/tl

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30js/tl

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 30js/tl

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20js/tl

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 50js/tl

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80js/tl

6.1.19 Check Drip Pans for moisture/contamination        Completed: bf 

6.1.20 Check tubing/fittings for fluid leaks             Completed: tl 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: tl

6.1.22 Check stations/components for contamination	 Completed: tl/js/bf 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 8 js 

6.1.24 Clean and lubricate the Scrubber rails		 Completed: js

6.1.25 Clean and lubricate the Paddle rails		 Completed: js

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: tl
                                                         
6.1.27 Scrub clean the Polish area tub and walls         Completed: tl 

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: tl/js/bf 

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: tl 

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: js

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: tl 

6.1.32 Check Carrier clean brushes for defects           Completed: bf
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: bf/tl

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: js

6.1.35 Check chiller fluid resevoir for proper level     Completed: js/tl

6.1.36 Check the chiller readout for 24 degrees C.       Completed: js

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: js/tl/bf 

6.1.38 Check the slurry flow alarm.                      Completed: tl 

Comments:  6.1.10 - applicable to CMP.B1 only.  


24.4WW46 WEEKLY PM COMPLETED.SUBPAC::LANDRYTue May 13 1997 11:57102
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE:5/13/97         TOOL ENTITY:CMP.B4       TECHNICIAN(S): Tim Landry
							     James Sadin
							     Bob Gee

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed: 80

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 30

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 45

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 15

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 30

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 45

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed: 6

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A *
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 55

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 55

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 30

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80

6.1.19 Check Drip Pans for moisture/contamination        Completed: TL/JS/RG

6.1.20 Check tubing/fittings for fluid leaks             Completed: TL/JS/RG

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: TL/JS/RG

6.1.22 Check stations/components for contamination	 Completed: TL/JS/RG

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 9 

6.1.24 Clean and lubricate the Scrubber rails		 Completed: TL/JS/RG

6.1.25 Clean and lubricate the Paddle rails		 Completed: TL/JS/RG

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: TL/JS/RG

6.1.27 Scrub clean the Polish area tub and walls         Completed: TL/JS/RG

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: TL/JS/RG

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: TL/JS/RG

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: TL/JS/RG

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: TL/JS/RG

6.1.32 Check Carrier clean brushes for defects           Completed: TL/JS/RG
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: TL/JS/RG

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: TL/JS/RG

6.1.35 Check chiller fluid resevoir for proper level     Completed: TL/JS/RG

6.1.36 Check the chiller readout for 24 degrees C.       Completed: TL/JS/RG

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: TL/JS/RG

6.1.38 Check the slurry flow alarm.                      Completed: TL/JS/RG

Comments:

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI *
       (Applicable to CMP.B1 only) EE Notified

                                        
24.5CMP.B4 SHUTDOWN AND STARTUP CHECKSHEETSFABSIX::J_SADINFreedom isn&#039;t free.Tue May 27 1997 10:5552
--------------------------------------------------------------------------------
        
SPEC# HF60-0172  REV-E       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

				CMP.B4


                        CMP.B SHUT DOWN CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
								 INIT / DATE
1) SCRUB SIDES OF CARRIERS				      AQ,BD/5-26-97
2) RUN CARRIER BLOW OFF FOR 30 SECONDS			      AQ,BD/5-26-97
3) REMOVE ALL CARRIERS					      AQ,BD/5-26-97
4) PLACE WIPES UNDER CARRIER FILMS AND LAY CARRIERS DI TANK   AQ,BD/5-26-97
5) IF POWER TO SLURRY SYSTEM IS GOING TO BE LOST, CONTACT 
   ASHLAND CHEMICAL AND HAVE SLURRY SYSTEM PURGED AND CHARGED 
   WITH DI WATER.					      AQ,BD/5-26-97
6) CLEAN ENTIRE SYSTEM OF DRIED SLURRY 			      AQ,BD/5-26-97
7) REMOVE CONDITIONER AND CLEAN				      AQ,BD/5-26-97
8) CYCLE/RINSE ALL DI FUNCTIONS: SPRAY NOZZLES, SLURRY PUMPS,
   CONDITIONER RINSE, ELEVATOR TANKS.			      AQ,BD/5-26-97
9) SHUT OFF DI BEHIND SYSTEM (ROTATE 3W VLV TO FULL RETURN)   AQ,BD/5-26-97
10) DRAIN ELEVATOR AND CONDITIONER TUBE			      AQ,BD/5-26-97
11) REMOVE PADS, AND CLEAN AND DRY TABLES		      AQ,BD/5-26-97
12) REMOVE SCRUBBER BRUSHES AND SOAK IN DI		      AQ,BD/5-26-97
13) DRY ENTIRE SYSTEM OF ANY STANDING WATER		      AQ,BD/5-26-97
14) POWER DOWN SYSTEM.



SPEC# HF60-0172  REV-D       SPEEDFAM CMP-V PREVENTIVE MAINTENANCE


                        CMP.B START UP CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
                                                                 INIT / DATE
1) TURN ON DI WATER (ROTATE 3W VLV TO FULLY TO POLISHER.	_js/tl/5/27__
2) POWER ON SYSTEM.						_js/tl/5/27__
3) CYCLE/RUN ALL DI FUNCTIONS FOR 15 MINUTES			_js/tl/5/27__
4) WIPE DOWN SYSTEM CLEAN ALL DRIED SLURRY	                _js/tl/5/27__
5) DRY TABLES, INSTALL PADS					_js/tl/5/27__
6) INSTALL SCRUBBER BRUSHES					_js/tl/5/27__
7) INSTALL CONDITIONER						_js/tl/5/27__
8) INSTALL CARRIERS						_js/tl/5/27__
9) RUN WET IDLE PROGRAM FOR 15 MIN. (ENOUGH TO CLEAN CARRIERS)  _js/tl/5/27__
10) IF SLURRY SYSTEM WAS SHUT DOWN, CONTACT ASHLAND CHEMICAL,
    REQUEST DI TO BE PURGE FROM SLURRY SYSTEM AND CHARGED WITH 
    SLURRY AND REQUEST A NEW SLURRY FILTER BE INSTALLED.	_js/tl/5/27__
11) CALIBRATE SLURRY FLOW					_NA___/______
12) PUT IN WET IDLE AND TURN OVER TO MFG FOR MQC		_js/tl/5/27__

                                                                 
24.6ww47 monthly pm completedFABSIX::L_SHKOLNIKOVWed May 28 1997 07:46187
                     SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                           SPEC# HF60-0172  REV-E 

                        Speedfam Corp. CMP-V Planarizer

                Monthly Preventative Maintenance Check Sheet, Rev. E 

DATE:5/24/97      TOOL ENTITY:CMP.B4    TECHNICIAN(S): Mike Standing
                                                       Dave Morin      (DM)
                                                       Leon Shkolnikov (ls)
START TIME:5/24/97         COMPLETED TIME: 05/28/97

6.2.1  Change Peristaltic Pump Lines and check flow     Completed: DM

6.2.2  Clean Polish area tub drains for clogs		Completed: ls/DM

6.2.3  Check all table belts for defects		Completed: ls

6.2.4  Perform Down Force Calibration on all 5 heads   
       to read at +/- 1lbs of 354 lbs.
       NOTE:  The target is 23 lbs. below the actual
       377 lbs. due to the carrier weight minus the
       alignment fixture using the point-to-point
       method as described in the downforce procedure
       in 6.2.4.1 through 6.2.4.13.                     Completed: ls/DM

       Down Frc: Head 1 Pre-Adj: 336   Post-adj: 354 lb

                 Head 2 Pre-Adj: 338   Post-adj: 354 lb

                 Head 3 Pre-Adj: 338   Post-adj: 354 lb

                 Head 4 Pre-Adj: 343   Post-adj: 354 lb

                 Head 5 Pre-Adj: 332   Post-adj: 354 lb

6.2.5  Perform Down Force Calibration on Conditioner    Completed: ls/DM
       to read +/- .5 lbs of 77lbs.
 
       Actual Down Force Pre-Adj:   116 lb      

       Actual Down Force Post-Adj:  77  lb         

6.2.6  Check Scrubber Brushes for contaminates/defects	Completed: ls

6.2.7  Check the Load Flipper alignment			Completed: ls

6.2.8  Check the Unload Flipper alignment		Completed: ls

6.2.9  Check Elevator alignments			Completed: ls

6.2.10 Check wafer unload, from Index table to cassette Completed: ls

6.2.11 Check the +24 Volt power supply for +/- 1V 
       of 24 volts.                    Pre:23.6  Post:23.6  Tech:  DM

6.2.12 Check the +/- 15 Volt power supply for +/- 1V
       of 15V                          Pre:14.9 Post:14.9   Tech:  DM

6.2.13 Check the +5 Volt power supply for 4.5 to
       5.5 v.                           Pre:5.1  Post:5.1   Tech:  DM

6.2.14 Check Table Rotation Speed for +/- 1.5 of 30RPM  Completed: 31 DM

6.2.15 Check Vacuum Pump Diaphrams			Completed: DM

6.2.16 Replace liquid separator filter element          Completed: ls 

6.2.17 Check Vacuum Tank/Pump lines			Completed: ls

6.2.18 Check carrier to Load Cup Position alignments    Completed: ls/DM

6.2.19 Check Load Cup Height to carrier alignments      Completed: ls

6.2.20  Check the Robot alignments                      Completed: ls
                                         
6.2.21 Check Muffin Fans for proper operation           Completed: ls

    Comments:Was unable to complete this pm due to the tool CMP.B4 not
    being listed on the quartly pm schedule, and due to the bottle neck of
    work in CMP production would not release the tool for an extended down
    time...                                                 Mike Standing.

========================================================================



                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE: 5/27/97  TOOL ENTITY: CMP.A4   TECHNICIAN(S):  DAVE MORIN      (DM)
                                                     Leon Shkolnikov (ls)
START TIME:       COMPLETED TIME:
6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed:80(DM) 

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55(DM)

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 28(DM)

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 45(DM)

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed:15(DM)

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35(DM)

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 35(DM)

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 45(DM)

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6(DM)

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20(DM)

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 55(DM)

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 55(DM)

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30(DM)

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 30(DM)

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20(DM)

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45(DM)

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80(DM)

6.1.19 Check Drip Pans for moisture/contamination        Completed: ls 

6.1.20 Check tubing/fittings for fluid leaks             Completed: ls 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: ls 

6.1.22 Check stations/components for contamination	 Completed: ls/DM 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 10

6.1.24 Clean and lubricate the Scrubber rails		 Completed: ls 

6.1.25 Clean and lubricate the Paddle rails		 Completed: ls

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: DM/ls

6.1.27 Scrub clean the Polish area tub and walls         Completed: DM/ls

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: DM/ls

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: DM

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: DM

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: ls

6.1.32 Check Carrier clean brushes for defects           Completed: ls/DM
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: ls

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: ls

6.1.35 Check chiller fluid resevoir for proper level     Completed: ls

6.1.36 Check the chiller readout for 24 degrees C.       Completed: ls

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: ls 

6.1.38 Check the slurry flow alarm.                      Completed: ls/DM 

Comments:



24.7ww48 weekly pm.FABSIX::L_SHKOLNIKOVWed May 28 1997 07:48103
          
========================================================================



                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE: 5/28/97  TOOL ENTITY: CMP.A4   TECHNICIAN(S):  DAVE MORIN      (DM)
                                                     Leon Shkolnikov (ls)
START TIME:       COMPLETED TIME:
6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed:80(DM) 

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55(DM)

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 28(DM)

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 45(DM)

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed:15(DM)

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35(DM)

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 35(DM)

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 45(DM)

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6(DM)

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20(DM)

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 55(DM)

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 55(DM)

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30(DM)

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 30(DM)

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20(DM)

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45(DM)

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80(DM)

6.1.19 Check Drip Pans for moisture/contamination        Completed: ls 

6.1.20 Check tubing/fittings for fluid leaks             Completed: ls 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: ls 

6.1.22 Check stations/components for contamination	 Completed: ls/DM 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 10

6.1.24 Clean and lubricate the Scrubber rails		 Completed: ls 

6.1.25 Clean and lubricate the Paddle rails		 Completed: ls

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: DM/ls

6.1.27 Scrub clean the Polish area tub and walls         Completed: DM/ls

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: DM/ls

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: DM

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: DM

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: ls

6.1.32 Check Carrier clean brushes for defects           Completed: ls/DM
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: ls

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: ls

6.1.35 Check chiller fluid resevoir for proper level     Completed: ls

6.1.36 Check the chiller readout for 24 degrees C.       Completed: ls

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: ls 

6.1.38 Check the slurry flow alarm.                      Completed: ls/DM 

Comments:



24.8ww49 weekly p.m. completedFABSIX::R_GEEMon Jun 02 1997 17:02102
                      SPEEDFAM CMP-V PREVENTIVE MAINTENANCE

                             SPEC# HF60-0172  REV-E  
                      
                       Speedfam Corp. CMP-V Planarizer

                Weekly Preventative Maintenance Check Sheet, Rev. E

DATE: 6/02/97  TOOL ENTITY: CMP.B4   TECHNICIAN(S):  Bob Gee (BG)
                                                     Brendan Finn (BF)
						     Tim Landry (TL)
						     Jim Sadin (JS)
		

6.1.1  Check CDA pressure inside tool for 80-90 PSI	 Completed:80(BG)

6.1.2  Check N2 pressure inside tool for 55-65 PSI       Completed: 55(JS)

6.1.3  Check incoming DI Water pressure for 20-30 PSI    Completed: 30(BG)

6.1.4  Check Load Cup pressure for 40-50 PSI		 Completed: 45(BG)

6.1.5  Check Pad Condition Balance pressure 10-20 PSI	 Completed: 15(BG)

6.1.6  Check Pad Conditioner Up pressure for 30-40 PSI	 Completed: 35(BG)

6.1.7  Check Carrier Up pressure for 25-35 PSI		 Completed: 35(BG)

6.1.8  Check Miscellaneous pressure for 40-50 PSI        Completed: 45(BG)

6.1.9  Check Head Balance pressure for 6-6.5 PSI         Completed:  6(BG)

6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed: N/A
       (Applicable for CMP.B1 only)

6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed: 20(TL)

6.1.12 Check Open Load Flipper pressure for 45-55 PSI	 Completed: 55(TL)

6.1.13 Check Open Unload Flipper pressure for 50-60 PSI	 Completed: 55(TL)

6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI  Completed: 30(TL)

6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI	 Completed: 25(TL)

6.1.16 Check Alignment Fixture pressure for 15-25 PSI    Completed: 20(TL)

6.1.17 Check Scrubber In/Out pressure for 45-55 PSI	 Completed: 45(TL)

6.1.18 Check MHTA pressure for 75-85 PSI	         Completed: 80(TL)

6.1.19 Check Drip Pans for moisture/contamination        Completed: BF

6.1.20 Check tubing/fittings for fluid leaks             Completed: BF 

6.1.21 Check tubing/fittings for pneumatic leaks         Completed: BF 

6.1.22 Check stations/components for contamination	 Completed: BF 

6.1.23 Check incoming Chilled Water pressure <10 PSI	 Completed: 10

6.1.24 Clean and lubricate the Scrubber rails		 Completed: BF 

6.1.25 Clean and lubricate the Paddle rails		 Completed: BF

6.1.26 Remove and clean conditioning Wheel and Housing   Completed: BF

6.1.27 Scrub clean the Polish area tub and walls         Completed: BF

6.1.28 Remove all Load and Unload cups and scrub clean    
       with hydrogen peroxide.                           Completed: BF

6.1.29 Wipe the Load area, Mapper and Aligner w/ISO      Completed: BF

6.1.30 Check slurry pump hoses and connectors for leaks  Completed: BF

6.1.31 Remove and clean the Vacuum system filter          
       element and replaced as needed.                   Completed: BF

6.1.32 Check Carrier clean brushes for defects           Completed: BF
       (On CMP.B1, rotate position)

6.1.33 Wipe the MHTA and covers with Isopropyl           Completed: BF

6.1.34 Wipe the Process Area plexiglas doors w/Iso       Completed: BF

6.1.35 Check chiller fluid resevoir for proper level     Completed: BF

6.1.36 Check the chiller readout for 24 degrees C.       Completed: BF

6.1.37 Check the positioning and functionality of the
       wafer detect sensors.  Use the procedure in
       step 6.1.37.4 to check sensors without having to
       make any adjustments.                             Completed: BF 

6.1.38 Check the slurry flow alarm.                      Completed: BF

Comments: Found the main table gear box leaking, notified EE and field
	  service.