T.R | Title | User | Personal Name | Date | Lines |
---|
80.1 | Ashland Chemical contact numbers | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Wed Nov 20 1996 21:06 | 6 |
|
Ashland Chemical 24-hotline number 1-800-489-4393
Dave Agresti - site manager x6112
Ashland office - 6122
|
80.2 | 10" filter installed | SUBPAC::LANDRY | | Mon Nov 25 1996 21:50 | 6 |
| Today, at approximately 12:00 PM (noon), the slurry filter was changed
over to a 10" filter. This is the first attempt with this filter.
Ashland will check on it more frequently than normal.
A shift
|
80.3 | 10" removed | STRATA::TDYER | | Mon Dec 02 1996 07:37 | 7 |
|
Ashland removed the 10" filter-rite 10" filter on Friday at 4:00pm,
Osmonics put back on line. The filter was running fine, they replaced
it because of fear it may clogg over the weekend. Testing will continue
this week.
Tim D.
|
80.4 | Title : Removed 10" | HOTLNE::INGLES | | Mon Dec 02 1996 07:49 | 4 |
| The 10" filter in slurry ran monday - friday with no
problems. We switched back to the osmonics to prevent
from occuring over the weekend. The filter will be
changed saturday and sunday.
|
80.5 | Removed 10" / Changed Osomics Filter | HOTLNE::OUELLETTE | | Mon Dec 02 1996 08:41 | 7 |
| The Osmonics filter in slurry was changed out Saturday November 30 1996.
Also Sunday November 31 1996 it was changed again.
Both filters were changed between the hours of three & four pm each day.
MAO
|
80.6 | millipore filter | HOTLNE::SPANG | | Tue Dec 03 1996 18:31 | 7 |
| Today Tuesday 12/3/96 We installed the millipore filter housing and millipore
filter # cr2501006 a 25 um. It was turned on at 17:45 and the presure readings
where 40 psi in and 38 psi out. The Osmonics filter is in place if need be due
to a failurem of the millipore.
Dave Spang 674 # 1
|
80.7 | Filterite 20" carteridge | HOTLNE::OUELLETTE | | Tue Dec 17 1996 15:18 | 6 |
| 12/16/96 at 4pm the Filterite 20" 30um filter was turned on-line.
The dispense out line pressure was at 35psi directly after the filter
was turned on-line.
MAO/RM
|
80.8 | filter change | HOTLNE::SPANG | | Fri Dec 27 1996 11:22 | 9 |
| Today Friday Dec 27 We changed out the filter-rite filter in the
bulk slurry.system. We have switched back to the Osmonics filter
at this point and will run on the Osmonics until Monday. We will
change the Osmonics filter out on Saturday afternoon at 4:00 and put
another Osmonics filter on line. On Monday we will switch to the 20"
Pall filter.
Dave Spang
|
80.9 | n | HOTLNE::INGLES | | Mon Jan 06 1997 11:19 | 2 |
| On 1/3/97 at 0830 we switched from the Osmonics filters to the 20" Pall
filter. We will run on this filter until it fails.
|
80.10 | Pall Filter Died | HOTLNE::OUELLETTE | | Thu Jan 09 1997 10:06 | 2 |
| On 1/9/97 at 0830 we switched from the 20"pall filter to a 30um
Osmonics.
|
80.11 | pal failed | STRATA::TDYER | | Thu Jan 09 1997 10:24 | 7 |
|
The Pal ultra-pleat filter failed for particles. B2 failed on 1/7
and B1 on 1/9. This was the 2nd test for this filter. We are now
confident that this filter is not acceptable. Evaluation will continue
with the Filter-Rite and Milli-pore over the next few weeks.
Tim
|
80.12 | high particles | HOTLNE::INGLES | | Thu Jan 09 1997 16:15 | 6 |
| At 1330 we drained the slurry system and flushed it with DI water for
30 minutes. The Osmonic filters were removed and new Osmonics filters were
installed. The system was filled with slurry and was turned over to CMP
at 1500.
George of Ashland
|
80.13 | testing 20" Filterite CMP 630-20UV300. | HOTLNE::INGLES | | Fri Jan 10 1997 15:38 | 4 |
| At 1530 we switched to the 20" Filterite using filter# CMP 630-20UV300.
We will run with this until failure.
George Of Ashland
|
80.15 | filter change | HOTLNE::MULLIN | | Fri Jan 17 1997 10:57 | 8 |
| On 1-16-97 we changed back to osmonic filter at 6:30am
due to system clog, after running filterite cartridge(20")
Found filter and housing to be caked with slurry sludge.
On 1-17-97 we changed over to the opposite osmonic filter due to
high pressure readings. This is the left side filter.
RPM
|
80.16 | | HOTLNE::OUELLETTE | | Mon Jan 20 1997 11:28 | 5 |
| 01/20/97 The left side Osmonics filter had extremely high pressure
readings so the switch over to the right side osmonics was completed
11:30am.
MAO
|
80.17 | changed osmonics filter 30 micron | HOTLNE::INGLES | | Wed Jan 22 1997 00:26 | 3 |
| At 11:40 pm the slurry filter climbed to a 30 lb differential. We
switched to the left osmonics filter and changed out the right. We are
still using the 30 micron osmonics.
|
80.18 | changed osmonics filter 30 micron | HOTLNE::MEHLER | | Thu Jan 23 1997 21:28 | 2 |
| At 8:30 pm the slurry filter was switched to right osmonics and the
left was changed out. We are still using 30 micron osmonics.
|
80.19 | Megasys Coming Soon? | HOTLNE::OUELLETTE | | Fri Jan 24 1997 08:33 | 5 |
|
This morning the CMP 630-10UV-M3 300 Filterite filter was installed.
Tonight this filter will be turn on-line @9pm, unless the osmonics fails.
|
80.20 | 10" filterite now operating | HOTLNE::MEHLER | | Fri Jan 24 1997 22:52 | 2 |
| The 10" 30 micron filterite slurry filter began running at 10:30 pm
|
80.21 | osmonics filter back on line | HOTLNE::SPANG | | Mon Jan 27 1997 14:00 | 5 |
| On Sunday jan 26 at 11:50 pm the 10" memtec slurry filter clogged
We went back to the osmonics filter and will changes these out every 48
hours untill further notice.
DS/GI
|
80.22 | 80.22 | HOTLNE::MULLIN | | Mon Feb 03 1997 08:20 | 5 |
| Saturday, Feb 2, 4:30p, changed out left osmonic filter, also changed
out the right as well. Unit is now running on right, with left ready.
Filter differential was 8 lbs.
|
80.23 | Updating Filter Changes | HOTLNE::OUELLETTE | | Mon Feb 24 1997 17:38 | 6 |
| 2/23/97
Changed from the left side osmonics to the right side osmonics
filter. The time was 6:30pm Sunday.
MAO
|
80.24 | | HOTLNE::OUELLETTE | | Tue Feb 25 1997 20:19 | 5 |
| 2/25/97 7pm The right side osmonics filter was changed out to the left side.
A new outlet pressure gauge was installed to the right side filter housing.
mao
|
80.25 | | HOTLNE::OUELLETTE | | Sun Mar 02 1997 19:45 | 7 |
| 2/28/97 The right side osmonics was changed over to the left side
filter housing. Roughly around 7pm.
3/2/97 The left side osmonics was changed over to the right side
filter housing @ 7pm.
MAO
|
80.26 | Slurry filter change | HOTLNE::MEHLER | | Wed Mar 12 1997 16:00 | 3 |
| System chemistry osmonic slurry filter was changed last night
at 9:30 pm. It was changed over to the right side.
RCM
|
80.27 | Osmonic filter change | HOTLNE::MEHLER | | Thu Mar 13 1997 21:03 | 3 |
| The Osmonic Slurry filter was changed at 8:30pm. It was
changed over to the left side.
RCM
|
80.28 | Slurry Osmonic filter changed | HOTLNE::MEHLER | | Mon Mar 17 1997 18:40 | 4 |
| The Osmonic filter on the systems chemistry Slurry system
was changed at 5:30pm on 3-17-97. It was switched over to
the left side.
-rcm
|
80.29 | slurry osmonic filter change | HOTLNE::INGLES | | Sun Mar 23 1997 20:23 | 2 |
| The Osmonic filter was changed on 3/21/97 at 4pm. The system is running
on the right osmonic filter.
|
80.30 | slurry osmonic filter change | HOTLNE::INGLES | | Sun Mar 23 1997 20:25 | 2 |
| The Osmonic filter was changed on 3/23/97 at 4:30 pm. The system is
running on the left osmonic filter.
|
80.31 | Osmonic filter change | HOTLNE::MEHLER | | Tue Mar 25 1997 23:26 | 2 |
| After notifying CMP, the Osmonic slurry filter was changed at approx. 4:30. It
was switched to the right side.
|
80.32 | Osmonic filter change | HOTLNE::MEHLER | | Thu Mar 27 1997 19:37 | 3 |
| After coordinating a time with CMP, the Slurry osmonic filter was changed tonight
at 6:00pm. The filter was changed to the right side.
-RCM and GI
|
80.33 | Slurry osmonic filter change | HOTLNE::MEHLER | | Mon Mar 31 1997 20:43 | 2 |
| The Slurry osmonic filter was changed tonight at 5:30pm. It was changed to the
right side by RCM and GI.
|
80.34 | new slurry filter CMP630-20UV-M3 300 | HOTLNE::INGLES | | Thu Apr 03 1997 00:16 | 5 |
| At 6:00 PM we changed the slurry system filter. We are now using the 20
inch Ametec filter housing and filter # CMP630-20UV-M3 300. We have
both Osmonic filter housings with new filters installed for backup.
GI and RCM
|
80.35 | | HOTLNE::OUELLETTE | | Fri Apr 04 1997 23:28 | 9 |
|
Today @ 1120 am the slurry filter was changed with a new
cmp630-20uv-m3 300.
MAO
Today @ 415pm the Mega slurry system filter was changed for CMP.B4.
|
80.36 | | HOTLNE::OUELLETTE | | Tue Apr 08 1997 17:13 | 9 |
| Today 4/8/97 the MegaflowII dispense filter was replaced with a new
fitler cmp 630 20 m3 300
Also the SC112 filter was replaced with a new filter
cmp 630 20 m3 300.
Both filters were changed at 11am.
MAO
|
80.37 | Mega and Sys Chem slurry filter changes | HOTLNE::INGLES | | Fri Apr 11 1997 12:58 | 3 |
| Today we changed both the System Chemistry and the Mega CDU filters. We
are using filter number CMP 630-20UV-M3 300. These filters were
changed between 11:00am and 11:30am.
|
80.38 | | HOTLNE::OUELLETTE | | Tue Apr 15 1997 12:03 | 3 |
| Today we changed both the system chemistry and mega cdu filters.
We are using cmp-20uv-m3 300. These filters were changed between
10:30 and 11am.
|
80.39 | | HOTLNE::OUELLETTE | | Fri Apr 25 1997 12:01 | 10 |
|
APRIL 18TH 1997
The filter to system chemistry MDU was changed ~10:30am.
The filters to Mega MDU was changed ~10:30am.
All filters replaced with cmp-20uv-m3 300 type filters.
|
80.40 | | HOTLNE::OUELLETTE | | Fri Apr 25 1997 12:03 | 3 |
|
Today at 1015am the slurry filter was changed using a cmp-20uv-m3 300
type filter.
|
80.41 | Mega Distribution 2 slurry filter change. | HOTLNE::INGLES | | Mon Apr 28 1997 12:35 | 5 |
| Today at 1000 we changed the Distribution 2 slurry filter using
cmp-20uv-m3 300. We did this in order to repair the flter housing 1/4
turn valve.
GI
|
80.42 | System Chemistry and Mega Slurry filter Change | HOTLNE::INGLES | | Tue Apr 29 1997 11:21 | 2 |
| Today at 0945 we changed the system chemistry and Mega ditribution one
filters using CMP-20UV-M3 300.
|
80.43 | System Chemistry and Mega System slurry filter Change. | HOTLNE::INGLES | | Fri May 02 1997 14:40 | 2 |
| Toaday we changed filters on the System Chemistry and Distro. 1 and 2 on
the Mega System using the CMP-20UV-M3 300 filters.
|
80.44 | | HOTLNE::OUELLETTE | | Tue May 06 1997 14:10 | 2 |
| Today we changed filters on the system chemistry and distro 1 & 2 on
the Mega System using CMP-20UV-m3 filters.
|
80.45 | | HOTLNE::OUELLETTE | | Fri May 09 1997 12:07 | 2 |
| Today May 9, 1997 bulkchemical group changed filters to SCI & MEGAFLOWII
distrobution dispense systems using cmp-200uv-m3.
|
80.46 | | HOTLNE::MULLIN | | Tue May 13 1997 11:41 | 2 |
| 5/13/97 - Ashland changed out filters in both the SCI & MEGASYS. slurry
distrubution units 10am-1030
|
80.47 | ASHLAND CHEMICAL - SLURRY FILTER CHANGE | HOTLNE::MEHLER | | Tue May 13 1997 21:44 | 3 |
| 5/13/97- At the request of CMP the system's chemistry filter was changed a
second time due to very high particle counts. 8:30-8:40pm
-rcm
|
80.48 | Systems Chemistry Slurry System filter change | HOTLNE::MEHLER | | Fri May 16 1997 04:36 | 5 |
| 5/16/97
On call responded to CMP's page that slurry from the systems chemistry
CDU was not reaching CMP. Found that filter was 100% clogged and changed
immediately. Finished at 3:00am.
-rcm
|
80.49 | Slurry filter change | HOTLNE::MEHLER | | Sat May 17 1997 16:42 | 3 |
| 5/17/97
At the request of CMP and due to high particles the Mega System Slurry
filters were changed at 3:00pm by RCM.
|
80.50 | Slurry filter changes | HOTLNE::INGLES | | Mon May 19 1997 14:55 | 4 |
| Today at 0800 the Slurry Mega system filters Dist.1&2 were changed. At 1330
the Slurry System Chemistry filter was changed.
GI
|
80.51 | | HOTLNE::OUELLETTE | | Wed May 21 1997 16:10 | 5 |
| Today at 10:15am the System Chemistry distrobution filter was changed.
Also at 2pm the MegaFlowII distrobution filters were changed.
MAO
|
80.52 | NOTE 80.52 | HOTLNE::MULLIN | | Sat May 24 1997 14:15 | 4 |
| This is a late entry to notify all the changeout of pump # 1 in the
Sys. Chem. CDU on Thursday, 5/22/97. There was zero downtime to the
FAB.
|
80.53 | | HOTLNE::OUELLETTE | | Tue May 27 1997 08:21 | 1 |
| Friday May 23, the System Chemistry CDU filter was changed.
|
80.54 | Slurry System Filter Changes | HOTLNE::INGLES | | Wed May 28 1997 09:41 | 2 |
| At 8:00 am the System Chemistry and Mega System Slurry filters were
changed.
|
80.55 | Slurry System Filter Changes | HOTLNE::INGLES | | Mon Jun 02 1997 16:15 | 2 |
| At 8:00 am the System Chemistry Slurry filter was changed. At 2:30 pm
the Mega System Slurry filter was changed.
|
80.56 | Slurry System Filter Changes | HOTLNE::INGLES | | Wed Jun 04 1997 11:34 | 2 |
| At 0900 we changed the System Chemistry Slurry filter and at 0945 we
changed the Mega System Slurry filters.
|