82.0. "CMP ops passdowns - Oct '96" by FABSIX::J_SADIN (Freedom isn't free.) Mon Sep 30 1996 20:37

    
    
    	CMP operations passdowns for October, 1996.
    
    
T.RTitleUserPersonal
Name
DateLines
82.1passdown cmp b-shift 10/01/96FABSIX::M_PROVENCHERTue Oct 01 1996 07:54111
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                17                   MQC'S

        BREAKIN WAFERS              26                    misc


           
CMP.A1 (Strasbaugh 6DS-SP) - up/running jd0521 pmd/jd0520 pmd      
CMP.A1 24hr MQCS COMPLETED:  10/01/96 @ 4:00 am 
CMP.A1 24hr MQCS NEXT DUE :  10/02/96 @ 4:00 am

CMP.A2 (Strasbaugh 6DS-SP) - dn/crash (needs carriers)
CMP.A2 24hr MQCS COMPLETED:  n/a              
CMP.A2 24hr MQCS NEXT DUE :  n/a            



CMP.B1 (Speedfam CMP-V) - :  up/mqc/down until 6:30 am 
CMP.B1 24hr MQCS COMPLETED   in process            
CMP.B1 24hr MQCS NEXT DUE :  n/a
CMP.B1 12hr MQCS COMPLETED:  10/01/96 @ 7:00 am           
CMP.B1 12hr MQCS NEXT DUE :  10/01/96 @ 7:00 pm

CMP.B2 (Speedfam CMP-V) - :  up/mqc first set failed (head 3) uniformity
CMP.B2 24hr MQCS COMPLETED:  in process          
CMP.B2 24hr MQCS NEXT DUE :  n/a            
CMP.B2 12hr MQCS COMPLETED:  9/30/96 @  9:00 pm            
CMP.B2 12hr MQCS NEXT DUE : 10/01/96 @  9:00 am            

CMP.B3 (Speedfam CMP-V) - :  up/running ye0192 m3/ jl0515 m2 both at touchup
CMP.B3 24hr MQCS COMPLETED:  9/30/96 @  8:30 am 
CMP.B3 24hr MQCS NEXT DUE : 10/01/96 @  8:30 am
CMP.B3 12hr MQCS COMPLETED:  9/30/96 @  8:30 pm            
CMP.B3 12hr MQCS NEXT DUE : 10/01/96 @  8:30 am            



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED:10/01/96 @ 6:30 am        
CMP-SCRUB.A1 12hr MQCS NEXT DUE :10/01/96 @ 6:30 pm        

CMP-SCRUB.A2 (On-track scrubber) - up/idle                 
CMP-SCRUB.A2 12hr MQCS COMPLETED:10/01/96 @ 6:30 am        
CMP-SCRUB.A2 12hr MQCS NEXT DUE :10/01/96 @ 6:30 pm        

CMP-SCRUB.A3 (On-track scrubber) - up/idle/down from 11pm til 6:00 am
CMP-SCRUB.A3 12hr MQCS COMPLETED:10/01/96 @ 6:30 am        
CMP-SCRUB.A3 12hr MQCS NEXT DUE :10/01/96 @ 6:30 pm



Hot/B lots in area:
__________________
* xd0533 m3 *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* xd0513 3.6 days (hold for eng) *
  jd0412 2.9 days (hold for eng)
  
Down Equipment:
--------------
* cmp.a2 needs carriers  *
  cmp.b1 mqc's in process
  cmp.b2 mqc's in process
Scrap lots:
----------
* none  *

Hold Lots:
----------
* xd0513 hold for proc eng to run *
  jd0412 hold for proc eng to run
  xd0560 eng stores @ cmp
  xd0441 eng stores @ cmp hold for eric b.

Monitor status:
--------------
3  boxes of 12k mqc wafers.  
1  boxes of 50K breakin wafers (one in process)*   

Number of product lots in room:
------------------------------
* 18 lots *

New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. * 

Lots/wafers processed:
---------------------
* jl0536 pmd 23 wafers *
  jl0511  m2 24 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
 11 speedfam carriers*
  0 strasbaugh carriers*
  ? strasbaugh plates*


82.2A-shift CMP passdown 10/1/96FABSIX::J_SADINFreedom isn't free.Tue Oct 01 1996 20:25118
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  mqcs

        BREAKIN WAFERS              20                  misc



CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: XD0558 (pmd).
CMP.A1 24hr MQCS COMPLETED: 4:30am 10/1
CMP.A1 24hr MQCS NEXT DUE : 4:30am 10/2

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0550 (pmd).
CMP.A2 24hr MQCS COMPLETED: 2pm 10/1
CMP.A2 24hr MQCS NEXT DUE : 2pm 10/2



CMP.B1 (Speedfam CMP-V) - REPAIR: reps looking into carrier rotation
errors.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0534 (m1).
CMP.B2 24hr MQCS COMPLETED: 11:30am 10/1
CMP.B2 24hr MQCS NEXT DUE : 11:30am 10/2
CMP.B2 12hr MQCS COMPLETED: 11:30am 10/1
CMP.B2 12hr MQCS NEXT DUE : 11:30pm 10/1

CMP.B3 (Speedfam CMP-V) - RUNNING: XD0513 (m3) and JD0412 (m3).
CMP.B3 24hr MQCS COMPLETED: 1pm 10/1
CMP.B3 24hr MQCS NEXT DUE : 1pm 10/2
CMP.B3 12hr MQCS COMPLETED: 1pm 10/1
CMP.B3 12hr MQCS NEXT DUE : 1am 10/2



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 7:30pm 10/1
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 7:30am 10/2

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 7:30pm 10/1
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 7:30am 10/2

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 7:30pm 10/1
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 7:30am 10/2



Hot/B lots in area:
__________________
JD0504 - M2 HOT
XD0533 - M3 HOT

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
XD0513 - 4.1DAYS
JL0509 - 1.5DAYS
XE0546 - 1.0DAYS
JE0491 - 1.1DAYS
XD0548 - 1.3DAYS
JD0412 - 3.4DAYS
XD0533 - 0.8DAYS
JL0530 - 1.6DAYS
JL0514 - 1.2DAYS

Down Equipment:
--------------
CMP.B1 - DOWN FOR REPS TO REPLACE GEARBOX

Scrap lots:
----------
* none *

Hold Lots:
---------
JD0412 - BEING RELEASED SHORTLY
ZE0141 - HOLD FOR METROLOGY TO MEASURE PRODUCT.

Monitor status:
--------------
2.5 boxes of 12K monitor wafers
0 boxes of 50K breakin wafers

Number of product lots in room:
------------------------------
17 

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0520 - PMD - 24WFRS
JD0521 - PMD - 23
JD0504 - M2 - 24
JD0535 - M1 - 22
YE0192 - M3 - 12
JL0515 - M2 - 19

# of carriers for strasbaugh/speedfam:
--------------------------------------
SEE SAM GRALEY'S PASSDOWN

82.3passdown cmp b-shift 10/06/96FABSIX::M_PROVENCHERSun Oct 06 1996 07:44115
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                22                   MQC'S

        BREAKIN WAFERS              37                    misc


           
CMP.A1 (Strasbaugh 6DS-SP) - up/mqc results pending as of 6:30am      
CMP.A1 24hr MQCS COMPLETED:  10/01/96 @ 4:00 am 
CMP.A1 24hr MQCS NEXT DUE :  10/02/96 @ 4:00 am

CMP.A2 (Strasbaugh 6DS-SP) - up/running jd0551 pmd
                             was down until 6:30 am
CMP.A2 24hr MQCS COMPLETED:  10/06/96 @ 6:30 am              
CMP.A2 24hr MQCS NEXT DUE :  10/07/96 @ 6:30 am



CMP.B1 (Speedfam CMP-V) - :  unsched.down/ down all night
			     failed mqc's for low r/r and high unif.
			     ran 2 sets of mqc's. prior to 2nd set
                             changed offsets on heads 1 and 2. r/r still
			     too low.   
CMP.B1 24hr MQCS COMPLETED   n/a            
CMP.B1 24hr MQCS NEXT DUE :  when tool comes up
CMP.B1 12hr MQCS COMPLETED:  10/01/96 @ 7:00 am           
CMP.B1 12hr MQCS NEXT DUE :  10/01/96 @ 7:00 pm

CMP.B2 (Speedfam CMP-V) - :  up/running xd0568 pmd (hotlot)/jl0486 m2
                             was down until @ 12:30 am, vacuum problem
CMP.B2 24hr MQCS COMPLETED:  10/06/96@  3:00 am           
CMP.B2 24hr MQCS NEXT DUE :  10/07/96@  3:00 am            
CMP.B2 12hr MQCS COMPLETED:  10/06/96@  3:00 am            
CMP.B2 12hr MQCS NEXT DUE :  10/06/96@  3:00 pm            

CMP.B3 (Speedfam CMP-V) - :  up/mqc 
CMP.B3 24hr MQCS COMPLETED:  in process 
CMP.B3 24hr MQCS NEXT DUE :  n/a
CMP.B3 12hr MQCS COMPLETED:  n/a           
CMP.B3 12hr MQCS NEXT DUE :  n/a           



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED:10/06/96 @ 4:00 am        
CMP-SCRUB.A1 12hr MQCS NEXT DUE :10/06/96 @ 4:00 pm        

CMP-SCRUB.A2 (On-track scrubber) - up/idle                 
CMP-SCRUB.A2 12hr MQCS COMPLETED:10/06/96 @ 4:00 am        
CMP-SCRUB.A2 12hr MQCS NEXT DUE :10/06/96 @ 4:00 pm        

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 12hr MQCS COMPLETED:10/06/96 @ 6:00 am        
CMP-SCRUB.A3 12hr MQCS NEXT DUE :10/06/96 @ 6:00 pm



Hot/B lots in area:
__________________
* xd0568 pmd (b2) *
  jd0505  m3

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* jd0548 pmd (at p2) hold for drg 
  
Down Equipment:
--------------
* cmp.a1 mqc *
  cmp.a2 mqc
  cmp.b1 mqc

Scrap lots:
----------
* none  *

Hold Lots:
----------
* jd0548 pmd (at p2) hold for drg 

Monitor status:
--------------
2  boxes of 12k mqc wafers. some on order  
1/2 box of 50K breakin wafers. 2 on order   

Number of product lots in room:
------------------------------
* 15 lots *

New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. * 

Lots/wafers processed:
---------------------
* jd0507 m3 *
  

# of carriers for strasbaugh/speedfam:
--------------------------------------
  ? speedfam carriers*
  ? strasbaugh carriers*
  ? strasbaugh plates*


82.4A-shift CMP passdown 10/6/96FABSIX::J_SADINFreedom isn't free.Sun Oct 06 1996 20:16107
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  mqcs

        BREAKIN WAFERS              25                  misc



CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JL0528 (m2) and JD0553 (pmd).
CMP.A1 24hr MQCS COMPLETED: 10am 10/6
CMP.A1 24hr MQCS NEXT DUE : 10am 10/7

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0551 (m2).
CMP.A2 24hr MQCS COMPLETED: 7am 10/6
CMP.A2 24hr MQCS NEXT DUE : 7am 10/7



CMP.B1 (Speedfam CMP-V) - VERIFY: running mqcs after equipment techs
tweaked DF.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - IDLE. 
CMP.B2 24hr MQCS COMPLETED: 3am 10/6
CMP.B2 24hr MQCS NEXT DUE : 3am 10/7
CMP.B2 12hr MQCS COMPLETED: 5pm 10/6
CMP.B2 12hr MQCS NEXT DUE : 5am 10/7

CMP.B3 (Speedfam CMP-V) - RUNNING: XD0550 (m1).
CMP.B3 24hr MQCS COMPLETED: 11am 10/6
CMP.B3 24hr MQCS NEXT DUE : 11am 10/7
CMP.B3 12hr MQCS COMPLETED: 11am 10/6
CMP.B3 12hr MQCS NEXT DUE : 11pm 10/6



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 7:30pm 10/6
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 7:30am 10/7

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 7:30pm 10/6
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 7:30am 10/7

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 7:30pm 10/6
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 7:30am 10/7



Hot/B lots in area:
__________________
JD0505 - ILD3

Hot lots coming to area:
-----------------------
JD0449 - DEP_M2

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.B1 - VERIFY: BAD UNIF AND LOW REM-RATE ALL DAY. RUNNING MQCS AGAIN.

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
�box of 12K mqc wafers. (more on order)
0 boxes of 50K breakin wafers. (more on order)

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0551 - PMD - 24WFRS
JL0516 - M2 - 24
JL0486 - M2 - 24
XD0568 - PMD - 24
JD0505 - M3 - 24

# of carriers for strasbaugh/speedfam:
--------------------------------------
?NEED TO CHECK CARRIER ROOM.

82.5passdown cmp b-shift 10/7/96FABSIX::M_PROVENCHERMon Oct 07 1996 07:35116
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                   MQC'S

        BREAKIN WAFERS              43                    misc


           
CMP.A1 (Strasbaugh 6DS-SP) - up/mqc     
CMP.A1 24hr MQCS COMPLETED:  in process 
CMP.A1 24hr MQCS NEXT DUE :  n/a

CMP.A2 (Strasbaugh 6DS-SP) - dn/crash @ 6:00 am (slurry problem)
			     pad/carrier changed will need mqc's
CMP.A2 24hr MQCS COMPLETED:  n/a              
CMP.A2 24hr MQCS NEXT DUE :  n/a



CMP.B1 (Speedfam CMP-V) - :  unsched.down/ down all night
			     failed mqc's for std dev. id/od
                             changed for less centerfast polish.
                             will need mqc's                             
CMP.B1 24hr MQCS COMPLETED   n/a            
CMP.B1 24hr MQCS NEXT DUE :  n/a
CMP.B1 12hr MQCS COMPLETED:  n/a           
CMP.B1 12hr MQCS NEXT DUE :  n/a

CMP.B2 (Speedfam CMP-V) - :  up/running ye0207 m1/xd0563 m1
CMP.B2 24hr MQCS COMPLETED:  10/07/96@   5:00 am           
CMP.B2 24hr MQCS NEXT DUE :  10/08/96@   5:00 am           
CMP.B2 12hr MQCS COMPLETED:  10/07/96@   5:00 am          
CMP.B2 12hr MQCS NEXT DUE :  10/07/96@   5:00 pm         

CMP.B3 (Speedfam CMP-V) - :  up/running xd0558 m1/jd0521 m1 
CMP.B3 24hr MQCS COMPLETED:  10/06/96 @ 11:00 am 
CMP.B3 24hr MQCS NEXT DUE :  10/07/96 @ 11:00 am
CMP.B3 12hr MQCS COMPLETED:  10/06/96 @ 11:00 pm           
CMP.B3 12hr MQCS NEXT DUE :  10/07/96 @ 11:00 am



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED:10/07/96 @ 5:00 am        
CMP-SCRUB.A1 12hr MQCS NEXT DUE :10/07/96 @ 5:00 pm        

CMP-SCRUB.A2 (On-track scrubber) - up/idle                 
CMP-SCRUB.A2 12hr MQCS COMPLETED:10/07/96 @ 5:00 am        
CMP-SCRUB.A2 12hr MQCS NEXT DUE :10/07/96 @ 5:00 pm        

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 12hr MQCS COMPLETED:10/07/96 @ 5:00 am        
CMP-SCRUB.A3 12hr MQCS NEXT DUE :10/07/96 @ 5:00 pm



Hot/B lots in area:
__________________
* none  *

Hot lots coming to area:
-----------------------
* jd0449 m2  *

Static Lots in area:
-------------------
* none * 
  
Down Equipment:
--------------
* cmp.a1 mqc  *
  cmp.a2 crash

Scrap lots:
----------
* jd0559 pmd 2 wafers  *

Hold Lots:
----------
* none  * 

Monitor status:
--------------
0  boxes of 12k mqc wafers.     2 ordered @ 8:00pm   
0  boxes of 50K breakin wafers  2 ordered @ 8:00pm   

Number of product lots in room:
------------------------------
* 8 lots  *

New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. * 

Lots/wafers processed:
---------------------
* jd0553 pmd 24 wafers *
  jd0524  m1 23 wafers
  jd0520  m1 23 wafers
  xd0551  m2 22 wafers
  jl0528  m2 24 wafers
  jd0506  m2 22 wafers
  

# of carriers for strasbaugh/speedfam:
--------------------------------------
  1 speedfam carriers
  1 strasbaugh carriers
  ? strasbaugh plates


82.6A-shift CMP passdown 10/7/96FABSIX::J_SADINFreedom isn't free.Mon Oct 07 1996 20:31110
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  mqcs

        BREAKIN WAFERS              20                  misc



CMP.A1 (Strasbaugh 6DS-SP) - IDLE. needs mqcs. waiting for more mqc wafers.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - DOWN: down for parts. Needs new three way
valve for slurry pumps.
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V) - RUNNING: YD0178 (m3) and XD0480 (m2).
CMP.B1 24hr MQCS COMPLETED: 5pm 10/7
CMP.B1 24hr MQCS NEXT DUE : 5pm 10/8
CMP.B1 12hr MQCS COMPLETED: 9am 10/7
CMP.B1 12hr MQCS NEXT DUE : 9pm 10/7

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0552 (pmd) and XE0555 (pmd).
CMP.B2 24hr MQCS COMPLETED: 5am 10/7
CMP.B2 24hr MQCS NEXT DUE : 5am 10/8
CMP.B2 12hr MQCS COMPLETED: 6am 10/7
CMP.B2 12hr MQCS NEXT DUE : now

CMP.B3 (Speedfam CMP-V) - RUNNING: XD0551 (m2) and XE0540 (m2).
CMP.B3 24hr MQCS COMPLETED: 2pm 10/7
CMP.B3 24hr MQCS NEXT DUE : 2pm 10/8
CMP.B3 12hr MQCS COMPLETED: 11am 10/7
CMP.B3 12hr MQCS NEXT DUE : 11pm 10/8



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9:30am 10/7
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9:30pm 10/7

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9:30am 10/7
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9:30pm 10/7

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9:30am 10/7
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9:30pm 10/7



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A2 - DOWN FOR FAULTY THREE WAY VALVES ON THE SLURRY PUMPS. WAITING FOR
PARTS.
CMP.A1 - NEEDS MQCS AFTER PAD/CARRIER CHANGE.

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
� box of 12K mqc wafers.
1 box of 50K breakin wafers.

Number of product lots in room:
------------------------------
9

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0559 - PMD - 20WFRS
XD0563 - M1 - 18
YE0207 - M1 - 24
XD0558 - M1 - 22
JD0521 - M1 - 23

# of carriers for strasbaugh/speedfam:
--------------------------------------
1 SPEEDFAM
1 STRASBAUGH

82.7passdown cmp.b-shift 10/08/96FABSIX::M_PROVENCHERTue Oct 08 1996 07:22116
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                12                   MQC'S

        BREAKIN WAFERS              47                    misc


           
CMP.A1 (Strasbaugh 6DS-SP) - up/mqc right carrier changed due to high particles 
CMP.A1 24hr MQCS COMPLETED:  in process 
CMP.A1 24hr MQCS NEXT DUE :  n/a

CMP.A2 (Strasbaugh 6DS-SP) - DOWN: down for parts. Needs new three way
                                   valve for slurry pumps.
CMP.A2 24hr MQCS COMPLETED:  n/a              
CMP.A2 24hr MQCS NEXT DUE :  n/a



CMP.B1 (Speedfam CMP-V) - :  up/mqc carrier change on head 4
			     yd0178 logged onto tool               
CMP.B1 24hr MQCS COMPLETED   n/a            
CMP.B1 24hr MQCS NEXT DUE :  n/a
CMP.B1 12hr MQCS COMPLETED:  10/07/96 @ 8:30 pm           
CMP.B1 12hr MQCS NEXT DUE :  10/08/96 @ 8:30 am

CMP.B2 (Speedfam CMP-V) - :  up/running jd0534 m2
CMP.B2 24hr MQCS COMPLETED:  10/07/96 @  5:00 am           
CMP.B2 24hr MQCS NEXT DUE :  10/08/96    now           
CMP.B2 12hr MQCS COMPLETED:  10/07/96 @ 10:30 pm          
CMP.B2 12hr MQCS NEXT DUE :  10/08/96 @ 10:30 am         

CMP.B3 (Speedfam CMP-V) - :  up/running xd0543 m3 
CMP.B3 24hr MQCS COMPLETED:  10/07/96 @  2:00 pm 
CMP.B3 24hr MQCS NEXT DUE :  10/08/96 @  2:00 pm
CMP.B3 12hr MQCS COMPLETED:  10/07/96 @ 11:00 pm           
CMP.B3 12hr MQCS NEXT DUE :  10/08/96 @ 11:00 am



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED:10/08/96 @ 6:00 am        
CMP-SCRUB.A1 12hr MQCS NEXT DUE :10/08/96 @ 6:00 pm        

CMP-SCRUB.A2 (On-track scrubber) - up/idle                 
CMP-SCRUB.A2 12hr MQCS COMPLETED:10/08/96 @ 6:00 am        
CMP-SCRUB.A2 12hr MQCS NEXT DUE :10/08/96 @ 6:00 pm        

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 12hr MQCS COMPLETED:10/08/96 @ 6:00 am        
CMP-SCRUB.A3 12hr MQCS NEXT DUE :10/08/96 @ 6:00 pm



Hot/B lots in area:
__________________
* none  *

Hot lots coming to area:
-----------------------
* none  *

Static Lots in area:
-------------------
* none * 
  
Down Equipment:
--------------
* cmp.a1 mqc after carrier change *
  cmp.a2 waiting for parts
  cmp.b1 mqc after carrier change

Scrap lots:
----------
* xe0577 (#8) pmd 1 wafers p.s.s. notified. *

Hold Lots:
----------
* none  * 

Monitor status:
--------------
3  boxes of 12k mqc wafers.     2 ordered @ 4:00am   
3  boxes of 50K breakin wafers  2 ordered @ 4:00am   

Number of product lots in room:
------------------------------
* 4 lots  *

New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. * 

Lots/wafers processed:
---------------------
* xe0555 pmd 24 wafers *
  jd0552 pmd 24 wafers
  xd0577 pmd 23 wafers
  xd0480  m2 13 wafers
  xe0540  m2 24 wafers
  jl0530  m2 24 wafers
  yd0178  m3 21 wafers
  

# of carriers for strasbaugh/speedfam:
--------------------------------------
  0 speedfam carriers
  0 strasbaugh carriers
  ? strasbaugh plates


82.8A-shift CMP passdown 10/8/96FABSIX::J_SADINFreedom isn't free.Tue Oct 08 1996 20:35111
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  mqcs

        BREAKIN WAFERS              20                  misc



CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JL0555 (pmd).
CMP.A1 24hr MQCS COMPLETED: 11:30am 10/8
CMP.A1 24hr MQCS NEXT DUE : 11:30am 10/9

CMP.A2 (Strasbaugh 6DS-SP) - REPAIR: replaced right carrier. Running more
mqcs (2 sets failed for high unif on right carrier).
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V) - RUNNING: JE0491 (m3) and XD0548 (m3).
CMP.B1 24hr MQCS COMPLETED: 6:30am 10/8
CMP.B1 24hr MQCS NEXT DUE : 6:30am 10/9
CMP.B1 12hr MQCS COMPLETED: 8pm 10/7
CMP.B1 12hr MQCS NEXT DUE : now

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0532 (m2) and JD0534 (m2).
CMP.B2 24hr MQCS COMPLETED: 11:30am 10/8
CMP.B2 24hr MQCS NEXT DUE : 11:30am 10/9
CMP.B2 12hr MQCS COMPLETED: 10pm 10/7
CMP.B2 12hr MQCS NEXT DUE : now

CMP.B3 (Speedfam CMP-V) - RUNNING: XD0559 (m1) and JD0525 (m3).
CMP.B3 24hr MQCS COMPLETED: 11:30am 10/8
CMP.B3 24hr MQCS NEXT DUE : 11:30am 10/9
CMP.B3 12hr MQCS COMPLETED: 9:30am 10/8
CMP.B3 12hr MQCS NEXT DUE : 9:30pm 10/8



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9am 10/8
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9pm 10/8

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9am 10/8
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9pm 10/8

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9am 10/8
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9pm 10/8



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
JD0543 - DEP_ILD1 1

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A2 - REPAIR: REPLACED RIGHT CARRIER. RERUNNING MQCS.

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
1.5 boxes of 12K mqc wafers.
1.5 boxes of 50K breakin wafers.

Number of product lots in room:
------------------------------
13

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0558 - PMD - 23WFRS
JD0560 - PMD - 24
JD0546 - M1 - 22
JL0530 - M2 - 24
XD0559 - M1 - 23
XE0540 - M2 - 24
XD0543 - M3 - 23

# of carriers for strasbaugh/speedfam:
--------------------------------------
0 SPEEDFAM CARRIERS
1 STRASBAUGH CARRIER
7 PLATES FILMED (HOLES DRILLED BUT NOT SHIMMED)

82.9passdown cmp b-shift 10/09/96FABSIX::M_PROVENCHERWed Oct 09 1996 07:49118
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                10                   MQC'S

        BREAKIN WAFERS             49                    misc


           
CMP.A1 (Strasbaugh 6DS-SP) - up/idle 
CMP.A1 24hr MQCS COMPLETED:  10/08/96 @ 11:30 am 
CMP.A1 24hr MQCS NEXT DUE :  10/09/96 @ 11:30 am

CMP.A2 (Strasbaugh 6DS-SP) - up/mqc passed particles, failed uniformity 
				second set of mqc's running (after pad change)
CMP.A2 24hr MQCS COMPLETED:  n/a              
CMP.A2 24hr MQCS NEXT DUE :  n/a



CMP.B1 (Speedfam CMP-V) - :  up/eng (now in possession of speedfam)    
CMP.B1 24hr MQCS COMPLETED   n/a            
CMP.B1 24hr MQCS NEXT DUE :  n/a
CMP.B1 12hr MQCS COMPLETED:  10/08/96 @ 10:00 pm           
CMP.B1 12hr MQCS NEXT DUE :  n/a

CMP.B2 (Speedfam CMP-V) - :  up/running jl0545 m1/jd0523 m2 
CMP.B2 24hr MQCS COMPLETED:  10/08/96 @ 11:30 am         
CMP.B2 24hr MQCS NEXT DUE :  10/09/96 @ 11:30 am       
CMP.B2 12hr MQCS COMPLETED:  10/09/96 @  1:30 am          
CMP.B2 12hr MQCS NEXT DUE :  10/09/96 @  1:30 pm         

CMP.B3 (Speedfam CMP-V) - :  up/mqc after pad change 1st, and secondary pads
                             were changed  
CMP.B3 24hr MQCS COMPLETED:  n/a 
CMP.B3 24hr MQCS NEXT DUE :  n/a
CMP.B3 12hr MQCS COMPLETED:  10/08/96 @ 11:00 pm           
CMP.B3 12hr MQCS NEXT DUE :  n/a



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED:10/09/96 @ 6:30 am        
CMP-SCRUB.A1 12hr MQCS NEXT DUE :10/09/96 @ 6:30 pm        

CMP-SCRUB.A2 (On-track scrubber) - up/idle                 
CMP-SCRUB.A2 12hr MQCS COMPLETED:10/09/96 @ 6:30 am        
CMP-SCRUB.A2 12hr MQCS NEXT DUE :10/09/96 @ 6:30 pm        

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 12hr MQCS COMPLETED:10/09/96 @ 6:30 am        
CMP-SCRUB.A3 12hr MQCS NEXT DUE :10/09/96 @ 6:30 pm



Hot/B lots in area:
__________________
* none  *

Hot lots coming to area:
-----------------------
* none  *

Static Lots in area:
-------------------
* none * 
  
Down Equipment:
--------------
* cmp.a2 mqc after pad change *
  cmp.b1 turned over to speedfam reps

Scrap lots:
----------
* jd0533 3 wafers, p.s.s. notified. *

Hold Lots:
----------
* none  * 

Monitor status:
--------------
3  boxes of 12k mqc wafers.     2 ordered @ 7:00am   
3  boxes of 50K breakin wafers  2 ordered @ 7:00am   

Number of product lots in room:
------------------------------
* 7 lots  *

New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. * 

Lots/wafers processed:
---------------------
* jl0555 pmd 24 wafers *
  xd0559  m1 23 wafers
  jd0543  m1 24 wafers (hot lot)
  jd0534  m2 24 wafers
  jd0532  m2 24 wafers
  jd0525  m2 23 wafers
  jd0533  m2 21 wafers
  xe0556  m2 24 wafers
  jd0449  m2  6 wafers (hot lot)
  xd0548  m3 24 wafers
  je0491  m3 20 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
  0 speedfam carriers
  0 strasbaugh carriers
  ? strasbaugh plates


82.10FABSIX::J_ROAWed Oct 09 1996 20:34120

CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 4                  mqcs

        BREAKIN WAFERS              50                  misc



CMP.A1 (Strasbaugh 6DS-SP) - : UP: Running lot JD0550

CMP.A1 24hr MQCS COMPLETED: 11:38 hours 10/09/96
CMP.A1 24hr MQCS NEXT DUE : 11:38 hours 10/10/96  

========================================================================
CMP.A2 (Strasbaugh 6DS-SP) - : UP: Running lot JD0526

CMP.A2 24hr MQCS COMPLETED:  11:12 hours 10/09/96
CMP.A2 24hr MQCS NEXT DUE :  11:12 hours 10/10/96

========================================================================


CMP.B1 (Speedfam CMP-V) - : VERIFY: Reps worked all day on tool to try to
fix some of issues associated with this polisher and also to try a new soft-
ware.( The software loaded at the present time is the old version.)
A new pad was installed and break-ins and Mqcs wafers will be running shortly.

CMP.B1 24hr MQCS COMPLETED:   Ongoing
CMP.B1 24hr MQCS NEXT DUE :   
CMP.B1 12hr MQCS COMPLETED:  
 

=========================================================================
CMP.B2 (Speedfam CMP-V) - : UP: Running lots XD0503 and XD0562B 

CMP.B2 24hr MQCS COMPLETED:   10:30 hours 10/09/96	
CMP.B2 24hr MQCS NEXT DUE :   10:30 hours 10/10/96
CMP.B2 12hr MQCS COMPLETED:   DONE 			


=========================================================================
CMP.B3 (Speedfam CMP-V) - : UP: Running lot JD0377C (M3). Once this lots
gets the desire target it needs to be put on hold for Frank Krupa.

CMP.B3 24hr MQCS COMPLETED:    12:30 hours 10/09/96
CMP.B3 24hr MQCS NEXT DUE :    12:30 hours 10/10/96
CMP.B3 12hr MQCS COMPLETED:    DONE	

=========================================================================

CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED:  10:48 hours 10/09/96

=========================================================================
CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED:  10:48 hours 10/10/96


=========================================================================

CMP-SCRUB.A3 (On-track scrubber) - UP: Running lot JD0523 final clean
CMP-SCRUB.A4 12hr MQCS COMPLETED:  10:48 hours 10/10/96

Hot/B lots in area:

__________________
none

Hot lots coming to area:
-----------------------


Static Lots in area:
-------------------
5 LOTS

Down Equipment:
--------------
CMP.B1 AT VERIFY

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0470 IN STORES

Monitor status:
-------------- 
2 boxes of 12K mqc wafers  
3 boxes of 50k exercise wafers

Number of product lots in room:
------------------------------
10 lots

New specs/revs posted:
---------------------
* NEW TDCO POSTED TODAY REGARDING RUNNING PRODUCT AND DUMMY WAFERS. *

Lots/wafers processed:
---------------------

JL0545 _ M1 -  24  WAFERS
JD0523 _ M2 -  21  WAFERS

# of carriers for strasbaugh/speedfam:
--------------------------------------
0  SPEEDFAM CARRIERS ( NO PLATES AVAILABLE.)
5 STRASBAUGH CARRIER AND 3 PLATES READY.


82.11passdown cmp b-shift 10/13/96FABSIX::M_PROVENCHERSun Oct 13 1996 07:22109
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               11                    MQC'S

        BREAKIN WAFERS             34                    misc


           
CMP.A1 (Strasbaugh 6DS-SP) - up/mqc after pad change, pad was pulled, failed 
                                    particles
CMP.A1 24hr MQCS COMPLETED:  n/a
CMP.A1 24hr MQCS NEXT DUE :  n/a

CMP.A2 (Strasbaugh 6DS-SP) - up/running jl0554/jd0561 pmd
CMP.A2 24hr MQCS COMPLETED:  10/13/96 @  4:00 am              
CMP.A2 24hr MQCS NEXT DUE :  10/14/96 @  4:00 am



CMP.B1 (Speedfam CMP-V) - :  up/idle    
CMP.B1 24hr MQCS COMPLETED   10/12/96 @ 10:00 am
CMP.B1 24hr MQCS NEXT DUE :  10/13/96 @ 10:00 am
CMP.B1 12hr MQCS COMPLETED:  10/13/96 @  5:00 am           
CMP.B1 12hr MQCS NEXT DUE :  10/13/95 @  5:00 pm

CMP.B2 (Speedfam CMP-V) - :  up/running jd0565 pmd
CMP.B2 24hr MQCS COMPLETED:  10/12/96 @  9:00 am         
CMP.B2 24hr MQCS NEXT DUE :  10/13/96 @  9:00 am       
CMP.B2 12hr MQCS COMPLETED:  10/12/96 @ 10:00 pm          
CMP.B2 12hr MQCS NEXT DUE :  10/13/96 @ 10:00 am         

CMP.B3 (Speedfam CMP-V) - :  up/running jd0524 m1/xd0549 m3
CMP.B3 24hr MQCS COMPLETED:  10/12/96 @  7:00 pm 
CMP.B3 24hr MQCS NEXT DUE :  10/13/96 @  7:00 pm
CMP.B3 12hr MQCS COMPLETED:  10/08/96 @  6:00 am           
CMP.B3 12hr MQCS NEXT DUE :  10/13/96 @  6:00 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED:10/12/96 @10:30 pm        
CMP-SCRUB.A1 12hr MQCS NEXT DUE :10/13/96 @10:30 am        

CMP-SCRUB.A2 (On-track scrubber) - up/idle                 
CMP-SCRUB.A2 12hr MQCS COMPLETED:10/12/96 @10:30 pm        
CMP-SCRUB.A2 12hr MQCS NEXT DUE :10/13/96 @10:30 am        

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 12hr MQCS COMPLETED:10/12/96 @10:30 pm        
CMP-SCRUB.A3 12hr MQCS NEXT DUE :10/13/96 @10:30 am



Hot/B lots in area:
__________________
* none  *

Hot lots coming to area:
-----------------------
* xd0550 pmd  *

Static Lots in area:
-------------------
* none * 
  
Down Equipment:
--------------
* cmp.a1 mqc after pad change *

Scrap lots:
----------
* none *

Hold Lots:
----------
* none  * 

Monitor status:
--------------
1  box of 12k mqc wafers.       2 ordered @ 10:00pm   
2  boxes of 50K breakin wafers  2 ordered @ 10:00pm   

Number of product lots in room:
------------------------------
* 5 lots  *

New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. *
  SEE E.D.C.O. AT CMP.A1 

Lots/wafers processed:
---------------------
* XD0550  M2 24 WAFERS *
  JD0552  M1 24 WAFERS
  JD0462  M1 22 WAFERS

# of carriers for strasbaugh/speedfam:
--------------------------------------
  0 speedfam carriers
  0 strasbaugh carriers
  ? strasbaugh plates


82.12A-shift CMP passdown 10/13/96FABSIX::J_SADINFreedom isn't free.Sun Oct 13 1996 20:26112
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  mqcs

        BREAKIN WAFERS              20                  misc



CMP.A1 (Strasbaugh 6DS-SP) - MQC: running mqcs after wafer crash. New
pad/carriers.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - VERIFY: running breakins after wafer crash.
New pad/carriers/disk.
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V) - RUNNING: JD0577 (pmd) and JL0527 (m1).
CMP.B1 24hr MQCS COMPLETED: 11am 10/13
CMP.B1 24hr MQCS NEXT DUE : 11am 10/14
CMP.B1 12hr MQCS COMPLETED: 8:30am 10/13
CMP.B1 12hr MQCS NEXT DUE : 8:30pm 10/13

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0560 (m1).
CMP.B2 24hr MQCS COMPLETED: 12pm 10/13
CMP.B2 24hr MQCS NEXT DUE : 12pm 10/14
CMP.B2 12hr MQCS COMPLETED: 7:30pm 10/13
CMP.B2 12hr MQCS NEXT DUE : 7:30am 10/14

CMP.B3 (Speedfam CMP-V) - RUNNING: JD0558 (m1). 
CMP.B3 24hr MQCS COMPLETED: 5pm 10/13
CMP.B3 24hr MQCS NEXT DUE : 5pm 10/14
CMP.B3 12hr MQCS COMPLETED: 3pm 10/13
CMP.B3 12hr MQCS NEXT DUE : 3am 10/14



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 2pm 10/13
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 2am 10/14

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 2pm 10/13
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 2am 10/14

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 2pm 10/13
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 2am 10/14



Hot/B lots in area:
__________________
JD0580 - PMD
JL0527 - M1

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - MQC AFTER WAFER CRASH
CMP.A2 - VERIFY AFTER WAFER CRASH

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
1 box of 12K mqc wafers
1/2 box of 50K breakin wafers

Number of product lots in room:
------------------------------
7

New specs/revs posted:
---------------------
see EDCO by CMP.A1

Lots/wafers processed:
---------------------
JD0576 - PMD - 22WFRS
JD0561 - PMD - 24
JL0554 - PMD - 24
JD0462 - M1 - 22
XD0549 - M3 - 17
JD0524 - M2 - 22

# of carriers for strasbaugh/speedfam:
--------------------------------------
5 STRASBAUGH (+ 3 PLATES SHIMMED/FILMED)
7 SPEEDFAM

82.13passdown cmp b-shift 10/14/96FABSIX::M_PROVENCHERMon Oct 14 1996 07:37109
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               10                    MQC'S

        BREAKIN WAFERS             41                    misc


           
CMP.A1 (Strasbaugh 6DS-SP) - unsch dn/error -(leak in robot body) 
CMP.A1 24hr MQCS COMPLETED:  10/14/96 @  2:00 am
CMP.A1 24hr MQCS NEXT DUE :  10/15/96 @  2:00 am

CMP.A2 (Strasbaugh 6DS-SP) - up/running jl0583/jd0573 pmd
CMP.A2 24hr MQCS COMPLETED:  10/14/96 @  2:00 am              
CMP.A2 24hr MQCS NEXT DUE :  10/15/96 @  2:00 am



CMP.B1 (Speedfam CMP-V) - :  up/idle    
CMP.B1 24hr MQCS COMPLETED   10/13/96 @ 11:00 am
CMP.B1 24hr MQCS NEXT DUE :  10/14/96 @ 11:00 am
CMP.B1 12hr MQCS COMPLETED:  10/13/96 @  8:30 pm           
CMP.B1 12hr MQCS NEXT DUE :  10/14/95 @  8:30 am

CMP.B2 (Speedfam CMP-V) - :  up/running jd0569 pmd at touchup
CMP.B2 24hr MQCS COMPLETED:  10/13/96 @ 12:00 pm         
CMP.B2 24hr MQCS NEXT DUE :  10/14/96 @ 12:00 pm       
CMP.B2 12hr MQCS COMPLETED:  10/14/96 @  7:30 am          
CMP.B2 12hr MQCS NEXT DUE :  10/14/96 @  7:30 pm         

CMP.B3 (Speedfam CMP-V) - :  up/idle
CMP.B3 24hr MQCS COMPLETED:  10/13/96 @  5:00 pm 
CMP.B3 24hr MQCS NEXT DUE :  10/14/96 @  5:00 pm
CMP.B3 12hr MQCS COMPLETED:  10/14/96 @  6:30 am           
CMP.B3 12hr MQCS NEXT DUE :  10/14/96 @  6:30 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED:10/14/96 @ 5:00 am        
CMP-SCRUB.A1 12hr MQCS NEXT DUE :10/14/96 @ 5:00 pm        

CMP-SCRUB.A2 (On-track scrubber) - up/idle                 
CMP-SCRUB.A2 12hr MQCS COMPLETED:10/14/96 @ 5:00 am        
CMP-SCRUB.A2 12hr MQCS NEXT DUE :10/14/96 @ 5:00 pm        

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 12hr MQCS COMPLETED:10/14/96 @ 5:00 pm        
CMP-SCRUB.A3 12hr MQCS NEXT DUE :10/14/96 @ 5:00 am



Hot/B lots in area:
__________________
* none  *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none * 
  
Down Equipment:
--------------
* cmp.a1 robot problem *

Scrap lots:
----------
* none *

Hold Lots:
----------
* none  * 

Monitor status:
--------------
2  boxes of 12k mqc wafers.     2 ordered @  7:00 am   
1  boxes of 50K breakin wafers  2 ordered @  7:00 am

lot in the room 
------------------------------
* 3 lots  *

New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. *
  SEE E.D.C.O. AT CMP.A1 

Lots/wafers processed:
---------------------
* jl0527  m1 11 wafers (hotlot) *
  jl0560  m1 23 wafers 
  jd0577 pmd 23 wafers
  jd0580 pmd 22 wafers (hotlot)

# of carriers for strasbaugh/speedfam:
--------------------------------------
  7 speedfam carriers
  3 strasbaugh carriers
  ? strasbaugh plates


82.14A-shift CMP passdown 10/14/96FABSIX::J_SADINFreedom isn't free.Mon Oct 14 1996 20:25106
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               20                   mqcs

        BREAKIN WAFERS             20                   misc



CMP.A1 (Strasbaugh 6DS-SP) - IDLE.
CMP.A1 24hr MQCS COMPLETED: 10am 10/14
CMP.A1 24hr MQCS NEXT DUE : 10am 10/15

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0574 (pmd).
CMP.A2 24hr MQCS COMPLETED: 2am 10/14
CMP.A2 24hr MQCS NEXT DUE : 2am 10/15



CMP.B1 (Speedfam CMP-V) - DOWN: software upgrade.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - RUNNING: JL0582 (pmd).
CMP.B2 24hr MQCS COMPLETED: 11:30am 10/14
CMP.B2 24hr MQCS NEXT DUE : 11:30am 10/15
CMP.B2 12hr MQCS COMPLETED: 11am 10/14
CMP.B2 12hr MQCS NEXT DUE : 11pm 10/14

CMP.B3 (Speedfam CMP-V) - RUNNING: YD0167 (m3) and JD0412 (m4).
CMP.B3 24hr MQCS COMPLETED: 1pm 10/14
CMP.B3 24hr MQCS NEXT DUE : 1pm 10/15
CMP.B3 12hr MQCS COMPLETED: 9am 10/14
CMP.B3 12hr MQCS NEXT DUE : 9pm 10/14



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 11am 10/14
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 11pm 10/14

CMP-SCRUB.A2 (On-track scrubber) - IDLE. 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 11am 10/14
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 11pm 10/14

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 11am 10/14
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 11pm 10/14



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.B1 - SOFTWARE UPGRADE. DOWN UNTIL TOMORROW. DO NOT RUN!

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
2 boxes of 12K mqc wafers
1 box of 50K breakin wafers

Number of product lots in room:
------------------------------
8

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0573 - PMD - 24WFRS
JL0583 - PMD - 24
JD0578 - PMD - 24
JD0544 - M1 - 23

# of carriers for strasbaugh/speedfam:
--------------------------------------
7 SPEEDFAM
3 STRASBAUGH

82.15passdown cmp b-shift 10/15/96FABSIX::M_PROVENCHERTue Oct 15 1996 07:36112
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                7                    MQC'S

        BREAKIN WAFERS             47                    misc


           
CMP.A1 (Strasbaugh 6DS-SP) - up/running xd0574 pmd/xe0564 
CMP.A1 24hr MQCS COMPLETED:  10/14/96 @ 10:00 am
CMP.A1 24hr MQCS NEXT DUE :  10/15/96 @ 10:00 am

CMP.A2 (Strasbaugh 6DS-SP) - up/idle
CMP.A2 24hr MQCS COMPLETED:  10/14/96 @  2:30 am              
CMP.A2 24hr MQCS NEXT DUE :  10/15/96 @  2:30 am 



CMP.B1 (Speedfam CMP-V) - :  DOWN: software upgrade
CMP.B1 24hr MQCS COMPLETED   n/a
CMP.B1 24hr MQCS NEXT DUE :  due when tool comes up
CMP.B1 12hr MQCS COMPLETED:  n/a           
CMP.B1 12hr MQCS NEXT DUE :  due when tool comes up

CMP.B2 (Speedfam CMP-V) - :  up/jl0545 m2/ xd0558 m3 (hotlot)
CMP.B2 24hr MQCS COMPLETED:  10/14/96 @ 11:00 am         
CMP.B2 24hr MQCS NEXT DUE :  10/15/96 @ 11:00 am       
CMP.B2 12hr MQCS COMPLETED:  10/14/96 @ 11:00 pm          
CMP.B2 12hr MQCS NEXT DUE :  10/15/96 @ 11:00 am         

CMP.B3 (Speedfam CMP-V) - :  up/running jd0412 m4 at touchup
CMP.B3 24hr MQCS COMPLETED:  10/14/96 @  1:00 pm 
CMP.B3 24hr MQCS NEXT DUE :  10/15/96 @  1:00 pm
CMP.B3 12hr MQCS COMPLETED:  10/14/96 @  9:30 pm           
CMP.B3 12hr MQCS NEXT DUE :  10/15/96 @  9:30 am



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED:10/14/96 @11:00 pm        
CMP-SCRUB.A1 12hr MQCS NEXT DUE :10/15/96 @11:00 am        

CMP-SCRUB.A2 (On-track scrubber) - up/idle                 
CMP-SCRUB.A2 12hr MQCS COMPLETED:10/14/96 @11:00 pm        
CMP-SCRUB.A2 12hr MQCS NEXT DUE :10/15/96 @11:00 am        

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 12hr MQCS COMPLETED:10/14/96 @11:00 pm        
CMP-SCRUB.A3 12hr MQCS NEXT DUE :10/15/96 @11:00 am



Hot/B lots in area:
__________________
* xd0588 m3 b2  *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none * 
  
Down Equipment:
--------------
* cmp.b1 software upgrade *

Scrap lots:
----------
* none   *

Hold Lots:
----------
* none  * 

Monitor status:
--------------
2  boxes of 12k mqc wafers.     2 ordered @  1:00 am   
1  boxes of 50K breakin wafers  2 ordered @  1:00 am

lot in the room 
------------------------------
* 6 lots  *

New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. *
  SEE E.D.C.O. AT CMP.A1 

Lots/wafers processed:
---------------------
* jl0582 pmd 24 wafers *
  jd0574 pmd 24 wafers
  yd0167  m3  5 wafers
  jl0585 pmd 24 wafers
  xe0541  m3 14 wafers
  jd0546  m2 22 wafers
  jl0527a m1 12 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
  7 speedfam carriers
  3 strasbaugh carriers
  ? strasbaugh plates


82.16A-shift CMP passdown 10/15/96FABSIX::J_SADINFreedom isn't free.Tue Oct 15 1996 20:28108
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  mqcs

        BREAKIN WAFERS              25                  misc



CMP.A1 (Strasbaugh 6DS-SP) - IDLE.
CMP.A1 24hr MQCS COMPLETED: 2pm 10/15 
CMP.A1 24hr MQCS NEXT DUE : 2pm 10/16

CMP.A2 (Strasbaugh 6DS-SP) - IDLE.
CMP.A2 24hr MQCS COMPLETED: 2am 10/15
CMP.A2 24hr MQCS NEXT DUE : 2am 10/16



CMP.B1 (Speedfam CMP-V) - DOWN: wafer crashed on pad.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0506 (m3) and XD0558 (m3). 
CMP.B2 24hr MQCS COMPLETED: 1pm 10/15
CMP.B2 24hr MQCS NEXT DUE : 1pm 10/16
CMP.B2 12hr MQCS COMPLETED: 10am 10/15
CMP.B2 12hr MQCS NEXT DUE : 10am 10/16

CMP.B3 (Speedfam CMP-V) - RUNNING: XE0552 (m2).
CMP.B3 24hr MQCS COMPLETED: 3pm 10/15
CMP.B3 24hr MQCS NEXT DUE : 3pm 10/16
CMP.B3 12hr MQCS COMPLETED: 12pm 10/15
CMP.B3 12hr MQCS NEXT DUE : 12am 10/16



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 11am 10/15
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 11pm 10/15

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 11am 10/15
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 11pm 10/15

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 11am 10/15
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 11pm 10/15



Hot/B lots in area:
__________________
XD0558 - M3

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.B1 - JUST CRASHED A WAFER ON THE PAD.

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
1/2 box of mqc wafers
1 box of breakin wafers

Number of product lots in room:
------------------------------
10

New specs/revs posted:
---------------------
see tdco by cmp.a2

Lots/wafers processed:
---------------------
XE0565 - PMD - 22WFRS
XE0564 - PMD - 24
XD0574 - PMD - 24
XE0541 - M3 - 12
JL0545 - M2 - 24
JD0412 - M4 - 8

# of carriers for strasbaugh/speedfam:
--------------------------------------
3 SPEEDFAM 
3 STRASBAUGH

82.17passdown cmp b-shift 10/20/96FABSIX::M_PROVENCHERSun Oct 20 1996 07:11112
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                1                    MQC'S

        BREAKIN WAFERS             40                    misc


           
CMP.A1 (Strasbaugh 6DS-SP) - up/idle
CMP.A1 24hr MQCS COMPLETED:  10/19/96 @  3:30 pm
CMP.A1 24hr MQCS NEXT DUE :  10/20/96 @  3:30 pm

CMP.A2 (Strasbaugh 6DS-SP) - up/idle
CMP.A2 24hr MQCS COMPLETED:  10/19/96 @  3:30 pm              
CMP.A2 24hr MQCS NEXT DUE :  10/20/96 @  3:30 pm 



CMP.B1 (Speedfam CMP-V) - :  BGN_ENG - Rep's workin' on head #1 bearing
                                    replacement.
CMP.B1 24hr MQCS COMPLETED   n/a
CMP.B1 24hr MQCS NEXT DUE :  due when tool comes up
CMP.B1 12hr MQCS COMPLETED:  n/a           
CMP.B1 12hr MQCS NEXT DUE :  due when tool comes up

CMP.B2 (Speedfam CMP-V) - :  up/running jd0522 m25/jd0523 m25 see remark for
                                                              both lots
CMP.B2 24hr MQCS COMPLETED:  10/19/96 @ 11:30 am         
CMP.B2 24hr MQCS NEXT DUE :  10/20/96 @ 11:30 am       
CMP.B2 12hr MQCS COMPLETED:  10/19/96 @ 11:30 pm          
CMP.B2 12hr MQCS NEXT DUE :  10/20/96 @ 11:30 am         

CMP.B3 (Speedfam CMP-V) - :  up/running jd0580 m2 (hotlot)
CMP.B3 24hr MQCS COMPLETED:  10/19/96 @  5:00 pm 
CMP.B3 24hr MQCS NEXT DUE :  10/20/96 @  5:00 pm
CMP.B3 12hr MQCS COMPLETED:  10/20/96 @  5:00 am           
CMP.B3 12hr MQCS NEXT DUE :  10/20/96 @  5:00 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED:10/19/96 @11:00 pm        
CMP-SCRUB.A1 12hr MQCS NEXT DUE :10/20/96 @11:00 am        

CMP-SCRUB.A2 (On-track scrubber) - up/idle                 
CMP-SCRUB.A2 12hr MQCS COMPLETED:10/19/96 @11:00 pm        
CMP-SCRUB.A2 12hr MQCS NEXT DUE :10/20/96 @11:00 am        

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 12hr MQCS COMPLETED:10/19/96 @11:00 pm        
CMP-SCRUB.A3 12hr MQCS NEXT DUE :10/20/96 @11:00 am



Hot/B lots in area:
__________________
* jd0580 m2 b3  *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none * 
  
Down Equipment:
--------------

* cmp.b1 bearing replacement *

Scrap lots:
----------
* none  *

Hold Lots:
----------
* ye0199 on hold for L. Camilletti * 

Monitor status:
--------------
6  boxes of 12k mqc wafers.     none ordered   
2� boxes of 50K breakin wafers  none ordered

lot in the room 
------------------------------
* 3 lots  *

New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. *
  SEE E.D.C.O. AT CMP.A1 

Lots/wafers processed:
---------------------
* xe0577 pmd 24 wafers  *
  xd0583 pmd 23 wafers
  jd0520  m3 23 wafers
  xd0563  m2 18 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
 16 speedfam carriers
 14 strasbaugh carriers
  ? strasbaugh plates


82.18A-shift CMP passdown 10/20/96FABSIX::J_SADINFreedom isn't free.Sun Oct 20 1996 20:31112
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  mqcs 

        BREAKIN WAFERS              35                  misc



CMP.A1 (Strasbaugh 6DS-SP) - IDLE.
CMP.A1 24hr MQCS COMPLETED: 5pm 10/20
CMP.A1 24hr MQCS NEXT DUE : 5pm 10/21

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0569 (m1).
CMP.A2 24hr MQCS COMPLETED: 5pm 10/20
CMP.A2 24hr MQCS NEXT DUE : 5pm 10/21



CMP.B1 (Speedfam CMP-V) - DOWN: still down for ongoing head one stuff.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0577 (m1).
CMP.B2 24hr MQCS COMPLETED: 7pm 10/20
CMP.B2 24hr MQCS NEXT DUE : 7pm 10/21
CMP.B2 12hr MQCS COMPLETED: 7pm 10/20
CMP.B2 12hr MQCS NEXT DUE : 7am 10/21

CMP.B3 (Speedfam CMP-V) - MQC: all five carriers changed (high wafer
count). mqcs in progress now.
CMP.B3 24hr MQCS COMPLETED: n/a
CMP.B3 24hr MQCS NEXT DUE : n/a
CMP.B3 12hr MQCS COMPLETED: 7pm 10/20
CMP.B3 12hr MQCS NEXT DUE : 7am 10/21



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 11am 10/20
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 11pm 10/21

CMP-SCRUB.A2 (On-track scrubber) - IDLE
CMP-SCRUB.A2 12hr MQCS COMPLETED: 11am 10/20
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 11pm 10/21

CMP-SCRUB.A3 (On-track scrubber) - IDLE
CMP-SCRUB.A3 12hr MQCS COMPLETED: 11am 10/20
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 11pm 10/21



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.B1 - HEAD ONE STUFF
CMP.B3 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
4 boxes of 12K mqc wafers
1 box of 50K breakin wafers

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XE0579 - PMD - 11WFRS
XD0581 - PMD - 24
JD0547 - M2 - 22
JD0523 - M25 - 14
JD0522 - M25 - 16
JD0567 - M1 - 24
JD0561 - M1 - 24
JD0580 - M2 - 18

# of carriers for strasbaugh/speedfam:
--------------------------------------
11 SPEEDFAM 
11 STRASBAUGH (3 PLATES SHIMMED/FILMED)

82.19passdown cmp b-shift 10/21/96FABSIX::M_PROVENCHERMon Oct 21 1996 07:17113
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               11                    MQC'S

        BREAKIN WAFERS             52                    misc


           
CMP.A1 (Strasbaugh 6DS-SP) - up/running xe0570 m1
CMP.A1 24hr MQCS COMPLETED:  10/20/96 @  5:00 pm
CMP.A1 24hr MQCS NEXT DUE :  10/21/96 @  5:00 pm

CMP.A2 (Strasbaugh 6DS-SP) - up/running jd0576 m1
CMP.A2 24hr MQCS COMPLETED:  10/20/96 @  5:00 pm              
CMP.A2 24hr MQCS NEXT DUE :  10/21/96 @  5:00 pm 



CMP.B1 (Speedfam CMP-V) - :  BGN_ENG - Rep's workin' on head #1 bearing
                                    replacement.
CMP.B1 24hr MQCS COMPLETED   n/a
CMP.B1 24hr MQCS NEXT DUE :  due when tool comes up
CMP.B1 12hr MQCS COMPLETED:  n/a           
CMP.B1 12hr MQCS NEXT DUE :  due when tool comes up

CMP.B2 (Speedfam CMP-V) - :  up/running jl0539 m2
CMP.B2 24hr MQCS COMPLETED:  10/20/96 @  7:00 pm         
CMP.B2 24hr MQCS NEXT DUE :  10/21/96 @  7:00 pm       
CMP.B2 12hr MQCS COMPLETED:  10/21/96 @  6:00 am          
CMP.B2 12hr MQCS NEXT DUE :  10/21/96 @  6:00 pm         

CMP.B3 (Speedfam CMP-V) - :  up/mqc mqc's failed for particles/uniformity.also
				had bad carrier(#5). carrier was changed. also
				found debris (red?) on pad, pad was changed.
				tool had vacuum problems all night
CMP.B3 24hr MQCS COMPLETED:  in process
CMP.B3 24hr MQCS NEXT DUE :  n/a
CMP.B3 12hr MQCS COMPLETED:  n/a          
CMP.B3 12hr MQCS NEXT DUE :  n/a



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED:10/21/96 @ 2:00 am        
CMP-SCRUB.A1 12hr MQCS NEXT DUE :10/21/96 @ 2:00 pm        

CMP-SCRUB.A2 (On-track scrubber) - up/idle                 
CMP-SCRUB.A2 12hr MQCS COMPLETED:10/21/96 @ 2:00 am        
CMP-SCRUB.A2 12hr MQCS NEXT DUE :10/21/96 @ 2:00 pm        

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 12hr MQCS COMPLETED:10/21/96 @ 2:00 am        
CMP-SCRUB.A3 12hr MQCS NEXT DUE :10/21/96 @ 2:00 pm



Hot/B lots in area:
__________________
* none  *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none * 
  
Down Equipment:
--------------

* cmp.b1 bearing replacement *

Scrap lots:
----------
* none  *

Hold Lots:
----------
* ye0199 on hold for L. Camilletti * 

Monitor status:
--------------
4 boxes of 12k mqc wafers.     none ordered   
1 box of 50K breakin wafers  2 boxes ordered @ 3:00 am

lot in the room 
------------------------------
* 6 lots  *

New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. *
  SEE E.D.C.O. AT CMP.A1 

Lots/wafers processed:
---------------------
* jd0569  m1 23 wafers *
  jd0577  m1 23 wafers
  xd0480  m3 13 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
 10 speedfam carriers
 11 strasbaugh carriers
  3 strasbaugh plates shimmed + filmed


82.20A-shift CMP passdown 10/21/96FABSIX::J_SADINFreedom isn't free.Mon Oct 21 1996 20:40112
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  mqcs

        BREAKIN WAFERS              20                  misc



CMP.A1 (Strasbaugh 6DS-SP) - MQC: running 24hr mqcs.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JL0606 (pmd).
CMP.A2 24hr MQCS COMPLETED: 6pm 10/20
CMP.A2 24hr MQCS NEXT DUE : after lot is done.



CMP.B1 (Speedfam CMP-V) - DOWN: down to reps. same problems.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - MQC: running 24hr mqcs.
CMP.B2 24hr MQCS COMPLETED: n/a 
CMP.B2 24hr MQCS NEXT DUE : n/a
CMP.B2 12hr MQCS COMPLETED: n/a
CMP.B2 12hr MQCS NEXT DUE : n/a

CMP.B3 (Speedfam CMP-V) - VERIFY: down for particles. Running more mqcs
after pad change.
CMP.B3 24hr MQCS COMPLETED: n/a
CMP.B3 24hr MQCS NEXT DUE : n/a
CMP.B3 12hr MQCS COMPLETED: n/a
CMP.B3 12hr MQCS NEXT DUE : n/a



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 1pm 10/21
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 1am 10/22

CMP-SCRUB.A2 (On-track scrubber) - IDLE. 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 1pm 10/21
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 1am 10/22

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 1pm 10/21
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 1am 10/22



Hot/B lots in area:
__________________
XD0589 - PMD

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - MQC
CMP.B1 - REPS
CMP.B2 - MQC
CMP.B3 - VERIFY-U (HIGH PARTICLES)

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
3 boxes of 12K mqc wafers
� box of 50K breakin wafers

Number of product lots in room:
------------------------------
11

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XE0570 - M1 - 18WFRS
JD0576 - M1 - 18
XD0568 - M2 - 22
JD0548 - M2 - 17
XD0480 - M3 - 13
JL0539 - M2 - 24

# of carriers for strasbaugh/speedfam:
--------------------------------------
10 SPEEDFAM
11 STRASBAUGH (3 PLATES FILMED/SHIMMED)

82.21passdown cmp b-shift 10/22/96FABSIX::M_PROVENCHERTue Oct 22 1996 07:51118
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               25                    MQC'S

        BREAKIN WAFERS             35                    misc


           
CMP.A1 (Strasbaugh 6DS-SP) - up/mqc running breakin/new pad, new carriers,
				after crash, failed particles, down all night
CMP.A1 24hr MQCS COMPLETED:  n/a
CMP.A1 24hr MQCS NEXT DUE :  n/a

CMP.A2 (Strasbaugh 6DS-SP) - up/mqc running breakin/new pad, (failed particles)
				down all night
CMP.A2 24hr MQCS COMPLETED:  n/a              
CMP.A2 24hr MQCS NEXT DUE :  n/a



CMP.B1 (Speedfam CMP-V) - :  BGN_ENG - Rep's workin' on head #1 bearing
                                    replacement.
CMP.B1 24hr MQCS COMPLETED   n/a
CMP.B1 24hr MQCS NEXT DUE :  due when tool comes up
CMP.B1 12hr MQCS COMPLETED:  n/a           
CMP.B1 12hr MQCS NEXT DUE :  due when tool comes up

CMP.B2 (Speedfam CMP-V) - :  unsched-dn/failed particles, tool scrubbed down
			                will need mqc's
CMP.B2 24hr MQCS COMPLETED:  n/a        
CMP.B2 24hr MQCS NEXT DUE :  n/a       
CMP.B2 12hr MQCS COMPLETED:  n/a          
CMP.B2 12hr MQCS NEXT DUE :  n/a         

CMP.B3 (Speedfam CMP-V) - :  unsched-dn/tool crashed, pad replaced, 3 carriers
					replaced, will need mqc's
CMP.B3 24hr MQCS COMPLETED:  n/a
CMP.B3 24hr MQCS NEXT DUE :  n/a
CMP.B3 12hr MQCS COMPLETED:  n/a          
CMP.B3 12hr MQCS NEXT DUE :  n/a



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED:10/22/96 @ 2:00 am        
CMP-SCRUB.A1 12hr MQCS NEXT DUE :10/22/96 @ 2:00 pm        

CMP-SCRUB.A2 (On-track scrubber) - up/idle                 
CMP-SCRUB.A2 12hr MQCS COMPLETED:10/22/96 @ 2:00 am        
CMP-SCRUB.A2 12hr MQCS NEXT DUE :10/22/96 @ 2:00 pm        

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 12hr MQCS COMPLETED:10/22/96 @ 2:00 am        
CMP-SCRUB.A3 12hr MQCS NEXT DUE :10/22/96 @ 2:00 pm



Hot/B lots in area:
__________________
* xd0589 pmd  *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none * 
  
Down Equipment:
--------------

* cmp.b1 bearing replacement *
  cmp.a1 crash/ breakins in process/pad-carrier change
  cmp.a2 breakins in process/pad change
  cmp.b2 failed particles/tool scrubed+cleaned
  cmp.b3 crash/failed particles/pad-3 carriers replaced

Scrap lots:
----------
* none  *

Hold Lots:
----------
* ye0199 on hold for L. Camilletti * 

Monitor status:
--------------
0 boxes of 12k mqc wafers.   2 boxes ordered @ 7:00 am, 1 box due @ 7:00am
							1 box due @ 8:00am  
� box of 50K breakin wafers  2 boxes ordered @ 7:00 am

lot in the room 
------------------------------
* 7 pmd lots  *
  2 ild2 lots
  1 ild3 lot
New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. *
  SEE E.D.C.O. AT CMP.A1 

Lots/wafers processed:
---------------------
* none *

# of carriers for strasbaugh/speedfam:
--------------------------------------
  7 speedfam carriers
  9 strasbaugh carriers
  3 strasbaugh plates shimmed + filmed


82.22A-shift CMP passdown 10/22/96FABSIX::J_SADINFreedom isn't free.Tue Oct 22 1996 20:34117
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                30                  mqcs

        BREAKIN WAFERS              30                  misc



CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: XD0589 (pmd - hot).
CMP.A1 24hr MQCS COMPLETED: 6pm 10/22
CMP.A1 24hr MQCS NEXT DUE : 6pm 10/23

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JL0606 (pmd - tup). 
CMP.A2 24hr MQCS COMPLETED: 6pm 10/22
CMP.A2 24hr MQCS NEXT DUE : 6pm 10/23



CMP.B1 (Speedfam CMP-V) - DOWN: down to speedfam for head 1 problems.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0552 (m2) and JD0560 (m2).
CMP.B2 24hr MQCS COMPLETED: 6pm 10/22
CMP.B2 24hr MQCS NEXT DUE : 6pm 10/23
CMP.B2 12hr MQCS COMPLETED: 6pm 10/22
CMP.B2 12hr MQCS NEXT DUE : 6am 10/23

CMP.B3 (Speedfam CMP-V) - MQC: running mqcs. particles passed.
CMP.B3 24hr MQCS COMPLETED: n/a
CMP.B3 24hr MQCS NEXT DUE : n/a
CMP.B3 12hr MQCS COMPLETED: n/a
CMP.B3 12hr MQCS NEXT DUE : n/a



CMP-SCRUB.A1 (On-track scrubber) - IDLE. 
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9am 10/22
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9pm 10/22

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9am 10/22
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9pm 10/22

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9am 10/22
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9pm 10/22



Hot/B lots in area:
__________________
XD0589 - PMD

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
XD0569 - STI - 1.4DAYS
XD0589 - PMD - 1.0DAYS
JL0606 - PMD - 1.3DAYS
JD0551 - M2 - 0.9DAYS
JD0590 - PMD - 0.8DAYS
XD0584 - PMD - 0.8DAYS
JD0573 - M1 - 1.0DAYS
JD0565 - M1 - 0.9DAYS
JD0578 - M1 - 1.1DAYS
XD0561 - M2 - 0.7DAYS
XE0547 - M3 - 1.0DAYS
JD0559 - M2 - 0.9DAYS
JL0607 - PMD - 1.3DAYS
JL0600 - PMD - 1.1DAYS
JD0524 - M25 - 0.8DAYS

Down Equipment:
--------------
CMP.B1 - HEAD 1 ROTATION
CMP.B3 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
2 boxes of 12K mqc wafers
2.5 boxes of 50K breakin wafers

Number of product lots in room:
------------------------------
25

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
* none *

# of carriers for strasbaugh/speedfam:
--------------------------------------
???? check rebuild room 

82.23passdown cmp b-shift 10/23/96FABSIX::M_PROVENCHERWed Oct 23 1996 07:35133
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               16                      MQC'S

        BREAKIN WAFERS             35                    misc


           
CMP.A1 (Strasbaugh 6DS-SP) - up/running jd0578 m1/ xd0580 pmd
CMP.A1 24hr MQCS COMPLETED:  10/22/96 @ 6;00 pm
CMP.A1 24hr MQCS NEXT DUE :  10/23/96 @ 6:00 pm

CMP.A2 (Strasbaugh 6DS-SP) - up/running jd0573 m1
CMP.A2 24hr MQCS COMPLETED:  10/22/96 @ 6:00 pm              
CMP.A2 24hr MQCS NEXT DUE :  10/23/96 @ 6:00 pm



CMP.B1 (Speedfam CMP-V) - :  BGN_ENG - Rep's workin' on head #1 bearing
                                    replacement.
CMP.B1 24hr MQCS COMPLETED   n/a
CMP.B1 24hr MQCS NEXT DUE :  due when tool comes up
CMP.B1 12hr MQCS COMPLETED:  n/a           
CMP.B1 12hr MQCS NEXT DUE :  due when tool comes up

CMP.B2 (Speedfam CMP-V) - :  up/running jd0551 m2/jd0559 m2
CMP.B2 24hr MQCS COMPLETED:  10/22/96 @ 6:00 pm        
CMP.B2 24hr MQCS NEXT DUE :  10/23/96 @ 6:00 pm       
CMP.B2 12hr MQCS COMPLETED:  10/23/96 @ 6:00 am          
CMP.B2 12hr MQCS NEXT DUE :  10/23/96 @ 6:00 pm           

CMP.B3 (Speedfam CMP-V) - :  unsched/dn-failed 2 sets of mqc's for particles
                                     r/r+unf post in process maint to hook up
				     remote slurry.    
				slurry pump out back malfunctioned twice during
				mqc runs. crash/pad change + 4 carriers changed
				(two prior to crash, two after crash) 
CMP.B3 24hr MQCS COMPLETED:  n/a
CMP.B3 24hr MQCS NEXT DUE :  n/a
CMP.B3 12hr MQCS COMPLETED:  n/a          
CMP.B3 12hr MQCS NEXT DUE :  n/a



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED:10/23/96 @ 2:00 am        
CMP-SCRUB.A1 12hr MQCS NEXT DUE :10/23/96 @ 2:00 pm        

CMP-SCRUB.A2 (On-track scrubber) - up/idle                 
CMP-SCRUB.A2 12hr MQCS COMPLETED:10/23/96 @ 2:00 am        
CMP-SCRUB.A2 12hr MQCS NEXT DUE :10/23/96 @ 2:00 pm        

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 12hr MQCS COMPLETED:10/23/96 @ 2:00 am        
CMP-SCRUB.A3 12hr MQCS NEXT DUE :10/23/96 @ 2:00 pm



Hot/B lots in area:
__________________
* jd0580 ILD3  *

Hot lots coming to area:
-----------------------
* jd0581 ILD1 *

Static Lots in area:
-------------------
* none * 
  
Down Equipment:
--------------

* cmp.b1 bearing replacement *

Scrap lots:
----------
* XD0569 - STI - 1.9 DAYS *
  JD0551 -  M2 - 1.4 DAYS running on cmp.b2
  JD0573 -  M1 - 1.5 DAYS
  JD0565 -  M1 - 1.4 DAYS  
  jd0578 -  m1 - 1.6 days
  jl0585 -  m1 -  .7 days
  jl0582 -  m1 -  .6 days
  xd0561 -  m2 - 1.2 days
  jd0553 -  m2 - 1.0 days
  ye0207 -  m2 -  .8 days
  jd0462 -  m2 -  .7 days
  xe0547 -  m3 - 1.5 days
 
Hold Lots:
----------
* none * 

Monitor status:
--------------
3 boxes of 12k mqc wafers     some should be ordered "Late" today
7 boxes of 50K breakin wafers 

lot in the room 
------------------------------
* 15 lots *

New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. *
  SEE E.D.C.O. AT CMP.A1 

Lots/wafers processed:
---------------------
* xd0589 pmd 24 wafers (hot lot)  *
  jl0606 pmd 24 wafers
  jl0607 pmd 24 wafers
  xd0584 pmd 24 wafers
  jd0590 pmd 24 wafers
  jl0601 pmd 24 wafers
  jl0600 pmd 24 wafers
  jl0605 pmd 24 wafers (1 pass lot)
  jd0560  m2 23 wafers
  jd0552  m2 24 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
  3 speedfam carriers
  9 strasbaugh carriers
  3 strasbaugh plates shimmed + filmed


82.24A-shift CMP passdown 10/23FABSIX::J_SADINFreedom isn't free.Wed Oct 23 1996 20:28112
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                50                  mqcs

        BREAKIN WAFERS              50                  misc



CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0573 (m1).
CMP.A1 24hr MQCS COMPLETED: 6pm 10/22
CMP.A1 24hr MQCS NEXT DUE : after lot is completed.

CMP.A2 (Strasbaugh 6DS-SP) - VERIFY: pad/carrier change after failed mqcs
for unif.
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V) - DOWN: down to speedfam for head 1 rotation
problems.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - MQC: running mqcs. Particles ok! 
CMP.B2 24hr MQCS COMPLETED: n/a
CMP.B2 24hr MQCS NEXT DUE : n/a
CMP.B2 12hr MQCS COMPLETED: n/a
CMP.B2 12hr MQCS NEXT DUE : n/a

CMP.B3 (Speedfam CMP-V) - DOWN: pad/carrier change after crash.
CMP.B3 24hr MQCS COMPLETED: n/a
CMP.B3 24hr MQCS NEXT DUE : n/a
CMP.B3 12hr MQCS COMPLETED: n/a
CMP.B3 12hr MQCS NEXT DUE : n/a



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 10am 10/23
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 10pm 10/23

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 10am 10/23
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 10pm 10/23

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 10am 10/23
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 10pm 10/23



Hot/B lots in area:
__________________
JD0580 - M3
JD0581 - M1
JD0546 - M3 

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
just about everything!

Down Equipment:
--------------
CMP.A2 - VERIFY AFTER PAD/CARRIER CHANGE
CMP.B1 - HEAD 1 ROTATION
CMP.B2 - MQC
CMP.B3 - VERIFY AFTER CRASH. PAD/CARRIER CHANGE

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
� box of 12K mqc wafers. 2 more boxes on order (we burned up most of our
supply today. Waiting for more from dielectrics).
6 boxes of 50K monitor wafers.

Number of product lots in room:
------------------------------
19

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0580 - PMD - 24 
JD0578 - M1 - 24

# of carriers for strasbaugh/speedfam:
--------------------------------------
0 SPEEDFAM
0 STRASBAUGH

82.25CMP C-SHIFT PD. 10-24-96FABSIX::E_DAWSONThu Oct 24 1996 20:3444
				CMP
				___
    
    
   ***** PLEASE READ PE. PASSDOWN REGARDING PARTICLE PROBLEM. *****
     

CMP.A1 (Strasbaugh 6DS-SP) - Running 1 - JD0565 ILD2 Ran for 6
    					 minutes 100% on Thick.A4
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE - Broke wafers today, new pad and
    				       carriers installed. Needs full
    				       break'in and mqc's.

CMP.B1 (Speedfam CMP-V) - Down/Repair - Speedfam reps. adressing problems.
    
CMP.B2 (Speedfam CMP-V) - Mqc -  Passed Rate Dev...Failed Particles
                                XE0547 & XE0552 100% on Thick.A5
     
CMP.B3 (Speedfam CMP-V) - Down/Repair - PE. adressing particle issue

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area: 0           Lots in CMP: 22		
	------------------	        -----------	
   
	Lots Shiped: 7                  New SPEC/TDCO: 2
	-----------                     -------------
                                       Strasbaugh & Speedfam..."PEASE READ"
    
	Down Equipment:                 Carriers:
	--------------                  --------
    	CMP.B1, CMP.B3	                See Carrier PD.

	MQC Mon. Used: ?	        MQC Monitors: 2.5 
    	-------------                   ------------
            
        Misc.
        ----
    
82.26CMP C- SHIFT PD. 10-25-96FABSIX::E_DAWSONFri Oct 25 1996 20:5358
    	
    			       !PLEASE READ!
        		*************************
				
        DUE TO A UNSHCEDULED SLURRY FILTER CHANGE (FROM A  ? FILTER TO A "BAG"
        FILTER) ALL TOOLS WILL NEED FUL MQC'S BEFORE ANY PRODUCT CAN BE RUN.
    
    			 ************************	
    
    				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - RUNNING 1 - XE0566 ILD1, 1/2 of the lot is
    					 done, othere 1/2 needs t-up.  
             
CMP.A2 (Strasbaugh 6DS-SP) - VERIFY-U - 2 WAFERS BROKE FROM LOT JL0539
    
     	       	      -	RUNNING 2 - *JD0558 ILD2 100% on Thick.A4 ready
    				    for t-up. 
    				    *JL0539 6 wafers ran for 3 min 2 wafers 
    				    broke, the rest of the lot still needs 
    				    to be run.
    
CMP.B1 (Speedfam CMP-V) - DOWN/UNSHED - Failed mqc's please see EE.for
    					details concerning status.   
			       
CMP.B2 (Speedfam CMP-V) - RUNNING 1 - XD0550 100% on Thick.A5.

CMP.B3 (Speedfam CMP-V) - RUNNING 3 - *JD0563 ILD2 ready for t-up. 
    				      *JL595 ILD1 100% on Thick.A4 ready 
    					for t-up.
    				      *JL0596 ILD1 100% on Thick.A4 ready
    					for t-up.		

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Needs Mqc 

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Needs Mqc 

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Needs Mqc 
                              
      	Hot/B lots in area: 0           Lots in CMP: I ran out of fingers
   	------------------		----------	 and toes.		
       
	Lots Shiped:11                  New SPEC/TDCO: 2 
	-----------                     -------------
                                        Strasbaugh & Speedfam "PLEASE READ"
    
	Down Equipment:                 Carriers:
	--------------                  --------
    	CMP.B1	                        See Carrier PD.
        CMP.A2
    
	MQC Mon. Used: 15 	        MQC Monitors: 1 1/2 BOXES
    	-------------                   ------------
            
        Misc.
        ----
                                                                 
82.27TESTFABSIX::G_ISAACSSat Oct 26 1996 11:2834
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE -
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE -

CMP.B1 (Speedfam CMP-V) - UP/IDLE -   
			       
CMP.B2 (Speedfam CMP-V) - UP/IDLE -

CMP.B3 (Speedfam CMP-V) - UP/IDLE -

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area:             Lots in CMP:		
	------------------	        -----------	
   
	Lots Shiped:                    New SPEC/TDCO:
	-----------                     -------------
    
	Down Equipment:                 Carriers:
	--------------                  --------
    		                        See Carrier PD.

	MQC Mon. Used: 	                MQC Monitors:
    	-------------                   ------------
            
        Misc.
        ----
82.28CMP C SHIFT 10/26/96FABSIX::G_ISAACSSat Oct 26 1996 20:4446
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE -
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/RUNNING LOT # JL0527A for 6 min. lot is in
                                              scrubber .A2.Will need 100%.      
                                              

CMP.B1 (Speedfam CMP-V) - UP/IDLE -          
			       
CMP.B2 (Speedfam CMP-V) - UP/RUNNING LOT # XD0559
                                           Lot has run for the first 400
                                           seconds. 100% measurement on
                                           thickness.A5

CMP.B3 (Speedfam CMP-V) - UP/RUNNING MQC'S
                                          Ran three MQC's today then
                                          equipment adjusted the down
                                          force. Ran MQC with 0 down force,
                                          put in the adjusted offsets and
                                          re-ran the MQC.
                                      

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area:             Lots in CMP:		
	------------------	        -----------	
                                            15
	Lots Shiped:                    New SPEC/TDCO:
	-----------                     -------------
           10
	Down Equipment:                 Carriers:
	--------------                  --------
    		                        See Carrier PD.

	MQC Mon. Used: 	                MQC Monitors:
    	-------------                   ------------
             25                            7 box's
        Misc.
        ----
                                             
82.29CMP C SHIFT 10/26/96FABSIX::G_ISAACSSat Oct 26 1996 20:5436
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE -
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/RUNNING LOT # JL0527A FOR 6 MIN. LOT IN
                                        SCRUBBER .A1 NEEDS 100%

CMP.B1 (Speedfam CMP-V) - UP/IDLE -   
			       
CMP.B2 (Speedfam CMP-V) - UP/RUNNING LOT # XD0559 ILD3 FIRST 400 SEC.
                                           100% ON THICKNESS.A5

CMP.B3 (Speedfam CMP-V) - UP/IDLE - JUST COMPLETED MQC'S

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area:             Lots in CMP:		
	------------------	        -----------	
                                           15
	Lots Shiped:                    New SPEC/TDCO:
	-----------                     -------------
           10
	Down Equipment:                 Carriers:
	--------------                  --------
    		                        See Carrier PD.

	MQC Mon. Used: 	                MQC Monitors:
    	-------------                   ------------
            25                                 7 BOX'S
        Misc.
        ----
82.30passdown cmp b-shift 10/27/96FABSIX::M_PROVENCHERSun Oct 27 1996 06:33119
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               30                      MQC'S

        BREAKIN WAFERS             38                    misc


           
CMP.A1 (Strasbaugh 6DS-SP) - up/running jd0544 m2/xd0557 m2
CMP.A1 24hr MQCS COMPLETED:  10/27/96 @ 4:00 am
CMP.A1 24hr MQCS NEXT DUE :  10/28/96 @ 4:00 am

CMP.A2 (Strasbaugh 6DS-SP) - up/running jl0556 m2/xd0567 m2
CMP.A2 24hr MQCS COMPLETED:  10/27/96 @ 4:00 am              
CMP.A2 24hr MQCS NEXT DUE :  10/28/96 @ 4:00 am



CMP.B1 (Speedfam CMP-V) - :  up/mqc
			     passed particles, failed for uniformity, id/od
			     changed for less edge fast, 2nd set in process
CMP.B1 24hr MQCS COMPLETED   in process (jd0524 is running on this tool)
CMP.B1 24hr MQCS NEXT DUE :  n/a
CMP.B1 12hr MQCS COMPLETED:  10/27/96 @ 2:00 am           
CMP.B1 12hr MQCS NEXT DUE :  10/27/96 @ 2:00 pm

CMP.B2 (Speedfam CMP-V) - :  up/mqc
			     passed particles, failed for removal range
			     (432) offset program activated and offsets have 
			     been changed, and placed into cmp notes.2nd set
			     in process no lots on this tool at this time.  
CMP.B2 24hr MQCS COMPLETED:  in process
CMP.B2 24hr MQCS NEXT DUE :  n/a       
CMP.B2 12hr MQCS COMPLETED:  10/27/96 @ 2:00 am          
CMP.B2 12hr MQCS NEXT DUE :  10/27/96 @ 2:00 pm           

CMP.B3 (Speedfam CMP-V) - :  verify
			     pad change/ (2)carriers changed after crash, pos-
			     -sible load cup to carrier alignment off. 
CMP.B3 24hr MQCS COMPLETED:  in process
CMP.B3 24hr MQCS NEXT DUE :  n/a
CMP.B3 12hr MQCS COMPLETED:  n/a          
CMP.B3 12hr MQCS NEXT DUE :  n/a



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED:10/27/96 @12:00 midnight        
CMP-SCRUB.A1 12hr MQCS NEXT DUE :10/27/96 @12:00 noon        

CMP-SCRUB.A2 (On-track scrubber) - up/idle                 
CMP-SCRUB.A2 12hr MQCS COMPLETED:10/27/96 @12:00 midnight       
CMP-SCRUB.A2 12hr MQCS NEXT DUE :10/27/96 @12:00 noon  

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 12hr MQCS COMPLETED:10/27/96 @12:00 midnight      
CMP-SCRUB.A3 12hr MQCS NEXT DUE :10/27/96 @12:00 noon



Hot/B lots in area:
__________________
* none  *

Hot lots coming to area:
-----------------------
* jd0581 m2 *

Static Lots in area:
-------------------
* yah right * 
  
Down Equipment:
--------------
* cmp.b1 mqc *
  cmp.b2 mqc
  cmp.b3 mqc after crash

Scrap lots:
----------
* jd0566 m2 (2 wafers)
 
Hold Lots:
----------
* xd0544  * 

Monitor status:
--------------
5 boxes of 12k mqc wafers     
1 box of 50K breakin wafers  2 ordered @ 9:00 pm

lot in the room 
------------------------------
* 24 lots *
jd0565 m1 (rework lot) check remarks
New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. *
  SEE E.D.C.O. AT CMP.A1 

Lots/wafers processed:
---------------------
* jl0527 m2 12 wafers *
  xd0559 m3 23 wafers
  yd0204 m3 16 wafers
  jl0555 m2 22 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
  4 speedfam carriers
  8 strasbaugh carriers
  ? strasbaugh plates shimmed + filmed


82.31A-shift CMP passdown 10/27/96FABSIX::J_SADINFreedom isn't free.Sun Oct 27 1996 19:32114
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                17                  mqcs

        BREAKIN WAFERS              15                  misc



CMP.A1 (Strasbaugh 6DS-SP) - MQC: running breakins and mqcs after
pad/carrier change.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - MQC: running breakins and mqcs after pad
change.
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V) - IDLE.
CMP.B1 24hr MQCS COMPLETED: 11am 10/27
CMP.B1 24hr MQCS NEXT DUE : 11am 10/28    
CMP.B1 12hr MQCS COMPLETED: 11am 10/27
CMP.B1 12hr MQCS NEXT DUE : 11pm 10/27

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0557 (m3) and JD0549 (m3).
CMP.B2 24hr MQCS COMPLETED: 4pm 10/27
CMP.B2 24hr MQCS NEXT DUE : 4pm 10/28
CMP.B2 12hr MQCS COMPLETED: 4pm 10/27
CMP.B2 12hr MQCS NEXT DUE : 4am 10/28

CMP.B3 (Speedfam CMP-V) - RUNNING: JD0581 (m2) and JD0562 (m2).
CMP.B3 24hr MQCS COMPLETED: 2pm 10/27
CMP.B3 24hr MQCS NEXT DUE : 2pm 10/28
CMP.B3 12hr MQCS COMPLETED: 2pm 10/27
CMP.B3 12hr MQCS NEXT DUE : 2am 10/28



CMP-SCRUB.A1 (On-track scrubber) - IDLE. 
CMP-SCRUB.A1 12hr MQCS COMPLETED: 2pm 10/27
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 2am 10/28

CMP-SCRUB.A2 (On-track scrubber) - IDLE. 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 2pm 10/27
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 2pm 10/28

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 2pm 10/27
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 2pm 10/28



Hot/B lots in area:
__________________
JL0648 - PMD
JD0581 - M2
JL0649 - M2

Hot lots coming to area:
-----------------------
JL0632 - DEP_M1

Static Lots in area:
-------------------
LOTS OF 'EM.

Down Equipment:
--------------
CMP.A1 - MQC
CMP.A2 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
JD0524 - M25 - HOLD FOR ENG EVAL. HIGH RANGE.

Monitor status:
--------------
2.5 boxes of 12K mqc wafers
0.5 boxes of 50K breakin wafers

Number of product lots in room:
------------------------------
29

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0544 - M2 - 23WFRS
XD0567 - M2 - 24
JL0556 - M2 - 23 
JL0649 - M1 - 5
YD0204 - M3 - 16
JD0566 - M2 - 22

# of carriers for strasbaugh/speedfam:
--------------------------------------
9 STRASBAUGH CARRIERS
3 SPEEDFAM CARRIERS
5 STRASBAUGH PLATES

82.32passdown cmp b-shift 10/28/96FABSIX::M_PROVENCHERMon Oct 28 1996 06:41115
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               17                      MQC'S

        BREAKIN WAFERS             49                    misc


           
CMP.A1 (Strasbaugh 6DS-SP) - up/running jl0612 pmd/xe0557 m2
CMP.A1 24hr MQCS COMPLETED:  10/28/96 @ 2:00 am
CMP.A1 24hr MQCS NEXT DUE :  10/29/96 @ 2:00 am

CMP.A2 (Strasbaugh 6DS-SP) - up/running jl0611 pmd/jl0624 pmd
CMP.A2 24hr MQCS COMPLETED:  10/27/96 @11:00 pm              
CMP.A2 24hr MQCS NEXT DUE :  10/28/96 @11:00 pm



CMP.B1 (Speedfam CMP-V) - :  up/mqc after crash/pad change and downforce 
			     calibrated. offsets changed, and ready for 2nd set
			     2nd set in process
CMP.B1 24hr MQCS COMPLETED   in process 
CMP.B1 24hr MQCS NEXT DUE :  n/a
CMP.B1 12hr MQCS COMPLETED:  10/28/96 @ 6:00 am           
CMP.B1 12hr MQCS NEXT DUE :  10/29/96 @ 6:00 pm

CMP.B2 (Speedfam CMP-V) - :  up/idle (not for long)  
CMP.B2 24hr MQCS COMPLETED:  10/27/96 @ 4:00 pm
CMP.B2 24hr MQCS NEXT DUE :  10/27/96 @ 4:00 pm
CMP.B2 12hr MQCS COMPLETED:  10/28/96 @ 6:00 am          
CMP.B2 12hr MQCS NEXT DUE :  10/28/96 @ 6:00 pm           

CMP.B3 (Speedfam CMP-V) - :  up/running jd0526 m3/jd0550 m3 
CMP.B3 24hr MQCS COMPLETED:  10/27/96 @ 2:00 pm
CMP.B3 24hr MQCS NEXT DUE :  10/28/96 @ 2:00 pm
CMP.B3 12hr MQCS COMPLETED:  10/28/96 @ 2:00 am          
CMP.B3 12hr MQCS NEXT DUE :  10/28/96 @ 2:00 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED:10/28/96 @ 6:00 am        
CMP-SCRUB.A1 12hr MQCS NEXT DUE :10/28/96 @ 6:00 pm        

CMP-SCRUB.A2 (On-track scrubber) - up/idle                 
CMP-SCRUB.A2 12hr MQCS COMPLETED:10/28/96 @ 6:00 am       
CMP-SCRUB.A2 12hr MQCS NEXT DUE :10/28/96 @ 6:00 pm 

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 12hr MQCS COMPLETED:10/28/96 @ 6:00 am      
CMP-SCRUB.A3 12hr MQCS NEXT DUE :10/28/96 @ 6:00 pm



Hot/B lots in area:
__________________
* none  *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* name it, it's here * 
  
Down Equipment:
--------------
* cmp.b1 mqc after crash,and downforce cal. *

Scrap lots:
----------
* none *
 
Hold Lots:
----------
* xd0544  * 

Monitor status:
--------------
3 boxes of 12k mqc wafers    2 ordered @ 7:00 am 
1 box of 50K breakin wafers  2 ordered @ 7:00 am

lot in the room 
------------------------------
* 28 lots *

New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. *
  SEE E.D.C.O. AT CMP.A1 

Lots/wafers processed:
---------------------
* jd0562  m2 22 wafers *
  jd0581  m2 23 wafers (hot lot)
  xe0578 pmd 24 wafers
  jd0549  m3 22 wafers
  jd0557  m3 22 wafers
  jl0648 pmd  5 wafers (hot lot)
  jd0588  m1 24 wafers
  jd0565  m1 24 wafers (rework lot) 

# of carriers for strasbaugh/speedfam:
--------------------------------------
  0 speedfam carriers
  9 strasbaugh carriers
  5 strasbaugh plates shimmed + filmed


82.33A-shift CMP passdown 10/28/96FABSIX::J_SADINFreedom isn't free.Mon Oct 28 1996 19:24109
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  mqcs

        BREAKIN WAFERS              20                  misc



CMP.A1 (Strasbaugh 6DS-SP) - IDLE. (as mark says, "not for long!")
CMP.A1 24hr MQCS COMPLETED: 2am 10/28
CMP.A1 24hr MQCS NEXT DUE : 2am 10/29

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JL0611 (pmd - touchup). 
CMP.A2 24hr MQCS COMPLETED: 11pm 10/27
CMP.A2 24hr MQCS NEXT DUE : 11pm 10/28



CMP.B1 (Speedfam CMP-V) - RUNNING: JD0561 (m2) and JL0598 (m1).
CMP.B1 24hr MQCS COMPLETED: 2pm 10/28
CMP.B1 24hr MQCS NEXT DUE : 2pm 10/29
CMP.B1 12hr MQCS COMPLETED: 4pm 10/28
CMP.B1 12hr MQCS NEXT DUE : 4am 10/29

CMP.B2 (Speedfam CMP-V) - RUNNING: JL0632 (m1) and XD0534 (m2). 
CMP.B2 24hr MQCS COMPLETED: 6pm 10/28
CMP.B2 24hr MQCS NEXT DUE : 6pm 10/29
CMP.B2 12hr MQCS COMPLETED: 5pm 10/28
CMP.B2 12hr MQCS NEXT DUE : 5am 10/29

CMP.B3 (Speedfam CMP-V) - RUNNING: JL0599 (m1) and JD0526 (m3). 
CMP.B3 24hr MQCS COMPLETED: 5pm 10/28
CMP.B3 24hr MQCS NEXT DUE : 5pm 10/29
CMP.B3 12hr MQCS COMPLETED: 5pm 10/28
CMP.B3 12hr MQCS NEXT DUE : 5am 10/28



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 10am 10/28
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 10pm 10/28

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 10am 10/28
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 10pm 10/28

CMP-SCRUB.A3 (On-track scrubber) - IDLE. 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 10am 10/28
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 10pm 10/28



Hot/B lots in area:
__________________
JL0632 - M1

Hot lots coming to area:
-----------------------
JD0590 - DEP_ILD1 2

Static Lots in area:
-------------------
BUNCHES

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0544 - HOLD FOR ENG TO RUN.
JD0524 - HOLD FOR ENG EVAL.

Monitor status:
--------------
2 boxes of 12K mqc wafers
0 boxes of 50K breakin wafers

Number of product lots in room:
------------------------------
25 

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JL0612 - PMD - 24WFRS
XE0557 - M2 - 18
JL0624 - PMD - 24
JL0611 - PMD - 24
JD0550 - M3 - 17

# of carriers for strasbaugh/speedfam:
--------------------------------------
9 STRASBAUGH CARRIERS
5 STRASBAUGH PLATES
0 SPEEDFAM CARRIERS

82.34passdown cmp b-shift 10/29/96FABSIX::M_PROVENCHERTue Oct 29 1996 06:24123
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               16                    MQC'S

        BREAKIN WAFERS             48                    misc


           
CMP.A1 (Strasbaugh 6DS-SP) - up/running jd0604 pmd (rework lot)/xd0591 pmd
CMP.A1 24hr MQCS COMPLETED:  10/29/96 @ 3:00 am
CMP.A1 24hr MQCS NEXT DUE :  10/30/96 @ 3:00 am

CMP.A2 (Strasbaugh 6DS-SP) - up/mqc crashed @ 9:00 pm, and again @ 1:00 am,
			     also had robot problems 
CMP.A2 24hr MQCS COMPLETED:  in process              
CMP.A2 24hr MQCS NEXT DUE :  n/a



CMP.B1 (Speedfam CMP-V) - :  up/mqc (vacuum filter clog -water- had this tool 
				     down off and on, for most of the night
				     1st set of mqc data seem bogus, high 
				     std_dev (+20%)? pre measuring 2nd set 
CMP.B1 24hr MQCS COMPLETED   in process 
CMP.B1 24hr MQCS NEXT DUE :  n/a
CMP.B1 12hr MQCS COMPLETED:  10/28/96 @ 6:00 am           
CMP.B1 12hr MQCS NEXT DUE :  10/29/96 @ 6:00 pm

CMP.B2 (Speedfam CMP-V) - :  up/running jd0522 m3/  
CMP.B2 24hr MQCS COMPLETED:  10/28/96 @ 5:00 pm
CMP.B2 24hr MQCS NEXT DUE :  10/29/96 @ 5:00 pm
CMP.B2 12hr MQCS COMPLETED:  10/29/96 @ 6:30 am          
CMP.B2 12hr MQCS NEXT DUE :  10/29/96 @ 6:30 pm           

CMP.B3 (Speedfam CMP-V) - :  up/running jd0589 m1/jd0525 m3
CMP.B3 24hr MQCS COMPLETED:  10/28/96 @ 5:00 pm
CMP.B3 24hr MQCS NEXT DUE :  10/29/96 @ 5:00 pm
CMP.B3 12hr MQCS COMPLETED:  10/29/96 @ 5:30 am          
CMP.B3 12hr MQCS NEXT DUE :  10/29/96 @ 5:30 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED:10/28/96 @ 9:30 pm        
CMP-SCRUB.A1 12hr MQCS NEXT DUE :10/29/96 @ 9:30 am        

CMP-SCRUB.A2 (On-track scrubber) - up/idle                 
CMP-SCRUB.A2 12hr MQCS COMPLETED:10/28/96 @ 9:30 pm       
CMP-SCRUB.A2 12hr MQCS NEXT DUE :10/29/96 @ 9:30 am 

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 12hr MQCS COMPLETED:10/28/96 @ 9:30 pm      
CMP-SCRUB.A3 12hr MQCS NEXT DUE :10/29/96 @ 9:30 am



Hot/B lots in area:
__________________
* jd0590 m1  *

Hot lots coming to area:
-----------------------
* xd0588 m1 (at die electrics) *

Static Lots in area:
-------------------
* if its a static lot, we've got it * 
  
Down Equipment:
--------------
* cmp.b1 mqc - vacuum filter clog (water) *

Scrap lots:
----------
* none *
 
Hold Lots:
----------
* xd0544 hold for eng to run  * 
  jd0524 hold for eng eval

Monitor status:
--------------
3 boxes of 12k mqc wafers      2 ordered @ 7:00 am 
2 boxes of 50K breakin wafers  2 ordered @ 7:00 am

lot in the room 
------------------------------
*  lots *

New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. *
  SEE E.D.C.O. AT CMP.A1 

Lots/wafers processed:
---------------------
* jl0611 pmd 24 wafers *
  jd0591 pmd 24 wafers
  jd0614 pmd 24 wafers
  jl0620 pmd 24 wafers
  jl0598  m1 21 wafers
  xd0574  m1 24 wafers
  jl0599  m1 24 wafers
  jl0632  m1 12 wafers (hotlot)
  xd0534  m2 22 wafers
  jd0561  m2 24 wafers
  jd0569  m2 23 wafers
  jd0526  m3 23 wafers
   

# of carriers for strasbaugh/speedfam:
--------------------------------------
  1 speedfam carriers
  5 strasbaugh carriers
  5 strasbaugh plates shimmed + filmed


82.35A-shift CMP passdown 10/29/96FABSIX::J_SADINFreedom isn't free.Tue Oct 29 1996 19:14116
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  misc

        BREAKIN WAFERS              30                  misc



CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0604 (pmd - rework. see remarks)
and JD0619 (pmd - touchup).
CMP.A1 24hr MQCS COMPLETED: 3am 10/29
CMP.A1 24hr MQCS NEXT DUE : 3am 10/30

CMP.A2 (Strasbaugh 6DS-SP) - REPAIR: new pad/carriers after crash. Will
need breakins/mqcs. Pad is already conditioned.
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V) - VERIFY: mqcs reading now. Particles are in!
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0590 (m1) and JD0522 (m3). JD0588 (m1)
on deck. 
CMP.B2 24hr MQCS COMPLETED: 6pm 10/29
CMP.B2 24hr MQCS NEXT DUE : 6pm 10/30
CMP.B2 12hr MQCS COMPLETED: 6pm 10/29
CMP.B2 12hr MQCS NEXT DUE : 6am 10/30

CMP.B3 (Speedfam CMP-V) - REPAIR: running particle checks. Went down for
high particles today.
CMP.B3 24hr MQCS COMPLETED: n/a
CMP.B3 24hr MQCS NEXT DUE : n/a
CMP.B3 12hr MQCS COMPLETED: n/a
CMP.B3 12hr MQCS NEXT DUE : n/a



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9am 10/29
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9pm 10/30

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9am 10/29
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9pm 10/29

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9am 10/29
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9pm 10/29



Hot/B lots in area:
__________________
XD0581 - THK ILD1
XD0588 - ILD 1
JD0590 - ILD 1

Hot lots coming to area:
-----------------------
JD0469 - DEP_PMD1

Static Lots in area:
-------------------
TOO MANY

Down Equipment:
--------------
CMP.A2 - NEEDS BREAKINS AND MQCS AFTER PAD/CARRIER CHANGE (WAFER CRASH).
CMP.B1 - MQCS READING NOW.
CMP.B3 - DOWN FOR HIGH PARTICLES. MQCS EVALUATING NOW.

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0544 - HOLD FOR ERIC BODENSIECK.

Monitor status:
--------------
1.5 boxes of 12K mqc wafers
2 boxes of 50K breakin wafers

Number of product lots in room:
------------------------------
19

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0591 - PMD - 24WFRS
JD0619 - PMD - 22
JL0621 - PMD - 24
JD0524 - M25 - 15 

# of carriers for strasbaugh/speedfam:
--------------------------------------
7 STRASBAUGH
5 STRASBAUGH PLATES
0 SPEEDFAM


82.36PASSDOWNFABSIX::D_CAUSEWed Oct 30 1996 07:3752
                             D SHIFT PASSDOWN

       
CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING XD0580 FIRST 3 MIN DONE 
    
CMP.A2 (Strasbaugh 6DS-SP) -UP/RUNNING JL0607 FIRST 3 MINUTES,XD0590 100%
                            ON THK.A4
        
CMP.B1 (Speedfam CMP-V) -  VERIFY/FAILED FOR UNIFORMITY 4 TIMES 

CMP.B2 (Speedfam CMP-V) - UP/RUNNING JL0597 1ST PASS,XD0583 FINAL TOUCHUP

CMP.B3 (Speedfam CMP-V) - VERIFY/RUNNING MQC
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE 
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT/B lots in area:1
-------------------
JL0648

STATIC lots in area:7
--------------------

HOLD LOTS IN AREA:
__________________

       
DOWN equipment:2
---------------
CMP.B1 UNIFORMITY
CMP.B3 UNIFORMITY

NUMBER of product lots in room:14

-------------------------------
           

LOTS COMPLETED : 11
----------------

BREAK IN WAFERS USED:35 

MQC WAFERS USED:44 WAFERS USED
MQC WAFERS AVAIL:2 3/4 BOXES

----------


82.37PASSDOWNFABSIX::D_CAUSEThu Oct 31 1996 07:3952
                             D SHIFT PASSDOWN

       
CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING XD0570 RUNNING TU 
    
CMP.A2 (Strasbaugh 6DS-SP) -UP/MQC ALS0 RUNNING JL0601 NEEDS 100% AND TU
        
CMP.B1 (Speedfam CMP-V) -  VERIFY/U DONT ASK

CMP.B2 (Speedfam CMP-V) - UP/RUNNING JD0567 FIRST PASS, JD0547 800 SEC RUN
                                     AND STILL AT 17K

CMP.B3 (Speedfam CMP-V) - UP/2 LOTS READY FOR TU
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE 
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT/B lots in area:1
-------------------
JL0632

STATIC lots in area:
--------------------

HOLD LOTS IN AREA:
__________________

       
DOWN equipment:1`
---------------
CMP.B1 


NUMBER of product lots in room:LOST COUNT

-------------------------------
           

LOTS COMPLETED : 7
----------------

BREAK IN WAFERS USED:40 

MQC WAFERS USED:24 WAFERS USED
MQC WAFERS AVAIL:2  BOXES

----------


82.38PASSDOWNFABSIX::D_CAUSEFri Nov 08 1996 07:2853
                             D SHIFT PASSDOWN

       
CMP.A1 (Strasbaugh 6DS-SP) -VERIFY-U PAD CHANGE DUE TO BUBBLES RUNNING FULL MQC 
    
CMP.A2 (Strasbaugh 6DS-SP) -UP/IDLE
        
CMP.B1 (Speedfam CMP-V) -  UP/RUNNING 2 LOTS:JD0567 NEEDS 100% AND TOUCH UP
                             ****HOT****  XD0588 FIRST 400 SEC 

CMP.B2 (Speedfam CMP-V) - VERIFY-S AFTER MONTHLY PM EVALUATEING FIRST MQC'S

CMP.B3 (Speedfam CMP-V) - VERIFY-S RUNNING MQC AFTER PM
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE 
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT lots in area:1
-------------------
XD0588*** 

STATIC lots in area:3
--------------------

HOLD LOTS IN AREA:3
__________________
ON HOLD FOR PROCESSING BY ERIC B. AND FRANK
       
DOWN equipment:
---------------
CMP.A1 PAD CHANGE
CMP.B2 VERFIY-S MQC AFTER PM
CMP.B3 VERIFY-S MQC AFTER PM

NUMBER of product lots in room:5

-------------------------------
           

LOTS COMPLETED : 6
----------------

BREAK IN WAFERS USED:25 

MQC WAFERS USED:13 WAFERS USED
MQC WAFERS AVAIL:3  BOXES

----------


82.39PASSDOWNFABSIX::D_CAUSESat Nov 09 1996 07:4554
                             D SHIFT PASSDOWN

       
CMP.A1 (Strasbaugh 6DS-SP) -UP/IDLE 
    
CMP.A2 (Strasbaugh 6DS-SP) -UP/IDLE
        
CMP.B1 (Speedfam CMP-V) -  UP/RUNNING 2 LOTS:JD0655 HOT LOT WILL NEED 100%
                                             JL0600 100% ON THK.A5 NEEDS TU 

CMP.B2 (Speedfam CMP-V) - UP/RUNNING 1 JD0569 100% ON THK.A4 
                          ****WARNING ON EQUIPMENT READ BEFORE RUNNING***

CMP.B3 (Speedfam CMP-V) - RUNNING 2 LOTS: JL0609 IN SCRUB.A3 NEEDS 100%
                                          JD0614 NEEDS 100% AND TU
                          *****WARNING ON SCRUBBER******
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE 
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT lots in area:3
-------------------
JD0655
XD0643
JL0642
STATIC lots in area:2
--------------------

HOLD LOTS IN AREA:2
__________________
ON HOLD FOR PROCESSING BY ERIC B. AND FRANK
       
DOWN equipment:
--------------

NUMBER of product lots in room:9

-------------------------------
           

LOTS COMPLETED : 8
----------------

BREAK IN WAFERS USED:25 

MQC WAFERS USED:0 WAFERS USED
MQC WAFERS AVAIL:5.5  BOXES

----------


82.40PASSDOWNFABSIX::D_CAUSEFri Nov 22 1996 07:4852
                             D SHIFT PASSDOWN

PLEASE ADD FABSIX::M_CADIEUX AND FABSIX::D_GIROUARD TO YOUR DIS LIST
FOR THE CMP AREA

       
CMP.A1 (Strasbaugh 6DS-SP) -UP/RUNNING JD0650 RUNNING SECOND 3 MIN 
    
CMP.A2 (Strasbaugh 6DS-SP) -UP/IDLE
        
CMP.B1 (Speedfam CMP-V) -  UP/RUNNING FIRST PASS 

CMP.B2 (Speedfam CMP-V) - UP/IDLE

CMP.B3 (Speedfam CMP-V) - UP/RUNNING JD0604 800 SEC COMPLETE NEEDS 100%
                          
CMP-SCRUB.A1 (On-track scrubber) - DOWN/EXTENAL FROM 8AM-12PM
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT lots in area:
-------------------

STATIC lots in area:
--------------------

HOLD LOTS IN AREA:2
__________________
ON HOLD FOR PROCESSING BY ERIC B. AND FRANK
       
DOWN equipment:
--------------
CMP-SCRUB.A1

NUMBER of product lots in room:3

-------------------------------
           

LOTS COMPLETED : 
----------------

BREAK IN WAFERS USED:25 

MQC WAFERS USED:23 WAFERS USED
MQC WAFERS AVAIL:1/2  BOX 

----------


82.41PASSDOWNFABSIX::D_CAUSEWed Nov 27 1996 08:0551
                             D SHIFT PASSDOWN

PLEASE ADD FABSIX::M_CADIEUX AND FABSIX::D_GIROUARD TO YOUR DIS LIST
FOR THE CMP AREA

       
CMP.A1 (Strasbaugh 6DS-SP) -UP/RUNNING JL0677 NEEDS 100% ON THK.A4 
    
CMP.A2 (Strasbaugh 6DS-SP) -DOWN/FAILED 24HR MQC NEEDS PAD CHANGE
        
CMP.B1 (Speedfam CMP-V) -  UP/RUNNING T/U ON JL0660  JD0663 HOT LOT
                                      READY TO POLISH 

CMP.B2 (Speedfam CMP-V) - UP/MQC RUNNING FOURTH MQC REPLACED CARRIER 1
                                         AFTER 3RD FAILURE

CMP.B3 (Speedfam CMP-V) - UP/RUNNING JD0634 FIRST PASS 400 SEC
                                     JL0554 100% THK ON A5 FOR TU
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT lots in area:1
------------------
JD0663 

STATIC lots in area:
--------------------

HOLD LOTS IN AREA:2
__________________
ON HOLD FOR PROCESSING BY ERIC B. AND FRANK
       
DOWN equipment:
--------------

NUMBER of product lots in room:7

--------------------------------

BREAK IN WAFERS USED:45

MQC WAFERS USED:32 WAFERS USED
MQC WAFERS AVAIL:1 1/4  BOXS 

----------


82.42@cmp.dis 11/27/96FABSIX::G_ISAACSWed Nov 27 1996 19:3740
				CMP           
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING LOT # JL0703A  for touch-up
                                         "      "  "   is 100% measuring on
                                         thickness .A4, you need to measure
                                         in bin date 7/96 thru 9/96, tool
                                         is not set up thru 12/96 bin.
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE -

CMP.B1 (Speedfam CMP-V) - DOWN/     Monthly PM
			       
CMP.B2 (Speedfam CMP-V) - UP/RUNNING LOT # JD0654 
                             Lot in in scrub .A3 needs 100% measurement.
                             

CMP.B3 (Speedfam CMP-V) - UP/IDLE -

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area:             Lots in CMP:		
	------------------	        -----------	
                                             3
	Lots Shiped:                    New SPEC/TDCO:
	-----------                     -------------
    
	Down Equipment:                 Carriers:
	--------------                  --------
    	  .B1 PM Monthly                See Carrier PD.

	MQC Mon. Used: 	                MQC Monitors:
    	-------------                   ------------
            15                              75
        Misc.
        ----
82.43exFABSIX::G_ISAACSWed Nov 27 1996 19:3834
  				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE -
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE -

CMP.B1 (Speedfam CMP-V) - UP/IDLE -   
			       
CMP.B2 (Speedfam CMP-V) - UP/IDLE -

CMP.B3 (Speedfam CMP-V) - UP/IDLE -

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area:             Lots in CMP:		
	------------------	        -----------	
   
	Lots Shiped:                    New SPEC/TDCO:
	-----------                     -------------
    
	Down Equipment:                 Carriers:
	--------------                  --------
    		                        See Carrier PD.

	MQC Mon. Used: 	                MQC Monitors:
    	-------------                   ------------
            
        Misc.
        ----
82.44FOR @CMP.DISFABSIX::G_ISAACSWed Nov 27 1996 19:4737
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING LOT # JL0703A FOR TOUCH-UP.
                                Lot measuring on thickness.A4.
                                You need to measure using bin 7/96 thru 9/96.
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE -

CMP.B1 (Speedfam CMP-V) - UP/DOWN  MONTHLY PM

			       
CMP.B2 (Speedfam CMP-V) - UP/RUNNING LOT JD0654 NEEDS 100%

CMP.B3 (Speedfam CMP-V) - UP/IDLE -

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area:             Lots in CMP:		
	------------------	        -----------	
                                             3
	Lots Shiped:                    New SPEC/TDCO:
	-----------                     -------------
    
	Down Equipment:                 Carriers:
	--------------                  --------
    		                        See Carrier PD.

	MQC Mon. Used: 	                MQC Monitors:
    	-------------                   ------------
            15                              75
        Misc.
        ----
82.45PASSDOWNFABSIX::D_CAUSEWed Dec 11 1996 07:5051
                             D SHIFT PASSDOWN

PLEASE ADD FABSIX::M_CADIEUX AND FABSIX::D_GIROUARD TO YOUR DIS LIST
FOR THE CMP AREA

       
CMP.A1 (Strasbaugh 6DS-SP) -UP RUNNING XM0613 NEEDS TOUCH UP 
    
CMP.A2 (Strasbaugh 6DS-SP) -UP/IDLE
        
CMP.B1 (Speedfam CMP-V) -  UP/IDLE **WARNING** ON EQUIP CARRIER #3 OFFLINE
                                   MQC DONE 

CMP.B2 (Speedfam CMP-V) - UP/RUNNING HOT LOT XM0587B NEEDS 100% AND TU
                                 *** READ REMARKS CAREFULLY THIS LOT IS
                                     A M-2 NOT A M-3 AS STATED IN WIP***

CMP.B3 (Speedfam CMP-V) - UP/IDLE MQC DONE
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT lots in area:1
------------------
XM0587B

STATIC lots in area:
--------------------

HOLD LOTS IN AREA:1
__________________
ON HOLD FOR PROCESSING BY ERIC B. AND FRANK
       
DOWN equipment:
--------------

NUMBER of product lots in room:2

--------------------------------

BREAK IN WAFERS USED:20

MQC WAFERS USED:15 WAFERS USED
MQC WAFERS AVAIL:5 3/4  BOXS 

----------


82.46PASSDOWNFABSIX::D_CAUSEFri Dec 27 1996 07:3247
                             D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -DOWN/FAILED 24 HR MQC NEEDS PAD CHANGE 
    
CMP.A2 (Strasbaugh 6DS-SP) -UP/MQC HIGH UNIFORMITY ON LAST TWO LOTS RUNNING
                                   MQC TO VERIFY EQUIPMENT 
        
CMP.B1 (Speedfam CMP-V) -  UP/RUNNING 2 M-3 LOTS FOR SECOND PASS WILL NEED
                                        100% AND TOUCHUP

CMP.B2 (Speedfam CMP-V) - UP/RUNNING 2 M-3 LOTS FIRST 400 COMPLETE READY FOR 
                                       SECOND PASS

CMP.B3 (Speedfam CMP-V) - DOWN/UNLOAD CUP #3 MISSING AT UNLOAD RUNNING 2 LOTS
                                          SEND AHEADS BEING EVALUATED
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT lots in area:
------------------

HOLD LOTS IN AREA:1
__________________
ON HOLD FOR PROCESSING BY ERIC B. 
       
DOWN equipment:
--------------
CMP.A1 NEEDS PAD CHANGE
CMP.B3 UNLOAD CUP #3 MISSING UNLOAD


NUMBER of product lots in room:21
--------------------------------

BREAK IN WAFERS USED:30

MQC WAFERS USED:20 WAFERS USED
MQC WAFERS AVAIL:2.5 BOXS 

----------


82.47PASSDOWNFABSIX::D_CAUSESat Dec 28 1996 07:4046
                             D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -DOWN/ROBOT PROBLEMS (JL0775 HALF OF THE LOT HAS 
                                                 BEEN RUN) 
    
CMP.A2 (Strasbaugh 6DS-SP) -UP/RUNNING JL0776 100% WILL NEED TU 
        
CMP.B1 (Speedfam CMP-V) -  UP/RUNNING  2 LOTS READY FOR TU

CMP.B2 (Speedfam CMP-V) - UP/RUNNING TU ON JL0712

CMP.B3 (Speedfam CMP-V) - DOWN/FAILED 24 HOUR MQC HAD PAD CHANGE NEEDS
                               FULL MQC 

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT lots in area:
------------------

HOLD LOTS IN AREA:1
__________________
ON HOLD FOR PROCESSING BY ERIC B. 
       
DOWN equipment:
--------------
CMP.A1 ROBOT PROBLEMS
CMP.B3 PAD CHANGE FOR MQC FAILURE


NUMBER of product lots in room:23
--------------------------------

BREAK IN WAFERS USED:30

MQC WAFERS USED:30 WAFERS USED
MQC WAFERS AVAIL:4 BOXS 

----------


82.48PASSDOWNFABSIX::D_CAUSEFri Jan 03 1997 07:5045
                             D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -UP/IDLE MONITOR STILL NOT WORKING PASSED MQC
    
CMP.A2 (Strasbaugh 6DS-SP) -UP/RUNNING SEND AHEADS FOR 2 PMD'S
        
CMP.B1 (Speedfam CMP-V) -  UP/RUNNING  JL0745 FINAL TU NEEDS DRG AND FINAL
                                       JL0745 READY FOR FIRST PASS

CMP.B2 (Speedfam CMP-V) - DOWN/VERIFY U PAD CHANGE FOR LOW REMOVAL RATE AND STD
                                   RUNNING MQC'S

CMP.B3 (Speedfam CMP-V) - UP/RUNNING XD0573 READY FOR TU  

CMP-SCRUB.A1 (On-track scrubber) - UP/RUNNING XD0759 NEEDS DRG AND FINAL
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT lots in area:JD0729 DUE AT 8AM
------------------

HOLD LOTS IN AREA:2
__________________
ON HOLD FOR PROCESSING BY ERIC B. 
       
DOWN equipment:
--------------
CMP.B2 PAD CHANGE FOR UNIFORMITY


NUMBER of product lots in room:12
--------------------------------

BREAK IN WAFERS USED:30

MQC WAFERS USED:7 WAFERS USED
MQC WAFERS AVAIL:3.5 BOXES 

----------


82.49exFABSIX::G_ISAACSFri May 23 1997 20:3163
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - DOWN/ Pad change.
                             
                                
             
CMP.A2 (Strasbaugh 6DS-SP) - DOWN/  
                               
                                  
                                    crash. Lost 2 wafers, crash report
                                    has been filled out.  Lot has not
                                    been run.
                                    MQC'S DONE.
                                  
CMP.B1 (Speedfam CMP-V) - TAKING A TRIP 	

			       
CMP.B2 (Speedfam CMP-V) - UP/RUNNING  JL1374 ILD1  rate=4881 time=160
                                      needs drg.
                                      JL1323 ILD1  rate=4546 time=160
                                      needs drg.
                                      MQC'S DONE.

CMP.B3 (Speedfam CMP-V) - UP/RUNNING  2 lots Send-a-heads 200 sec.
                                             # JL1319 ILD2
                                               JL1331 ILD2
                                      Wafers are in same cassette
                                      JL1331 are in slots  6-10
                                      JL1319 are in slots 11-15
                                      MQC'S DONE

CMP.B4 (Speedfam CMP-V)-- Down/  Recalb conditioner arm. 
                                 Installed new pad.  Needs MQC's
                                 wafers pre measured on .A1
                                 File #'s 1.1170
                                          2.1171
                                          3.1172
                                          4.1173
                                          5.1174
              

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area:             Lots in CMP:		
	------------------	        -----------	
                                             
	Lots Shiped:                    New SPEC/TDCO:
	-----------                     -------------
    
	Down Equipment:                 Carriers:
	--------------                  --------
    		                        See Carrier PD.

	MQC Mon. Used: 	                MQC Monitors:
    	-------------                   ------------
            
        Misc.
        ----
82.50@cmp.disFABSIX::G_ISAACSFri May 23 1997 20:4869
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - DOWN   Pad change. Ready for break-in and MQC.
                             
                                
             
CMP.A2 (Strasbaugh 6DS-SP) -UP/ RUNNING JD1596 PMD 1ST PASS.
                                        Will need 100%.
                                  
                                 
                              
                                  
CMP.B1 (Speedfam CMP-V) - TAKING A TRIP 	

			       
CMP.B2 (Speedfam CMP-V) - DOWN/   Pad replaced.  Will need break-in and
                                                  MQC.
                                 

CMP.B3 (Speedfam CMP-V) - DOWN/    Carriers not seeing wafers at pick-up
                                   JL1508 ILD2 sa heads ran 190 sec measured 
                                   on .A5. Removal rate-3735
                                   First 5 wafers in cassette are the
                                   send-a-head wafers, need 1 sec touch-up.
                                   JL1514 ILD2 sa heads ran 190 sec
                                   measured on .A5 Removal rate-3925
                                   Send-a-head wafers are done and in
                                   cassette next to lot.
                                   MQC wafers have been pre-measured on .A4
                                   File # 3390 thru 3394.
 

CMP.B4 (Speedfam CMP-V)-- UP/RUNNING  ROCKET LOT. JD1566 lot 100% on .A1
                                      Removal rate
                                      1 thru 5   400 sec  1569
                                      6     10            1825
                                     11     15            1842
                                     16     20            2369
                                     21     24            2551
                              
                               
                                     
                                      
                                     
                                     
              

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area:             Lots in CMP:		
	------------------	        -----------	
                                             
	Lots Shiped:                    New SPEC/TDCO:
	-----------                     -------------
    
	Down Equipment:                 Carriers:
	--------------                  --------
    		                        See Carrier PD.

	MQC Mon. Used: 	                MQC Monitors:
    	-------------                   ------------
            
        Misc.
        ----
82.51@cmp.dis 5/24/97FABSIX::G_ISAACSSat May 24 1997 20:5267
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING  JL1098 ILD1 first pass 180 sec.
    
                             
                                
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/RUNNING  JD1552 ILD1 100% on .A4
                                         ran for 180 sec.
                             
                                  
CMP.B1 (Speedfam CMP-V) - TAKING A TRIP 	

			       
CMP.B2 (Speedfam CMP-V) - DOWN/   CRASHED  break-in wafers.
                                  Tool has new pads and carriers.
                                  FAILED particles. SCRATCHES
                                  HOT LOT JD1563 ILD1 ran send-a-heads
                                  are in seperate cassette. 
                                  JL1522 ILD2 send-a-heads ran and are in
                                  seperate cassette.
                                  MQC post readings are reading on
                                  thickness .A4.
                                      needs drg.
                                      JL1323 ILD1  rate=4546 time=160
                                      needs drg.
                                

CMP.B3 (Speedfam CMP-V) - UP/RUNNING       JD1450 is ready to run. No
                                           wafers have run yet.
                                           
                                          

CMP.B4 (Speedfam CMP-V)-- UP/RUNNING   HOT LOT XE1478 first 400 sec.
                              
                             
                           
                                    
                                     
                                   
                                      
              

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...

CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE..was down all day.
                              
      	Hot/B lots in area:             Lots in CMP:		
	------------------	        -----------	
         XE1478
         JD1563                               
	Lots Shiped:                    New SPEC/TDCO:
	-----------                     -------------
    
	Down Equipment:                 Carriers:
	--------------                  --------
    		                        See Carrier PD.

	MQC Mon. Used: 	                MQC Monitors:
    	-------------                   ------------
            
        Misc.
        ----
               
82.52FABSIX::G_ISAACSThu May 29 1997 20:1278
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING  JD1310, needs 100%
                             
                                
             
CMP.A2 (Strasbaugh 6DS-SP) - DOWN/  
                              
                                   
                                  
                                   
                              
                                   
                                  
CMP.B1 (Speedfam CMP-V) - TAKING A TRIP 	

			       
CMP.B2 (Speedfam CMP-V) - UP/RUNNING    
                                   
                                     
                                    
                                  

CMP.B3 (Speedfam CMP-V) - UP/RUNNING  2 LOTS             MQC'S DONE
                                      JD1562 ILD1
                                      Removal rate=3035
                                      Run time    =245
                                      running needs scrub and 100%
                                      measurements.
                                      JD1451 ILD3
                                      First 400 sec.
    
                                         
                                               
                                 
                                    
                                  
                                

CMP.B4 (Speedfam CMP-V)-- UP/RUNNING 2 LOTS
                                       XD1506 ILD1
                                       Removal rate=3650
                                       Run time    =215
                                       Lot has run and needs scrub and 100%
                                       measurements.
                                       JD1401 ILD3
                                       first 400 sec.
                                 
                                
                              
                                      
                                       
                                       
                                       
              

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area:             Lots in CMP:		
	------------------	        -----------	
                                             
	Lots Shiped:                    New SPEC/TDCO:
	-----------                     -------------
    
	Down Equipment:                 Carriers:
	--------------                  --------
    		                        See Carrier PD.

	MQC Mon. Used: 	                MQC Monitors:
    	-------------                   ------------
            
        Misc.
        ----
82.53@CMP.DISFABSIX::G_ISAACSFri May 30 1997 20:3272
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE    MQC's done.
                             
                                
             
CMP.A2 (Strasbaugh 6DS-SP) -UP/RUNNING JL1630 PMD 
                                       Will need scrub and 100.           
                                       Removal rate=2380
                                       Run time    =120
                                
                                       MQC'S DONE.
                                  
                                  
                                  
CMP.B1 (Speedfam CMP-V) - TAKING A TRIP 	

			       
CMP.B2 (Speedfam CMP-V) - UP/RUNNING  2 lots JD1533 ILD2  JD1452 ILD2
                                      Send-a-heads have been run for 
                                      both lots. Will need to be read.
                                      Run time=185 sec. for both lots.      
                                      
                                      MQC'S DONE.
                                   

CMP.B3 (Speedfam CMP-V) - DOWN/       RUNNING JD1449 ILD3 will need
                                              100% measurements.
                                              Removal rate=1050
                                              Run time    =400 sec.
                                          
                                              MQC'S ARE DONE.
                                     
                                     
                                   

CMP.B4 (Speedfam CMP-V)-- UP/RUNNING   LOT # XD1557 ILD1
                                             Running touch-up
                                             Removal rate=3240
                                             Run time    =200 sec.
                                 
                                             MQC'S DONE.
                                
                                       
                                        
                                        
                                       
              

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area:             Lots in CMP:		
	------------------	        -----------	
                                             
	Lots Shiped:                    New SPEC/TDCO:
	-----------                     -------------
    
	Down Equipment:                 Carriers:
	--------------                  --------
    		                        See Carrier PD.

	MQC Mon. Used: 	                MQC Monitors:
    	-------------                   ------------
            
        Misc.
        ----
                                                  
82.54FABSIX::G_ISAACSFri May 30 1997 20:4463
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING  JD1310, needs 100%
                             
                                
             
CMP.A2 (Strasbaugh 6DS-SP) - DOWN/  Wafer broke send cassette do
                                    to robot.
                                    XD1292 was on tool at time of
                                    crash. Lost 2 wafers, crash report
                                    has been filled out.  Lot has not
                                    been run.
                                    MQC'S DONE.
                                  
CMP.B1 (Speedfam CMP-V) - TAKING A TRIP 	

			       
CMP.B2 (Speedfam CMP-V) - UP/RUNNING  JL1374 ILD1  rate=4881 time=160
                                      needs drg.
                                      JL1323 ILD1  rate=4546 time=160
                                      needs drg.
                                      MQC'S DONE.

CMP.B3 (Speedfam CMP-V) - UP/RUNNING  2 lots Send-a-heads 200 sec.
                                             # JL1319 ILD2
                                               JL1331 ILD2
                                      Wafers are in same cassette
                                      JL1331 are in slots  6-10
                                      JL1319 are in slots 11-15
                                      MQC'S DONE

CMP.B4 (Speedfam CMP-V)-- Down/  Recalb conditioner arm. 
                                 Installed new pad.  Needs MQC's
                                 wafers pre measured on .A1
                                 File #'s 1.1170
                                          2.1171
                                          3.1172
                                          4.1173
                                          5.1174
              

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area:             Lots in CMP:		
	------------------	        -----------	
                                             
	Lots Shiped:                    New SPEC/TDCO:
	-----------                     -------------
    
	Down Equipment:                 Carriers:
	--------------                  --------
    		                        See Carrier PD.

	MQC Mon. Used: 	                MQC Monitors:
    	-------------                   ------------
            
        Misc.
        ----