[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Conference asdg::cmp

Title:CMP
Notice:Welcome to the CMP notesfile
Moderator:FABSIX::B_TOWERLLE
Created:Tue Oct 31 1995
Last Modified:Fri Jun 06 1997
Last Successful Update:Fri Jun 06 1997
Number of topics:94
Total number of notes:6381

81.0. "CMP ops passdowns - sept '96" by FABSIX::J_SADIN (Freedom isn't free.) Sun Sep 01 1996 20:10

    
    
    	cmp ops passdowns for September 1996.
    
    
T.RTitleUserPersonal
Name
DateLines
81.1A-shift CMP passdown 9/1/96FABSIX::J_SADINFreedom isn't free.Sun Sep 01 1996 20:11107
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                5                   mqcs

        BREAKIN WAFERS             10                   misc



CMP.A1 (Strasbaugh 6DS-SP) - EXTERNAL: down for shutdown.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - EXTERNAL: down for shutdown.
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V) - RUNNING: touching up JD0431 (m3). Then going down
for shutdown.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - EXTERNAL: down for shutdown.
CMP.B2 24hr MQCS COMPLETED: n/a
CMP.B2 24hr MQCS NEXT DUE : n/a
CMP.B2 12hr MQCS COMPLETED: n/a
CMP.B2 12hr MQCS NEXT DUE : n/a

CMP.B3 (Speedfam CMP-V) - RUNNING: touching up JL0479 (m1 - hot). Then
going down for shutdown.
CMP.B3 24hr MQCS COMPLETED: n/a
CMP.B3 24hr MQCS NEXT DUE : n/a
CMP.B3 12hr MQCS COMPLETED: n/a
CMP.B3 12hr MQCS NEXT DUE : n/a



CMP-SCRUB.A1 (On-track scrubber) - IDLE. 
CMP-SCRUB.A1 12hr MQCS COMPLETED: n/a
CMP-SCRUB.A1 12hr MQCS NEXT DUE : n/a

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: n/a
CMP-SCRUB.A2 12hr MQCS NEXT DUE : n/a

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: n/a
CMP-SCRUB.A3 12hr MQCS NEXT DUE : n/a



Hot/B lots in area:
__________________
JL0479 - M1 
JL0473 - M1

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
all equipment being shutdown for PCW work.

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
5.5 boxes of 12K mqc wafers. 4 boxes of 50K breakin wafers.

Number of product lots in room:
------------------------------
5

New specs/revs posted:
---------------------
SEE EDCO BY CMP.B1.

Lots/wafers processed:
---------------------
JD0431 - M3 - 24WFRS
JL0479 - M1 - 23
XE0530 - PMD - 24
JD0497 - PMD - 6

# of carriers for strasbaugh/speedfam:
--------------------------------------
Jesus is building more now. Check room.

81.2A-shift CMP passdown 9/03/96FABSIX::J_SADINFreedom isn't free.Tue Sep 03 1996 20:24104
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS

        BREAKIN WAFERS



CMP.A1 (Strasbaugh 6DS-SP) - MQC: running breakins and mqcs after shutdown.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - MQC: running breakins and mqcs after shutdown.
Had to rebuild right carrier (FYI). 
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V) - RUNNING: XD0516 (m1).
CMP.B1 24hr MQCS COMPLETED: 5:30pm 9/03
CMP.B1 24hr MQCS NEXT DUE : 5:30pm 9/04
CMP.B1 12hr MQCS COMPLETED: 5pm 9/03
CMP.B1 12hr MQCS NEXT DUE : 5am 9/04

CMP.B2 (Speedfam CMP-V) - IDLE. mqcs complete and in spec. 
CMP.B2 24hr MQCS COMPLETED: 6:30pm 9/03
CMP.B2 24hr MQCS NEXT DUE : 6:30pm 9/04
CMP.B2 12hr MQCS COMPLETED: 5pm 9/03
CMP.B2 12hr MQCS NEXT DUE : 5am 9/04

CMP.B3 (Speedfam CMP-V) - RUNNING: JL0473 (m1 - hot) and JL0447 (m2).
CMP.B3 24hr MQCS COMPLETED: 5pm 9/03 
CMP.B3 24hr MQCS NEXT DUE : 5pm 9/04
CMP.B3 12hr MQCS COMPLETED: 5pm 9/03
CMP.B3 12hr MQCS NEXT DUE : 5am 9/04



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 3pm 9/03
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 3am 9/04

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 3:30pm 9/03
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 3:30am 9/04

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 3pm 9/03
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 3am 9/04



Hot/B lots in area:
__________________
JL0473 - M1

Hot lots coming to area:
-----------------------
XD0521 - DEP_ILD1 2

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - MQC
CMP.A2 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
4.5 boxes of 12K mqc wafers.

Number of product lots in room:
------------------------------
3

New specs/revs posted:
---------------------
* SEE TDCO POSTED BY CMP.B1 FOR NEW INITIAL POLISH TIMES *

Lots/wafers processed:
---------------------
* none *

# of carriers for strasbaugh/speedfam:
--------------------------------------
14 SPEEDFAM CARRIERS
0 STRASBAUGH CARRIERS

81.3PASSDOWNFABSIX::D_CAUSEWed Sep 04 1996 08:2251
       
CMP.A1 (Strasbaugh 6DS-SP) - DOWN/3 MQC FAILURES REMOVEAL RATE INCREASING PAST
                                  UCL. NEEDS PAD CHANGE    
                                                                       
CMP.A2 (Strasbaugh 6DS-SP) -DOWN/ 3 MQC FAILURES FOR HIGH UNIFORMITY NEEDS PAD
                                  CHANGE
        
CMP.B1 (Speedfam CMP-V) -  UP/RUNNING JD0482 REWORK

CMP.B2 (Speedfam CMP-V) - UP/RUNNING XD0527 FIRST PASS

CMP.B3 (Speedfam CMP-V) - UP/RUNNING XD0513 FIRST PASS
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC COMPLETE
                                        
CMP-SCRUB.A2 (On-track scrubber) - DOWN/SPIN STATION INOP 
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE MQC COMPLETE

HOT/B lots in area:0
-------------------

STATIC lots in area:1
--------------------

HOLD LOTS IN AREA:0
__________________

       
DOWN equipment:
---------------
CMP.A1 HIGH REMOVAL RATE
CMP.A2 HIGH UNIFORMITY
CMP-SCRUB.A2 SPIN STATION INOP

NUMBER of product lots in room:4

-------------------------------
           

LOTS COMPLETED : 4
----------------

BREAK IN WAFERS USED: 15

MQC WAFERS USED:12
MQC WAFERS AVAIL:4.5 BOX

----------


81.4D SHIFT PASSDOWNFABSIX::D_CAUSEThu Sep 05 1996 08:4549
       
CMP.A1 (Strasbaugh 6DS-SP) - UP/TO PROCESS ENG    
                                                                       
CMP.A2 (Strasbaugh 6DS-SP) -UP/IDLE
        
CMP.B1 (Speedfam CMP-V) -  UP/IDLE MQC DONE NEW CONDITIONER RAISED REMOVAL
                                   RATE TO AN AVERAGE OF 3300!!!!

CMP.B2 (Speedfam CMP-V) - UP/IDLE

CMP.B3 (Speedfam CMP-V) - UP/RUNNING JD0441 HOT LOT FIRST 400 SEC
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC COMPLETE
                                        
CMP-SCRUB.A2 (On-track scrubber) - DOWN/SPIN STATION ERROR 
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE MQC COMPLETE

HOT/B lots in area:1
-------------------
JD0441 **HOT**
STATIC lots in area:0
--------------------

HOLD LOTS IN AREA:0
__________________

       
DOWN equipment:
---------------

CMP-SCRUB.A2 SPIN STATION ERROR

NUMBER of product lots in room:1

-------------------------------
           

LOTS COMPLETED : 8
----------------

BREAK IN WAFERS USED: 15

MQC WAFERS USED:12
MQC WAFERS AVAIL:3 BOXS

----------


81.5PASSDOWN CMP B-SHIFT 9/8/96FABSIX::M_PROVENCHERSun Sep 08 1996 07:33110
    
    CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  MQC'S

        BREAKIN WAFERS              37                  misc



CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE 
CMP.A1 24hr MQCS COMPLETED:  9/7/96 @5:00 PM 
CMP.A1 24hr MQCS NEXT DUE :  9/8/96 @5:00 PM

CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE
CMP.A2 24hr MQCS COMPLETED:  9/7/96 @2:00 PM 
CMP.A2 24hr MQCS NEXT DUE :  9/8/96 @2:00 PM



CMP.B1 (Speedfam CMP-V) - UP/RUNNING JL0450 M2 TOUCHUP    
CMP.B1 24hr MQCS COMPLETED:  9/8/96 @1:00 AM
CMP.B1 24hr MQCS NEXT DUE :  9/9/96 @1:00 AM
CMP.B1 12hr MQCS COMPLETED:  9/8/96 @11:00PM
CMP.B1 12hr MQCS NEXT DUE :  9/8/96 @11:00AM

CMP.B2 (Speedfam CMP-V) - UP/RUNNING XD0521 M2 (HOT LOT) TOUCHUP
CMP.B2 24hr MQCS COMPLETED:  9/8/96 @12:30AM
CMP.B2 24hr MQCS NEXT DUE :  9/9/96 @12:30AM   
CMP.B2 12hr MQCS COMPLETED:  9/8/96 @12:30AM
CMP.B2 12hr MQCS NEXT DUE :  9/8/96 @12:30PM

CMP.B3 (Speedfam CMP-V) - : UP/IDLE
CMP.B3 24hr MQCS COMPLETED:  9/8/96 @ 2:30 AM
CMP.B3 24hr MQCS NEXT DUE :  9/9/96 @ 2:30 AM
CMP.B3 12hr MQCS COMPLETED:  9/8/96 @ 2:30 AM
CMP.B3 12hr MQCS NEXT DUE :  9/8/96 @ 2:30 PM



CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9/7/96 @ 10:00 PM
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9/8/96 @ 10:00 AM

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9/7/96 @ 10:00 PM
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9/8/96 @ 10:00 AM

CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9/7/96 @ 10:00 PM
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9/8/96 @ 10:00 AM



Hot/B lots in area:
__________________
* XD0521 M2 (B2 TOUCHUP) *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* NONE *

Down Equipment:
--------------
* NONE *

Scrap lots:
----------
* NONE *

Hold Lots:
---------
* XD0519 *

Monitor status:
--------------
3 BOXES of 12k mqc wafers. ( 2 ON ORDER )
1 BOX   50K BREAKIN WAFERS ( 4 ON ORDER )   

Number of product lots in room:
------------------------------
* 2 LOTS *

New specs/revs posted:
---------------------
* SEE *NEW* TDCO BY CMP.B1 *
REGAURING NEW TIMES FOR SPEEDFAMS ONLY

Lots/wafers processed:
---------------------
* JL0488 PMD 23 WAFERS *
  JL0474  M1 24 WAFERS
  XD0520  M2 24 WAFERS
 
# of carriers for strasbaugh/speedfam:
--------------------------------------
 8  SPEEDFAM CARRIERS
 10 STRASBAUGH CARRIERS
 ?  STRASBAUGH PLATES


    
81.6A-shift CMP passdown 9/08/96FABSIX::J_SADINFreedom isn't free.Sun Sep 08 1996 20:31112
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                10                  mqcs

        BREAKIN WAFERS              20                  misc



CMP.A1 (Strasbaugh 6DS-SP) - IDLE.
CMP.A1 24hr MQCS COMPLETED: 7pm 9/08
CMP.A1 24hr MQCS NEXT DUE : 7pm 9/09

CMP.A2 (Strasbaugh 6DS-SP) - IDLE.
CMP.A2 24hr MQCS COMPLETED: 7:30pm 9/08
CMP.A2 24hr MQCS NEXT DUE : 7:30pm 9/09



CMP.B1 (Speedfam CMP-V) - RUNNING: XE0530 (m1).
CMP.B1 24hr MQCS COMPLETED: 2am 9/08
CMP.B1 24hr MQCS NEXT DUE : 2am 9/09
CMP.B1 12hr MQCS COMPLETED: 3:30pm 9/08
CMP.B1 12hr MQCS NEXT DUE : 3:30am 9/09

CMP.B2 (Speedfam CMP-V) - RUNNING: JL0460 (m2) and XE0530 (m1). 
CMP.B2 24hr MQCS COMPLETED: 12am 9/08
CMP.B2 24hr MQCS NEXT DUE : 12am 9/09
CMP.B2 12hr MQCS COMPLETED: 7pm 9/08
CMP.B2 12hr MQCS NEXT DUE : 7am 9/09

CMP.B3 (Speedfam CMP-V) - RUNNING: XE0524 (m1).
CMP.B3 24hr MQCS COMPLETED: 2:30am 9/08
CMP.B3 24hr MQCS NEXT DUE : 2:30am 9/09
CMP.B3 12hr MQCS COMPLETED: 5pm 9/08
CMP.B3 12hr MQCS NEXT DUE : 5am 9/09



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 4:30pm 9/08
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 4:30am 9/09

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 4:30pm 9/08
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 4:30am 9/09

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 4:30pm 9/08
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 4:30am 9/09



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
JD0462 - 1.9 (STI LOT)
XD0519 - 0.9 (ON HOLD FOR FRANK K.)

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0519 - HOLD FOR FRANK K.

Monitor status:
--------------
4 boxes of 12K mqc wafers
2 boxes of 50K breakin wafers (more on order)

Number of product lots in room:
------------------------------
5

New specs/revs posted:
---------------------
SEE TDCO POSTED BY CMP.B1

Lots/wafers processed:
---------------------
JL0476 - M1 - 24WFRS
JD0468 - M1 - 24
JL0450 - M2 - 24
JD0467 - M2 - 22
XD0521 - M2 - 22
JD0483 - M1 - 14
JD0466 - M2 - 18
XD0510 - M2 - 21

# of carriers for strasbaugh/speedfam:
--------------------------------------
8 SPEEDFAM CARRIERS
10 STRASBAUGH CARRIERS


81.7PASSDOWN CMP. B-SHIFT 9/9/96FABSIX::M_PROVENCHERMon Sep 09 1996 07:16113
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                16                  MQC'S

        BREAKIN WAFERS              29                  misc



CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE 
CMP.A1 24hr MQCS COMPLETED:  9/8/96 @7:00 PM 
CMP.A1 24hr MQCS NEXT DUE :  9/9/96 @7:00 PM

CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE
CMP.A2 24hr MQCS COMPLETED:  9/8/96 @7:30 PM 
CMP.A2 24hr MQCS NEXT DUE :  9/9/96 @7:30 PM



CMP.B1 (Speedfam CMP-V) -    UP/IDLE    
CMP.B1 24hr MQCS COMPLETED:  9/9/96 @3:30 AM
CMP.B1 24hr MQCS NEXT DUE :  9/10/96 @3:30 AM
CMP.B1 12hr MQCS COMPLETED:  9/9/96 @3:30AM
CMP.B1 12hr MQCS NEXT DUE :  9/9/96 @3:30PM

CMP.B2 (Speedfam CMP-V) -    UP/IDLE
CMP.B2 24hr MQCS COMPLETED:  9/9/96 @4:30AM
CMP.B2 24hr MQCS NEXT DUE :  9/10/96 @4:30AM   
CMP.B2 12hr MQCS COMPLETED:  9/9/96 @4:30AM
CMP.B2 12hr MQCS NEXT DUE :  9/9/96 @4:30PM

CMP.B3 (Speedfam CMP-V) - :  UP/IDLE
CMP.B3 24hr MQCS COMPLETED:  9/9/96 @ 2:30 AM
CMP.B3 24hr MQCS NEXT DUE :  9/10/96 @ 2:30 AM
CMP.B3 12hr MQCS COMPLETED:  9/9/96 @ 2:30 AM
CMP.B3 12hr MQCS NEXT DUE :  9/9/96 @ 2:30 PM



CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9/9/96 @ 3:00 AM
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9/9/96 @ 3:00 PM

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9/9/96 @ 3:00 AM
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9/9/96 @ 3:00 PM

CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9/9/96 @ 3:00 AM
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9/9/96 @ 3:00 PM



Hot/B lots in area:
__________________
* NONE *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* JD0462 (STI LOT) 2.4 *
  XD0519 (ON HOLD FOR F. KRUPA) 1.45
  XD0508 (ON HOLD FOR F. KRUPA "EXTENSIVE P2 MEAS.") .35

Down Equipment:
--------------
* THICKNESS.A5 *

Scrap lots:
----------
* NONE *

Hold Lots:
---------
* XD0519 *
  JD0462
  XD0508

Monitor status:
--------------
3 1/2 BOXES of 12k mqc wafers. ( 2 ON ORDER )
1 1/2 BOX   50K BREAKIN WAFERS ( MORE ON ORDER )   

Number of product lots in room:
------------------------------
* NONE *

New specs/revs posted:
---------------------
* SEE *NEW* TDCO BY CMP.B1 *
NEW TIMES FOR SPEEDFAMS ONLY

Lots/wafers processed:
---------------------
* XE0524  M1 24 WAFERS
  XE0530  M1 24 WAFERS
  XD0536  M1 11 WAFERS
  JL0460  M2 23 WAFERS

# of carriers for strasbaugh/speedfam:
--------------------------------------
 8  SPEEDFAM CARRIERS
 10 STRASBAUGH CARRIERS
 ?  STRASBAUGH PLATES


81.8CMP A SHIFT PASSDOWNFABSIX::J_ROAMon Sep 09 1996 20:41123

CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 4                  mqcs

        BREAKIN WAFERS              50                  misc



CMP.A1 (Strasbaugh 6DS-SP) - IDLE/UP

CMP.A1 24hr MQCS COMPLETED: 15:46 hours 9/09/96
CMP.A1 24hr MQCS NEXT DUE : 12:32 hours 9/10/96  

========================================================================
CMP.A2 (Strasbaugh 6DS-SP) - : DOWN: Needs new pad.
Lot XD0539 was 100% measured. Only 3 wafers need to be touched-up
and the lot will be done.

CMP.A2 24hr MQCS COMPLETED: Mqcs to begin after pad change.
CMP.A2 24hr MQCS NEXT DUE : 

========================================================================


CMP.B1 (Speedfam CMP-V) - : MQC: Reps worked all day on tool to try to
fix the carrier rotation issues. The pad was replaced because a dummy
wafer broke on the pad.
 
CMP.B1 24hr MQCS COMPLETED:   Ongoing
CMP.B1 24hr MQCS NEXT DUE :   
CMP.B1 12hr MQCS COMPLETED:  
 

=========================================================================
CMP.B2 (Speedfam CMP-V) - : RUNNING: JL0493 (PMD) 

CMP.B2 24hr MQCS COMPLETED:   4:16 hours 9/09/96	
CMP.B2 24hr MQCS NEXT DUE :   4:16 hours 8/10/96
CMP.B2 12hr MQCS COMPLETED:   DONE 			


=========================================================================
CMP.B3 (Speedfam CMP-V) - :   RUNNING: Lot XD0508 (M3) splitted six 
different ways. We must try to get as close to target as possible.
Once lot completes polishing it needs to be final_sorted, then 100%
measured on thickness tool and put on hold for frank Krupa.

CMP.B3 24hr MQCS COMPLETED:    3:17 hours 9/09/96
CMP.B3 24hr MQCS NEXT DUE :    3:17 hours 9/10/96
CMP.B3 12hr MQCS COMPLETED:    DONE	

=========================================================================

CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED:  14:48 hours 9/09/96

=========================================================================
CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED:  14:48 hours 9/10/96


=========================================================================

CMP-SCRUB.A3 (On-track scrubber) - IDLE
CMP-SCRUB.A4 12hr MQCS COMPLETED:  14:48 hours 9/10/96

Hot/B lots in area:

__________________
none

Hot lots coming to area:
-----------------------


Static Lots in area:
-------------------
none 

Down Equipment:
--------------


Scrap lots:
----------
* none *

Hold Lots:
---------
 

Monitor status:
--------------
3 boxes of 12K mqc wafers  
3 boxes of 50k exercise wafers

Number of product lots in room:
------------------------------
4 lots

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------

XD0519 _ M2 - 22  WAFERS


# of carriers for strasbaugh/speedfam:
--------------------------------------
8  SPEEDFAM CARRIERS
10 STRASBAUGH CARRIERS


81.9PASSDOWN CMP. B-SHIFT 9/10/96FABSIX::M_PROVENCHERTue Sep 10 1996 07:48114
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  MQC'S

        BREAKIN WAFERS              43                  misc



CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE 
CMP.A1 24hr MQCS COMPLETED:  9/9/96  @4:00 PM 
CMP.A1 24hr MQCS NEXT DUE :  9/10/96 @4:00 PM

CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE
CMP.A2 24hr MQCS COMPLETED:  9/9/96  @10:30 PM 
CMP.A2 24hr MQCS NEXT DUE :  9/10/96 @10:30 PM



CMP.B1 (Speedfam CMP-V) - UP/IDLE    
CMP.B1 24hr MQCS COMPLETED:  9/9/96  @11:00 PM
CMP.B1 24hr MQCS NEXT DUE :  9/10/96 @11:00 PM
CMP.B1 12hr MQCS COMPLETED:  9/9/96  @11:00 PM
CMP.B1 12hr MQCS NEXT DUE :  9/10/96 @11:00 AM

CMP.B2 (Speedfam CMP-V) - UP/MQC (MQC'S EDGE FAST HEADS 4, AND 5 ABOVE 8% 
				  PAD STEP_H IS @ .061 )
CMP.B2 24hr MQCS COMPLETED:  9/10/96 IN PROCESS
CMP.B2 24hr MQCS NEXT DUE :  9/11/96 IN PROCESS 
CMP.B2 12hr MQCS COMPLETED:  9/10/96 @7:00 AM
CMP.B2 12hr MQCS NEXT DUE :  9/10/96 @7:00 PM

CMP.B3 (Speedfam CMP-V) - : UP/RUNNING JL0473 M3 TOUCHUP
CMP.B3 24hr MQCS COMPLETED:  9/10/96 @ 4:30 AM
CMP.B3 24hr MQCS NEXT DUE :  9/11/96 @ 4:30 AM
CMP.B3 12hr MQCS COMPLETED:  9/10/96 @ 4:30 AM
CMP.B3 12hr MQCS NEXT DUE :  9/10/96 @ 4:30 PM



CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9/10/96 @ 7:00 AM
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9/10/96 @ 7:00 PM

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9/10/96 @ 7:00 AM
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9/10/96 @ 7:00 PM

CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9/10/96 @ 7:00 AM
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9/10/96 @ 7:00 PM



Hot/B lots in area:
__________________
* NONE *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* JD0462 (STI LOT) 2.4 *
  XD0508 (ON HOLD FOR F. KRUPA "POST P2 MEAS.") .15

Down Equipment:
--------------
* NONE *

Scrap lots:
----------
* JL0493 #12 ROBOT GRIPPER FAILURE *

Hold Lots:
---------
* JD0462 *
  XD0508

Monitor status:
--------------
2 1/2 BOXES of 12k mqc wafers. ( 2 ON ORDER )
2 1/2 BOX   50K BREAKIN WAFERS ( 2 ON ORDER )   

Number of product lots in room:
------------------------------
* 1 LOT *

New specs/revs posted:
---------------------
* SEE *NEW* TDCO BY CMP.B1 *
 NEW TIMES FOR SPEEDFAMS ONLY

Lots/wafers processed:
---------------------
* XD0539 PMD 24 WAFERS *
  JD0499 PMD 23 WAFERS
  JL0493 PMD 23 WAFERS
  JL0494 PMD 23 WAFERS
  JD0497  M1  6 WAFERS
  XD0508  M3 24 WAFERS (ON HOLD PER F.KRUPA FOR P2 MEAS.)

# of carriers for strasbaugh/speedfam:
--------------------------------------
 8  SPEEDFAM CARRIERS
 10 STRASBAUGH CARRIERS
 ?  STRASBAUGH PLATES


81.10A-shift CMP passdown 9/10/96FABSIX::J_SADINFreedom isn't free.Tue Sep 10 1996 20:26106
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                12                  mqc

        BREAKIN WAFERS              30                  misc



CMP.A1 (Strasbaugh 6DS-SP) - DOWN: down to eng for pad experiments.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0545 (pmd).
CMP.A2 24hr MQCS COMPLETED: 12am 9/10
CMP.A2 24hr MQCS NEXT DUE : 12am 9/11



CMP.B1 (Speedfam CMP-V) - DOWN: waiting for parts for conditioning arm.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - RUNNING: XD0505 (m3).
CMP.B2 24hr MQCS COMPLETED: 2pm 9/10
CMP.B2 24hr MQCS NEXT DUE : 2pm 9/11
CMP.B2 12hr MQCS COMPLETED: 2pm 9/10
CMP.B2 12hr MQCS NEXT DUE : 2am 9/11

CMP.B3 (Speedfam CMP-V) - RUNNING: XM0515 (m2).
CMP.B3 24hr MQCS COMPLETED: 5am 9/10
CMP.B3 24hr MQCS NEXT DUE : 5am 9/11
CMP.B3 12hr MQCS COMPLETED: 4:30pm 9/10
CMP.B3 12hr MQCS NEXT DUE : 5:30am 9/11



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 7:30pm 9/10
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 7:30am 9/11

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 7:30pm 9/10
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 7:30am 9/11

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 7:30pm 9/10
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 7:30am 9/11



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
XD0521 - DEP_ILD3 1

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - ENG
CMP.B1 - PARTS

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
3 boxes of 12K mqc wafers.
6 boxes of 50K breakin wafers.

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
* see tdco by CMP.B1 *

Lots/wafers processed:
---------------------
JD0462 - STI - 23WFRS
JD0497B - M3 - 5

# of carriers for strasbaugh/speedfam:
--------------------------------------
8 SPEEDFAM CARRIERS
10 STRASBAUGH CARRIERS


81.11passdown cmp b-shift 9/11/96FABSIX::M_PROVENCHERWed Sep 11 1996 07:15112
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 8                  MQC'S

        BREAKIN WAFERS              47                  misc



CMP.A1 (Strasbaugh 6DS-SP) - DOWN: down to eng for pad experiments. 
CMP.A1 24hr MQCS COMPLETED:  N/A 
CMP.A1 24hr MQCS NEXT DUE :  N/A

CMP.A2 (Strasbaugh 6DS-SP) - UP/MQC
CMP.A2 24hr MQCS COMPLETED:  IN PROCESS 
CMP.A2 24hr MQCS NEXT DUE :  N/A



CMP.B1 (Speedfam CMP-V) - DOWN: waiting for parts for conditioning arm.    
CMP.B1 24hr MQCS COMPLETED:  N/A
CMP.B1 24hr MQCS NEXT DUE :  N/A
CMP.B1 12hr MQCS COMPLETED:  N/A
CMP.B1 12hr MQCS NEXT DUE :  N/A

CMP.B2 (Speedfam CMP-V) - UP/RUNNING XD0521 M3 (HOT LOT)
CMP.B2 24hr MQCS COMPLETED:  9/11/96 @2:00 PM 
CMP.B2 24hr MQCS NEXT DUE :  9/12/96 @2:00 PM 
CMP.B2 12hr MQCS COMPLETED:  9/11/96 @6:00 AM
CMP.B2 12hr MQCS NEXT DUE :  9/11/96 @6:00 PM

CMP.B3 (Speedfam CMP-V) - : UP/RUNNING YE0191 M2/JL0472 M2
CMP.B3 24hr MQCS COMPLETED:  9/11/96 @ 4:00 AM
CMP.B3 24hr MQCS NEXT DUE :  9/12/96 @ 4:00 AM
CMP.B3 12hr MQCS COMPLETED:  9/11/96 @ 4:00 AM
CMP.B3 12hr MQCS NEXT DUE :  9/11/96 @ 4:00 PM



CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9/11/96 @ 7:30 AM
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9/11/96 @ 7:30 PM

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9/11/96 @ 7:30 AM
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9/11/96 @ 7:30 PM

CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9/11/96 @ 7:30 AM
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9/11/96 @ 7:30 PM



Hot/B lots in area:
__________________
* XD0521 M3 cmp.B2 *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
* CMP.A1 eng. *
  CMP.B1 parts

Scrap lots:
----------
* JD0482 wafer #5 over polished *

Hold Lots:
----------
* NONE *

Monitor status:
--------------
2 1/2 boxes of 12k mqc wafers. 
5 1/2 boxes of 50K breakin wafers    

Number of product lots in room:
------------------------------
* 3 lots  *

New specs/revs posted:
---------------------
* SEE *NEW* TDCO BY CMP.B1 *
 NEW TIMES FOR SPEEDFAMS ONLY

Lots/wafers processed:
---------------------
* XD0545 PMD 24 wafers *
  JD0482  M1 20 wafers
  XD0528  M1 24 wafers
  XM0515  M2 20 wafers
  XD0516  M2 19 wafers
  XD0505  M3 21 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
 8  speedfam carriers
 10 strasbaugh carriers
 ?  strasbaugh plates


81.12A-shift CMP passdown 9/11FABSIX::J_SADINFreedom isn't free.Wed Sep 11 1996 20:25109
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 15                 mqcs

        BREAKIN WAFERS               40                 misc



CMP.A1 (Strasbaugh 6DS-SP) - ENG: down to eng for pad experiments.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JL0471 (m2). 
CMP.A2 24hr MQCS COMPLETED: 8:30am 9/11
CMP.A2 24hr MQCS NEXT DUE : 8:30am 9/12



CMP.B1 (Speedfam CMP-V) - MQC: running mqcs after pad/carrier change.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - RUNNING: XD0538 (m1).
CMP.B2 24hr MQCS COMPLETED: 4pm 9/11
CMP.B2 24hr MQCS NEXT DUE : 4pm 9/12
CMP.B2 12hr MQCS COMPLETED: 4pm 9/11
CMP.B2 12hr MQCS NEXT DUE : 4am 9/12

CMP.B3 (Speedfam CMP-V) - VERIFY: running breakins and mqcs after pad
change (both pads).
CMP.B3 24hr MQCS COMPLETED: n/a
CMP.B3 24hr MQCS NEXT DUE : n/a
CMP.B3 12hr MQCS COMPLETED: n/a
CMP.B3 12hr MQCS NEXT DUE : n/a



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 11pm 9/11
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 11am 9/12

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 11pm 9/11
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 11am 9/12

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 11pm 9/11
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 11am 9/12



Hot/B lots in area:
__________________
XD0520 - M3

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - ENG
CMP.B1 - MQC
CMP.B3 - VERIFY

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
1.5 boxes of 12K mqc wafers. 
5 boxes of 50K mqc wafers.

Number of product lots in room:
------------------------------
8

New specs/revs posted:
---------------------
see tdco by cmp.b1

Lots/wafers processed:
---------------------
JD0498 - PMD - 24WFRS
XD0521 - M3 - 22
JL0472 - M2 - 23
YE0191 - M2 - 21

# of carriers for strasbaugh/speedfam:
--------------------------------------
6 SPEEDFAM CARRIERS
9 STRASBAUGH CARRIERS

81.13D SHIFT PASSDOWNFABSIX::D_CAUSEThu Sep 12 1996 08:4747
       
CMP.A1 (Strasbaugh 6DS-SP) - UP/TO PROCESS ENG    
CMP.A2 (Strasbaugh 6DS-SP) -UP/RUNNING JL0471 NEEDS 100% AND T/U
        
CMP.B1 (Speedfam CMP-V) -  UP/IDLE MQC DONE

CMP.B2 (Speedfam CMP-V) - DOWN/FLIPPER ASSY MALFUNCTION

CMP.B3 (Speedfam CMP-V) - DOWN/MQC
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC COMPLETE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC COMPLETE 
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE MQC COMPLETE

HOT/B lots in area:
-------------------

STATIC lots in area:7
--------------------

HOLD LOTS IN AREA:1
__________________

       
DOWN equipment:
---------------
CMP.A1 DOWN TO ENG
CMP.B2 FLIPPER ASSY
CMP.B3 FAILED MQC 5 TIMES
NUMBER of product lots in room:10

-------------------------------
           

LOTS COMPLETED : 3
----------------

BREAK IN WAFERS USED: 15

MQC WAFERS USED:45 WAFERS USED
MQC WAFERS AVAIL:2 BOXES

----------


81.14D SHIFT PASSDOWNFABSIX::D_CAUSEFri Sep 13 1996 08:2946
       
CMP.A1 (Strasbaugh 6DS-SP) - UP/TO PROCESS ENG    
CMP.A2 (Strasbaugh 6DS-SP) -UP/RUNNING XD0542 **HOT LOT**
        
CMP.B1 (Speedfam CMP-V) -  DOWN/CRASH WILL NEED FULL MQC

CMP.B2 (Speedfam CMP-V) - UP/RUNNING FIRST 400 SEC ON JD0453

CMP.B3 (Speedfam CMP-V) - UP/IDLE
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC COMPLETE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC COMPLETE 
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE MQC COMPLETE

HOT/B lots in area:1
-------------------
XD0542 ****HOT LOT****

STATIC lots in area:0
--------------------

HOLD LOTS IN AREA:1
__________________

       
DOWN equipment:
---------------
CMP.B1 CRASH
NUMBER of product lots in room:2

-------------------------------
           

LOTS COMPLETED : 11
----------------

BREAK IN WAFERS USED: 25

MQC WAFERS USED:5 WAFERS USED
MQC WAFERS AVAIL:5 BOXES

----------


81.15passdown cmp b-shift 9/15/96FABSIX::M_PROVENCHERSun Sep 15 1996 07:19108
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                13                  MQC'S

        BREAKIN WAFERS              32                  misc



CMP.A1 (Strasbaugh 6DS-SP) - DOWN: down to eng for pad experiments. 
CMP.A1 24hr MQCS COMPLETED:  N/A 
CMP.A1 24hr MQCS NEXT DUE :  N/A

CMP.A2 (Strasbaugh 6DS-SP) - UP/MQC
CMP.A2 24hr MQCS COMPLETED:  IN PROCESS 
CMP.A2 24hr MQCS NEXT DUE :  N/A



CMP.B1 (Speedfam CMP-V) - :  up/idle    
CMP.B1 24hr MQCS COMPLETED:  9/14/96 @11:00 am
CMP.B1 24hr MQCS NEXT DUE :  9/15/96 @11:00 am
CMP.B1 12hr MQCS COMPLETED:  9/14/96 @ 9:00 pm
CMP.B1 12hr MQCS NEXT DUE :  9/15/96 @ 9:00 am

CMP.B2 (Speedfam CMP-V) - :  up/mqc
CMP.B2 24hr MQCS COMPLETED:  n/a 
CMP.B2 24hr MQCS NEXT DUE :  n/a 
CMP.B2 12hr MQCS COMPLETED:  n/a
CMP.B2 12hr MQCS NEXT DUE :  n/a

CMP.B3 (Speedfam CMP-V) - :  up/running XE0530 M2
CMP.B3 24hr MQCS COMPLETED:  9/14/96 @10:30 pm
CMP.B3 24hr MQCS NEXT DUE :  9/15/96 @10:30 pm
CMP.B3 12hr MQCS COMPLETED:  9/14/96 @10:30 pm
CMP.B3 12hr MQCS NEXT DUE :  9/15/96 @10:30 am



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9/15/96 @12:30 AM
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9/15/96 @12:30 PM

CMP-SCRUB.A2 (On-track scrubber) - up/idle 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9/15/96 @12:30 AM
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9/15/96 @12:30 PM

CMP-SCRUB.A3 (On-track scrubber) - up/idle 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9/15/96 @12:30 AM
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9/15/96 @12:30 PM



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
* CMP.A1 eng *

Scrap lots:
----------
* none *

Hold Lots:
----------
* XD0519 M3 on hold per F.Krupa *

Monitor status:
--------------
3 1/2 boxes of 12k mqc wafers. 
4  boxes of 50K breakin wafers    

Number of product lots in room:
------------------------------
* 1 lot  *

New specs/revs posted:
---------------------
* SEE *NEW* TDCO BY CMP.B1 *
 NEW TIMES FOR SPEEDFAMS ONLY

Lots/wafers processed:
---------------------
* JL0494  m1 23 wafers *
  JL0476  m2 24 wafers
  XE0524  m2 24 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
 10 speedfam carriers
  8 strasbaugh carriers
  ?  strasbaugh plates


81.16A-shift CMP passdown 9/15/96FABSIX::J_SADINFreedom isn't free.Sun Sep 15 1996 20:10108
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                6                   mqcs

        BREAKIN WAFERS             20                   misc



CMP.A1 (Strasbaugh 6DS-SP) - ENG: pad experiments.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0503 (pmd).
CMP.A2 24hr MQCS COMPLETED: 7:30am 9/15
CMP.A2 24hr MQCS NEXT DUE : 7:30am 9/16



CMP.B1 (Speedfam CMP-V) - RUNNING: XD0516 (m3).
CMP.B1 24hr MQCS COMPLETED: 7pm 9/15
CMP.B1 24hr MQCS NEXT DUE : 7pm 9/16
CMP.B1 12hr MQCS COMPLETED: 7pm 9/15
CMP.B1 12hr MQCS NEXT DUE : 7am 9/16

CMP.B2 (Speedfam CMP-V) - IDLE.
CMP.B2 24hr MQCS COMPLETED: 7:30am 9/15
CMP.B2 24hr MQCS NEXT DUE : 7:30am 9/16
CMP.B2 12hr MQCS COMPLETED: 7:30pm 9/15
CMP.B2 12hr MQCS NEXT DUE : 7:30am 9/16

CMP.B3 (Speedfam CMP-V) - IDLE.
CMP.B3 24hr MQCS COMPLETED: 10pm 9/14 
CMP.B3 24hr MQCS NEXT DUE : 10pm 9/15
CMP.B3 12hr MQCS COMPLETED: 4pm 9/15
CMP.B3 12hr MQCS NEXT DUE : 4am 9/16



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 4:45pm 9/15
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 4:45am 9/16

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 4:45pm 9/15
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 4:45am 9/16

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 4:45pm 9/15
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 4:45am 9/16



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
XD0542 - DEP_ILD1 2

Static Lots in area:
-------------------
XD0519 - 0.9DAYS - HOLD FOR FRANK K.

Down Equipment:
--------------
CMP.A1 - ENG PAD EXPERIMENTS

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0519 - HOLD FOR FRANK K.

Monitor status:
--------------
4 BOXES OF 12K WAFERS
5 BOXES OF 50K WAFERS

Number of product lots in room:
------------------------------
3

New specs/revs posted:
---------------------
* SEE TDCO BY CMP.B1 *

Lots/wafers processed:
---------------------
XD0539 - M1 - 24WFRS
JD0501 - PMD - 24
JD0481 - M1 - 24
JD0497 - M3 - 6
XE0530 - M2 - 22

# of carriers for strasbaugh/speedfam:
--------------------------------------
10 SPEEDFAM CARRIERS
8 STRASBAUGH CARRIERS


81.17passdown cmp b-shift 9/16/96FABSIX::M_PROVENCHERMon Sep 16 1996 07:54110
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                23                  MQC'S

        BREAKIN WAFERS              35                  misc



CMP.A1 (Strasbaugh 6DS-SP) - DOWN: down to eng for pad experiments. 
CMP.A1 24hr MQCS COMPLETED:  N/A 
CMP.A1 24hr MQCS NEXT DUE :  N/A

CMP.A2 (Strasbaugh 6DS-SP) - UP/MQC
CMP.A2 24hr MQCS COMPLETED:  IN PROCESS 
CMP.A2 24hr MQCS NEXT DUE :  N/A



CMP.B1 (Speedfam CMP-V) - :  up/running xd0542 m1 hot lot/jd0499 m1    
CMP.B1 24hr MQCS COMPLETED:  9/15/96 @ 7:00 pm
CMP.B1 24hr MQCS NEXT DUE :  9/16/96 @ 7:00 am
CMP.B1 12hr MQCS COMPLETED:  9/16/96 @ 7:00 am
CMP.B1 12hr MQCS NEXT DUE :  9/16/96 @ 7:00 pm

CMP.B2 (Speedfam CMP-V) - :  up/mqc
CMP.B2 24hr MQCS COMPLETED:  n/a 
CMP.B2 24hr MQCS NEXT DUE :  n/a 
CMP.B2 12hr MQCS COMPLETED:  n/a
CMP.B2 12hr MQCS NEXT DUE :  n/a

CMP.B3 (Speedfam CMP-V) - :  up/mqc 
CMP.B3 24hr MQCS COMPLETED:  n/a
CMP.B3 24hr MQCS NEXT DUE :  n/a
CMP.B3 12hr MQCS COMPLETED:  n/a
CMP.B3 12hr MQCS NEXT DUE :  n/a



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9/16/96 @ 4:30 AM
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9/15/96 @ 4:30 PM

CMP-SCRUB.A2 (On-track scrubber) - up/idle 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9/15/96 @ 4:30 AM
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9/15/96 @ 4:30 PM

CMP-SCRUB.A3 (On-track scrubber) - up/idle 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9/15/96 @ 4:30 AM
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9/15/96 @ 4:30 PM



Hot/B lots in area:
__________________
* xd0542 m1 hot (b1) *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* xd0519 m3 1.46 days hold per f.krupa *

Down Equipment:
--------------
* CMP.A1 eng *

Scrap lots:
----------
* none *

Hold Lots:
----------
* XD0519 M3 on hold per F.Krupa *

Monitor status:
--------------
3  boxes of 12k mqc wafers. 
5  boxes of 50K breakin wafers    

Number of product lots in room:
------------------------------
* 3 lots  *

New specs/revs posted:
---------------------
* SEE *NEW* TDCO BY CMP.B1 *
 NEW TIMES FOR SPEEDFAMS ONLY

Lots/wafers processed:
---------------------
* jd0503 pmd 24 wafers *
  jl0513 pmd 24 wafers
  jd0498  m1 24 wafers
  xd0516  m3 19 wafers
  

# of carriers for strasbaugh/speedfam:
--------------------------------------
 10 speedfam carriers
  8 strasbaugh carriers
  ?  strasbaugh plates


81.18A-shift CMP passdown 9/16/96FABSIX::J_SADINFreedom isn't free.Mon Sep 16 1996 20:35111
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  mqcs

        BREAKIN WAFERS              30                  misc



CMP.A1 (Strasbaugh 6DS-SP) - PM: annual pm in progress. Should be done this
evening.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JL0509 (pmd).
CMP.A2 24hr MQCS COMPLETED: 10am 9/16
CMP.A2 24hr MQCS NEXT DUE : 10am 9/17



CMP.B1 (Speedfam CMP-V) - MQC: running 24hr mqcs.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: 6:45pm 9/16
CMP.B1 12hr MQCS NEXT DUE : 6:45am 9/17

CMP.B2 (Speedfam CMP-V) - IDLE.
CMP.B2 24hr MQCS COMPLETED: 8am 9/16
CMP.B2 24hr MQCS NEXT DUE : 8am 9/17
CMP.B2 12hr MQCS COMPLETED: 6pm 9/16
CMP.B2 12hr MQCS NEXT DUE : 6am 9/17

CMP.B3 (Speedfam CMP-V) - IDLE.
CMP.B3 24hr MQCS COMPLETED: 10am 9/16
CMP.B3 24hr MQCS NEXT DUE : 10am 9/17
CMP.B3 12hr MQCS COMPLETED: 10am 9/16
CMP.B3 12hr MQCS NEXT DUE : 10pm 9/16



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 4pm 9/16
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 4am 9/17

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 4pm 9/16
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 4am 9/17

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 4pm 9/16
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 4am 9/17



Hot/B lots in area:
__________________
XD0554 - PMD 

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - ANNUAL PM

Scrap lots:
----------
15wfrs scrapped from XD0542 (over polished)

Hold Lots:
---------
XD0519 - M3 ON HOLD FOR FRANK K. (SPLIT LOT)

Monitor status:
--------------
3 boxes of 12K mqc wafers
4.5 boxes of 50K breakin wafers

Number of product lots in room:
------------------------------
4

New specs/revs posted:
---------------------
* see tdco by CMP.B1 *

Lots/wafers processed:
---------------------
JL0502 - PMD - 24WFRS
JL0513 - PMD - 24
XD0542 - M1 - 5
JD0499 - M1 - 23
XD0554 - PMD - 24
XD0545 - M1 - 23
XD0536 - M2 - 11

# of carriers for strasbaugh/speedfam:
--------------------------------------
10 SPEEDFAM CARRIERS
8 STRASBAUGH CARRIERS


81.19passdown cmp b-shift 9/17/96FABSIX::M_PROVENCHERTue Sep 17 1996 07:20110
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 8                  MQC'S

        BREAKIN WAFERS              37                  misc



CMP.A1 (Strasbaugh 6DS-SP) - DOWN: down to eng for pad experiments. 
CMP.A1 24hr MQCS COMPLETED:  N/A 
CMP.A1 24hr MQCS NEXT DUE :  N/A

CMP.A2 (Strasbaugh 6DS-SP) - UP/MQC (PAD CHANGE, carrier change)
CMP.A2 24hr MQCS COMPLETED:  IN PROCESS 
CMP.A2 24hr MQCS NEXT DUE :  N/A



CMP.B1 (Speedfam CMP-V) - :  up/running YD0187 M2/ YE0192 M2(BOTH AT TOUCHUP)  
CMP.B1 24hr MQCS COMPLETED:  9/16/96 @ 9:30 pm
CMP.B1 24hr MQCS NEXT DUE :  9/17/96 @ 9:30 pm
CMP.B1 12hr MQCS COMPLETED:  9/17/96 @ 4:30 am
CMP.B1 12hr MQCS NEXT DUE :  9/17/96 @ 4:30 pm

CMP.B2 (Speedfam CMP-V) - :  up/idle
CMP.B2 24hr MQCS COMPLETED:  9/17/96 @ 2:30 am
CMP.B2 24hr MQCS NEXT DUE :  9/18/96 @ 2:30 am 
CMP.B2 12hr MQCS COMPLETED:  9/17/96 @ 4:30 am
CMP.B2 12hr MQCS NEXT DUE :  9/17/96 @ 4:30 pm

CMP.B3 (Speedfam CMP-V) - :  up/idle 
CMP.B3 24hr MQCS COMPLETED:  9/16/96 @10:00 am
CMP.B3 24hr MQCS NEXT DUE :  9/17/96 @10:00 am
CMP.B3 12hr MQCS COMPLETED:  9/17/96 @ 2:30 am
CMP.B3 12hr MQCS NEXT DUE :  9/17/96 @ 2:30 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9/17/96 @ 4:30 AM
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9/17/96 @ 4:30 PM

CMP-SCRUB.A2 (On-track scrubber) - up/idle 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9/17/96 @ 4:30 AM
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9/17/96 @ 4:30 PM

CMP-SCRUB.A3 (On-track scrubber) - up/idle 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9/17/96 @ 4:30 AM
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9/17/96 @ 4:30 PM



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* xd0519 m3 2.46 days hold per f.krupa *
                                             

Down Equipment:
--------------
* CMP.A1 (eng) *
  cmp.a2 (pad change, carrier change)
Scrap lots:
----------
* none *

Hold Lots:
----------
* XD0519 M3 on hold per F.Krupa *

Monitor status:
--------------
2 1/2  boxes of 12k mqc wafers. (two on order)
5      boxes of 50K breakin wafers    

Number of product lots in room:
------------------------------
* 3 lots  *

New specs/revs posted:
---------------------
* SEE *NEW* TDCO BY CMP.B1 *
 NEW TIMES FOR SPEEDFAMS ONLY

Lots/wafers processed:
---------------------
* xd0535 pmd 24 wafers *
  jl0509 pmd 24 wafers
  yd0184a m2  3 wafers
  

# of carriers for strasbaugh/speedfam:
--------------------------------------
 10 speedfam carriers
  6 strasbaugh carriers
  ?  strasbaugh plates


81.20A-shift CMP passdown 9/17/96FABSIX::J_SADINFreedom isn't free.Tue Sep 17 1996 20:21108
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  mqcs

        BREAKIN WAFERS              35                  misc



CMP.A1 (Strasbaugh 6DS-SP) - ENG: down to eng for pad experiments.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0508 (pmd).
CMP.A2 24hr MQCS COMPLETED: 5pm 9/17
CMP.A2 24hr MQCS NEXT DUE : 5pm 9/18



CMP.B1 (Speedfam CMP-V) - MQC: running mqcs and breakin wafers after
pad/carrier change.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - RUNNING: XD0528 (m2).
CMP.B2 24hr MQCS COMPLETED: 4:30am 9/17
CMP.B2 24hr MQCS NEXT DUE : 4:30am 9/18
CMP.B2 12hr MQCS COMPLETED: 7pm 9/17
CMP.B2 12hr MQCS NEXT DUE : 7am 9/18

CMP.B3 (Speedfam CMP-V) - RUNNING: XD0519 (m3).
CMP.B3 24hr MQCS COMPLETED: 10am 9/17
CMP.B3 24hr MQCS NEXT DUE : 10am 9/18
CMP.B3 12hr MQCS COMPLETED: 10am 9/17
CMP.B3 12hr MQCS NEXT DUE : 10pm 9/17



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 6pm 9/17
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 6am 9/18

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 6pm 9/17
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 6am 9/18

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 7:30pm 9/17
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 7:30am 9/18



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
XD0519 - 1.1DAYS

Down Equipment:
--------------
CMP.A1 - ENG
CMP.B1 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0519 - HOLD FOR F. KRUPA
JD0377 - HOLD FOR L. CAMILLETTI

Monitor status:
--------------
2 boxes of 12K mqc wafers
2 boxes of 50K breakin wafers

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
see tdco by cmp.b1

Lots/wafers processed:
---------------------
XD0543 - PMD - 23WFRS
YD0168 - M3 - 24

# of carriers for strasbaugh/speedfam:
--------------------------------------
5 SPEEDFAM CARRIERS
6 STRASBAUGH CARRIERS
(SAM WAS IN TODAY AND MAY HAVE BUILT MORE - SEE HIS PASSDOWN FOR DETAILS)

81.21PASSDOWNFABSIX::D_CAUSEWed Sep 18 1996 08:4952
                             D SHIFT PASSDOWN

       
CMP.A1 (Strasbaugh 6DS-SP) - UP/TO PROCESS ENG
    
CMP.A2 (Strasbaugh 6DS-SP) -UP/IDLE
        
CMP.B1 (Speedfam CMP-V) -  DOWN/UNLOAD CUP STICKING LOT YE0194 NEED TO FINISH
                           FIRST RUN OF THE LAST 10 WAFERS, THEY ARE CLEARLY
                           MARKED, FOR 150 SEC

CMP.B2 (Speedfam CMP-V) - UP/MQC EVAL OF 3RD MQC

CMP.B3 (Speedfam CMP-V) - UP/RUNNIG JD0481 ***HOT LOT*** 5 SEND AHEADS 
                             MEASURING ON THICK.A5 RUN FOR 150 SECS
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC COMPLETE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC COMPLETE 
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE MQC COMPLETE

HOT/B lots in area:1
-------------------
JD0481 ****HOT LOT****

STATIC lots in area:2
--------------------

HOLD LOTS IN AREA:2
__________________

       
DOWN equipment:
---------------
CMP.B1 UNLOAD CUP #2
NUMBER of product lots in room:4

-------------------------------
           

LOTS COMPLETED : 5
----------------

BREAK IN WAFERS USED: 25

MQC WAFERS USED:20 WAFERS USED
MQC WAFERS AVAIL:3.5 BOXES

----------


81.22CMP C-SHIFT PD. 9/21/96FABSIX::E_DAWSONSat Sep 21 1996 20:3645
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE - Break'in ran, needs full mqc's.
             
CMP.A2 (Strasbaugh 6DS-SP) - DOWN - Both L&R spindles stick'in to the pad. 

CMP.B1 (Speedfam CMP-V) - UP/IDLE - Mqc's performed.  
			       
CMP.B2 (Speedfam CMP-V) - RUNNING 1 - "HOT LOT" JD0481 ILD3, S/A meassuring
    				       on Thick.A4. Mqc's performed.
    
CMP.B3 (Speedfam CMP-V) - RUNNING 2 - "HOT LOT" XD0503 ILD2 running T-up's.  
                                       & JD0492 ILD2 100% on Thick.A5.
                                       Mqc's performed.
    
CMP-SCRUB.A1 (On-track scrubber) - DOWN - Oustside brush station speed out
    					  of spec. 

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
    
      	Hot/B lots in area:             Lots in CMP: 7		
	------------------	        -----------	
        JD0481 ILD3 DC1026 24W /.B2
        XD0503 ILD2 DC1026 22W /.B3
    	JD0501 ILD2 DC1026 23W...THICKNESS
    
	Lots Shiped: 4                  New SPEC/TDCO:
	-----------                     -------------
                                       "POSTED AT CMP.B1/2"
    
	Down Equipment:                 Carriers:
	--------------                  --------
    	CMP.A2	                        See Carrier PD.
        CMP-SCRUB.A1
    
	MQC Mon. Used: 16 	        MQC Monitors: 5.5 Boxes
    	-------------                   ------------
            
        Misc.
        ----
                      
81.23passdown cmp b-shift 9/22/96FABSIX::M_PROVENCHERSun Sep 22 1996 07:54111
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                26                  MQC'S

        BREAKIN WAFERS              41                  misc



CMP.A1 (Strasbaugh 6DS-SP) - up/mqc after pad,carrier,brush,and conditioner
				    changes, due to failed particles 
CMP.A1 24hr MQCS COMPLETED:  in process
CMP.A1 24hr MQCS NEXT DUE :  N/A

CMP.A2 (Strasbaugh 6DS-SP) - UP/MQC (pad change)
CMP.A2 24hr MQCS COMPLETED:  IN PROCESS 
CMP.A2 24hr MQCS NEXT DUE :  N/A



CMP.B1 (Speedfam CMP-V) - :  up/running jd0501 M2 hot/ jl0487 M2
				       (BOTH AT TOUCHUP)  
CMP.B1 24hr MQCS COMPLETED:  9/21/96 @ 6:00 pm
CMP.B1 24hr MQCS NEXT DUE :  9/22/96 @ 6:00 am
CMP.B1 12hr MQCS COMPLETED:  9/22/96 @ 7:00 am
CMP.B1 12hr MQCS NEXT DUE :  9/22/96 @ 7:00 pm

CMP.B2 (Speedfam CMP-V) - :  up/mqc failed 1st set dev (head #2)
CMP.B2 24hr MQCS COMPLETED:  in process
CMP.B2 24hr MQCS NEXT DUE :  n/a 
CMP.B2 12hr MQCS COMPLETED:  9/22/96 @ 7:00 am
CMP.B2 12hr MQCS NEXT DUE :  9/22/96 @ 7:00 pm

CMP.B3 (Speedfam CMP-V) - :  up/running jd0498 m2/jd0483 m3 (both at touchup)
CMP.B3 24hr MQCS COMPLETED:  9/21/96 @ 4:00 pm
CMP.B3 24hr MQCS NEXT DUE :  9/22/96 @ 4:00 pm
CMP.B3 12hr MQCS COMPLETED:  9/22/96 @ 4:00 am
CMP.B3 12hr MQCS NEXT DUE :  9/22/96 @ 4:00 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9/22/96 @ 4:00 AM
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9/22/96 @ 4:00 PM

CMP-SCRUB.A2 (On-track scrubber) - up/idle 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9/22/96 @ 4:00 AM
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9/22/96 @ 4:00 PM

CMP-SCRUB.A3 (On-track scrubber) - up/idle 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9/22/96 @ 4:00 AM
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9/22/96 @ 4:00 PM



Hot/B lots in area:
__________________
* jd0501 m2 b1 *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *
  

Down Equipment:
--------------
* none *
Scrap lots:
----------
* jd0501 4 wafers *
  jl0487 2 wafers

Hold Lots:
----------
* none *

Monitor status:
--------------
4      boxes of 12k mqc wafers. (two on order)
3      boxes of 50K breakin wafers    

Number of product lots in room:
------------------------------
* 9 lots  *

New specs/revs posted:
---------------------
* SEE *NEW* TDCO BY CMP.B1 *
 NEW TIMES FOR SPEEDFAMS ONLY

Lots/wafers processed:
---------------------
* jd0503  m2 24 wafers (hot) *
  jl0481  m2 22 wafers
  jd0481  m3 24 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
 14 speedfam carriers
  4 strasbaugh carriers
  ? strasbaugh plates


81.24A-shift CMP passdown 9/22/96FABSIX::J_SADINFreedom isn't free.Sun Sep 22 1996 20:36111
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 15                 mqcs

        BREAKIN WAFERS               35                 misc



CMP.A1 (Strasbaugh 6DS-SP) - VERIFY: brushes/pad changed. Still has high
particles. (3000~)
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - VERIFY: pad changed. brush heights reset.
still has high particles (3000~)
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V) - RUNNING: JL0517 (pmd).
CMP.B1 24hr MQCS COMPLETED: 7pm 9/21
CMP.B1 24hr MQCS NEXT DUE : 7pm 9/22 (due now - will run before shift change)
CMP.B1 12hr MQCS COMPLETED: 7pm 9/21
CMP.B1 12hr MQCS NEXT DUE : 7am 9/22 (due now - will run before shift change)

CMP.B2 (Speedfam CMP-V) - IDLE. 
CMP.B2 24hr MQCS COMPLETED: 8:30am 9/22
CMP.B2 24hr MQCS NEXT DUE : 8:30am 9/23
CMP.B2 12hr MQCS COMPLETED: 7am 9/22
CMP.B2 12hr MQCS NEXT DUE : 7pm 9/22

CMP.B3 (Speedfam CMP-V) - RUNNING: XD0543 (m1).
CMP.B3 24hr MQCS COMPLETED: running now (insitu with XD0543).
CMP.B3 24hr MQCS NEXT DUE : n/a
CMP.B3 12hr MQCS COMPLETED: now
CMP.B3 12hr MQCS NEXT DUE : n/a



CMP-SCRUB.A1 (On-track scrubber) - IDLE. 
CMP-SCRUB.A1 12hr MQCS COMPLETED: 5pm 9/22
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 5am 9/23

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 5pm 9/22
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 5am 9/23

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 5pm 9/22
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 5am 9/23



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
XD0562 - DEP_PMD1

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - HIGH PARTICLES
CMP.A2 - HIGH PARTICLES

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
3 boxes of 12K mqc wafers
2 boxes of 50K mqc wafers

Number of product lots in room:
------------------------------
9

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JL0487 - M2 - 22WFRS
JD0501 - M2 - 20
JL0516 - PMD - 24
XE0546 - PMD - 24
JL0570 - PMD - 6
JD0483 - M3 - 14

# of carriers for strasbaugh/speedfam:
--------------------------------------
15 SPEEDFAM CARRIERS
6 STRASBAUGH CARRIERS

81.25passdown cmp b-shift 9/23/96FABSIX::M_PROVENCHERMon Sep 23 1996 07:29114
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                24                  MQC'S

        BREAKIN WAFERS              49                  misc



CMP.A1 (Strasbaugh 6DS-SP) - up @4:30 am/xd0562 pmd hotlot 
CMP.A1 24hr MQCS COMPLETED:  9/23/96 @ 4:30 am
CMP.A1 24hr MQCS NEXT DUE :  9/24/96 @ 4:30 am

CMP.A2 (Strasbaugh 6DS-SP) - UP/mqc (carrier change)
CMP.A2 24hr MQCS COMPLETED:  IN PROCESS 
CMP.A2 24hr MQCS NEXT DUE :  N/A



CMP.B1 (Speedfam CMP-V) - :  up/running jl0493 m1/jd0507  
CMP.B1 24hr MQCS COMPLETED:  9/23/96 @10:00 pm
CMP.B1 24hr MQCS NEXT DUE :  9/24/96 @10:00 pm
CMP.B1 12hr MQCS COMPLETED:  9/23/96 @ 7:30 am
CMP.B1 12hr MQCS NEXT DUE :  9/23/96 @ 7:30 pm

CMP.B2 (Speedfam CMP-V) - :  up/running jd0499 m2
CMP.B2 24hr MQCS COMPLETED:  9/22/96 @ 8:30 am
CMP.B2 24hr MQCS NEXT DUE :  9/23/96 @ 8:30 am
CMP.B2 12hr MQCS COMPLETED:  9/22/96 @ 9:00 pm
CMP.B2 12hr MQCS NEXT DUE :  9/23/96 @ 9:00 am

CMP.B3 (Speedfam CMP-V) - :  up/running jl0502 m1/jl0509 m1 
CMP.B3 24hr MQCS COMPLETED:  9/22/96 @ 9:00 pm
CMP.B3 24hr MQCS NEXT DUE :  9/23/96 @ 9:00 pm
CMP.B3 12hr MQCS COMPLETED:  9/23/96 @ 7:30 am
CMP.B3 12hr MQCS NEXT DUE :  9/23/96 @ 7:30 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9/23/96 @ 5:00 AM
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9/23/96 @ 5:00 PM

CMP-SCRUB.A2 (On-track scrubber) - up/idle 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9/23/96 @ 5:00 AM
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9/23/96 @ 5:00 PM

CMP-SCRUB.A3 (On-track scrubber) - up/idle 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9/23/96 @ 5:00 AM
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9/23/96 @ 5:00 PM



Hot/B lots in area:
__________________
* xd0562 pmd a1 *

Hot lots coming to area:
-----------------------
* xd0554  m2 *

Static Lots in area:
-------------------
* none *
  

Down Equipment:
--------------
* cmp.a2 *

Scrap lots:
----------
* none *

Hold Lots:
----------
* xd0544 m2 after thickness per f.krupa *

Monitor status:
--------------
3      boxes of 12k mqc wafers. (two on order 9/22/96)
1 1/2  boxes of 50K breakin wafers (two on order 9/23/96)   

Number of product lots in room:
------------------------------
* 7 lots *

New specs/revs posted:
---------------------
* SEE *NEW* TDCO BY CMP.B1 *
 NEW TIMES FOR SPEEDFAMS ONLY

Lots/wafers processed:
---------------------
* jd0506 pmd 24 wafers *
  jl0543 pmd 12 wafers
  xd0543  m1 23 wafers
  jd0508  m1 24 wafers
  xd0535  m1 24 wafers
  xd0511  m2 24 wafers
  xd0511  m2 24 wafers
  jd0536  m3 11 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
 14 speedfam carriers
  4 strasbaugh carriers
  ? strasbaugh plates


81.26A-shift CMP passdown 9/23/96FABSIX::J_SADINFreedom isn't free.Mon Sep 23 1996 20:22109
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 10                 mqcs

        BREAKIN WAFERS               20                 misc



CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JL0486 (pmd).
CMP.A1 24hr MQCS COMPLETED: 4:30am 9/23
CMP.A1 24hr MQCS NEXT DUE : 4:30am 9/24

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JL0528 (pmd).
CMP.A2 24hr MQCS COMPLETED: 11am 9/23
CMP.A2 24hr MQCS NEXT DUE : 11am 9/24



CMP.B1 (Speedfam CMP-V) - RUNNING: JE0491 (m1).
CMP.B1 24hr MQCS COMPLETED: 10pm 9/22
CMP.B1 24hr MQCS NEXT DUE : 10pm 9/23
CMP.B1 12hr MQCS COMPLETED: 3:30pm 9/23
CMP.B1 12hr MQCS NEXT DUE : 3:30am 9/24

CMP.B2 (Speedfam CMP-V) - RUNNING: XD0528 (m3).
CMP.B2 24hr MQCS COMPLETED: 11am 9/23
CMP.B2 24hr MQCS NEXT DUE : 11am 9/24
CMP.B2 12hr MQCS COMPLETED: 11am 9/23
CMP.B2 12hr MQCS NEXT DUE : 11pm 9/23

CMP.B3 (Speedfam CMP-V) - RUNNING: XD0545 (m2).
CMP.B3 24hr MQCS COMPLETED: 11pm 9/22
CMP.B3 24hr MQCS NEXT DUE : 11pm 9/23
CMP.B3 12hr MQCS COMPLETED: 9am 9/23
CMP.B3 12hr MQCS NEXT DUE : 9pm 9/23



CMP-SCRUB.A1 (On-track scrubber) - IDLE. 
CMP-SCRUB.A1 12hr MQCS COMPLETED: 10:30am 9/23
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 10:30pm 9/23

CMP-SCRUB.A2 (On-track scrubber) - IDLE. 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 10:30am 9/23
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 10:30pm 9/23

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 10:30am 9/23
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 10:30pm 9/23



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
JD0503 - DEP_M3

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
3 boxes of 12K mqc wafers
4 boxes of 50K breakin wafers

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0480 - PMD - 14WFRS
XE0556 - PMD - 24
JL0493 - M2 - 23
JD0507 - M1 - 24
XD0539 - M2 - 24
JL0509 - M1 - 24
JL0502 - M1 - 24

# of carriers for strasbaugh/speedfam:
--------------------------------------
14 SPEEDFAM CARRIERS
4 STRASBAUGH CARRIERS

81.27CMP Passdowm B shiftFABSIX::S_MCREYNOLDSTue Sep 24 1996 08:41112
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                   MQC'S

        BREAKIN WAFERS              50                  misc



CMP.A1 (Strasbaugh 6DS-SP) -up idle 
CMP.A1 24hr MQCS COMPLETED:  9/24/96 @ 4:30 am
CMP.A1 24hr MQCS NEXT DUE :  9/25/96 @ 4:30 am

CMP.A2 (Strasbaugh 6DS-SP) - UP/running JL0530 pmd
CMP.A2 24hr MQCS COMPLETED:  9/23/96 @ 10:42am
CMP.A2 24hr MQCS NEXT DUE :  9/24/96 @ 10:42am



CMP.B1 (Speedfam CMP-V) - :  up/running XD0528 m3  
CMP.B1 24hr MQCS COMPLETED:  9/23/96 @10:00 pm
CMP.B1 24hr MQCS NEXT DUE :  9/24/96 @10:00 pm
CMP.B1 12hr MQCS COMPLETED:  9/23/96 @ 7:30 am
CMP.B1 12hr MQCS NEXT DUE :  9/23/96 @ 7:30 pm

CMP.B2 (Speedfam CMP-V) - :  up/idle
CMP.B2 24hr MQCS COMPLETED:  9/23/96 @ 8:30 am
CMP.B2 24hr MQCS NEXT DUE :  9/24/96 @ 8:30 am
CMP.B2 12hr MQCS COMPLETED:  9/23/96 @ 9:00 pm
CMP.B2 12hr MQCS NEXT DUE :  9/24/96 @ 9:00 am

CMP.B3 (Speedfam CMP-V) - : down 
CMP.B3 24hr MQCS COMPLETED:  N/A
CMP.B3 24hr MQCS NEXT DUE :  N/A
CMP.B3 12hr MQCS COMPLETED:  N/A
CMP.B3 12hr MQCS NEXT DUE :  N/A



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9/24/96 @ 5:00 AM
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9/24/96 @ 5:00 PM

CMP-SCRUB.A2 (On-track scrubber) - running/JE0491 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9/24/96 @ 5:00 AM
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9/24/96 @ 5:00 PM

CMP-SCRUB.A3 (On-track scrubber) - up/idle 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9/24/96 @ 5:00 AM
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9/24/96 @ 5:00 PM



Hot/B lots in area:
__________________
* XD0554 ILD2 profiler *

Hot lots coming to area:
-----------------------
 *none*

Static Lots in area:
-------------------
* none *
  

Down Equipment:
--------------
* cmp.B3 *

Scrap lots:
----------
* none *

Hold Lots:
----------
* xd0544 m2 at profiler f.krupa *
  JD0520 unable to measure
Monitor status:
--------------
4   boxes of 12k mqc wafers. 
3�  boxes of 50K breakin wafers   

Number of product lots in room:
------------------------------
* 5 lots *

New specs/revs posted:
---------------------
* SEE *NEW* TDCO BY CMP.B1 *
 NEW TIMES FOR SPEEDFAMS ONLY

Lots/wafers processed:
---------------------
* JL0528 PMD  24
  JL0486 PMD  24
  XD0539 ILD2 24
  XD0545 ILD2 19
  JE0491 ILD1 24

# of carriers for strasbaugh/speedfam:
--------------------------------------
  9 speedfam carriers
  4 strasbaugh carriers
  ? strasbaugh plates


81.28A-shift CMP passdown 9/24/96FABSIX::J_SADINFreedom isn't free.Tue Sep 24 1996 20:48106
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                25                  mqcs

        BREAKIN WAFERS              40                  misc



CMP.A1 (Strasbaugh 6DS-SP) - IDLE.
CMP.A1 24hr MQCS COMPLETED: 5am 9/24
CMP.A1 24hr MQCS NEXT DUE : 5am 9/25

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JL0514 (m1).
CMP.A2 24hr MQCS COMPLETED: 4pm 9/24
CMP.A2 24hr MQCS NEXT DUE : 4pm 9/25



CMP.B1 (Speedfam CMP-V) - RUNNING: XD0548 (m1).
CMP.B1 24hr MQCS COMPLETED: 4pm 9/24
CMP.B1 24hr MQCS NEXT DUE : 4pm 9/25
CMP.B1 12hr MQCS COMPLETED: 11am 9/24
CMP.B1 12hr MQCS NEXT DUE : 11pm 9/24

CMP.B2 (Speedfam CMP-V) - RUNNING: XD0528 (m3).
CMP.B2 24hr MQCS COMPLETED: 2:30pm 9/24
CMP.B2 24hr MQCS NEXT DUE : 2:30pm 9/25
CMP.B2 12hr MQCS COMPLETED: 2:30pm 9/24
CMP.B2 12hr MQCS NEXT DUE : 2:30am 9/25

CMP.B3 (Speedfam CMP-V) - RUNNING: XD0544 (m1) and JL0510 (m1).
CMP.B3 24hr MQCS COMPLETED: 2pm 9/24
CMP.B3 24hr MQCS NEXT DUE : 2pm 9/25
CMP.B3 12hr MQCS COMPLETED: 2pm 9/24
CMP.B3 12hr MQCS NEXT DUE : 2am 9/25



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 4pm 9/24
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 4am 9/25

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 4pm 9/24
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 4am 9/25

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 4pm 9/24
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 4am 9/25



Hot/B lots in area:
__________________
JL0570 - M1 HOT
JD0554 - M2 HOT (moving out now)

Hot lots coming to area:
-----------------------
JD0503 - DEP_ILD3 2

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
3 boxes of 12K mqc wafers
1 box of 50K breakin wafers

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
SEE NEW STRASBAUGH AND SPEEDFAM SPECS. SHOULD BE ON LINE TODAY.
PRE-MEASUREMENTS ARE BEING ELIMINATED!

Lots/wafers processed:
---------------------
XD0554 - M2 - 23WFRS
JL0530 - PMD - 24

# of carriers for strasbaugh/speedfam:
--------------------------------------
9 SPEEDFAM CARRIERS
4 STRASBAUGH CARRIERS

81.29passdown cmp b-shift 9/25/96FABSIX::M_PROVENCHERWed Sep 25 1996 06:41111
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 5                  MQC'S

        BREAKIN WAFERS              36                  misc



CMP.A1 (Strasbaugh 6DS-SP) - up/mqc failed 1st set for particles
				tool placed in mqc @ 4 am 
CMP.A1 24hr MQCS COMPLETED:  in process 
CMP.A1 24hr MQCS NEXT DUE :  n/a

CMP.A2 (Strasbaugh 6DS-SP) - UP/xd0551 pmd
CMP.A2 24hr MQCS COMPLETED:  9/24/96 @ 4:00 pm 
CMP.A2 24hr MQCS NEXT DUE :  9/25/96 @ 4:00 pm (pad count is high)



CMP.B1 (Speedfam CMP-V) - :  up/running jl0515 m1
CMP.B1 24hr MQCS COMPLETED:  9/24/96 @ 4:30 pm
CMP.B1 24hr MQCS NEXT DUE :  9/25/96 @ 4:30 pm
CMP.B1 12hr MQCS COMPLETED:  9/25/96 @ 3:00 am
CMP.B1 12hr MQCS NEXT DUE :  9/25/96 @ 3:00 pm

CMP.B2 (Speedfam CMP-V) - :  up/running jl0570 m1 hot lot 
CMP.B2 24hr MQCS COMPLETED:  9/24/96 @ 4:30 pm
CMP.B2 24hr MQCS NEXT DUE :  9/25/96 @ 4:30 pm
CMP.B2 12hr MQCS COMPLETED:  9/24/96 @ 8:30 pm
CMP.B2 12hr MQCS NEXT DUE :  9/25/96 @ 8:30 am

CMP.B3 (Speedfam CMP-V) - :  up/running xd0506 m3 hot lot
CMP.B3 24hr MQCS COMPLETED:  9/24/96 @ 2:00 pm
CMP.B3 24hr MQCS NEXT DUE :  9/25/96 @ 2:00 pm
CMP.B3 12hr MQCS COMPLETED:  9/24/96 @ 9:30 pm
CMP.B3 12hr MQCS NEXT DUE :  9/25/96 @ 9:00 am



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9/25/96 @ 6:00 AM
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9/25/96 @ 6:00 PM

CMP-SCRUB.A2 (On-track scrubber) - up/idle 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9/25/96 @ 6:00 AM
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9/25/96 @ 6:00 PM

CMP-SCRUB.A3 (On-track scrubber) - up/idle 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9/25/96 @ 6:00 AM
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9/25/96 @ 6:00 PM



Hot/B lots in area:
__________________
* xd0506 m3 hot lot (b3) *
  jl0570 m1 hot lot (b2)

Hot lots coming to area:
-----------------------
* jd0501 m3 (@ 2134 dep ILD3) *

Static Lots in area:
-------------------
* none *
  
Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
----------
* xd0544 m2 after post cmp_thickness per f.krupa *

Monitor status:
--------------
2   boxes of 12k mqc wafers. (two on order)
1   boxes of 50K breakin wafers (two on order)   

Number of product lots in room:
------------------------------
* 5 lots *

New specs/revs posted:
---------------------
* SEE NEW STRASBAUGH AND SPEEDFAM SPECS. SHOULD BE ON LINE TODAY.
  PRE-MEASUREMENTS ARE BEING ELIMINATED!

Lots/wafers processed:
---------------------
* jl0514 M1 24 wafers *
  xd0548 m1 24 wafers
  xd0528 m3 24 wafers
  xd0544 m1 23 wafers (placed on hold @ post cmp thickness per f. krupa)

# of carriers for strasbaugh/speedfam:
--------------------------------------
  9 speedfam carriers
  4 strasbaugh carriers
  ? strasbaugh plates


81.30A-shift CMP passdown 9/25/96FABSIX::J_SADINFreedom isn't free.Wed Sep 25 1996 20:47111
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  mqcs

        BREAKIN WAFERS              20                  misc



CMP.A1 (Strasbaugh 6DS-SP) - VERIFY: running mqcs after pad/carrier change.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - PM: down for scheduled pad change. will need
breakins and mqcs.
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V) - RUNNING: XD0542 (m3).
CMP.B1 24hr MQCS COMPLETED: 1pm 9/25
CMP.B1 24hr MQCS NEXT DUE : 1pm 9/26
CMP.B1 12hr MQCS COMPLETED: 1pm 9/25
CMP.B1 12hr MQCS NEXT DUE : 1am 9/26

CMP.B2 (Speedfam CMP-V) - RUNNING: XE0526 (m1).
CMP.B2 24hr MQCS COMPLETED: 6pm 9/25
CMP.B2 24hr MQCS NEXT DUE : 6pm 9/26
CMP.B2 12hr MQCS COMPLETED: 6pm 9/25
CMP.B2 12hr MQCS NEXT DUE : 6am 9/26

CMP.B3 (Speedfam CMP-V) - IDLE.
CMP.B3 24hr MQCS COMPLETED: 7pm 9/25
CMP.B3 24hr MQCS NEXT DUE : 7pm 9/26
CMP.B3 12hr MQCS COMPLETED: 7pm 9/25
CMP.B3 12hr MQCS NEXT DUE : 7am 9/26



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 7:45pm 9/25
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 7:45am 9/26

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 7:45pm 9/25
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 7:45am 9/26

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 7:45pm 9/25
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 7:45am 9/26



Hot/B lots in area:
__________________
JD0501 - M3 HOT

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - DOWN. HIGH PARTICLES AFTER LAST MQC. PAD AND CARRIERS WERE
CHANGED. 
CMP.A2 - ROUTINE PAD CHANGE. EXCEEDED MAX WAFER COUNT.

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
3 boxes of 12K mqc wafers
2 boxes of 50K breakin wafers

Number of product lots in room:
------------------------------
7

New specs/revs posted:
---------------------
SEE FRANK KRUPA'S MAIL MESSAGE ABOUT THE CHANGES MADE IN THE SPEEDFAM SPEC.
THICKNESS PRE-MEASUREMENTS ARE ELIMINATED!

Lots/wafers processed:
---------------------
JD0504 - M1 - 24WFRS
JL0515 - M1 - 19
JL0511 - M1 - 24
JD0501 - M3 - 20
JD0503 - M3 - 23

# of carriers for strasbaugh/speedfam:
--------------------------------------
9 SPEEDFAM CARRIERS
0 STRASBAUGH CARRIERS

81.31PASSDOWNFABSIX::D_CAUSEFri Sep 27 1996 08:2950
                             D SHIFT PASSDOWN

       
CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING YD0204 FIRST 180 SEC
    
CMP.A2 (Strasbaugh 6DS-SP) -UP/RUNNING XD0441 FIRST 180 SEC
        
CMP.B1 (Speedfam CMP-V) -  UP/RUNNING XD0533**HOT LOT** 100% ON THK.A5

CMP.B2 (Speedfam CMP-V) - DOWN/PARTICLE PROBLEMS STILL EXIST 3 MQC'S DONE

CMP.B3 (Speedfam CMP-V) - UP/RUNNIG JD0500 WILL NEED 100% 1 WAFER SCRAPPED
                                    DURING RECOVERY FROM SCRUBBER
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC COMPLETE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC COMPLETE 
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE MQC COMPLETE

HOT/B lots in area:1
-------------------
XD0533 ****HOT LOT****

STATIC lots in area:1
--------------------

HOLD LOTS IN AREA:2
__________________

       
DOWN equipment:
---------------
CMP.B2 PARTICLES
NUMBER of product lots in room:5

-------------------------------
           

LOTS COMPLETED : 5
----------------

BREAK IN WAFERS USED: 30

MQC WAFERS USED:31 WAFERS USED
MQC WAFERS AVAIL:3/4 BOX  (2 MORE LOTS RUNNING IN DIALECTRICS)

----------


81.32PASSDOWNFABSIX::D_CAUSESat Sep 28 1996 08:3448
                             D SHIFT PASSDOWN

       
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE
    
CMP.A2 (Strasbaugh 6DS-SP) -UP/IDLE
        
CMP.B1 (Speedfam CMP-V) -  UP/RUNNING XD0494, JD498 BOTH WILL NEED 100%

CMP.B2 (Speedfam CMP-V) - UP/RUNNING XE0530 FIRST 400SEC DONE 

CMP.B3 (Speedfam CMP-V) - UP/IDLE
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC COMPLETE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC COMPLETE 
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE MQC COMPLETE

HOT/B lots in area:
-------------------

STATIC lots in area:1
--------------------

HOLD LOTS IN AREA:2
__________________

       
DOWN equipment:
---------------

NUMBER of product lots in room:4

-------------------------------
           

LOTS COMPLETED : 7
----------------

BREAK IN WAFERS USED: 

MQC WAFERS USED:0 WAFERS USED
MQC WAFERS AVAIL:3 BOXES

----------


81.33passdown cmp b-shift 9/29/96FABSIX::M_PROVENCHERSun Sep 29 1996 07:49119
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                26                  MQC'S

        BREAKIN WAFERS              42                  misc



	cmp down from @ 12:30 am to @ 2am due to slurry filter clogging.
        A1, and A2 crashed.
          
CMP.A1 (Strasbaugh 6DS-SP) - up/mqc (crash. slurry flow stopped @12:30 am.)
CMP.A1 24hr MQCS COMPLETED:  in process 
CMP.A1 24hr MQCS NEXT DUE :  n/a

CMP.A2 (Strasbaugh 6DS-SP) - UP/mqc (crash @ 12:30 am failed for high dev)
CMP.A2 24hr MQCS COMPLETED:  in process
CMP.A2 24hr MQCS NEXT DUE :  n/a



CMP.B1 (Speedfam CMP-V) - :  down/@4am. down for vibrations/heads 4, and 5 not
				  rotating, also taken for monthly pm. will
				  need mqc's after monthly
CMP.B1 24hr MQCS COMPLETED:  n/a
CMP.B1 24hr MQCS NEXT DUE :  n/a
CMP.B1 12hr MQCS COMPLETED:  n/a
CMP.B1 12hr MQCS NEXT DUE :  n/a

CMP.B2 (Speedfam CMP-V) - :  up/mqc in process (down @ 6:30 am)
CMP.B2 24hr MQCS COMPLETED:  in process
CMP.B2 24hr MQCS NEXT DUE :  
CMP.B2 12hr MQCS COMPLETED:  
CMP.B2 12hr MQCS NEXT DUE :  

CMP.B3 (Speedfam CMP-V) - :  up/running jd0508 m2 (down until @5:30 am)
CMP.B3 24hr MQCS COMPLETED:  9/29/96 @ 5:30 am
CMP.B3 24hr MQCS NEXT DUE :  9/30/96 @ 5:30 pm
CMP.B3 12hr MQCS COMPLETED:  9/29/96 @ 5:30 am
CMP.B3 12hr MQCS NEXT DUE :  9/29/96 @ 5:30 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9/29/96 @ 5:00 AM
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9/29/96 @ 5:00 PM

CMP-SCRUB.A2 (On-track scrubber) - up/idle 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9/29/96 @ 5:00 AM
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9/29/96 @ 5:00 PM

CMP-SCRUB.A3 (On-track scrubber) - down/@ 7 am screen will not initialize, and
					robot problems 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9/29/96 @ 5:00 AM
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 9/29/96 @ 5:00 PM



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *
  
Down Equipment:
--------------
* cmp.a1 mqc after crash
  cmp.a2 mqc after crash
  cmp.b1 down to maint vibration, carrier rotation problems, and monthly pm
  cmp.b2 mqc

Scrap lots:
----------
* xd0541 M1 2 wafers (a2) *
  jd0506 M1 2 wafers (a1)
Hold Lots:
----------
* none *

Monitor status:
--------------
4   boxes of 12k mqc wafers. 
0   boxes of 50K breakin wafers (two on order)   

Number of product lots in room:
------------------------------
* 5 lots *

New specs/revs posted:
---------------------
* SEE NEW STRASBAUGH AND SPEEDFAM SPECS. SHOULD BE ON LINE TODAY.
  PRE-MEASUREMENTS ARE BEING ELIMINATED!

Lots/wafers processed:
---------------------
* jl0517  m1 12 wafers *
  jl0516  m1 24 wafers
  jd0507  m2 24 wafers
  xd0511  m3 24 wafers (need 2nd measurment on e test tm69 seven site, see 
							remark for this lot)

# of carriers for strasbaugh/speedfam:
--------------------------------------
 13 speedfam carriers
  3 strasbaugh carriers
  ? strasbaugh plates


81.34A-shift CMP passdown 9/29/96FABSIX::J_SADINFreedom isn't free.Sun Sep 29 1996 20:15110
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                10                  mqcs

        BREAKIN WAFERS              20                  misc



CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: XE0540 (m1).
CMP.A1 24hr MQCS COMPLETED: 8am 9/29
CMP.A1 24hr MQCS NEXT DUE : 8am 9/30

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0551 (m1).
CMP.A2 24hr MQCS COMPLETED: 12pm 9/29
CMP.A2 24hr MQCS NEXT DUE : 12pm 9/30



CMP.B1 (Speedfam CMP-V) - RUNNING: XD0535 (m2).
CMP.B1 24hr MQCS COMPLETED: 11:30am 9/29
CMP.B1 24hr MQCS NEXT DUE : 11:30am 9/30
CMP.B1 12hr MQCS COMPLETED: 11:30am 9/29
CMP.B1 12hr MQCS NEXT DUE : 11:30pm 9/29

CMP.B2 (Speedfam CMP-V) - RUNNING: XD0545 (m3).
CMP.B2 24hr MQCS COMPLETED: 8am 9/29
CMP.B2 24hr MQCS NEXT DUE : 8am 9/30
CMP.B2 12hr MQCS COMPLETED: 7pm 9/29
CMP.B2 12hr MQCS NEXT DUE : 7am 9/30

CMP.B3 (Speedfam CMP-V) - RUNNING: JD0499 (m3).
CMP.B3 24hr MQCS COMPLETED: 6am 9/29
CMP.B3 24hr MQCS NEXT DUE : 6am 9/30
CMP.B3 12hr MQCS COMPLETED: n/a
CMP.B3 12hr MQCS NEXT DUE : now



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 7pm 9/29
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 7am 9/30

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 7pm 9/29
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 7am 9/30

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 7pm 9/29
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 7am 9/30



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
XD0513 - 2.1DAYS (HOLD FOR ENG)
JD0412 - 1.4DAYS (HOLD FOR ENG)

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0513 - M3 HOLD FOR ENG TO RUN
JD0412 - M3 "                   "

Monitor status:
--------------
4 boxes of 12K mqc wafers
0 boxes of 50K breakin wafers (supe notified - more wafers coming)

Number of product lots in room:
------------------------------
12

New specs/revs posted:
---------------------
SEE NEW SPEEDFAM SPEC

Lots/wafers processed:
---------------------
JD0506 - M1 - 22WFRS
XE0541 - M1 - 14
JD0449 - PMD - 6
XD0535 - M2 - 24
JD0519 - PMD - 24
JD0508 - M2 - 24

# of carriers for strasbaugh/speedfam:
--------------------------------------
13 SPEEDFAM CARRIERS
3 STRASBAUGH CARRIERS

81.35passdown cmp b-shift 9/30/96FABSIX::M_PROVENCHERMon Sep 30 1996 07:22119
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               8                    MQC'S

        BREAKIN WAFERS             32                   misc


          
[EOB] 
CMP.A1 (Strasbaugh 6DS-SP) - up/mqc
CMP.A1 24hr MQCS COMPLETED:  in process 
CMP.A1 24hr MQCS NEXT DUE :  n/a

CMP.A2 (Strasbaugh 6DS-SP) - UP/running jd0524 pmd/jl0536 pmd
CMP.A2 24hr MQCS COMPLETED:  9/29/96 @ 12:00 pm
CMP.A2 24hr MQCS NEXT DUE :  9/30/96 @ 12:00 pm



CMP.B1 (Speedfam CMP-V) - :  up/running jl0486 m1/jl0509 m2
CMP.B1 24hr MQCS COMPLETED:  9/29/96 @ 11:30 am
CMP.B1 24hr MQCS NEXT DUE :  9/30/96 @ 11:30 am
CMP.B1 12hr MQCS COMPLETED:  9/30/96 @ 12:00 am
CMP.B1 12hr MQCS NEXT DUE :  9/30/96 @ 12:00 pm

CMP.B2 (Speedfam CMP-V) - :  up/running xd0556 m1/jl0510 m2
CMP.B2 24hr MQCS COMPLETED:  9/29/96 @  8:00 am
CMP.B2 24hr MQCS NEXT DUE :  9/30/96 @  8:00 am
CMP.B2 12hr MQCS COMPLETED:  9/30/96 @  7:00 am
CMP.B2 12hr MQCS NEXT DUE :  9/30/96 @  7:00 pm

CMP.B3 (Speedfam CMP-V) - :  up/mqc
CMP.B3 24hr MQCS COMPLETED:  in process 
CMP.B3 24hr MQCS NEXT DUE :  n/a
CMP.B3 12hr MQCS COMPLETED:  9/30/96 @  3:00 am
CMP.B3 12hr MQCS NEXT DUE :  9/30/96 @  3:00 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle 
CMP-SCRUB.A1 12hr MQCS COMPLETED: 9/30/96 @ 6:00 am
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 9/30/96 @ 6:00 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 9/30/96 @ 6:00 am
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 9/30/96 @ 6:00 pm

CMP-SCRUB.A3 (On-track scrubber) - down/down from 11pm on
CMP-SCRUB.A3 12hr MQCS COMPLETED: 9/29/96 @ 7:00 pm
CMP-SCRUB.A3 12hr MQCS NEXT DUE : when tool comes up



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* xd0513 2.6 days (hold for eng) *
  jd0412 1.9 days (hold for eng)
  
Down Equipment:
--------------
* cmp-scrub.a3 (maint) *
  cmp.a1 mqc
  cmp.b2 mqc

Scrap lots:
----------
* none  *

Hold Lots:
----------
* xd0513 hold for proc eng to run *
  jd0412 hold for proc eng to run
  xd0560 eng stores @ cmp
  xd0441 eng stores @ cmp hold for eric b.

Monitor status:
--------------
4  boxes of 12k mqc wafers. * 
0  boxes of 50K breakin wafers (two on order)*   

Number of product lots in room:
------------------------------
* 13 lots excluding hold lots *

New specs/revs posted:
---------------------
* SEE NEW SPEEDFAM SPEC. * 

Lots/wafers processed:
---------------------
* xd0551 m1 24 wafers *
  jl0528 m1 24 wafers
  xe0540 m1 24 wafers
  jl0502 m2 24 wafers
  xd0539 m3 24 wafers
  jd0499 m3 19 wafers
  yd0148 m3  3 wafers
  xd0545 m3 19 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
 13 speedfam carriers*
  3 strasbaugh carriers*
  ? strasbaugh plates*


81.36A-shift CMP passdown 9/30/96FABSIX::J_SADINFreedom isn't free.Mon Sep 30 1996 20:34121
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  mqcs

        BREAKIN WAFERS              30                  misc


special note!! Lot# JL0515 was received into CMP with a thickness of 13K�
@ild1 (should be 18K�). Lot has been taken back to films and is being
reworked. It should be back in the room sometime tonight. 

        Also, please make sure to let your supervisor and PSS know if you
crash product wafers. They need to fill out a report to track the losses.


CMP.A1 (Strasbaugh 6DS-SP) - DOWN: crashed dummy wafers on the pad. Needs
new pad/carriers.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - MQC: running more breakins and mqcs. First set
failed for high unif.
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V) - DOWN: inverter errors. Reps are working on the
tool now.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : when up.
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : when up.

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0535 (m1) and JL0511 (m2).
CMP.B2 24hr MQCS COMPLETED: 9am 9/30
CMP.B2 24hr MQCS NEXT DUE : 9am 10/1
CMP.B2 12hr MQCS COMPLETED: 9am 9/30
CMP.B2 12hr MQCS NEXT DUE : 9pm 9/30

CMP.B3 (Speedfam CMP-V) - RUNNING: YE0192 (m3) and JL0515 (m1).
CMP.B3 24hr MQCS COMPLETED: 8:30am 9/30
CMP.B3 24hr MQCS NEXT DUE : 8:30am 10/1
CMP.B3 12hr MQCS COMPLETED: 8:30am 9/30
CMP.B3 12hr MQCS NEXT DUE : 8:30pm 9/30



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 7:30pm 9/30
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 7:30am 10/1

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 7:30pm 9/30
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 7:30am 10/1

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 7:30pm 9/30
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 7:30am 10/1



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
XD0533 - DEP_ILD3 2

Static Lots in area:
-------------------
XD0513 - 3.1DAYS
JD0412 - 2.4DAYS 

Down Equipment:
--------------
CMP.A1 - DUMMY CRASHED ON PAD. NEEDS PAD/CARRIERS.
CMP.A2 - MQCS.
CMP.B1 - INVERTER ERRORS. REPS GETTING NEW BOARD.

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0513 - HOLD FOR ENG TO PROCESS
JD0412 - HOLD FOR ENG TO PROCESS

Monitor status:
--------------
4 BOXES OF 12K MQC WAFERS
0 BOXES OF 50K BREAKIN WAFERS

Number of product lots in room:
------------------------------
15

New specs/revs posted:
---------------------
SEE NEW SPEEDFAM SPEC

Lots/wafers processed:
---------------------
JL0486 - M1 - 24WFRS
JD0524 - PMD - 22
XE0556 - M1 - 24
XD0543 - M2 - 23
XD0480 - M1 - 13
JL0510 - M2 - 22

# of carriers for strasbaugh/speedfam:
--------------------------------------
13 SPEEDFAM CARRIERS
0 STRASBAUGH CARRIERS
81.37PASSDOWNFABSIX::D_CAUSEThu Oct 10 1996 08:2748
                             D SHIFT PASSDOWN

       
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE IN ENGINEERING
    
CMP.A2 (Strasbaugh 6DS-SP) -UP/IDLE IN ENGINEERING
        
CMP.B1 (Speedfam CMP-V) -  UP/RUNNING JL0539 FIRST PASS

CMP.B2 (Speedfam CMP-V) - UP/RUNNING JD0526 WILL NEED 100%, JL0531 FIRST PASS 

CMP.B3 (Speedfam CMP-V) - UP/IDLE RUNNING YD0184 FIRST PASS 350 SEC
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC COMPLETE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC COMPLETE 
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE MQC COMPLETE

HOT/B lots in area:
-------------------

STATIC lots in area:8
--------------------

HOLD LOTS IN AREA:2
__________________

       
DOWN equipment:
---------------

NUMBER of product lots in room:13

-------------------------------
           

LOTS COMPLETED : 8
----------------

BREAK IN WAFERS USED: 

MQC WAFERS USED:15 WAFERS USED
MQC WAFERS AVAIL:1.5 BOXES

----------


81.38PASSDOWNFABSIX::D_CAUSESat Oct 12 1996 08:3350
                             D SHIFT PASSDOWN

       
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE 
    
CMP.A2 (Strasbaugh 6DS-SP) -UP/IDLE 
        
CMP.B1 (Speedfam CMP-V) -  UP/IDLE

CMP.B2 (Speedfam CMP-V) - UP/MQC RUNNING 4TH MQC PARTICLES AND DEV GOOD 
                             FAILED FOR RANGE 784A

CMP.B3 (Speedfam CMP-V) - UP/RUNNING 2 HOT LOTS JD0523 5 SA ON THK.A5
                             JD0559 NEED 100% AND TOUCHUP
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC COMPLETE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC COMPLETE 
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE MQC COMPLETE

HOT/B lots in area:2
-------------------

STATIC lots in area:4
--------------------

HOLD LOTS IN AREA:
__________________

       
DOWN equipment:
---------------

NUMBER of product lots in room:6

-------------------------------
           

LOTS COMPLETED : 5
----------------

BREAK IN WAFERS USED:30 

MQC WAFERS USED:20 WAFERS USED
MQC WAFERS AVAIL:2 BOXES

----------


81.39PASSDOWNFABSIX::D_CAUSEWed Oct 16 1996 08:2351
                             D SHIFT PASSDOWN

       
CMP.A1 (Strasbaugh 6DS-SP) - TECHS FINISHING MONTHLY PM WILL NEED FULL MQC 
    
CMP.A2 (Strasbaugh 6DS-SP) -UP/RUNNING JL0596 FIRST PASS
        
CMP.B1 (Speedfam CMP-V) -  UP/TO ENGINEERING 

CMP.B2 (Speedfam CMP-V) - VERIFY/PAD CHANGE FOR LOW REMOVAL RATE
                          JD0506 NEEDS T/U , XD0551 FIRST 400 SEC DONE

CMP.B3 (Speedfam CMP-V) - UP/RUNNING XE0540 NEED 100% WHEN FINISHED
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE 
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT/B lots in area:
-------------------

STATIC lots in area:1
--------------------

HOLD LOTS IN AREA:1
__________________

       
DOWN equipment:2
---------------
CMP.A1 MONTHLY PM
CMP.B2 PAD CHANGE FOR LOW REMOVAL RATE

NUMBER of product lots in room:6

-------------------------------
           

LOTS COMPLETED : 5
----------------

BREAK IN WAFERS USED:30 

MQC WAFERS USED:20 WAFERS USED
MQC WAFERS AVAIL:2 BOXES

----------