[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Conference asdg::cmp

Title:CMP
Notice:Welcome to the CMP notesfile
Moderator:FABSIX::B_TOWERLLE
Created:Tue Oct 31 1995
Last Modified:Fri Jun 06 1997
Last Successful Update:Fri Jun 06 1997
Number of topics:94
Total number of notes:6381

79.0. "CMP ops passdowns - August '96" by FABSIX::J_SADIN (Freedom isn't free.) Wed Jul 31 1996 20:32

    
    
    	CMP operations passdowns for August 1996.
    
    
T.RTitleUserPersonal
Name
DateLines
79.1PASSDOWN CMP B-SHIFT 8/4/96FABSIX::M_PROVENCHERSun Aug 04 1996 08:1287
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 15		         b1  

        BREAKIN WAFERS               58                  MISC

	BROKEN PRODUCT WAFERS	     0      
		

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE 
		WILL NEED MQC'S TODAY @4PM 

CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE
		WILL NEED MQC'S TODAY @ 4 PM

CMP.B1 (SPEEDFAM CMP-V) - DOWN/MQC  
		SEE KRUPA MAIL MESSAGE REGAURDING B1, AND MQC'S
                            
CMP.B2 (SPEEDFAM CMP-V) - UP/IDLE
		WILL NEED MQC'S (OVER DUE)

CMP.B3 (SPEEDFAM CMP-V) - UP/RUNNING JD0378 M1
		WILL NEED MQC'S TODAY @ 7 PM

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE WILL NEED MQC'S 
 
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE WILL NEED MQC'S

Hot/B lots in area:
________________________
*NONE*

Hot lots coming to area:
------------------------
*NONE*

Static Lots in area:
--------------------
*NONE*

Down Equipment:
--------------
*CMP.B1*
 THICKNESS.A4

Scrap lots:
----------- 
*NONE* 
 
Hold Lots:
------------
*NONE*

Monitor status:
----------------
*1 BOX*

Number of product lots in room:
------------------------------
*1 LOT*

New specs/revs posted:
---------------------
*NONE*

Lots/wafers processed:
-----------------------
*XD0506 PMD 23 WAFERS*
 XD0507 PMD 24 WAFERS
 JD0480 PMD 24 WAFERS
 JD0394  M1 24 WAFERS
 JD0376  M2 19 WAFERS
 JD0364  M3 22 WAFERS

 
# of carriers for strasbaugh/speedfam:
-------------------------------------
16  spare carriers for CMP.B1/B2/B3
11  full carriers for CMP.A1/.A2
2   PLATES FOR CMP.A1/.A2  	
79.2CMP A SHIFT PASSDOWNFABSIX::J_ROASun Aug 04 1996 20:41113

CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                21                  mqcs

        BREAKIN WAFERS              25                  misc



CMP.A1 (Strasbaugh 6DS-SP) - MQC:Failed Mqc's twice. A new pad was installed
and we are running break-in wafers at the present time.
CMP.A1 24hr MQCS COMPLETED: 
CMP.A1 24hr MQCS NEXT DUE :   

========================================================================
CMP.A2 (Strasbaugh 6DS-SP) - IDLE
CMP.A2 24hr MQCS COMPLETED: 15:25pm 8/4/96
CMP.A2 24hr MQCS NEXT DUE : 15:25pm 8/5/96

========================================================================


CMP.B1 (Speedfam CMP-V) - MQC: The pad was changed twice on this tool.
The first mqc failed due to high particles. We are presently running
break-in wafers after the last pad change. 
 
CMP.B1 24hr MQCS COMPLETED: ON GOING
CMP.B1 24hr MQCS NEXT DUE : 
CMP.B1 12hr MQCS COMPLETED: 
CMP.B1 12hr MQCS NEXT DUE : 

=========================================================================
CMP.B2 (Speedfam CMP-V) - Running JD0370 (m3).
CMP.B2 24hr MQCS COMPLETED: 15:05 hours 8/4/96
CMP.B2 24hr MQCS NEXT DUE : 15:05 hours 8/5/96
CMP.B2 12hr MQCS COMPLETED: 15:05 hours 8/4/96			
CMP.B2 12hr MQCS NEXT DUE : 3:05  hours 8/5/96

=========================================================================
CMP.B3 (Speedfam CMP-V) - IDLE:
Mqc's were due at the 19:20 hours. Mqc wafers are being measured on 
thickness.A5.

CMP.B3 24hr MQCS COMPLETED: 
CMP.B3 24hr MQCS NEXT DUE : 
CMP.B3 12hr MQCS COMPLETED: 
CMP.B3 12hr MQCS NEXT DUE : 
=========================================================================

CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED:  9:10 hours 8/4/96
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 21:10 hours 8/4/96
=========================================================================
CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED:  9:10 hours 8/4/96
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 21:10 houra 8/4/96

=========================================================================

Hot/B lots in area:
__________________


Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.B1 - HIGH PARTICLES. HAS NEW PAD. RUNNING BREAK-IN AND MQC WAFERS.

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
1 box of 12K mqc wafers. Some more coming.

Number of product lots in room:
------------------------------


New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0378 - M1 - 23WFRS
JD0429 - PMD- 24 "
JD0365 - M3 - 24 "

# of carriers for strasbaugh/speedfam:
--------------------------------------
16 SPEEDFAM CARRIERS
11 STRASBAUGH CARRIERS


79.3PASSDOWN CMP B-SHIFT 8/5/96FABSIX::M_PROVENCHERMon Aug 05 1996 07:4183
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 20		        A1,B1,SCRUBBAS  

        BREAKIN WAFERS               48                  MISC

	BROKEN PRODUCT WAFERS	     0      
		

CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING JD0399 PMD 
		           MQC'S DONE @10 PM 

CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE
		WILL NEED MQC'S TODAY @ 4 PM

CMP.B1 (SPEEDFAM CMP-V) - UP/MQC  
		PARTICLES CAME IN. CHECKING R/R-DEV
                            
CMP.B2 (SPEEDFAM CMP-V) - UP/RUNNING JD0338 M3
		WILL NEED MQC'S @5PM

CMP.B3 (SPEEDFAM CMP-V) - UP/IDLE
		           MQC'S DONE @ 10:30 PM

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC'S PERFORMED @ 3 AM 
 
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC'S PERFORMED @ 3 AM

Hot/B lots in area:
________________________
*NONE*

Hot lots coming to area:
------------------------
*NONE*

Static Lots in area:
--------------------
*NONE*

Down Equipment:
--------------
*THICKNESS.A4*

Scrap lots:
----------- 
*NONE* 
 
Hold Lots:
------------
*NONE*

Monitor status:
----------------
*2 BOXES*

Number of product lots in room:
------------------------------
*2 LOT*

New specs/revs posted:
---------------------
*NONE*

Lots/wafers processed:
-----------------------
*JD0382  M1 23 WAFERS*
 JD0370  M3 22 WAFERS
 XD0495  M3 24 WAFERS

 
# of carriers for strasbaugh/speedfam:
-------------------------------------
 9  spare carriers for CMP.B1/B2/B3
11  full carriers for CMP.A1/.A2
2   PLATES FOR CMP.A1/.A2  	
79.4FABSIX::J_ROAMon Aug 05 1996 20:43124

CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                21                  mqcs

        BREAKIN WAFERS              25                  misc



CMP.A1 (Strasbaugh 6DS-SP) - :Running lot JL0427 (pmd)

CMP.A1 24hr MQCS COMPLETED: 14:54 hours 8/5/96
CMP.A1 24hr MQCS NEXT DUE : 14:54 hours 8/6/96  

========================================================================
CMP.A2 (Strasbaugh 6DS-SP) - : Runnning XD0508 (pmd)

CMP.A2 24hr MQCS COMPLETED: 17:04 hours 8/5/96
CMP.A2 24hr MQCS NEXT DUE : 17:04 hours 8/6/96

========================================================================


CMP.B1 (Speedfam CMP-V) - : Running lot JD0338 (M3)
 
CMP.B1 24hr MQCS COMPLETED:  6:42 hours 8/5/96
CMP.B1 24hr MQCS NEXT DUE :  6:42 hours 8/6/96
CMP.B1 12hr MQCS COMPLETED: 13:25 hours 8/5/96
CMP.B1 12hr MQCS NEXT DUE :  1:25 hours 8/6/96 

=========================================================================
CMP.B2 (Speedfam CMP-V) - DOWN: Failed Mqc's. Both primary and secondary
pad are going to be replaced.

Lot XD0498 was running on this tool prior to the mqc's. This lot needs to
be finished once the tools gets going. Or, it can be transfer to another
tool.

CMP.B2 24hr MQCS COMPLETED: Ongoing
CMP.B2 24hr MQCS NEXT DUE : 
CMP.B2 12hr MQCS COMPLETED: 			
CMP.B2 12hr MQCS NEXT DUE : 

=========================================================================
CMP.B3 (Speedfam CMP-V) - MQC: Facilities work most of the day hooking up
CMP.B3 to CMP.C1. 
A new pad was installed after the tool was given back to manufacturing 
because the previous pad had dried up while the hook-up took place.


CMP.B3 24hr MQCS COMPLETED: Ongoing. Ran break-ins and mqc wafers. Need to 
measure and evaluate test.

CMP.B3 24hr MQCS NEXT DUE : 
CMP.B3 12hr MQCS COMPLETED: 
CMP.B3 12hr MQCS NEXT DUE : 
=========================================================================

CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED:  9:30 hours 8/5/96
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 21:30 hours 8/5/96
=========================================================================
CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED:  9:30 hours 8/5/96
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 21:30 hourS 8/5/96

=========================================================================

Hot/B lots in area:
__________________


Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------


Scrap lots:
----------
* none *

Hold Lots:
---------
* XD0495 IS ON HOLD AT CMP FOR B SHIFT PSS FOR DISPOSITION AND REMARKS. * 

Monitor status:
--------------
3 boxES of 12K mqc wafers. 

Number of product lots in room:
------------------------------


New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0367 - M2 - 23 WAFERS
JD0368 - M3 - 14   "
JD0399 - PMD- 24   "
JL0430 - PMD- 12   "
JD0344 - M2 - 23   "

# of carriers for strasbaugh/speedfam:
--------------------------------------
11 SPEEDFAM CARRIERS
11 STRASBAUGH CARRIERS


79.5PASSDOWN CMPB-SHIFT 8/6/96FABSIX::M_PROVENCHERTue Aug 06 1996 08:0486
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 20		        b2!,,SCRUBBAS  

        BREAKIN WAFERS               51                  MISC

	BROKEN PRODUCT WAFERS	     0      
		

CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING JD0405 M1/JD0407 M1 
		           MQC'S DUE TODAY @5 PM 

CMP.A2 (Strasbaugh 6DS-SP) - UP/RUNNING JD0414 M1
		WILL NEED MQC'S DUE TODAY @ 4 PM

CMP.B1 (SPEEDFAM CMP-V) - UP/RUNNING JD0390 TOUCH UP  
		WILL NEED MQC'S DUE TODAY
                            
CMP.B2 (SPEEDFAM CMP-V) - UP/MQC IN PROCESS
		

CMP.B3 (SPEEDFAM CMP-V) - UP/RUNNING JD0388 M1 (HOT)/XD0501 M2
		           MQC'S DONE @ 10:30 PM

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC'S PERFORMED @ 4 AM 
 
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC'S PERFORMED @ 4 AM

Hot/B lots in area:
________________________
*JD0388 M1 (B3)*

Hot lots coming to area:
------------------------
*JL0436 M1*

Static Lots in area:
--------------------
*NONE*

Down Equipment:
--------------
*CMP.B2*

Scrap lots:
----------- 
*NONE* 
 
Hold Lots:
------------
*XD0495 PSS B-SHIFT HAS BEEN NOTIFIED AND INFORMED*

Monitor status:
----------------
*2 BOXES*

Number of product lots in room:
------------------------------
*7 LOTS*

New specs/revs posted:
---------------------
*NONE*

Lots/wafers processed:
-----------------------
*JL0427 PMD 20 WAFERS*
 JL0428 PMD 24 WAFERS
 XD0508 PMD 24 WAFERS
 XD0498  M2 24 WAFERS
 JD0338  M3 22 WAFERS
 JD0362  M3 23 WAFERS

 
# of carriers for strasbaugh/speedfam:
-------------------------------------
11  spare carriers for CMP.B1/B2/B3
11  full carriers for CMP.A1/.A2
2   PLATES FOR CMP.A1/.A2  	
79.6CMP A SHIFT PASSDOWNFABSIX::J_ROATue Aug 06 1996 20:28118

CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  mqcs

        BREAKIN WAFERS              50                  misc



CMP.A1 (Strasbaugh 6DS-SP) - :Running lot JD0407 m1. Once this lot is 
done the tool need to have Mqc's performed.

CMP.A1 24hr MQCS COMPLETED: 14:54 hours 8/5/96
CMP.A1 24hr MQCS NEXT DUE : 14:54 hours 8/6/96  

========================================================================
CMP.A2 (Strasbaugh 6DS-SP) - : Runnnig JD0405 m1. Once this lot is 
done the tool needs to have Mqc's performed.

CMP.A2 24hr MQCS COMPLETED: 17:04 hours 8/5/96
CMP.A2 24hr MQCS NEXT DUE : 17:04 hours 8/6/96

========================================================================


CMP.B1 (Speedfam CMP-V) - : Running hot lot JL0436
 
CMP.B1 24hr MQCS COMPLETED:  15:10 hours 8/6/96
CMP.B1 24hr MQCS NEXT DUE :  15:10 hours 8/7/96
CMP.B1 12hr MQCS COMPLETED:  15:10 hours 8/6/96
CMP.B1 12hr MQCS NEXT DUE :   3:10 hours 8/7/96 

=========================================================================
CMP.B2 (Speedfam CMP-V) - VERIFY/U: This tool was down almost the entire
shift due to particle issues. The pad was replaced twice and we are now
evaluting the last mqc wafers.


CMP.B2 24hr MQCS COMPLETED: Ongoing
CMP.B2 24hr MQCS NEXT DUE : 
CMP.B2 12hr MQCS COMPLETED: 			
CMP.B2 12hr MQCS NEXT DUE : 

=========================================================================
CMP.B3 (Speedfam CMP-V) - :Running hot lot JL0410 m3

CMP.B3 24hr MQCS COMPLETED:   23:23 hours 8/5/96			 
CMP.B3 24hr MQCS NEXT DUE :   23:23 hours 8/6/96
CMP.B3 12hr MQCS COMPLETED:   19:30 hours 8/6/96	
CMP.B3 12hr MQCS NEXT DUE :    6:30 hours 8/7/96
=========================================================================

CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED:  9:30 hours 8/6/96
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 21:30 hours 8/7/96
=========================================================================
CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED:  9:30 hours 8/6/96
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 21:30 hourS 8/7/96

=========================================================================

Hot/B lots in area:
__________________
hot lots JL0410, JL0436 and XL0514

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------


Scrap lots:
----------
* none *

Hold Lots:
---------
* NONE * 

Monitor status:
--------------
2 boxes of 12K mqc wafers and 2 of 50k. 

Number of product lots in room:
------------------------------
10 lots

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------

JD0414 _ M1 - 24  WAFERS
JD0390 - M2 - 23  "
JD0395 - M1 - 17  "
XD0501 - M2 - 24  "

# of carriers for strasbaugh/speedfam:
--------------------------------------
9 SPEEDFAM CARRIERS
9 STRASBAUGH CARRIERS


79.7CMP C-SHFT PD. 8/9/96FABSIX::E_DAWSONFri Aug 09 1996 20:4437
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE -
             
CMP.A2 (Strasbaugh 6DS-SP) - RUNNING 1 - XD0507 9 MIN

CMP.B1 (Speedfam CMP-V) - BGN ENG. -     
			       
CMP.B2 (Speedfam CMP-V) - RUNNING 2 - JD0372 JD0381  ILD'3

CMP.B3 (Speedfam CMP-V) -  UP/ILDE - NEEDS FULL MQC'S *PLEASE SEE EE. PD.*
                                     

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - RUNNING 1 - JD0397 "NEEDS DGR" 
    					         Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area:0            Lots in CMP:8		
	------------------	        -----------	
                                  
	Down Equipment:                 New SPEC/TDCO:"YES"
	--------------                  -------------
        CMP.B1 - ENG.			POSTED AT CMP.B1 PLEASE READ
    
	MQC Monitors:                   Carriers:
	-------------                   --------
    	2.5 BOXES	                See Carrier PD.
	MQC Mon. Used: 	              
    	-------------                 
        I lost track after 50....
    
    	** THICKNESS.A4 IS ALSO STILL DOWN. **    
        
79.8CMP C-SHIFT PD. 9-11-96FABSIX::E_DAWSONSat Aug 10 1996 20:4740
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE - Needs Mqc's
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE - Mqc's performed.

CMP.B1 (Speedfam CMP-V) - ENG -   
			       
CMP.B2 (Speedfam CMP-V) - UP/IDLE - Mqc's performed.
        
CMP.B3 (Speedfam CMP-V) - MQC - Running full brk'in & mqc. 

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area: 0           Lots in CMP: 0		
	------------------	        -----------	
   
	Lots Shipped: 10                 New SPEC/TDCO: "YES"
	------------                     -------------
                                POSTED NEXT TO CMP.B1 "PLEASE READ"
    
	Down Equipment:                 Carriers:
	--------------                  --------
    	CMP.B1/ENG	                See Carrier PD.

	MQC Mon. Used: 15 	        MQC Monitors:
    	-------------                   ------------
                                        1 Pod / 100 Wafers ordered 
        Misc.
        ----
        * THICKNESS.A4 is still down for a handler issue.
    
    	**** PLEASE READ EE. PD. IN REGARDS TO "NEW" MQC RECEIPE. IF THERE
             ARE ANY ? PLEASES SEE SOMEONE FROM THE EE. GROUP. ***** 
                                                                    
79.9PASSDOWN CMP B-SHIFT 8/11/96FABSIX::M_PROVENCHERSun Aug 11 1996 07:5582
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 20		        b3,A1  

        BREAKIN WAFERS               38                  MISC

	BROKEN PRODUCT WAFERS	     0      
		

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE 
		           MQC'S PERFORMED TODAY 

CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE
		WILL NEED MQC'S DUE TODAY 

CMP.B1 (SPEEDFAM CMP-V) - UP/ENG  
		
                            
CMP.B2 (SPEEDFAM CMP-V) - UP/RUNNING JD0380 M3
		 WILL NEED MQC'S TODAY

CMP.B3 (SPEEDFAM CMP-V) - UP/IDLE 
		          MQC'S PERFORMED TODAY

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE 
 
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE 

Hot/B lots in area:
________________________
*NONE*

Hot lots coming to area:
------------------------
*NONE*

Static Lots in area:
--------------------
*NONE*

Down Equipment:
--------------
*THICKNESS.A4*

Scrap lots:
----------- 
*NONE* 
 
Hold Lots:
------------
*NONE*

Monitor status:
----------------
*1 BOX*

Number of product lots in room:
------------------------------
*1 LOT*

New specs/revs posted:
---------------------
*YES, POSTED AT CMP.B1 PLEASE READ*

Lots/wafers processed:
-----------------------
*JL0430A PMD 12 WAFERS*
 JL0437  PMD 21 WAFERS 

 
# of carriers for strasbaugh/speedfam:
-------------------------------------
8  spare carriers for CMP.B1/B2/B3
9  full carriers for CMP.A1/.A2
2   PLATES FOR CMP.A1/.A2  	
79.10A-shift CMP passdown 8/11/96FABSIX::J_SADINFreedom isn't free.Sun Aug 11 1996 20:19109
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               15                   mqcs

        BREAKIN WAFERS             30                   misc



CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0422 (pmd).
CMP.A1 24hr MQCS COMPLETED: 10pm 8/10
CMP.A1 24hr MQCS NEXT DUE : 10pm 8/11

CMP.A2 (Strasbaugh 6DS-SP) - MQC: running mqcs.
CMP.A2 24hr MQCS COMPLETED:  running now.
CMP.A2 24hr MQCS NEXT DUE :  n/a



CMP.B1 (Speedfam CMP-V) - MQC: running mqcs.
CMP.B1 24hr MQCS COMPLETED: running now.
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: 5:30pm 8/11
CMP.B1 12hr MQCS NEXT DUE : 5:30am 8/12

CMP.B2 (Speedfam CMP-V) - MQC: running mqcs.
CMP.B2 24hr MQCS COMPLETED: running now.
CMP.B2 24hr MQCS NEXT DUE : n/a
CMP.B2 12hr MQCS COMPLETED: 5pm 8/11
CMP.B2 12hr MQCS NEXT DUE : 5am 8/12

CMP.B3 (Speedfam CMP-V) - RUNNING: JD0375 (m3 - touchup). 
CMP.B3 24hr MQCS COMPLETED: 12am 8/11
CMP.B3 24hr MQCS NEXT DUE : 12am 8/12
CMP.B3 12hr MQCS COMPLETED: 5:15pm 8/11
CMP.B3 12hr MQCS NEXT DUE : 5:15am 8/12



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 1pm 8/11
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 1am 8/12

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 12pm 8/11
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 12am 8/12

CMP-SCRUB.A3 (On-track scrubber) - IDLE. 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 12:30pm 8/11
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 12:30am 8/12



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A2 - MQC
CMP.B1 - MQC
CMP.B2 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0503 - STI LOT. HOLD FOR ENGINEERING TO RUN.

Monitor status:
--------------
4 boxes of 12K mqc wafers. 2 more boxes on order.

Number of product lots in room:
------------------------------
4

New specs/revs posted:
---------------------
* SEE TDCO POSTED NEXT TO CMP.B1! NEW PARTICLE LIMITS FOR CMP.B2 AND
CMP.B3*

Lots/wafers processed:
---------------------
JL0438 - PMD - 24WFRS
JD0380 - M3 - 23 
JD0375 - M3 - 21
JD0420 - M1 - 24

# of carriers for strasbaugh/speedfam:
--------------------------------------
8 SPEEDFAM CARRIERS
9 STRASBAUGH CARRIERS
2 STRASBAUGH PLATES

79.11PASSDOWN CMP B-SHIFT 8/12/96FABSIX::M_PROVENCHERMon Aug 12 1996 07:5486
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 22		        A1,B1,B2,B3  
                                                        SCRUBBERS
        BREAKIN WAFERS               42                  MISC

	BROKEN PRODUCT WAFERS	     0      
		

CMP.A1 (Strasbaugh 6DS-SP) - UP/MQC 
		           MQC'S IN PROCESS AFTER PAD CHANGE + MONTHLY P.M. 

CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE
		WILL NEED MQC'S DUE TODAY 

CMP.B1 (SPEEDFAM CMP-V) - UP/IDLE  
			   MQC'S PERFORMED 
                            
CMP.B2 (SPEEDFAM CMP-V) - UP/IDLE
		 	   MQC'S PERFORMED

CMP.B3 (SPEEDFAM CMP-V) - UP/MQC 
                           MQC'S IN PROCESS AFTER OFFSET CHANGE. NEW CARRIER
                              ON HEAD THREE GAVE HIGH R/R. CAUSING HIGH RANGE.


CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
 
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC'S PERFORMED

CMP-SCRUB.A3 (ON-TRACK SCRUBBER) - UP/IDLE MQC'S PERFORMED

Hot/B lots in area:
________________________
*NONE*

Hot lots coming to area:
------------------------
*NONE*

Static Lots in area:
--------------------
*NONE*

Down Equipment:
--------------
*THICKNESS.A4*

Scrap lots:
----------- 
*NONE* 
 
Hold Lots:
------------
*XD0503 (FOR ENG.)*

Monitor status:
----------------
*3 BOXES*

Number of product lots in room:
------------------------------
*1 LOT (ON HOLD)*

New specs/revs posted:
---------------------
*YES, POSTED AT CMP.B1 PLEASE READ*

Lots/wafers processed:
-----------------------
*JD0422  PMD 23 WAFERS*
 XD0505  PMD 24 WAFERS 

 
# of carriers for strasbaugh/speedfam:
-------------------------------------
7  spare carriers for CMP.B1/B2/B3
9  full carriers for CMP.A1/.A2
2   PLATES FOR CMP.A1/.A2  	
79.12A-shift CMP passdown 8/12/96FABSIX::J_SADINFreedom isn't free.Mon Aug 12 1996 20:48115
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  mqcs

        BREAKIN WAFERS              50                  misc



CMP.A1 (Strasbaugh 6DS-SP) - MQC: mqcs after shutdown. New pad/carriers.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - DOWN: down for robot vacuum problem. Needs
mqcs (new pad/carriers). 
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V) - MQC: new pad being installed. Needs mqcs after
shutdown.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE :

CMP.B2 (Speedfam CMP-V) - MQC: new pads being installed. Needs mqcs after
shutdown.
CMP.B2 24hr MQCS COMPLETED: n/a
CMP.B2 24hr MQCS NEXT DUE : n/a
CMP.B2 12hr MQCS COMPLETED: n/a
CMP.B2 12hr MQCS NEXT DUE : n/a

CMP.B3 (Speedfam CMP-V) - MQC: new pads being installed. Needs mqcs after
shutdown.
CMP.B3 24hr MQCS COMPLETED: n/a
CMP.B3 24hr MQCS NEXT DUE : n/a
CMP.B3 12hr MQCS COMPLETED: n/a
CMP.B3 12hr MQCS NEXT DUE : n/a



CMP-SCRUB.A1 (On-track scrubber) - MQC: mqc after shutdown. 
CMP-SCRUB.A1 12hr MQCS COMPLETED: n/a
CMP-SCRUB.A1 12hr MQCS NEXT DUE : n/a

CMP-SCRUB.A2 (On-track scrubber) - MQC: mqc after shutdown.
CMP-SCRUB.A2 12hr MQCS COMPLETED: n/a
CMP-SCRUB.A2 12hr MQCS NEXT DUE : n/a

CMP-SCRUB.A3 (On-track scrubber) - MQC: mqc after shutdown.
CMP-SCRUB.A3 12hr MQCS COMPLETED: n/a
CMP-SCRUB.A3 12hr MQCS NEXT DUE : n/a



Hot/B lots in area:
__________________
XD0502 - M3  HOT
JL0439 - PMD HOT

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - MQC
CMP.A2 - ROBOT PROBLEMS
CMP.B1 - MQC
CMP.B2 - MQC
CMP.B3 - MQC
CMP-SCRUB.A1 - MQC
CMP-SCRUB.A2 - MQC
CMP-SCRUB.A3 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0503 - STI

Monitor status:
--------------
1 box of 12k mqc wafers. Need to order more!

Number of product lots in room:
------------------------------
4

New specs/revs posted:
---------------------
* SEE TDCO BY CMP.B1*

Lots/wafers processed:
---------------------
* none *

# of carriers for strasbaugh/speedfam:
--------------------------------------
7 SPEEDFAM CARRIERS
7 STRASBAUGH CARRIERS
2 STRASBAUGH PLATES

79.13PASSDOWN CMP B-SHIFT 8/13/96FABSIX::M_PROVENCHERTue Aug 13 1996 07:21107

CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                25                  mqcs

        BREAKIN WAFERS              68                  misc



CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING JD0433 PMD
CMP.A1 24hr MQCS COMPLETED: @ 10 PM 8/13 
CMP.A1 24hr MQCS NEXT DUE : @ 10 PM 8/14

CMP.A2 (Strasbaugh 6DS-SP) - UP/
CMP.A2 24hr MQCS COMPLETED: 
CMP.A2 24hr MQCS NEXT DUE :



CMP.B1 (Speedfam CMP-V) - DOWN: PAD CHANGE, AND TWO CARRIERS REPLACED. NEEDS
 				MQC'S AFTER CRASH
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE :

CMP.B2 (Speedfam CMP-V) - MQC: PAD CHANGE. WILL NEED MQC'S AFTER CRASH
CMP.B2 24hr MQCS COMPLETED: n/a
CMP.B2 24hr MQCS NEXT DUE : n/a
CMP.B2 12hr MQCS COMPLETED: n/a
CMP.B2 12hr MQCS NEXT DUE : n/a

CMP.B3 (Speedfam CMP-V) - MQC: MQC'S ON GOING. HAD NUMEROUS PROBLEMS WITH TOOL 
CMP.B3 24hr MQCS COMPLETED: n/a
CMP.B3 24hr MQCS NEXT DUE : n/a
CMP.B3 12hr MQCS COMPLETED: n/a
CMP.B3 12hr MQCS NEXT DUE : n/a



CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE 
CMP-SCRUB.A1 12hr MQCS COMPLETED: @ 8PM 8/12
CMP-SCRUB.A1 12hr MQCS NEXT DUE : @ 8AM 8/13

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE
CMP-SCRUB.A2 12hr MQCS COMPLETED: @ 8PM 8/12
CMP-SCRUB.A2 12hr MQCS NEXT DUE : @ 8AM 8/13

CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE
CMP-SCRUB.A3 12hr MQCS COMPLETED: @ 8PM 8/12
CMP-SCRUB.A3 12hr MQCS NEXT DUE : @ 8AM 8/13



Hot/B lots in area:
__________________
XD0502 - M3  HOT (B2 AT TOUCH UP)

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
B2 - PAD CHANGE + MQC
B3 - MQC 
Scrap lots:
----------
*XD0502 M3 (HOT LOT) WAFERS #2, AND #6. VICTIMS OF B2 CRASH*

Hold Lots:
---------
XD0503 - STI

Monitor status:
--------------
2 BOXES of 12k mqc wafers. 2 BOXES ON ORDER 

Number of product lots in room:
------------------------------
5 LOTS

New specs/revs posted:
---------------------
* SEE TDCO BY CMP.B1*

Lots/wafers processed:
---------------------
* JL0439 PMD 24 WAFERS (HOT) *

# of carriers for strasbaugh/speedfam:
--------------------------------------
3 SPEEDFAM CARRIERS
7 STRASBAUGH CARRIERS
2 STRASBAUGH PLATES


79.14A-shift CMP passdown 8/13/96FABSIX::J_SADINFreedom isn't free.Tue Aug 13 1996 20:39109
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                25                  mqcs

        BREAKIN WAFERS              40                  misc



CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JL0434 (pmd).
CMP.A1 24hr MQCS COMPLETED: 12am 8/13
CMP.A1 24hr MQCS NEXT DUE : 12am 8/14

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JL0427 (m1).
CMP.A2 24hr MQCS COMPLETED: 5am 8/13
CMP.A2 24hr MQCS NEXT DUE : 5am 8/14



CMP.B1 (Speedfam CMP-V) - DOWN: scheduled down. Reps working on system all
day. 
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : when up.
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : when up. 

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0398 (m2).
CMP.B2 24hr MQCS COMPLETED: 10am 8/13
CMP.B2 24hr MQCS NEXT DUE : 10am 8/14
CMP.B2 12hr MQCS COMPLETED: 7:30pm 8/13
CMP.B2 12hr MQCS NEXT DUE : 7:30am 8/14

CMP.B3 (Speedfam CMP-V) - RUNNING: JL0436 (m2) and JD0376 (m3). 
CMP.B3 24hr MQCS COMPLETED: 9am 8/13
CMP.B3 24hr MQCS NEXT DUE : 9am 8/14
CMP.B3 12hr MQCS COMPLETED: 7:30pm 8/13
CMP.B3 12hr MQCS NEXT DUE : 7:30am 8/14



CMP-SCRUB.A1 (On-track scrubber) - IDLE. 
CMP-SCRUB.A1 12hr MQCS COMPLETED: 11:30am 8/13
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 11:30pm 8/13

CMP-SCRUB.A2 (On-track scrubber) - IDLE. 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 11:20am 8/13
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 11:20pm 8/13

CMP-SCRUB.A3 (On-track scrubber) - IDLE. 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 12:20am 8/13
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 12:20pm 8/13



Hot/B lots in area:
__________________
JL0436 - M2 HOT LOT (TREAT AS HOT LOT BUT WILL NOT SHOW UP AS HOT ON
WORKSTREAM. HAS RED TAG HOLDERS.)

Hot lots coming to area:
-----------------------
JL0430 - DEP ILD1 1

Static Lots in area:
-------------------
XD0503 - STI. HOLD FOR ENG.

Down Equipment:
--------------
CMP.B1 - DOWN TO SPEEDFAM.

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0503 - STI. HOLD FOR ENG.

Monitor status:
--------------
1 box of 12K mqc wafers. 4 more boxes on order.

Number of product lots in room:
------------------------------
8

New specs/revs posted:
---------------------
* SEE TDCO NEAR CMP.B1 *

Lots/wafers processed:
---------------------
JD0433 - PMD - 24WFRS
XD0475 - M1 - 24
JD0395 - M2 - 17
XD0502 - M3 - 18
JD0394 - M2 - 24

# of carriers for strasbaugh/speedfam:
--------------------------------------
3 SPEEDFAM CARRIERS
7 STRASBAUGH CARRIERS
2 STRASBAUGH PLATES

79.15PASSDOWN CMP.B-SHIFT 8/14/96FABSIX::M_PROVENCHERWed Aug 14 1996 07:55111

CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  mqcs

        BREAKIN WAFERS              60                  misc



CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING JD0421 PMD/JL0430 M1 (HOT LOT)
CMP.A1 24hr MQCS COMPLETED: @ 1:40 AM 8/14 
CMP.A1 24hr MQCS NEXT DUE : @ 1:40 AM 8/15

CMP.A2 (Strasbaugh 6DS-SP) - UP/MQC MQC'S IN PROCESS AFTER CRASH/PAD + CARRIERS
			     REPLACED
CMP.A2 24hr MQCS COMPLETED: N/A
CMP.A2 24hr MQCS NEXT DUE : N/A



CMP.B1 (Speedfam CMP-V) -  UP/24 HOUR MQC'S IN PROCESS
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - UP/MQC MQC'S IN PROCESS AFTER CRASH/PAD + CARRIERS #3,
                                 AND #4 REPLACED 
CMP.B2 24hr MQCS COMPLETED: n/a
CMP.B2 24hr MQCS NEXT DUE : n/a
CMP.B2 12hr MQCS COMPLETED: n/a
CMP.B2 12hr MQCS NEXT DUE : n/a

CMP.B3 (Speedfam CMP-V) - : DOWN POLISH TABLE BELT SLIPPING 
CMP.B3 24hr MQCS COMPLETED: n/a
CMP.B3 24hr MQCS NEXT DUE : n/a
CMP.B3 12hr MQCS COMPLETED: n/a
CMP.B3 12hr MQCS NEXT DUE : n/a



CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC'S PERFORMED 
CMP-SCRUB.A1 12hr MQCS COMPLETED: @ 8PM 8/12
CMP-SCRUB.A1 12hr MQCS NEXT DUE : @ 8AM 8/13

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
CMP-SCRUB.A2 12hr MQCS COMPLETED: @ 8PM 8/12
CMP-SCRUB.A2 12hr MQCS NEXT DUE : @ 8AM 8/13

CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
CMP-SCRUB.A3 12hr MQCS COMPLETED: @ 8PM 8/12
CMP-SCRUB.A3 12hr MQCS NEXT DUE : @ 8AM 8/13



Hot/B lots in area:
__________________
JL0430 M1 (A1)

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------

B3 - POLISH TABLE BELT SLIPPING 
Scrap lots:
----------
*NONE*

Hold Lots:
---------
XD0503 - STI

Monitor status:
--------------
1 BOX of 12k mqc wafers. 3 BOXES ON ORDER 

Number of product lots in room:
------------------------------
7 LOTS

New specs/revs posted:
---------------------
* SEE TDCO BY CMP.B1*

Lots/wafers processed:
---------------------
* JL0434 PMD 23 WAFERS *
  JL0428  M1 24 WAFERS
  JL0436  M2 22 WAFERS (HOT)
  JD0398  M2 24 WAFERS

# of carriers for strasbaugh/speedfam:
--------------------------------------
1 SPEEDFAM CARRIERS
5 STRASBAUGH CARRIERS
2 STRASBAUGH PLATES


79.16PASSDOWN CMP B-SHIFT 8/14/96FABSIX::M_PROVENCHERWed Aug 14 1996 07:59110

CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  mqcs

        BREAKIN WAFERS              60                  misc



CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING JD0421 PMD/JL0430 M1 (HOT LOT)
CMP.A1 24hr MQCS COMPLETED: @ 1:40 AM 8/14 
CMP.A1 24hr MQCS NEXT DUE : @ 1:40 AM 8/15

CMP.A2 (Strasbaugh 6DS-SP) - UP/MQC MQC'S IN PROCESS AFTER CRASH/PAD + CARRIERS
			     REPLACED
CMP.A2 24hr MQCS COMPLETED: N/A
CMP.A2 24hr MQCS NEXT DUE : N/A



CMP.B1 (Speedfam CMP-V) -  DOWN/ COMPUTER ERA 
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - UNSCD-DN/DOWN TO MAINT 
CMP.B2 24hr MQCS COMPLETED: n/a
CMP.B2 24hr MQCS NEXT DUE : n/a
CMP.B2 12hr MQCS COMPLETED: n/a
CMP.B2 12hr MQCS NEXT DUE : n/a

CMP.B3 (Speedfam CMP-V) - : DOWN POLISH TABLE BELT SLIPPING 
CMP.B3 24hr MQCS COMPLETED: n/a
CMP.B3 24hr MQCS NEXT DUE : n/a
CMP.B3 12hr MQCS COMPLETED: n/a
CMP.B3 12hr MQCS NEXT DUE : n/a



CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC'S PERFORMED 
CMP-SCRUB.A1 12hr MQCS COMPLETED: @ 8PM 8/12
CMP-SCRUB.A1 12hr MQCS NEXT DUE : @ 8AM 8/13

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
CMP-SCRUB.A2 12hr MQCS COMPLETED: @ 8PM 8/12
CMP-SCRUB.A2 12hr MQCS NEXT DUE : @ 8AM 8/13

CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
CMP-SCRUB.A3 12hr MQCS COMPLETED: @ 8PM 8/12
CMP-SCRUB.A3 12hr MQCS NEXT DUE : @ 8AM 8/13



Hot/B lots in area:
__________________
JL0430 M1 (A1)

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------

B3 - POLISH TABLE BELT SLIPPING 
Scrap lots:
----------
*NONE*

Hold Lots:
---------
XD0503 - STI

Monitor status:
--------------
1 BOX of 12k mqc wafers. 3 BOXES ON ORDER 

Number of product lots in room:
------------------------------
7 LOTS

New specs/revs posted:
---------------------
* SEE TDCO BY CMP.B1*

Lots/wafers processed:
---------------------
* JL0434 PMD 23 WAFERS *
  JL0428  M1 24 WAFERS
  JL0436  M2 22 WAFERS (HOT)
  JD0398  M2 24 WAFERS

# of carriers for strasbaugh/speedfam:
--------------------------------------
1 SPEEDFAM CARRIERS
5 STRASBAUGH CARRIERS
2 STRASBAUGH PLATES


79.17A-shift CMP passdown 8/14/96FABSIX::J_SADINFreedom isn't free.Wed Aug 14 1996 20:58109
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  mqcs

        BREAKIN WAFERS              40                  misc



CMP.A1 (Strasbaugh 6DS-SP) - MQC: running mqcs after pad change (one
carrier changed also).
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0405 (m2).
CMP.A2 24hr MQCS COMPLETED: 1pm 8/14
CMP.A2 24hr MQCS NEXT DUE : 1pm 8/15



CMP.B1 (Speedfam CMP-V) - VERIFY: needs recipes edited to match .b2/.b3 and
full breakins/mqcs.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0378 (m2).
CMP.B2 24hr MQCS COMPLETED: 6:30pm 8/14
CMP.B2 24hr MQCS NEXT DUE : 6:30pm 8/15
CMP.B2 12hr MQCS COMPLETED: due now
CMP.B2 12hr MQCS NEXT DUE : due now

CMP.B3 (Speedfam CMP-V) - VERIFY: needs full breakins and mqcs. Use this
system to copy recipes for CMP.B1.
CMP.B3 24hr MQCS COMPLETED: n/a
CMP.B3 24hr MQCS NEXT DUE : n/a
CMP.B3 12hr MQCS COMPLETED: n/a
CMP.B3 12hr MQCS NEXT DUE : n/a



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 11:40am 8/14
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 11:40pm 8/14

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 12:29pm 8/14
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 12:29am 8/15

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 11:30am 8/14
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 11:30pm 8/14



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
JD0305 - DEP_ILD3 1
** rocket lot will be here by 10pm!! keep a machine open for it per
management **

Static Lots in area:
-------------------
n/a

Down Equipment:
--------------
CMP.B1 - VERIFY
CMP.B3 - VERIFY
CMP.A1 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0503 - STI
XD0462 - BEING REWORKED AT FILMS. SEE PAUL SKOWRONSKI WITH QUESTIONS.

Monitor status:
--------------
2 boxes of 12K mqc wafers. 2 more on order.

Number of product lots in room:
------------------------------
18

New specs/revs posted:
---------------------
SEE TDCO NEAR CMP.B1

Lots/wafers processed:
---------------------
n/a

# of carriers for strasbaugh/speedfam:
--------------------------------------
???

79.18D SHIFT PASSDOWNFABSIX::D_CAUSEThu Aug 15 1996 08:3850
       
CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING JD0443 NEEDS 100% AND TOUCHUP   
                                                                       
CMP.A2 (Strasbaugh 6DS-SP) -UP/IDLE
        
CMP.B1 (Speedfam CMP-V) -  DOWN/PARTICLES

CMP.B2 (Speedfam CMP-V) - UP/RUNNING HOT LOT JD0305 IN TOUCHUP

CMP.B3 (Speedfam CMP-V) - UP/RUNNING JD0376 READY FOR TOUCHUP, JD0388 FIRST 
                                     PASS 400 COMPLETE.                       
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC COMPLETE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC COMPLETE
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE MQC COMPLETE

HOT/B lots in area:1
-------------------
JD0305
STATIC lots in area:14
--------------------

HOLD LOTS IN AREA:2
__________________

       
DOWN equipment:
---------------
CMP.B1/ PARTICLES

NUMBER of product lots in room:21

-------------------------------
           

LOTS COMPLETED : 6
----------------

BREAK IN WAFERS USED: 30

MQC WAFERS USED:40

MQC WAFERS AVAILABLE:11 WAFERS----A SHIFT ORDERED 50 AND D SHIFT ORDERED 50
ALSO 100 BREAKIN WAFERS ORDERED BY D SHIFT

----------


79.19CMP C-SHIFT PD. 8-15-96FABSIX::E_DAWSONThu Aug 15 1996 20:4640
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE - Needs MQC's
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE - Needs MQC's

CMP.B1 (Speedfam CMP-V) - DOWN - REPAIR   
			       
CMP.B2 (Speedfam CMP-V) - UP/IDLE - RUNNING 2 - JD0390 ILD3 Needs DRG. 
                                                JD0407 ILD2 100% Thick.A5.
                                                Mqc's, Offsets performed.
    
CMP.B3 (Speedfam CMP-V) - Running 2 - JD0414 ILD2 100% on Thick.A5
    				      JD0382 Scrubin / Scrub.A2 Needs100%

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area: 0           Lots in CMP: 13		
	------------------	        -----------	
   
	Lots Shiped: 12                 New SPEC/TDCO:
	-----------                     -------------
                                        POSTED @CMP.B1 "PLEASE READ"
    
	Down Equipment:                 Carriers:                       
	--------------                  --------
    	CMP.B1...REPAIR	                See Carrier PD.

	MQC Mon. Used: 6 	        MQC Monitors: 1 Box
    	-------------                   ------------
            
        Misc.
        ----
    	Hold lots:  
    	XD0503...STI, XD0462...P2, XD0508...P2
79.20C-SHIFT CMP PD. 8-16-96FABSIX::E_DAWSONFri Aug 16 1996 20:3838
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE - Mqc's performed.
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE - Mqc's performed.

CMP.B1 (Speedfam CMP-V) - UP/IDLE - DOWN - See E.E. PD.  
			       
CMP.B2 (Speedfam CMP-V) - UP/IDLE - Mqc's performed.

CMP.B3 (Speedfam CMP-V) - UP/IDLE - JD0425 ILD2 @ T-up
    				    XD0501 ILD3 @ t-up

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
      	Hot/B lots in area: 0           Lots in CMP: 7		
	------------------	        -----------	
   
	Lots Shiped: 13                 New SPEC/TDCO:
	-----------                     -------------
                                        POSTED @ CMP.B1 "PLEASE READ"
    
	Down Equipment:                 Carriers:
	--------------                  --------
        CMP.B1 - See E.E.	        See Carrier PD.

	MQC Mon. Used: 10 	        MQC Monitors:
    	-------------                   ------------
                                        3.5 Boxes
        Misc:
        ----
        Lots on Hold = XD0508..See PE.
                                              
79.21PASSDOWNFABSIX::D_CAUSESat Aug 17 1996 08:3347
       
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE   
                                                                       
CMP.A2 (Strasbaugh 6DS-SP) -UP/IDLE
        
CMP.B1 (Speedfam CMP-V) -  UP/IDLE MQC DONE

CMP.B2 (Speedfam CMP-V) - UP/RUNNING JD0389 M3 100% ON THICK.A5

CMP.B3 (Speedfam CMP-V) - DOWN/MONTHLY PM                   
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC COMPLETE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC COMPLETE JD0424 NEED DRG&FINAL
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE MQC COMPLETE

HOT/B lots in area:
-------------------

STATIC lots in area:0
--------------------

HOLD LOTS IN AREA:2
__________________

       
DOWN equipment:
---------------
CMP.B3 MONTHLY PM

NUMBER of product lots in room:2

-------------------------------
           

LOTS COMPLETED : 9
----------------

BREAK IN WAFERS USED: 15

MQC WAFERS USED:10


----------


79.22CMP C-SHIFT PD. 8/17/96FABSIX::E_DAWSONSat Aug 17 1996 20:2442
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE - Mqc's performed.
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE - Mqc's performed.

CMP.B1 (Speedfam CMP-V) - UP/IDLE - Needs Mqc's. @2:00am 
			       
CMP.B2 (Speedfam CMP-V) - PM - Monthly  

CMP.B3 (Speedfam CMP-V) - MQC - 

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
    
                              
      	Hot/B lots in area: 0           Lots in CMP: 1		
	------------------	        -----------	
                                        JD0377   "NO TAG"
    
	Lots Shiped: 5                  New SPEC/TDCO:
	-----------                     -------------
                                        Posted @ CMP.B1  "PLEASE READ"
    
	Down Equipment: 0               Carriers:       
	--------------                  --------
    		                        See Carrier PD.

	MQC Mon. Used: 10               MQC Monitors:
    	-------------                   ------------
                                        3.5 Boxes
    
        Misc:
        ----
        - Prometrix weekly mqc's performed on both thickness. 
    	- Four more lots of mqc wafers were ordered, there are 11~
          TM40 MA lots at ILD.   
        - XD0508 / Hold P2
79.23PASSDOWN CMP B-SHIFT 8/18/96FABSIX::M_PROVENCHERSun Aug 18 1996 07:40106

CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                31                  MQC'S

        BREAKIN WAFERS              65                  misc



CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING JL0446 PMD
CMP.A1 24hr MQCS COMPLETED: @ 1:40 AM 8/17 
CMP.A1 24hr MQCS NEXT DUE : @ 1:40 AM 8/18

CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE
CMP.A2 24hr MQCS COMPLETED: @ 9:30 AM 8/17
CMP.A2 24hr MQCS NEXT DUE : @ 9:30 AM 8/18



CMP.B1 (Speedfam CMP-V) -   UP/MQC (IN PROCESS) 
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) -   UP/ RUNNING JD0373 M2.5 (M3) 
CMP.B2 24hr MQCS COMPLETED: @ 4:00 AM 8/18
CMP.B2 24hr MQCS NEXT DUE : @ 4:00 AM 8/19
CMP.B2 12hr MQCS COMPLETED: @ 4:00 AM 8/18
CMP.B2 12hr MQCS NEXT DUE : @ 4:00 PM 8/18

CMP.B3 (Speedfam CMP-V) - : UP/RUNNING XD0500 M3/JD0420 M2 
CMP.B3 24hr MQCS COMPLETED: @ 5:00 AM 8/18
CMP.B3 24hr MQCS NEXT DUE : @ 5:00 AM 8/19
CMP.B3 12hr MQCS COMPLETED: @ 5:00 AM 8/18
CMP.B3 12hr MQCS NEXT DUE : @ 5:00 PM 8/18



CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC'S PERFORMED 
CMP-SCRUB.A1 12hr MQCS COMPLETED: @ 3AM 8/18
CMP-SCRUB.A1 12hr MQCS NEXT DUE : @ 3PM 8/19

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
CMP-SCRUB.A2 12hr MQCS COMPLETED: @ 3AM 8/18
CMP-SCRUB.A2 12hr MQCS NEXT DUE : @ 3PM 8/19

CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
CMP-SCRUB.A3 12hr MQCS COMPLETED: @ 3AM 8/18
CMP-SCRUB.A3 12hr MQCS NEXT DUE : @ 3PM 8/19



Hot/B lots in area:
__________________
* NONE *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* XD0508 HOLD P2*
  XD0503 HOLD - STI LOT
Down Equipment:
--------------
* NONE * 
Scrap lots:
----------
* NONE *

Hold Lots:
---------
XD0503 - STI
XD0508 - P2

Monitor status:
--------------
2 BOXES of 12k mqc wafers. 4 BOXES ON ORDER 

Number of product lots in room:
------------------------------
4 LOTS

New specs/revs posted:
---------------------
* SEE TDCO BY CMP.B1*

Lots/wafers processed:
---------------------
* JD0377 M2.5 (M3)*

# of carriers for strasbaugh/speedfam:
--------------------------------------
3 SPEEDFAM CARRIERS
9 STRASBAUGH CARRIERS
4 STRASBAUGH PLATES


79.24CMP A SHIFT PASSDOWNFABSIX::J_ROASun Aug 18 1996 20:45119

CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                11                  mqcs

        BREAKIN WAFERS              50                  misc



CMP.A1 (Strasbaugh 6DS-SP) - :Running JL0447 (PMD)

CMP.A1 24hr MQCS COMPLETED: 12:32 hours 8/18/96
CMP.A1 24hr MQCS NEXT DUE : 12:32 hours 8/19/96  

========================================================================
CMP.A2 (Strasbaugh 6DS-SP) - : Runnnig XD0516 (PMD)

CMP.A2 24hr MQCS COMPLETED: 14:45 hours 8/18/96
CMP.A2 24hr MQCS NEXT DUE : 14:45 hours 8/19/96

========================================================================


CMP.B1 (Speedfam CMP-V) - : Running JD0386 (M3)
 
CMP.B1 24hr MQCS COMPLETED:  11:33 hours 8/18/96
CMP.B1 24hr MQCS NEXT DUE :  11:33 hours 8/19/96
CMP.B1 12hr MQCS COMPLETED:  DONE
 

=========================================================================
CMP.B2 (Speedfam CMP-V) - : Running JD0393 (M3)

CMP.B2 24hr MQCS COMPLETED:   3:56 hours 8/18/96	
CMP.B2 24hr MQCS NEXT DUE :   3:56 hours 8/19/96
CMP.B2 12hr MQCS COMPLETED:   DONE 			


=========================================================================
CMP.B3 (Speedfam CMP-V) - :   IDLE

CMP.B3 24hr MQCS COMPLETED:    4:39 hours 8/18/96
CMP.B3 24hr MQCS NEXT DUE :    4:39 hours 8/19/96
CMP.B3 12hr MQCS COMPLETED:    DONE	

=========================================================================

CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED:  15:40 hours 8/18/96

=========================================================================
CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED:  15:40 hours 8/18/96


=========================================================================

CMP-SCRUB.A3 (On-track scrubber) - IDLE
CMP-SCRUB.A4 12hr MQCS COMPLETED:  15:40 hours 8/18/96

Hot/B lots in area:

__________________
hot lot JL0464

Hot lots coming to area:
-----------------------
* ROCKET *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------


Scrap lots:
----------
* none *

Hold Lots:
---------
XD0503 and XD0508 

Monitor status:
--------------
2 boxes of 12K mqc wafers  

Number of product lots in room:
------------------------------
7 lots

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------

XD0500 _ M3 - 23  WAFERS
JD0420 - M2 - 24  "
JD0433 _ M1 - 24  "
JD0373 - M25- 16  "
JL0477A- M2 -  6  "
JL0446 - PMD  24  "

# of carriers for strasbaugh/speedfam:
--------------------------------------
4  SPEEDFAM CARRIERS
11 STRASBAUGH CARRIERS


79.25PASSDOWN CMP B-SHIFT 8/19/96FABSIX::M_PROVENCHERMon Aug 19 1996 07:51112

CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                16                  MQC'S

        BREAKIN WAFERS              48                  misc



CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE
CMP.A1 24hr MQCS COMPLETED: @ 12:30 AM 8/18 
CMP.A1 24hr MQCS NEXT DUE : @ 12:30 AM 8/19

CMP.A2 (Strasbaugh 6DS-SP) - UP/MQC (CRASHED WHILE RUNNING XD0521)
			            PAD CHANGED CARRIERS REPLACED
CMP.A2 24hr MQCS COMPLETED: N/A
CMP.A2 24hr MQCS NEXT DUE : N/A



CMP.B1 (Speedfam CMP-V) -   UP/IDLE 
CMP.B1 24hr MQCS COMPLETED: @12:30 AM 8/18
CMP.B1 24hr MQCS NEXT DUE : @12:30 AM 8/19
CMP.B1 12hr MQCS COMPLETED: @ 4:00 AM 8/19
CMP.B1 12hr MQCS NEXT DUE : @ 4:00 PM 8/19

CMP.B2 (Speedfam CMP-V) -   UP/ RUNNING JL0439 M2 (TOUCH UP) 
CMP.B2 24hr MQCS COMPLETED: @ 4:00 AM 8/19
CMP.B2 24hr MQCS NEXT DUE : @ 4:00 AM 8/20
CMP.B2 12hr MQCS COMPLETED: @ 4:00 AM 8/19
CMP.B2 12hr MQCS NEXT DUE : @ 4:00 PM 8/19

CMP.B3 (Speedfam CMP-V) - : UP/IDLE 
CMP.B3 24hr MQCS COMPLETED: @ 6:00 AM 8/19
CMP.B3 24hr MQCS NEXT DUE : @ 6:00 AM 8/20
CMP.B3 12hr MQCS COMPLETED: @ 4:00 AM 8/19
CMP.B3 12hr MQCS NEXT DUE : @ 4:00 PM 8/29



CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC'S PERFORMED 
CMP-SCRUB.A1 12hr MQCS COMPLETED: @ 4:00 AM 8/19
CMP-SCRUB.A1 12hr MQCS NEXT DUE : @ 4:00 PM 8/19

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
CMP-SCRUB.A2 12hr MQCS COMPLETED: @ 4:00 AM 8/19
CMP-SCRUB.A2 12hr MQCS NEXT DUE : @ 4:00 PM 8/19

CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
CMP-SCRUB.A3 12hr MQCS COMPLETED: @ 4:00 AM 8/19
CMP-SCRUB.A3 12hr MQCS NEXT DUE : @ 4:00 PM 8/19



Hot/B lots in area:
__________________
* JL0439 (HOT) B2 TOUCH UP *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* XD0508 HOLD P2*
  XD0503 HOLD - STI LOT
Down Equipment:
--------------
* NONE * 
Scrap lots:
----------
* XD0521 (2 WAFERS) CRASH ON TOOL CMP A2 *

Hold Lots:
---------
XD0503 - STI                         
XD0508 - P2

Monitor status:
--------------
1 BOX of 12k mqc wafers. 1 ON ORDER  

Number of product lots in room:
------------------------------
2 LOTS

New specs/revs posted:
---------------------
* SEE TDCO BY CMP.B1*

Lots/wafers processed:
---------------------
* JL0447 PMD 24 WAFERS *
  XD0512 PMD 24 WAFERS
  JL0464  M1 12 WAFERS (HOT)
  JL0439  M2 23 WAFERS (HOT)
  JD0393  M3 24 WAFERS
  JD0386  M3 24 WAFERS

# of carriers for strasbaugh/speedfam:
--------------------------------------
4 SPEEDFAM CARRIERS
9 STRASBAUGH CARRIERS
4 STRASBAUGH PLATES


79.26A-shift CMP passdown 8/19/96FABSIX::J_SADINFreedom isn't free.Mon Aug 19 1996 20:47108
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  mqcs

        BREAKIN WAFERS              35                  misc



CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: XD0510 (pmd).
CMP.A1 24hr MQCS COMPLETED: 4:30pm 8/19
CMP.A1 24hr MQCS NEXT DUE : 4:30pm 8/20

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0508 (m1 - split).
CMP.A2 24hr MQCS COMPLETED: 11:30am 8/19
CMP.A2 24hr MQCS NEXT DUE : 11:30am 8/20



CMP.B1 (Speedfam CMP-V) - RUNNING: JL0438 (m1). 
CMP.B1 24hr MQCS COMPLETED: 1pm 8/19
CMP.B1 24hr MQCS NEXT DUE : 1pm 8/20
CMP.B1 12hr MQCS COMPLETED: 1pm 8/19
CMP.B1 12hr MQCS NEXT DUE : 1am 8/20

CMP.B2 (Speedfam CMP-V) - IDLE.
CMP.B2 24hr MQCS COMPLETED: 3:30am 8/19
CMP.B2 24hr MQCS NEXT DUE : 3:30am 8/20
CMP.B2 12hr MQCS COMPLETED: 7pm 8/19
CMP.B2 12hr MQCS NEXT DUE : 7am 8/20

CMP.B3 (Speedfam CMP-V) - RUNNING: XD0506 (m2).
CMP.B3 24hr MQCS COMPLETED: 4:30am 8/19
CMP.B3 24hr MQCS NEXT DUE : 4:30am 8/20
CMP.B3 12hr MQCS COMPLETED: 7:30pm 8/19
CMP.B3 12hr MQCS NEXT DUE : 7:30am 8/20



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 7:30pm 8/19
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 7:30am 8/20

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 7:30pm 8/19
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 7:30am 8/20

CMP-SCRUB.A3 (On-track scrubber) - IDLE. 
CMP-SCRUB.A3 12hr MQCS COMPLETED: 7:30pm 8/19
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 7:30am 8/20



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0508 - HOLD FOR ERIC BODENSIECK (6 WAY SPLIT LOT).

Monitor status:
--------------
2 boxes of 12K mqc wafers.

Number of product lots in room:
------------------------------
9

New specs/revs posted:
---------------------
TDCO POSTED BY CMP.B1.

Lots/wafers processed:
---------------------
XD0521 - PMD - 22WFRS
XD0503 - STI - 19
JD0431 - M1 - 24
JD0392 - M3 - 24
JD0400 - M2 - 23 
XD0507 - M2 - 22

# of carriers for strasbaugh/speedfam:
--------------------------------------
2 SPEEDFAM CARRIERS
4 STRASBAUGH CARRIERS
3 STRASBAUGH PLATES

79.27PASSDOWN CMP B-SHIFT 8/20/96FABSIX::M_PROVENCHERTue Aug 20 1996 07:45112

CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                16                  MQC'S

        BREAKIN WAFERS              49                  misc



CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING XD0522 PMD
CMP.A1 24hr MQCS COMPLETED: @  4:30 PM 8/19 
CMP.A1 24hr MQCS NEXT DUE : @  4:30 PM 8/20

CMP.A2 (Strasbaugh 6DS-SP) - UP/RUNNING XD0494 PMD
CMP.A2 24hr MQCS COMPLETED: @ 11:30 AM 8/19 
CMP.A2 24hr MQCS NEXT DUE : @ 11:30 AM 8/20



CMP.B1 (Speedfam CMP-V) -   UP/MQC (CRASHED @ 5:00 AM) HEADS 1,AND 5 REPLACED 
CMP.B1 24hr MQCS COMPLETED: IN PROCESS
CMP.B1 24hr MQCS NEXT DUE : "        "
CMP.B1 12hr MQCS COMPLETED: @ 6:00 AM 8/20
CMP.B1 12hr MQCS NEXT DUE : @ 6:00 PM 8/20

CMP.B2 (Speedfam CMP-V) -   UP/ RUNNING JL0428 M2/JD0493 M3 
CMP.B2 24hr MQCS COMPLETED: @ 6:00 AM 8/20
CMP.B2 24hr MQCS NEXT DUE : @ 6:00 AM 8/21
CMP.B2 12hr MQCS COMPLETED: @ 6:00 AM 8/20
CMP.B2 12hr MQCS NEXT DUE : @ 6:00 PM 8/20

CMP.B3 (Speedfam CMP-V) - : UP/RUNNING  JL0434 M2/JD0395 M3
CMP.B3 24hr MQCS COMPLETED: @ 6:00 AM 8/20
CMP.B3 24hr MQCS NEXT DUE : @ 6:00 AM 8/21
CMP.B3 12hr MQCS COMPLETED: @ 6:00 AM 8/20
CMP.B3 12hr MQCS NEXT DUE : @ 6:00 PM 8/20



CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC'S PERFORMED 
CMP-SCRUB.A1 12hr MQCS COMPLETED: @ 6:30 AM 8/20
CMP-SCRUB.A1 12hr MQCS NEXT DUE : @ 6:30 PM 8/20

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
CMP-SCRUB.A2 12hr MQCS COMPLETED: @ 6:30 AM 8/20
CMP-SCRUB.A2 12hr MQCS NEXT DUE : @ 6:30 PM 8/20

CMP-SCRUB.A3 (On-track scrubber) - DOWN/UNSCHED (WAITING FOR PARTS)
CMP-SCRUB.A3 12hr MQCS COMPLETED: N/A
CMP-SCRUB.A3 12hr MQCS NEXT DUE : N/A
                                      


Hot/B lots in area:
__________________
* NONE*

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* NONE*

Down Equipment:
--------------
* CMP-SCRUB.A3 *
 
Scrap lots:
----------
* JL0428 M2 (2 WAFERS) CRASH ON TOOL CMP B1 *

Hold Lots:
---------
XD0508 - FOR ERIC B.

Monitor status:
--------------
3 BOXES of 12k mqc wafers. 3 ON ORDER  

Number of product lots in room:
------------------------------
6 LOTS

New specs/revs posted:
---------------------
* SEE TDCO BY CMP.B1*

Lots/wafers processed:
---------------------
* XD0510 PMD 22 WAFERS
  JL0477 PMD  6 WAFERS
  JL0445 PMD 24 WAFERS
  JD0421  M1 24 WAFERS
  JL0438  M1 24 WAFERS
  XD0506  M2 19 WAFERS
  JD0397  M3 24 WAFERS

# of carriers for strasbaugh/speedfam:
--------------------------------------
0 SPEEDFAM CARRIERS
4 STRASBAUGH CARRIERS
3 STRASBAUGH PLATES


79.28A-shift CMP passdown 8/20/96FABSIX::J_SADINFreedom isn't free.Tue Aug 20 1996 20:49117
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  mqc

        BREAKIN WAFERS              35                  misc



CMP.A1 (Strasbaugh 6DS-SP) - DOWN: failed mqcs for high unif. Replacing
pad.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - IDLE.
CMP.A2 24hr MQCS COMPLETED: needs mqcs now! ran eng work all day.
CMP.A2 24hr MQCS NEXT DUE : needs mqcs now! ran eng work all day.



CMP.B1 (Speedfam CMP-V) - DOWN: head one not rotating. Parts on order.
Machine can be run with only heads 2,3,4,5 if absolutely necessary.
CMP.B1 24hr MQCS COMPLETED: 7:45am 8/20
CMP.B1 24hr MQCS NEXT DUE : 7:45am 8/21
CMP.B1 12hr MQCS COMPLETED: 6am 8/20
CMP.B1 12hr MQCS NEXT DUE : now

CMP.B2 (Speedfam CMP-V) - IDLE.
CMP.B2 24hr MQCS COMPLETED: 6am 8/20
CMP.B2 24hr MQCS NEXT DUE : 6am 8/21
CMP.B2 12hr MQCS COMPLETED: 6pm 8/20
CMP.B2 12hr MQCS NEXT DUE : 6am 8/21

CMP.B3 (Speedfam CMP-V) - RUNNING: JL0427 (m2).
CMP.B3 24hr MQCS COMPLETED: 6am 8/20
CMP.B3 24hr MQCS NEXT DUE : 6am 8/21
CMP.B3 12hr MQCS COMPLETED: 2:30pm 8/20
CMP.B3 12hr MQCS NEXT DUE : 2:30am 8/21



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 5pm 8/20
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 5am 8/21

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 5pm 8/20
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 5am 8/21

CMP-SCRUB.A3 (On-track scrubber) - DOWN: rep will be in tomorrow morning to
fix the tool.
CMP-SCRUB.A3 12hr MQCS COMPLETED: n/a
CMP-SCRUB.A3 12hr MQCS NEXT DUE : n/a



Hot/B lots in area:
__________________
JL0430 - M2 HOT (*ONLY MEASURE ON THICKNESS.A5. THICK.A4 IS NOT OPTIMIZED
FOR THIS DEVICE YET*).

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.B1 - CARRIER ONE ROTATION
CMP.A1 - BAD UNIF AFTER MQCS
CMP-SCRUB.A3 - DOWN FOR REP TO FIX IN AM.

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0508 - DONE POLISHING! HOLD FOR ENG FOR EXTENSIVE P2 MEASUREMENTS.

Monitor status:
--------------
3 BOXES OF 12K MQC WAFERS. BUNCHES ON ORDER.

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
TDCO POSTED NEXT TO CMP.B1

Lots/wafers processed:
---------------------
XD0517 - PMD - 24WFRS
XD0522 - PMD - 24
XD0508 - M1 - 24 
XD0494 - PMD - 18 
JL0387B - M1 - 12
JL0428 - M2 - 22
JD0394 - M3 - 24 
JL0434 - M1 - 23
JD0395 - M3 - 17

# of carriers for strasbaugh/speedfam:
--------------------------------------
0 SPEEDFAM CARRIERS
4 STRASBAUGH CARRIERS
3 STRASBAUGH PLATES

79.29PASSDOWNFABSIX::D_CAUSEThu Aug 22 1996 08:4147
       
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE MQC COMPLETE   
                                                                       
CMP.A2 (Strasbaugh 6DS-SP) -UP/IDLE MQC COMPLETE
        
CMP.B1 (Speedfam CMP-V) -  UP/IDLE MQC COMPLETE

CMP.B2 (Speedfam CMP-V) - UP/RUNNING JD0399 SEND AHEADS 

CMP.B3 (Speedfam CMP-V) - UP/IN MQC WAFERS BEING EVALUATED    
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC COMPLETE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC COMPLETE 
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE MQC COMPLETE

HOT/B lots in area:0
-------------------

STATIC lots in area:0
--------------------

HOLD LOTS IN AREA:0
__________________

       
DOWN equipment:
---------------


NUMBER of product lots in room:1

-------------------------------
           

LOTS COMPLETED : 3
----------------

BREAK IN WAFERS USED: 15

MQC WAFERS USED:21
MQC WAFERS AVAIL:1 BOX

----------


79.30A-shift CMP passdown 8/25/96FABSIX::J_SADINFreedom isn't free.Sun Aug 25 1996 20:21102
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  mqcs

        BREAKIN WAFERS              30                  misc



CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: YD0172 (m1).
CMP.A1 24hr MQCS COMPLETED: 3:30pm 8/25
CMP.A1 24hr MQCS NEXT DUE : 3:30pm 8/26

CMP.A2 (Strasbaugh 6DS-SP) - MQC: running mqcs.
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V) - RUNNING: XD0517 (m1).
CMP.B1 24hr MQCS COMPLETED: 3am 8/25
CMP.B1 24hr MQCS NEXT DUE : 3am 8/26
CMP.B1 12hr MQCS COMPLETED: 7:15pm 8/25
CMP.B1 12hr MQCS NEXT DUE : 7:15am 8/26

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0425 (m3).
CMP.B2 24hr MQCS COMPLETED: 9am 8/25
CMP.B2 24hr MQCS NEXT DUE : 9am 8/26
CMP.B2 12hr MQCS COMPLETED: 7pm 8/25
CMP.B2 12hr MQCS NEXT DUE : 7am 8/26

CMP.B3 (Speedfam CMP-V) - RUNNING: JL0463 (m1) and JD0400 (m3).
CMP.B3 24hr MQCS COMPLETED: 5:15am 8/25
CMP.B3 24hr MQCS NEXT DUE : 5:15am 8/26
CMP.B3 12hr MQCS COMPLETED: 7:30pm 8/25
CMP.B3 12hr MQCS NEXT DUE : 7:30am 8/26



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 7:30pm 8/25
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 7:30am 8/26

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 7:30pm 8/25
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 7:30am 8/26

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 7:30pm 8/25
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 7:30am 8/26



Hot/B lots in area:
__________________
JL0463 - HOT M1

Hot lots coming to area:
-----------------------
JD0440 - DEP_M2

Static Lots in area:
-------------------
XD0519 - 2.4DAYS (ON HOLD FOR ENG)

Down Equipment:
--------------
CMP.A2 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0519 - HOLD FOR ENG.

Monitor status:
--------------
5 boxes of 12K mqc wafers.

Number of product lots in room:
------------------------------
9

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XM0515 - PMD - 24WFRS
JD0466 - PMD - 19

# of carriers for strasbaugh/speedfam:
--------------------------------------
?????

79.31PASSDOWN CMP B-SHIFT 8/26/96FABSIX::M_PROVENCHERMon Aug 26 1996 08:04113

CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                21                  MQC'S

        BREAKIN WAFERS              49                  misc



CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING JL0465 PMD
CMP.A1 24hr MQCS COMPLETED: @  3:30 PM 8/25 
CMP.A1 24hr MQCS NEXT DUE : @  3:30 PM 8/26

CMP.A2 (Strasbaugh 6DS-SP) - UP/RUNNING XD0518 PMD 
CMP.A2 24hr MQCS COMPLETED: @  8:00 PM 8/25 
CMP.A2 24hr MQCS NEXT DUE : @  8:00 PM 8/26



CMP.B1 (Speedfam CMP-V) -   UP/IDLE  
CMP.B1 24hr MQCS COMPLETED: @  7:00 AM 8/26
CMP.B1 24hr MQCS NEXT DUE : @  7:00 AM 8/27
CMP.B1 12hr MQCS COMPLETED: @  3:00 AM 8/26
CMP.B1 12hr MQCS NEXT DUE : @  3:00 PM 8/26

CMP.B2 (Speedfam CMP-V) -   UP/MQC 
CMP.B2 24hr MQCS COMPLETED: IN PROCESS
CMP.B2 24hr MQCS NEXT DUE : "        "
CMP.B2 12hr MQCS COMPLETED: @ 4:00 AM 8/26
CMP.B2 12hr MQCS NEXT DUE : @ 4:00 PM 8/26

CMP.B3 (Speedfam CMP-V) - : UP/RUNNING JD0377 M3
CMP.B3 24hr MQCS COMPLETED: @ 6:30 AM 8/25
CMP.B3 24hr MQCS NEXT DUE : @ 6:30 AM 8/26
CMP.B3 12hr MQCS COMPLETED: @ 6:00 AM 8/26
CMP.B3 12hr MQCS NEXT DUE : @ 6:00 PM 8/26



CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC'S PERFORMED 
CMP-SCRUB.A1 12hr MQCS COMPLETED: @ 7:00 AM 8/25
CMP-SCRUB.A1 12hr MQCS NEXT DUE : @ 7:00 PM 8/25

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
CMP-SCRUB.A2 12hr MQCS COMPLETED: @ 7:00 AM 8/25
CMP-SCRUB.A2 12hr MQCS NEXT DUE : @ 7:00 PM 8/25

CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
CMP-SCRUB.A3 12hr MQCS COMPLETED: @ 7:00 AM 8/25
CMP-SCRUB.A3 12hr MQCS NEXT DUE : @ 7:00 AM 8/25



Hot/B lots in area:
__________________
* NONE*

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* NONE*

Down Equipment:
--------------
* NONE*
 
Scrap lots:
----------
* NONE*

Hold Lots:
---------
* XD0519 M1 HOLD FOR F.KRUPA, SEE REMARKS

Monitor status:
--------------
4 BOXES of 12k mqc wafers.   

Number of product lots in room:
------------------------------
5 LOTS

New specs/revs posted:
---------------------
* SEE TDCO BY CMP.B1*

Lots/wafers processed:
---------------------
*JD0467 PMD 24 WAFERS
 JL0463  M1 24 WAFERS (HOT)
 YD0172  M1 14 WAFERS
 XD0517  M1 24 WAFERS
 XD0522  M1 24 WAFERS
 JL0417  M2 21 WAFERS
 JD0400  M3 23 WAFERS
 JD0425  M3 21 WAFERS
 
# of carriers for strasbaugh/speedfam:
--------------------------------------
12 SPEEDFAM CARRIERS
 2 STRASBAUGH CARRIERS
 ? STRASBAUGH PLATES


79.32A-shift CMP passdown 8/26/96FABSIX::J_SADINFreedom isn't free.Mon Aug 26 1996 20:36108
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  mqcs

        BREAKIN WAFERS              35                  misc



CMP.A1 (Strasbaugh 6DS-SP) - VERIFY: running breakins and mqcs after
pad/carrier change.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - MQC: running third set of mqcs (high unif but
good center fast 3d map).
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V) - RUNNING: JD0431 (m2).
CMP.B1 24hr MQCS COMPLETED: 6:50am 8/26
CMP.B1 24hr MQCS NEXT DUE : 6:50am 8/27
CMP.B1 12hr MQCS COMPLETED: 3:50pm 8/26
CMP.B1 12hr MQCS NEXT DUE : 3:50am 8/27

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0373 (m3).
CMP.B2 24hr MQCS COMPLETED: 10am 8/26
CMP.B2 24hr MQCS NEXT DUE : 10am 8/27
CMP.B2 12hr MQCS COMPLETED: 10am 8/26
CMP.B2 12hr MQCS NEXT DUE : 10pm 8/26

CMP.B3 (Speedfam CMP-V) - RUNNING: XD0506 (m3).
CMP.B3 24hr MQCS COMPLETED: 6:30am 8/26
CMP.B3 24hr MQCS NEXT DUE : 6:30am 8/27
CMP.B3 12hr MQCS COMPLETED: 3:55pm 8/26
CMP.B3 12hr MQCS NEXT DUE : 3:55am 8/27



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 7:30pm 8/26
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 7:30am 8/27

CMP-SCRUB.A2 (On-track scrubber) - IDLE. 
CMP-SCRUB.A2 12hr MQCS COMPLETED: 7:30pm 8/26
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 7:30am 8/27

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 7:30pm 8/26
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 7:30am 8/27



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
JD0440 - DEP_ILD2 1

Static Lots in area:
-------------------
XD0519 - 3.4 DAYS (ENG RUNNING NOW)

Down Equipment:
--------------
CMP.A1 - VERIFY AFTER PAD/CARRIER CHANGE.

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
7 boxes of 12K monitors.

Number of product lots in room:
------------------------------
8

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JL0465 - PMD - 24WFRS
XD0518 - PMD - 24
XD0459 - M3 - 15
XD0507 - M3 - 22
JD0377 - M3 - 23

# of carriers for strasbaugh/speedfam:
--------------------------------------
10 SPEEDFAM CARRIERS
3 STRASBAUGH CARRIERS (SOME ON HOLD FOR KYLE - PRE-PUNCHED FILM)
?? STRASBAUGH PLATES
79.33PASSDOWN CMP B-SHIFT 8/27/96FABSIX::M_PROVENCHERTue Aug 27 1996 07:23112

CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                21                  MQC'S

        BREAKIN WAFERS              62                  misc



CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING JL0451 PMD
CMP.A1 24hr MQCS COMPLETED: @  9:00 PM 8/26 
CMP.A1 24hr MQCS NEXT DUE : @  9:00 PM 8/27

CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE 
CMP.A2 24hr MQCS COMPLETED: @  8:00 PM 8/26 
CMP.A2 24hr MQCS NEXT DUE : @  8:00 PM 8/27



CMP.B1 (Speedfam CMP-V) -   UP/IDLE  
CMP.B1 24hr MQCS COMPLETED: @  5:00 AM 8/27
CMP.B1 24hr MQCS NEXT DUE : @  5:00 AM 8/28
CMP.B1 12hr MQCS COMPLETED: @  5:00 AM 8/27
CMP.B1 12hr MQCS NEXT DUE : @  5:00 PM 8/27

CMP.B2 (Speedfam CMP-V) -   UP/IDLE 
CMP.B2 24hr MQCS COMPLETED: @ 10:00 AM 8/26
CMP.B2 24hr MQCS NEXT DUE : @ 10:00 AM 8/27   
CMP.B2 12hr MQCS COMPLETED: @ 10:00 PM 8/26
CMP.B2 12hr MQCS NEXT DUE : @ 10:00 AM 8/27

CMP.B3 (Speedfam CMP-V) - : UP/IDLE
CMP.B3 24hr MQCS COMPLETED: @ 6:30 AM 8/27
CMP.B3 24hr MQCS NEXT DUE : @ 6:30 AM 8/28
CMP.B3 12hr MQCS COMPLETED: @ 5:00 AM 8/27
CMP.B3 12hr MQCS NEXT DUE : @ 5:00 PM 8/27



CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC'S PERFORMED 
CMP-SCRUB.A1 12hr MQCS COMPLETED: @ 7:00 AM 8/27
CMP-SCRUB.A1 12hr MQCS NEXT DUE : @ 7:00 PM 8/27

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
CMP-SCRUB.A2 12hr MQCS COMPLETED: @ 7:00 AM 8/27
CMP-SCRUB.A2 12hr MQCS NEXT DUE : @ 7:00 PM 8/27

CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
CMP-SCRUB.A3 12hr MQCS COMPLETED: @ 7:00 AM 8/27
CMP-SCRUB.A3 12hr MQCS NEXT DUE : @ 7:00 AM 8/27



Hot/B lots in area:
__________________
* NONE*

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* NONE*

Down Equipment:
--------------
* NONE*
 
Scrap lots:
----------
* NONE*

Hold Lots:
---------
* NONE *

Monitor status:
--------------
6 BOXES of 12k mqc wafers.   

Number of product lots in room:
------------------------------
1 LOT

New specs/revs posted:
---------------------
* SEE TDCO BY CMP.B1*

Lots/wafers processed:
---------------------
*JL0472 PMD 23 WAFERS*
 JL0470 PMD 24 WAFERS
 JL0456  M1 24 WAFERS
 JL0477  M1  6 WAFERS
 JD0431  M2 24 WAFERS
 XD0506  M3 19 WAFERS
 JD0373  M3 21 WAFERS
 
# of carriers for strasbaugh/speedfam:
--------------------------------------
 7 SPEEDFAM CARRIERS
 2 STRASBAUGH CARRIERS
 ? STRASBAUGH PLATES


79.34A-shift CMP passdown 8/27/96FABSIX::J_SADINFreedom isn't free.Tue Aug 27 1996 20:24108
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  mqcs

        BREAKIN WAFERS              25                  misc



CMP.A1 (Strasbaugh 6DS-SP) - IDLE.
CMP.A1 24hr MQCS COMPLETED: 9pm 8/26
CMP.A1 24hr MQCS NEXT DUE : 9pm 8/27

CMP.A2 (Strasbaugh 6DS-SP) - MQC: running 24hr mqcs. 
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V) - IDLE.
CMP.B1 24hr MQCS COMPLETED: 5am 8/27
CMP.B1 24hr MQCS NEXT DUE : 5am 8/28
CMP.B1 12hr MQCS COMPLETED: 5pm 8/27
CMP.B1 12hr MQCS NEXT DUE : 5am 8/28

CMP.B2 (Speedfam CMP-V) - RUNNING: JL0438 (m2).
CMP.B2 24hr MQCS COMPLETED: 10:30am 8/27
CMP.B2 24hr MQCS NEXT DUE : 10:30am 8/28
CMP.B2 12hr MQCS COMPLETED: 10:30am 8/27
CMP.B2 12hr MQCS NEXT DUE : 19:30pm 8/27

CMP.B3 (Speedfam CMP-V) - IDLE.
CMP.B3 24hr MQCS COMPLETED: 7am 8/27
CMP.B3 24hr MQCS NEXT DUE : 7am 8/28
CMP.B3 12hr MQCS COMPLETED: 5pm 8/27
CMP.B3 12hr MQCS NEXT DUE : 5am 8/28



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 10am 8/27
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 10pm 8/27

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 10am 8/27
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 10pm 8/27

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 10am 8/27
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 10pm 8/27



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
JD0441 - DEP_ILD1 1
JD0440 - DEP_ILD2 2

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A2 - MQCS

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
6 boxes of 12K wafers.

Number of product lots in room:
------------------------------
2

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JL0448 - PMD - 21WFRS
JL0451 - PMD - 24
XD0527 - PMD - 24
XE0524 - PMD - 24
JL0434 - M2 - 23
JL0447 - M1 - 24

# of carriers for strasbaugh/speedfam:
--------------------------------------
7 SPEEDFAM CARRIERS 
2 STRASBAUGH CARRIERS

79.35PASSDOWN CMP B-SHIFT 8/28/96FABSIX::M_PROVENCHERWed Aug 28 1996 07:56108

CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                21                  MQC'S

        BREAKIN WAFERS              56                  misc



CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING JD0454 M1 
CMP.A1 24hr MQCS COMPLETED: @  9:00 PM 8/27 
CMP.A1 24hr MQCS NEXT DUE : @  9:00 PM 8/28

CMP.A2 (Strasbaugh 6DS-SP) - UP/RUNNING JD0441 M1 (HOT) 
CMP.A2 24hr MQCS COMPLETED: @  8:00 PM 8/27 
CMP.A2 24hr MQCS NEXT DUE : @  8:00 PM 8/28



CMP.B1 (Speedfam CMP-V) - DOWN/REPAIR CRASH WILL NEED MQC'S    
CMP.B1 24hr MQCS COMPLETED: N/A
CMP.B1 24hr MQCS NEXT DUE : N/A
CMP.B1 12hr MQCS COMPLETED: N/A
CMP.B1 12hr MQCS NEXT DUE : N/A

CMP.B2 (Speedfam CMP-V) -   UP/RUNNING XL0525 M1 (HOT) 
CMP.B2 24hr MQCS COMPLETED: @ 10:00 AM 8/27
CMP.B2 24hr MQCS NEXT DUE : @ 10:00 AM 8/28   
CMP.B2 12hr MQCS COMPLETED: @ 10:30 PM 8/28
CMP.B2 12hr MQCS NEXT DUE : @ 10:30 AM 8/29

CMP.B3 (Speedfam CMP-V) - : UP/MQC FAILED FIRST SET (HIGH UNIFORMITY)
CMP.B3 24hr MQCS COMPLETED: IN PROCESS
CMP.B3 24hr MQCS NEXT DUE : "        "
CMP.B3 12hr MQCS COMPLETED: "        "
CMP.B3 12hr MQCS NEXT DUE : "        "



CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC'S PERFORMED 
CMP-SCRUB.A1 12hr MQCS COMPLETED: @ 7:00 AM 8/27
CMP-SCRUB.A1 12hr MQCS NEXT DUE : @ 7:00 PM 8/27

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
CMP-SCRUB.A2 12hr MQCS COMPLETED: @ 7:00 AM 8/27
CMP-SCRUB.A2 12hr MQCS NEXT DUE : @ 7:00 PM 8/27

CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE MQC'S PERFORMED
CMP-SCRUB.A3 12hr MQCS COMPLETED: @ 7:00 AM 8/27
CMP-SCRUB.A3 12hr MQCS NEXT DUE : @ 7:00 AM 8/27



Hot/B lots in area:
__________________
* XL0525 M1 (B2)*
  JD0441 M1 (A2) 

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* NONE*

Down Equipment:
--------------
* CMP.B1 *

Scrap lots:
----------
* NONE*

Hold Lots:
---------
* NONE *

Monitor status:
--------------
5 BOXES of 12k mqc wafers.   

Number of product lots in room:
------------------------------
5 LOTS

New specs/revs posted:
---------------------
* SEE TDCO BY CMP.B1*

Lots/wafers processed:
---------------------
*JL0438  M2 24 WAFERS *
 XD0475  M3 24 WAFERS
 
# of carriers for strasbaugh/speedfam:
--------------------------------------
 5 SPEEDFAM CARRIERS
 2 STRASBAUGH CARRIERS
 ? STRASBAUGH PLATES


79.36A-shift CMP passdown 8/28/96FABSIX::J_SADINFreedom isn't free.Wed Aug 28 1996 20:34112
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                40                  mqcs

        BREAKIN WAFERS              50                  misc



CMP.A1 (Strasbaugh 6DS-SP) - MQC: failed first set of mqcs for high
uniformity (new pad). Center fast removal tho'. Running more breakins and
will need to rerun mqcs.
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : n/a

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JL0458 (m1) and JD0454 (m1). 
CMP.A2 24hr MQCS COMPLETED: 8pm 8/27
CMP.A2 24hr MQCS NEXT DUE : 8pm 8/28



CMP.B1 (Speedfam CMP-V) - MQC: running 2nd set of mqcs after changing
carrier #2. Particles in, unif too high.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a
CMP.B1 12hr MQCS NEXT DUE : n/a

CMP.B2 (Speedfam CMP-V) - MQC: running 2nd set of mqcs after changing both
pads. 
CMP.B2 24hr MQCS COMPLETED: n/a
CMP.B2 24hr MQCS NEXT DUE : n/a
CMP.B2 12hr MQCS COMPLETED: n/a
CMP.B2 12hr MQCS NEXT DUE : n/a

CMP.B3 (Speedfam CMP-V) - RUNNING: JL0477C (m2), XD0512 (m1), and JD0452
(m1).
CMP.B3 24hr MQCS COMPLETED: 3:40pm 8/28
CMP.B3 24hr MQCS NEXT DUE : 3:40pm 8/29
CMP.B3 12hr MQCS COMPLETED: 3:40pm 8/28
CMP.B3 12hr MQCS NEXT DUE : 3:40am 8/29



CMP-SCRUB.A1 (On-track scrubber) - IDLE.
CMP-SCRUB.A1 12hr MQCS COMPLETED: 11:30am 8/28
CMP-SCRUB.A1 12hr MQCS NEXT DUE : 11:30pm 8/28

CMP-SCRUB.A2 (On-track scrubber) - IDLE.
CMP-SCRUB.A2 12hr MQCS COMPLETED: 11:30am 8/28
CMP-SCRUB.A2 12hr MQCS NEXT DUE : 11:30pm 8/28

CMP-SCRUB.A3 (On-track scrubber) - IDLE.
CMP-SCRUB.A3 12hr MQCS COMPLETED: 11:30am 8/28
CMP-SCRUB.A3 12hr MQCS NEXT DUE : 11:30pm 8/28



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
JL0465 - DEP_M1

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.B2 - MQC AFTER BOTH PADS CHANGED.
CMP.B1 - MQC AFTER CARRIER#2 CHANGED.
CMP.A1 - MQC AFTER PAD CHANGE.

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
5 boxes of 12K mqc wafers.

Number of product lots in room:
------------------------------
8

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0441 - M1 - 23WFRS
XD0527 - PMD - 24
XD0510 - M1 - 22
XL0525 - M1 - 12

# of carriers for strasbaugh/speedfam:
--------------------------------------
4 SPEEDFAM CARRIERS
2 STRASBAUGH CARRIERS

79.37D SHIFT PASSDOWNFABSIX::D_CAUSESat Aug 31 1996 08:3348
       
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE    
                                                                       
CMP.A2 (Strasbaugh 6DS-SP) -UP/IDLE 
        
CMP.B1 (Speedfam CMP-V) -  UP/IDLE MQC COMPLETE

CMP.B2 (Speedfam CMP-V) - UP/RUNNING XD0462 FIRST 300 SEC DONE MEASURMENTS A4
                          MQC COMPLETE 

CMP.B3 (Speedfam CMP-V) - UP/IDLE
                          
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC COMPLETE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE MQC COMPLETE 
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE MQC COMPLETE

HOT/B lots in area:0
-------------------

STATIC lots in area:0
--------------------

HOLD LOTS IN AREA:0
__________________

       
DOWN equipment:0
---------------


NUMBER of product lots in room:1

-------------------------------
           

LOTS COMPLETED : 9
----------------

BREAK IN WAFERS USED: 25

MQC WAFERS USED:11
MQC WAFERS AVAIL:2.5 BOX

----------