[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Conference asdg::cmp

Title:CMP
Notice:Welcome to the CMP notesfile
Moderator:FABSIX::B_TOWERLLE
Created:Tue Oct 31 1995
Last Modified:Fri Jun 06 1997
Last Successful Update:Fri Jun 06 1997
Number of topics:94
Total number of notes:6381

74.0. "Ops passdowns - May 1996" by SUBPAC::SADIN (Freedom isn't free.) Tue Apr 30 1996 20:38

    
    
    	This note is reserved for CMP ops passdowns for May 1996.
    
    
    
T.RTitleUserPersonal
Name
DateLines
74.15/5/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONESun May 05 1996 08:1974
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 15            cmp.a1/.b1/scrub

        BREAKIN WAFERS               100               misc

	BROKEN PRODUCT WAFERS	     2          REASON FOR CRASH IS UNKNOWN  

CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING YD0163 M1

CMP.A2 (Strasbaugh 6DS-SP) - UP MQC WITH NEW PAD AND CARRIERS AFTER CRASH
                             LOT JD0218 PMD HAS 2 WAFERS THAT NEED TO BE 
                             SCRAPED WHEN THE LOT IS PROCTED OUT OF POLISH. 

CMP.B1 (Speedfam CMP-V) - UP RUNNING JD0168 M3
                                
CMP.B2 (SPEEDFAM CMP-V) - UP IDLE    

CMP-SCRUB.A1 (On-track scrubber) - IDLE
CMP-SCRUB.A2 (On-track scrubber) - IDLE


Hot/B lots in area:
___________________
* NONE *

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
--------------------
JD0184 M2 NO TAG

Down Equipment:
--------------
* NONE *

Scrap lots:
----------- 
* NONE *

Hold Lots:
---------
* NONE * 

Monitor status:
---------------
3 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
4

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
-----------------------
7 lots

# of carriers for strasbaugh/speedfam:
-------------------------------------
13 spare carriers for CMP.B1/B2
6  full carriers for CMP.A1/.A2
7  filmed and shimed for CMP.A1/.A2
74.2A-shift CMP passdown 5/5/96SUBPAC::SADINFreedom isn't free.Sun May 05 1996 20:0773
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  cmp.a2/.b2/scrub

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0220 (pmd) and JD0193 (m1).

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0212 (pmd). 

CMP.B1 (Speedfam CMP-V) - RUNNING: JD0168 (m3) and JD0161 (m3).

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0209 (m3).

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
JD0209 (M3)
JD0220 (PMD)

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
5 boxes of 12K monitors

Number of product lots in room:
------------------------------
10

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0218 - PMD - 22WFRS
YD0163 - M1 - 24WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------

13 carriers for speedfam
4 full carriers for strasbaugh
7 plates shimmed and filmed for strasbaugh
74.35/6/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONEMon May 06 1996 08:3184
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 18              cmp.a1/.b1/scrub

        BREAKIN WAFERS               100               misc

	BROKEN PRODUCT WAFERS	     2          REASON FOR CRASH IS UNKNOWN  

CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING JD0203 M1 + JD0196 M1

CMP.A2 (Strasbaugh 6DS-SP) - UP MQC WITH NEW PAD AND CARRIERS AFTER CRASH
                             LOT JD0226 PMD HAS 2 WAFERS THAT WERE SCRAPED.  
			     LOT JD0195 M1 IS PROCED INTO THIS TOOL.

CMP.B1 (Speedfam CMP-V) - UP RUNNING JD0180 + JD0185 BOTH M2
                                
CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING JD0170 M3

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S PERFORMED
CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S PERFORMED


Hot/B lots in area:
___________________
* NONE *

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
--------------------
* NONE *

Down Equipment:
--------------
* NONE *

Scrap lots:
----------- 
JD0226 PMD HAD 2 WAFERS SCRAPPED AT POLISH

Hold Lots:
---------
* NONE * 

Monitor status:
---------------
2 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
11

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
-----------------------
JD0212 PMD 24W
JD0220 PMD 24W
JD0222 PMD 24W
JD0226 PMD 22W
JD0193 M1 24W
XD0445 M2 24W
JD0184 M2 22W
JD0161 M3 21W
JD0209 M3 24W
JD0168 M3 22W


# of carriers for strasbaugh/speedfam:
-------------------------------------
13 spare carriers for CMP.B1/B2
?  full carriers for CMP.A1/.A2
?  filmed and shimed for CMP.A1/.A2
74.4A-shift CMP passdown 5/06/96SUBPAC::SADINFreedom isn't free.Mon May 06 1996 20:3382
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  cmp.a2/.b2/scrb

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0203 (m2).

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0456 (pmd).

CMP.B1 (Speedfam CMP-V) - RUNNING: JD0195 (m1).

CMP.B2 (Speedfam CMP-V) - RUNNING: XD0442 (m3).

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
* none * 

Hot lots coming to area:
-----------------------
XD0469 (PMD - HOT)
JD0206 (ILD2 1 - BLOT)

Static Lots in area:
-------------------
JD0195 - 0.8DAYS
JD0182 - 0.9DAYS (NO TAG)
JD0181 - 0.7DAYS (NO TAG)

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
2.5 boxes of 12K monitor wafers.

Number of product lots in room:
------------------------------
11

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0196 - M1 - 20WFRS
JD0203 - M1 - 22
JD0180 - M2 - 24
JD0185 - M2 - 24
JD0170 - M3 - 24


# of carriers for strasbaugh/speedfam:
--------------------------------------
13 SPARE CARRIERS FOR SPEEDFAM
0 CARRIERS BUILT FOR STRASBAUGH
FYI:
 * PLATES THAT ARE BUILT FOR STRASBAUGH HAVE NO GREEN PLUGS IN THEM. THEY
WILL NEED TO HAVE THE FILMS STRIPPED OFF AND BE REBUILT. PUSHING PLUGS INTO
THE PLATES NOW WOULD CAUSE BUBBLES UNDER THE FILM. *

74.55/7/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONETue May 07 1996 08:1484
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 10              cmp.a1/.b1/scrub

        BREAKIN WAFERS               50               misc

	BROKEN PRODUCT WAFERS	     0            

CMP.A1 (Strasbaugh 6DS-SP) - UP MQC, AFTER PAD CHANGE

CMP.A2 (Strasbaugh 6DS-SP) - UP RUNNING XD0453 M1

CMP.B1 (Speedfam CMP-V) - UP MQC, 12HR
                                
CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING JD0171 + JD0167 BOTH M3

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S PERFORMED
CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S PERFORMED


Hot/B lots in area:
___________________
JD0206 M2 B LOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
--------------------
JD0227 PMD NO TAG
JD0225 PMD NO TAG            
JD0206 M2 NO TAG B LOT
    
Down Equipment:
--------------
* NONE *

Scrap lots:
----------- 
* NONE *

Hold Lots:
---------
* NONE * 

Monitor status:
---------------
2 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
7

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
-----------------------
JD0216 PMD 24W
XD0223 PMD 24W
XD0456 PMD 24W
XD0469 PMD 23W
JD0198 M1 24W
JD0195 M1 24W
JD0181 M2 24W
JD0182 M2 24W
JD0189 M2 23W
XD0442 M3 23W

# of carriers for strasbaugh/speedfam:
-------------------------------------
13 spare carriers for CMP.B1/B2
0  full carriers for CMP.A1/.A2
0  filmed and shimed for CMP.A1/.A2
 
74.6A-shift CMP passdown 5/7/96SUBPAC::SADINFreedom isn't free.Tue May 07 1996 20:2773
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                14                  cmp.b2/.a2/scrb

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0225 (pmd). 

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0227 (pmd) and JD0206 (m2).

CMP.B1 (Speedfam CMP-V) - RUNNING: JD0211 (m2) and XD0463 (m3).

CMP.B2 (Speedfam CMP-V) - MQC: running mqcs.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
JD0211 - HOT
JD0206 - B

Hot lots coming to area:
-----------------------
JD0169 - ILD3 2

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.B2 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
2 boxes of 12K monitor wafers.

Number of product lots in room:
------------------------------
10

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0453 - M1 - 22WFRS
YD0162 - M3 - 24WFRS
JD0167 - M3 - 23WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
13 SPEEDFAM CARRIERS
O STRASBAUGH CARRIERS

74.75/8/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONEWed May 08 1996 08:4080
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 10              cmp.a1/.b1/scrub

        BREAKIN WAFERS               75               misc

	BROKEN PRODUCT WAFERS	     3              NOT A CRASH                       

CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING XD0461 PMD TOUCH UP

CMP.A2 (Strasbaugh 6DS-SP) - UP MQC 

CMP.B1 (Speedfam CMP-V) - UP RUNNING XD0463 M3 TOUCH UP
                                
CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING JD0097 M3 + JD0169 M3

CMP-SCRUB.A1 (On-track scrubber) - IDLE
CMP-SCRUB.A2 (On-track scrubber) - IDLE


Hot/B lots in area:
___________________
JD0169 M3
JD0211 M2

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
--------------------
* NONE *

Down Equipment:
--------------
* NONE *

Scrap lots:
----------- 
JD0169 M3 HOT LOT 3 WAFERS BROKEN

Hold Lots:
---------
* NONE * 

Monitor status:
---------------
2 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
5

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
-----------------------
7 LOTS

# of carriers for strasbaugh/speedfam:
-------------------------------------
13 spare carriers for CMP.B1/B2
0  full carriers for CMP.A1/.A2
0  filmed and shimed for CMP.A1/.A2


	Last night thickness.A4 and .A5 both gave us problems measuring lots.
They either kicked out the measurement sites or they did not have a GOF that
was acceptable. That is if they got that far for they also would not measure
their recognition sites. 
  	
74.8CMP A SHIFT PASSDOWNFABSIX::J_ROAWed May 08 1996 20:3684

               -< A shift CMP passdown - Wednesday  05/8/96 >-
--------------------------------------------------------------------------------
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        		
        MQC-12K MONS            15	                      cmp.b1 mqcs
				
        BREAKIN WAFERS          75                          cmp.b1 breakin

                
                 Built carriers and plates available.
                 -----------------------------------

                  4 FULL CARRIERS BUILT ( STRASBAUGH ) 
              ------------------------------------------

               11 SPEEDFAM B1 AND B2 CARRIERS AVAILABLE 



CMP.A1 (Strasbaugh 6DS-SP) - MQC: Running machine quality checks

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: Final polishing lot JD0191/m2.
Lot JD0224 is being measured 100% and will need to be touched up


CMP.B1 (Speedfam CMP-V) -  IDLE/UP:   ( Mqc's done on this tool )


CMP.B2 (Speefam CMP_V ) - IDLE/UP:    ( Mqc's will be needed after 8:30 PM )


CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE: 


CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE:

                  

Hot/B lots in area:
__________________



Hot lots coming to area:
-----------------------


Static Lots in area:
-------------------
2 lots without tags

Down Equipment:
--------------



Scrap lots:
----------

Hold Lots:
---------


Monitor status:
--------------



Number of product lots in room:
------------------------------
 6 LOTS

New specs/revs posted:
---------------------


74.9D SHIFT PASSDOWNFABSIX::D_CAUSEFri May 10 1996 06:4940
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE
                                                                                                           
CMP.A2 (Strasbaugh 6DS-SP) - UP/MQC FAILED FIRST TIME FOR UNIFORMITY AND 
                             SCRATCHES. WAITING FOR MQC WAFERS.
        
CMP.B1 (Speedfam CMP-V) - UP/IDLE

CMP.B2 (Speedfam CMP-V)- UP/RUNNING LOT JD0200 100% ON A.5 
                         
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  MQC DONE

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  MQC DONE
 
HOT/B lots in area: 
-------------------

HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:2
--------------------

HOLD LOTS IN AREA:

__________________
       
DOWN equipment: 
---------------
---------------
  

NUMBER of product lots in room:3
-------------------------------
           

LOTS COMPLETED : 7
----------------
74.105/12/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONESun May 12 1996 08:2173
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 15              cmp.a1/.b1/scrub

        BREAKIN WAFERS               75               misc

	BROKEN PRODUCT WAFERS	     0                                    

CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING XD0469 M1 

CMP.A2 (Strasbaugh 6DS-SP) - UP RUNNING YD0167 M1 B LOT

CMP.B1 (Speedfam CMP-V) - UP RUNNING JD0197 M2
                                
CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING JD0217 M2

CMP-SCRUB.A1 (On-track scrubber) - IDLE
CMP-SCRUB.A2 (On-track scrubber) - IDLE


Hot/B lots in area:
___________________
YD0167 M1 B LOT
XD0469 M1 B LOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
--------------------
* NONE *

Down Equipment:
--------------
* NONE *

Scrap lots:
----------- 
* NONE *

Hold Lots:
---------
* NONE * 

Monitor status:
---------------
2 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
7

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
-----------------------
6 LOTS

# of carriers for strasbaugh/speedfam:
-------------------------------------
13 spare carriers for CMP.B1/B2
0  full carriers for CMP.A1/.A2
  	
74.11A-shift CMP passdown 5/12/96SUBPAC::SADINFreedom isn&#039;t free.Sun May 12 1996 20:2276
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  cmp.a1/.a2/scrb/.b1

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - IDLE. 

CMP.A2 (Strasbaugh 6DS-SP) -  MQC: running mqcs after pad change.

CMP.B1 (Speedfam CMP-V) - RUNNING: JD0265 (pmd - hot) for touchups.

CMP.B2 (Speedfam CMP-V) - IDLE. 

CMP-SCRUB.A1 (On-track scrubber) - IDLE. 

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
JD0265 - HOT

Hot lots coming to area:
-----------------------
JD0220 - ILD2_2

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
2 boxes of 12K monitor wafers

Number of product lots in room:
------------------------------
1

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0469 - M1 - 23WFRS 
JD0239 - PMD - 24
YD0167 - M1 - 24
JD0265 - PMD - 24
JD0242 - PMD - 24
JD0197 - M2 - 24
JD0217 - M1 - 24

# of carriers for strasbaugh/speedfam:
--------------------------------------
4 STRASBAUGH CARRIERS 
3 SPEEDFAM CARRIERS

74.125/13/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONEMon May 13 1996 06:4272
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 6              cmp.a1/.b1/scrub

        BREAKIN WAFERS               75               misc

	BROKEN PRODUCT WAFERS	     0                                    

CMP.A1 (Strasbaugh 6DS-SP) - UP IDLE 

CMP.A2 (Strasbaugh 6DS-SP) - UP IDLE

CMP.B1 (Speedfam CMP-V) - UP RUNNING JD0218 M1
                                
CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING JD0179 M3 + JD0220 M2 HOT LOT

CMP-SCRUB.A1 (On-track scrubber) - IDLE
CMP-SCRUB.A2 (On-track scrubber) - IDLE


Hot/B lots in area:
___________________
JD0220 M2 HOT LOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
--------------------
* NONE *

Down Equipment:
--------------
* NONE *

Scrap lots:
----------- 
* NONE *

Hold Lots:
---------
* NONE * 

Monitor status:
---------------
1 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
4

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
-----------------------
1 LOTS

# of carriers for strasbaugh/speedfam:
-------------------------------------
6  spare carriers for CMP.B1/B2
4  full carriers for CMP.A1/.A2
2  PLATES FOR CMP.A1/.A2  	
74.13A-shift CMP passdown 5/13/96SUBPAC::SADINFreedom isn&#039;t free.Mon May 13 1996 20:4196
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 15                 .b2/.b1/scrb

        BREAKIN WAFERS              100                 misc


** note ** please read comments at end of passdown!! Important m3
processing information there. 

CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: XD0456 (m1). 

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0240 (pmd).

CMP.B1 (Speedfam CMP-V) - RUNNING: JD0178 (m3) and JD0193 (m2).

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0179 (m3).

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
XD0468 - UPP ILD1-1 HOT
JD0206 - DEP_ILD3-1 BLOT

Static Lots in area:
-------------------
JD0179 - 0.8DAYS

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
1 box of mqc wafers

Number of product lots in room:
------------------------------
11

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0222 - M1 - 24WFRS
XD0458 - PMD - 24
JD0218 - M1 - 22
JD0220 - M2 - 24 

# of carriers for strasbaugh/speedfam:
--------------------------------------
6 SPEEDFAM CARRIERS
4 STRASBAUGH CARRIERS
2 STRASBAUGH PLATES


** note ** M3 lots have been getting the edges severly polished which in
turn is messing up contact etch (contacts are not getting etched fully,
hence yield loss). So, per engineering please do the following:

        ON M3 LOTS ONLY! Adjust the id/od to get a good center-fast polish.
Run send ahead wafers to make sure that you are not removing more off the
edge than in the center! If you are unsure, run mqcs with the new id/od
settings and look at the 3d maps to verify center fast polishing. PLEASE
INFORM THE ONCOMING SHIFT OF THE NEW ID/OD SETTINGS AND WHAT RECIPES THEY
ARE IN. 

        Center the id/od around 115 (11.5 on CMP.B1 with new software). The
id should be no less than 95 (9.5) and the od should be no greater than 135
(13.5). Make sure they are equidistant from 115 (11.5).

        Any questions should be directed to Frank Krupa (SUBPAC::KRUPA).

74.145/14/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONETue May 14 1996 08:2072
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 2              cmp.a1/.b1/scrub

        BREAKIN WAFERS               50               misc

	BROKEN PRODUCT WAFERS	     0                                    

CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING JD0244 PMD

CMP.A2 (Strasbaugh 6DS-SP) - UP IDLE

CMP.B1 (Speedfam CMP-V) - UP RUNNING JD0196 M2 + XD0468 M1 HOT LOT BOTH AT 100%
                                
CMP.B2 (SPEEDFAM CMP-V) - UP IDLE

CMP-SCRUB.A1 (On-track scrubber) - IDLE
CMP-SCRUB.A2 (On-track scrubber) - IDLE


Hot/B lots in area:
___________________
XD0468 M1 HOT LOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
--------------------
* NONE *

Down Equipment:
--------------
* NONE *

Scrap lots:
----------- 
* NONE *

Hold Lots:
---------
* NONE * 

Monitor status:
---------------
1 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
5

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
-----------------------
9 LOTS

# of carriers for strasbaugh/speedfam:
-------------------------------------
6  spare carriers for CMP.B1/B2
2  full carriers for CMP.A1/.A2
2  PLATES FOR CMP.A1/.A2  	
74.15A-shift CMP passdown 5/14/96SUBPAC::SADINFreedom isn&#039;t free.Tue May 14 1996 20:0792
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 20                 polish tools/scrubba

        BREAKIN WAFERS              100                 misc

** please see important M3 processing information at end of passdown **

CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0243 (pmd).

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0247 (pmd).

CMP.B1 (Speedfam CMP-V) - RUNNING:  JD0226 (m1). 

CMP.B2 (Speedfam CMP-V) - IDLE.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
0 mqc wafers on hand. two more boxes on order. check status in
ASDG::FAB6_WAFERSTARTS notesfile and in workstream.

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0185 - M3 - 24WFRS
JD0244 - PMD - 23
JD0196 - M2 - 20
XD0468 - M1 - 23

# of carriers for strasbaugh/speedfam:
--------------------------------------
6 speedfam carriers
2 strasbaugh carriers
2 strasbaugh plates

** note ** M3 lots have been getting the edges severly polished which in
turn is messing up contact etch (contacts are not getting etched fully,
hence yield loss). So, per engineering please do the following:

        ON M3 LOTS ONLY! Adjust the id/od to get a good center-fast polish.
Run send ahead wafers to make sure that you are not removing more off the
edge than in the center! If you are unsure, run mqcs with the new id/od
settings and look at the 3d maps to verify center fast polishing. PLEASE
INFORM THE ONCOMING SHIFT OF THE NEW ID/OD SETTINGS AND WHAT RECIPES THEY
ARE IN. 

        Center the id/od around 115 (11.5 on CMP.B1 with new software). The
id should be no less than 95 (9.5) and the od should be no greater than 135
(13.5). Make sure they are equidistant from 115 (11.5).

        Any questions should be directed to Frank Krupa (SUBPAC::KRUPA).
74.16D SHIFT PASSDOWNFABSIX::D_CAUSEWed May 15 1996 07:4341
CMP.A1 (Strasbaugh 6DS-SP) - DOWN/MONTHLY PM
                                                                                                         
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE
        
CMP.B1 (Speedfam CMP-V) - UP/RUNNING JD0203  LOT 100% ON A.4

CMP.B2 (Speedfam CMP-V)- UP/IDLE
                         
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  MQC DONE

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  MQC DONE
 
HOT/B lots in area: 
-------------------

HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:1 PMD NO T TAG
--------------------

HOLD LOTS IN AREA:

__________________
       
DOWN equipment: A.1 MONTHLY PM
---------------
---------------
  

NUMBER of product lots in room:2
-------------------------------
           

LOTS COMPLETED : 7
----------------

***MQC WAFERS 100 ORDERED "0" INHOUSE***
74.17D SHIFT PASSDOWNFABSIX::D_CAUSEFri May 17 1996 08:4943
CMP.A1 (Strasbaugh 6DS-SP) - DOWN/LEFT SPINDLE TO LOW CAUSEING ROBOT TO HIT
                                  CARRIER
                                                                       
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE NEEDS MQC
        
CMP.B1 (Speedfam CMP-V) - UP/RUNNING JD0220 HOT 100% ON A5 READY FOR TOUCHUP
                             WAFERS IN SLOTS 5-9 HAVE SCRATCHES PSS NOTIFIED
                             WAITING FOR FURTHER INSPECTION

CMP.B2 (Speedfam CMP-V)- VERIFY-U RUNNING 50 WAFERS FOR VERIFY
                         
CMP-SCRUB.A1 (On-track scrubber) - DOWN/EQUIPMENT SHUTTING DOWN WITHOUT ERROR
                                       MQC DONE
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  MQC DONE
 
HOT/B lots in area:1 
-------------------
JD0220

HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:6
--------------------

HOLD LOTS IN AREA:

__________________
       
DOWN equipment: A.1 SPINDLE/ SCRUB A1 SHUTTING DOWN/ B2 VERIFY
---------------
---------------
  

NUMBER of product lots in room:7
-------------------------------
           

LOTS COMPLETED : 5
----------------

74.185/19/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONESun May 19 1996 08:3577
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 6              cmp.a1/.b1/scrub

        BREAKIN WAFERS               58               misc

	BROKEN PRODUCT WAFERS	     1		    CARRIER                                    

CMP.A1 (Strasbaugh 6DS-SP) - UP IDLE 

CMP.A2 (Strasbaugh 6DS-SP) - UP MQC, REPLACED 1 CARRIER IT SHOULD COME BACK UP
                                     FAST, PAST UNIF. NOW CHECKING PARTICLES

CMP.B1 (Speedfam CMP-V) - UP IDLE
                                
CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING JD0204 M2

CMP-SCRUB.A1 (On-track scrubber) - IDLE
CMP-SCRUB.A2 (On-track scrubber) - IDLE


Hot/B lots in area:
___________________
JD0212 HOT LOT NEEDS FINAL MEASURMENTS

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
--------------------
JD0252 PMD NO TAG
JD0257 PMD NO TAG (NEEDS SPECIAL RECIPE ON UV1050 SEE REMARK)
JD0219 PMD NO TAG
JD0259 PMD NO TAG
YD0166 M2 (SEE REMARK)

Down Equipment:
--------------
* NONE *

Scrap lots:
----------- 
JD0227 M1 BROKE 1 WAFER ON CMP.A2

Hold Lots:
---------
* NONE * 

Monitor status:
---------------
1 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
8

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
-----------------------
4 LOTS

# of carriers for strasbaugh/speedfam:
-------------------------------------
13  spare carriers for CMP.B1/B2
6  full carriers for CMP.A1/.A2
2  PLATES FOR CMP.A1/.A2  	
74.19CMP A SHIFT PASSDOWNFABSIX::J_ROASun May 19 1996 20:2787

               -< A shift CMP passdown - Sunday  05/19/96 >-
--------------------------------------------------------------------------------
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        		
        MQC-12K MONS            15	                      cmp.b1 mqcs
				
        BREAKIN WAFERS          75                          cmp.b1 breakin

                
                 Built carriers and plates available.
                 -----------------------------------

                  6 FULL CARRIERS BUILT ( STRASBAUGH ) 
              ------------------------------------------

               9 SPEEDFAM B1 AND B2 CARRIERS AVAILABLE 



CMP.A1 (Strasbaugh 6DS-SP) - IDLE/UP:


CMP.A2 (Strasbaugh 6DS-SP) - UP/MQC: Monitors need to be read on thickness.a5
and the data need to be combined.

CMP.B1 (Speedfam CMP-V) -  RUNNING: PMD lot JD0252 running for 25 seconds.
Lot JD0208 is been measured 100% on thickness.A4. It will have to be touched
when done with all the measurements.


CMP.B2 (Speefam CMP_V ) - RUNNING: Lot JD0193 running through 2nd. polish run


CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE: 


CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE:

                  

Hot/B lots in area:
__________________
B LOT JD0193


Hot lots coming to area:
-----------------------


Static Lots in area:
-------------------
2 PMD lots without tags

Down Equipment:
--------------



Scrap lots:
----------

Hold Lots:
---------
Lot YD0166 on hold per remark ( Larry Camilletti needs to be present
while processing this lot.)

Monitor status:
--------------



Number of product lots in room:
------------------------------
 8 LOTS

New specs/revs posted:
---------------------


74.205/20/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONEMon May 20 1996 08:0973
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 11              cmp.a1/.b1/scrub

        BREAKIN WAFERS               55               misc

	BROKEN PRODUCT WAFERS	     0		                                       

CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING JD0232 M1

CMP.A2 (Strasbaugh 6DS-SP) - UP RUNNING JD0259 PMD

CMP.B1 (Speedfam CMP-V) - UP RUNNING JD0228 M1
                                
CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING JD0221 M1 + JD0188 M3

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S PERFORMED
CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S PERFORMED


Hot/B lots in area:
___________________
* NONE *

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
--------------------
JD0219 PMD NO TAG
JD0260 PMD NO TAG

Down Equipment:
--------------
* NONE *

Scrap lots:
----------- 
* NONE *

Hold Lots:
---------
YD0166 ON HOLD (LARRY CAM. MUST BE PRESENT WHILE LOT IS BEING RUN)  

Monitor status:
---------------
1/2 BOX OF MQC WAFERS

Number of product lots in room:
------------------------------
7

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
-----------------------
4 LOTS

# of carriers for strasbaugh/speedfam:
-------------------------------------
12  spare carriers for CMP.B1/B2
4  full carriers for CMP.A1/.A2
2  PLATES FOR CMP.A1/.A2  	
74.21A-shift CMP passdown 5/20/96SUBPAC::SADINFreedom isn&#039;t free.Mon May 20 1996 20:2874
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                5                   cmp.b2

        BREAKIN WAFERS              75                  misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0200 (m2).

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0215 (m2).

CMP.B1 (Speedfam CMP-V) - RUNNING: JD0195 (m3).

CMP.B2 (Speedfam CMP-V) - MQC: running mqcs after wafer crash.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
JD0195 - BLOT

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
JD0219 - PMD (NO TAG)

Down Equipment:
--------------
CMP.B2 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
YD0166 - HOLD FOR ENG (LOT IS BEING SCRAPPED)

Monitor status:
--------------
* none * WE HAVE SIX 12K LOTS SITTING AT NOVELLUS WAITING FOR DEP. WE ARE
GETTING ONE LOT FROM P5000 UNTIL NOVELLUS CAN START OUR LOTS. 

Number of product lots in room:
------------------------------
10

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0232 - M1 - 24WFRS
JD0259 - PMD- 24
JD0205 - M2 - 24
JD0228 - M1 - 23

# of carriers for strasbaugh/speedfam:
--------------------------------------
4 STRASBAUGH CARRIERS
11 SPEEDFAM CARRIERS

74.225/21/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONETue May 21 1996 08:3276
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 14              cmp.a1/.b1/scrub

        BREAKIN WAFERS               100               misc

	BROKEN PRODUCT WAFERS	     0		                                       

CMP.A1 (Strasbaugh 6DS-SP) - UP MQC

CMP.A2 (Strasbaugh 6DS-SP) - UP RUNNING JD0215 M2 + JD0200 M2 

CMP.B1 (Speedfam CMP-V) - UP RUNNING JD0189 M3
                                
CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING JD0219 PMD


	*LOT YD0168 M1 IS BEING 100% ON UV1050.  SOME OF THE WAFERS MAY 
	 NEED TO BE REMARKED.*

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S PERFORMED
CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S PERFORMED


Hot/B lots in area:
___________________
* NONE *

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
--------------------
3 PMD'S NO TAG

Down Equipment:
--------------
* NONE *

Scrap lots:
----------- 
* NONE *

Hold Lots:
---------
YD0166 ON HOLD (LARRY CAM. MUST BE PRESENT WHILE LOT IS BEING RUN)  

Monitor status:
---------------
2 BOX OF MQC WAFERS

Number of product lots in room:
------------------------------
7

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
-----------------------
2 LOTS

# of carriers for strasbaugh/speedfam:
-------------------------------------
11  spare carriers for CMP.B1/B2
1   full carriers for CMP.A1/.A2
2   PLATES FOR CMP.A1/.A2  	
74.23A-shift CMP passdown 5/21/96SUBPAC::SADINFreedom isn&#039;t free.Tue May 21 1996 20:1977
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                12                  cmp tools

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: YD0163 (m2). 

CMP.A2 (Strasbaugh 6DS-SP) - IDLE.

CMP.B1 (Speedfam CMP-V) - RUNNING: JD0217 (m2). 

CMP.B2 (Speedfam CMP-V) - DOWN: main vac problems. EE techs looking into it
now...

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
XD0468 - DEP_ILD3 2

Static Lots in area:
-------------------
XD0464 - 1.3DAYS
JD0260 - 1.6     NO T-TAGS
JD0258 - 0.9

Down Equipment:
--------------
CMP.B2 - MAIN VAC PROBLEMS.

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
� box of 12K wafers.

Number of product lots in room:
------------------------------
9

New specs/revs posted:
---------------------
* none * 

Lots/wafers processed:
---------------------
JD0200 - M2 - 24
JD0215 - M2 - 23
JD0189 - M3 - 23
JD0219 - PMD- 12

# of carriers for strasbaugh/speedfam:
--------------------------------------
11 CARRIERS FOR SPEEDFAM
1 CARRIER FOR STRASBAUGH
2 PLATES FOR STRASBAUGH

74.245/22/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONEWed May 22 1996 08:3973
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 15              cmp.a1/.b1/scrub

        BREAKIN WAFERS               110               misc

	BROKEN PRODUCT WAFERS	     0		                                       

CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING JD0234 M1 + YD0163 M2 NEEDS TOUCH UP

CMP.A2 (Strasbaugh 6DS-SP) - UP MQC, NEW PAD 

CMP.B1 (Speedfam CMP-V) - UP RUNNING JD0260 PMD + JD0214 M2
                                
CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING JD0192 M3 + XD0468 M3 TOUCH UP HOT LOT

CMP-SCRUB.A1 (On-track scrubber) - IDLE
CMP-SCRUB.A2 (On-track scrubber) - IDLE


Hot/B lots in area:
___________________
XD0468 M3 RUNNING TOUCH UP HOT LOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
--------------------
3 PMD'S NO TAG
1 M1,M2 AND M3 NO MACHINE

Down Equipment:
--------------
* NONE *

Scrap lots:
----------- 
LOT YD0163 NEEDS TOUCH UPS HOWEVER 4 WAFERS ARE OVER POLISHED

Hold Lots:
---------
YD0166 ON HOLD (LARRY CAM. MUST BE PRESENT WHILE LOT IS BEING RUN)  

Monitor status:
---------------
0 BOX OF MQC WAFERS

Number of product lots in room:
------------------------------
14

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
-----------------------
4 LOTS

# of carriers for strasbaugh/speedfam:
-------------------------------------
11  spare carriers for CMP.B1/B2
0   full carriers for CMP.A1/.A2
2   PLATES FOR CMP.A1/.A2  	
74.25A-shift CMP passdown 5/22/96SUBPAC::SADINFreedom isn&#039;t free.Wed May 22 1996 20:1777
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               10                   mqcs

        BREAKIN WAFERS            100                   misc


CMP.A1 (Strasbaugh 6DS-SP) - MQC: just running mqcs now due to having no
mqc wafers all day.

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0221 (m1) and JD0258 (pmd).

CMP.B1 (Speedfam CMP-V) - RUNNING: JD0233 (m1).

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0218 (m2).  

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
JD0265 - DEP_ILD1 2
JD0265A- UPP_ILD1 1

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
1 box of 12K monitor wafers.

Number of product lots in room:
------------------------------
13

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0234 - M1 - 23WFRS 
YD0163 - M2 - 22
JD0260 - PMD- 22 
JD0214 - M2 - 22
XM0450 - M3 - 17
JD0192 - M3 - 23

# of carriers for strasbaugh/speedfam:
--------------------------------------
11 SPEEDFAM CARRIERS
2 STRASBAUGH CARRIERS

74.26D SHIFT PASSDOWNFABSIX::D_CAUSESat May 25 1996 08:1840
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE
                                                                       
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE 
        
CMP.B1 (Speedfam CMP-V) - UP/RUNNING JD0202 100% A5/XL0469 NEEDS 100% ON A5

CMP.B2 (Speedfam CMP-V)- UP/IN MQC
                         
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE
                                       
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
HOT/B lots in area:1 
-------------------
JD0202 B LOT

HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:3
--------------------

HOLD LOTS IN AREA:

__________________
       
DOWN equipment: 
---------------
---------------
  

NUMBER of product lots in room:5
-------------------------------
           

LOTS COMPLETED : 7
----------------

74.27CMP C-SHIT PD. 5/25/96FABSIX::E_DAWSONSat May 25 1996 20:3332
			  	CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE...Will need 2'nd set of mqc's, first
    				       set failed for high unf. @ 10.7 &
    				       11.3%. 
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE....Mqc's performed.

CMP.B1 (Speedfam CMP-V) - UP/IDLE...Mqc's due @ 3:00am.   
			       
CMP.B2 (Speedfam CMP-V) - UP/IDLE...Mqc's perform. 

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
       	Static Lots:                    Scrap Lots:  
	-----------                     ----------
        See workstream                  1 Wafer sraped "XD0469"
    
	Hold Lots:0                     Lots in CMP: 4 "No Tagz"
        ---------                       -----------
       
       	MQC Monitors:                   Carriers:
	-------------                   --------
    	1 1/2 Boxes	                See "The Holy Graley's" PD.  
    
	MQC Mon. Used: 11 	               
    	-------------                 
            
        
74.285/26/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONESun May 26 1996 08:0372
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 6              cmp.a1/.b1/scrub

        BREAKIN WAFERS               50               misc

	BROKEN PRODUCT WAFERS	     0		                                       

CMP.A1 (Strasbaugh 6DS-SP) - UP BREAKIN MQC

CMP.A2 (Strasbaugh 6DS-SP) - UP IDLE 

CMP.B1 (Speedfam CMP-V) - UP RUNNING YD0169 M3 + XD0472 PMD
                                
CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING XD0449 M3 + JD0270 PMD

CMP-SCRUB.A1 (On-track scrubber) - IDLE
CMP-SCRUB.A2 (On-track scrubber) - IDLE


Hot/B lots in area:
___________________
XD0471 PMD IN SCRUBBER

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
--------------------
* NONE *

Down Equipment:
--------------
* NONE *

Scrap lots:
----------- 
* NONE *

Hold Lots:
---------
* NONE *

Monitor status:
---------------
1 BOX OF MQC WAFERS

Number of product lots in room:
------------------------------
8

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
-----------------------
5 LOTS

# of carriers for strasbaugh/speedfam:
-------------------------------------
15  spare carriers for CMP.B1/B2
3   full carriers for CMP.A1/.A2
3   PLATES FOR CMP.A1/.A2  	
74.29A-shift CMP passdown 5/26/96SUBPAC::SADINFreedom isn&#039;t free.Sun May 26 1996 20:3975
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                14                  mqcs

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - IDLE.

CMP.A2 (Strasbaugh 6DS-SP) - IDLE. needs breakins and mqcs (new pad).

CMP.B1 (Speedfam CMP-V) - RUNNING: JD0247 (m1) and YD0159 (m3). Touchups on
both.

CMP.B2 (Speedfam CMP-V) - RUNNING: XD0449 (m3). touchups.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
JD0232 - DEP_ILD2 1
JD0233 - "        "
JD0265 _ "        "

Static Lots in area:
-------------------
XD0458 - 0.8DAYS (NOT IN ROOM OR STOCKER?)

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
� box of 12K monitor wafers

Number of product lots in room:
------------------------------
7

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0467 - PMD- 23WFRS
JD0270 - PMD- 24
YD0169 - M3 - 24
XD0472 - PMD- 24

# of carriers for strasbaugh/speedfam:
--------------------------------------
11 SPEEDFAM CARRIERS 
3 STRASBAUGH CARRIERS
74.305/27/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONEMon May 27 1996 07:3375
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 0              cmp.a1/.b1/scrub

        BREAKIN WAFERS               10               misc

	BROKEN PRODUCT WAFERS	     0		                                       

CMP.A1 (Strasbaugh 6DS-SP) - DOWN

CMP.A2 (Strasbaugh 6DS-SP) - DOWN 

CMP.B1 (Speedfam CMP-V) - DOWN
                                
CMP.B2 (SPEEDFAM CMP-V) - DOWN

CMP-SCRUB.A1 (On-track scrubber) - DOWN
CMP-SCRUB.A2 (On-track scrubber) - DOWN


Hot/B lots in area:
___________________
JD0233 HOT LOT
JD0232 HOT LOT
JL0315 HOT LOT (ON HOLD WILL NOT READ ON UV1050)

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
--------------------
* NONE *

Down Equipment:
--------------
ALL

Scrap lots:
----------- 
* NONE *

Hold Lots:
---------
JL0315 M1 (WILL NOT MEASURE ON UV1050) HOT LOT
XD0458 M1 (NO RECIPE ON THE UV1050)

Monitor status:
---------------
1 BOX OF MQC WAFERS

Number of product lots in room:
------------------------------
7

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
-----------------------
2 LOTS

# of carriers for strasbaugh/speedfam:
-------------------------------------
15  spare carriers for CMP.B1/B2
3   full carriers for CMP.A1/.A2
3   PLATES FOR CMP.A1/.A2  	
74.31A-shift CMP passdown 5/28/96SUBPAC::SADINFreedom isn&#039;t free.Tue May 28 1996 20:2479
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  mqcs

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - DOWN: broke wafers on pad. Kevin is working on
building two new carriers (this is the third crash today, hence we have no
carriers left). 

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0458 (m1) for first 3mins.

CMP.B1 (Speedfam CMP-V) - DOWN: waiting on parts for robot. Will be down
until tomorrow.

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0233 (m2) and JD0232 (m2).

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
JD0232 - M2 HOT
JD0233 - M2 HOT

Hot lots coming to area:
-----------------------
JD0279 - DEP_PMD 1

Static Lots in area:
-------------------
JD0271 - PMD no tag
JD0274 - PMD no tag
JD0208 - M3

Down Equipment:
--------------
CMP.B1 - WAITING ON ROBOT PARTS
CMP.A1 - WAFER CRASH. NEEDS NEW PAD AND CARRIERS.

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
� box of 12K monitor wafers (2 more boxes sitting at novellus and two more
on order)

Number of product lots in room:
------------------------------
13

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JL0315 - PMD - 12WFRS
JD0232 - M2 - 23

# of carriers for strasbaugh/speedfam:
--------------------------------------
1 SPEEDFAM CARRIER
0 STRASBAUGH CARRIERS

74.32D SHIFT PASSDOWNFABSIX::D_CAUSEThu May 30 1996 08:5540
CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING JD0256 WILL NEED 100%
                                                                       
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE 
        
CMP.B1 (Speedfam CMP-V) - DOWN/CARRIER ROTATION PROBLEMS

CMP.B2 (Speedfam CMP-V)- DOWN/MQC STILL HAS NOT PASSED MQC
                         
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE
                                       
CMP-SCRUB.A2 (On-track scrubber) - DOWN/AWAITING PARTS
 
HOT/B lots in area:1 
-------------------
JD0215

HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:7
--------------------

HOLD LOTS IN AREA:

__________________
       
DOWN equipment: 
---------------
---------------
  

NUMBER of product lots in room:9
-------------------------------
           

LOTS COMPLETED : 4
----------------

74.33D SHIFT PASSDOWNFABSIX::D_CAUSEThu Jun 06 1996 08:2741
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE MQC DONE
                                                                       
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE 
        
CMP.B1 (Speedfam CMP-V) - UP/RUNNING 1 LOT IN TOUCHUP JD0252

CMP.B2 (Speedfam CMP-V)- UP/MQC RUNNIG SECOND SET OF MQC CHANGED OFFSETS
                         JD0225 HAS HAD FIRST 400 SEC RUN
 
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE
                                       
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE
 
HOT/B lots in area:
-------------------


HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:8
--------------------

HOLD LOTS IN AREA:

__________________
       
DOWN equipment: 
---------------
---------------
  

NUMBER of product lots in room:12
-------------------------------
           

LOTS COMPLETED : 9
----------------