4.0. "CMP.A PM CHECKSHEET TEMPLATES" by SUBPAC::BJUBINVILLE (NFD Fire - Rescue) Tue Apr 16 1996 22:08

    
    
        THIS NOTE IS FOR THE BLANK PM CHECK SHEETS FOR THE CMP.A 
    TOOLS.  ENTRIES INTO THIS NOTE (4) TO BE MADE BY EQUIPMENT 
    ENGINEERING ONLY.  ALL CMP.A PM CHECK SHEETS SHOULD BE COPIED 
    FROM THIS FILE ONLY.
    
T.RTitleUserPersonal
Name
DateLines
4.1WEEKLY PM CHECKSHEET TEMPLATESUBPAC::BJUBINVILLENFD Fire - RescueTue Apr 16 1996 22:0978
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Weekly Preventive Maintenance Check Sheet, REV. C

  DATE:__________   SYSTEM RTC CODE:__________   EQUIP. TECH.:_______________

 INITIAL

 _______ 6.1.1  CDA pressure @ 100 PSI:  Pre-adjust:________

                                         Post-adjust:________

 _______ 6.1.2  N2 pressure @ 85 PSI:    Pre-adjust:________

                                         Post-adjust:________

 _______ 6.1.3  DI Water pressure @ 40 PSI:   Actual Reading:________
  
 _______ 6.1.4  Check drip pan for any slurry/moisture.  Clean any    
                contamination found.  

 _______ 6.1.5  Check all tubing and fittings for leaks. 

 _______ 6.1.6  Check all tubing and fittings for air leaks.

 _______ 6.1.7  Check all indicator lights.

 _______ 6.1.8  Check all stations/components for slurry, debris, or  
                any contaminants.  Clean if necessary.  

 _______ 6.1.9  Wipe down polish table, tub, and splash ring.

 _______ 6.1.10 Wipe down polypropylene deck and all stainless steel surfaces.

 _______ 6.1.11 Wipe down pad conditioning arm.

 _______ 6.1.12 Remove, rinse, and replace diamond conditioning disk.

 _______ 6.1.13 Remove, wipe down ,and rinse pad conditioner park station.

 _______ 6.1.14 Wipe down outer surface of both spindle hubs.

 _______ 6.1.15 Remove and clean O-rings, replace if necessary.

 _______ 6.1.16 Wipe down inside and outside of loa/cleaning station buckets.

 _______ 6.1.17 Wipe down all surfaces of the robot.

 _______ 6.1.18 Clean end effector vacuum chuck air port.

 _______ 6.1.19 Inspect and clean end effector air nozzle.

 _______ 6.1.20 Replace point of use slurry filters on Slurry Pump 1 & 2.

 _______ 6.1.21 Inspect compression fittings on Slurry Pump 1 & 2 for leaks.

 _______ 6.1.22 Check calibration of Slurry Pump 1 & 2, recalibrate if 
                necessary.

 _______ 6.1.23 Check Neslab TCU for leaks.

 _______ 6.1.24 Check Neslab TCU temperature readout.

 _______ 6.1.25 Lubricate robot travel lead screw with NSK #2 grease.

 _______ 6.1.26 Lubricate all elevator lead screws with NSK #2 grease.

 _______ 6.1.27 Drain and wipe down inside and outside surfaces of all
                elevator DI Water tanks.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
4.2MONTHLY PM CHECKSHEET TEMPLATESUBPAC::BJUBINVILLENFD Fire - RescueTue Apr 16 1996 22:0990
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
             Monthly Preventive Maintenance Check Sheet, REV. C

 DATE:__________   SYSTEM RTC CODE:__________   EQUIP. TECH.:_________________

 INITIAL

 _______ 6.2.1  Perform weekly PM checks in addition to this monthly list.

 _______ 6.2.2  Replace the fluid lines on the peristaltic pumps.  

 _______ 6.2.3  Check bridge drive belt for cracking, fraying or any signs of
                deterioration.  Replace if necessary.

 _______ 6.2.4  Measure and record polish table alignment runout. 

                Polish Table Runout:____________

 _______ 6.2.5  Measure and record right and left spindle runout.

                Right Spindle Runout:____________

                Left Spindlele Runout:____________

 _______ 6.2.6  Measure and record right and left spindle hub runout.

                Right Spindle Hub Runout:____________

                Left Spindle Hub Runout:____________

 _______ 6.2.7  Perform the spindle down Force Calibration on the right and
                left spindles.

                Left Spindle Force Error:____________

                Right Spindle Force Error:____________

                Left Spindle Calibration Variable:

                     Pre-adjust:____________  Post-adjust:____________

                Right Spindle Calibration Variable:

                     Pre-adjust:____________  Post-adjust:____________

 _______ 6.2.8  Check left and right load station alignment.  Adjust if
                necessary.

 _______ 6.2.9  Check left and right cleaning station alignment.  Adjust if
                necessary.

 _______ 6.2.10 Check shuttle travel.  Adjust if necessary.

 _______ 6.2.14 Check the 24 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 _______ 6.2.15 Check the +/- 15 Volt Power Supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________
 
 _______ 6.2.16 Check the 5 Volt Power Supply.  Calibrate if necessary

                Pre-adjust:____________   Post-adjust:____________

 _______ 6.2.17 Check the +/- 12 Volt power supply.  Calibrate if necessary.

                Pre-adjust:____________   Post-adjust:____________

 _______ 6.2.18 Check the oil level in the bridge lube resevoir.  Adjust if
                necessary using Shell Tellus 10 or equivalent.

 _______ 6.2.19 Check the Neslab Temperature Control Unit (TCU) water level.
 	        Adjust level if necessary.

 _______ 6.2.20 Check the Neslab Temperature Control Unit (TCU) for loose
                fittings.

 _______ 6.2.21 Check the system vacuum cabinet for any loose fittings or
                connectors.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
4.3SEMI-ANNUAL PM CHECKSHEET TEMPLATESUBPAC::BJUBINVILLENFD Fire - RescueTue Apr 16 1996 22:1032
    
    
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
              Semi-annual Preventive Maintenance Check Sheet, REV. C

 INITIAL

 _______ 6.3.1  Perform Weekly and Monthly PM's in addition to this Semi-Annual
                list.

 _______ 6.3.2  Check all safety interlocked doors for proper operation.  

 _______ 6.3.2  Check all EMO's for proper operation.

 _______ 6.3.3  Change oil in the brush rotation gear box using AGMA #8 or
                equivalent oil.

 _______ 6.3.4  Change oil in the left and right spindle gear boxes using AGMA
                #8 or equivalent oil.

 _______ 6.3.5  Change oil in the polish table gear box using AGMA #8 or
                equivalent oil.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________
4.4ANNUAL PM CHECKSHEET TEMPLATESUBPAC::BJUBINVILLENFD Fire - RescueTue Apr 16 1996 22:1027
           R. H. Strasbaugh 6DS-SP Planarizer (CMP.A1/CMP.A2) HF6O-0171
               Annual Preventive Maintenance Check Sheet, REV. C

 INITIAL

 _______ 6.4.1  Perform Weekly, Monthly, and Semi-Annual PM's in  addition to
                this Annual list

 _______ 6.4.2  Perform Bridge Position calibration.

 _______ 6.4.3  Check Robot Position Alignment.  Calibrate if necessary.

 _______ 6.4.4  Check Robot Travel position.  Adjust if necessary.

 _______ 6.4.5  Check Robot Arm position.  Adjust if necessary.

 _______ 6.4.6  Check Elevator Height position.  Adjust if necessary.

 COMMENTS:__________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________

 ___________________________________________________________________________