SPEEDFAM CMP-V PREVENTIVE MAINTENANCE
SPEC# HF60-0172 REV-E
Speedfam Corp. CMP-V Planarizer
Weekly Preventative Maintenance Check Sheet, Rev. E
DATE: TOOL ENTITY: TECHNICIAN(S):
START TIME: COMPLETED TIME:
6.1.1 Check CDA pressure inside tool for 80-90 PSI Completed:
6.1.2 Check N2 pressure inside tool for 55-65 PSI Completed:
6.1.3 Check incoming DI Water pressure for 20-30 PSI Completed:
6.1.4 Check Load Cup pressure for 40-50 PSI Completed:
6.1.5 Check Pad Condition Balance pressure 10-20 PSI Completed:
6.1.6 Check Pad Conditioner Up pressure for 30-40 PSI Completed:
6.1.7 Check Carrier Up pressure for 25-35 PSI Completed:
6.1.8 Check Miscellaneous pressure for 40-50 PSI Completed:
6.1.9 Check Head Balance pressure for 6-6.5 PSI Completed:
6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed:
(Applicable for CMP.B1 only)
6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed:
6.1.12 Check Open Load Flipper pressure for 45-55 PSI Completed:
6.1.13 Check Open Unload Flipper pressure for 50-60 PSI Completed:
6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI Completed:
6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI Completed:
6.1.16 Check Alignment Fixture pressure for 15-25 PSI Completed:
6.1.17 Check Scrubber In/Out pressure for 45-55 PSI Completed:
6.1.18 Check MHTA pressure for 75-85 PSI Completed:
6.1.19 Check Drip Pans for moisture/contamination Completed:
6.1.20 Check tubing/fittings for fluid leaks Completed:
6.1.21 Check tubing/fittings for pneumatic leaks Completed:
6.1.22 Check stations/components for contamination Completed:
6.1.23 Check incoming Chilled Water pressure <10 PSI Completed:
6.1.24 Clean and lubricate the Scrubber rails Completed:
6.1.25 Clean and lubricate the Paddle rails Completed:
6.1.26 Remove and clean conditioning Wheel and Housing Completed:
6.1.27 Scrub clean the Polish area tub and walls Completed:
6.1.28 Remove all Load and Unload cups and scrub clean
with hydrogen peroxide. Completed:
6.1.29 Wipe the Load area, Mapper and Aligner w/ISO Completed:
6.1.30 Check slurry pump hoses and connectors for leaks Completed:
6.1.31 Remove and clean the Vacuum system filter
element and replaced as needed. Completed:
6.1.32 Check Carrier clean brushes for defects Completed:
(On CMP.B1, rotate position)
6.1.33 Wipe the MHTA and covers with Isopropyl Completed:
6.1.34 Wipe the Process Area plexiglas doors w/Iso Completed:
6.1.35 Check chiller fluid resevoir for proper level Completed:
6.1.36 Check the chiller readout for 24 degrees C. Completed:
6.1.37 Check the positioning and functionality of the
wafer detect sensors. Use the procedure in
step 6.1.37.4 to check sensors without having to
make any adjustments. Completed:
6.1.38 Check the slurry flow alarm. Completed:
Comments:
|
16.2 | MONTHLY CMP.B PM TEMPLATE | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Mon Feb 03 1997 15:20 | 183 |
|
SPEEDFAM CMP-V PREVENTIVE MAINTENANCE
SPEC# HF60-0172 REV-E
Speedfam Corp. CMP-V Planarizer
Monthly Preventative Maintenance Check Sheet, Rev. E
DATE: TOOL ENTITY: TECHNICIAN(S):
START TIME: COMPLETED TIME:
6.2.1 Change Peristaltic Pump Lines and check flow Completed:
6.2.2 Clean Polish area tub drains for clogs Completed:
6.2.3 Check all table belts for defects Completed:
6.2.4 Perform Down Force Calibration on all 5 heads
to read at +/- 1lbs of 354 lbs.
NOTE: The target is 23 lbs. below the actual
377 lbs. due to the carrier weight minus the
alignment fixture using the point-to-point
method as described in the downforce procedure
in 6.2.4.1 through 6.2.4.13. Completed:
Down Frc: Head 1 Pre-Adj:______ Post-adj:______
Head 2 Pre-Adj:______ Post-adj:______
Head 3 Pre-Adj:______ Post-adj:______
Head 4 Pre-Adj:______ Post-adj:______
Head 5 Pre-Adj:______ Post-adj:______
6.2.5 Perform Down Force Calibration on Conditioner Completed:
to read +/- .5 lbs of 77lbs.
Actual Down Force Pre-Adj:_____________
Actual Down Force Post-Adj:____________
6.2.6 Check Scrubber Brushes for contaminates/defects Completed:
6.2.7 Check the Load Flipper alignment Completed:
6.2.8 Check the Unload Flipper alignment Completed:
6.2.9 Check Elevator alignments Completed:
6.2.10 Check wafer unload, from Index table to cassette Completed:
6.2.11 Check the +24 Volt power supply for +/- 1V
of 24 volts. Pre: Post: Tech:
6.2.12 Check the +/- 15 Volt power supply for +/- 1V
of 15V Pre: Post: Tech:
6.2.13 Check the +5 Volt power supply for 4.5 to
5.5 v. Pre: Post: Tech:
6.2.14 Check Table Rotation Speed for +/- 1.5 of 30RPM Completed:
6.2.15 Check Vacuum Pump Diaphrams Completed:
6.2.16 Replace liquid separator filter element Completed:
6.2.17 Check Vacuum Tank/Pump lines Completed:
6.2.18 Check carrier to Load Cup Position alignments Completed:
6.2.19 Check Load Cup Height to carrier alignments Completed:
6.2.20 Check the Robot alignments Completed:
6.2.21 Check Muffin Fans for proper operation Completed:
Comments:
========================================================================
SPEEDFAM CMP-V PREVENTIVE MAINTENANCE
SPEC# HF60-0172 REV-E
Speedfam Corp. CMP-V Planarizer
Weekly Preventative Maintenance Check Sheet, Rev. E
DATE: TOOL ENTITY: TECHNICIAN(S):
START TIME: COMPLETED TIME:
6.1.1 Check CDA pressure inside tool for 80-90 PSI Completed:
6.1.2 Check N2 pressure inside tool for 55-65 PSI Completed:
6.1.3 Check incoming DI Water pressure for 20-30 PSI Completed:
6.1.4 Check Load Cup pressure for 40-50 PSI Completed:
6.1.5 Check Pad Condition Balance pressure 10-20 PSI Completed:
6.1.6 Check Pad Conditioner Up pressure for 30-40 PSI Completed:
6.1.7 Check Carrier Up pressure for 25-35 PSI Completed:
6.1.8 Check Miscellaneous pressure for 40-50 PSI Completed:
6.1.9 Check Head Balance pressure for 6-6.5 PSI Completed:
6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed:
(Applicable for CMP.B1 only)
6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed:
6.1.12 Check Open Load Flipper pressure for 45-55 PSI Completed:
6.1.13 Check Open Unload Flipper pressure for 50-60 PSI Completed:
6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI Completed:
6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI Completed:
6.1.16 Check Alignment Fixture pressure for 15-25 PSI Completed:
6.1.17 Check Scrubber In/Out pressure for 45-55 PSI Completed:
6.1.18 Check MHTA pressure for 75-85 PSI Completed:
6.1.19 Check Drip Pans for moisture/contamination Completed:
6.1.20 Check tubing/fittings for fluid leaks Completed:
6.1.21 Check tubing/fittings for pneumatic leaks Completed:
6.1.22 Check stations/components for contamination Completed:
6.1.23 Check incoming Chilled Water pressure <10 PSI Completed:
6.1.24 Clean and lubricate the Scrubber rails Completed:
6.1.25 Clean and lubricate the Paddle rails Completed:
6.1.26 Remove and clean conditioning Wheel and Housing Completed:
6.1.27 Scrub clean the Polish area tub and walls Completed:
6.1.28 Remove all Load and Unload cups and scrub clean
with hydrogen peroxide. Completed:
6.1.29 Wipe the Load area, Mapper and Aligner w/ISO Completed:
6.1.30 Check slurry pump hoses and connectors for leaks Completed:
6.1.31 Remove and clean the Vacuum system filter
element and replaced as needed. Completed:
6.1.32 Check Carrier clean brushes for defects Completed:
(On CMP.B1, rotate position)
6.1.33 Wipe the MHTA and covers with Isopropyl Completed:
6.1.34 Wipe the Process Area plexiglas doors w/Iso Completed:
6.1.35 Check chiller fluid resevoir for proper level Completed:
6.1.36 Check the chiller readout for 24 degrees C. Completed:
6.1.37 Check the positioning and functionality of the
wafer detect sensors. Use the procedure in
step 6.1.37.4 to check sensors without having to
make any adjustments. Completed:
6.1.38 Check the slurry flow alarm. Completed:
Comments:
|
16.3 | SEMI-ANNUAL CMP.B PM TEMPLATE | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Mon Feb 03 1997 15:44 | 406 |
|
SPEEDFAM CMP-V PREVENTIVE MAINTENANCE
SPEC# HF60-0172 REV-E
Speedfam Corp. CMP-V Planarizer
Semi-Annual Preventative Maintenance Check Sheet, Rev. E
DATE: TOOL ENTITY: TECHNICIAN(S):
START TIME: COMPLETED TIME:
6.4.1 Check all interlocks for functionality Completed:
6.4.2 Check all EMO's for functionality Completed:
6.4.3 Lubricate the Rotary Union Completed:
6.4.4 Lubricate the Lead Screw Completed:
6.4.5 Lubricate the Linear Guide Rails Completed:
6.4.6 Lubricate the Idler Pulley Completed:
6.4.7 Rebuild the vacuum pump using the appropriate
rebuild kit. Completed:
Comments:
=======================================================================
SPEEDFAM CMP-V PREVENTIVE MAINTENANCE
SPEC# HF60-0172 REV-E
Speedfam Corp. CMP-V Planarizer
Monthly Preventative Maintenance Check Sheet, Rev. E
DATE: TOOL ENTITY: TECHNICIAN(S):
START TIME: COMPLETED TIME:
6.2.1 Change Peristaltic Pump Lines and check flow Completed:
6.2.2 Clean Polish area tub drains for clogs Completed:
6.2.3 Check all table belts for defects Completed:
6.2.4 Perform Down Force Calibration on all 5 heads
to read at +/- 1lbs of 354 lbs.
NOTE: The target is 23 lbs. below the actual
377 lbs. due to the carrier weight minus the
alignment fixture using the point-to-point
method as described in the downforce procedure
in 6.2.4.1 through 6.2.4.13. Completed:
Down Frc: Head 1 Pre-Adj:______ Post-adj:______
Head 2 Pre-Adj:______ Post-adj:______
Head 3 Pre-Adj:______ Post-adj:______
Head 4 Pre-Adj:______ Post-adj:______
Head 5 Pre-Adj:______ Post-adj:______
6.2.5 Perform Down Force Calibration on Conditioner Completed:
to read +/- .5 lbs of 77lbs.
Actual Down Force Pre-Adj:_____________
Actual Down Force Post-Adj:____________
6.2.6 Check Scrubber Brushes for contaminates/defects Completed:
6.2.7 Check the Load Flipper alignment Completed:
6.2.8 Check the Unload Flipper alignment Completed:
6.2.9 Check Elevator alignments Completed:
6.2.10 Check wafer unload, from Index table to cassette Completed:
6.2.11 Check the +24 Volt power supply for +/-1V
of 24V. Pre: Post: Tech:
6.2.12 Check the +/- 15 Volt power supply for +/- 1V
of 15V. Pre: Post: Tech:
6.2.13 Check the +5 Volt power supply for 4.5 to
5.5 v. Pre: Post: Tech:
6.2.14 Check Table Rotation Speed for +/- 1.5 of 30RPM Completed:
6.2.15 Check Vacuum Pump Diaphrams Completed:
6.2.16 Replace liquid separator filter element Completed:
6.2.17 Check Vacuum Tank/Pump lines Completed:
6.2.18 Check carrier to Load Cup Position alignments Completed:
6.2.19 Check Load Cup Height to carrier alignments Completed:
6.2.20 Check the Robot alignments Completed:
6.2.21 Check Muffin Fans for proper operation Completed:
Comments:
========================================================================
SPEEDFAM CMP-V PREVENTIVE MAINTENANCE
SPEC# HF60-0172 REV-E
Speedfam Corp. CMP-V Planarizer
Weekly Preventative Maintenance Check Sheet, Rev. E
DATE: TOOL ENTITY: TECHNICIAN(S):
START TIME: COMPLETED TIME:
6.1.1 Check CDA pressure inside tool for 80-90 PSI Completed:
6.1.2 Check N2 pressure inside tool for 55-65 PSI Completed:
6.1.3 Check incoming DI Water pressure for 20-30 PSI Completed:
6.1.4 Check Load Cup pressure for 40-50 PSI Completed:
6.1.5 Check Pad Condition Balance pressure 10-20 PSI Completed:
6.1.6 Check Pad Conditioner Up pressure for 30-40 PSI Completed:
6.1.7 Check Carrier Up pressure for 25-35 PSI Completed:
6.1.8 Check Miscellaneous pressure for 40-50 PSI Completed:
6.1.9 Check Head Balance pressure for 6-6.5 PSI Completed:
6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed:
(Applicable for CMP.B1 only)
6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed:
6.1.12 Check Open Load Flipper pressure for 45-55 PSI Completed:
6.1.13 Check Open Unload Flipper pressure for 50-60 PSI Completed:
6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI Completed:
6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI Completed:
6.1.16 Check Alignment Fixture pressure for 15-25 PSI Completed:
6.1.17 Check Scrubber In/Out pressure for 45-55 PSI Completed:
6.1.18 Check MHTA pressure for 75-85 PSI Completed:
6.1.19 Check Drip Pans for moisture/contamination Completed:
6.1.20 Check tubing/fittings for fluid leaks Completed:
6.1.21 Check tubing/fittings for pneumatic leaks Completed:
6.1.22 Check stations/components for contamination Completed:
6.1.23 Check incoming Chilled Water pressure <10 PSI Completed:
6.1.24 Clean and lubricate the Scrubber rails Completed:
6.1.25 Clean and lubricate the Paddle rails Completed:
6.1.26 Remove and clean conditioning Wheel and Housing Completed:
6.1.27 Scrub clean the Polish area tub and walls Completed:
6.1.28 Remove all Load and Unload cups and scrub clean
with hydrogen peroxide. Completed:
6.1.29 Wipe the Load area, Mapper and Aligner w/ISO Completed:
6.1.30 Check slurry pump hoses and connectors for leaks Completed:
6.1.31 Remove and clean the Vacuum system filter
element and replaced as needed. Completed:
6.1.32 Check Carrier clean brushes for defects Completed:
(On CMP.B1, rotate position)
6.1.33 Wipe the MHTA and covers with Isopropyl Completed:
6.1.34 Wipe the Process Area plexiglas doors w/Iso Completed:
6.1.35 Check chiller fluid resevoir for proper level Completed:
6.1.36 Check the chiller readout for 24 degrees C. Completed:
6.1.37 Check the positioning and functionality of the
wafer detect sensors. Use the procedure in
step 6.1.37.4 to check sensors without having to
make any adjustments. Completed:
6.1.38 Check the slurry flow alarm. Completed:
Comments:
<<< ASDG::DISK$SYS_DATA:[NOTES$LIBRARY]CMP.NOTE;1 >>>
-< CMP >-
================================================================================
Note 16.2 CMP.B PM TEMPLATES 2 of 2
SUBPAC::BJUBINVILLE "CMP-6 Equipment Engineering" 183 lines 3-FEB-1997 15:20
-< MONTHLY CMP.B PM TEMPLATE >-
--------------------------------------------------------------------------------
SPEEDFAM CMP-V PREVENTIVE MAINTENANCE
SPEC# HF60-0172 REV-E
Speedfam Corp. CMP-V Planarizer
Monthly Preventative Maintenance Check Sheet, Rev. E
DATE: TOOL ENTITY: TECHNICIAN(S):
START TIME: COMPLETED TIME:
6.2.1 Change Peristaltic Pump Lines and check flow Completed:
6.2.2 Clean Polish area tub drains for clogs Completed:
6.2.3 Check all table belts for defects Completed:
6.2.4 Perform Down Force Calibration on all 5 heads
to read at +/- 1lbs of 354 lbs.
NOTE: The target is 23 lbs. below the actual
377 lbs. due to the carrier weight minus the
alignment fixture using the point-to-point
method as described in the downforce procedure
in 6.2.4.1 through 6.2.4.13. Completed:
Down Frc: Head 1 Pre-Adj:______ Post-adj:______
Head 2 Pre-Adj:______ Post-adj:______
Head 3 Pre-Adj:______ Post-adj:______
Head 4 Pre-Adj:______ Post-adj:______
Head 5 Pre-Adj:______ Post-adj:______
6.2.5 Perform Down Force Calibration on Conditioner Completed:
to read +/- .5 lbs of 77lbs.
Actual Down Force Pre-Adj:_____________
Actual Down Force Post-Adj:____________
6.2.6 Check Scrubber Brushes for contaminates/defects Completed:
6.2.7 Check the Load Flipper alignment Completed:
6.2.8 Check the Unload Flipper alignment Completed:
6.2.9 Check Elevator alignments Completed:
6.2.10 Check wafer unload, from Index table to cassette Completed:
6.2.11 Check the +24 Volt power supply for +/- 1V
of 24 volts. Pre: Post: Tech:
6.2.12 Check the +/- 15 Volt power supply for +/- 1V
of 15V Pre: Post: Tech:
6.2.13 Check the +5 Volt power supply for 4.5 to
5.5 v. Pre: Post: Tech:
6.2.14 Check Table Rotation Speed for +/- 1.5 of 30RPM Completed:
6.2.15 Check Vacuum Pump Diaphrams Completed:
6.2.16 Replace liquid separator filter element Completed:
6.2.17 Check Vacuum Tank/Pump lines Completed:
6.2.18 Check carrier to Load Cup Position alignments Completed:
6.2.19 Check Load Cup Height to carrier alignments Completed:
6.2.20 Check the Robot alignments Completed:
6.2.21 Check Muffin Fans for proper operation Completed:
Comments:
========================================================================
SPEEDFAM CMP-V PREVENTIVE MAINTENANCE
SPEC# HF60-0172 REV-E
Speedfam Corp. CMP-V Planarizer
Weekly Preventative Maintenance Check Sheet, Rev. E
DATE: TOOL ENTITY: TECHNICIAN(S):
START TIME: COMPLETED TIME:
6.1.1 Check CDA pressure inside tool for 80-90 PSI Completed:
6.1.2 Check N2 pressure inside tool for 55-65 PSI Completed:
6.1.3 Check incoming DI Water pressure for 20-30 PSI Completed:
6.1.4 Check Load Cup pressure for 40-50 PSI Completed:
6.1.5 Check Pad Condition Balance pressure 10-20 PSI Completed:
6.1.6 Check Pad Conditioner Up pressure for 30-40 PSI Completed:
6.1.7 Check Carrier Up pressure for 25-35 PSI Completed:
6.1.8 Check Miscellaneous pressure for 40-50 PSI Completed:
6.1.9 Check Head Balance pressure for 6-6.5 PSI Completed:
6.1.10 Check Transport Paddle L/R pressure for 25-35 PSI Completed:
(Applicable for CMP.B1 only)
6.1.11 Check Transport Paddle U/D pressure for 10-20 PSI Completed:
6.1.12 Check Open Load Flipper pressure for 45-55 PSI Completed:
6.1.13 Check Open Unload Flipper pressure for 50-60 PSI Completed:
6.1.14 Check Vacuum Tank Blowout pressure for 15-30 PSI Completed:
6.1.15 Check Wafer Scrub Down pressure for 20-30 PSI Completed:
6.1.16 Check Alignment Fixture pressure for 15-25 PSI Completed:
6.1.17 Check Scrubber In/Out pressure for 45-55 PSI Completed:
6.1.18 Check MHTA pressure for 75-85 PSI Completed:
6.1.19 Check Drip Pans for moisture/contamination Completed:
6.1.20 Check tubing/fittings for fluid leaks Completed:
6.1.21 Check tubing/fittings for pneumatic leaks Completed:
6.1.22 Check stations/components for contamination Completed:
6.1.23 Check incoming Chilled Water pressure <10 PSI Completed:
6.1.24 Clean and lubricate the Scrubber rails Completed:
6.1.25 Clean and lubricate the Paddle rails Completed:
6.1.26 Remove and clean conditioning Wheel and Housing Completed:
6.1.27 Scrub clean the Polish area tub and walls Completed:
6.1.28 Remove all Load and Unload cups and scrub clean
with hydrogen peroxide. Completed:
6.1.29 Wipe the Load area, Mapper and Aligner w/ISO Completed:
6.1.30 Check slurry pump hoses and connectors for leaks Completed:
6.1.31 Remove and clean the Vacuum system filter
element and replaced as needed. Completed:
6.1.32 Check Carrier clean brushes for defects Completed:
(On CMP.B1, rotate position)
6.1.33 Wipe the MHTA and covers with Isopropyl Completed:
6.1.34 Wipe the Process Area plexiglas doors w/Iso Completed:
6.1.35 Check chiller fluid resevoir for proper level Completed:
6.1.36 Check the chiller readout for 24 degrees C. Completed:
6.1.37 Check the positioning and functionality of the
wafer detect sensors. Use the procedure in
step 6.1.37.4 to check sensors without having to
make any adjustments. Completed:
6.1.38 Check the slurry flow alarm. Completed:
Comments:
|
16.4 | CMP.B SHUTDOWN/STARTUP CHECKSHEETS | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Mon Feb 03 1997 15:45 | 50 |
|
SPEC# HF60-0172 REV-E SPEEDFAM CMP-V PREVENTIVE MAINTENANCE
CMP.B SHUT DOWN CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
INIT / DATE
1) SCRUB SIDES OF CARRIERS ______/______
2) RUN CARRIER BLOW OFF FOR 30 SECONDS ______/______
3) REMOVE ALL CARRIERS ______/______
4) PLACE WIPES UNDER CARRIER FILMS AND LAY CARRIERS DI TANK ______/______
5) IF POWER TO SLURRY SYSTEM IS GOING TO BE LOST, CONTACT
ASHLAND CHEMICAL AND HAVE SLURRY SYSTEM PURGED AND CHARGED
WITH DI WATER. ______/______
6) CLEAN ENTIRE SYSTEM OF DRIED SLURRY ______/______
7) REMOVE CONDITIONER AND CLEAN ______/______
8) CYCLE/RINSE ALL DI FUNCTIONS: SPRAY NOZZLES, SLURRY PUMPS,
CONDITIONER RINSE, ELEVATOR TANKS. ______/______
9) SHUT OFF DI BEHIND SYSTEM (ROTATE 3W VLV TO FULL RETURN) ______/______
10) DRAIN ELEVATOR AND CONDITIONER TUBE ______/______
11) REMOVE PADS, AND CLEAN AND DRY TABLES ______/______
12) REMOVE SCRUBBER BRUSHES AND SOAK IN DI ______/______
13) DRY ENTIRE SYSTEM OF ANY STANDING WATER ______/______
14) POWER DOWN SYSTEM.
SPEC# HF60-0172 REV-D SPEEDFAM CMP-V PREVENTIVE MAINTENANCE
CMP.B START UP CHECK SHEET
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
INIT / DATE
1) TURN ON DI WATER (ROTATE 3W VLV TO FULLY TO POLISHER. ______/______
2) POWER ON SYSTEM. ______/______
3) CYCLE/RUN ALL DI FUNCTIONS FOR 15 MINUTES ______/______
4) WIPE DOWN SYSTEM CLEAN ALL DRIED SLURRY ______/______
5) DRY TABLES, INSTALL PADS ______/______
6) INSTALL SCRUBBER BRUSHES ______/______
7) INSTALL CONDITIONER ______/______
8) INSTALL CARRIERS ______/______
9) RUN WET IDLE PROGRAM FOR 15 MIN. (ENOUGH TO CLEAN CARRIERS) ______/______
10) IF SLURRY SYSTEM WAS SHUT DOWN, CONTACT ASHLAND CHEMICAL,
REQUEST DI TO BE PURGE FROM SLURRY SYSTEM AND CHARGED WITH
SLURRY AND REQUEST A NEW SLURRY FILTER BE INSTALLED. ______/______
11) CALIBRATE SLURRY FLOW ______/______
12) PUT IN WET IDLE AND TURN OVER TO MFG FOR MQC ______/______
|