[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Conference asdg::cmp

Title:CMP
Notice:Welcome to the CMP notesfile
Moderator:FABSIX::B_TOWERLLE
Created:Tue Oct 31 1995
Last Modified:Fri Jun 06 1997
Last Successful Update:Fri Jun 06 1997
Number of topics:94
Total number of notes:6381

70.0. "CMP ops passdowns - Feb 1996" by SUBPAC::SADIN (Freedom isn't free.) Tue Jan 30 1996 19:25

    
    
    	cmp passdowns for FEBRUARY 1996.
    
    
    
T.RTitleUserPersonal
Name
DateLines
70.11/31/96 B SHIFT CMP PASSDOWNFABSIX::L_CEDRONEWed Jan 31 1996 07:0176
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               13                   cmp.a1/.b1/scrub

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING MQC

CMP.A2 (Strasbaugh 6DS-SP) - UP RUNNING JD0075 - TOUCH UP

CMP.B1 (Speedfam CMP-V) - UP RUNNING MQC

CMP.B2 (SPEEDFAM CMP-V) - DOWN, WAITING FOR MOTOR FOR INDEX TABLE

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S DONE

CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S DONE


Hot/B lots in area:
___________________
* NONE *

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
JD0076 24W NO TOLKEN

Down Equipment:
---------------
CMP.B2 - WAITNG FOR MOTOR FOR INDEX TABLE

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0374 ENG. STI LOT

Monitor status:
---------------
5 1/2 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
4

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0363 23W PMD
XD0348 22W M1
JD0069 24W M1

# of carriers for strasbaugh/speedfam:
-------------------------------------
9 spare carriers for CMP.B1/B2
2 full carriers for CMP.A1/.A2



70.2CMP C-SHIFT PD. 2/1/96FABSIX::E_DAWSONThu Feb 01 1996 19:3227
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - DOWN...ROBOT SENSOR
             
CMP.A2 (Strasbaugh 6DS-SP) - RUNNING-1 XL0365 TM55 PMD 23W 

CMP.B1 (Speedfam CMP-V) - RUNNING-2 XD0355 ILD1 TM36 23W (NEEDS 100%) 
			            YD0146 ILD2 TM36 22W (100% ON SCATTER)
     
CMP.B2 (Speedfam CMP-V) - DOWN...TABLE INDEXER/PART

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
       
    
       	Hold Lots:                      Lots in CMP: 5
        ---------                       -----------
        XL0313 TM55...100% P2
       
	MQC Monitors:                   Carriers:
	-------------                   --------
    	3.5 BOXES	             4 - Strasbaugh
	MQC Mon. Used: 6 	     2 - Strasbaugh Plates
    	-------------               10 - Speedfam  
                                                                     
70.3CMP C-SHIFT PD.1/2/96FABSIX::E_DAWSONFri Feb 02 1996 19:3325
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - RUNNING-1 XD0370 PMD TM36 22W
             
CMP.A2 (Strasbaugh 6DS-SP) - RUNNING-1 XD0351 ILD2 TM36 23W

CMP.B1 (Speedfam CMP-V) - RUNNING-1 XL0346 TM55 ILD2 24W   
			       
CMP.B2 (Speedfam CMP-V) -  DOWN...????

CMP-SCRUB.A1 (On-track scrubber) - RUNNING-1 XD0330 TM36 ILD3 21W
    				...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
       
	Hold Lots:                      Lots in CMP:6 
        ---------                       -----------
                                                      
	MQC Monitors:                   Carriers:
	-------------                   --------
    	3 BOXES	                      4 - Strasbaugh
	MQC Mon. Used:16              3 - Strasbaugh Plates
    	-------------                11 - Speedfam                     
70.4CMP C-SHIFT PD. 2/3/96FABSIX::E_DAWSONSat Feb 03 1996 19:0234
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE

CMP.B1 (Speedfam CMP-V) - UP/IDLE   
			       
CMP.B2 (Speedfam CMP-V) - RUNNING-1 B-LOT XD0352 TM36 ILD3 15W

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
	Hot/B lots in area: 		
        ------------------
        B-LOT XD0352 TM36 ILD3 15W
    	B-LOT XDO340 TM36 ILD2 21W "NO T-TAG"
    
	Static Lots:                    
	-----------                   
        XD0368 TM36 PMD 24W "NO T-TAG"
	JD0038 DC1026 PMD 24W "       "
        
        Lots in CMP: 6 
        -----------
       
    	MQC Monitors:                  Carriers:
	-------------                   --------
    	  3 BOXES	              4 - Strasbaugh
	MQC Mon. Used: 1	      2 - Strasbaugh Plates
    	-------------                12 - Speedfam              
           
70.102/4/96 B SHIFT CMP PASSDOWNFABSIX::L_CEDRONESun Feb 04 1996 07:2276
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               3                   cmp.a1/.b1/scrub

        BREAKIN WAFERS             25                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP IDLE

CMP.A2 (Strasbaugh 6DS-SP) - UP IDLE

CMP.B1 (Speedfam CMP-V) - UP RUNNING JD0071, XD0368

CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING JD0078

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S DONE

CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S DONE


Hot/B lots in area:
___________________
XD0340 M2  B-LOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
XD0340 M2 NO TOLKEN
XD0349 M2 NO TOLKEN

Down Equipment:
---------------
* NONE *

Scrap lots:
----------
* none *

Hold Lots:
---------
* NONE *

Monitor status:
---------------
3 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
--------------------
XD0358 M1 24W
JD0083 PMD 24W

# of carriers for strasbaugh/speedfam:
-------------------------------------
10 spare carriers for CMP.B1/B2
 4 full carriers for CMP.A1/.A2
 2 PLATES CMP.A1/.A2


70.5A-shift CMP passdown 2/4/96SUBPAC::SADINFreedom isn't free.Sun Feb 04 1996 19:1774
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               20                   cmp.a1/.a2/.b2/scrb

        BREAKIN WAFERS             120                  misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0062 (m2).

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0074 (m1).

CMP.B1 (Speedfam CMP-V) - RUNNING: XD0349 (m2).

CMP.B2 (Speedfam CMP-V) - IDLE.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
XD0340 - M2 (moving out)

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
2.5 boxes of 12K monitors (2 more boxes on order)

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0340 - M2 - 21WFRS 
JD0081 - PMD - 24WFRS
JD0071 - M1 - 24WFRS
XD0368 - PMD - 24WFRS
JD0078 - M1 - 23WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
10 SPEEDFAM CARRIERS
2 STRASBAUGH CARRIERS + 2 PLATES

70.62/5/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONEMon Feb 05 1996 07:2576
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               3                   cmp.a1/.b1/scrub

        BREAKIN WAFERS             25                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP IDLE

CMP.A2 (Strasbaugh 6DS-SP) - UP IDLE

CMP.B1 (Speedfam CMP-V) - UP RUNNING JD0071, XD0368

CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING JD0078

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S DONE

CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S DONE


Hot/B lots in area:
___________________
XD0340 M2  B-LOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
XD0340 M2 NO TOLKEN
XD0349 M2 NO TOLKEN

Down Equipment:
---------------
* NONE *

Scrap lots:
----------
* none *

Hold Lots:
---------
* NONE *

Monitor status:
---------------
3 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
--------------------
XD0358 M1 24W
JD0083 PMD 24W

# of carriers for strasbaugh/speedfam:
-------------------------------------
10 spare carriers for CMP.B1/B2
 4 full carriers for CMP.A1/.A2
 2 PLATES CMP.A1/.A2


70.7A-shift passdown 2/05/96SUBPAC::SADINFreedom isn't free.Mon Feb 05 1996 19:3883
*** special engineering request for all lots **

        Please read the five wafers at incoming/outgoing thickness on a 9
site and a 5 site recipe (that will give you five readings at 9sites, 5 at
5sites). Send the mean and range of both the 9 site and 5 site (along with
lot#, level, and mask) to Eric Bodensieck (SUBPAC::BODENSIECK). That's all
five wafers, not just the average of the five. To get the five site recipe,
just edit the wafer map. I will show B-shift how to edit this. 


CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                10                  cmp.a1/.b2/scrb

        BREAKIN WAFERS             150                  misc


CMP.A1 (Strasbaugh 6DS-SP) - IDLE.

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0079 (M1)

CMP.B1 (Speedfam CMP-V) - RUNNING: JD0070 (M3) HOT LOT

CMP.B2 (Speedfam CMP-V) - RUNNING: XD0335 (M3)

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - DOWN: WEEKLY PM.


Hot/B lots in area:
__________________
JD0070 - M3 (HOT)

Hot lots coming to area:
-----------------------
JD0082 - UPP_PMD 1

Static Lots in area:
-------------------
XD0373 - 1.3DAYS (NO T-TAG)

Down Equipment:
--------------
CMP-SCRUB.A2 - WEEKLY PM

Scrap lots:
----------
* none *

Hold Lots:
---------
XL0314 - DONE POLISHING. ON HOLD FOR LCAM FOR COPIOUS P2 MEASUREMENTS.

Monitor status:
--------------
4.5 BOXES OF 12K MONITORS.

Number of product lots in room:
------------------------------
8

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0376 - PMD - 22WFRS
JD0063B - M2 - 11WFRS
XL0314 - M3 - 17WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
11 SPEEDFAM CARRIERS
2 STRASBAUGH CARRIERS + 2 PLATES

70.82/6/96 B SHIFT CMP PASSDOWNFABSIX::L_CEDRONETue Feb 06 1996 07:1780
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               1                   cmp.a1/.b1/scrub

        BREAKIN WAFERS             75                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP IDLE

CMP.A2 (Strasbaugh 6DS-SP) - UP IDLE

CMP.B1 (Speedfam CMP-V) - UP RUNNING JD0082

CMP.B2 (SPEEDFAM CMP-V) - UP IDLE

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S DONE
CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S DONE


Hot/B lots in area:
___________________
JD0082 PMD HOT-LOT
XD0369 M3  HOT-LOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
XD0373 PMD NO TOLKEN
XL0377 PMD NO TOLKEN
XD0341 M3  REACHED GOAL

Down Equipment:
---------------
* NONE *

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0363 M1 WAITING TO BE COMBINED W/CHILD
XL0314 HOLD FOR LARRY CAM.

Monitor status:
---------------
4 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
--------------------
JD0070 M3 23W
JD0079 M1 22W
XD0335 M3 23W
JD0066 M2 19W

# of carriers for strasbaugh/speedfam:
-------------------------------------
11 spare carriers for CMP.B1/B2
 4 full carriers for CMP.A1/.A2
 


70.9A-shift CMP passdown 2/06/96SUBPAC::SADINFreedom isn't free.Tue Feb 06 1996 19:3583
** note ** If the thickness tools are sitting idle, please measure some of
Frank Krupa's wafers that are sitting on the tall rack between the two
phones. They are blanket oxide wafers and should be measured on the same
recipe you measure mqc wafers on. After wafers are done measuring, please
place a sticker on the box that says "PREMEASURED ON THICKNESS.A4/.A5 - DO
NOT USE!". 



CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                14                  cmp.b1/.b2/.a1/scrb

        BREAKIN WAFERS             150                  misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: XD0357 (PMD).

CMP.A2 (Strasbaugh 6DS-SP) - DOWN: ROBOT/SOFTWARE UPGRADE.

CMP.B1 (Speedfam CMP-V) - RUNNING: XD0341 (M3) and XD0345 (M2). mqcs
completed.

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0065 (M2).

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
1

Down Equipment:
--------------
CMP.A2 - ROBOT/SOFTWARE UPGRADES

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0363 - WAITING TO RECOMBINE WITH CHILD LOT

Monitor status:
--------------
4.5 boxes of 12K monitors

Number of product lots in room:
------------------------------
9

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0082 - PMD - 24WFRS
XD0373 - PMD - 24WFRS
XD0369 - M3 - 23WFRS
XL0377 - PMD - 24WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
11 CARRIERS FOR SPEEDFAM
2 CARRIERS FOR STRASBAUGH + 1 PLATE

70.11CMP C-SHIFT PD. 2/8/96FABSIX::E_DAWSONThu Feb 08 1996 19:1828
				CMP   
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE
             
CMP.A2 (Strasbaugh 6DS-SP) - DOWN/ROBOT  

CMP.B1 (Speedfam CMP-V) - DOWN/MODIFY...?   
			       
CMP.B2 (Speedfam CMP-V) - MQC...2ND SET

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed                    
       
	Static Lots:                    
	-----------                   
        JD0085 DC1026 PMD 24W "NO T TAG"
        XD0360 TM36 ILD2 24W  "NO TOOL"
                          
        Lots in CMP: 8  
        -----------
	
	MQC Monitors:                   Carriers:
	-------------                   --------
    	 3 BOXES	              4 - Strasbaugh
	MQC Mon. Used: 16 	      1 - Strasbaugh Plates
    	-------------                 6 - Speedfam                      
70.122/11/96 B SHIFT CMP PASSDOWNFABSIX::L_CEDRONESun Feb 11 1996 07:3176
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               12                   cmp.a1/.b1/scrub

        BREAKIN WAFERS             75                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING JD0077 M1

CMP.A2 (Strasbaugh 6DS-SP) - DOWN MQC

CMP.B1 (Speedfam CMP-V) - UP IDLE

CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING JD0073 + XD0362 FOR TOUCH UP

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S DONE
CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S DONE


Hot/B lots in area:
___________________
* NONE *

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
XD0371 PMD NO TOLKEN
JD0091 PMD NO TOLKEN
JD0071 M2 NO TOLKEN

Down Equipment:
---------------
CMP.A2 - DOWN, MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
* NONE *

Monitor status:
---------------
1 1/2 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
8

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
--------------------
XD0351 M3 23W

# of carriers for strasbaugh/speedfam:
-------------------------------------
10 spare carriers for CMP.B1/B2
 2 full carriers for CMP.A1/.A2
 1 PLATE FILMED AND SHIMED FOR CMP.A1/.A2



70.13A-shift CMP passdown 2/11/96SUBPAC::SADINFreedom isn't free.Sun Feb 11 1996 19:2174
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                12                  cmp.b1/.b2/scrb

        BREAKIN WAFERS             200                  misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0091 (pmd)

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0370 (m1) 

CMP.B1 (Speedfam CMP-V) - RUNNING: XD0349 (M3) and JD0071 (M2)

CMP.B2 (Speedfam CMP-V) - RUNNING: XD0348 (M2) 

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
XD0364 - SPECIAL "ONE PASS" LOT. SEE REMARKS.

Down Equipment:
--------------
* none *

Scrap lots:
----------
XD0362 - POSSIBLE SCRAP DUE TO OVERPOLISH. ENG/PRODUCTION WILL HASH IT OUT
TOMORROW.

Hold Lots:
---------
XD0362 - HOLD FOR ENG EVAL.

Monitor status:
--------------
1 box of 12K monitors (2 more on order)

Number of product lots in room:
------------------------------
11

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0077 - M1 - 24WFRS
XD0371 - PMD - 24WFRS
JD0073 - M2 - 24WFRS
XD0362 - M1 - 24WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
11 CARRIERS FOR SPEEDFAM
2 STRASBAUGH CARRIERS + 1 PLATE

70.142/13/96 B SHIFT CMP PASSDOWNFABSIX::L_CEDRONETue Feb 13 1996 06:5576
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               4                 cmp.a1/.b1/scrub

        BREAKIN WAFERS             50                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP IDLE

CMP.A2 (Strasbaugh 6DS-SP) - UP IDLE

CMP.B1 (Speedfam CMP-V) - UP RUNNING JD0062 + JD0087 (HOT) BOTH AT TOUCH UP

CMP.B2 (SPEEDFAM CMP-V) - SCHED. DOWN

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S DONE
CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S DONE


Hot/B lots in area:
___________________
JD0087 HOT LOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
JD0097 PMD NO TOLKEN
XD0380 PMD NO TOLKEN
JD0078 M2 NO TOLKEN

Down Equipment:
---------------
CMP.B2 - SCHED. DOWN

Scrap lots:
----------
* none *

Hold Lots:
---------
* NONE *

Monitor status:
---------------
2 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
5

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
--------------------
4 LOTS

# of carriers for strasbaugh/speedfam:
-------------------------------------
6 spare carriers for CMP.B1/B2
 4 full carriers for CMP.A1/.A2
 0 PLATE FILMED AND SHIMED FOR CMP.A1/.A2



70.15A-shift CMP passdown for 2/12/96...notesfile down yesterdaySUBPAC::SADINFreedom isn't free.Tue Feb 13 1996 10:4575
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                6                   cmp.a1/scrb

        BREAKIN WAFERS            100                   misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0076 (m1) 

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0080 (m1 touchup)

CMP.B1 (Speedfam CMP-V) - RUNNING: JD0082 (m2 touchup) and JD0062 (m3)

CMP.B2 (Speedfam CMP-V) - SCHED_DOWN: down for next 3 days for scheduled
work. 

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
JD0082 - M2

Hot lots coming to area:
-----------------------
JD0087 - ILD1-1
XD0388(BLOT)- UPP_PMD1

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.B2 - SCHED DOWN 

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
� box of 12K wafers. 2 more on order (Novellus dep system is down)

Number of product lots in room:
------------------------------
7

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0096 - pmd - 24wfrs
JD0072 - m2 - 24wfrs
XD0364 - m1 - 24wfrs


# of carriers for strasbaugh/speedfam:
--------------------------------------
5 speedfam carriers built, 5 waiting to be built
4 strasbaugh carriers built

70.16A-shift CMP passdown 2/13/96SUBPAC::SADINFreedom isn't free.Tue Feb 13 1996 19:1874
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                5                   cmp.a1/.a2/scrb

        BREAKIN WAFERS            100                   misc


CMP.A1 (Strasbaugh 6DS-SP) - SCHED_DOWN: pad change after monthly pm.

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0078 (M2).

CMP.B1 (Speedfam CMP-V) - REPAIR: reps repairing scrubber.

CMP.B2 (Speedfam CMP-V) - SCHED_DOWN: reps/eng working to optimize tool. 

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
XD0345 (B)

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
JD0097 - 1.4 NO TOKIN
XD0380 - 1.0 NO TOKIN

Down Equipment:
--------------
CMP.A1 - PAD CHANGE AFTER MONTHLY PM
CMP.B1 - SCRUBBER FAILURE
CMP.B2 - SCHED_DOWN FOR ENG/REPS TO CALIBRATE/OPTIMIZE TOOL

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
� box of mqc wafers. More ordered but Novellus is holding them up.

Number of product lots in room:
------------------------------
7

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0062 - M3 - 21WFRS
JD0087 - M1 - 23WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
10 COMPLETE CARRIERS FOR SPEEDFAM
4 COMPLETE CARRIERS AND 2 PLATES SHIMMED AND FILMED

70.172/14/96 B SHIFT CMP PASSDOWNFABSIX::L_CEDRONEWed Feb 14 1996 06:3374
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               19                 cmp.a1/.b1/scrub

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING JD0074 M2

CMP.A2 (Strasbaugh 6DS-SP) - UP RUNNING XD0345 M3 B LOT

CMP.B1 (Speedfam CMP-V) - UP RUNNING JD0083 M1 + JD0066 M3

CMP.B2 (SPEEDFAM CMP-V) - SCHED. DOWN

CMP-SCRUB.A1 (On-track scrubber) - IDLE 
CMP-SCRUB.A2 (On-track scrubber) - IDLE


Hot/B lots in area:
___________________
XD0345 B-LOT

Hot lots coming to area:
------------------------
XD0388 B-LOT PMD

Static Lots in area:
-------------------
* NONE *

Down Equipment:
---------------
CMP.B2 - SCHED. DOWN

Scrap lots:
----------
* none *

Hold Lots:
---------
* NONE *

Monitor status:
---------------
1/2 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
4

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
--------------------
3 LOTS

# of carriers for strasbaugh/speedfam:
-------------------------------------
10 spare carriers for CMP.B1/B2
 4 full carriers for CMP.A1/.A2
 2 PLATE FILMED AND SHIMED FOR CMP.A1/.A2



70.18CMP A SHIFT PASSDOWNFABSIX::J_ROAWed Feb 14 1996 18:4886

               -< A shift CMP passdown -  Wednesday  02/14/96 >-
--------------------------------------------------------------------------------
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        		
        MQC-12K MONS            15	                      cmp.b1 mqcs
				
        BREAKIN WAFERS          75                          cmp.b1 breakin

                
                 Built carriers and plates available.
                 -----------------------------------

                4 FULL CARRIERS BUILT ( STRASBAUGH )PLUS 2 PLATES 
              ------------------------------------------

               10 SPEEDFAM B1 AND B2 CARRIERS AVAILABLE 



CMP.A1 (Strasbaugh 6DS-SP) - RUNNING :Final polishing lot XD0388


CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: Lot XD0379 running through initial
polish. It will need 100% measurements on UV1050 after.


CMP.B1 (Speedfam CMP-V) -  RUNNING: Lot XD0345 was measured and JD0066
need to be 100% measured. Both lots need to be touched up.


CMP.B2 (Speefam CMP_V ) - SCHED/DOWN: Reps working to improved tool 
performance.


CMP-SCRUB.A1 (On-track scrubber) - DOWN: Wafer broke in the spin station. 
Need to clean up station, run excersise wafers and do a particle check.


CMP-SCRUB.A2 (On-track scrubber) - DOWN: Top motor on inside brush to be
replaced to avoid anymore error messages.
                  

Hot/B lots in area:
__________________
XD0345 AND XD0388

Hot lots coming to area:
-----------------------


Static Lots in area:
-------------------


Down Equipment:
--------------
CMP.B2


Scrap lots:
----------

Hold Lots:
---------

Monitor status:
--------------

1 boxe of 12K's

Number of product lots in room:
------------------------------
 5 LOTS

New specs/revs posted:
---------------------


70.19CMP C-SHIFT PD. 2/15/96FABSIX::E_DAWSONThu Feb 15 1996 19:2828
				CMP                 
				___

CMP.A1 (Strasbaugh 6DS-SP) - RUNNING-1 JD0081 DC1026 ILD1 24W
             
CMP.A2 (Strasbaugh 6DS-SP) - MQC

CMP.B1 (Speedfam CMP-V) - RUNNING-1 "HOT LOT" XD0365 ILD3 TM36 24W   
			       
CMP.B2 (Speedfam CMP-V) - MQC

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
	Hot/B lots in area: 1 	      
	------------------	      
        XD0360 TM36 ILD3 24W
    
        Lots in CMP: 4 
        -----------
       
       	MQC Monitors:                   Carriers:
	-------------                   --------
    	1.5 BOXES	              4 - Strasbaugh
	MQC Mon. Used: 10 	      2 - Strasbaugh Plates
    	-------------                 9 - Speedfam              
        
70.202/18/96 B SHIFT CMP PASSDOWNFABSIX::L_CEDRONESun Feb 18 1996 07:2975
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               18                 cmp.a1/.b1/scrub

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING mqc

CMP.A2 (Strasbaugh 6DS-SP) - UP RUNNING XD0371 and xd0389

CMP.B1 (Speedfam CMP-V) - UP RUNNING xd0363 hot, and jd0068 (M3)

CMP.B2 (SPEEDFAM CMP-V) - up mqc

CMP-SCRUB.A1 (On-track scrubber) - IDLE 
CMP-SCRUB.A2 (On-track scrubber) - IDLE


Hot/B lots in area:
___________________
XD0363 HOT LOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
* NONE *

Down Equipment:
---------------
* NONE *

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0397
YD0148

Monitor status:
---------------
3 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
7

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
--------------------
2 LOTS

# of carriers for strasbaugh/speedfam:
-------------------------------------
9 spare carriers for CMP.B1/B2
2 full carriers for CMP.A1/.A2
2 PLATE FILMED AND SHIMED FOR CMP.A1/.A2



70.21A-shift CMP passdown 2/18/96SUBPAC::SADINFreedom isn&#039;t free.Sun Feb 18 1996 19:1878
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  cmp.b1/.b2/.a1/scrb

        BREAKIN WAFERS             150                  misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0084 (m1).

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0387 (pmd transferred from CMP.A1)

CMP.B1 (Speedfam CMP-V) - RUNNING: JD0075 (m2) and JD0068 (m3).

CMP.B2 (Speedfam CMP-V) - DOWN: wafers not seating properly on carriers.
(XL0354)

CMP-SCRUB.A1 (On-track scrubber) - IDLE. 

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
XD0363 - HOT - MOVING OUT NOW
XD0403 - HOT - PMD 

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
XD0397 - STI LOT.
YD0148 - HOLD FOR ENG EVAL

Down Equipment:
--------------
CMP.B2 - WAFERS NOT SEATING PROPERLY ON CARRIERS.

Scrap lots:
----------
* none *

Hold Lots:
---------
YD0148 - HOLD FOR ENG EVAL.
XD0397 - STI LOT. ENG NEEDS TO RUN.

Monitor status:
--------------
3 FULL BOXES OF 12K MONITORS. APPROX 100 BREAKIN WAFERS AVAILABLE.

Number of product lots in room:
------------------------------
10

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0382 - PMD - 19WFRS
XD0387 - PMD - 24WFRS
XD0389 - PMD - 23WFRS
XD0371 - M1 - 24WFRS
XD0363 - M2 - 21WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
7 CARRIERS FOR SPEEDFAM (6 IN REBUILD ROOM, 1 IN CMP ROOM)
2 COMPLETE STRASBAUGH CARRIERS (+4 PLATES SHIMMED/FILMED)

70.222/19/96 B SHIFT CMP PASSDOWNFABSIX::L_CEDRONEMon Feb 19 1996 07:3577
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               20                 cmp.a1/.b1/scrub

        BREAKIN WAFERS             150                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP MQC, RUNNING JD0084 (TOUCH UP)

CMP.A2 (Strasbaugh 6DS-SP) - UP MQC, RUNNING XD0370+XD0403 (TOUCH UP)

CMP.B1 (Speedfam CMP-V) - UP RUNNING XL0378

CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING XL0354 

CMP-SCRUB.A1 (On-track scrubber) - IDLE 
CMP-SCRUB.A2 (On-track scrubber) - IDLE


Hot/B lots in area:
___________________
* NONE *

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
* NONE *

Down Equipment:
---------------
* NONE *

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0397
YD0148

Monitor status:
---------------
1 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
--------------------
JD0068 M3 19W
JD0075 M2 24W
XD0370 M2 19W

# of carriers for strasbaugh/speedfam:
-------------------------------------
9 spare carriers for CMP.B1/B2
2 full carriers for CMP.A1/.A2
0 PLATE FILMED AND SHIMED FOR CMP.A1/.A2



70.23A-shift CMP passdown 2/19/96SUBPAC::SADINFreedom isn&#039;t free.Mon Feb 19 1996 19:1684
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  cmp.b1/.a1/.a2/scrb

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - IDLE.

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0085 (m1).

CMP.B1 (Speedfam CMP-V) - MQC: evaluating mqcs now after pad change. 

CMP.B2 (Speedfam CMP-V) - DOWN: lost wafer earlier. Equip eng and speedfam
reps are working on tool. 

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
JD0105 - DEP_PMD1
JD0083 - DEP ILD2-1

Static Lots in area:
-------------------
XL0354 - 1.3DAYS (WAITING FOR .B2 TO COME BACK UP)
YD0148 - 3.1DAYS (ON HOLD FOR ENG EVAL - LARRY CAMILLETTI)

Down Equipment:
--------------
CMP.B2 - LOST A WAFER. DOWN TO EQUIP ENG AND REPS.
CMP.B1 - MQC.

Scrap lots:
----------
* none *

Hold Lots:
---------
YD0148 - 3.1DAYS (ON HOLD FOR ENG EVAL - LARRY CAMILLETTI)
JD0084 - ON HOLD FOR HIGH RANGE. PSS IS AWARE OF THIS LOT.

Monitor status:
--------------
1.5 BOXES OF 12K MONITOR WAFERS.

Number of product lots in room:
------------------------------
8

New specs/revs posted:
---------------------
** SPEC CHANGE COMING SOON TO A SPEC NEAR YOU! **
        
        The Strasbaugh spec will be edited to reflect the fact that we no
longer need to do a double scrub on product lots before they leave the
room. In the mean time, the Strasbaugh spec still DOES say to do a double
scrub. In order to comply with the current on-line spec, ALL LOTS RUN ON
THE STRASBAUGH TOOLS STILL NEED TO BE DOUBLE SCRUBBED. As soon as we get an
ECO or the spec gets changed, we can stop double-scrubbing Strasbaugh lots.
 
Lots/wafers processed:
---------------------
JD0098 - PMD - 12WFRS
XD0403 - PMD - 24WFRS
XL0378 - M1 - 24WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
7 SPEEDFAM CARRIERS (6 IN THE REBUILD ROOM - 1 OVER HERE)
2 STRASBAUGH CARRIERS + 2 PLATES

70.242/20/96 B SHIFT CMP PASSDOWNFABSIX::L_CEDRONETue Feb 20 1996 07:2179
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               21                 cmp.a1/.b1/scrub

        BREAKIN WAFERS             350                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING JD0077 + JD0105 (HOT)

CMP.A2 (Strasbaugh 6DS-SP) - UP RUNNING XL0365

CMP.B1 (Speedfam CMP-V) - UP BREAK IN, MQC

CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING JD0073 + JD0083 (HOT) 

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S DONE
CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S DONE


Hot/B lots in area:
___________________
JD0105 HOT LOT
JD0083 HOT LOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
* NONE *

Down Equipment:
---------------
* NONE *

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0397
YD0148

Monitor status:
---------------
1 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
8

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
--------------------
JD0085 M1 24W
JD0102 PMD 24W
JD0088 M1 24W
XL0354 M3 19W

# of carriers for strasbaugh/speedfam:
-------------------------------------
6 spare carriers for CMP.B1/B2
2 full carriers for CMP.A1/.A2
2 PLATE FILMED AND SHIMED FOR CMP.A1/.A2



70.25CMP A SHIFT PASSDOWNFABSIX::J_ROATue Feb 20 1996 20:1888

               -< A shift CMP passdown -  Tuesday  02/20/96 >-
--------------------------------------------------------------------------------
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        		
        MQC-12K MONS            15	                      cmp.b1 mqcs
				
        BREAKIN WAFERS          75                          cmp.b1 breakin

                
                 Built carriers and plates available.
                 -----------------------------------

                2 FULL CARRIERS BUILT ( STRASBAUGH )PLUS 2 PLATES 
              ------------------------------------------

               5 SPEEDFAM B1 AND B2 CARRIERS AVAILABLE 



CMP.A1 (Strasbaugh 6DS-SP) - RUNNING : JD0103 AND XL0365


CMP.A2 (Strasbaugh 6DS-SP) - DOWN: FAILED MQC'S TWICE AFTER PAD CHANGE.
LOT JD0077 WAS RUNNING ON THIS TOOL BEFORE IT WENT DOWN. LOT IS BEEN MEASURED
100% ON THICKNESS.A5

CMP.B1 (Speedfam CMP-V) -  MQC: FAILED MQC'S MANY TIMES FOR UNIFORMITY AND
SCRATCHES. NEW PAD INSTALLED AND BROKEN IN. MQC WAFERS RAN AND NEED TO 
BE EVALUTED.



CMP.B2 (Speefam CMP_V ) - RUNNING: LOTS JD0073 AND JD0083 WERE MEASURED AND 
ARE READY TO BE TOUCHED UP



CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE: 


CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE:

                  

Hot/B lots in area:
__________________
YD0147 - JD0083

Hot lots coming to area:
-----------------------


Static Lots in area:
-------------------


Down Equipment:
--------------
CMP.A2


Scrap lots:
----------

Hold Lots:
---------

Monitor status:
--------------



Number of product lots in room:
------------------------------
9 LOTS

New specs/revs posted:
---------------------


70.26CMP C-SHIFT PD. 2/22/96FABSIX::E_DAWSONThu Feb 22 1996 19:1837
				CMP   
				___

CMP.A1 (Strasbaugh 6DS-SP) - RUNNING-1 YD0147 TM36 ILD1 24W 
                                  WILL NEED A PAD CHANGE...
    
CMP.A2 (Strasbaugh 6DS-SP) - RUNNING-1 **HOT LOT** XD0403 TM36 ILD1 24W 12 
                                  WILL NEED A PAD CHANGE...
    
CMP.B1 (Speedfam CMP-V) - RUNNING-1 JD0071 DC1026 ILD3 24W   
			          WILL NEED MQC'S
    
CMP.B2 (Speedfam CMP-V) - RUNNING-1 YD0150 TM36 24W
                                  MQC'S DONE @ 6:00PM
    
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
    	Hot Lots: 
    	---------
        XD0403 TM36 ILD1 24W...CMP.A2
    
        Scrap Wafers:  
        -------------
        "1 WAFER WILL BE" XD0403 OVERPOLISHED
       
        Lots in CMP: 5
        ------------                     
    
   	MQC Monitors:                   Carriers:
	-------------                   --------
    	1 BOX, 4 ORDERED	       5 - Strasbaugh
                                       3 - Strasbaugh Plates
       	MQC Mon. Used: 35 	       9 - Speedfam
    	-------------                   
                      
70.272/25/96 B SHIFT CMP PASSDOWNFABSIX::L_CEDRONESun Feb 25 1996 07:4478
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               1                 cmp.a1/.b1/scrub

        BREAKIN WAFERS             25                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP IDLE (Eng. pad do not run any qual. lots)

CMP.A2 (Strasbaugh 6DS-SP) - UP IDLE

CMP.B1 (Speedfam CMP-V) - UP RUNNING JD0097 (Is going to need a pad change)
                                        (Two carriers also need to be changed)

CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING XD0379 

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S DONE
CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S DONE


Hot/B lots in area:
___________________
XD0373 B LOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
* NONE *

Down Equipment:
---------------
* NONE *

Scrap lots:
----------
* NONE *

Hold Lots:
---------
* NONE *

Monitor status:
---------------
3 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
5

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
--------------------
XD0391 24W
XD0144 24W
XD0362 23W
XD0388 24W

# of carriers for strasbaugh/speedfam:
-------------------------------------
11 spare carriers for CMP.B1/B2
5 full carriers for CMP.A1/.A2
4 PLATE FILMED AND SHIMED FOR CMP.A1/.A2



70.28A-shift CMP passdown 02/25/96SUBPAC::SADINFreedom isn&#039;t free.Sun Feb 25 1996 19:0276
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                16                  cmp.b1/.b2/scrb/.a1/.a2

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0073 (M3).

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0373 (M2).

CMP.B1 (Speedfam CMP-V) - VERIFY-S: finishing up mqcs after pad change
(carrier 4 and 5 changed also).

CMP.B2 (Speedfam CMP-V) - VERIFY-U: running breakin wafers after 2nd table
crash.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
XD0373 - BLOT - M2

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
JD0107 - 0.8DAYS (NO TOKIN)
XL0385A - 2.5DAYS (NO TOKIN)

Down Equipment:
--------------
CMP.B1 - VERIFY-S - FINISHING MQCS
CMP.B2 - VERIFY-U - RUNNING BREAKINS

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
2.5 boxes of 12K monitor wafers.

Number of product lots in room:
------------------------------
5

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0097 - M1 - 23WFRS
XD0379 - M1 - 24WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
7 SPEEDFAM CARRIERS
5 STRASBAUGH CARRIERS
4 PLATES SHIMMED/FILMED FOR STRASBAUGH

70.29A-shift CMP passdown 02/26/96SUBPAC::SADINFreedom isn&#039;t free.Mon Feb 26 1996 19:1572
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                14                  cmp.b1/.b2/scrb

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - IDLE.

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0072 (M3).

CMP.B1 (Speedfam CMP-V) - RUNNING: JD0105 (M2 - HOT) and JD0074 (M3).

CMP.B2 (Speedfam CMP-V) - RUNNING: YD0137 (M3).

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
JD0105 - HOT
JD0106 - HOT

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
1

Down Equipment:
--------------
jd0074  1.1days

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
2 boxes of 12K monitors

Number of product lots in room:
------------------------------
8

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
YD0151 - M1 - 24WFRS
JD0107 - PMD - 12WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
7 SPEEDFAM CARRIERS (NO PLATES)
5 STRASBAUGH CARRIES + 4 PLATES

70.302/27/96 B SHIFT CMP PASSDOWNFABSIX::L_CEDRONETue Feb 27 1996 07:4878
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                0               cmp.a1/.b1/scrub

        BREAKIN WAFERS             50                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP running (hot) jd0117

CMP.A2 (Strasbaugh 6DS-SP) - UP RUNNING XD0395 (WAITING FOR PROMETRICS TO BE FIXED)

CMP.B1 (Speedfam CMP-V) - UP BREAKIN + MQC (COULD NOT MEASURE MQC WAFERS PROMETRIC
                                             LOCKED UP)
CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING XD0379 

CMP-SCRUB.A1 (On-track scrubber) - IDLE
CMP-SCRUB.A2 (On-track scrubber) - IDLE


Hot/B lots in area:
___________________
JD0117 HOT LOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
* NONE *

Down Equipment:
---------------
CMP.B1 + .B2 PAD AND CARRIER CHANGE

Scrap lots:
----------
* NONE *

Hold Lots:
---------
* NONE *

Monitor status:
---------------
3 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
8

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
--------------------
JD0105 M2
JD0074 M3
JD0106 PMD
JD0072 M3
YD0137 M3

# of carriers for strasbaugh/speedfam:
-------------------------------------
3 spare carriers for CMP.B1/B2
3 full carriers for CMP.A1/.A2
1 PLATE FILMED AND SHIMED FOR CMP.A1/.A2



70.31A-shift CMP passdown 02/27/96SUBPAC::SADINFreedom isn&#039;t free.Tue Feb 27 1996 19:2780
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                35                  cmp.b1/.b2/.a1/.a2

        BREAKIN WAFERS             150                  misc


CMP.A1 (Strasbaugh 6DS-SP) - IDLE. Just passed mqcs with new pad. 

CMP.A2 (Strasbaugh 6DS-SP) - VERIFY-S: pad and carriers changed. Needs
breakin and mqcs.

CMP.B1 (Speedfam CMP-V) - MQC: running mqcs now. (Mapper for cassette A and
B are not working properly. We can only use cassette A and we need to
manually pick the slots with wafers in them. We cannot automatically map in
wafers. New parts are on order).

CMP.B2 (Speedfam CMP-V) - RUNNING2: XD0364 (m2) and XD0403 (m2 - hot).

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
XD0403 - M2 HOT

Hot lots coming to area:
-----------------------
JD0085 - ILD2-1

Static Lots in area:
-------------------
XD0381 - M1 - 0.8DAYS
XD0364 - M2 - 0.7DAYS
PA1114 - PMD - 1.7DAYS
XD0404 - PMD - 0.7DAYS

Down Equipment:
--------------
CMP.A1 - DOWN FOR PAD CHANGE
CMP.A2 - VERIFY - PADS/CARRIERS CHANGED. NEEDS BREAKIN/MQC.
CMP.B1 - MQC - RUNNING MQCS NOW.

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
� box of 12K monitors left, 2 more boxes ordered today.

Number of product lots in room:
------------------------------
12

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0117 - PMD - 23WFRS
XD0395 - PMD - 23WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
3 SPEEDFAM CARRIERS (6 NEW PLATES IN THE ROOM)
4 STRASBAUGH CARRIERS + 3 PLATES

70.322/28/96 B SHIFT CMP PASSDOWNFABSIX::L_CEDRONEWed Feb 28 1996 07:2774
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                16               cmp.a1/.b1/scrub

        BREAKIN WAFERS              98                 misc


CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING JD0099 M1 + JD0076 M2

CMP.A2 (Strasbaugh 6DS-SP) - UP RUNNING JD0113 PMD + XD0404 PMD

CMP.B1 (Speedfam CMP-V) - UP RUNNING JD0376 M2 + JD0079 M3

CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING JD0078 M3 + XD0358 M3

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S DONE
CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S DONE


Hot/B lots in area:
___________________
* NONE *

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
* NONE *

Down Equipment:
---------------
* NONE *

Scrap lots:
----------
* NONE *

Hold Lots:
---------
* NONE *

Monitor status:
---------------
1 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
9

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
--------------------
3 LOTS

# of carriers for strasbaugh/speedfam:
-------------------------------------
6 spare carriers for CMP.B1/B2
4 full carriers for CMP.A1/.A2
4 PLATE FILMED AND SHIMED FOR CMP.A1/.A2



70.33FABSIX::J_ROAWed Feb 28 1996 18:5586

               -< A shift CMP passdown -  Wednesday  02/28/96 >-
--------------------------------------------------------------------------------
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        		
        MQC-12K MONS            15	                      cmp.b1 mqcs
				
        BREAKIN WAFERS          75                          cmp.b1 breakin

                
                 Built carriers and plates available.
                 -----------------------------------

                4 FULL CARRIERS BUILT ( STRASBAUGH )PLUS 2 PLATES 
              ------------------------------------------

               6 SPEEDFAM B1 AND B2 CARRIERS AVAILABLE 



CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: Lot JD0076 ran for 6 minutes so far.
JD0099 needs touch ups. 


CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE: 


CMP.B1 (Speedfam CMP-V) -  RUNNING: Final polishing lot JD0079. Lot JD0078
still needs to to touched up.



CMP.B2 (Speefam CMP_V ) - DOWN: High uniformity/range. Tool needs new pad
and some carriers. Head #3 is the worse.


CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE: 


CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE:

                  

Hot/B lots in area:
__________________
B lot JD0085 

Hot lots coming to area:
-----------------------


Static Lots in area:
-------------------


Down Equipment:
--------------
CMP.B2


Scrap lots:
----------

Hold Lots:
---------

Monitor status:
--------------



Number of product lots in room:
------------------------------
 8 LOTS

New specs/revs posted:
---------------------


70.34CMP C-SHIFT PD. 3/2/96FABSIX::E_DAWSONSat Mar 02 1996 19:2733
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING TUP ON JD0081 ILD2 WILL NEED SCRUB
    				& FINAL MESSURMENT
             
CMP.A2 (Strasbaugh 6DS-SP) - RUNNING 1- XD0396 RUNNING 9 MINS, NEEDS SCRUB
    					&100%  
CMP.B1 (Speedfam CMP-V) - MQC    
			       
CMP.B2 (Speedfam CMP-V) - UP/IDLE

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
	B lots in area: 	
	-------------- 
        XD0396 ILD1
    
	Static Lots:                   
	-----------                   
        SEE WORKSTREAM
    
        Lots in CMP:7 
        -----------
       
	MQC Monitors:                   Carriers:
	-------------                   --------
    	2.5 BOXES	                SEE S.GRALEY PD.
    
	MQC Mon. Used:16 	       
    	-------------                    
70.353/3/96 B SHIFT CMP PASSDOWNFABSIX::L_CEDRONESun Mar 03 1996 08:0274
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                4               cmp.a1/.b1/scrub

        BREAKIN WAFERS              75                 misc


CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING XD0407 PMD

CMP.A2 (Strasbaugh 6DS-SP) - UP IDLE

CMP.B1 (Speedfam CMP-V) - UP RUNNING YD0140M3 (TOUCH UP) + XD0370 M3

CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING XD0371 + XL0370 BOTH M2

CMP-SCRUB.A1 (On-track scrubber) - IDLE
CMP-SCRUB.A2 (On-track scrubber) - IDLE


Hot/B lots in area:
___________________
* NONE *

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
* NONE *

Down Equipment:
---------------
* NONE *

Scrap lots:
----------
* NONE *

Hold Lots:
---------
* NONE *

Monitor status:
---------------
1 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
9

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
--------------------
4 LOTS

# of carriers for strasbaugh/speedfam:
-------------------------------------
7 spare carriers for CMP.B1/B2
6 full carriers for CMP.A1/.A2
4 PLATE FILMED AND SHIMED FOR CMP.A1/.A2