[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Conference asdg::cmp

Title:CMP
Notice:Welcome to the CMP notesfile
Moderator:FABSIX::B_TOWERLLE
Created:Tue Oct 31 1995
Last Modified:Fri Jun 06 1997
Last Successful Update:Fri Jun 06 1997
Number of topics:94
Total number of notes:6381

69.0. "CMP ops passdowns - Jan 1996" by SUBPAC::SADIN (Freedom isn't free.) Tue Jan 02 1996 19:20

    
    
    	CMP operations passdowns for January 1996.
    
    
T.RTitleUserPersonal
Name
DateLines
69.1A shift CMP passdown 1/2/96SUBPAC::SADINFreedom isn't free.Tue Jan 02 1996 19:1878
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                26                  cmp.b1/.b2./.a2/.a1

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - VERIFY-U: needs new carriers/pad and mqcs.

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: running XD0319 (m3).

CMP.B1 (Speedfam CMP-V) - DOWN: wafer breakage. Has a new pad and we
managed to salvage 3 carriers. There is one carrier in the rebuild room
that we can bring over to bring us up to four carriers on B1. We have no
more plates.

CMP.B2 (Speedfam CMP-V) - RUNNING: running XL0320 (m3).

CMP-SCRUB.A1 (On-track scrubber) -  IDLE. 

CMP-SCRUB.A2 (On-track scrubber) -  IDLE.


Hot/B lots in area:
__________________
XL0320 - B-lot
XL0338 - HOT

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
10

Down Equipment:
--------------
CMP.B1 - BROKEN WAFER
CMP.A1 - VERIFY-U

Scrap lots:
----------
* none *

Hold Lots:
---------
JD0046 - NEEDS 100% UV-1050

Monitor status:
--------------
1 box of 12K monitors

Number of product lots in room:
------------------------------
16

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0343 - M1 - 15WFRS
JD0044 - M3 - 11WFRS
XD0325 - M2 - 20WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
4 COMPLETE STRASBAUGH CARRIERS
3 STRASBAUGH PLATES FILMED (ONE WITH HOLES DRILLED)
0 EXTRA CARRIERS FOR SPEEDFAM (NO PLATES - MORE ON ORDER)

69.2A shift CMP passdown 1/3/96SUBPAC::SADINFreedom isn't free.Wed Jan 03 1996 18:3775
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               23                   cmp.a1/.b1/.a2/scrub

        BREAKIN WAFERS            100                   misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: XD0323 (m3) JD0056 (m1).

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0054 (m1).

CMP.B1 (Speedfam CMP-V) - DOWN: carrier plates had 10+micron curvature
resulting in center slow polish (even with 155 OD setting). No carriers
in-house. More plates should be in tomorrow.

CMP.B2 (Speedfam CMP-V) - DOWN: down for vibration problems.

CMP-SCRUB.A1 (On-track scrubber) - IDLE. 

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
XL0320 - M3 - BLOT

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
6

Down Equipment:
--------------
CMP.B1 - NO CARRIERS
CMP.B2 - VIBRATION

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
2 boxes of 12K monitor wafers (2 more boxes on order)

Number of product lots in room:
------------------------------
16

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0052 - M1 - 12WFRS
JD0053 - M1 - 12WFRS
JD0054 - M1 - 12WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
2 complete strasbaugh carriers + 3 plates filmed/shimmed
0 speedfam plates/carriers

69.3D SHIFT PASSDOWNFABSIX::D_CAUSEThu Jan 04 1996 07:5556
CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING LOT XL0313
                                      
                                                                      
CMP.A2 (Strasbaugh 6DS-SP) - UP/RUNNING LOT JD0054
                                     
CMP.B1 (Speedfam CMP-V) - DOWN WAITING FOR PLATES WAS RUNNING XLO311,XL0320

CMP.B2 (Speedfam CMP_V) - DOWN WAITING FOR PLATES

                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  MQC COMPLETE  

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  MQC COMPLETE 

HOT/B lots in area: 
-------------------

 B   lot # XL0320
HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:16 TOTAL LOTS IN AREA
--------------------
       
DOWN equipment:CMP.B1, CMP.B2
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   0 COMPLETE
     STRAUSBAUGH COMPLETE       5 COMPLETE
 
HOLD LOTS:
----------

NONE


MONITOR status:
---------------
  

NUMBER of product lots in room: 12
-------------------------------
    
              
              
             
              
              
new spec/revs posted:
---------------------

*none*
69.4D SHIFT PASSDOWNFABSIX::D_CAUSEFri Jan 05 1996 07:3756
CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING LOT YD0138
                                      
                                                                      
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE
                                     
CMP.B1 (Speedfam CMP-V) - DOWN WAITING FOR PLATES

CMP.B2 (Speedfam CMP_V) - UP/IDLE ONLY USEING 3 CARRIERS JD0033,XD0315(BLOT)

                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  MQC COMPLETE  

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  MQC COMPLETE 

HOT/B lots in area: 
-------------------

 B   lot # XD0315
HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:13 LOTS IN AREA
--------------------
       
DOWN equipment:CMP.B1
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   0 COMPLETE
     STRAUSBAUGH COMPLETE       5 COMPLETE
 
HOLD LOTS:
----------

NONE


MONITOR status:
---------------
  

NUMBER of product lots in room: 13
-------------------------------
    
              
              
             
              
              
new spec/revs posted:
---------------------

*none*
69.5CMP C-SHIFT PD. 1/5/96FABSIX::E_DAWSONSat Jan 06 1996 18:5645
              <<< ASDG::DISK$SYS_DATA:[NOTES$LIBRARY]CMP.NOTE;1 >>>
                                    -< CMP >-
================================================================================
Note 70.0                    CMP C-SHIFT PD. 1/5/96                   No replies
FABSIX::E_DAWSON                                     39 lines   5-JAN-1996 19:40
--------------------------------------------------------------------------------
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) -  RUNNING - XD0326 TM36 ILD2 24 Wafers 
                                          
CMP.A2 (Strasbaugh 6DS-SP) - RUNNING - XD0336 TM36 PMD 23 Wafers

CMP.B1 (Speedfam CMP-V) - DOWN....Carriers are being built.   
			       
CMP.B2 (Speedfam CMP-V) - RUNNING - JD0035 DC1026 ILD3 11 Wafers
    
CMP-SCRUB.A1 (On-track scrubber) - RUNNING XD0309 TM36 ILD3 24 Wafers
    					...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
	Hot/B lots in area: 		Hot Lots coming: 
	------------------		---------------
        XD0343 TM36 ILD2 15 Wafers
        JD0058 DC1026 ILD2 23 Wafers
    
 	Static Lots:                    Scrap Lots:  
	-----------                     ----------
                                       

	Hold Lots:                      Lots in CMP: 13
        ---------                       -----------
       
	Down Equipment:                 New SPEC/TDCO:
	--------------                  -------------
	CMP.B1     
   
	MQC Monitors:                   Carriers:
	-------------                   --------
         4  Boxes                      1 - Strasbaugh
	MQC Mon. Used: 26              2 - Strasbaugh Plates
    	-------------                  3 - Speedfam  
            
         ***  Four boxes of "EXERCISE" wafers were order today. ***
69.6CMP C-SHIFT PD. 1/6/95FABSIX::E_DAWSONSat Jan 06 1996 19:3241
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - RUNNING - XL0289 TM55 ILD2 23W 
             
CMP.A2 (Strasbaugh 6DS-SP) - MQC

CMP.B1 (Speedfam CMP-V) - UP/IDLE....Needs Breakin & Mqc   
			       
CMP.B2 (Speedfam CMP-V) - UP/IDLE....Mqc peformed 6:00pm

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
	Hot/B lots in area: 		Hot Lots coming: 
	------------------		---------------
       
	Static Lots:                    Scrap Lots: 1 Wafer 
	-----------                     ----------
                                        XL0338 TM55 ILD3 
     
	Hold Lots: 2                      Lots in CMP: 5 
        ---------                         -----------
       YD0141 TM36 ILD1 24W
       XL0328 TM55 17W "STORES"
    
	Down Equipment:                 New SPEC/TDCO:
	--------------                  -------------
    
	MQC Monitors:                   Carriers:
	-------------                   --------
        2.5 Boxes                     3 - Strasbaugh
	                              2 - Strasbaugh Plates
    	MQC Mon. Used:16 	      5 - Speedfam
    	-------------                 
            
   *** FOUR MORE BOXES OF MQC WAFERS WERE ORDERED ***
    
   *** FOUR MORE BOXES OF EXERCISE WAFERS WERE ORDERED. "PLEASE DO NOT USE
    	THESE FOR MQC'S THEY ARE INTERNAL RECLAIM WAFERS. (ie. HIGH PART.)     
69.7A shift CMP passdown 1/08/96SUBPAC::SADINFreedom isn&#039;t free.Mon Jan 08 1996 19:2073
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                10                  cmp.b1/scrubbers

        BREAKIN WAFERS              75                  misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING1: XD0343 (M3 hot lot). 

CMP.A2 (Strasbaugh 6DS-SP) - IDLE.

CMP.B1 (Speedfam CMP-V) - VERIFY: 1st set of mqcs failed. Increase OD to
155 and try again. Still not running carrier 3.

CMP.B2 (Speedfam CMP-V) - DOWN: wafer loss detector problems. 

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
XD0343 - M3 HOT LOT

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.B1 - VERIFY - NEEDS ANOTHER SET OF MQCS RUN. 1ST SET CENTER SLOW.
CMP.B2 - DOWN - WAFER LOSS SENSOR PROBLEMS.

Scrap lots:
----------
* none *

Hold Lots:
---------
XL0328 - NEEDS TO BE SPLIT BETWEEN CMP.B1 AND CMP.B2. NEITHER MACHINE UP.

Monitor status:
--------------
3 BOXES OF 12K MONITORS.

Number of product lots in room:
------------------------------
2

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
YD0142 - M1 - 24WFRS
YD0141 - M1 - 24WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
0 CARRIERS FOR SPEEDFAM (I don't think the shipment of plates made it today)
1 CARRIER FOR STRASBAUGH

69.8A shift CMP passdown 1/09/96SUBPAC::SADINFreedom isn&#039;t free.Tue Jan 09 1996 19:1476
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  cmp.a1/.b1/.b2/scrb

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: XD0344 (pmd - hot).

CMP.A2 (Strasbaugh 6DS-SP) - DOWN: needs new pad.

CMP.B1 (Speedfam CMP-V) - DOWN: down for scratches again.

CMP.B2 (Speedfam CMP-V) - RUNNING: running split lot XL0328 (CMP.B2
portion). DON'T USE MACHINE FOR REGULAR PRODUCT LOTS UNLESS YOU HAVE NO
OTHER MACHINES UP AND RUNNING. Wafer loss detection is still off-line.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
XD0344 - PMD/HOT

Hot lots coming to area:
-----------------------
JD0061 - PMD
JD0058 - M3

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - PAD CHANGE
CMP.B1 - SCRATCHES
CMP.B2 - UP FOR SPLIT LOT BUT DON'T USE FOR PRODUCTION UNLESS ABSOLUTELY
NECESSARY.

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
2 boxes of 12k monitors

Number of product lots in room:
------------------------------
1

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
* none *

# of carriers for strasbaugh/speedfam:
--------------------------------------
8 speedfam carries
2 complete strasbaugh carriers + 2 plates shimmed/filmed

69.9D SHIFT PASSDOWNFABSIX::D_CAUSEWed Jan 10 1996 06:4055
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE
                                                                                                           
CMP.A2 (Strasbaugh 6DS-SP) - UP/IN VERIFY AFTER PM (NEED MQC)
                                     
CMP.B1 (Speedfam CMP-V) - UP/IDLE

CMP.B2 (Speedfam CMP_V) - UP/IDLE ONLY USE IF ALL OTHER MACHINES DOWN! 

                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  MQC COMPLETE 

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  MQC COMPLETE 

HOT/B lots in area: 
-------------------


HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:
--------------------
       
DOWN equipment:CMP.
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   2 COMPLETE
     STRAUSBAUGH COMPLETE       8 COMPLETE
 
HOLD LOTS:
----------

XL0328


MONITOR status:
---------------
  

NUMBER of product lots in room:0 
-------------------------------
    
              
              
             
              
              
new spec/revs posted:
---------------------

*none*
69.10CMP C-SHIFT PD. 1/10/96FABSIX::E_DAWSONWed Jan 10 1996 19:3332
				CMP                              
				___

CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE....Needs mqc's
             
CMP.A2 (Strasbaugh 6DS-SP) - VERIFY-S...Needs Pad & Carriers  

CMP.B1 (Speedfam CMP-V) - DOWN...Scratches....Running pad breakin   
			       
CMP.B2 (Speedfam CMP-V) - VERIFY-U....Running full mqc's  

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
	Hot/B lots in area: 		Hot Lots coming: 
	------------------		---------------
        JD0058 ILD3 DC1026 23W (CMP.B1)
     	
	Hold Lots:                      Lots in CMP: 2 
        ---------                       -----------
       XL0314 "STORES"
       XL0328 "      "
       
	MQC Monitors:                   Carriers:
	-------------                   --------
    	5 BOXES	                     3 - Strasbaugh
                                     4 - Strasbaugh Plates
	MQC Mon. Used: 22 	     8 - Speedfam 
    	-------------                 
            
             *** Four boxes of exercise wafers were ordered.  ***
69.11D SHIFT PASSDOWNFABSIX::D_CAUSEThu Jan 11 1996 07:2655
CMP.A1 (Strasbaugh 6DS-SP) - UP/running JD0051
                                                                                                           
CMP.A2 (Strasbaugh 6DS-SP) - DOWN/IN VERIFY 
                                     
CMP.B1 (Speedfam CMP-V) - DOWN FOR SCRATCHES

CMP.B2 (Speedfam CMP_V) -DOWN/VERIFY 

                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  MQC COMPLETE 

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  MQC COMPLETE 

HOT/B lots in area: 
-------------------


HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:0
--------------------
       
DOWN equipment:CMP.B1 FOR SCRATCHES
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   6 COMPLETE
     STRAUSBAUGH COMPLETE       3 COMPLETE
 
HOLD LOTS:
----------




MONITOR status:
---------------
  

NUMBER of product lots in room:3 
-------------------------------
    
              
              
             
              
              
new spec/revs posted:
---------------------

*none*
69.12CMP C-SHIFT PD. 1/11/95FABSIX::E_DAWSONThu Jan 11 1996 19:4233
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - JD0052 DC1026 ILD2 12W 
             
CMP.A2 (Strasbaugh 6DS-SP) - VERIFY-S...WAITING FOR PAD. 

CMP.B1 (Speedfam CMP-V) - DOWN...SCRATHES   
			       
CMP.B2 (Speedfam CMP-V) - VERIFY-U...RUNNING MQC

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
       
	Static Lots:                     
	-----------                    
       XD0332 TM36 ILD3 23W  .9 DAYS
    
	Hold Lots:                      Lots in CMP: 7 
        ---------                       -----------
       XL0328 "STORES"
	
	MQC Monitors:                         Carriers:
	-------------                         --------
        2 BOXES		                      3 - Strasbaugh
	MQC Mon. Used: 47  	              1 - Strasbaugh Plates
    	-------------                         6 - Speedfam  
                
        *** SIX BOXES OF EXERCISE WAFERS WERE ORDERED. ***
	*** FOUR BOXES OF MQC WAFERS WERE ALSO ORDERED. ***	
                                     
69.13D SHIFT PASSDOWNFABSIX::D_CAUSEFri Jan 12 1996 07:4455
CMP.A1 (Strasbaugh 6DS-SP) - UP/running JD0057 AND JD0055
                                                                                                           
CMP.A2 (Strasbaugh 6DS-SP) - DOWN/IN VERIFY 
                                     
CMP.B1 (Speedfam CMP-V) - DOWN FOR SCRATCHES

CMP.B2 (Speedfam CMP_V) -DOWN/ FAILED MQC'S FOR UNIFORMITY FROM 
        A 140 OD THRU 155 BY INCREMENTS OF 5 AS PER SPEC.
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
HOT/B lots in area: 
-------------------


HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:6
--------------------
       
DOWN equipment:CMP.B1 FOR SCRATCHES/.B2 FOR UNIFORMITY/.A2 FOR PAD
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   6 COMPLETE
     STRAUSBAUGH COMPLETE       3 COMPLETE
 
HOLD LOTS:
----------




MONITOR status:
---------------
  

NUMBER of product lots in room:3 
-------------------------------
    
              
              
             
              
              
new spec/revs posted:
---------------------

*none*
69.14CMP C-SHIFT PD.1/12/95FABSIX::E_DAWSONFri Jan 12 1996 19:4231
				CMP                 
				___

CMP.A1 (Strasbaugh 6DS-SP) - MQC
             
CMP.A2 (Strasbaugh 6DS-SP) - RUNNING 1...XL0333 TM55 ILD2 23W 

CMP.B1 (Speedfam CMP-V) - VERIFY-U...NEEDS FULL BREAKIN AND MQC'S   
			       
CMP.B2 (Speedfam CMP-V) - RUNNING 1...JD0048 DC1026 ILD3 12W

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
       
	Static Lots: 2                    Scrap Lots: 2 WAFERS 
	-----------                       ----------
       JD0048 IDL3 DC1026 12W @OP#1989    XL0333 "LOW INCOMEING STEP"
       JD0053 ILD2 DC1026 12W @OP#3068	     WAFERS SCRAPED BY PE. EB
    					
	Hold Lots: 0                     Lots in CMP: 8
        ---------                        -----------       
       
	MQC Monitors:                   Carriers:
	-------------                   --------
    	  2 BOXES	              3 - Strasbaugh
	MQC Mon. Used: 18	      2 - Strasbaugh Plates
    	-------------                 2 - Speedfam  
            
        
69.15D SHIFT PASSDOWNFABSIX::D_CAUSESat Jan 13 1996 07:3252
CMP.A1 (Strasbaugh 6DS-SP) - UP/running JD0053,XD0336
                                                                                                           
CMP.A2 (Strasbaugh 6DS-SP) - DOWN/MQC IN PROGRESS
                                     
CMP.B1 (Speedfam CMP-V) - DOWN FOR SCRATCHES

CMP.B2 (Speedfam CMP-V)- UP/RUNNING JD0048, JD0061 HOT LOT
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  MQC DONE

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  MQC DONE  
 
HOT/B lots in area: 1
-------------------
JD0061

HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:2
--------------------

HOLD LOTS IN AREA:2
__________________
       
DOWN equipment:CMP.B1 FOR SCRATCHES/A2 FOR MQC
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   6 COMPLETE
     STRAUSBAUGH COMPLETE       2 COMPLETE


MONITOR status:
---------------
  

NUMBER of product lots in room:8 
-------------------------------
    
              
              
             
              
              
new spec/revs posted:
---------------------

*none*
69.16CMP C-SHIFT PD. 1/13/95FABSIX::E_DAWSONSat Jan 13 1996 19:4831
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - UNSCH_DOWN...ROBOT SENSOR..SEE E.E.
             
CMP.A2 (Strasbaugh 6DS-SP) - UNSCH_DOWN....PAD CHANGE...MQC'S FAILED 
                                        
CMP.B1 (Speedfam CMP-V) - UNSCH_DOWN....SCRATCHES...SEE E.E.   
			       
CMP.B2 (Speedfam CMP-V) - UNSCH_DOWN....HIGH PART & BAD UNF...NEEDS PAD
    					CHANGE

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
       
	Static Lots:                    Scrap Lots:  
	-----------                     ----------
       XD0336 TM36 ILD1 23W
    	
	Hold Lots:                      Lots in CMP: 3
        ---------                       -----------
      
	MQC Monitors:                   Carriers:
	-------------                   --------
    	 2 BOXES	              0 - Strasbaugh
	MQC Mon. Used: 17 	      2 - Strasbaugh Plates
    	-------------                 6 - Speedfam  
            
   ***** FOUR BOXES OF MQC AND FOUR BOXES OF EXERCISE WAFERS WERE ORDERS.
69.17B SHIFT CMP PASSDOWNFABSIX::L_CEDRONESun Jan 14 1996 06:0874
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               39                   cmp.a1/.b1/scrub

        BREAKIN WAFERS            200                   misc


CMP.A1 (Strasbaugh 6DS-SP) - DOWN, ROBOT END EFFECTOR SENSOR

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING XD0317 AND XD0336 

CMP.B1 (Speedfam CMP-V) - RUNNING MQC'S

CMP.B2 (SPEEDFAM CMP-V) - RUNNING MQC'S

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S DONE

CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S DONE


Hot/B lots in area:
__________________
XD0317 B LOT

Hot lots coming to area:
-----------------------
* NONE *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 DOWN, ROBOT END EFFECTOR SENSOR

Scrap lots:
----------
* none *

Hold Lots:
---------
* NONE *

Monitor status:
--------------
1/2 BOX MQC WAFERS

Number of product lots in room:
------------------------------
5

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
* NONE *

# of carriers for strasbaugh/speedfam:
-------------------------------------
6 spare carriers for CMP.B1/B2
0 full carriers for CMP.A1/.A2
2 plates filmed for CMP.A1/.A2


69.18A-shift CMP passdown 1/14/96SUBPAC::SADINFreedom isn&#039;t free.Sun Jan 14 1996 18:4574
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  cmp.b1/.b2/scrb

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - MQC: needs full mqcs. Ask shift supervisor if
he wants to leave the machine down since it's being taken at 8am for
upgrades.

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XL0347 and XD0336. 

CMP.B1 (Speedfam CMP-V) - DOWN: scratches. Experimental pad is installed.
Do not run any product on this pad!

CMP.B2 (Speedfam CMP-V) - RUNNING: XD0317.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
XD0317 - BLOT

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
3

Down Equipment:
--------------
CMP.A1 - MQC - UPGRADES SCHEDULED FOR 8AM
CMP.B1 - DOWN - SCRATCHES

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
2 boxes of 12K monitor wafers

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0054 - M2 - 12WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
6 SPEEDFAM CARRIERS
2 PLATES SHIMMED/FILMED FOR STRASBAUGH

69.19A-shift CMP passdown 1/15/96SUBPAC::SADINFreedom isn&#039;t free.Mon Jan 15 1996 19:0777
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                35                  cmp.b1/.a2/.b2/scrub

        BREAKIN WAFERS             120                  misc


CMP.A1 (Strasbaugh 6DS-SP) - DOWN: down for upgrades.

CMP.A2 (Strasbaugh 6DS-SP) - DOWN: pad changed and mqcs run...evaluating
now.

CMP.B1 (Speedfam CMP-V) - DOWN: all spindles are being pulled apart due to
rust and metal particles found inside. System is down hard.

CMP.B2 (Speedfam CMP-V) - DOWN: down for scratches(!) and high particles.
Pad being pulled and machine being cleaned.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
XD0350 PMD B-LOT

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - DOWN FOR UPGRADES
CMP.A2 - RUNNING MQCS
CMP.B1 - DOWN FOR RUST IN SPINDLES
CMP.B2 - DOWN FOR PAD CHANGE/CLEANING DUE TO HIGH PARTICLES/SCRATCHES

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
2 boxes of 12K monitor wafers (2 more on order)

Number of product lots in room:
------------------------------
2

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
YD0144 - M1 - 24WFRS
XL0327 - M3 - 28WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
3 COMPLETE CARRIERS BUILT FOR STRASBAUGH (2 PLATES SHIMMED/FILMED ALSO)
6 COMPLETE CARRIERS BUILT FOR SPEEDFAM

69.20A-shift CMP passdown 1/16/96SUBPAC::SADINFreedom isn&#039;t free.Tue Jan 16 1996 19:2675
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               20                   cmp.b2/scrub

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - DOWN: robot/software upgrades.

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0326 (M3). Will need pad change
after lot is done.

CMP.B1 (Speedfam CMP-V) - DOWN: multihead torn apart, vacuum tank replaced,
etc, etc....see EE passdown in the ASDG::CMP notesfile for details.

CMP.B2 (Speedfam CMP-V) - DOWN: scratches look good on this run! Reading
mqc wafers for uniformity now. If uniformity is ok, the machine is up.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
JD0067 - UPP_PMD1

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - UPGRADES
CMP.B1 - CLEANING/UPGRADES
CMP.B2 - SCRATCHES ISSUE LOOKS RESOLVED...WAITING ON UNIFORMITY RESULTS.

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
1� boxes of 12K wafers (1 box coming)

Number of product lots in room:
------------------------------
3

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0356 - PMD - 24

# of carriers for strasbaugh/speedfam:
--------------------------------------
5 CARRIERS FOR STRASBAUGH
1 CARRIER FOR SPEEDFAM (10 PLATES DUE IN TOMORROW)

69.21A-shift CMP passdown 1/17/96SUBPAC::SADINFreedom isn&#039;t free.Wed Jan 17 1996 19:0873
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  cmp.b2/.a2/scrub

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - DOWN: verify. Upgrades done.

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0061 (m2) and XL0339 (m1). 

CMP.B1 (Speedfam CMP-V) - DOWN: upgrades and repairs.

CMP.B2 (Speedfam CMP-V) - DOWN: verify. running more mqcs.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
JD0061 - M2

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
4

Down Equipment:
--------------
CMP.A1 - VERIFY - UP TO VERIFY AFTER UPGRADES.
CMP.B1 - DOWN - UPGRADES.
CMP.B2 - VERIFY - READING MQC WAFERS NOW.

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
2.5 boxes of 12K monitors

Number of product lots in room:
------------------------------
10

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0067 - PMD - 24

# of carriers for strasbaugh/speedfam:
--------------------------------------
3 COMPLETE CARRIERS FOR STRASBAUGH PLUS 4 PLATES SHIMMED/FILMED
1 CARRIER BUILD FOR SPEEDFAM (NO PLATES)
** all speedfam carries have had the gimble assembly removed and cleaned.
    As soon as we get plates we can build the carriers.
69.22CMP C-SHIFT PD. 1/18/95FABSIX::E_DAWSONThu Jan 18 1996 19:3132
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - DOWN/REPAIR (XD0329 ILD1 TM36 22W) 
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/RUNNING-1 XD0335 ILD1 TM36 24W

CMP.B1 (Speedfam CMP-V) - DOWN/REPAIR   
			       
CMP.B2 (Speedfam CMP-V) - UP/RUNNING-2 XD0331 TM36 ILD3 10W 
                                       XD0302 TM36 ILD3 23W
    
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
       
	Static Lots: 0                  Scrap Lots:  
	-----------                     ----------
                                        1 WAFER XD0329
    
	Hold Lots: 0                    Lots in CMP: 8 
        ---------                       -----------
              
	MQC Monitors:                  Carriers:
	-------------                   --------
    	9 BOXES	                      3 - Strasbaugh
	MQC Mon. Used: 1              4 - Strasbaugh Plates
    	-------------                 7 - Speedfam  
            
        
       
69.23D SHIFT PASSDOWNFABSIX::D_CAUSEFri Jan 19 1996 07:3356
CMP.A1 (Strasbaugh 6DS-SP) - UP/running XD0329  WARNING POSTED! SYSTEM
                             ALARM FOR NO WAFER FOUND IN RIGHT UNLOAD CUP
                             SET OFF EVERY CYCLE. RESETS ON OWN.
                                                                                                           
CMP.A2 (Strasbaugh 6DS-SP) - UP/RUNNING XL0328
                                     
CMP.B1 (Speedfam CMP-V) - DOWN/ STILL AWAITING REPAIR 

CMP.B2 (Speedfam CMP-V)- UP/RUNNING MQC LOTS XD0322,XD0302 CARRIER THREE OFF
                         LINE.  WARNING POSTED FOR B2; ERROR "CARRIER ONE NOT
                         ROTATEING" ACTIVATEING EVERY CYCLE.
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  MQC DONE

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  MQC DONE  
 
HOT/B lots in area: 
-------------------


HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:2
--------------------

HOLD LOTS IN AREA:1
__________________
       
DOWN equipment:CMP.B1 DOWN AWAITING REPAIR
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   6 COMPLETE
     STRAUSBAUGH COMPLETE       4 COMPLETE


MONITOR status:
---------------
  

NUMBER of product lots in room:8 
-------------------------------
    
              
              
             
              
              
new spec/revs posted:
---------------------

*none*
69.24CMP C-SHIFT PD. 1/19/96FABSIX::E_DAWSONFri Jan 19 1996 19:2936
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - RUNNING-2 *B-LOT XD0352 TM36 PMD 19W*
                                              XD0329 TM36 ILD1 22W
    
CMP.A2 (Strasbaugh 6DS-SP) - MQC -  RUNNING FULL BREAKIN AND MQC'S

CMP.B1 (Speedfam CMP-V) - DOWN/REPAIR   
			       
CMP.B2 (Speedfam CMP-V) - RUNNING-1  LOT XD0302 TM36 M3 20W

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
	Hot/B lots in area: 		Hot Lots coming: 
	------------------		---------------
        XD0352 TM36 PMD 19W
    
	Static Lots:                    Scrap Lots:  
	-----------                     ----------
        XD0329 TM36 ILD1 22W
        XD0322 TM36 ILD3 20W
    
	Hold Lots:                      Lots in CMP: 7
        ---------                       -----------
              
	MQC Monitors:                   Carriers:
	-------------                   --------
    	11 BOXES	              2 - Strasbaugh
	MQC Mon. Used: 9	      3 - Strasbaugh Plates
    	-------------                 4 - Speedfam  
            
        
                                                      
69.25CMP C-SHIFT PD. 1/20/96FABSIX::E_DAWSONSat Jan 20 1996 19:3837
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - MQC...(LOT JD0062 DC1026 PMD 21W)
                                   (B-LOT XD0358 TM36 ILD1 24W )
    
CMP.A2 (Strasbaugh 6DS-SP) - DOWN..PAD & CARRIER CHANGE 

CMP.B1 (Speedfam CMP-V) - DOWN/REPAIR...WAFERS CYCLED, B2 NEEDS PANELS
                          INSTALLED, MORE BREAKIN WAFERS & MQC'S. 
                      
CMP.B2 (Speedfam CMP-V) - UP/IDLE...CARRIER #3 NEEDS TO BE INSTALLED & FULL 
                                           MQC'S
    
    SPEEDFAMS BEEPER IF ANY ????   1-800-796-7363  PIN# 1033751
    
    
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
	Hot/B lots in area: 		Hot Lots coming: 
	------------------		---------------
        XD0350 TM36 ILD1 24W
     
      	Hold Lots:                      Lots in CMP: 5 
        ---------                       -----------
        XL0313 TM55 ILD2 22W "STORES"
    
	MQC Monitors:                   Carriers:
	-------------                   --------
    	11 BOXES	              4 - Strasbaugh
	MQC Mon. Used: 14 	      2 - Strasbaugh Plates
    	-------------                 4 - Speedfam  
            
        
                      
69.261/21/96 B SHIFT CMP PASSDOWNFABSIX::L_CEDRONESun Jan 21 1996 07:1377
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               20                   cmp.a1/.b1/scrub

        BREAKIN WAFERS             176                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING XD0337-TOUCH UP

CMP.A2 (Strasbaugh 6DS-SP) - UP RUNNING XD0341, JD0068-TOUCH UP 

CMP.B1 (Speedfam CMP-V) - DOWN, REPAIR

CMP.B2 (SPEEDFAM CMP-V) - DOWN, REPAIR

CMP-SCRUB.A1 (On-track scrubber) - IDLE

CMP-SCRUB.A2 (On-track scrubber) - IDLE


Hot/B lots in area:
___________________
* NONE *

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
* none *

Down Equipment:
---------------
CMP.B1-DOWN, REPAIR
CMP.B2-DOWN, REPAIR

Scrap lots:
----------
* none *

Hold Lots:
---------
* NONE *

Monitor status:
---------------
10 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
4

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0350 24W
JD0065 24W
JD0062 21W

# of carriers for strasbaugh/speedfam:
-------------------------------------
4 spare carriers for CMP.B1/B2
2 full carriers for CMP.A1/.A2
2 plates filmed for CMP.A1/.A2


69.27A-shift CMP passdown 1/21/96SUBPAC::SADINFreedom isn&#039;t free.Sun Jan 21 1996 19:1074
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  cmp.a1/.a2/.b1/.b2/scrb

        BREAKIN WAFERS              100                 misc


CMP.A1 (Strasbaugh 6DS-SP) - MQC: running mqcs.

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0344 (hot M3).

CMP.B1 (Speedfam CMP-V) - RUNNING: JD0061 (hot M3).

CMP.B2 (Speedfam CMP-V) - VERIFY: running breakins and mqcs.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
JD0061 - M3
XD0344 - M3
XD0356 - M1

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.B2 - VERIFY - RUNNING BREAKINS AND MQCS.
CMP.A1 - MQC - CARRIERS BEING CHANGED AND MQCS BEING RE-RUN DUE TO BAD
UNIF.

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0337 - hold for process eng to evaluate. Erroneous edge readings.

Monitor status:
--------------
9 boxes of 12K monitors.

Number of product lots in room:
------------------------------
9

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0068 - PMD - 24WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
3 COMPLETE STRASBAUGH CARRIERS + 1 PLATE SHIMMED/FILMED
4 COMPLETE SPEEDFAM CARRIERS

69.281/22/96 B SHIFT PASSDOWNFABSIX::L_CEDRONEMon Jan 22 1996 07:5278
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               10                   cmp.a1/.b1/scrub

        BREAKIN WAFERS             50                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING JD0052

CMP.A2 (Strasbaugh 6DS-SP) - UP IDLE

CMP.B1 (Speedfam CMP-V) - UP RUNNING XD0356

CMP.B2 (SPEEDFAM CMP-V) - UP IDLE

CMP-SCRUB.A1 (On-track scrubber) - IDLE

CMP-SCRUB.A2 (On-track scrubber) - IDLE


Hot/B lots in area:
___________________
XD0356 B LOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
* none *

Down Equipment:
---------------
* NONE *

Scrap lots:
----------
* none *

Hold Lots:
---------
XL0347

Monitor status:
---------------
9 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0070 24W
XD0341 23W 
XD0344 18W
JD0061 24W
XL0353 23W

# of carriers for strasbaugh/speedfam:
-------------------------------------
4 spare carriers for CMP.B1/B2
4 full carriers for CMP.A1/.A2
1 plates filmed for CMP.A1/.A2


69.29A-shift CMP passdown 1/22/96SUBPAC::SADINFreedom isn&#039;t free.Mon Jan 22 1996 19:0678
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                30                  cmp.a1/.a2/.b1/scrb

        BREAKIN WAFERS             150                  misc


CMP.A1 (Strasbaugh 6DS-SP) - MQC: running mqcs.

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0336 (m2).

CMP.B1 (Speedfam CMP-V) - MQC: running mqcs.

CMP.B2 (Speedfam CMP-V) - RUNNING2: JD0052 (m3) and XL0333 (m3).

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
JD0063 - PMD (reading 100% pre due to high incoming thickness on some wafers)

Hot lots coming to area:
-----------------------
JD0067 ILD 2-1

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - MQC
CMP.B1 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
8 boxes of 12K monitors

Number of product lots in room:
------------------------------
8

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0356 - M1 - 24WFRS
XL0346 - M1 - 24WFRS
XL0347 - M1 - 24WFRS
JD0069 - PMD - 24WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
1 COMPLETE CARRIER FOR STRASBAUGH + 1 PLATE SHIMMED/FILMED
4 COMPLETE SPEEDFAM CARRIERS

* NOTE * ALL operations are now active on the JIT board! Please keep the
board updated...thanks.

        
69.301/23/96 B SHIFT CMP PASSDOWNFABSIX::L_CEDRONETue Jan 23 1996 07:3977
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               4                   cmp.a1/.b1/scrub

        BREAKIN WAFERS             50                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP IDLE

CMP.A2 (Strasbaugh 6DS-SP) - UP RUNNING JD0052-TOUCH UP

CMP.B1 (Speedfam CMP-V) - UP IDLE

CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING YL0143-TOUCH UP

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S DONE

CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S DONE


Hot/B lots in area:
___________________
JD0067 HOT LOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
* none *

Down Equipment:
---------------
* NONE *

Scrap lots:
----------
* none *

Hold Lots:
---------
* NONE *

Monitor status:
---------------
9 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0336 23W
XL0333 12W
JD0063 23W
XL0354 22W

# of carriers for strasbaugh/speedfam:
-------------------------------------
10 spare carriers for CMP.B1/B2
6 full carriers for CMP.A1/.A2



69.31A-shift CMP passdown 1/23/96SUBPAC::SADINFreedom isn&#039;t free.Tue Jan 23 1996 19:1373
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  cmp.b2/.a1/.a2/scrb

        BREAKIN WAFERS             100                  misc         


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0072 (pmd).

CMP.A2 (Strasbaugh 6DS-SP) - DOWN: down for pad change. 

CMP.B1 (Speedfam CMP-V) - DOWN: robot problems. reps working on it with EE
techs. 

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0054 (m3).

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
JD0067 - M2

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
JD0053 - 1.4 

Down Equipment:
--------------
CMP.B1 - ROBOT PROBLEMS
CMP.A2 - PAD CHANGE

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
8 boxes of 12K monitor wafers

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0052 - M3 - 12WFRS
YL0143 - M2 - 24WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
10 SPEEDFAM CARRIERS
6 STRASBAUGH CARRIERS

69.32robot repair/SpeedFamSUBPAC::CMPWed Jan 24 1996 11:192
    Robot continues with problem of stopping, bringing to ADE for
    evaluation and repair.
69.33robot errorsSUBPAC::CMPWed Jan 24 1996 11:242
    Robot continues with the problem of hanging, taking to ADE for
    evaluation and repair.
69.34CMP C-SHIFT PD. 1/24/96FABSIX::E_DAWSONWed Jan 24 1996 19:3725
				CMP   
				___

CMP.A1 (Strasbaugh 6DS-SP) - DOWN/PM
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE

CMP.B1 (Speedfam CMP-V) - DOWN/REPAIR...ROBOT   
			       
CMP.B2 (Speedfam CMP-V) - RUNNING-1 JD0053 DC0126 ILD3 8W

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
     	Hold Lots:                      Lots in CMP: 3 
        ---------                       -----------
       
     	MQC Monitors:                   Carriers:
	-------------                   --------
    	7 BOXES	                     4 - Strasbaugh
	MQC Mon. Used: 6  	     2 - Strasbaugh Plates
    	-------------               13 - Speedfam  
            
        
69.35D SHIFT PASSDOWNFABSIX::D_CAUSEThu Jan 25 1996 07:3152
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE
                                                                                                           
CMP.A2 (Strasbaugh 6DS-SP) - VERIFY U PERFOMING MQC
                                     
CMP.B1 (Speedfam CMP-V) - UP/IDLE 

CMP.B2 (Speedfam CMP-V)- UP/RUNNING 
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  MQC DONE

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  MQC DONE  
 
HOT/B lots in area: 
-------------------


HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:2 NO T TAG AVAIL
--------------------

HOLD LOTS IN AREA:
__________________
       
DOWN equipment:
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   13 COMPLETE
     STRAUSBAUGH COMPLETE       4  COMPLETE


MONITOR status:
---------------
  

NUMBER of product lots in room:2 
-------------------------------
    
SPEACIAL NOTE*              
______________
* NOTE * CMP.B1 MQC PASSED ( NEW .CTR-MQC RECIPE )             
              
              
new spec/revs posted:
---------------------

*none*
69.36CMP C-SHIFT PD. 1/25/96FABSIX::E_DAWSONThu Jan 25 1996 19:4237
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - RUNNING-1 XD0349 TM36 ILD1 24W
             
CMP.A2 (Strasbaugh 6DS-SP) - RUNNING-1 *HOT LOT JD0063 ILD1 DC1035 12W

CMP.B1 (Speedfam CMP-V) - DOWN/REPAIR...ROBOT   
			       
CMP.B2 (Speedfam CMP-V) - DOWN....BROKEN WAFERS
                                  (XD0350 TM36 ILD2 23W)
    				  (XD0334 TM36 ILD3 6W)
    	
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE
                              
	Hot/B lots in area: 		Hot Lots coming: 
	------------------		---------------
        JD0063 ILD1 DC1035 12W "HOT"
    	XD0350 ILD3 TM36 23W "B-LOT"                    
    
	Static Lots: 1                    Scrap Lots:  
	-----------                     ----------
        XD0359 TM36 PMD 24W "NO TAG"
    
	Hold Lots:                      Lots in CMP: 10 
        ---------                       -----------
        XL0314 TM55 ILD2 17W
       
	MQC Monitors:                   Carriers:
	-------------                   --------
    	7.5 BOXES	              2 - Strasbaugh
	MQC Mon. Used: 2              2 - Strasbaugh Plates
    	-------------                11 - Speedfam  
            
        
69.37CMP C-SHIFT PD. 1/26/96FABSIX::E_DAWSONFri Jan 26 1996 19:4335
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - DOWN/REPAIR....SPINDLE VARIATION
             
CMP.A2 (Strasbaugh 6DS-SP) - DOWN/PM...RUNNING BREAK IN

CMP.B1 (Speedfam CMP-V) - MQC   
			       
CMP.B2 (Speedfam CMP-V) - MQC

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
        Hot/B lots in area: 		Hot Lots coming: 
	------------------		---------------
        XD0340 TM36 ILD1 21W "B-LOT"
    
	Static Lots:                    Scrap Lots:  
	-----------                     ----------
        XL0340 TM55 ILD3 13W 
        JD0079 DC1026 PMD 22W
    
	Hold Lots:                      Lots in CMP: 4 
        ---------                       -----------
       
       	MQC Monitors:                     Carriers:
	-------------                   --------
    	4 BOXES	                      6 - Strasbaugh
	MQC Mon. Used: 18 	      1 - Strasbaugh Plates
    	-------------                12 - Speedfam  
            
        
        
69.38CMP C-SHIFT PD. 1/27/96FABSIX::E_DAWSONSat Jan 27 1996 19:3730
				CMP 
				___

CMP.A1 (Strasbaugh 6DS-SP) - MQC...(JD0074 DC1026 PMD 24W)
             
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE...BUBBLES ON THE PAD

CMP.B1 (Speedfam CMP-V) - UP/IDLE...WARNING "CARRIER #1 NOT ROTATING"   
			       
CMP.B2 (Speedfam CMP-V) - RUNNING-1 JD0066 DC1026 ILD1 19W

CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE...Mqc performed

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE...Mqc performed
                              
       
	Static Lots: 1                  Scrap Lots:  
	-----------                     ----------
        XD0359 TM36 PMD 24W "NO TAG"    2 WAF/ JD0074 DC1026 PMD                                  
	
        Hold Lots:                      Lots in CMP: 5
        ---------                       -----------
                                                      
	MQC Monitors:                   Carriers:
	-------------                   --------
    	 3 BOXES	              4 - Strasbaugh
	MQC Mon. Used: 14 	      1 - Strasbaugh Plates
    	-------------                13 - Speedfam  
            
        
69.39A-shift CMP passdown 1/28/96SUBPAC::SADINFreedom isn&#039;t free.Sun Jan 28 1996 18:5172
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               20                   mqcs - all tools

        BREAKIN WAFERS            250                   misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0064 and JD0063.

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0359 and XD0360.

CMP.B1 (Speedfam CMP-V) - RUNNING: XD0356 and XD0336.

CMP.B2 (Speedfam CMP-V) - DOWN: table not rotating (XL0339).

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
XD0356 - B
JD0053 - HOT

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
1

Down Equipment:
--------------
CMP.B2 - TABLE NOT ROTATING

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
3 boxes of 12K monitors (4 more ordered).
2 boxes of 50K breakin wafers ordered.

Number of product lots in room:
------------------------------
11

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
* none *

# of carriers for strasbaugh/speedfam:
--------------------------------------
2 complete strasbaugh carriers (plus one plate filmed/shimmed)
13 complete speedfam carriers

69.401/29/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONEMon Jan 29 1996 07:1881
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               6                   cmp.a1/.b1/scrub

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - UP RUNNING JD0065-TOUCH UP, JD0068

CMP.A2 (Strasbaugh 6DS-SP) - UP RUNNING YDO140

CMP.B1 (Speedfam CMP-V) - UP IDLE

CMP.B2 (SPEEDFAM CMP-V) - UP IDLE

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S DONE

CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S DONE


Hot/B lots in area:
___________________
* NONE *

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
* none *

Down Equipment:
---------------
* NONE *

Scrap lots:
----------
* none *

Hold Lots:
---------
* NONE *

Monitor status:
---------------
3 1/2 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
4

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0360 24W
XD0359 24W
JD0064 24W
XD0356 24W
XD0336 22W
XL0339 24W
XD0361 24W


# of carriers for strasbaugh/speedfam:
-------------------------------------
9 spare carriers for CMP.B1/B2
2 full carriers for CMP.A1/.A2



69.41A-shift CMP passdown 1/29/96SUBPAC::SADINFreedom isn&#039;t free.Mon Jan 29 1996 18:5875
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                10                  cmp.a1/.b1/scrb

        BREAKIN WAFERS             200                  misc


CMP.A1 (Strasbaugh 6DS-SP) - MQC: running mqcs. (JD0068)

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0070 (m1).

CMP.B1 (Speedfam CMP-V) - RUNNING: XD0350 (m3).

CMP.B2 (Speedfam CMP-V) - RUNNING: XD0352 (m2) and XL0353 (m1).

CMP-SCRUB.A1 (On-track scrubber) - PM: down for weekly pm.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
JD0070 - HOT
XD0352 - B
XD0350 - B

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
XD0363 - 1.0 - NO TAG/TSHIRT

Down Equipment:
--------------
CMP-SCRUB.A1 - WEEKLY PM (WILL BE UP BY SHIFT CHANGE)

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
2 boxes of 12K monitors (3 more on order)

Number of product lots in room:
------------------------------
7

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0065 - M1 - 23WFRS
YD0140 - M2 - 21WFRS
XD0335 - M2 - 24WFRS


# of carriers for strasbaugh/speedfam:
--------------------------------------
9 CARRIERS FOR SPEEDFAM
2 CARRIERS FOR STRASBAUGH (+ 1 PLATE SHIMMED/FILMED)

69.421/30/96 CMP B SHIFT PASSDOWNFABSIX::L_CEDRONETue Jan 30 1996 07:3277
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               5                   cmp.a1/.b1/scrub

        BREAKIN WAFERS             50                  misc


CMP.A1 (Strasbaugh 6DS-SP) - DOWN, ROBOT NOT PICKING UP WAFER. JD0068 TOUCH UP

CMP.A2 (Strasbaugh 6DS-SP) - UP RUNNING MQC

CMP.B1 (Speedfam CMP-V) - UP RUNNING XD0329 AND XD0369

CMP.B2 (SPEEDFAM CMP-V) - UP RUNNING XD0362

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S DONE

CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S DONE


Hot/B lots in area:
___________________
XD0369 HOT

Hot lots coming to area:
------------------------
* NONE *

Static Lots in area:
-------------------
XD0363 23W NO TOLKEN

Down Equipment:
---------------
CMP.A1 DOWN, ROBOT NOT PICKING UP WAFER

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0374 ENG.

Monitor status:
---------------
6 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
6

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0070 23W
XD0352 17W
XD0350 22W
XL0353 23W

# of carriers for strasbaugh/speedfam:
-------------------------------------
9 spare carriers for CMP.B1/B2
2 full carriers for CMP.A1/.A2



69.43A-shift CMP passdown 1/30/96SUBPAC::SADINFreedom isn&#039;t free.Tue Jan 30 1996 19:2177
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                15                  cmp.a1/.a2/scrb

        BREAKIN WAFERS             150                  misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: XD0348 (M1). Occasional "Wafer on
Robot" errors. System starts right back up by pressing the "cycle start"
button.

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0363 (PMD) touchup. 

CMP.B1 (Speedfam CMP-V) - RUNNING: XD0362 (PMD) touchup.

CMP.B2 (Speedfam CMP-V) - DOWN: will be down until tomorrow. waiting for
new motor for the index table. See Tim Dyer's passdown in ASDG::CMP for
more details.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
XD0374 - 0.7 (HOLD - STI ENG LOT)

Down Equipment:
--------------
CMP.B2 - DOWN FOR NEW INDEX TABLE MOTOR.

Scrap lots:
----------
* none *

Hold Lots:
---------
XD0374 - STI LOT. HOLD FOR ENG.

Monitor status:
--------------
5 boxes of 12K monitors.

Number of product lots in room:
------------------------------
7

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0341 - 22
JD0068 - 24
XD0369 - 23
XD0329 - 21

# of carriers for strasbaugh/speedfam:
--------------------------------------
9 SPEEDFAM CARRIERS
??? STRASBAUGH. JESUS IS BUILDING MORE NOW.

69.44CMP A SHIFT PASSDOWNFABSIX::J_ROAWed Jan 31 1996 19:1988

               -< A shift CMP passdown -  Wednesday  01/31/96 >-
--------------------------------------------------------------------------------
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        		
        MQC-12K MONS            15	                      cmp.b1 mqcs
				
        BREAKIN WAFERS          75                          cmp.b1 breakin

                
                 Built carriers and plates available.
                 -----------------------------------

                4 FULL CARRIERS BUILT ( STRASBAUGH )PLUS 1 PLATE 
              ------------------------------------------

               9 SPEEDFAM B1 AND B2 CARRIERS AVAILABLE 



CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE: If tool errors for " wafer sensed on 
spindle" verify there is not wafer there, hit cycle start and continue
runnning. The rep will be here next week and will take care of the error. 


CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: Lot XL0354 is been measured 100% on 
thickness tool. It will need touch ups .


CMP.B1 (Speedfam CMP-V) -  RUNNING: Touching up lots ZD0101 and YD0145


CMP.B2 (Speefam CMP_V ) -  DOWN. Reps working to correct tool problems.



CMP-SCRUB.A1 (On-track scrubber) - IDLE/UP:  


CMP-SCRUB.A2 (On-track scrubber) - IDLE/UP:  



                  

Hot/B lots in area:
__________________


Hot lots coming to area:
-----------------------


Static Lots in area:
-------------------
Two PMD lots without T-tags

Down Equipment:
--------------
cmp.a1


Scrap lots:
----------

Hold Lots:
---------

Monitor status:
--------------

2 boxes of 12K's

Number of product lots in room:
------------------------------
 six lots

New specs/revs posted:
---------------------


69.45D SHIFT PASSDOWNFABSIX::D_CAUSEFri Feb 09 1996 07:3749
CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING JD0082*HOT LOT* & XL0365
                                                                                                           
CMP.A2 (Strasbaugh 6DS-SP) - DOWN FOR UPGRADE
                                     
CMP.B1 (Speedfam CMP-V) - UP/RUNNING LOTS JD0085,YD0137

CMP.B2 (Speedfam CMP-V)- UP/IDLE
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE 

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE    
 
HOT/B lots in area: 
-------------------
JD0082 *HOT*
XD0340 *B LOT* NO T TAG
HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:3 NO T TAG AVAIL
--------------------

HOLD LOTS IN AREA:
__________________
       
DOWN equipment:A2 UPGRADE
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   7 COMPLETE
     STRAUSBAUGH COMPLETE       4  COMPLETE


MONITOR status:
---------------
  

NUMBER of product lots in room:8 
-------------------------------
                
              
              
new spec/revs posted:
---------------------

*none*
69.46D SHIFT PASSDOWNFABSIX::D_CAUSEFri Feb 16 1996 06:4250
CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING XD0357
                                                                                                           
CMP.A2 (Strasbaugh 6DS-SP) - DOWN/SLURRY LINE BURST  
                                     
CMP.B1 (Speedfam CMP-V) - DOWN/PROCESS ENG

CMP.B2 (Speedfam CMP-V)- DOWN/CRASH LOTS JD0069 & JD0087 *HOT LOT*
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC DONE

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  MQC DONE  
 
HOT/B lots in area: 
-------------------
JD0087 *HOT*

HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:
--------------------

HOLD LOTS IN AREA:2 LOTS   YD0148 NEEDS ENGR ATTENTION BAD READINGS ON UV1050
                           XD0397 REMARKED TO HOLD FOR CMP ENGR 1ST SHIFT
__________________
       
DOWN equipment:A2 SLURRY LINE,B1 PROC ENG,B2 CRACH
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   8  COMPLETE
     STRAUSBAUGH COMPLETE       4  COMPLETE


MONITOR status:
---------------
  

NUMBER of product lots in room:5
-------------------------------
                
              
              
new spec/revs posted:
---------------------

*none*
69.47D SHIFT PASSDOWNFABSIX::D_CAUSEWed Feb 21 1996 06:4246
CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING XD0372
                                                                                                           
CMP.A2 (Strasbaugh 6DS-SP) - UP/ RUNNING JD0091  
                                     
CMP.B1 (Speedfam CMP-V) - DOWN/CONTINUES TO HAVE SCRATCHES ON MQC

CMP.B2 (Speedfam CMP-V)- DOWN/FLIPPER MOTOR FAILURE 
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC NOT DONE

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  MQC NOT DONE  
 
HOT/B lots in area: 
-------------------
YD0147 BLOT

HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:5
--------------------

HOLD LOTS IN AREA:1

__________________
       
DOWN equipment:B1 SCRATCHES, B2 FLIPPER MOTOR
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   5  COMPLETE
     STRAUSBAUGH COMPLETE       2  COMPLETE


MONITOR status:***NO MQC MONITORS 1 LOT IN PROCESS***
---------------
  

NUMBER of product lots in room:9
-------------------------------
           


69.48D SHIFT PASSDOWNFABSIX::D_CAUSEFri Mar 01 1996 07:1146
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE
                                                                                                           
CMP.A2 (Strasbaugh 6DS-SP) - UP/MQC ***WARNING ON MACHINE** SOFTWARE PROBLEM  
                                     
CMP.B1 (Speedfam CMP-V) - UP/RUNNING ROCKET LOT JD0117**

CMP.B2 (Speedfam CMP-V)- UP/RUNNING HOT LOT XD0402
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC DONE

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  MQC DONE  
 
HOT/B lots in area: 2
-------------------
JD0117,XD0402

HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:2 PMD NO T TAG
--------------------

HOLD LOTS IN AREA:

__________________
       
DOWN equipment:
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   8  COMPLETE
     STRAUSBAUGH COMPLETE       2  COMPLETE


MONITOR status:4 BOXES
---------------
  

NUMBER of product lots in room:4
-------------------------------
           
LOTS COMPLETED 8
----------------
69.49D SHIFT PASSDOWNFABSIX::D_CAUSESat Mar 02 1996 06:3746
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE
                                                                                                           
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE ***WARNING ON MACHINE** SOFTWARE PROBLEM  
                                     
CMP.B1 (Speedfam CMP-V) - UP/RUNNING LOT XD0387

CMP.B2 (Speedfam CMP-V)- UP/IDLE
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE MQC DONE

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  MQC DONE  
 
HOT/B lots in area: 
-------------------


HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:
--------------------

HOLD LOTS IN AREA:

__________________
       
DOWN equipment:
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   9  COMPLETE
     STRAUSBAUGH COMPLETE       6  COMPLETE


MONITOR status:3.5 BOXES
---------------
  

NUMBER of product lots in room:
-------------------------------
           
LOTS COMPLETED 2
----------------