[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Conference asdg::cmp

Title:CMP
Notice:Welcome to the CMP notesfile
Moderator:FABSIX::B_TOWERLLE
Created:Tue Oct 31 1995
Last Modified:Fri Jun 06 1997
Last Successful Update:Fri Jun 06 1997
Number of topics:94
Total number of notes:6381

67.0. "CMP ops passdowns - Dec '95" by SUBPAC::SADIN (Freedom isn't free.) Sun Dec 03 1995 11:21

    
    
    	CMP operations passdowns for December '95.
    
    
T.RTitleUserPersonal
Name
DateLines
67.1A shift CMP passdown 12/03/95SUBPAC::SADINFreedom isn't free.Sun Dec 03 1995 18:4372
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                1                   scrubbers

        BREAKIN WAFERS             75                   misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: running XD0316 pmd.

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: running XL0306 m2.

CMP.B1 (Speedfam CMP-V) - RUNNING: running XL0297 m3.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
 * none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
� box of 12K monitors. 2 more boxes on orders (see ASDG::FAB6_WAFERSTARTS)

Number of product lots in room:
------------------------------
8

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0316 - PMD - 24WFRS
XL0306 - M2 - 23WFRS
XL0321 - PMD - 23WFRS
XL0320 - PMD - 24WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
6 FULL CARRIERS FOR STRASBAUGH
6 FULL CARRIERS FOR CMP.B1
1 PLATE FILMED/HOLES PUNCHED FOR STRASBAUGH

67.2A shift CMP passdown 12/04/95SUBPAC::SADINFreedom isn't free.Mon Dec 04 1995 18:4176
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                6                   cmp.b1/scrub mqc

        BREAKIN WAFERS             75                   misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: running JD0034 M2.

CMP.A2 (Strasbaugh 6DS-SP) - IDLE. 

CMP.B1 (Speedfam CMP-V) - IDLE.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.  

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
JD0050 - PMD (pre-measuring now)

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
� box of 12K monitors

Number of product lots in room:
------------------------------
2

New specs/revs posted:
---------------------
Read strasbaugh spec to see new changes.

Lots/wafers processed:
---------------------
XD0275 - M2 - 23WFRS
XD0307 - M2 - 23WFRS
XD0274 - M2 - 17WFRS
YD0135 - M1 - 23WFRS
JD0034 - M2 - 10WFRS
JD0038B- M2 - 6WFRS

102 WAFERS TOTAL

# of carriers for strasbaugh/speedfam:
--------------------------------------
6 full carriers built for strasbaugh.
3 plates filmed/shimmed for strasbaugh.
4 carriers built for speedfam (need more white rings...suprise, suprise!)

67.3A shift CMP passdown 12/05/95SUBPAC::SADINFreedom isn't free.Tue Dec 05 1995 19:3474
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                12                  cmp.a1/.b1/scrub

        BREAKIN WAFERS              75                  misc


CMP.A1 (Strasbaugh 6DS-SP) - MQC: breaking in a new pad now.

CMP.A2 (Strasbaugh 6DS-SP) - PM: down for a semi-annual.

CMP.B1 (Speedfam CMP-V) - MQC: running daily mqcs.

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A2 - SEMI-ANNUAL PM

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
1 box of 12K monitors (2 more boxes ordered)

Number of product lots in room:
------------------------------
2

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0035 - PMD - 12WFRS
XA0215A- PMD - 12WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
4 extra carriers for CMP.B1
6 full carriers for strasbaugh
3 extra plates (shimmed/filmed) for strasbaugh


* note * - fab dumped for a few hours this afternoon/evening due to solvent
exhaust problems.

67.4CMP 12/7/95FABSIX::G_ISAACSThu Dec 07 1995 06:0053
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE 
                                     
                                                           
                                    
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE
                                 
                                 
                                     
CMP.B1 (Speedfam CMP-V) - DOWN/
                        
 
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  RAN MQC'S D SHIFT

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  RAN MQC'S D SHIFT

HOT/B lots in area: 
-------------------
 Hot lot # 
 B   lot # 
HOT lots coming to area:
------------------------
 Hot lot # 
             
STATIC lots in area:
--------------------

DOWN equipment:
---------------
        SPEEDFAM
CARRIERS::
-----------
 5  SPEEDFAM EXTRA  5 HAVE PLATES
 4  STRAUSBAUGH COMPLETE
 
HOLD LOTS:
----------

*none*

MONITOR status:
---------------
  

NUMBER of product lots in room:  
-------------------------------
    1-XD0299

new spec/revs posted:
---------------------

*none*
67.5A shift CMP passdown 12/10/95SUBPAC::SADINFreedom isn't free.Sun Dec 10 1995 18:1971
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                30                  cmp.a1/.a2./.b1/scrub

        BREAKIN WAFERS             100                  misc


CMP.A1 (Strasbaugh 6DS-SP) - MQC: running mqcs.

CMP.A2 (Strasbaugh 6DS-SP) - MQC: running breakins.

CMP.B1 (Speedfam CMP-V) - RUNNING2: running JD0033 (m1) and JD0042 (m1).

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE. (receiver door latch failure
errors today)


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - MQC
CMP.A2 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
1 box of 12K monitors. 2 more boxes ordered.

Number of product lots in room:
------------------------------
5

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0041 - M1 - 12WFRS 
JD0043 - M1 - 12WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
4 complete strasbaugh carriers
4 complete speedfam carriers

67.6A shift CMP passdown 12/11/95SUBPAC::SADINFreedom isn't free.Mon Dec 11 1995 18:3868
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                18                  cmp.a1/.a2./.b1/scrb

        BREAKIN WAFERS              75                  misc


CMP.A1 (Strasbaugh 6DS-SP) - MQC: running mqcs. (new pad/carriers)

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0309 (M1).

CMP.B1 (Speedfam CMP-V) - RUNNING: XD0307 (m3) and JD0035 (m1).

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
JD0049 - PMD

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
1 full box of 12k monitors

Number of product lots in room:
------------------------------
4

New specs/revs posted:
---------------------
NEW SPEEDFAM SPEC ON-LINE. PLEASE REVIEW.

Lots/wafers processed:
---------------------
* none *

# of carriers for strasbaugh/speedfam:
--------------------------------------
2 carriers for strasbaugh (need to have some built)
3 spare carriers for speedfam

67.7A shift CMP passdown 12/12/95SUBPAC::SADINFreedom isn't free.Tue Dec 12 1995 18:5972
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                18                  cmp.a1/.b1/scrub

        BREAKIN WAFERS              75                  misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING2: XL0321 (m2) and XD0274 (m3).

CMP.A2 (Strasbaugh 6DS-SP) - DOWN: broke wafers on the pad. 

CMP.B1 (Speedfam CMP-V) - MQC: running daily mqcs. 

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
XL0321

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A2 - BROKE WAFERS
CMP.B1 - MQC

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
� box of 12K monitors left.

Number of product lots in room:
------------------------------
7

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0315 M2 22WAFERS
XD0275 M3 21WAFERS
XA0215A M1 12WAFERS
XD0332 M1 24WAFERS

# of carriers for strasbaugh/speedfam:
--------------------------------------
2 COMPLETE CARRIERS FOR STRASBAUGH
5 COMPLETE CARRIERS FOR SPEEDFAM

67.8A shift CMP passdown 12/17/95SUBPAC::SADINFreedom isn't free.Sun Dec 17 1995 18:5773
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                6                   cmp.a1/scrub

        BREAKIN WAFERS             75                   misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: XD0317 (pmd).

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: JD0033 (m2) and XL0327 (m1).

CMP.B1 (Speedfam CMP-V) - RUNNING: XL0321 (m3).

CMP-SCRUB.A1 (On-track scrubber) - IDLE. (doc fixed roller motor problem
today) 

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
XD0317 - PMD
XL0321 - M3

Hot lots coming to area:
-----------------------
JD0049 - DEP 2-1
XL0320 - DEP 2-1 (B-LOT)

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
2 boxes ordered, none left in room.

Number of product lots in room:
------------------------------
5

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0322 - M1 - 22WFRS
JD0040 - M2 - 12WFRS
JD0033 - M2 - 12WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
6 complete strasbaugh carriers (plus two plates filmed/shimmed)
10 complete speedfam carriers

67.9A shift CMP passdown 12/18/95SUBPAC::SADINFreedom isn't free.Mon Dec 18 1995 19:0873
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               20                   cmp.a1/scrub

        BREAKIN WAFERS            100                   misc


CMP.A1 (Strasbaugh 6DS-SP) - RUNNING: JD0052 (pmd).

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING: XD0309 (m2).

CMP.B1 (Speedfam CMP-V) - RUNNING: JD0053 (pmd).

CMP-SCRUB.A1 (On-track scrubber) - IDLE.

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
4 full boxes of 12K monitors. Please make sure to keep at least 2 full
boxes on hand at all times! Don't be shy about ordering monitors. See the
ASDG::CMP notesfile for details.

Number of product lots in room:
------------------------------
3

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0049 - M2 - 12WFRS
XL0320 - M2 - 24WFRS
JD0051 - PMD - 10WFRS
JD0053 - PMD - 12WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
6 complete strasbaugh carriers (plus two plates filmed/shimmed)
10 complete speedfam carriers

67.10A shift CMP passdown 12/19/95SUBPAC::SADINFreedom isn't free.Tue Dec 19 1995 19:0573
CMP
___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                20                  cmp.b1/.b2./.a2 mqc

        BREAKIN WAFERS              75                  misc


CMP.A1 (Strasbaugh 6DS-SP) - IDLE.

CMP.A2 (Strasbaugh 6DS-SP) - IDLE.

CMP.B1 (Speedfam CMP-V) - IDLE.

CMP.B2 (Speedfam CMP-V) - RUNNING: JD0058 (pmd - hot) and XL0314 (m1 -
split)

CMP-SCRUB.A1 (On-track scrubber) - IDLE. 

CMP-SCRUB.A2 (On-track scrubber) - IDLE.


Hot/B lots in area:
__________________
JD0058 - PMD - HOT

Hot lots coming to area:
-----------------------
XL0338 - ILD 1-1
XD0343 - DEP_PMD

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *

Monitor status:
--------------
3.5 boxes of 12K monitors

Number of product lots in room:
------------------------------
3

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
JD0058 - PMD - 24WFRS
JD0056 - PMD - 10WFRS

# of carriers for strasbaugh/speedfam:
--------------------------------------
10 CARRIERS FOR CMP.B1/.B2
6 CARRIERS FOR CMP.A1/.A2 (PLUS 2 PLATES SHIMMED AND FILMED)

67.11CMP 12/21/95 D SHIFTFABSIX::D_CAUSEThu Dec 21 1995 06:4055
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE  MQC COMPLETE RUN AT 14.8
                                      
                                                                      
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE RUNNING MQC'S SECOND TIME
                                     
CMP.B1 (Speedfam CMP-V) - UP/RUNNING LOT XD0332 FOR TOUCHUP

CMP.B2 (Speedfam CMP_V) - UP/ RUNNING SECOND MQC                       
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  RAN MQC'S

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  RAN MQC'S

HOT/B lots in area: 
-------------------
 Hot lot # JD0049 SUPER HOT LOT!
 B   lot # 
HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:
--------------------
       
DOWN equipment:
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   10 COMPLETE
     STRAUSBAUGH COMPLETE        4 COMPLETE
 
HOLD LOTS:
----------

NONE


MONITOR status:
---------------
  

NUMBER of product lots in room: 1 
-------------------------------
     LOT #    XD0332 
              
              
             
              
              
new spec/revs posted:
---------------------

*none*
67.12D SHIFT PASSDOWN 12/22/95FABSIX::D_CAUSEFri Dec 22 1995 07:1256
CMP.A1 (Strasbaugh 6DS-SP) - UP/IDLE  NEEDS MQC
                                      
                                                                      
CMP.A2 (Strasbaugh 6DS-SP) - UP/IDLE 
                                     
CMP.B1 (Speedfam CMP-V) - DOWN/   RAN MQC'S FAILED FOR SCRATCHES. CHANGED PAD
FAIED FOR SCRATCHES AGAIN.

CMP.B2 (Speedfam CMP_V) - UP/ RUNNING TWO LOTS  JD0042, "B" LOT XD0317                       
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  RAN MQC'S

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  RAN MQC'S

HOT/B lots in area: 
-------------------
 Hot lot # 
 B   lot # XD0317
HOT lots coming to area:
------------------------
 Hot lot # JD0058
 B   LOT #       
STATIC lots in area:
--------------------
       
DOWN equipment:CMP.B1
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   10 COMPLETE
     STRAUSBAUGH COMPLETE        4 COMPLETE
 
HOLD LOTS:
----------

NONE


MONITOR status:
---------------
  

NUMBER of product lots in room: 4
-------------------------------
     LOT #    JD0055-XD0317-JD0042-JD0046
              
              
             
              
              
new spec/revs posted:
---------------------

*none*
67.13D SHIFT PASSDOWN FABSIX::D_CAUSESat Dec 23 1995 07:0757
CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING LOT JD0046
                                      
                                                                      
CMP.A2 (Strasbaugh 6DS-SP) - UP/RUNNING LOT YD00137
                                     
CMP.B1 (Speedfam CMP-V) - DOWN/   RAN MQC'S FAILED FOR SCRATCHES. CHANGED PAD
FAIED FOR SCRATCHES AGAIN.

CMP.B2 (Speedfam CMP_V) - UP/ RUNNING FOUR LOTS JD0041,JD0044,XD0343 HOT LOT
XD0325 B LOT                       
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE 

HOT/B lots in area: 
-------------------
 Hot lot # XD0343
 B   lot # XD0325
HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:
--------------------
       
DOWN equipment:CMP.B1
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   10 COMPLETE
     STRAUSBAUGH COMPLETE        4 COMPLETE
 
HOLD LOTS:
----------

NONE


MONITOR status:
---------------
  

NUMBER of product lots in room: 10
-------------------------------
    
              
              
             
              
              
new spec/revs posted:
---------------------

*none*
67.14CORRECTION OF STATUS FOR CMP.B1FABSIX::D_CAUSESat Dec 23 1995 07:1456
CMP.A1 (Strasbaugh 6DS-SP) - UP/RUNNING LOT JD0046
                                      
                                                                      
CMP.A2 (Strasbaugh 6DS-SP) - UP/RUNNING LOT YD00137
                                     
CMP.B1 (Speedfam CMP-V) - DOWN

CMP.B2 (Speedfam CMP_V) - UP/ RUNNING FOUR LOTS JD0041,JD0044,XD0343 HOT LOT
XD0325 B LOT                       
                                           
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE  

CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE 

HOT/B lots in area: 
-------------------
 Hot lot # XD0343
 B   lot # XD0325
HOT lots coming to area:
------------------------
 Hot lot # 
 B   LOT #       
STATIC lots in area:
--------------------
       
DOWN equipment:CMP.B1
---------------

CARRIERS::
-----------
    SPEEDFAM PLATES COMPLETE.   10 COMPLETE
     STRAUSBAUGH COMPLETE        4 COMPLETE
 
HOLD LOTS:
----------

NONE


MONITOR status:
---------------
  

NUMBER of product lots in room: 10
-------------------------------
    
              
              
             
              
              
new spec/revs posted:
---------------------

*none*
67.15CMP C-SHIFT PD. 12/23/95FABSIX::E_DAWSONSat Dec 23 1995 17:3740
				CMP
				___

CMP.A1 (Strasbaugh 6DS-SP) - DOWN/GLOBAL
                                          
CMP.A2 (Strasbaugh 6DS-SP) - DOWN/GLOBAL 

CMP.B1 (Speedfam CMP-V) - DOWN/GLOBAL   
			       
CMP.B2 (Speedfam CMP-V) - DOWN/GLOBAL 

CMP-SCRUB.A1 (On-track scrubber) - DOWN/GLOBAL

CMP-SCRUB.A2 (On-track scrubber) - DOWN/GLOBAL
                              
			LOT STATUS        
   		       ------------
   * HOT LOT *  XD0343 @OP# 1981 CMP_ILD1
                - Lot was polished on CMP.B2 needs 100% on meassurement.
                   *2 Wafers broke during T/UP on .B2*
    
   * B-LOT *    XD0325 @OP# 3066 THICK AFTER CMP ILD2...This lot is at T/UP
    		Lot was run on CMP.B2 and needs 100% meassurement. 
   
    * B-LOT * 	XL0320 @OP# 3127 THICK BEFORE ILD3 
    
	       * Lot JD0041 @OP# 1989 CMP AFTER ILD3. Lot was run on CMP.B2
                    Lot is at T/UP and needs 100% meassurement. 
		
               * Lot JD0044 @OP# 1989 CMP AFTER ILD3. Lot was run on CMP.B2
    		    Lot is at T/UP and needs a 100% meassurement.	 
    
    * HOLD *   * JD0046 THICK AFTER CMP ILD2. This lot needs a 100%
    		    meassurement and T/UP on CMP.A1.
      
    Lots in CMP.....JD0051      DC1035 1981 CMP_ILD1 
    	            XL0311	TM55   1996 CMP_ILD3
    		    XD0319	TM36   3058 THK_CMP 14		 	    
    		    XD0323	TM36   3058 THK_CMP 14	
                    
67.161/16/96 CMP PASSDOWNFABSIX::L_CEDRONETue Jan 16 1996 06:4077
                           CMP PASSDOWN
                           ------------


                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS               23                   cmp.a1/.b1/scrub

        BREAKIN WAFERS             100                   misc


CMP.A1 (Strasbaugh 6DS-SP) - DOWN, ROBOT UPGRADE 

CMP.A2 (Strasbaugh 6DS-SP) - RUNNING XD0356

CMP.B1 (Speedfam CMP-V) - DOWN -PARTS

CMP.B2 (SPEEDFAM CMP-V) - MQC, SCRATCHES

CMP-SCRUB.A1 (On-track scrubber) - IDLE, MQC'S DONE

CMP-SCRUB.A2 (On-track scrubber) - IDLE, MQC'S DONE


Hot/B lots in area:
__________________
XD0356 24W B LOT

Hot lots coming to area:
-----------------------
* NONE *

Static Lots in area:
-------------------
* none *

Down Equipment:
--------------
CMP.A1 DOWN, ROBOT UPGRADE
CMP.B1 DOWN, PARTS

Scrap lots:
----------
* none *

Hold Lots:
---------
* NONE *

Monitor status:
---------------
1/2 BOXS OF MQC WAFERS

Number of product lots in room:
------------------------------
1

New specs/revs posted:
---------------------
* none *

Lots/wafers processed:
---------------------
XD0341 23W
XD0345 24W
XD0350 24W

# of carriers for strasbaugh/speedfam:
-------------------------------------
6 spare carriers for CMP.B1/B2
3 full carriers for CMP.A1/.A2
1 plates filmed for CMP.A1/.A2


67.17CMP.B2 OFFSET CHANGE 5/30/96FABSIX::G_ISAACSThu May 30 1996 12:5316
    SYSTEM:CMP.B2
    DATE   5/30/96
           OLD     NEW
    HEAD   OFFSET  OFFSET
    ----   ------  ------
     1              +14
     2              -14
     3              +14
     4              + 7
     5              +14
    
    
    REASON FOR CHANGE: HEAD TO HEAD VARIATION WAS GREATER THAN 300�/MIN.
    ON MQCS FOLLOWING A PAD CHANGE AND NEW CARRIERS.
    
    
67.18OFFSET CHANGE CMP.B2 5/31/96FABSIX::G_ISAACSFri May 31 1996 16:3217
    SYSTEM:CMP.B2
    DATE    5/31/96
           OLD     NEW
    HEAD   OFFSET  OFFSET
    ----   ------  ------
     1      +14     +14
     2      -14     -15
     3      +14     +16
     4      + 7     - 3
     5      +14     + 1
    
    
    
    REASON FOR CHANGE: HEAD TO HEAD VARIATION WAS DIFFERENCE, AFTER MQC"S