Title: | POLYCENTER Console Manager |
Notice: | Kits, Scans, Docs on CSC32:: as PCM$KITS:,PCM$DOCS:, PCM$SCANS: |
Moderator: | CSC32::BUTTERWORTH |
Created: | Thu Aug 06 1992 |
Last Modified: | Fri Jun 06 1997 |
Last Successful Update: | Fri Jun 06 1997 |
Number of topics: | 1541 |
Total number of notes: | 6564 |
Polycenter Console Manager - URGENT ISSUE SUBJECT: PCM Fails to Communicate with 2nd Network Board ENVIRONMENT: PCM V1.6-126 under VMS V6.1 PROBLEM: PCM will NOT communicate over the SECOND Network Controller SYMPTOM: PCM is used to communicate with LAT connections to more than one extended LAN. This requires at least TWO Network Interconnect (NI) I/O controllers for the network connections, one for each extended LAN. PCM will initiate LAT connections to terminal servers ONLY OVER THE FIRST LAT LINK CONNECTION THAT IS DEFINED IN THE LAT$SYSTARTUP.COM procedure. EXAMPLE: SYS$MANAGER:LAT$SYSTARTUP.COM $! ------------------------- Start LAT Protocol -------------------------- $! $ lcp create link csc$link /device=exa0: /decnet $ lcp create link cx1$link /device=eta0: /decnet $ lcp set node /state=on In this example, PCM will initiate connections over the link on the EXA0: device. It will NOT initiate (or very seldom initiate) connections on the ETA0: device. If the two commands are reversed in order, only the first defined link will be used by PCM, and connections would be made to the ETA0: network. OBSERVATION: This USED to work OK on previous (patched) versions of PCM. Jim Lind CCS - CXO3 Datacenter Support DTN 592-4099
T.R | Title | User | Personal Name | Date | Lines |
---|---|---|---|---|---|
1291.1 | INCREASE Console Open Timeout | BSS::LIND | Jim Lind; 592-4099 CX03-1/N14 CNMC-West | Fri May 03 1996 14:00 | 30 |
The CXO3 PCM system has over 250 systems connected, with almost all of them on the FIRST network controller. PCM needs more time to establish console connections over multiple LAT lines and where there are a large number of systems to connect to. The "FIX" is to change the "hidden" parameter for "Console Open Timeout" from the default value to a much larger number. $ CONSOLE EDIT /INTERFACE=CHARACTER PCM Edit> show hidden Max. configurable Systems = 400 systems Systems per controller = 4 systems Console Open Timeout = 90 seconds Monitor interval = 150 seconds TELNET Status Timeout = 15 seconds Buffer size = 256 bytes Nulls in data stream will be ignored Notice that "Console Open Timeout" has been increased to 90 seconds. This will allow more time for PCM to connect to LAT devices on the 2nd NI controller. Thanks to Dan Butterworth of the Customer Support Center for providing this solution to the problem. Jim Lind |