TOPIC | 1.0 | Mon Jul 26 1993 15:02 | CA/CO Data Center Consolidation Project | 22 lines |
| 1.1 | Mon Jul 26 1993 15:02 | Purpose of the Project | 14 lines |
| 1.2 | Tue Jul 27 1993 18:03 | How to Use NOTES | 36 lines |
| 1.3 | Tue Oct 12 1993 17:47 | California Data Center Move Conference - FYI | 31 lines |
TOPIC | 2.0 | Mon Jul 26 1993 14:19 | Who Are You? | 4 lines |
| 2.1 | Mon Jul 26 1993 14:26 | Jim Lind - CXO3 Data Center Subproject Leader | 17 lines |
| 2.10 | Wed Sep 22 1993 18:16 | LIND CXO3 Contact Info | 15 lines |
| 2.13 | Fri Dec 03 1993 09:32 | TUS/WRO System Managers | 14 lines |
| 2.14 | Fri Dec 03 1993 10:18 | CXO WIZARD Mailing List and Contacts | 15 lines |
TOPIC | 3.0 | Mon Jul 26 1993 15:46 | Meeting Agenda/Minutes & Misc Admin | 4 lines |
| 3.1 | Mon Jul 26 1993 17:13 | 13 July Meeting Agenda | 233 lines |
| 3.2 | Mon Jul 26 1993 17:27 | 13 Jul Minutes/20 Jul Agenda | 209 lines |
| 3.3 | Mon Jul 26 1993 17:28 | 20 Jul Minutes | 126 lines |
| 3.4 | Thu Jul 29 1993 18:04 | 27 July Minutes | 198 lines |
| 3.5 | Mon Aug 09 1993 18:16 | 10 Aug Meeting Agenda | 142 lines |
| 3.7 | Thu Aug 19 1993 18:36 | 17 Aug Minutes | 144 lines |
| 3.8 | Wed Aug 25 1993 13:27 | 24 Aug Agenda & DIBS for FUTURE | 113 lines |
| 3.10 | Tue Aug 31 1993 15:57 | 31 Aug Meeting Agenda | 114 lines |
| 3.12 | Fri Sep 03 1993 17:05 | 07 Sep Agenda | 104 lines |
| 3.17 | Thu Sep 30 1993 17:52 | October DIBS Numbers | 56 lines |
| 3.19 | Tue Oct 26 1993 15:53 | Request STAFF Meeing Info be placed here | 9 lines |
| 3.28 | Wed Oct 27 1993 15:53 | 10/26 Con Call Minutes | 100 lines |
| 3.30 | Tue Nov 02 1993 10:40 | Future Meeting Schedule 11/2 | 128 lines |
| 3.37 | Tue Nov 16 1993 16:22 | Minutes 16 November | 85 lines |
| 3.40 | Wed Nov 24 1993 14:21 | Minutes 23 Nov Meeting | 130 lines |
TOPIC | 4.0 | Mon Jul 26 1993 16:09 | PROJECT Plan/Sched/Funding | 5 lines |
| 4.1 | Mon Jul 26 1993 17:08 | Schedule Updates Using Microsoft Project | 41 lines |
| 4.2 | Mon Jul 26 1993 17:14 | Location of Project Plan and Task Sheet | 18 lines |
| 4.3 | Mon Jul 26 1993 17:48 | Updated Project Plan and Tasks | 47 lines |
| 4.4 | Tue Jul 27 1993 10:53 | CAR Assignemnt and Plan Approval | 19 lines |
| 4.5 | Wed Jul 28 1993 17:20 | CAR Status Update | 32 lines |
| 4.7 | Mon Aug 09 1993 10:39 | Business Plan for Data Center Consolidation | 1025 lines |
| 4.8 | Mon Aug 09 1993 18:10 | Plan status | 16 lines |
| 4.9 | Tue Aug 10 1993 17:17 | Business Plan Final Approval | 6 lines |
| 4.10 | Mon Aug 16 1993 15:27 | Move Capital/Expense Info | 70 lines |
| 4.11 | Wed Aug 18 1993 12:54 | Capital Asset and Expense Tracking | 20 lines |
| 4.13 | Mon Aug 23 1993 16:39 | TUSTIN Vacated by 31 December | 28 lines |
| 4.14 | Wed Sep 08 1993 10:04 | CC Info is 1MV | 8 lines |
| 4.15 | Wed Oct 06 1993 16:46 | COST Estimate on Move | 20 lines |
| 4.16 | Thu Oct 07 1993 13:29 | Estimated Cost of Relocating HW from WRO and TUS | 30 lines |
| 4.17 | Tue Nov 02 1993 10:55 | One 4000 System Ships | 55 lines |
| 4.18 | Tue Nov 02 1993 17:09 | CXO3 Tape Drive Order | 74 lines |
| 4.19 | Fri Nov 05 1993 15:58 | Project task sheet | 10257 lines |
| 4.20 | Thu Dec 02 1993 15:06 | Bill for UPS Battery Replacement | 28 lines |
| 4.21 | Wed Dec 22 1993 15:47 | CXO Expense Documentation | 92 lines |
TOPIC | 5.0 | Thu Sep 02 1993 19:05 | TACT Minutes and Info | 18 lines |
| 5.1 | Wed Sep 01 1993 18:34 | TACT Meeting minutes for last 3 weeks | 54 lines |
| 5.2 | Wed Sep 15 1993 16:28 | TACT 08 Sep Meeting Minutes | 52 lines |
| 5.3 | Wed Sep 15 1993 16:30 | TACT 15 Sep Meeting Minutes | 60 lines |
| 5.4 | Thu Oct 14 1993 14:58 | Transition/Consolidation Minutes, 13-OCT | 75 lines |
| 5.5 | Thu Oct 21 1993 14:31 | TACT Minutes 20 Oct 93 | 96 lines |
| 5.6 | Fri Nov 12 1993 10:13 | TACT Update 11 November | 68 lines |
| 5.7 | Fri Nov 19 1993 14:32 | TACT Minutes 17-Nov | 64 lines |
| 5.8 | Wed Dec 08 1993 14:05 | TACT Minutes 08-Dec | 57 lines |
TOPIC | 6.0 | Mon Jul 26 1993 14:34 | POWER and SPACE in CXO3 | 17 lines |
| 6.1 | Mon Jul 26 1993 14:36 | Status of Money for CXO3 Breaker Equipment | 23 lines |
| 6.2 | Mon Jul 26 1993 16:08 | PDS Pole and Power Initial Estimate | 22 lines |
| 6.3 | Thu Jul 29 1993 09:47 | Power requirements will be resetimated | 5 lines |
| 6.4 | Thu Jul 29 1993 09:52 | IPA for CXO3 Power Equipment Approved | 16 lines |
| 6.6 | Tue Aug 03 1993 15:31 | CXO CAR requirements needed | 16 lines |
| 6.7 | Tue Aug 03 1993 15:57 | Summary requirements for CXO3 | 24 lines |
| 6.8 | Thu Aug 05 1993 11:36 | Critical Status Items for CX03 Power | 36 lines |
| 6.10 | Thu Aug 05 1993 15:06 | Work Issue on 1 Sep Power | 10 lines |
| 6.11 | Thu Aug 05 1993 15:31 | CAR for Data Center Move | 10 lines |
| 6.12 | Thu Aug 05 1993 15:38 | Joe Gale Contact on expense for CXO | 19 lines |
| 6.13 | Mon Aug 09 1993 13:30 | Paul Magginetti/CXO3 Power Point of Contact | 20 lines |
| 6.15 | Fri Aug 20 1993 18:45 | UPS Power Assignments | 17 lines |
| 6.16 | Mon Aug 23 1993 17:15 | Logistics on UPS if possible | 11 lines |
| 6.17 | Mon Aug 23 1993 18:08 | UPS Cluster Proposal | 27 lines |
| 6.18 | Thu Aug 26 1993 11:40 | Power Install Status | 18 lines |
| 6.19 | Thu Aug 26 1993 12:35 | CX03 PDS Cable Inventory | 21 lines |
| 6.20 | Thu Sep 02 1993 18:56 | Need Info on V-Type Power Cables | 26 lines |
| 6.21 | Tue Sep 14 1993 12:26 | Power In at CXO3 LAB1 | 10 lines |
| 6.22 | Wed Sep 22 1993 10:36 | HA3000 Had One bad Battery | 7 lines |
| 6.23 | Wed Dec 01 1993 13:02 | UPS Outage Requested for 4/5 Dec | 33 lines |
| 6.24 | Thu Dec 02 1993 11:30 | OXFORD Outage Requirements | 14 lines |
| 6.25 | Thu Dec 02 1993 15:09 | NO POWER OUTAGE AFTER ALL | 9 lines |
| 6.26 | Tue Dec 07 1993 14:49 | Need TWO PDS in CXO3 | 27 lines |
| 6.27 | Tue Dec 07 1993 16:31 | Received TFO RA90 | 8 lines |
TOPIC | 7.0 | Mon Jul 26 1993 15:30 | UPS Requirements | 8 lines |
| 7.1 | Mon Jul 26 1993 15:39 | What's on UPS | 22 lines |
| 7.2 | Mon Dec 06 1993 16:10 | UPS at 80% - as planned | 8 lines |
TOPIC | 8.0 | Mon Jul 26 1993 16:26 | BACKUP Requirements | 15 lines |
| 8.1 | Tue Jul 27 1993 14:43 | BACKUP Tape Responsibilities in CXO | 14 lines |
| 8.5 | Mon Aug 16 1993 10:48 | OXFORD/WE_CHAMP Backup Requirements | 131 lines |
| 8.6 | Wed Aug 18 1993 13:04 | Need TUS/SEO Backup Requirements | 18 lines |
| 8.7 | Wed Aug 18 1993 18:29 | Backup Problem Statement | 62 lines |
| 8.9 | Wed Aug 25 1993 13:00 | Tape Library Issues in Topic 27 | 6 lines |
| 8.10 | Wed Aug 25 1993 18:01 | More on BACKUP Conversion | 33 lines |
| 8.11 | Thu Sep 02 1993 19:14 | Info from Staff Meeting | 15 lines |
| 8.12 | Wed Sep 08 1993 16:21 | BACKUP Team Members | 13 lines |
| 8.13 | Fri Sep 10 1993 18:03 | BACKUP Team Members | 12 lines |
| 8.14 | Fri Sep 10 1993 18:04 | BACKUP REPORT FOR CLUSTER/NODE OXFORD | 32 lines |
| 8.15 | Fri Sep 10 1993 18:05 | OXFORD/CHAMP backup info | 133 lines |
| 8.16 | Fri Sep 10 1993 18:18 | SWCHAMP & ONOFRE Backup Schedule | 63 lines |
| 8.17 | Fri Sep 10 1993 18:23 | ONOFRE Files for Backup | 75 lines |
| 8.18 | Fri Sep 10 1993 18:30 | Swchamp files | 70 lines |
| 8.19 | Tue Sep 14 1993 09:44 | Current OXFORD Backup Command Procedures | 419 lines |
| 8.20 | Fri Sep 24 1993 09:52 | Timing of OXFORD Backup During Move Timeframe | 35 lines |
| 8.21 | Fri Sep 24 1993 11:44 | OXFORD_DAILY Hold for Ship | 18 lines |
| 8.22 | Mon Sep 27 1993 16:38 | BACKUP OXFORD Tape Use Schedule | 19 lines |
| 8.23 | Wed Oct 13 1993 12:49 | ONOFRE TA79 Backup Requirements | 15 lines |
| 8.24 | Fri Oct 15 1993 14:40 | TA79 TAPE BACKUP | 19 lines |
TOPIC | 9.0 | Tue Jul 27 1993 10:35 | Prioritizing Equipment Moves | 5 lines |
| 9.1 | Tue Jul 27 1993 10:41 | Request MCS/Logictics Move ASAP | 35 lines |
| 9.2 | Thu Jul 29 1993 09:44 | Reply to Isses on What to Move First | 49 lines |
| 9.4 | Thu Aug 05 1993 17:38 | NDW022 Move Issue | 13 lines |
TOPIC | 10.0 | Tue Jul 27 1993 14:45 | Performance and Capacity Planning | 4 lines |
TOPIC | 11.0 | Tue Jul 27 1993 14:48 | Status of Capacity Planning | 13 lines |
| 11.1 | Tue Jul 27 1993 15:46 | MPR Account Used for CA system access | 8 lines |
TOPIC | 12.0 | Tue Jul 27 1993 15:02 | CXO Network Hub Reqruirements | 10 lines |
| 12.1 | Tue Jul 27 1993 15:34 | COMM Equipment Racking Requirements | 14 lines |
| 12.2 | Fri Sep 03 1993 17:11 | Data Line Short Supply at CXO3 | 20 lines |
TOPIC | 13.0 | Thu Jul 29 1993 17:27 | CXO Ethernet Segment Requirements | 10 lines |
TOPIC | 15.0 | Thu Jul 29 1993 17:37 | Application Availability Requirements | 6 lines |
| 15.14 | Tue Aug 17 1993 17:21 | Updated Tentative Move Dates | 12 lines |
| 15.16 | Fri Sep 24 1993 09:42 | Schedule Info in Topic 45 | 4 lines |
TOPIC | 16.0 | Thu Jul 29 1993 17:42 | Mail Transition Subtask | 5 lines |
TOPIC | 17.0 | Thu Jul 29 1993 17:53 | Application Migration Considerations | 5 lines |
TOPIC | 18.0 | Wed Aug 04 1993 12:25 | WRO1 Data Center Move and Layout | 5 lines |
| 18.1 | Wed Aug 04 1993 12:29 | WRO1 Data Center Responsibilities | 21 lines |
| 18.2 | Tue Oct 26 1993 15:45 | STATUS Requested of Bob Decker | 4 lines |
TOPIC | 19.0 | Mon Aug 09 1993 10:47 | OXFORD Logistics Cluster Move | 10 lines |
| 19.1 | Mon Aug 09 1993 11:25 | Target Configuration | 13 lines |
| 19.3 | Mon Aug 09 1993 17:38 | Tentative Move Schedule | 47 lines |
| 19.4 | Tue Aug 10 1993 17:47 | Backup of Disks Prior to Shutdown | 25 lines |
| 19.5 | Tue Aug 10 1993 17:55 | Updated Tentative Schedule | 23 lines |
| 19.6 | Mon Aug 16 1993 13:41 | Estimates for Oxford Backup | 57 lines |
| 19.7 | Mon Aug 16 1993 13:51 | Preparation of Equipment for Move | 16 lines |
| 19.8 | Tue Aug 17 1993 19:49 | OXFORD target disk config | 47 lines |
| 19.9 | Wed Aug 18 1993 12:16 | Suggested Disk Config Changes | 21 lines |
| 19.10 | Thu Aug 19 1993 11:14 | Concerns on Disk Config | 23 lines |
| 19.11 | Fri Aug 20 1993 16:43 | Updated Disk Config | 49 lines |
| 19.12 | Wed Aug 25 1993 18:05 | Banner Informing of Shutdown | 7 lines |
| 19.13 | Wed Aug 25 1993 18:15 | What to Test before Ship | 27 lines |
| 19.14 | Thu Aug 26 1993 10:58 | Configuration Information | 91 lines |
| 19.15 | Fri Aug 27 1993 17:59 | Tustin Equipment Received | 29 lines |
| 19.16 | Fri Aug 27 1993 18:08 | CXO3 OXFORD Swing Hardware | 20 lines |
| 19.17 | Mon Aug 30 1993 14:12 | OXFORD hardware, backups, and timetable concerns | 45 lines |
| 19.18 | Mon Aug 30 1993 15:11 | Some Answers to Concerns | 65 lines |
| 19.19 | Mon Aug 30 1993 15:43 | Updated Move Schedule | 43 lines |
| 19.20 | Mon Aug 30 1993 17:55 | OXFORD Color Tag Assignments | 33 lines |
| 19.21 | Mon Aug 30 1993 18:07 | Responses to Answers | 94 lines |
| 19.22 | Tue Aug 31 1993 13:45 | Tape Equipment Issue | 15 lines |
| 19.23 | Tue Aug 31 1993 17:10 | No TA90 from WRO for Now | 13 lines |
| 19.24 | Tue Aug 31 1993 17:23 | OXFORD Schedule - More Details | 53 lines |
| 19.25 | Thu Sep 02 1993 11:27 | Contacts and Coordination Issues | 73 lines |
| 19.26 | Thu Sep 02 1993 17:51 | Mandatory HSC names/config | 33 lines |
| 19.27 | Fri Sep 03 1993 17:17 | Requestor update | 18 lines |
| 19.28 | Fri Sep 03 1993 17:56 | TA90 CONNECTIVITY | 19 lines |
| 19.29 | Tue Sep 07 1993 10:51 | 8550 and HSC70's bound for CXO | 24 lines |
| 19.30 | Tue Sep 07 1993 11:05 | FYI on OXFORD configuration | 71 lines |
| 19.31 | Wed Sep 08 1993 12:26 | TA7X Tapes Access on OXFORD Cluster | 11 lines |
| 19.32 | Mon Sep 13 1993 16:53 | Disk Cab Reconfig for RA90/92 | 21 lines |
| 19.34 | Tue Sep 14 1993 18:01 | RA7X fail point question | 25 lines |
| 19.36 | Wed Sep 15 1993 14:34 | More on Oxford Disk Configuration | 159 lines |
| 19.37 | Wed Sep 15 1993 14:37 | Reply on More on Oxford Disk Configuration | 71 lines |
| 19.38 | Mon Sep 20 1993 12:49 | OXFORD disk config and backups | 73 lines |
| 19.39 | Mon Sep 20 1993 12:56 | Responses to Questions | 27 lines |
| 19.40 | Mon Sep 20 1993 13:30 | Updated Disk Config - As Build | 74 lines |
| 19.41 | Mon Sep 20 1993 13:30 | Questions on As Build | 95 lines |
| 19.42 | Mon Sep 20 1993 15:53 | Let's Freeze the Config As Is | 15 lines |
| 19.43 | Wed Sep 22 1993 13:04 | CAMOVE, initial look-see | 28 lines |
| 19.44 | Wed Sep 22 1993 13:27 | Response to Configuration Concerns | 35 lines |
| 19.45 | Wed Sep 22 1993 13:50 | Oops, possible TA90 config typo | 17 lines |
| 19.47 | Thu Sep 23 1993 14:51 | Announcement of OXFORD Move | 50 lines |
| 19.48 | Fri Sep 24 1993 09:56 | DS Expertise Center Contact Information | 16 lines |
| 19.49 | Sun Sep 26 1993 22:22 | OXFORD Move COMPLETED Ahead of Schedule | 12 lines |
| 19.50 | Mon Sep 27 1993 13:23 | DECnet Perf Issue Resolved | 11 lines |
| 19.51 | Mon Sep 27 1993 16:05 | OXFORD Move Completed | 10 lines |
TOPIC | 20.0 | Mon Aug 09 1993 11:41 | PHYSICAL Move Contacts and Info | 12 lines |
| 20.1 | Mon Aug 09 1993 11:46 | Initial Contacts for Move Info | 20 lines |
| 20.2 | Mon Aug 09 1993 15:54 | TWI Request for Move Estimate | 96 lines |
| 20.3 | Thu Aug 26 1993 11:44 | Problem contacting TWI | 11 lines |
| 20.4 | Mon Sep 13 1993 16:35 | Request for Move Quote | 100 lines |
| 20.5 | Wed Sep 15 1993 16:10 | TWI No Contact Yet | 6 lines |
| 20.6 | Fri Sep 17 1993 11:40 | Update on Move Contract | 99 lines |
| 20.7 | Wed Sep 22 1993 18:01 | QUOTE for 15 Oct Move | 41 lines |
| 20.8 | Wed Sep 29 1993 14:22 | Request for PO for Trucking | 189 lines |
| 20.9 | Wed Sep 29 1993 14:26 | Detail Schedule to TWI Trucking | 158 lines |
| 20.10 | Tue Oct 05 1993 10:48 | TWI PO Request w/sole source | 370 lines |
| 20.11 | Wed Oct 06 1993 13:58 | MOVING Plan and Schedule | 267 lines |
| 20.12 | Tue Oct 12 1993 09:41 | WRO3 Contact for CA Datacenter Move | 27 lines |
| 20.13 | Wed Nov 10 1993 09:55 | ONOFRE Trucking Update | 95 lines |
TOPIC | 21.0 | Mon Aug 09 1993 11:55 | Project Overview Information | 8 lines |
| 21.1 | Mon Aug 09 1993 13:22 | Equipment Summary | 18 lines |
TOPIC | 24.0 | Tue Aug 10 1993 17:24 | SWING Hardware | 4 lines |
| 24.1 | Tue Aug 10 1993 17:33 | Ready for Shipment | 26 lines |
| 24.3 | Tue Aug 17 1993 14:02 | Swing Hardware Plan | 60 lines |
| 24.6 | Wed Aug 18 1993 17:46 | CHAMP Reconfig Contingency Hardware | 40 lines |
| 24.7 | Thu Aug 19 1993 16:59 | 6000 Power Cable Shortage | 13 lines |
| 24.8 | Fri Aug 20 1993 09:41 | PDS V Dial Cable Listing | 131 lines |
| 24.10 | Wed Aug 25 1993 13:37 | Hardware Rev for OXFORD Swing | 86 lines |
| 24.12 | Thu Aug 26 1993 10:57 | Configuration Information | 91 lines |
| 24.14 | Thu Aug 26 1993 17:53 | OXFORD Eqpt for Swing after Move | 12 lines |
| 24.15 | Fri Aug 27 1993 17:19 | Hardware for final OXFORD target/swing | 22 lines |
| 24.16 | Fri Aug 27 1993 17:27 | HSC70 vrs 50 and Delivery of 8xxx CPU | 23 lines |
| 24.17 | Fri Sep 03 1993 17:27 | Node Registration | 31 lines |
| 24.18 | Fri Sep 03 1993 17:28 | Node Registration Request | 76 lines |
| 24.19 | Tue Sep 14 1993 12:27 | OXFORD SWING Under Test | 11 lines |
| 24.20 | Mon Sep 20 1993 13:50 | Need Old NWD022 Equipment ASAP | 19 lines |
| 24.21 | Tue Sep 28 1993 15:09 | SEO NWD Hardware Deinstall | 94 lines |
| 24.22 | Tue Sep 28 1993 15:29 | Status of SEO Equipment Move to CXO3 | 44 lines |
| 24.23 | Wed Sep 29 1993 10:45 | Add Star Coupler to System | 64 lines |
| 24.24 | Wed Sep 29 1993 14:31 | SEO Swing Ships 30 Oct/Arrive 5 Oct | 9 lines |
| 24.25 | Wed Sep 29 1993 15:47 | SWING Hardware Summary | 35 lines |
| 24.26 | Thu Sep 30 1993 16:50 | Need RA90 for System Disk | 24 lines |
| 24.27 | Thu Sep 30 1993 17:36 | TA90 Tape Config Info | 19 lines |
| 24.28 | Tue Oct 05 1993 12:09 | Deal on RA90 for System Disk | 15 lines |
| 24.29 | Tue Oct 05 1993 12:14 | Order Request for RA26 Disks | 46 lines |
| 24.30 | Fri Oct 08 1993 14:21 | CAMOVE Cluster is ONLINE | 28 lines |
| 24.31 | Mon Oct 11 1993 10:01 | CAMOVE Swing Cluster is ONLINE | 41 lines |
| 24.32 | Mon Oct 11 1993 10:02 | 16 drives from CSCTLS | 10 lines |
| 24.33 | Mon Oct 11 1993 16:41 | Drives from CSC32 | 11 lines |
| 24.34 | Mon Oct 11 1993 16:44 | 20 Drives from CXO1 | 55 lines |
| 24.35 | Mon Oct 11 1993 18:01 | Need 20 RA82 from CXO1 | 36 lines |
| 24.36 | Mon Oct 11 1993 18:41 | Swing Equipment Summary Update | 51 lines |
| 24.37 | Thu Oct 14 1993 14:04 | RA82 from CXO1 for Swing | 78 lines |
TOPIC | 26.0 | Wed Aug 18 1993 13:08 | WE_CHAMP Cluster Move | 4 lines |
| 26.1 | Wed Aug 18 1993 17:56 | Need MINIMUM Config for Contingency Plan | 28 lines |
| 26.2 | Mon Sep 27 1993 16:14 | DECtalk Issues Moved to 47.* | 5 lines |
| 26.10 | Mon Sep 27 1993 16:17 | CXO3 Cluster Move Volunteers | 32 lines |
| 26.12 | Tue Sep 28 1993 15:37 | Cluster Config Info Needed | 20 lines |
| 26.13 | Wed Sep 29 1993 13:13 | Detail Move Schedule & Activities | 131 lines |
| 26.16 | Tue Oct 05 1993 15:59 | WE_Champ Cluster Config | 22 lines |
| 26.17 | Wed Oct 06 1993 13:44 | CASWING Suggested for Temp Service | 47 lines |
| 26.18 | Wed Oct 06 1993 14:11 | UPDATED MOVE Schedule | 139 lines |
| 26.21 | Thu Oct 07 1993 11:53 | Customer Move Memo | 133 lines |
| 26.22 | Thu Oct 07 1993 11:54 | MOVE SCHEDULE Update 10/7 | 148 lines |
| 26.23 | Thu Oct 07 1993 13:14 | Update Move Schedule - 27 Hour Driving Time | 148 lines |
| 26.24 | Thu Oct 07 1993 16:16 | FE Contact at WRO3 | 22 lines |
| 26.26 | Fri Oct 08 1993 17:04 | WE_CHAMP Sys Mgmt/Applications in Topic 53 | 4 lines |
| 26.27 | Mon Oct 11 1993 10:00 | CAMOVE Swing ONLINE Announcement | 39 lines |
| 26.28 | Mon Oct 11 1993 17:47 | WE_CHAMP Move Schedule Update 11-Oct | 169 lines |
| 26.29 | Tue Oct 12 1993 10:05 | Lind Contact Info for CXO3 | 50 lines |
| 26.30 | Wed Oct 13 1993 11:18 | TA90 Configuration | 16 lines |
| 26.31 | Wed Oct 13 1993 12:23 | WE_CHAMP Move Schedule Update 10/13/93 | 173 lines |
| 26.32 | Wed Oct 13 1993 12:41 | WE_CHAMP Shipping List | 29 lines |
| 26.33 | Wed Oct 13 1993 14:23 | Security Contact Concerning Move | 21 lines |
| 26.34 | Wed Oct 13 1993 15:13 | WE_CHAMP Move Schedule Update 10/13-2 | 179 lines |
| 26.35 | Wed Oct 13 1993 15:48 | TA90E WE_CHAMP Config Info | 33 lines |
| 26.38 | Tue Oct 12 1993 17:54 | WE_CHAMP Move - EC/Liaison Contacts | 24 lines |
| 26.41 | Thu Oct 14 1993 14:07 | MCS Page Procedure at CXO3 | 21 lines |
| 26.42 | Thu Oct 14 1993 14:25 | WE_CHAMP Move Schedule & Procedures | 224 lines |
| 26.43 | Thu Oct 14 1993 15:18 | EC EVENTS FOR THE WE_CHAMP MOVE | 31 lines |
| 26.44 | Fri Oct 15 1993 09:59 | | 4 lines |
| 26.45 | Fri Oct 15 1993 10:03 | Move Status Update | 31 lines |
| 26.46 | Fri Oct 15 1993 14:35 | CXO shipping list (so far) | 130 lines |
| 26.47 | Fri Oct 15 1993 18:26 | Move Blow by Blow Update | 18 lines |
| 26.49 | Mon Oct 18 1993 13:49 | WE_CHAMP CHAMP Call Documenting the Move | 1910 lines |
TOPIC | 27.0 | Wed Aug 25 1993 13:00 | TAPE Libraries and Movement | 8 lines |
| 27.2 | Thu Aug 05 1993 15:48 | Arcus Contact planned 9 Aug | 14 lines |
| 27.4 | Wed Aug 25 1993 13:08 | ARCUS Meeting Planned for 31 Aug | 14 lines |
| 27.5 | Thu Sep 02 1993 12:57 | Tape Move PLAN and ISSUES | 105 lines |
| 27.6 | Wed Sep 08 1993 17:10 | Tape Move strategy update for OXFORD | 61 lines |
| 27.7 | Wed Sep 08 1993 18:00 | Final Disposition of OXFORD Backup Tapes | 18 lines |
| 27.8 | Wed Sep 08 1993 18:45 | Request for ARCUS Quote from Digital | 84 lines |
| 27.9 | Mon Sep 13 1993 11:19 | Tape Count for Off Site Storage | 16 lines |
| 27.10 | Tue Sep 14 1993 18:56 | Need Tape Supply for Systems After OXFORD | 24 lines |
| 27.11 | Wed Sep 15 1993 15:37 | ARCUS Quote for OXFORD Tape Move | 87 lines |
| 27.12 | Wed Sep 15 1993 16:02 | Tapes amounts for Oxford and We-Champ clusters | 30 lines |
| 27.13 | Mon Sep 20 1993 10:33 | Confirm ARCUS Contact in WRO3 | 23 lines |
| 27.14 | Fri Oct 08 1993 16:39 | ARCUS Quote to Move WE_CHAMP Tapes | 70 lines |
| 27.15 | Mon Oct 11 1993 16:39 | ARCUS to Ship WE_CHAMP Tapes | 99 lines |
| 27.16 | Fri Dec 03 1993 15:12 | Tape Racks (TA90/TU867) - Need any from TUS or WRO | 14 lines |
| 27.17 | Fri Dec 03 1993 15:12 | Yes - Need one or two tape racks | 10 lines |
| 27.18 | Fri Dec 03 1993 16:08 | Tape Racks | 23 lines |
| 27.19 | Mon Dec 06 1993 12:37 | Tapes Racks will be shipped | 11 lines |
| 27.20 | Mon Dec 06 1993 12:39 | TUS ARCUS tapes arrived | 10 lines |
TOPIC | 28.0 | Wed Aug 25 1993 18:20 | NWD022 PHASE I Cluster Move | 4 lines |
| 28.1 | Wed Aug 25 1993 18:23 | General Issues and Concerns | 21 lines |
| 28.2 | Thu Aug 26 1993 10:52 | Hardware Available 24 Sep | 20 lines |
| 28.3 | Tue Sep 07 1993 11:27 | Revised, NWD002 Plan | 108 lines |
| 28.4 | Tue Sep 14 1993 17:59 | Revision 1.1 | 48 lines |
| 28.5 | Tue Sep 21 1993 18:13 | NWD hardware deinstall. | 84 lines |
TOPIC | 29.0 | Fri Aug 27 1993 17:09 | CONTINGENCY Planning | 9 lines |
| 29.1 | Fri Aug 27 1993 17:10 | Manufacturing Disk Contingency | 26 lines |
TOPIC | 30.0 | Fri Aug 27 1993 17:15 | ACCOUNTS for System Access | 6 lines |
| 30.1 | Fri Aug 27 1993 17:16 | CNMCW Account Used for Access | 15 lines |
| 30.2 | Tue Aug 31 1993 13:49 | LIND/WESTDALE Access Granted | 4 lines |
TOPIC | 31.0 | Tue Aug 31 1993 17:44 | CAMOVE Swing Node Name and Address | 4 lines |
| 31.1 | Tue Aug 31 1993 17:45 | Reqest for Area 28 Node Name and Address | 26 lines |
| 31.2 | Tue Sep 07 1993 10:43 | Node CAMOVE Addr 28.0471 | 72 lines |
| 31.3 | Tue Sep 07 1993 10:43 | Network Policies | 38 lines |
| 31.4 | Tue Sep 07 1993 11:07 | DNRS welcomes new System Manager | 42 lines |
| 31.5 | Wed Sep 29 1993 12:56 | Request for CAMOV1 and CAMOV2 | 31 lines |
| 31.6 | Tue Oct 05 1993 14:40 | CAMOV1 Address 28.0346 | 72 lines |
| 31.7 | Tue Oct 05 1993 14:41 | CAMOV2 Addres 28.0347 | 72 lines |
| 31.8 | Tue Oct 05 1993 14:42 | CAMOVE Alias 28.0471 | 72 lines |
| 31.9 | Tue Oct 05 1993 14:44 | CAMOV1 Router for CAMOVE Cluster | 30 lines |
| 31.10 | Thu Oct 07 1993 11:30 | Node Registration form for Area 30 | 442 lines |
| 31.11 | Mon Feb 07 1994 16:10 | REMOVE CAMOV2 | 77 lines |
TOPIC | 32.0 | Thu Sep 02 1993 13:17 | Documentation Standards | 4 lines |
| 32.1 | Thu Sep 02 1993 13:18 | PS Info on Documentation Standards | 862 lines |
TOPIC | 34.0 | Fri Sep 03 1993 17:08 | OA Transition Issues | 4 lines |
| 34.1 | Fri Sep 03 1993 17:08 | OA Additional Projects -- Sep & Oct 1993 | 42 lines |
TOPIC | 35.0 | Tue Sep 07 1993 11:00 | OXFORD System Management Issues | 13 lines |
| 35.1 | Tue Sep 07 1993 11:01 | OXFORD work v2.5, and 9/4/93 status | 194 lines |
| 35.2 | Tue Sep 07 1993 11:03 | FYI on OXFORD configuration | 67 lines |
| 35.3 | Mon Sep 20 1993 10:58 | OXFORD work V2.7 | 123 lines |
| 35.4 | Wed Sep 22 1993 11:56 | Tape Load Policy | 10 lines |
| 35.5 | Wed Sep 22 1993 13:52 | Prep file for CAMOVE (new OXFORD) | 117 lines |
| 35.6 | Wed Sep 22 1993 13:53 | OXFORD CLUSTER_DISKS.COM | 163 lines |
TOPIC | 36.0 | Wed Sep 08 1993 10:06 | Purchase Order Information | 4 lines |
| 36.1 | Wed Sep 08 1993 10:15 | PO for UPS Batteries | 30 lines |
| 36.2 | Wed Sep 08 1993 16:11 | EPE Tech Vendor Info | 15 lines |
TOPIC | 37.0 | Tue Sep 14 1993 09:53 | NWD002 Application Issues | 6 lines |
| 37.1 | Tue Sep 14 1993 09:53 | Work on Friday 9-17-93 | 33 lines |
| 37.2 | Mon Sep 20 1993 13:44 | NWD022 Application Move to from ZSO to WRO | 38 lines |
TOPIC | 38.0 | Wed Sep 15 1993 16:15 | VCS Accounts for CNMC and MPR | 3 lines |
| 38.1 | Wed Sep 15 1993 16:18 | Statement of Access ISsue | 20 lines |
| 38.3 | Thu Sep 30 1993 15:43 | VCS over to Sys Mgt Team | 11 lines |
TOPIC | 39.0 | Thu Sep 16 1993 11:24 | VCS Location and Management | 6 lines |
| 39.1 | Thu Sep 16 1993 11:57 | VCS Configuration and Management | 47 lines |
| 39.2 | Thu Sep 16 1993 14:59 | VCS Stay in CA | 13 lines |
| 39.3 | Mon Sep 20 1993 11:04 | Ron Van Zuylen CA Contact for VCS | 9 lines |
| 39.4 | Mon Sep 20 1993 11:24 | CA VCS to remain in CA | 11 lines |
| 39.6 | Mon Oct 18 1993 17:52 | VCS DOINK Now in CXO3 | 17 lines |
| 39.7 | Thu Oct 21 1993 12:32 | VCS Access Info | 27 lines |
| 39.8 | Thu Oct 21 1993 14:22 | CXO3 DOINK via WROLAN | 16 lines |
| 39.9 | Fri Jan 07 1994 11:17 | Request to Install 2nd VCS | 25 lines |
| 39.10 | Fri Jan 07 1994 14:50 | Additional VCS Needs | 22 lines |
| 39.11 | Mon Jan 10 1994 10:57 | Request for Node Name and Address | 17 lines |
| 39.12 | Mon Jan 10 1994 15:57 | 2ND VCS ZOINK 30.109 | 9 lines |
| 39.13 | Mon Feb 14 1994 12:06 | 2nd VCS Ready for Config | 33 lines |
TOPIC | 40.0 | Thu Sep 16 1993 17:46 | ASSET & COLOR Tag Information | 9 lines |
| 40.1 | Mon Dec 20 1993 17:45 | CA Color Tag and Asset Summary | 367 lines |
| 40.2 | Thu Sep 16 1993 18:09 | TUS Eqpt Rcvd 8/27/93 | 33 lines |
| 40.3 | Wed Oct 27 1993 10:54 | WRO Eqpt Rcvd 9/17/93 | 70 lines |
| 40.4 | Wed Oct 27 1993 13:57 | SEO Eqpt Rcvd 10/6/93 | 46 lines |
| 40.5 | Thu Oct 28 1993 09:06 | CXO1 Eqpt Rcvd 10/14/93 | 124 lines |
| 40.6 | Wed Oct 27 1993 11:11 | WRO3 Eqpt Rcvd 10/17/93 | 186 lines |
| 40.7 | Thu Nov 18 1993 16:36 | TUS Eqpt Rcvd 11/14/93 | 111 lines |
| 40.8 | Thu Dec 16 1993 12:50 | TEMPE Eqpt Rcvd 12/13/93 | 36 lines |
| 40.9 | Mon Dec 20 1993 17:30 | TUS Eqpt Rcvd 12/11/93 | 151 lines |
| 40.10 | Mon Dec 20 1993 17:41 | TEMPE Eqpt Rcvd 12/8/93 | 17 lines |
| 40.11 | Wed May 25 1994 14:59 | HSC Received | 44 lines |
| 40.12 | Wed Jun 08 1994 13:57 | See BSS::HARDWARE_LOG | 7 lines |
TOPIC | 41.0 | Mon Sep 20 1993 10:45 | MAINTENANCE Coverage for CXO3 Equipment | 5 lines |
| 41.1 | Mon Sep 20 1993 10:50 | 5x9 Standard Coverage | 17 lines |
| 41.2 | Mon Sep 20 1993 13:32 | 7x24 required on three clusters | 10 lines |
TOPIC | 42.0 | Mon Sep 20 1993 14:09 | WRO/SEO Network Status | 3 lines |
| 42.1 | Mon Sep 20 1993 15:02 | WRO/SEO Network Status | 15 lines |
| 42.2 | Mon Sep 20 1993 19:01 | CAMOVE Service Available | 6 lines |
| 42.3 | Tue Sep 21 1993 18:18 | DECnet CXO30 to WRO30 and CXO28 Works | 17 lines |
| 42.4 | Wed Sep 22 1993 10:21 | DECnet Link Problems | 22 lines |
| 42.5 | Wed Sep 22 1993 14:25 | Reply on SEO Decnet Link NOT Online | 16 lines |
| 42.6 | Thu Sep 23 1993 12:31 | NETWORK Status/Problems 23 Sep 93 | 76 lines |
| 42.7 | Thu Sep 23 1993 14:21 | Network Installation Contacts | 16 lines |
| 42.8 | Thu Sep 23 1993 14:22 | Status Request to Field Network Support | 26 lines |
| 42.9 | Fri Sep 24 1993 11:52 | Network Status Update | 15 lines |
| 42.10 | Mon Sep 27 1993 13:25 | DEMSA Parameter Setting Problem | 10 lines |
| 42.11 | Tue Sep 28 1993 12:32 | Line Transients on Network | 16 lines |
| 42.14 | Thu Sep 30 1993 10:02 | VITALINK/LAT Discussions to Topic 48 | 5 lines |
| 42.15 | Thu Oct 07 1993 12:09 | FLEAGL/LAT/DEcserver status | 30 lines |
| 42.16 | Thu Oct 07 1993 12:10 | Current LAT disconnect status | 52 lines |
TOPIC | 43.0 | Tue Sep 21 1993 19:01 | LARS Kept Here | 4 lines |
| 43.1 | Tue Sep 21 1993 19:01 | LARS for 1st CA Move | 70 lines |
| 43.2 | Wed Oct 13 1993 14:54 | Lars for Swing Hardware Install | 70 lines |
| 43.3 | Mon Oct 18 1993 18:28 | Lars for WE_CHAMP Install | 70 lines |
| 43.4 | Thu Oct 21 1993 14:43 | LARS for DOINK and ONOFRE Prep | 69 lines |
| 43.5 | Thu Nov 18 1993 11:07 | LARS for ONOFRE Cluster Install | 70 lines |
| 43.6 | Mon Dec 13 1993 08:04 | Lars for NWD Cluster Setup | 70 lines |
| 43.7 | Wed Dec 22 1993 11:13 | LARS for SWCHAMP Move | 73 lines |
| 43.8 | Mon Jan 03 1994 10:09 | NWD002 Configuration LARs | 70 lines |
| 43.9 | Wed Jan 05 1994 16:06 | NWD002 RA90 Repair LARs | 70 lines |
TOPIC | 44.0 | Wed Sep 22 1993 15:56 | TERM SERVER Equipment | 4 lines |
| 44.1 | Wed Sep 22 1993 15:59 | NEED Term Servers | 13 lines |
| 44.2 | Tue Oct 26 1993 14:06 | Term Servers for CXO3 | 20 lines |
| 44.3 | Wed Oct 27 1993 16:12 | DS200MC's and the area 16 to area 30 gateway | 19 lines |
| 44.4 | Wed Nov 10 1993 10:28 | Equipment from Tustin | 22 lines |
TOPIC | 45.0 | Fri Sep 24 1993 09:40 | SCHEDULE for MOVES | 6 lines |
| 45.1 | Fri Sep 24 1993 09:41 | Initial Schedule Info | 83 lines |
| 45.2 | Tue Sep 28 1993 15:49 | Need WRO3 Contact People | 13 lines |
| 45.3 | Tue Sep 28 1993 15:56 | Contacts at WRO3 for Move | 14 lines |
| 45.4 | Wed Sep 29 1993 10:26 | Update Move Schedule | 64 lines |
TOPIC | 46.0 | Mon Sep 27 1993 14:03 | VCS Term Server Setup Info | 4 lines |
| 46.1 | Mon Sep 27 1993 16:35 | Term Server Assignments 09/27 | 32 lines |
| 46.2 | Thu Sep 30 1993 16:27 | Can't See Term Servers | 12 lines |
| 46.3 | Thu Sep 30 1993 16:42 | Term Server Config Info | 80 lines |
| 46.4 | Mon Oct 04 1993 15:16 | VCS vs HOMER | 12 lines |
| 46.5 | Mon Oct 04 1993 15:28 | Response to issues | 54 lines |
| 46.6 | Tue Oct 12 1993 11:10 | Term Server Assignments 10/12 | 52 lines |
| 46.7 | Mon Oct 18 1993 17:47 | Term Server Assignments 10/18 | 87 lines |
| 46.8 | Mon Nov 15 1993 17:31 | Term Server Assignments 11/15 | 90 lines |
| 46.9 | Mon Nov 22 1993 17:02 | Term Server Assignments 11/22 | 90 lines |
| 46.10 | Tue Nov 23 1993 10:23 | VCS Capacity in Topic 70 | 5 lines |
| 46.11 | Mon Dec 06 1993 13:22 | Term Server Assignments 12/06 | 91 lines |
| 46.12 | Thu Dec 09 1993 16:11 | Term SErver Assignments 12/06 | 94 lines |
| 46.13 | Thu Dec 09 1993 16:14 | SWAM3 connected to VCS Term Server | 10 lines |
| 46.14 | Tue May 03 1994 00:36 | Term Server Assignments 5 May | 96 lines |
| 46.15 | Thu May 26 1994 14:44 | CA Equipment VCS Server Assignments | 96 lines |
| 46.16 | Thu May 26 1994 14:45 | Moved to CX3PCM Conference | 4 lines |
TOPIC | 47.0 | WE_CHAMP DECtalk Issues |
| 47.9 | Mon Sep 27 1993 16:15 | WE_CHAMP DECtalk Issues | 6 lines |
TOPIC | 48.0 | Thu Sep 30 1993 09:58 | VITALINK/LAT Network Issues | 5 lines |
| 48.2 | Thu Sep 30 1993 10:10 | LAT Recommended Settings | 27 lines |
| 48.3 | Thu Sep 30 1993 12:23 | More info on VITALINK LANS | 34 lines |
| 48.4 | Thu Sep 30 1993 18:35 | LAT problems on 8550 FLEAGL | 40 lines |
| 48.6 | Mon Oct 04 1993 15:16 | LAT changes on FLEAGL | 15 lines |
| 48.7 | Thu Oct 07 1993 10:12 | Terminal Servers have new settings... | 19 lines |
| 48.9 | Fri Oct 15 1993 15:06 | Vitalink Resets | 112 lines |
| 48.11 | Mon Nov 01 1993 17:31 | VCS Mail on Vitalink Problems | 137 lines |
| 48.12 | Mon Nov 01 1993 08:39 | Vitalinks to Move to Term Servers | 20 lines |
| 48.13 | Wed Nov 10 1993 13:43 | Scheduled XLAN outage tonight | 27 lines |
TOPIC | 49.0 | Thu Sep 30 1993 13:27 | CALL LOGGING Procedures | 5 lines |
| 49.1 | Thu Sep 30 1993 13:36 | MPR Call Logging Procedures | 27 lines |
| 49.2 | Thu Sep 30 1993 17:40 | Procedure Definition Needed | 29 lines |
| 49.3 | Thu Sep 30 1993 18:20 | Call logging info | 30 lines |
| 49.4 | Fri Oct 01 1993 13:54 | Using DSNlink on BSS to log call | 33 lines |
| 49.6 | Thu Oct 07 1993 13:36 | TEST WORKED - Another Test Started | 8 lines |
| 49.7 | Tue Oct 12 1993 13:35 | IMPORTANT: MPR Call Logging Procedures | 84 lines |
| 49.8 | Tue Oct 12 1993 17:46 | WE_CHAMP Cluster Move Schedule and Information | 206 lines |
TOPIC | 50.0 | ONOFRE Cluster Move |
| 50.8 | Tue Oct 05 1993 15:41 | Questions Regarding ONOFRE Move | 133 lines |
| 50.13 | Tue Oct 12 1993 09:35 | Response to .10 - .12 | 68 lines |
| 50.14 | Tue Oct 12 1993 17:17 | Onofre Cluster Config | 35 lines |
| 50.15 | Tue Oct 12 1993 18:12 | TA79 on ONOFRE | 14 lines |
| 50.16 | Tue Oct 12 1993 18:14 | TA79 Not Needed in CXO | 16 lines |
| 50.19 | Thu Oct 14 1993 13:43 | HSC MAP - Onofre 'WIND' | 2285 lines |
| 50.20 | Thu Oct 14 1993 13:44 | HSC MAP - Onofre 'Sail' | 2299 lines |
| 50.21 | Thu Oct 14 1993 13:45 | HSC MAP - Onofre 'PIER' | 2313 lines |
| 50.22 | Thu Oct 14 1993 13:46 | HSC MAP - Onofre 'Gull' | 2320 lines |
| 50.23 | Thu Oct 14 1993 13:46 | Production Cluster Map - Tustin | 1691 lines |
| 50.24 | Mon Oct 18 1993 18:36 | CABLES with Move | 21 lines |
| 50.27 | Tue Oct 26 1993 09:38 | Cables and Queue Mgmt System | 18 lines |
| 50.28 | Tue Oct 26 1993 11:51 | ONOFRE Move Schedule - Preliminary 10/26 | 93 lines |
| 50.29 | Tue Oct 26 1993 12:32 | Trucking Request | 63 lines |
| 50.30 | Mon Nov 01 1993 15:55 | Truck Loading at TUS | 37 lines |
| 50.32 | Tue Nov 02 1993 14:54 | ONOFRE Move Schedule - 11/2 | 121 lines |
| 50.33 | Mon Nov 08 1993 16:00 | Additional Equipment | 15 lines |
| 50.34 | Wed Nov 10 1993 10:11 | LIND your contact at CXO3 | 57 lines |
| 50.35 | Wed Nov 10 1993 13:49 | Initial ONOFRE Ship List | 60 lines |
| 50.36 | Wed Nov 10 1993 17:06 | FINAL ONOFRE Move Schedule & Contacts | 211 lines |
| 50.37 | Fri Nov 12 1993 09:47 | ONOFRE Move Delayed 7 hours - Update 11/12 09:30 | 36 lines |
| 50.38 | Fri Nov 12 1993 14:58 | MODIFIED ONOFRE Move Schedule | 34 lines |
| 50.39 | Fri Nov 12 1993 22:56 | Overview of Tustin Move Activities | 124 lines |
| 50.40 | Mon Nov 15 1993 14:18 | CHAMP Call SRQ C931111-7245 | 1599 lines |
| 50.41 | Thu Nov 18 1993 11:12 | CXO3 Crew on ONOFRE Move | 21 lines |
TOPIC | 51.0 | Thu Sep 30 1993 17:57 | TIME ZONE for Clusters | 4 lines |
| 51.1 | Thu Sep 30 1993 17:57 | Question Regarding System Time | 18 lines |
| 51.2 | Thu Sep 30 1993 18:01 | Our Thoughts on OXFORD Time | 17 lines |
| 51.3 | Thu Sep 30 1993 18:26 | OXFORD on PST | 20 lines |
TOPIC | 53.0 | Fri Oct 08 1993 17:02 | WE_CHAMP System Management/Applications | 7 lines |
| 53.1 | Fri Oct 08 1993 17:02 | Accounts for Temp System | 25 lines |
| 53.2 | Tue Oct 12 1993 09:15 | Swing Configuration Update | 41 lines |
| 53.3 | Tue Oct 12 1993 11:25 | Field Service Accounts | 12 lines |
| 53.4 | Wed Oct 13 1993 14:47 | SALES EC REPLY REGARDING WECHAMP MOVE | 27 lines |
TOPIC | 54.0 | Tue Oct 12 1993 17:20 | ACCOUNTS for Field Service | 4 lines |
| 54.1 | Tue Oct 12 1993 17:22 | FE Accounts Needed | 34 lines |
| 54.2 | Tue Oct 12 1993 17:23 | Field Service Accounts WE_CHAMP, OXFORD, CAMOVE | 29 lines |
| 54.3 | Tue Oct 12 1993 17:49 | CXO3 Field Service Accounts | 24 lines |
| 54.4 | Tue Oct 12 1993 17:50 | RE: CXO3 Field Service Accounts | 14 lines |
| 54.5 | Thu Oct 14 1993 13:16 | FE Account Access Problem Resolution | 55 lines |
| 54.6 | Wed Oct 20 1993 17:45 | Field Service Accounts again | 33 lines |
TOPIC | 56.0 | Fri Oct 15 1993 09:56 | INFOSERVER on Area 16/30 LAN | 5 lines |
| 56.2 | Thu Oct 14 1993 14:01 | INFO Server for 6000 checkout | 40 lines |
| 56.5 | Fri Oct 15 1993 10:02 | Need INFOSERVER access on Area 16/30 LAN | 59 lines |
| 56.6 | Tue Oct 26 1993 14:01 | INFOSERVER Avail w/ONOFRE Move | 6 lines |
TOPIC | 57.0 | Fri Oct 15 1993 14:42 | IVO/TUS Low-end Systems | 4 lines |
| 57.1 | Fri Oct 15 1993 14:59 | Low-end Systems, pls. extract to print | 1975 lines |
TOPIC | 58.0 | Tue Oct 19 1993 18:15 | THANKS Go Here | 4 lines |
| 58.1 | Tue Oct 19 1993 19:13 | THANKS for Successful Santa Clara Moves | 78 lines |
| 58.3 | Thu Oct 21 1993 09:43 | WECHAMP Move | 59 lines |
| 58.4 | Tue Nov 16 1993 16:45 | ONOFRE Move - Thank You | 39 lines |
| 58.6 | Thu Nov 18 1993 11:27 | CXO3 MCS ONOFRE Install | 31 lines |
| 58.7 | Wed Dec 08 1993 14:34 | Thanks for Job Well Done on SWCHAMP Move | 36 lines |
| 58.8 | Thu Dec 09 1993 09:13 | Thanks to the MCS Troops | 41 lines |
TOPIC | 59.0 | PM Procedure & Pager List |
| 59.1 | Tue Oct 26 1993 12:06 | CONTACT List for CA Systems | 39 lines |
| 59.3 | Thu Nov 18 1993 11:05 | Maint/PM/Contacts Needed | 118 lines |
| 59.4 | Thu Nov 18 1993 12:14 | OXFORD PM - Larry Locken | 13 lines |
| 59.5 | Fri Dec 03 1993 14:56 | PM Procedures and Accounts on California systems | 63 lines |
| 59.6 | Fri Dec 03 1993 15:35 | PM Procedures and Accounts on California systems | 35 lines |
| 59.7 | Mon Dec 13 1993 12:48 | OXFORD PM Input | 18 lines |
TOPIC | 60.0 | Tue Oct 26 1993 09:28 | ONOFRE Swing & System Management | 5 lines |
| 60.1 | Tue Oct 26 1993 09:29 | CAMOVE Account to Support ONOFRE | 30 lines |
| 60.5 | Thu Oct 28 1993 16:50 | 9-track Tape for ONOFRE | 29 lines |
| 60.6 | Fri Oct 29 1993 11:14 | TA79 ONOFRE Rquirements | 26 lines |
| 60.8 | Mon Nov 08 1993 14:57 | ONOFRE MOVE MEMO | 122 lines |
| 60.9 | Tue Nov 16 1993 16:50 | TA79 Nine Track Requirement Deleted | 11 lines |
TOPIC | 61.0 | Tue Oct 26 1993 15:45 | TUS/IVO MOVE Datacenter Issues | 3 lines |
| 61.1 | Tue Oct 26 1993 15:46 | Ed to Discuss IRV Move Issue | 5 lines |
| 61.2 | Wed Nov 03 1993 17:13 | Tustin to Irvine Move Task List | 163 lines |
TOPIC | 62.0 | Wed Nov 03 1993 17:35 | NETWORK Support/Delivery Contacts | 4 lines |
| 62.1 | Wed Nov 03 1993 17:36 | CXO3 Network Contacts | 93 lines |
TOPIC | 63.0 | Fri Nov 05 1993 16:29 | SWCHAMP Cluster Move | 4 lines |
| 63.1 | Fri Nov 05 1993 16:29 | TEMPORARY HARDWARE FOR SWCHAMP | 19 lines |
| 63.4 | Mon Nov 15 1993 17:38 | SYSTEM BANNER FOR SWCHAMP MOVE | 30 lines |
| 63.6 | Tue Nov 16 1993 16:28 | SWCHAMP Tape Transfer | 24 lines |
| 63.7 | Wed Nov 17 1993 08:58 | SWCHAMP Cluster Config Info | 15 lines |
| 63.8 | Thu Nov 18 1993 12:33 | Truck Request WRO/CXO Shipment 3 Decmeber 1993 | 69 lines |
| 63.9 | Fri Nov 19 1993 14:18 | Phillips Brining Tapes from TUS | 14 lines |
| 63.10 | Fri Nov 19 1993 14:30 | SWCHAMP Backup Time Required | 21 lines |
| 63.11 | Fri Nov 19 1993 14:31 | Confirmed Reservation for Truck | 11 lines |
| 63.12 | Mon Nov 22 1993 14:57 | Preliminary Move Schedule | 106 lines |
| 63.13 | Wed Nov 24 1993 11:49 | Revisted Trucking Request Pickup Time | 84 lines |
| 63.14 | Mon Nov 29 1993 15:26 | SWCHAMP Config/Shipping Info | 16 lines |
| 63.15 | Mon Nov 29 1993 15:48 | Arrival and Info Summary | 14 lines |
| 63.16 | Wed Dec 01 1993 09:33 | Missing Disk Volume | 27 lines |
| 63.18 | Wed Dec 01 1993 17:47 | URGENT - BANNER CHANGE ON SWCHAMP | 17 lines |
| 63.19 | Wed Dec 01 1993 17:48 | SWCHAMP Move - EC Contacts | 17 lines |
| 63.20 | Wed Dec 01 1993 17:49 | CHANGES to SWCHAMP Move Schedule | 22 lines |
| 63.21 | Wed Dec 01 1993 17:51 | SWCHAMP MOVE PHILLIPS ARRIVAL | 14 lines |
| 63.22 | Thu Dec 02 1993 08:45 | Dishon Move Notice | 159 lines |
| 63.23 | Thu Dec 02 1993 14:24 | SWCHAMP FINAL Move Schedule & Tasks | 212 lines |
| 63.24 | Thu Dec 02 1993 15:45 | FINAL Trucking Info - Contact Named | 72 lines |
| 63.25 | Fri Dec 03 1993 14:24 | swchamp down | 186 lines |
| 63.26 | Mon Dec 06 1993 13:25 | SWCHAMP Champ Call Used to Track Move | 2171 lines |
TOPIC | 64.0 | Tue Nov 09 1993 11:41 | TA867 Tape Drive Issues | 4 lines |
| 64.1 | Tue Nov 09 1993 11:42 | CAR Tape Order | 86 lines |
| 64.2 | Tue Nov 09 1993 11:46 | Tapes for TA867 | 8 lines |
| 64.3 | Tue Nov 09 1993 14:46 | Estimate need 200 tapes | 15 lines |
| 64.4 | Thu Nov 11 1993 11:45 | Tapes for TA867 Tape Drive | 94 lines |
| 64.5 | Mon Nov 15 1993 11:23 | Tape Order Approved | 10 lines |
| 64.6 | Wed Nov 17 1993 11:58 | Tapes Rcvd from TUS 11/17 | 8 lines |
| 64.7 | Fri Nov 19 1993 13:38 | Tapes for 867 Ship 18 Nov | 4 lines |
| 64.8 | Mon Nov 22 1993 12:33 | TA867 Tapes Arrive CXO3 | 16 lines |
TOPIC | 65.0 | Wed Nov 10 1993 10:39 | NEED BA23 MicroVAX IIs | 4 lines |
| 65.1 | Wed Nov 10 1993 10:40 | WANTED: BA23 (skinny) microVAX chassis | 16 lines |
TOPIC | 66.0 | Mon Nov 15 1993 13:52 | DISASTER Recovery Plans | 4 lines |
| 66.1 | Mon Nov 15 1993 13:53 | Contingency plans for audi | 68 lines |
| 66.2 | Mon Nov 15 1993 13:57 | Contingency Plan Notes Conference | 5 lines |
| 66.3 | Wed Dec 08 1993 12:25 | Received Plans | 4 lines |
TOPIC | 67.0 | Mon Nov 15 1993 15:14 | NWD002 PHASE II Cluster Move | 5 lines |
| 67.1 | Mon Nov 15 1993 15:17 | Initial status of Cloning of the NWD022 Cluster | 18 lines |
| 67.2 | Tue Nov 16 1993 16:43 | NWD022 Tape Transfer | 42 lines |
| 67.3 | Thu Nov 18 1993 09:38 | NWD022 Tape Transfer | 18 lines |
| 67.4 | Mon Nov 22 1993 13:24 | NWD002 Move Project plan | 93 lines |
| 67.5 | Mon Nov 29 1993 15:15 | NWD022 Config Info | 16 lines |
| 67.6 | Mon Dec 06 1993 13:36 | NWD022 Config Changes | 34 lines |
| 67.7 | Tue Dec 07 1993 15:54 | Update/Correct NWD022 Equipment | 19 lines |
| 67.8 | Wed Dec 08 1993 12:37 | NWD002 Disk Config for MOVE | 26 lines |
| 67.9 | Wed Dec 08 1993 13:54 | NWD002 Move Schedule & Contacts | 81 lines |
| 67.10 | Thu Dec 09 1993 11:22 | Directions to Marriott and Digital | 56 lines |
| 67.11 | Thu Dec 09 1993 16:08 | NWD002 Swing System is Ready | 9 lines |
| 67.12 | Fri Dec 10 1993 10:09 | NWD002 FINAL Move Schedule/Contacts | 84 lines |
| 67.13 | Fri Dec 10 1993 10:15 | Embry Colorado Bound | 25 lines |
| 67.14 | Fri Dec 10 1993 14:20 | (I) NWD002 Cluster Move is GO - Schedule/Contacts FYI | 21 lines |
| 67.15 | Mon Dec 13 1993 08:38 | CHAMP NWD002 Call Tracking Move | 710 lines |
| 67.16 | Thu Dec 16 1993 13:03 | RA90 Disks for NWD002 | 13 lines |
| 67.17 | Mon Dec 20 1993 12:29 | NWD002 RA90 Disks Next Week | 12 lines |
| 67.18 | Thu Dec 23 1993 13:27 | RA90 Stack Powered Up - One Drive Failure | 8 lines |
TOPIC | 68.0 | Network support Teleconf call schedule |
| 68.1 | Tue Nov 16 1993 09:12 | NWD002 Embry with System | 20 lines |
TOPIC | 69.0 | Mon Nov 22 1993 17:25 | ADDITIONAL Eqpt Available from TUS/WRO | 5 lines |
| 69.1 | Mon Nov 22 1993 17:27 | Need for four 6400 boards in TUS/WRO | 9 lines |
| 69.2 | Fri Dec 03 1993 14:28 | TUS Excess Equipment to CXO | 29 lines |
| 69.3 | Fri Dec 03 1993 14:50 | Addition to CXOSHIPS. | 19 lines |
TOPIC | 70.0 | Tue Nov 23 1993 10:22 | VCS Capacity Issue | 6 lines |
| 70.1 | Mon Nov 22 1993 17:21 | OVERLOAD Condition on VCS | 22 lines |
| 70.2 | Tue Nov 23 1993 10:23 | Addressing Overload Condition | 15 lines |
| 70.3 | Tue Nov 23 1993 11:36 | Problem Is Being Addressed | 11 lines |
| 70.4 | Mon Dec 13 1993 08:25 | 2nd VCS for CA Datacenter | 25 lines |
TOPIC | 71.0 | Wed Nov 24 1993 10:22 | TUS Tape Storage and Transfer to CXO | 8 lines |
| 71.1 | Wed Nov 24 1993 10:23 | TUS ARCUS Archive Tapes | 283 lines |
| 71.2 | Wed Nov 24 1993 10:33 | What Tapes Should be Transferred | 41 lines |
TOPIC | 72.0 | Mon Dec 06 1993 12:41 | TA90/TA867 Connect in LAB1 | 5 lines |
| 72.1 | Mon Dec 06 1993 13:12 | TA90E Status Review | 42 lines |
| 72.2 | Mon Dec 13 1993 08:12 | Additional TU90 Equipment Config | 15 lines |
| 72.3 | Mon Dec 13 1993 08:20 | TU90E w/THREE Slaves | 7 lines |
TOPIC | 73.0 | Tue Dec 07 1993 15:50 | MISC Equipment Ship/Needs | 4 lines |
| 73.1 | Tue Dec 07 1993 15:50 | CXO3 in Need of MVIII and BA23 MVII | 33 lines |
TOPIC | 74.0 | Wed Dec 08 1993 13:28 | SWAELF Config Issues | 4 lines |
| 74.1 | Wed Dec 08 1993 13:30 | System Config and Use? | 21 lines |
| 74.2 | Thu Dec 09 1993 09:16 | SWAM3 Going ONLINE soon | 15 lines |
| 74.3 | Thu Dec 09 1993 09:20 | Additional Info on Disk Config | 21 lines |
| 74.4 | Thu Dec 09 1993 11:01 | Disk Requirements | 21 lines |
TOPIC | 75.0 | Thu Dec 16 1993 13:16 | FDDI I/O for DirecTV - Request | 16 lines |
TOPIC | 76.0 | PROJECT SUMMARY Sent To Walker for Witney Update |
| 76.1 | Wed Feb 16 1994 10:50 | Postproject Review Agenda | 205 lines |
| 76.2 | Tue Mar 01 1994 17:15 | Done & Did Project Summary | 842 lines |
TOPIC | 77.0 | Fri Jan 07 1994 09:17 | CXO3 Summary and Cleanup | 4 lines |
| 77.1 | Fri Jan 07 1994 09:41 | 2nd VCS, Tape and Disk STatus | 24 lines |
TOPIC | 78.0 | Fri Feb 11 1994 16:48 | DECtalk at CXO3 | 7 lines |
| 78.1 | Mon Feb 14 1994 12:13 | DECtalk Location Determined | 11 lines |
TOPIC | 79.0 | Mon Mar 07 1994 17:49 | Documentation of the Backups on The Calif. systems] | 339 lines |
TOPIC | 80.0 | Wed Mar 16 1994 10:35 | FINAL Project Review Document | 5 lines |
| 80.1 | Wed Mar 16 1994 10:35 | COMMENTS on Review | 107 lines |
| 80.2 | Wed Mar 16 1994 10:36 | PS of REVIEW Document | 838 lines |
| 80.5 | Tue Apr 05 1994 10:08 | PS of Project Summary | 97 lines |
TOPIC | 81.0 | Thu May 26 1994 09:03 | NETWORK Changes | 6 lines |
| 81.1 | Fri May 27 1994 16:57 | LAN Changes 6/1/94 | 41 lines |
| 81.2 | Thu Jun 02 1994 02:11 | AS Built Net Reconfig | 62 lines |
| 81.3 | Fri Jun 03 1994 21:33 | OXFORD/CA Node Changes Summary | 58 lines |
| 81.4 | Sat Jun 04 1994 04:07 | OXFORD Cluster Post Mortum | 47 lines |