TOPIC | 25.0 | CICS Application Support Requested |
| 25.1 | Fri Dec 29 1989 10:34 | IBM side is sut up | 4 lines |
| 25.2 | Thu Jan 11 1990 12:22 | Application is running OK | 3 lines |
TOPIC | 96.0 | Jim Kehoe needs another CICS Application |
| 96.1 | Tue Dec 11 1990 10:22 | COBOL/CICS to C | 10 lines |
TOPIC | 98.0 | Thu Dec 06 1990 16:25 | Netron DEMO for LOMA trade show. | 17 lines |
| 98.1 | Mon Dec 10 1990 11:24 | No Setup needed. | 9 lines |
TOPIC | 106.0 | PrE Needs some regression testing facilities |
| 106.1 | Mon Jan 07 1991 09:59 | LU sessions are set. | 4 lines |
| 106.2 | Mon Jan 07 1991 13:10 | LU chart for Gateways. | 133 lines |
TOPIC | 117.0 | Thu Feb 28 1991 10:07 | State Mutual Project Technical assistance. | 6 lines |
TOPIC | 127.0 | Mon Mar 11 1991 09:12 | Information request for RTX. | 8 lines |
| 127.1 | Mon Mar 11 1991 14:21 | More Info | 4 lines |
TOPIC | 128.0 | 3287 printer move to John Ritz's office |
| 128.1 | Wed Mar 13 1991 08:57 | You can move the 3287. | 16 lines |
| 128.2 | Fri Mar 15 1991 07:48 | 3287 installation next week | 6 lines |
| 128.3 | Tue Mar 19 1991 13:24 | work completed | 4 lines |
TOPIC | 134.0 | Wed Mar 20 1991 09:02 | More MLT's on 4381 | 4 lines |
TOPIC | 136.0 | Thu Mar 21 1991 08:44 | Bisync 2780/3780 on MVS | 7 lines |
| 136.1 | Fri Mar 22 1991 08:51 | MEST will do... | 3 lines |
| 136.2 | Fri Mar 22 1991 15:30 | RJE was the solution | 4 lines |
| 136.3 | Mon Mar 25 1991 11:13 | Testing setup complete | 6 lines |
TOPIC | 143.0 | Mon Apr 08 1991 14:36 | Dump tapes to VSE | 13 lines |
TOPIC | 145.0 | Mon Apr 08 1991 14:40 | Request to copy tapes | 8 lines |
TOPIC | 146.0 | Mon Apr 08 1991 14:43 | Dump a tape to VSE. | 6 lines |
TOPIC | 173.0 | Wed Jun 19 1991 13:39 | RJE and DTF batch help. | 11 lines |
TOPIC | 181.0 | Mon Jul 29 1991 10:30 | Controller support for IVO | 22 lines |
TOPIC | 182.0 | Tue Jul 30 1991 10:45 | Request for 3270 test software. | 7 lines |
TOPIC | 183.0 | JES2 Workstation RMT74 and NOCCTL |
| 183.1 | Thu Aug 01 1991 16:40 | Complete, waiting for IPL | 6 lines |
| 183.4 | Mon Aug 12 1991 10:15 | Mores changes are on RMT74 | 5 lines |
TOPIC | 184.0 | IMS request from Montreal ACT |
| 184.2 | Tue Aug 06 1991 16:19 | Did a gen for their LTERMS | 6 lines |
TOPIC | 185.0 | Tue Aug 06 1991 16:24 | GDDM assistance. | 5 lines |
TOPIC | 210.0 | Tue Nov 12 1991 12:28 | Insurance application demo | 46 lines |
| 210.1 | Mon Dec 02 1991 14:55 | Insurance demo estimate. | 94 lines |
| 210.2 | Tue Dec 03 1991 09:33 | Request for application with NO update | 48 lines |
| 210.3 | Thu Dec 05 1991 11:12 | Application Complete | 13 lines |
| 210.4 | Mon Jan 27 1992 17:12 | In production. | 3 lines |
TOPIC | 211.0 | Wed Nov 13 1991 10:03 | Netron Demo for DECworld. | 23 lines |
TOPIC | 214.0 | Greg VonSternberg needs an LU6.2 demo |
| 214.4 | Thu Jan 09 1992 06:46 | Slowly, testing start | 15 lines |
| 214.5 | Mon Jan 27 1992 17:14 | Application is in production | 3 lines |
| 214.6 | Tue Feb 25 1992 10:24 | Finshed | 5 lines |
TOPIC | 223.0 | Domain Gateway and VSE testing |
| 223.1 | Fri Jan 24 1992 10:56 | VSE access | 9 lines |
| 223.3 | Mon Jan 27 1992 17:09 | RJE and TE to VSE | 12 lines |
| 223.6 | Wed Feb 19 1992 08:47 | VTAM 3.2 ordered for VSESP32 | 15 lines |
TOPIC | 234.0 | LU62 test drivers |
| 234.1 | Fri Feb 21 1992 08:29 | I will take a look | 6 lines |
| 234.2 | Wed Feb 26 1992 16:56 | LU62 drivers are compiled | 3 lines |
TOPIC | 235.0 | CICS programming help needed. |
| 235.1 | Tue Feb 25 1992 10:21 | I'll Help. | 8 lines |
| 235.2 | Tue Feb 25 1992 10:28 | Setting up environment | 2 lines |
| 235.3 | Wed Feb 26 1992 16:55 | Chris is set up for testing | 5 lines |
TOPIC | 241.0 | Need 3287 moved |
| 241.1 | Fri Mar 13 1992 16:50 | No problem | 4 lines |
| 241.2 | Mon Mar 23 1992 11:12 | Printer moved, ready for use | 4 lines |
TOPIC | 242.0 | Fri Mar 13 1992 16:47 | VSE request from R. Chadis | 6 lines |
TOPIC | 244.0 | Please move Printer to lab |
| 244.1 | Fri Mar 20 1992 12:05 | It will be moved soon | 7 lines |
TOPIC | 245.0 | Mon Mar 23 1992 16:44 | CICSLU62 programming request | 3 lines |
| 245.1 | Thu Apr 02 1992 17:58 | LU62 program for Engineers | 13 lines |
| 245.2 | Thu Apr 02 1992 18:05 | LU62 help for D. Goble. | 4 lines |
| 245.3 | Fri Apr 03 1992 17:39 | Help with LU62 test program | 5 lines |
TOPIC | 248.0 | SAP America demo for Al Burroughs |
| 248.6 | Tue Apr 21 1992 13:39 | SAP ready to go in production | 8 lines |
TOPIC | 250.0 | Melynda Boling needs test env for Banking Eng. |
| 250.1 | Thu Apr 09 1992 10:01 | List of Demos sent. | 189 lines |
| 250.2 | Thu Apr 16 1992 11:43 | More requests related to Melynda | 8 lines |
TOPIC | 251.0 | Tue Mar 31 1992 15:14 | Request to review RDO panels | 4 lines |
TOPIC | 254.0 | Pim Van Velzen needs IMS demo assistance |
| 254.1 | Wed Apr 08 1992 09:41 | SYSGEN parametrs sent | 23 lines |
TOPIC | 259.0 | Fri Apr 10 1992 11:40 | VSE demo request from B. Berg | 7 lines |
TOPIC | 261.0 | Tue Apr 14 1992 09:24 | Request to send TP program. | 5 lines |
TOPIC | 262.0 | Tue Apr 14 1992 09:26 | CICS VSE/SP 3.2 request for access. | 6 lines |
| 262.1 | Tue Apr 14 1992 09:29 | Mail for this request | 24 lines |
| 262.2 | Fri Nov 06 1992 11:25 | Peter is all set. | 3 lines |
TOPIC | 266.0 | Thu Apr 16 1992 15:01 | ASM install request on MVS/XA | 17 lines |
| 266.3 | Mon Apr 27 1992 14:53 | Producted accepted on MVS/XA | 5 lines |
TOPIC | 267.0 | Fri Apr 17 1992 16:49 | Request for LU62 assistance | 4 lines |
| 267.1 | Tue Apr 28 1992 14:27 | LU62/CICS assistance for Dave | 3 lines |
| 267.2 | Wed Apr 29 1992 10:42 | Dave is all set/suggestion. | 23 lines |
TOPIC | 270.0 | Wed Apr 22 1992 17:16 | IBM TP program coding assitance at VBO | 10 lines |
| 270.1 | Wed Apr 22 1992 17:16 | mail request | 17 lines |
| 270.2 | Wed Apr 22 1992 17:17 | First reply. | 19 lines |
| 270.3 | Wed Apr 22 1992 17:45 | Data & JCL to load files at VBO | 23 lines |
| 270.4 | Thu Apr 23 1992 16:01 | Problem found, executed solution. | 19 lines |
TOPIC | 275.0 | Thu Apr 30 1992 10:30 | LU62 application request | 8 lines |
| 275.1 | Thu Apr 30 1992 10:31 | Request from PIM. | 44 lines |
| 275.2 | Fri May 08 1992 10:01 | Pim is all set. | 12 lines |
TOPIC | 288.0 | Fri Jun 12 1992 12:04 | Request for SAS/GRAPH information. | 27 lines |
| 288.1 | Fri Jun 12 1992 12:10 | Followup to the request. | 16 lines |
TOPIC | 299.0 | Mon Jul 06 1992 18:05 | Request for LU62 help. | 5 lines |
| 299.1 | Tue Jul 14 1992 17:13 | Programming request. | 8 lines |
| 299.2 | Tue Jul 14 1992 17:15 | Needed information. | 26 lines |
TOPIC | 300.0 | Wed Jul 08 1992 10:03 | Request for VSE pricing information. | 46 lines |
TOPIC | 310.0 | Mon Jul 20 1992 18:27 | DB2 table copy request | 4 lines |
TOPIC | 314.0 | Tue Jul 21 1992 17:33 | Enhancements to JARS monthly reports. | 31 lines |
TOPIC | 318.0 | Mon Jul 27 1992 17:49 | Request to run JARS for one CC | 51 lines |
| 318.1 | Mon Jul 27 1992 17:52 | Now solution... working on it. | 5 lines |
| 318.2 | Tue Aug 04 1992 16:49 | Rports produced, place in data set. | 4 lines |
TOPIC | 322.0 | Tue Aug 04 1992 16:51 | Request to add LUs to IMS | 3 lines |
TOPIC | 333.0 | Mon Aug 24 1992 09:32 | USAGE reports for DTFPROD. | 12 lines |
| 333.1 | Thu Aug 27 1992 14:43 | Reports created | 6 lines |
TOPIC | 334.0 | Mon Aug 24 1992 11:39 | SAS help requested from Harry Silverstone | 3 lines |
| 334.1 | Mon Aug 24 1992 11:41 | Corrected logmode, ran fine. | 3 lines |
| 334.2 | Thu Aug 27 1992 14:48 | ANother SAS request | 4 lines |
TOPIC | 346.0 | Mike Furnanz needs MVS and Netview accounts |
| 346.1 | Thu Sep 10 1992 14:19 | Acoounts have been added | 3 lines |
TOPIC | 350.0 | Wed Sep 16 1992 11:31 | Request for SAS support. | 19 lines |
| 350.1 | Wed Sep 16 1992 11:33 | Request fulfilled | 5 lines |
TOPIC | 352.0 | Thu Sep 17 1992 18:10 | Request to review a TCT entry. | 5 lines |
| 352.1 | Wed Sep 30 1992 10:56 | Problem fixed | 75 lines |
TOPIC | 355.0 | Tue Sep 29 1992 17:46 | Question on CICS access. | 7 lines |
TOPIC | 363.0 | Fri Oct 30 1992 09:42 | Request for VSE VSAM ESDS file | 5 lines |
TOPIC | 365.0 | Thu Nov 05 1992 11:23 | Request for Insurance Application source | 12 lines |
| 365.1 | Fri Nov 06 1992 10:19 | Source for application sent | 4 lines |
| 365.2 | Thu Nov 12 1992 15:45 | Install problems at Valbonne | 33 lines |
| 365.3 | Thu Nov 12 1992 15:46 | More than a quick fix. | 45 lines |
| 365.4 | Thu Nov 12 1992 15:47 | Status of Valbonne problem | 27 lines |
| 365.5 | Fri Nov 13 1992 07:53 | Application fixed | 22 lines |
TOPIC | 369.0 | Mon Nov 16 1992 16:50 | Bill Greim needs IMS information | 21 lines |
| 369.1 | Mon Nov 16 1992 16:50 | My first reply to Bill | 23 lines |
| 369.2 | Mon Nov 16 1992 16:50 | My second reply to Bill | 24 lines |
TOPIC | 386.0 | EDA stuff |
| 386.2 | Fri Jan 15 1993 12:00 | Applids, data base info soon | 32 lines |
| 386.4 | Wed Aug 04 1993 14:57 | Latest EDASAF version on system | 5 lines |
TOPIC | 395.0 | 2 non-SNA connections (one bisync) |
| 395.7 | Tue Feb 23 1993 09:56 | Terminals set for testing. | 14 lines |
| 395.8 | Wed Aug 04 1993 14:59 | Closed | 4 lines |
TOPIC | 396.0 | Fri Feb 12 1993 10:22 | IBI/FOCUS support | 8 lines |
| 396.1 | Thu Feb 18 1993 15:46 | Install the IBI IMS driver | 5 lines |
TOPIC | 402.0 | non-sna terminal in my office |
| 402.1 | Thu Mar 04 1993 10:04 | Line ordered | 5 lines |
| 402.2 | Wed Aug 04 1993 15:00 | closed | 4 lines |
TOPIC | 424.0 | More office blocks wired for 3270s |
| 424.2 | Wed Aug 04 1993 15:02 | closed | 3 lines |
TOPIC | 426.0 | LU6.2 VMS/APPC testing assistance requested |
| 426.1 | Tue Apr 06 1993 18:04 | TEST program has been written | 9 lines |
| 426.2 | Wed Aug 04 1993 15:03 | Closed | 4 lines |
TOPIC | 443.0 | John Difonzo needs DB2 extract help |
| 443.1 | Wed Aug 04 1993 15:09 | Refered to Dave White closed. | 5 lines |
TOPIC | 445.0 | Tue May 11 1993 16:36 | VSE request from Peter Jenkins. | 5 lines |
| 445.1 | Tue May 11 1993 16:36 | Request number 1 | 19 lines |
| 445.2 | Tue May 11 1993 16:37 | Request number 2 | 18 lines |
| 445.3 | Tue May 11 1993 16:38 | Solution number 1 | 40 lines |
| 445.4 | Tue May 11 1993 16:39 | Peter's solution | 23 lines |
| 445.5 | Tue May 11 1993 16:40 | My solution | 29 lines |
TOPIC | 449.0 | Thu May 20 1993 09:24 | IPL request from Arnold Sodder | 4 lines |
| 449.1 | Thu May 20 1993 09:25 | Mail sent to IBM$USERS | 9 lines |
TOPIC | 498.0 | Wed Sep 15 1993 13:37 | Request to order DB2 V3 | 17 lines |
| 498.1 | Tue Feb 15 1994 14:20 | | 1 lines |
TOPIC | 500.0 | Dave Paulson needs VSAM assistance |
| 500.1 | Mon Sep 20 1993 11:43 | Helping customer out. | 5 lines |
TOPIC | 503.0 | Fri Oct 01 1993 10:44 | Request for REXX interface | 6 lines |
| 503.1 | Mon Oct 11 1993 11:50 | Interface complete | 5 lines |
TOPIC | 517.0 | Tue Nov 02 1993 10:53 | Request for SAS graphics help | 3 lines |
| 517.1 | Wed Dec 08 1993 13:38 | SAS file did not diplay graphics | 7 lines |
TOPIC | 518.0 | Tue Nov 02 1993 10:56 | Request on CICS terminal help | 3 lines |
TOPIC | 530.0 | Tom Moriarty needs MVS access to TSO/SCLM |
| 530.2 | Thu Dec 23 1993 11:07 | SCLM installed on system | 15 lines |
TOPIC | 543.0 | Wed Dec 08 1993 13:34 | Request for DB2 trace | 7 lines |
| 543.1 | Tue Feb 15 1994 14:26 | closed | 1 lines |
TOPIC | 558.0 | Tue Feb 08 1994 10:42 | Jars information requested | 4 lines |
| 558.2 | Wed Feb 09 1994 11:43 | More Jars information | 7 lines |
TOPIC | 569.0 | Mon Mar 14 1994 11:42 | EDA/DB2 work request | 67 lines |
| 569.1 | Mon Mar 14 1994 11:44 | Reply to Jack for more information. | 92 lines |
| 569.2 | Wed Mar 16 1994 10:25 | | 2 lines |
TOPIC | 574.0 | Thu Mar 24 1994 10:35 | Request for 3270 access in office. | 2 lines |
| 574.1 | Thu Mar 24 1994 10:37 | Request | 15 lines |
| 574.2 | Thu Mar 24 1994 10:40 | TSR: reply | 15 lines |
| 574.3 | Thu Mar 24 1994 10:42 | Rich came to get the solution together | 12 lines |
TOPIC | 576.0 | Tue Mar 29 1994 14:00 | Hank Vessal needs IMS work. | 6 lines |
| 576.1 | Tue Mar 29 1994 14:02 | Initial requests.......... | 50 lines |
| 576.2 | Mon Apr 25 1994 15:29 | Oked to perform work for Hank | 76 lines |
| 576.3 | Mon May 02 1994 17:13 | Initial application setup. | 29 lines |
| 576.4 | Tue May 10 1994 14:02 | Hank is testing at customer site. | 2 lines |
TOPIC | 577.0 | Thu Mar 31 1994 10:06 | Dave with needs DRDA between DB2 subsystems | 1 lines |
| 577.1 | Thu Mar 31 1994 10:07 | Dave's request | 11 lines |
| 577.2 | Tue Apr 05 1994 10:16 | DDF coonection beetween DB2 complete. | 20 lines |
TOPIC | 580.0 | Michel Menahem needs DB2, VSAM help for Brazil demo |
| 580.6 | Fri Apr 01 1994 15:55 | Information supplied to Michel. | 185 lines |
| 580.8 | Thu Apr 21 1994 12:08 | Received cost center authoruzation. | 62 lines |
| 580.9 | Fri Apr 29 1994 17:50 | Tables & Files defined, Support help left | 32 lines |
TOPIC | 581.0 | Tue Apr 05 1994 10:19 | Craig Dudley request terminal work. | 2 lines |
| 581.1 | Tue Apr 05 1994 15:22 | Terminal setup and tested. | 2 lines |
TOPIC | 583.0 | Thu Apr 07 1994 15:17 | Request to change DB2 subsystems to different CICS. | 2 lines |
| 583.1 | Thu Apr 07 1994 15:19 | Message sent to DB2 users. | 19 lines |
TOPIC | 588.0 | Aram Agopian of SanFrancisco needs DB2 demo support |
| 588.2 | Thu Apr 21 1994 12:00 | Aram is set. | 5 lines |
TOPIC | 599.0 | Wed May 11 1994 14:21 | Request for Jars accounting report | 75 lines |
TOPIC | 600.0 | Wed May 11 1994 15:04 | Dave White needs Resource Limit Facality for DB2D | 9 lines |
| 600.1 | Fri May 13 1994 16:38 | Adjust asutime in the RLST table. | 19 lines |
TOPIC | 601.0 | Fri May 13 1994 16:41 | Jack Alexander needs to start and stop the IBI server. | 16 lines |
| 601.1 | Tue May 17 1994 14:24 | Jack is set up. | 4 lines |
TOPIC | 603.0 | DB2 work for Mike Benton |
| 603.1 | Tue May 24 1994 15:04 | Further information concerning this request | 30 lines |
| 603.2 | Wed Jun 01 1994 11:12 | Upload of GE software almost complete | 97 lines |
| 603.3 | Wed Jun 01 1994 11:13 | meeting with Mike Benton requested. | 117 lines |
| 603.4 | Fri Jun 17 1994 16:13 | OSF/1 benchmark portion has started. | 4 lines |
TOPIC | 609.0 | Mon Jun 06 1994 11:45 | Jack Alexander requests IBI/IMS support | 3 lines |
| 609.1 | Wed Jun 08 1994 17:25 | Jack can access IMS via IBI. | 4 lines |
| 609.2 | Fri Jun 17 1994 16:17 | DB2 tables needed on IMS database for testing. | 4 lines |
TOPIC | 611.0 | Fri Jun 17 1994 16:00 | Request to install Sequelink from Techgnosis | 6 lines |
| 611.1 | Fri Jun 17 1994 16:00 | Warning for install | 18 lines |
| 611.2 | Fri Jun 17 1994 16:01 | Tapes are here | 13 lines |
| 611.3 | Fri Jun 17 1994 16:02 | Status of install | 34 lines |
| 611.4 | Mon Jun 20 1994 15:40 | Further status | 61 lines |
| 611.11 | Tue Aug 09 1994 14:08 | Trouble accessing databases | 24 lines |
| 611.12 | Fri Aug 12 1994 11:57 | Problem fixed | 18 lines |
TOPIC | 616.0 | Mon Aug 01 1994 11:59 | Lou Bragaw requests LU0 channel attached printer | 3 lines |