[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Posting history for user KAMPUS::REGENBOGEN

1,281 notes across 3 conferences

Summary of Posts

Click on conference filespec to scroll down to
ConferenceTotal
Posts
Conference Title
kasino::eerp_abstracts1,213European Research Abstracts
gvprod::eerp_proposals62Research proposals and other EERP matters
rdvax::erp_proposals6ERP Proposals

Conference gvprod::eerp_proposals (Research proposals and other EERP matters)

62 posts
TOPIC 667.0 768/SU NIITP/Software for Industrial & Municipal Wastes Processing Equipment & Computer-Aided Design
667.14Wed Oct 12 1994 14:04 First report available at @KAR.... 13 lines
TOPIC 680.0 781/GY UAK/BIG (Berkom II, ITEMS, Gigaswitch High Performance Networking and Multimedia Service Development
680.21Tue Nov 08 1994 16:03 08.11.94: letter signed and sent 7 lines
TOPIC 687.0 788/IR Dublin/Development of parallel computational algorithm
687.58Fri Feb 24 1995 14:30 24.02.95:Amendment letter signed and sent 8 lines
TOPIC 698.0 799/GY Siegen/Tools for Developing Parallel OO Applications on WS Farms
698.19Fri May 20 1994 15:53 contracts now signed by University 5 lines
698.34Wed Jan 03 1996 14:01 22.12.95:amendment contract GY-072A signed and sent 49 lines
698.35Mon Jan 22 1996 16:48 EERP process needs to be clarified with CAS by sales rep 29 lines
TOPIC 700.0 801/GY ABB/Implementation of SF Framework SW for Manufacturing Apps
700.40Wed May 25 1994 10:01 contract+letter:signed+sent 6 lines
TOPIC 701.0 802/AU Leoben/Two-dimensional oxidation modelled with stochastic growth models?
701.11Tue Mar 29 1994 10:38 28-3-94 contracts signed by Igor 6 lines
TOPIC 703.0 804/SW Uppsala/3D Graphics Porting & Support for Protein Crystallography Environment
703.13Tue Mar 29 1994 14:13 29-3-94 signed contracts sent to Peter 10 lines
703.18Tue May 17 1994 10:48 Revised contract sent to Peter Szmulik 7 lines
TOPIC 704.0 805/CH Geneva/Computer Aided Translation Research
704.19Tue May 03 1994 18:12 03-MAY-94 contracts sent out 13 lines
TOPIC 705.0 806/SU Moscow/Supercomputing in MSU/Edu
705.28Wed Aug 03 1994 18:51 Contract signed and sent ! 8 lines
TOPIC 707.0 808/AU Vienna/Real-time Computing
707.15Tue May 03 1994 18:07 03-MAY-94 contracts sent out 10 lines
TOPIC 708.0 809/FN Tampere/ATM FASTER (Finnish Broadband Telecom Project)
708.13Tue May 03 1994 18:17 03-MAY-94 all contracts sent out 13 lines
TOPIC 709.0 810/AU Joanneum/Meta Information Approach
709.26Tue Aug 02 1994 16:58 02.Aug:Contract, letter and memo sent 11 lines
TOPIC 710.0 811/UK Imperial College/A SuperJanet Shared Image Resource for Synchronous Apps
710.45Wed Jun 29 1994 17:41 contract signed by Igor and sent off ! 7 lines
710.47Fri Aug 12 1994 16:13 Order been placed ! 53 lines
710.75Mon Feb 13 1995 09:47 10.02.95:Amendment Letter + new list sent 7 lines
TOPIC 711.0 812/UK Ral-Manchester/Modular Architecture for Distributed Shared Memory System
711.9Wed Jun 08 1994 11:53 08-JUN-94 signed contracts sent to...... 8 lines
711.26Fri Jul 29 1994 10:39 27-July-94 Amendment Letter sent 12 lines
711.28Tue Oct 04 1994 11:24 04.10.94:Additional letter signed and sent 6 lines
711.30Wed Oct 05 1994 11:08 ps.version of letter sent 04-OCT-94 522 lines
711.46Mon Dec 12 1994 15:02 12.12.:Amendment letter sent to Researcher 7 lines
TOPIC 712.0 813/PO Lisboa/Parallel Distributed Prolog and Applications (PADIPRO)
712.19Wed Oct 19 1994 15:17 Signed contracts sent off to Portugal 10 lines
TOPIC 713.0 814/AU TUVienna/Dopant Profiling by Voltage Contrast Scanning Electron Microscopy (VCSEM)
713.13Thu Jun 09 1994 17:31 signed contract sent by TNT on 09.06.94 7 lines
TOPIC 714.0 815/BE Louvain/World Ocean Modelling on a small parallel computer
714.14Tue Aug 02 1994 16:50 02.Aug contract,letter and memo sent 12 lines
TOPIC 715.0 816/SU Moscow/High Accuracy and High Performance Computing in Modelling
715.22Wed Nov 09 1994 10:57 09.11.94: signed contract sent out 9 lines
TOPIC 716.0 817/IT ITIA - CNR/Development of Interactive Graphic System to show BASEstar's capabilities
716.17Tue Aug 02 1994 16:54 02.Aug:Contract,letter and memo sent 14 lines
TOPIC 717.0 818/IT Padova/Development of Durable Concrete
717.18Tue Sep 27 1994 10:59 27.09.: Contract signed and sent 7 lines
TOPIC 719.0 820/HL Utrecht/Real-time Monitoring Experiments on WAN using ATM
719.31Wed Nov 09 1994 10:37 Signed contract sent to Colja and Debbie 9 lines
TOPIC 720.0 821/IT CNUCE/Advanced Information Servers for Multimedia Networking
720.21Tue Aug 02 1994 16:46 02.Aug contract,letter and memo sent 11 lines
720.38Fri Jan 27 1995 09:48 27.01.95:Approval letter signed and sent 8 lines
TOPIC 723.0 824/AU Vienna/STARPULS
723.6Tue Sep 27 1994 11:01 27.09: Contract signed and sent 7 lines
TOPIC 724.0 825/UK LPAC/Porting & Extension of Financial Apps Libraries to Alpha Farms
724.32Fri Nov 11 1994 11:00 11.11.94:contract signed and sent 194 lines
TOPIC 725.0 826/GY GMD Fokus/MHEG Engine for GLASS
725.9Tue Nov 22 1994 15:06 modified contract signed and sent 11 lines
725.11Fri Nov 25 1994 15:21 25.11.:contract sent to researcher for signature 12 lines
TOPIC 727.0 828/CH Geneva/ATM Network Development on University and Observatory Site
727.14Mon Dec 12 1994 15:12 12.12.94:signed contract,memo and researcher letter sent out 15 lines
TOPIC 728.0 829/SW SICS/Porting & Support of SCICTUS PROLOG on Alpha with OSF/1
728.11Wed Jan 11 1995 11:29 11.01.:contract signed and sent 13 lines
728.17Mon Jan 16 1995 10:35 13.01.95:new version signed and sent 8 lines
728.23Thu Mar 09 1995 16:39 John Kreatsoulas new technoloy recipient 68 lines
728.29Wed Jun 28 1995 19:38 announce Alpha port./ SICStus Prolog 3 80 lines
TOPIC 729.0 830/BE LEUVEN/Parallel Object-Oriented simulation Software
729.9Fri Jan 13 1995 15:20 13.01.95:Contract signed and sent 8 lines
TOPIC 731.0 832/AU Uni Vienna/Global Optimization
731.14Fri Jan 13 1995 15:17 13.01.95:contract signed and sent 8 lines
TOPIC 732.0 833/AU Linz/Interactive Multimedia Teleservices over Euro-ISDN
732.12Tue Mar 14 1995 14:52 13.03.95:contract signed and sent 9 lines
732.24Thu Dec 21 1995 15:13 21.12.95: extension letter signed and sent 8 lines
TOPIC 733.0 834/GY Karlsruhe-CMU/Speech recognition on DEC Alpha ComputeServers
733.43Tue Jun 27 1995 19:42 Complementary activity at MIT 139 lines
733.44Mon Jul 03 1995 18:02 Researcher returned signed copies of contract 13 lines
TOPIC 736.0 837/FR DAUSSET/Porting, SMP Impl. and Dev. of QUICKMAP on SMP Server
736.31Tue Oct 24 1995 18:04 23.10.95: contract signed and sent 18 lines
736.32Wed Sep 25 1996 11:46 Good summary of benefits 29 lines
TOPIC 737.0 838/CH CERN/Data Mining using PIAF for Physics Data Access
737.22Wed Oct 11 1995 13:03 09.10.95:contract signed and sent 13 lines
TOPIC 738.0 839/AU Vienna/Performance Evaluation of HP Fortran 90, Parallel SW Environment & Load Share Facility
738.24Wed Aug 09 1995 12:35 08.08.95:Signed contract sent to R.Hanslik-Kupsa 13 lines
TOPIC 739.0 840/AU Vienna/Improved DXML (Digital Extended Mathematics Library)
739.23Wed Aug 09 1995 12:32 08.08.95:Signed contract sent to R.Hanslik-Kupsa 13 lines
739.28Mon Nov 06 1995 16:09 Planned EERP_ABSTRACTS input:sponsor expects 1st results soon 110 lines
739.29Tue Nov 07 1995 17:54 Planned EERP_ABSTRACT input:Sponsor insists on deliverables 39 lines
TOPIC 740.0 841/GY Darmstadt/Modelling Heterogeneous Multimedia Mail
740.14Thu Sep 07 1995 11:09 05.09.95:Contracts sent on to researcher 14 lines
TOPIC 741.0 842/GY Karlsruhe/CARMA - Comms Support for Apps Research & ATM Network Mgmt
741.19Thu Sep 07 1995 11:07 05.09.95:Contracts sent on to researcher 15 lines
741.24Wed Nov 22 1995 15:29 Contract GY-080 signed 4.10.95 / copies received 6 lines
741.38Thu Apr 25 1996 10:03 PC - quotation in the files @ KAR 47 lines
TOPIC 742.0 843/GY IPK Berlin/Application & Utilization of Comm. Info Services based on WWW
742.15Tue Sep 12 1995 12:51 12.09.95:contract signed and sent 11 lines
TOPIC 744.0 845/GY ECRC/Port of ECLiPSe
744.9Mon Feb 05 1996 09:18 EERP interested in buying Alpha Seed unit ? 67 lines
744.10Mon Feb 05 1996 09:22 Approval to initiate CoC transfer 36 lines
TOPIC 745.0 846/AU TUVienna/Device & Process Numerical Simulation Software
745.8Fri Feb 02 1996 11:17 Contract AU-047 issued 1.2.96 40 lines

Conference kasino::eerp_abstracts (European Research Abstracts)

1,213 posts
TOPIC 180.0 522.1/SW-002 [75] KTH:TMC Project
180.14Wed May 25 1994 12:06 update:29-JUN-1992 prj completed 7 lines
TOPIC 183.0 515/UK-035 [100] HICOM: Technology Transfer th. conf.
183.10Wed Jul 27 1994 14:57 Project dead wrt our actual information 10 lines
183.12Thu Aug 04 1994 15:59 Project considered terminated after revision ! 9 lines
TOPIC 189.0 485/UK-038 [75] U. Edinburgh GIS in par & multi-pr env
189.34Thu Jul 21 1994 14:43 Project been finished,report received ? 118 lines
189.35Thu Aug 11 1994 16:15 As Mike left,Lindsay able to help ? 42 lines
189.36Wed Jun 21 1995 19:33 Finally report in internal mail ! 53 lines
189.37Mon Jul 10 1995 17:46 Final documentation available (chapter from a book ) 33 lines
TOPIC 190.0 532.1/FR-017 [50] INRIA EPIDAURE (Inter.Compl.3D Images)
190.17Wed Jul 27 1994 17:54 Project terminated 7 lines
TOPIC 191.0 486/CH-017 [50] GENEVA Interactive NL Parser
191.4Wed Jul 27 1994 17:36 Project terminated 6 lines
TOPIC 193.0 508/UK-037 [75] ECMWF Visual.& Systems monit. Tools
193.3Wed Jul 27 1994 14:51 Project dead 9 lines
TOPIC 196.0 462/GY-036 [100] STUTTGART: Transaction Systems
196.12Mon Jun 27 1994 10:20 project still active or finished ? 57 lines
196.13Mon Jun 27 1994 10:21 Frank Severin is able to help! 27 lines
196.14Mon Jun 27 1994 10:23 11/93 prj finished/final report at EERP office Karlsruhe 20 lines
TOPIC 202.0 425/HL-013 [100] SNN (Neural Network Foundation)
202.28Wed Jun 01 1994 15:11 project terminated/letter to be sent 42 lines
202.29Wed Aug 03 1994 16:22 Letter of notification been sent ! 351 lines
TOPIC 204.0 540/IS-008 [100] Weizmann Inst.: distr.systems visual.
204.2Wed Jul 27 1994 11:25 Project dead 9 lines
TOPIC 205.0 541/NW-001 [50] SINTEF: conversion of CAD to SLA using EXPRESS
205.12Wed Jul 27 1994 11:22 Project terminated 7 lines
TOPIC 206.0 542/CH-020 [50] CERN/OPAL: Central Ops f Distr Environments
206.3Wed Jul 27 1994 17:35 Project terminated 7 lines
TOPIC 207.0 536/FR-020 [75] IPG: Seismic Simulation
207.1Wed Jul 27 1994 11:10 Project dead 9 lines
TOPIC 211.0 553/IT-016 [50] POLITECNICO TORINO: CAD algorithms on MPP
211.1Thu May 26 1994 16:19 update:project dead 4 lines
TOPIC 224.0 565/IT-017 [50] TORINO: Concurrent GOOD simulation
224.2Wed Jul 27 1994 11:04 project successfully terminated 8 lines
TOPIC 227.0 562/UK-041 [80] LEEDS University: DB_Habits
227.1Wed Jul 27 1994 10:58 Project dead 9 lines
TOPIC 228.0 535/GY-040 [75] GMD: GRACIA
228.2Wed Jul 27 1994 17:33 Projetc terminated 6 lines
TOPIC 232.0 564/IR-007 [100] DUBLIN: Formal Properties of Mixed-Mode Inference
232.1Wed Jul 27 1994 10:55 Project dead 10 lines
TOPIC 233.0 424/UK-042 [60] WALES: Use of Speech in Mixed Modality
233.5Thu Aug 04 1994 15:56 Project completed wrt a mail of the sponsor! 13 lines
TOPIC 235.0 528/GY-039 [75] WUPPERTAL: Parallel Computation on the CM-2
235.1Mon Jul 25 1994 17:49 Project dead 7 lines
TOPIC 237.0 586/IR-008 [50] GALWAY: Planning & Control in JIT
237.1Mon Jul 25 1994 17:42 Project dead 7 lines
TOPIC 239.0 583/GY-043 [30] REGENSBURG Atomic/Magnetic Force Microscopy
239.1Mon Jul 25 1994 17:39 Project dead 6 lines
TOPIC 240.0 577/FR-022 [100] PARIS-ICM: Symbolic Computation & Workstation
240.1Mon Jul 25 1994 17:33 Project dead 9 lines
TOPIC 243.0 582/IT-018 [65] WORLD LAB: SIP Porting and Developing M
243.2Mon Jul 25 1994 17:29 Project dead 7 lines
TOPIC 244.0 571/FR-029 [75] ENSL: Dictionary Machine
244.2Mon Jul 25 1994 17:26 Project dead 6 lines
TOPIC 246.0 579/HG-002 [100] BUDAPEST: Surface Modelling
246.7Wed Jun 01 1994 16:28 project end to be AUG 1994 9 lines
246.8Fri Sep 02 1994 14:12 project finished ? 189 lines
246.9Fri Oct 07 1994 15:53 Dr.Varady needs to be asked for a final report... 19 lines
246.10Fri Oct 21 1994 16:19 Sponsor Patrick Baudelaire able to help ? 58 lines
246.11Wed Dec 21 1994 15:58 Due to PRL closure no advantage of excellent work 70 lines
246.12Tue Feb 21 1995 08:40 Actual email address of Dr. Varady known by J.Nittmann ? 195 lines
246.13Tue Feb 21 1995 08:42 Johann unfortunately not able to help 17 lines
246.14Thu Feb 23 1995 10:53 Request of final report directly to researcher 74 lines
246.15Wed Mar 08 1995 14:27 Final hardcopy report soon from Dr.Varady 34 lines
246.16Wed Mar 08 1995 14:35 EERP looking forward to final report 22 lines
246.17Fri Apr 21 1995 17:43 Final report available/ thank you note to researcher 33 lines
246.18Fri Apr 21 1995 17:46 Hardcopies of final report and papers at KAR 41 lines
246.19Tue Apr 25 1995 16:14 Requested EERP brochure has been sent by KTR 33 lines
TOPIC 248.0 600/SU-001 [100] KIEV: Desktop Services in Russian
248.4Mon Jul 25 1994 17:22 Project dead 9 lines
TOPIC 250.0 587/UK-043 [75] BATH: Algorithms and Data Structures
250.2Mon Jul 25 1994 17:18 Project dead 7 lines
TOPIC 251.0 607/AU-026 [65] IIASA/SIP Porting Environmental Appl
251.3Mon Jul 25 1994 17:15 Project dead 7 lines
TOPIC 252.0 639/AU-028 [100] TUVienna/Device & Process Simul.
252.1Mon Jul 25 1994 17:10 Project dead 7 lines
TOPIC 253.0 622/CH-021 [50] UNIX Data Center
253.6Mon Jul 25 1994 17:07 Project dead 7 lines
TOPIC 257.0 647/GR-001 [100] TUAthens/Performance & Funct of RDB Systems
257.1Mon Jul 25 1994 17:01 Project dead 6 lines
TOPIC 258.0 627/UK-044 [100] Oxford Press/Hector
258.1Mon Jul 25 1994 16:58 Project dead 6 lines
TOPIC 259.0 649/IS-010 [100] Hebrew/Formal Spec & Auto Deduction
259.1Mon Jul 25 1994 16:54 Project dead 7 lines
TOPIC 261.0 667/BE-005 [65] ESAT/Multimedia Archiving & Comm
261.14Fri May 06 1994 11:16 prj dead as sponsor leaves Digital 38 lines
TOPIC 262.0 632/SW-007 [65] Uppsalla/MT Russian -> English
262.4Wed Jul 27 1994 17:00 Project terminated 6 lines
TOPIC 263.0 617/SW-005 [65] SW UPPSALLA/Port of O to DECstation
263.2Thu Aug 18 1994 15:14 Project finished ?/ Reports available ? 42 lines
263.3Thu Aug 18 1994 15:48 Angela requires info which need to be more specified ! 41 lines
263.4Fri Aug 19 1994 09:22 Project completed in 1992 ! 17 lines
TOPIC 264.0 618/SW-004 [65] SW UPPSALLA/Assig of NMR Spectra
264.1Mon Jul 25 1994 16:48 Project considered DEAD 7 lines
TOPIC 265.0 605/AU-023 [75] UVienna/High-Level Progamming Spport
265.2Wed Jul 27 1994 17:31 Project terminated 7 lines
TOPIC 266.0 633/AU-024 [50] TUVienna/Central European Networks
266.4Thu May 26 1994 16:00 project DEAD 4 lines
TOPIC 267.0 621/SW-006 [70] ULinkopink/Integrated Env Medical
267.1Thu May 26 1994 15:47 project considered DEAD 4 lines
TOPIC 271.0 598/UK-045 [100] filmedia/Strategy Formulation
271.2Thu May 26 1994 15:57 project declared dead 5 lines
TOPIC 274.0 637/GY-047 [90] Munich/Adv DB Systems Concepts
274.1Fri Aug 19 1994 16:20 some background details...... 14 lines
274.2Thu Nov 03 1994 16:44 Comments of the former sponsor (in German) 49 lines
274.3Thu Nov 10 1994 10:53 Prj completed wrt to comments by Christoph Freytag 79 lines
TOPIC 275.0 636/SU-002 [100] Inst Space Research/NASA-Soyuz Cosm
275.21Thu Mar 17 1994 14:26 answer to Dr. Gorshkov/NPO Energia 49 lines
275.22Thu Mar 17 1994 14:35 Allowance increased to $25K 74 lines
275.34Fri Aug 12 1994 15:56 Robert B.able to help wrt status of project ? 68 lines
275.35Thu Dec 22 1994 15:35 Project terminated / no notification to be sent 15 lines
TOPIC 276.0 626/GY-050 [75] Bremerhaven/Rsrc-Mgt & UI for Graphics
276.16Mon May 09 1994 10:19 CDA is beeing outsourced ! 74 lines
TOPIC 285.0 685/GY-053 [85] EMBL/SIP-Integrating Heterogeneous Biolo
285.3Tue Jun 21 1994 12:46 Project finished?/ status update to follow 37 lines
285.4Wed Jun 22 1994 12:51 final reports expected in Dec'94 /P.Sibbald left EMBL> 14 lines
285.5Fri Jan 27 1995 15:03 Any news wrt status or final results ? 47 lines
285.6Thu Mar 16 1995 09:51 Ongoing SIP projects in EUROPE 153 lines
285.7Thu Mar 16 1995 10:29 B.Frommherz able to help wrt final report ? 66 lines
285.8Wed Mar 22 1995 12:03 Is prj successfully completed ? 461 lines
285.9Wed Apr 26 1995 18:12 Rachel still available for EERP ? 60 lines
285.10Wed Apr 26 1995 18:17 Project declared prematurely terminated by sponsor 27 lines
TOPIC 286.0 675/GY-054 [65] EMBL/STIP-Potential Impact of HIPPI Links
286.13Mon Jul 18 1994 17:28 Ben Frommherz new local contact 26 lines
286.14Tue Mar 14 1995 13:36 Reminder for project status / end 39 lines
286.15Tue Mar 14 1995 13:42 Ben Frommherz will follow up 72 lines
286.16Thu Mar 16 1995 09:53 Ongoing SIP projects in EUROPE 154 lines
286.17Wed Mar 22 1995 12:07 Is prj successfully completed ? 461 lines
286.18Wed Apr 26 1995 18:01 Rachel still available for EERP ? 64 lines
286.19Wed Apr 26 1995 18:07 How should we(EERP and sponsor) proceed ? 27 lines
286.20Fri Apr 28 1995 10:00 Will Rachel sent short notification ? 51 lines
TOPIC 289.0 673/SU-003 [100] AcadScience/Development of a Multipurpose Linguistic Processor Based on the Meaning - Text Theroy of Language
289.24Fri Aug 12 1994 10:42 Project still active ? MS 3 fulfilled ? 44 lines
289.25Mon Nov 28 1994 14:58 Robert Boers able to help wrt status update ? 41 lines
289.26Thu Mar 23 1995 16:03 Irina will contact Mr.Grigorjev (researcher) 52 lines
289.27Wed Mar 29 1995 08:27 Mr.Grigorjev will contact EERP directly 50 lines
289.28Thu Apr 13 1995 16:40 Researcher happy to hear of EERP's interest 57 lines
289.29Thu Apr 13 1995 16:59 Direct request for final report to researcher 75 lines
289.30Thu Apr 13 1995 17:02 Final report to be ready end of May 95 17 lines
289.31Fri Jul 07 1995 12:31 Aug 95: new date for final report 15 lines
289.32Wed Aug 02 1995 15:06 Final report should be ready soon 47 lines
289.33Tue Aug 22 1995 13:07 Final report available/ see extract of introduction 70 lines
289.34Thu Aug 31 1995 17:26 Thank you note to researcher 31 lines
TOPIC 290.0 711/UK-048/1444 [88] Cambridge/Handling & Analysis Package
290.4Thu May 26 1994 15:46 project considered DEAD 4 lines
TOPIC 291.0 707/DK-003 [100] Aarhus/Translator for Mechanical Verification in TLA
291.13Wed Jul 27 1994 16:55 Project terminated 6 lines
TOPIC 292.0 708/DK-004 [100] TUDenmark/Mechanical Verification of Concurrent Systems in TLA
292.6Wed Jul 27 1994 16:47 Project terminated 6 lines
TOPIC 293.0 689/CS-001 [100] UAK/Compatibility Testing on Czech VAX Clones
293.7Thu Aug 11 1994 15:38 Project successfully completed ? 36 lines
293.8Mon Jun 12 1995 11:01 No success in tracking down sponsor / must have left DEC 81 lines
293.9Mon Jul 17 1995 10:08 Mr. Mederly should be able to help/ Skultely now with DEC 33 lines
293.10Mon Jul 17 1995 10:40 Request for final report to Dr. Mederly 92 lines
293.11Thu Jul 27 1995 16:57 Researcher received request /details to follow 09/95 16 lines
293.12Wed Nov 15 1995 11:38 Researcher will look for report soon,very busy at the moment 56 lines
293.13Tue Jan 23 1996 15:42 Final report:successful completed in Oct 93 66 lines
TOPIC 294.0 687/SW-008 [65] SICS/Data Diffusion Machine & the ANDORRA
294.3Wed Apr 27 1994 13:00 new technical sponsor 48 lines
294.4Wed Apr 27 1994 13:06 A.Podelski will follow up 45 lines
294.5Wed May 04 1994 12:36 Andreas P. now following up 16 lines
294.6Wed May 04 1994 12:37 Status report from SICS 74 lines
294.7Mon May 09 1994 10:28 Igor's reply to prompt update ! 34 lines
294.8Thu Aug 18 1994 16:19 Project already finished ? 32 lines
294.9Fri Aug 19 1994 14:27 Project end delayed now: 30-OCT-1994 24 lines
294.10Thu Nov 24 1994 14:56 project completed/ report available ? 33 lines
294.11Fri Dec 02 1994 09:39 Project almost completed /request of porting Prolog on Alphas 73 lines
294.12Fri Dec 02 1994 09:49 Already establishm. of an EERP contr. on porting SICStus Prolog 26 lines
294.13Thu Dec 22 1994 10:12 EERP looking forward to receive final report 52 lines
294.14Thu Mar 23 1995 09:57 Is final report now available ? 72 lines
294.15Tue Mar 28 1995 17:18 End of April 95 final rep.should be available 26 lines
294.16Mon Jun 12 1995 17:41 Now final report available ? 118 lines
294.17Wed Jun 14 1995 12:58 Researcher would like to put report on the web 128 lines
294.18Wed Jun 21 1995 19:15 Unfortunately refusal to invitation 35 lines
294.19Wed Aug 09 1995 18:40 1st draft of web page available/remark from EERP 48 lines
294.20Wed Nov 15 1995 15:51 EERP requests for www page and access to sources 59 lines
294.21Wed Nov 15 1995 19:06 Sources available via the web page /final web page ready 21 lines
294.22Fri Nov 17 1995 16:03 EXTRACT of final wep page (index page) 58 lines
294.23Fri Nov 17 1995 16:31 Thank you note to researcher 34 lines
TOPIC 296.0 645/HG-010 [50] Multilogic/A Family of Artificial Intelligence Software Tools
296.4Mon Jun 27 1994 14:37 Any news or status update ? 59 lines
296.6Tue Jul 19 1994 12:17 DEC Hungary :SALES able to help ? 66 lines
296.8Thu Apr 27 1995 12:49 Direct request to researcher wrt final report 52 lines
296.9Wed May 03 1995 14:06 31.12.93 Prj successfully completed 33 lines
296.10Mon May 08 1995 18:15 Thank you note to Prof. Futo 46 lines
TOPIC 299.0 677/GY-037A [100] Dortmund/Tools for Axiom Based Specifications
299.26Thu Aug 11 1994 14:26 Project completed?Interested in final review? 33 lines
299.27Mon Jan 16 1995 15:48 presentation:"Formal Specification+TLA"available 9 lines
299.28Wed Apr 26 1995 18:29 Project review planed for May or June 95 60 lines
299.29Fri Apr 28 1995 10:04 Researcher strongly interested in mtg but end of June 39 lines
299.30Wed May 03 1995 17:56 28.06.95 new date for project review mtg 44 lines
299.31Tue May 16 1995 11:45 28.06.95 Heiko's suggestion and proposed agenda 142 lines
299.32Fri May 19 1995 11:04 28.06.95 ok with Igor as well ! 95 lines
299.33Fri May 19 1995 11:07 Is EERP still willing to pay air fare ? 48 lines
299.34Fri May 19 1995 11:13 EERP will pay for ticket in FY95 25 lines
299.35Wed May 31 1995 09:56 hotel info /open issue reg travel payment(crosscharge) 138 lines
299.36Thu Jun 08 1995 20:04 Explanation on accounting process reg year-end accruals 123 lines
299.37Wed Jun 21 1995 19:56 Paper on a HS Transfer Protocol Framework 1897 lines
299.38Thu Jul 06 1995 09:59 JUL 94:SRC researcher impressed by results 54 lines
299.39Thu Jul 27 1995 17:19 Report on final review held by sponsor and researcher 270 lines
299.40Thu Jul 27 1995 18:06 On request available:reports and handouts of review mtg 49 lines
299.41Fri Sep 01 1995 10:44 Discussion about possibility of upcoming project 45 lines
299.42Fri Sep 01 1995 10:50 Heiko Krumm's reply: He is ready to start 61 lines
TOPIC 300.0 700/IS-011 [75] TELAVIV/Wait-Free Synchronization
300.1Thu Jul 28 1994 10:35 Status update/ Project still alive ? 61 lines
300.2Fri Jul 29 1994 15:34 Project still active / reports to follow ! 24 lines
300.3Tue Aug 16 1994 14:03 Status report(.ps) / MS met 988 lines
300.4Tue Aug 16 1994 14:12 Paper:"Software Transact.Memory" .ps version 5859 lines
300.5Tue Aug 16 1994 14:28 Paper:"Diffracting Trees" (.ps version) 4395 lines
300.6Tue Aug 16 1994 16:06 Paper:"Towards a Practial Snapshot Alg."" .ps file) 9637 lines
300.7Wed Apr 19 1995 15:19 Reminder MS 2+3 34 lines
300.8Wed Apr 19 1995 15:21 Sponsor seems not to be with Digital anymore 49 lines
300.9Tue Apr 25 1995 15:37 M.Stern able to help wrt status as sponsor not available 262 lines
300.10Fri Jul 07 1995 11:37 Moshe requested more information for status update 28 lines
300.11Tue Jul 18 1995 13:29 2 ongoing EERPs with Isreal mixed up ? 64 lines
300.12Mon Oct 09 1995 11:42 Short update BUT Moshe took on action 54 lines
TOPIC 302.0 739/IT-020 [100] Bergamo/Real-Time Trading Analytics for the New Italian Markets
302.3Fri Aug 05 1994 09:28 Reminder 2nd MS/project still active ? 63 lines
302.4Fri Jul 07 1995 13:00 Any news reg.project follow-up from Ivan's CC mgr ? 59 lines
302.5Thu Aug 24 1995 11:09 Prj terminated :although leverage for sales 14 lines
TOPIC 303.0 719/FN-001 [75] Helsinki/The Network VENUE Distance Education and Remote Conferencing System
303.16Tue Apr 05 1994 14:21 TeleVenue at Mercury:answers wrt their questions 109 lines
303.17Tue Apr 12 1994 16:48 CTE/ARFNO Q3/94 Report 123 lines
303.18Fri Jun 17 1994 14:02 TeleVenue memo and survey of Petteri Heng 107 lines
303.20Fri Jul 01 1994 11:09 Quarterly update Q4/94 99 lines
303.21Fri Jul 01 1994 11:56 In spite of new role Petteri still will be active for EERP ! 39 lines
303.22Mon Aug 08 1994 15:00 Project finished ? 35 lines
303.23Fri Aug 12 1994 16:13 Project finsihed/ Final report to follow ! 28 lines
303.24Mon Aug 22 1994 15:22 Final report / Project successfully completed ! 371 lines
303.25Tue Jan 17 1995 17:56 further actions around TeleVenue (extr of quarterly) 39 lines
303.26Tue Apr 04 1995 16:44 Update on final actions around TeleVenue 44 lines
303.27Tue Apr 04 1995 16:53 TeleVenue has now a price tag ! 71 lines
303.28Mon Apr 22 1996 11:05 I: Status and pointer to TELEVENUE Kit 133 lines
TOPIC 304.0 692/IT-021 [75] Milan/Computer Supported Cooperative Work: General Communication Support
304.8Mon Aug 22 1994 17:42 Reminder of MS 3 31 lines
304.9Tue Aug 30 1994 18:09 Chiara will contact researcher in September 21 lines
304.10Wed Sep 28 1994 11:14 Hardcopy report available in Karlsruhe/see note: 23 lines
304.11Fri Oct 07 1994 15:50 short update(extract of EERP Quarterly) 15 lines
304.12Tue Jan 17 1995 14:45 Milestones postponed referring to Chiara's answer 37 lines
304.13Wed Feb 15 1995 12:06 Reminder of 1st milestone 32 lines
304.14Thu Mar 09 1995 12:14 Prj considered prematurely terminated 22 lines
TOPIC 305.0 693/SW-013 [75] Chalmers/Parallel Functional Languages on a Loosely Coupled Multiprocessor System
305.4Mon Aug 22 1994 17:51 Reminder of MS 2 33 lines
305.5Tue Oct 18 1994 16:03 Milestone 2 report : Ms met 137 lines
305.12Mon Dec 19 1994 13:36 What percentage for second year? 29 lines
305.14Thu Mar 23 1995 10:59 Reminder MS 3 207 lines
305.15Fri Mar 31 1995 18:52 Update will be in soon.... 18 lines
305.16Mon Jul 10 1995 10:42 Sponsor sent another reminder to researcher... 94 lines
305.17Fri Aug 18 1995 11:10 L.Cardelli received no answer by email,will try different way 74 lines
305.18Thu Aug 24 1995 09:47 Researcher promised to send report within a week... 18 lines
305.19Thu Aug 31 1995 18:11 Final rep.(.ps):"Distributed Functional Programming 1117 lines
305.20Thu Aug 31 1995 19:05 Request for additional statement from sponsor 36 lines
305.21Tue Sep 05 1995 17:24 Statement from Sponsor 29 lines
305.22Wed Sep 06 1995 11:48 Thank you note to sponsor 16 lines
TOPIC 307.0 704.2/PL-001 [100] Poznan/National EARN Gateway System
307.2Wed Aug 10 1994 17:33 Has project been completed in April 94 ? 35 lines
307.3Wed May 03 1995 15:25 2nd reminder for project end 72 lines
307.4Fri Jul 07 1995 14:57 **3rd request for final report** 96 lines
307.5Thu Jul 13 1995 16:01 Project declared DEAD as there were never results... 106 lines
TOPIC 309.0 714/AU-025A [75] Seibersdorf/Extension of the CDA/DDIF Environment for Dynamic Media, Synchronization, and Hyper-Links
309.11Mon May 09 1994 10:17 CDA is beeing outsourced ! 74 lines
309.12Mon Jun 20 1994 16:03 Seibersdorf applies as BERKOM pilot user 73 lines
309.13Thu Oct 13 1994 13:20 Project on hold for the time being ! 19 lines
309.14Tue Nov 22 1994 10:15 proposal for redirecting work 267 lines
309.15Mon Jan 23 1995 09:31 Project still on hold ? 29 lines
309.16Tue Jun 27 1995 19:47 redirection of work; project completion expected by 12/95 596 lines
309.17Tue Jul 04 1995 12:16 Summary of changed milestones 200 lines
309.18Fri Sep 01 1995 16:33 12/96 new expected date of completion 21 lines
309.19Mon Feb 05 1996 14:33 Reminder MS 6 40 lines
309.20Wed Feb 14 1996 15:26 03/96 new project end with final report 45 lines
309.22Mon Apr 29 1996 17:25 Reminder project end 59 lines
309.23Mon Apr 29 1996 17:26 *Note: No further monitoring of project 10 lines
309.24Mon Apr 29 1996 17:44 Project still not completed ... 79 lines
309.25Thu May 23 1996 16:49 in 06/96 : L.Kotsch will sent final report 29 lines
TOPIC 310.0 703/NW-003 [75] Bergen/Reservoir and Seismic Applications on Parallel Machines
310.11Mon Jun 20 1994 17:34 Still Bob Nilsson to deliver status update ? 93 lines
310.12Tue Jun 21 1994 10:39 Is Ingebrigt able to give a status update ? 107 lines
310.13Tue Jun 28 1994 18:13 Peter Szmulik will try to help! 21 lines
310.14Wed Jun 29 1994 15:29 Is Magnus Person able to help ? 413 lines
310.15Tue Jul 12 1994 12:01 project closed due to downsizing 374 lines
310.16Tue Jul 12 1994 12:12 Report available in spite of downsizing? 24 lines
310.17Thu Sep 01 1994 09:23 Disaster with INTEL ? 34 lines
310.18Mon Oct 17 1994 16:30 Ingebrigt left /new EERP prj with Bergen University ? 125 lines
310.19Fri Aug 04 1995 09:45 Clarification around Bergen 97 lines
TOPIC 311.0 701/SW-010 [70] Linkoping/Swedish High-Performance Computing Network - SHPCnet
311.9Tue Apr 05 1994 13:50 Summary of SHPCnet meeting 29MAR94 from Peter 41 lines
311.10Tue Apr 12 1994 17:35 SHPCnet Fileserver Accep.Spec.V 2.0 557 lines
311.11Wed Apr 13 1994 12:34 !!! new milestones !!! 24 lines
311.12Tue Apr 26 1994 09:09 report of Reference Group meeting/prj.under control 124 lines
311.13Wed May 11 1994 16:08 performance numbers over 34Mbps-FDDI links 373 lines
311.14Tue Jun 07 1994 18:29 project on track ! 18 lines
311.17Mon Nov 07 1994 09:50 reminder of MS 1 38 lines
311.20Thu Sep 07 1995 14:58 Project active: update will follow soon 11 lines
311.21Mon Feb 05 1996 15:44 Reminder MS 3 58 lines
TOPIC 312.0 704.4/RO-001 [100] Bucharest/National EARN Gateway
312.9Thu Jul 14 1994 17:16 Project still active ? 59 lines
312.10Thu Jan 12 1995 11:16 Project supposed to be completed 17 lines
TOPIC 314.0 721/GY-055 [90] CIS/Software for Linguistic Databases
314.5Fri Aug 05 1994 13:13 Sponsor left/Frank Severin able to help ? 259 lines
314.7Thu Oct 20 1994 14:59 Project commpleted 130 lines
314.8Thu Nov 03 1994 16:38 Comments of the former sponsor(in german) 35 lines
314.9Thu Nov 10 1994 10:27 Additional comments by Christoph Freytag 37 lines
TOPIC 316.0 722/GY-057 [75] Furtwangen/Application-driven Investigation of Object-Oriented Design in an Industrial Environment
316.12Fri Apr 15 1994 14:47 invoice of US trip '94 received 8 lines
316.13Mon Aug 08 1994 14:14 Project finished ? 31 lines
316.15Fri Oct 07 1994 15:57 Project successfully completed ! 333 lines
316.16Thu Oct 13 1994 15:08 Final report in hardcopy available at @KAR 10 lines
316.17Tue Nov 15 1994 15:32 issues with FH Furtwangen equipment 38 lines
TOPIC 317.0 738/GY-058 [90] Nurnberg/Research on the Micro-Foundation of Market Processes using Computer-based Market Models with Human and/or Simulated Traders
317.6Fri May 20 1994 16:09 Status,Info and pot.Follow up 226 lines
317.7Wed May 25 1994 12:37 ERP management pleased with project 34 lines
317.8Mon Jul 25 1994 11:44 Project finished ? Any further plans ? 38 lines
TOPIC 318.0 723/GY-059 [100] Munchen/MACH Kernel with VAXELN Runtime Personality TITLE :
318.11Tue Oct 10 1995 19:28 Reply to P.Schmitt reg property rights of results 224 lines
318.12Thu Nov 02 1995 13:08 Reply from Frank Severin 23 lines
318.13Thu Nov 02 1995 13:10 Internal note 8 lines
TOPIC 319.0 679/GY-051 [75] Karlsruhe/NESTOR (Networked Systems for Tutoring)
319.5Thu Jul 28 1994 08:53 Project finished ? 31 lines
319.6Fri Oct 07 1994 15:13 Prj terminated prematurely with results in 1993 66 lines
TOPIC 321.0 683/IS-012 [75] Tel Aviv/Computational Fluid Dynamics and Parallel Computations
321.13Tue Jul 12 1994 16:10 reminder of 4th milestone 27 lines
321.14Wed Nov 09 1994 17:06 With Gil Paecht gone prj still active ? 447 lines
321.15Wed Nov 09 1994 17:12 Prj still alive / Moshe Stern new contact 40 lines
321.16Wed Nov 09 1994 17:22 despite all problems Shtilman likes 2nd years grant 80 lines
321.17Thu Nov 10 1994 14:29 reminder of status update 67 lines
321.18Tue Nov 22 1994 09:02 Moshe Stern is awaiting milestone report 40 lines
321.19Tue Nov 22 1994 11:23 progress report / MS met 280 lines
321.20Thu Mar 23 1995 11:19 Reminder MS 6 39 lines
321.21Fri Mar 31 1995 18:44 Prj ahead of time / next report due in 4 months 73 lines
321.22Tue Jul 11 1995 10:40 J.Kreatsoulas now mgr of HPC expertese ctr, Maynard 41 lines
321.23Tue Jul 18 1995 13:28 2 ongoing EERPs with Isreal mixed up ? 64 lines
321.24Tue Jul 25 1995 16:56 Reminder MS 7 132 lines
321.25Mon Oct 09 1995 11:44 Short update BUT Moshe took on action 55 lines
321.26Mon Apr 29 1996 17:47 Reminder project end 66 lines
TOPIC 322.0 712/CH-022 [65] CERN/Event Distribution in NA48 Experiment using HIPPI
322.12Mon Sep 04 1995 16:19 Draft of article will be send soon by D.Gillot 27 lines
TOPIC 323.0 680/UK-049 [50] Ulster/Interactive Computer Systems Exemplars
323.13Tue Apr 26 1994 12:23 1 year delay/Prof.Brotherton new co-ordinator 6 lines
323.15Fri Jun 10 1994 14:57 loss of sponsorship/prj dead 242 lines
323.16Tue Jun 14 1994 18:54 Still sponsors of the project ? 295 lines
323.17Tue Jun 14 1994 18:56 Kirsten to follow up ! 12 lines
323.18Tue Jun 14 1994 18:57 Is John O'Sullivan @ ILO the new sponsor ? 122 lines
323.19Mon Jun 20 1994 15:35 Mike Kelly @ ILO to give a status update ! 28 lines
323.21Thu Apr 27 1995 15:41 Reminder project end 110 lines
323.22Wed Aug 09 1995 17:52 Project alive or dead ? 366 lines
323.23Wed Aug 09 1995 17:58 Clifford Harris is account manager for education in N.Ireland 22 lines
323.24Thu Aug 17 1995 11:26 First response from Mike Kelly @ ILO 31 lines
323.25Thu Aug 17 1995 12:08 EERP needs actual status:active or already completed ? 51 lines
323.26Tue Feb 06 1996 13:55 2nd reminder project end 136 lines
323.27Wed Apr 24 1996 17:17 *note:no further investigation of project results 10 lines
TOPIC 324.0 532/FR-017A [50] INRIA/Computer-Aided Interpretation of Complex 3D Images
324.1Thu May 26 1994 15:37 project considered DEAD 4 lines
TOPIC 325.0 604/FR-025 [75] PERLE/Implementation of ESTEREL on PERLE
325.3Tue Mar 29 1994 16:06 project finished ? 104 lines
TOPIC 326.0 597/FR-026 [75] IMAG/Synchronous Declarative Language
326.4Wed Jun 01 1994 16:10 project dead/letter to be sent 6 lines
326.5Mon Aug 01 1994 17:26 Letter of sponsorship loss sent ! 53 lines
TOPIC 329.0 575/FR-030 [60] LISAN/Object-Oriented Design Environment
329.2Thu Jul 28 1994 09:58 Project dead 9 lines
TOPIC 330.0 594/FR-032 [60] Thomson/Imaging Processing Subsystem for MPP
330.14Tue Apr 12 1994 16:36 order placement before end of FY94 5 lines
330.15Wed Apr 27 1994 18:09 Jean-Luc Blin is working on it ! 44 lines
330.16Wed May 04 1994 12:06 Questions on grant by Debbie 58 lines
330.17Wed May 04 1994 12:07 Igor maintains original conditions-valid until end FY94 45 lines
330.19Thu May 26 1994 16:22 Project declared dead 7 lines
330.25Fri Jul 01 1994 12:01 Sales+Igor coordinate process of invoicing DEIL 60 lines
330.26Mon Jul 04 1994 11:50 Jean-Luc is happy/planned meeting with LER in Q1/95 30 lines
330.27Tue Jul 05 1994 10:20 Sales and Deborah M. need copy of signed Agreement 42 lines
330.28Wed Jul 06 1994 15:05 Copy of Agreement in Karlsruhe, sent to @GEO as well! 12 lines
TOPIC 331.0 630/FR-033 [35] LIFL/Programming Environment for Supercomputers
331.4Fri May 27 1994 16:49 M.Dufresne leaves Digital 6 lines
331.5Mon May 30 1994 15:31 project finished ? 30 lines
331.6Mon Jul 10 1995 12:56 M.Annaratone has joined the Western Research Lab 50 lines
TOPIC 332.0 657/FR-034 [35] INRIA/Object-Oriented Parallel Processing Environment
332.1Mon Aug 08 1994 15:39 Patrick Baranes able to help wrt the status ? 33 lines
TOPIC 333.0 658/FR-035 [35] CRIHAN/Development of Advanced Numerical Tools for MPSS
333.5Wed Apr 06 1994 12:18 MD still active wrt contact CRIHAN - S.Akhtari 65 lines
333.6Tue May 31 1994 15:52 Claudia Fleury wrt sponsors of french projects 78 lines
333.7Tue May 31 1994 15:54 Igor's answer wrt to Claudia's questions 54 lines
333.8Thu Aug 04 1994 12:31 Project terminated/ Letter to be sent 8 lines
333.9Fri Aug 05 1994 15:48 Project terminated/notification has been sent ! 49 lines
TOPIC 334.0 696/FR-036 [75] LIRMM/Hardware Speed-up for Genetic Sequence Analysis
334.5Tue May 31 1994 15:57 Claudia Fleury wrt to sponsors of french projects 80 lines
334.6Tue May 31 1994 15:58 Igor'sreply wrt to Claudia's questions 53 lines
334.7Wed Jun 01 1994 16:00 project terminated/letter to be sent 7 lines
334.8Wed Aug 03 1994 12:59 Letter of notification sent 78 lines
TOPIC 335.0 625/FR-037 [35] IMAG/CHRUG-Neural Network Approach to Parallel Processing
335.5Mon Apr 18 1994 17:04 project finished ? 31 lines
335.6Mon Apr 18 1994 17:10 Marc follows up with Jim Novak again 15 lines
335.7Mon Aug 01 1994 17:39 Project terminated due to PRL closure 8 lines
335.8Tue Aug 09 1994 13:00 Letter of notification has been sent 53 lines
335.9Wed Oct 25 1995 14:51 Queries from France / Operations Mgr's answer 56 lines
TOPIC 336.0 717/FR-038 [50] D'Orsay/Multimedia Workbench
336.18Wed Apr 27 1994 17:58 status update fr. C.Fleury+comments from Igor 52 lines
TOPIC 337.0 740/GR-001A [100] TUATHENS/Improving the Performance and Functionality of Relational Database Systems
337.4Mon Aug 22 1994 15:05 Letter of sponsorship loss has been sent 56 lines
337.5Mon Aug 22 1994 15:07 Dennis Makris will follow up in Sep 94 39 lines
TOPIC 338.0 741/GY-060 [89] Erlangen/Application of Event Synchronization Technology in Cooperative Work Environments
338.6Fri May 20 1994 11:08 reminder 4th milestone/status update 27 lines
338.7Wed May 25 1994 15:32 Ms met/ report available 13 lines
338.8Tue Nov 15 1994 15:09 Project very successfully completed 25 lines
338.9Tue Nov 15 1994 15:16 final report (.ps version) hardcopy soon available! 5588 lines
338.10Mon Nov 28 1994 14:23 Hardcopy version of final report available in Karlsruhe 10 lines
TOPIC 340.0 734/IT-022 [75] LIUC/CIM Open Standard Framework
340.7Fri Oct 07 1994 15:39 Short status update: Prj entering 3rd year 24 lines
340.8Thu Oct 13 1994 09:37 Continuation:subject to satisfaction of the sponsor 443 lines
340.9Thu Oct 13 1994 09:57 Reminder MS 2 + will prj be continued ? 335 lines
340.10Fri Nov 04 1994 16:14 Project still ongoing ref to extr of EERP mr Oct 16 lines
340.11Fri Nov 11 1994 09:17 no extension of project / status report to follow 19 lines
340.12Tue Nov 22 1994 09:46 Further LIUC orders should be dealt with on an ad hoc manner 44 lines
340.13Tue Nov 22 1994 13:29 final review/sponsor satiesfied with results 228 lines
340.14Thu Nov 24 1994 14:14 more details appreciated / no further formal review needed 37 lines
340.15Wed Nov 30 1994 16:36 Deliverables of direct interest to Engineering Italy 42 lines
340.16Fri Dec 02 1994 14:19 Project summary from Massimo Actis-Dato 34 lines
340.17Thu Jan 12 1995 14:46 still activities although project completed 22 lines
TOPIC 341.0 729/SW-012 [75] Uppsala/Protein Crystallography Computational Environment
341.4Fri Oct 21 1994 13:12 Project finished? 37 lines
341.5Thu Mar 16 1995 09:38 Is J.Kreatsoulas interested in following-up ? 153 lines
TOPIC 342.0 641/BE-004A [100] IMEC/Improved Gate Oxidation and Cleaning Technology
342.4Wed Jul 27 1994 17:42 Project considered dead 10 lines
TOPIC 346.0 725/FR-017B [50] INRIA/Towards a 3D Medical Image Proces
346.16Wed Apr 27 1994 17:47 status update from C.Fleury and comments from Igor 69 lines
346.17Mon May 16 1994 11:05 Michel Gangnet new techn.sponsor due to Anwar leaving the company 54 lines
346.18Tue May 31 1994 15:47 Claudia Fleury wrt status of french projects 80 lines
346.19Tue May 31 1994 15:49 Igor's reply to Claudia's questions 58 lines
346.20Wed Aug 03 1994 12:45 Letter of notification sent 56 lines
346.21Thu Aug 04 1994 17:40 Renegotiation of contract/P.Baranes new sponsor! 411 lines
346.27Mon Nov 28 1994 10:45 Agreement sought from France for Researcher letter 113 lines
346.30Mon Dec 19 1994 12:02 Small reminder on status update 66 lines
346.31Tue Feb 07 1995 12:04 Sponsor leaves DEC / Riem Nguyen : new contact 121 lines
346.32Tue Feb 07 1995 12:10 Igor regrets Patrick's leaving.... 122 lines
346.33Fri Aug 25 1995 17:49 Ziem Nguyen able to provide update ? 92 lines
346.34Tue Oct 10 1995 16:52 P.Longuet will sent project reports 34 lines
346.35Tue Oct 10 1995 16:55 Igor's reply to Patrick Longuet 20 lines
346.36Wed Jan 03 1996 15:24 List of hardcopy reports ( available on request ) 39 lines
346.37Wed Jan 03 1996 15:26 ABSTRACT of "Medical computer vision ..." report 28 lines
346.38Tue Feb 06 1996 14:36 Prj completed ? Reports available ? 64 lines
346.39Mon Apr 29 1996 17:54 Reminder project end to researcher 100 lines
346.40Tue Apr 30 1996 11:51 Soon final comments of successful prj from researcher 25 lines
346.41Tue May 14 1996 19:07 Final update / Survey and report will follow 43 lines
346.42Fri Aug 02 1996 12:21 Following reports are available @KAR: 15 lines
346.43Fri Aug 02 1996 12:22 Thank you note to researcher 30 lines
TOPIC 347.0 731/PL-002 [100] Warsaw/Methods and Tools supporting Formal Documentation of Computer Systems
347.20Wed Mar 30 1994 11:00 Jim H. wrt to confusion about project schedule 208 lines
347.25Tue Apr 26 1994 08:43 rep.received in Karlsruhe,letter to Dr.Madey 28 lines
347.28Tue Jun 14 1994 12:34 Prof.Madey asking for help spending travel grant 245 lines
347.29Tue Jun 14 1994 18:30 Debbie's reply 74 lines
347.30Tue Jun 14 1994 19:03 Igor's agreement with Prof.Madey 37 lines
347.31Thu Jun 16 1994 10:55 Sponsor happy with arrangement 26 lines
347.32Thu Jun 16 1994 10:59 Letter Dr.Madey to Z.Borowiec 62 lines
347.33Thu Jun 16 1994 11:02 transactions which need to be done asap ! 24 lines
347.34Thu Jun 16 1994 11:04 Jan Madey wrt transactions 29 lines
347.35Thu Jun 16 1994 11:08 Lindsay's authorization to Zbigniew Borrowiec 78 lines
347.36Thu Jun 16 1994 11:15 Finance @ RPW is not very supportive ! 76 lines
347.37Thu Jun 16 1994 11:25 Kirsten to follow up with Finance @ RPW 44 lines
347.38Thu Jun 16 1994 11:27 Any extras ok with Lindsay if still ok with Igor 101 lines
347.39Mon Jun 20 1994 14:38 J.Madey clarifying VAT issue to E.Skayne (Finance @ RPW) 78 lines
347.40Mon Jun 20 1994 14:46 (Tired) Jan asking Igor for advice 33 lines
347.41Mon Jun 20 1994 14:48 Igor's answer 48 lines
347.45Fri Jun 24 1994 15:22 Two issues need to be separated/Lindsay+Gene to work on it 99 lines
347.48Thu Jun 30 1994 09:38 No reaction from Gene Skayne/Lindsay to follow-up 33 lines
347.49Thu Jul 07 1994 15:29 Finance received invoices from Poland ! 16 lines
347.50Fri Aug 05 1994 10:15 Hard copy reports in Polish available in Karlsruhe 19 lines
347.51Fri Aug 05 1994 10:38 2nd milestone already fulfilled ? 34 lines
347.52Tue Aug 09 1994 15:53 MS no.2 met / trip report to follow 24 lines
347.53Wed Aug 10 1994 09:58 Trip report of workshop Hull/Hamilton 2.-5.Aug 94 204 lines
347.54Fri Aug 12 1994 10:56 Remarks of Jim H. wrt trip report 23 lines
347.55Tue Jan 31 1995 16:43 Update:ms met,useful cooperation inspite of painful exp. 188 lines
347.56Wed Feb 01 1995 09:51 Igor's answer referring to J.Madey's comments 45 lines
347.57Thu Feb 02 1995 16:46 Jan's reply and update on MS for 1995 88 lines
347.58Thu Feb 02 1995 16:48 Igor very interested in results 22 lines
347.59Fri Mar 31 1995 18:50 EERP cannot pay for sponsor's travel to workshop in Poland 88 lines
347.60Mon Apr 10 1995 17:32 Mail from the sponsor 66 lines
347.61Wed Apr 12 1995 15:41 Jean Bonney's response 52 lines
347.62Wed Apr 12 1995 15:43 Sponsor re-read his first message .... 121 lines
347.63Thu May 18 1995 16:46 Reminder MS 3 43 lines
347.64Fri May 19 1995 11:27 Status update/new and previous reports to come 161 lines
347.65Fri May 19 1995 11:29 Sponsor will attend mtgs and then send trip reports 16 lines
347.66Wed May 31 1995 12:41 Correct mail address to ensure postal delivery 38 lines
347.67Mon Jun 26 1995 11:24 Reports from Dec 94 now available in hardcopy 15 lines
347.68Mon Jun 26 1995 11:53 Thank you note to Jan Madey 32 lines
347.69Fri Jul 07 1995 18:03 Workshop MS fulfilled / extract of J.Horning's trip report 352 lines
347.70Fri Jul 07 1995 18:08 issues on technology transfer 51 lines
347.71Mon Jul 10 1995 15:54 1994 hardcopy reports available on request @ KAR 70 lines
347.72Wed Jan 31 1996 12:12 Reminder project end to researcher 62 lines
347.73Wed Jan 31 1996 13:08 Final report will be ready soon 68 lines
347.74Wed Jan 31 1996 13:32 Thank you note from Igor 13 lines
347.75Thu Mar 14 1996 18:37 Jim Horning went to SGI 28 lines
347.76Wed Apr 24 1996 16:54 *Note: no further investigation reg project results 10 lines
TOPIC 348.0 733/CH-025 [65] Neuchatel/An Electronic Medical Record Generator, a Crucial & Necessary Tool in the Development of Clinical Information Systems
348.8Wed Jun 01 1994 14:57 project terminated/letter to be sent 42 lines
348.9Thu Jul 28 1994 13:24 Notification of sponsorship loss / Prj dead 291 lines
TOPIC 349.0 735/AU-029 [100] Vienna/Device and Process Numerical Simulation Software
349.4Mon Jun 27 1994 16:08 Still no update/Martin wrong person to ask? 73 lines
349.5Mon Jul 04 1994 11:58 Martin will follow up mid of July '94 23 lines
349.6Wed Mar 15 1995 13:58 Another reminder for project end / final report ... 65 lines
349.7Thu Mar 16 1995 11:30 Final report must have got lost in the post.... 49 lines
349.8Tue Mar 28 1995 17:32 Final report with personal comments see IV/prj completed 166 lines
TOPIC 350.0 709/SW-015 [75] Uppsala/OPENLabs
350.13Wed Jun 01 1994 14:49 project dead/letter to be sent 42 lines
350.14Thu Apr 27 1995 10:04 Notification of sponsorship loss been sent 182 lines
TOPIC 351.0 730/CH-024 [75] CERN/Testing Neural Net Algorithms on the DECmpp and the DECperle for Second Level Trigger of LHC Experiments
351.1Mon Apr 18 1994 16:33 project finished ? 34 lines
351.2Tue Apr 19 1994 13:14 request to Henri Gouraud by J.Barraquand 19 lines
351.4Wed Sep 28 1994 09:43 Dominique Gillot new sponsor ? 26 lines
351.5Wed Oct 05 1994 13:01 D.Gillot to give details to J.Bonney wrt DECperle.... 53 lines
351.6Wed Oct 05 1994 13:02 Need status update from D.Gillot 39 lines
351.7Tue Oct 11 1994 16:26 DECperle boards and obligations to CERN 27 lines
351.8Wed May 03 1995 18:05 2nd reminder for project end 78 lines
351.9Fri Jul 07 1995 17:02 3rd reminder for status update 28 lines
351.10Thu Jul 13 1995 16:44 in 08/95 A.Guglielmi should be able give status update 37 lines
351.11Fri Nov 10 1995 18:25 Any news wrt status ? / Has mtg taken place? 83 lines
351.12Fri Nov 10 1995 18:29 Prj completed / big lack of communication 37 lines
351.13Fri Nov 17 1995 18:36 SUMMARY of status report 08/95 75 lines
351.14Fri Nov 17 1995 18:53 Following reports/publications through Joint Project-CERN: 29 lines
TOPIC 352.0 728/GY-062 [90] Fraunhofer/Development and Integration of Information and Communication Components in Assembly and Logistics Systems
352.5Thu Mar 17 1994 17:00 Reminder of 2nd milestone 28 lines
352.6Fri Mar 18 1994 12:59 milestones met/ project on time 19 lines
352.7Fri Jan 27 1995 15:42 Project successfully finished ? 46 lines
TOPIC 353.0 727/SW-014 [70] Astrophysics Research/Digital Camera System for Fast Image Acquisition
353.13Tue Oct 11 1994 16:14 request to Sam Fuller wrt support with DEC PRL Technology 97 lines
353.14Mon Oct 17 1994 13:00 Details requested by Eliane Markoff(Corporate Research) 36 lines
353.15Mon Oct 17 1994 13:05 Eliane and Peter will talk about a possible solution 147 lines
353.16Thu Oct 20 1994 14:45 Proposed letter to Prof G.Scharmer by Peter Szmulik 87 lines
353.17Thu Oct 20 1994 14:47 Sam Fuller wants to help but needs more information 21 lines
353.21Tue Mar 14 1995 15:53 Any news wrt status and project end ? 42 lines
353.22Thu Sep 07 1995 15:11 Another request for important information 78 lines
353.23Wed Mar 13 1996 14:27 Update as help to track down booking problem 38 lines
353.24Wed Mar 13 1996 14:29 M.Shand interested in extension ? 60 lines
353.25Wed Mar 13 1996 14:34 M.Shand more than happy to extend contract 26 lines
353.26Wed Mar 13 1996 14:54 Request of content, deliverables + configuration 16 lines
353.27Thu Mar 14 1996 10:12 Reminder prj update to Mark Shand 50 lines
353.28Wed May 08 1996 16:44 Project completed/ below see URL for add.information 156 lines
353.29Thu May 09 1996 15:30 Conference paper:"A 3.8ms latency correlation tracker ..." 58 lines
353.30Thu May 09 1996 20:00 Conference paper:Flexible Image Acquisition using... 64 lines
353.31Tue May 14 1996 18:46 Hardcopies arrived /Thank you note to techn.sponsor 36 lines
353.32Wed Jul 03 1996 14:05 New ETGP style project ? Formal proposal requested 50 lines
TOPIC 355.0 749/AU-031 [80] Joanneum/Review of DDIF Extensions for 3D and Multimedia in Conjunction with the Development of Pilot Application
355.7Mon May 09 1994 10:16 CDA is beeing outsourced ! 74 lines
355.8Fri May 27 1994 14:18 reminder 4th milestone/status update 31 lines
355.9Fri Oct 21 1994 16:44 Interim report/ Ms met 199 lines
355.10Thu Nov 24 1994 15:37 project completed ? 34 lines
355.11Fri Sep 01 1995 16:48 10/95 new completion date of project 26 lines
355.12Tue Jan 23 1996 15:28 Finalization is once more delayed : 02/96 42 lines
TOPIC 357.0 758/FR-042 [100] OSF/1 Miccrokernel on DEC Alpha AXP
357.2Tue Aug 09 1994 18:29 Project ever been alive ? 43 lines
357.3Wed Aug 31 1994 10:07 Completed:in Aug 93 project results communicated 50 lines
TOPIC 358.0 695/FR-039 [75] INRIA/Implemenation of the GAMMA - Language on PAM (DECperle)
358.6Wed Apr 27 1994 18:01 status update by C.Fleury+comments from Igor 60 lines
358.7Tue May 31 1994 16:00 Claudia F.wrt to sponsors of french projects 78 lines
358.8Tue May 31 1994 16:09 Igor's reply wrt Claudia's questions 54 lines
358.9Mon Aug 01 1994 17:50 Letter of sponsorship loss sent 54 lines
TOPIC 359.0 762/AU-032 [50] Salzurg/Wavelet Transform of Rough Surfaces
359.2Mon Jul 25 1994 16:29 Project going to be finished ? 29 lines
359.3Mon Aug 08 1994 12:51 Approx.8 months delay time of project 35 lines
359.4Thu Oct 13 1994 10:47 Reminder MS 3 35 lines
359.5Thu Apr 06 1995 13:53 Reminder PROJECT END 45 lines
359.6Fri Aug 04 1995 13:55 09/95 hopefully update 24 lines
359.7Tue Sep 12 1995 17:52 Final report by NOV 95 / delay due to research problems 22 lines
359.8Tue Feb 06 1996 15:19 Reminder project end 95 lines
359.9Tue Feb 13 1996 17:21 Sponsor to look for final report/successful project 34 lines
359.10Thu Jun 13 1996 14:43 2nd reminder for final report 56 lines
359.11Thu Jun 13 1996 15:59 J.Nittmann will send final report to @KAR 42 lines
359.12Mon Jun 17 1996 14:12 Hardcopy of final report available/Email of res. requ. 42 lines
359.13Tue Jun 18 1996 11:59 e-mail address of researcher 16 lines
359.14Tue Jun 18 1996 12:01 Online request for report to researcher 36 lines
359.15Thu Jun 27 1996 11:39 Pointer to URL for abstract and to ftp for ps file 59 lines
359.16Thu Jun 27 1996 11:56 INTRODUCTION of final report 31 lines
TOPIC 360.0 754/GY-063 [75] Munich/2D & 3D Discretization of Nonplanar Structures in Device Simulation
360.9Fri Jun 17 1994 12:38 Hardcopy report available at the CEC Vienna 14 lines
360.10Mon Jun 20 1994 15:48 Gerd to send hardcopy of report to Karlsruhe 14 lines
360.11Fri Jul 08 1994 12:20 Report also available in Karlsruhe! 7 lines
360.13Fri Jan 27 1995 16:48 Project completed or still delayed ? 37 lines
360.14Wed Feb 01 1995 17:11 Planned project end: June 95 24 lines
360.17Wed May 31 1995 12:04 January 96 : proposed project end 84 lines
360.18Fri Dec 08 1995 09:57 Prj closed due to closure of CEC Vienna 26 lines
360.19Fri Dec 08 1995 09:59 Postscript file of final report 541 lines
360.20Fri Dec 08 1995 10:19 project report (.ps) 7277 lines
TOPIC 361.0 765/SU-004 [100] Cyclomena/Data Compression
361.4Mon Apr 18 1994 16:20 project finished ? 30 lines
TOPIC 362.0 755/SW-016 [75] Chalmers/A Road Transport Informatics (RTI) Monitoring Central
362.5Tue Jul 12 1994 16:28 reminder of 2nd milestone 35 lines
362.6Fri Jan 27 1995 17:07 Project finished or delayed ? 53 lines
362.7Wed Feb 08 1995 12:49 Prj perhaps 3 months delayed/P.Szmulik will check... 24 lines
362.8Thu Sep 07 1995 15:58 Email address of PI available ? 47 lines
362.9Wed Apr 24 1996 17:15 *Note:no further investigation of project results 11 lines
TOPIC 363.0 547.6/FR-018A [75] Broussais/HELIOS-2
363.4Wed Jun 01 1994 14:46 project terminated/letter to be sent 42 lines
363.5Mon Aug 01 1994 17:10 Letter of sponsorship loss sent 60 lines
TOPIC 364.0 547/FR-040 [75] Cap Gemini/HELIOS-2
364.4Wed Jun 01 1994 14:38 project terminated/letter to be sent 42 lines
364.5Wed Aug 03 1994 13:23 Letter of notification been sent 227 lines
364.6Fri Aug 26 1994 09:32 Albert Mallet not in Edu/Res anymore/ C.Petithory new contact 34 lines
TOPIC 365.0 547.1/GY-038A [75] Heidelberg/HELIOS-2
365.4Mon Jul 18 1994 17:25 Ben Frommherz new local contact 26 lines
365.5Wed Aug 24 1994 09:49 no legacy project/ no exception wrt VAT ref LAW 20 lines
365.6Thu Sep 01 1994 16:55 Perhaps an exception possible ?Diana to contact Igor 52 lines
365.7Tue Sep 27 1994 12:37 VAT issue for EERP resolved:now DKFZ to pay VAT? 68 lines
365.8Fri Jan 27 1995 17:29 Project successfully finished ? 35 lines
365.9Mon Jan 30 1995 10:44 project finished : more details to come 35 lines
365.10Wed Feb 08 1995 12:53 MS met / final report to come 48 lines
365.11Fri Mar 31 1995 16:28 Hardcopy of final report available @ KAR 20 lines
TOPIC 366.0 547.3/SW-011 [75] Uppsala/HELIOS-2
366.5Wed Jun 01 1994 14:34 project dead/letter to be sent 42 lines
366.7Thu Apr 27 1995 09:43 Notification of sponsorship loss been sent 50 lines
TOPIC 367.0 547.4/SW-006A [75] Linkoping/HELIOS-2
367.4Wed Jun 01 1994 14:29 project dead/letter to be sent 42 lines
367.5Thu Apr 27 1995 09:25 Notification of sponsorship loss been sent 218 lines
TOPIC 368.0 745/PL-003 [75] Cracow/Document Paradigm as Information Interchange Tool in Construction Process
368.8Mon May 09 1994 10:14 21.04.94:CDA is beeing outsourced! 74 lines
368.10Thu Jul 14 1994 16:15 Status update May 94(ps.file) 6603 lines
368.11Thu Jul 14 1994 16:51 Currently planned project end needed ! 33 lines
368.12Mon Feb 20 1995 15:25 Project finally completed 17 lines
368.13Mon Feb 20 1995 15:26 Final report in electronic form requested 17 lines
368.14Mon Feb 20 1995 15:27 Actual project end ? 18 lines
368.15Wed Feb 22 1995 11:55 Final report (hardcopy) and floppy disk available in @KAR 19 lines
TOPIC 369.0 752.1/ES-001 [75] BALTMET, Estonia
369.6Wed May 25 1994 17:24 reminder 3rd milestone/ status update 171 lines
369.7Wed Jun 08 1994 12:05 project on track 25 lines
369.8Wed Jun 08 1994 12:15 Prj successfully completed,final report due 24 lines
369.9Fri Jun 10 1994 12:14 DEIL invoices missing/decision on extended EERP grant? 69 lines
369.10Fri Sep 02 1994 15:25 status ? 51 lines
369.12Tue Mar 21 1995 14:39 Project finished ? 57 lines
369.13Thu Sep 07 1995 15:04 Another request for information... 80 lines
TOPIC 370.0 752.2/LI-001 [75] BALTMET, Lithuania
370.6Wed May 25 1994 17:45 reminder of 3rd milestone 171 lines
370.7Wed Jun 08 1994 12:07 project is on track ! 24 lines
370.8Wed Jun 08 1994 12:16 Prj successfully completed,final report due 24 lines
370.9Fri Jun 10 1994 12:24 DEIL invoices missing/decision on extended EERP grant ? 68 lines
370.10Fri Sep 02 1994 15:25 status ? 51 lines
370.12Tue Mar 21 1995 11:19 Project completed ? 202 lines
370.13Thu Sep 07 1995 15:09 Another request for important information 77 lines
TOPIC 371.0 774.1/UK-053 [75] Cambridge/Hippocrene, Operating System
371.1Fri May 27 1994 15:02 reminder of 1st milestone 27 lines
371.2Thu Jun 09 1994 09:07 detailed report to come ! 16 lines
371.5Tue Aug 01 1995 15:34 (.ps) update: MS 1 met 283 lines
371.6Tue Aug 01 1995 15:40 .ps rep.:Operating-System Supp.for Distrib.Multimedia 5057 lines
371.7Tue Aug 01 1995 17:36 Reminder MS 2 68 lines
371.8Thu Aug 03 1995 15:56 D.Redell will follow-up asap 24 lines
371.9Mon Oct 09 1995 11:52 Progress on review/ report to follow soon 20 lines
TOPIC 372.0 789/AU-034 [100] Vienna/Device & Process Numerical Simulation Software
372.2Thu Apr 14 1994 15:54 status ? 28 lines
372.6Fri Oct 21 1994 13:51 project finished ? 39 lines
372.7Wed Apr 24 1996 17:28 *Note:no further investigation reg project results 10 lines
TOPIC 373.0 776/BE-009 [75] VKI/PVM/HeNCE on Alpha Farms
373.5Mon Apr 18 1994 17:39 project finished now ? 92 lines
373.6Fri Apr 28 1995 12:56 2nd reminder for project end 124 lines
373.7Tue May 09 1995 17:11 Comments of Lucas DeLamper who is not in edu&research anymore... 72 lines
373.8Tue May 09 1995 17:13 Thank you note to Lucas 36 lines
373.9Wed Jun 07 1995 18:49 Did M.Vanderstraeten collect final report ? 35 lines
373.10Mon Mar 18 1996 11:35 *5th* request for final report 262 lines
373.11Fri Mar 29 1996 17:40 If new sales deal Michael is willing to try to ... 55 lines
TOPIC 374.0 775/GY-066 [80] Karlsruhe/DCE++ - A Distributed Object-Oriented Framework on top of DCE
374.4Tue Apr 19 1994 16:31 successfully completed/report attached 1621 lines
TOPIC 375.0 782/UK-054 [67] Olivetti/Active Badge and Pandora
375.2Wed Jun 01 1994 15:35 Project dead/letter to be sent 9 lines
375.3Thu Aug 04 1994 12:22 Letter of notification been sent 255 lines
375.4Mon Dec 12 1994 15:37 Trip report from Bill Laing 203 lines
375.5Mon Dec 19 1994 09:58 Request for equipment/ see also EERP_LEADS 93.* 188 lines
TOPIC 376.0 774.2/HL-015 [75] Twente/Hippocrene, Operating System Support
376.2Thu Jul 28 1994 09:35 Reminder of MS 1 59 lines
376.3Fri Jul 29 1994 15:37 Dave Redell will follow up ! 22 lines
376.5Mon Jan 16 1995 17:20 progress update(.ps): MS met 276 lines
376.6Mon Jan 16 1995 17:49 .ps rep.:Operating-System Supp.for Distrib.Multimedia 5055 lines
376.7Tue Aug 01 1995 17:33 Reminder MS 2 68 lines
376.8Thu Aug 03 1995 15:51 D.Redell will follow-up asap 24 lines
376.9Mon Oct 09 1995 11:53 Progress on review/ report to follow soon 19 lines
TOPIC 377.0 752.3/LA-001 [75] BALTMET, Latvia
377.4Fri May 27 1994 15:14 reminder of 4th milestone 25 lines
377.5Wed Jun 08 1994 12:07 project is on track 23 lines
377.6Wed Jun 08 1994 12:15 Prj successfully completed,final report due 24 lines
377.7Fri Jun 10 1994 12:22 DEIL invoices missing/decision on extended EERP grant ? 68 lines
377.8Fri Sep 02 1994 15:24 status? 51 lines
377.10Tue Mar 21 1995 11:04 Project finished ? 57 lines
377.11Thu Sep 07 1995 15:07 Another request for information 77 lines
TOPIC 378.0 783/FR-044 [75] ENSL/Computer Arithmetic Algorithms on a DECperle-1 Board
378.3Tue May 31 1994 16:26 Claudia F.wrt sponsors of french projects 77 lines
378.4Tue May 31 1994 16:27 Igor's reply wrt Claudia's questions 56 lines
378.5Wed Jun 01 1994 15:26 Project dead/letter to be sent 8 lines
378.6Wed Aug 03 1994 13:35 Letter of notification been sent 345 lines
TOPIC 379.0 753/FR-041 [50] LILLE-LIFL/Partner project (extension to FR-033)
379.26Mon Mar 21 1994 09:06 letter D.Lazure to Dr.Annaratone 56 lines
379.27Mon Mar 21 1994 09:42 answer beforehand Dr.Annaratone to Lazure 112 lines
379.35Wed Apr 27 1994 18:07 status update by C.Fleury+comments from Igor 74 lines
379.36Fri May 06 1994 17:00 D.Lazure worried about his travel to Boston 30 lines
379.37Fri May 06 1994 17:04 J.L.Dekeyser waiting for an happy end 20 lines
379.41Tue May 10 1994 16:44 Marco's decision on new student who just started the PH.D.track 34 lines
379.42Tue May 17 1994 10:59 Marco wrt to visa and working-permit answer to jean luc 59 lines
379.43Tue May 24 1994 09:50 Student Boris K.wrt to visa requirements 34 lines
379.49Fri May 27 1994 16:57 M.Dufresne leaves Digital 6 lines
379.50Fri May 27 1994 17:01 information concerning student internship 345 lines
379.51Fri May 27 1994 17:38 Boris needs help with ticket ! 26 lines
379.52Fri May 27 1994 17:55 M.Annaratone will take on sponsorship 10 lines
379.58Tue May 31 1994 16:05 Claudia F.wrt sponsors of french projects 78 lines
379.59Tue May 31 1994 16:07 Igor's reply to Claudia's Questions 59 lines
379.60Tue Jun 07 1994 17:52 Igor wrt problems on Marco's side 124 lines
379.61Tue Jun 07 1994 18:14 hosting opportunity is gone ! 24 lines
379.62Wed Jun 08 1994 15:34 Thierry to inform Boris about the change of plans 25 lines
379.63Tue Jun 14 1994 11:52 Jean Pierre to give advice! 55 lines
379.64Tue Jun 14 1994 11:57 finance contact for interco billings in France 95 lines
379.65Tue Jun 14 1994 12:10 title of incremental work package 34 lines
379.66Thu Jun 16 1994 11:46 Payment arrangements 265 lines
379.68Tue Jul 12 1994 18:41 reminder of 2nd milestone 30 lines
379.69Fri Jan 27 1995 15:22 reminder of 3rd milestone 59 lines
379.70Mon Jul 10 1995 12:55 Marco Annarat.has joined the Western Research Lab 50 lines
379.71Tue Jul 25 1995 18:45 Sponsor hasn't recently been in contact with Dekeyser 70 lines
379.72Wed Jan 31 1996 15:58 Reminder project end to researcher 56 lines
379.73Wed Apr 24 1996 16:48 *Note:no further investigation of results 10 lines
TOPIC 380.0 547.2/CH-019A [75] Geneva/HELIOS-2
380.4Wed Jun 01 1994 12:46 project terminated/letter to be sent 42 lines
380.5Thu Jul 28 1994 12:34 notification of sponsorship loss 54 lines
TOPIC 381.0 779/GY-069 [60] GWDG/Client-Server Large Scale SI
381.13Tue Apr 26 1994 09:27 Status update from Peter Heine 94 lines
381.14Fri May 06 1994 16:52 Hardcopy "management summary" available 8 lines
381.15Fri Jun 24 1994 15:26 Meeting DECathena-engineering - GWDG 102 lines
381.16Mon Jul 04 1994 14:58 short report of meeting 21-6-94 from G.Dotterweich 36 lines
381.19Fri Oct 07 1994 16:06 Prof.Wall needs to talk to managemnet to solve problems 70 lines
381.20Thu Oct 20 1994 14:32 Info from W.Glietsch that ordering period expired 38 lines
381.21Mon Jan 23 1995 10:20 Reminder MS1 + MS2 38 lines
381.22Thu Jan 26 1995 14:10 33 lines
381.23Thu Jan 26 1995 14:16 report expected in March 44 lines
381.24Wed Feb 01 1995 14:14 Some confusion around actual ms schedule 24 lines
381.25Wed Feb 01 1995 15:04 Project delayed by 16 months / Peter clarified confusion 34 lines
381.26Wed Apr 19 1995 16:28 Reminder MS 1 36 lines
381.27Wed Apr 26 1995 19:15 Still troubles with raid-performance and DECsafe ! 980 lines
381.28Tue Jul 11 1995 16:12 Status report 152 lines
381.29Tue Oct 24 1995 16:20 Availability problem in UNIX-downsizing prj;ref to L.Jones 298 lines
381.30Tue Oct 24 1995 16:26 Lynda Jones is trying to assist wrt problems 420 lines
381.31Wed Jan 31 1996 09:48 07/95: issue on GWDG reference 119 lines
TOPIC 382.0 771/AU-033 [75] TUV/SW Tool Kit for Multi-Method Imaging Material Analysis
382.3Wed Jul 13 1994 12:14 Reminder of MS 2,3 and 4 48 lines
382.4Wed Aug 31 1994 16:53 Status update of project 78 lines
382.6Wed Oct 26 1994 16:10 Project successfully finished ? 38 lines
382.7Thu Jan 26 1995 13:34 postponed MS due to problems at researcher's end 58 lines
382.8Mon Mar 13 1995 16:04 Project is constantly progressing wrt timeframe 60 lines
382.9Tue Mar 14 1995 12:28 When available reports will follow 29 lines
382.10Fri Jun 09 1995 15:22 Reminder MS 3 36 lines
382.11Tue Jul 11 1995 14:02 MS 3 met 55 lines
382.12Wed Jan 31 1996 14:55 Reminder project end 110 lines
TOPIC 383.0 781.1/GY-068 [75] THD/BIG (Berkom II, Items, Gigaswitch)
383.5Fri Apr 15 1994 11:32 Reminder of milestone 1 25 lines
383.6Wed Apr 27 1994 11:39 Sponsor interested in BERKOM II as well 148 lines
383.7Mon Jun 20 1994 16:06 Seibersdorf applies as BERKOM pilot user 71 lines
383.8Fri Oct 21 1994 12:33 Reminder MS 2 / status update 40 lines
383.9Mon Jan 30 1995 13:22 Reminder project end 80 lines
383.10Fri Feb 10 1995 10:14 Researcher's promise not to miss our ofiice wrt reports... 27 lines
383.11Fri Feb 10 1995 10:23 milestone report M1 (German) / ms met 114 lines
383.12Fri Feb 10 1995 10:33 (German)report MS2 :User Agent--User Interface 182 lines
383.13Fri Feb 10 1995 10:38 (.ps) rep.:Changes to Mailworks to implement hypertext 1605 lines
383.14Tue Feb 28 1995 10:36 (German):final report/ project successfully completed 102 lines
TOPIC 384.0 793/UK-057 [55] RAL/Alpha AXP Farms - Collaboration for Robust Production Environment
384.4Tue Aug 09 1994 12:19 Project terminated or completed ? 24 lines
384.5Fri Aug 26 1994 16:34 John requested final report from researchers! 279 lines
384.6Fri Apr 28 1995 13:26 2nd reminder for final report 35 lines
384.7Fri Apr 28 1995 17:28 P.Chambers requested report 23 lines
384.8Wed May 03 1995 15:31 Request for researcher's address 23 lines
384.9Fri Jul 07 1995 12:18 Final report requested from researcher directly 50 lines
384.10Tue Jul 11 1995 10:35 J.Kreatsoulas now mgr of HPC expertese ctr, Maynard 41 lines
384.11Fri Jul 14 1995 11:27 Is John still going to monitor prj although new role ? 109 lines
384.12Mon Sep 04 1995 17:40 John K. refers to Techn.Comp.Group@ILO or stand-in 35 lines
384.13Tue Nov 07 1995 18:24 EERP Country Coordinator able to follow up ? 109 lines
384.14Fri Dec 08 1995 09:20 12/95 possible date for final report 59 lines
384.15Wed Apr 24 1996 17:24 Note for future proposals 6 lines
384.16Wed Apr 24 1996 17:26 *Note: no further investigation reg project results 10 lines
TOPIC 386.0 791.10/UK-055 [60] Cambridge/ODP Test and CollaboratioN
386.3Thu Jul 14 1994 15:50 Project finished as Barry never answered ? 28 lines
386.4Mon Aug 08 1994 10:10 Project not been completed yet! 21 lines
386.5Mon Aug 08 1994 13:17 Still need detailed status update ! 20 lines
386.7Wed May 03 1995 18:21 Another reminder for status update/project end.... 68 lines
386.8Thu Jul 13 1995 16:21 3rd request for final report ! 38 lines
386.9Thu Jul 13 1995 16:22 Since 01/94 B.Rubinson not monitoring project 8 lines
386.10Thu Jul 13 1995 16:24 Doug Jensen will follow up immediately ! 12 lines
386.11Mon Aug 14 1995 20:09 Doug will follow-up again as 1st attempt failed 46 lines
386.12Wed Sep 13 1995 15:03 Hopefully update in 10/95 ; researcher didn't reply yet 13 lines
386.13Mon Oct 09 1995 11:27 Prj finished / report to follow 40 lines
386.14Fri Nov 10 1995 18:20 Final report hasn't been received by sponsor yet 25 lines
386.15Wed Apr 24 1996 17:20 *Note:no further investigation of project results 10 lines
TOPIC 387.0 737/AU-030 [75] Graz/Picture Archiving & Documentation System Decision Support
387.4Mon Apr 18 1994 14:57 Status update from Anwar requested 312 lines
387.5Thu May 19 1994 09:30 Johann N.will follow up ! 22 lines
387.6Thu Jun 09 1994 09:44 status update : project on time! 55 lines
387.8Mon Jan 23 1995 10:46 Reminder MS 3 33 lines
387.9Wed Aug 16 1995 16:23 Reminder MS 4 36 lines
387.10Mon Feb 05 1996 14:57 Reminder MS 5 43 lines
387.11Wed Feb 21 1996 17:24 E.Poetz requested update from Prof.Gell 22 lines
387.12Mon Apr 22 1996 16:39 E.Poetz now to forward information he received 58 lines
387.13Thu Apr 25 1996 09:50 *Note: no further project follow-up by ETG 10 lines
TOPIC 388.0 792/AU-036 [50] Vienna/Multifractal Analysis of Cleanroom Data
388.1Thu Apr 21 1994 13:32 proejct finished ? 30 lines
388.2Wed Apr 27 1994 10:51 Johann to send final reports 14 lines
388.3Fri Jan 20 1995 17:08 Prj successfully finished:final report of technical contact 94 lines
388.4Fri Jan 27 1995 13:15 Reports now available in Karlsruhe 19 lines
388.5Tue May 16 1995 09:53 Research has turned into a production-worthy tool 34 lines
TOPIC 389.0 769/CH-026 [75] CERN/GIGAswitch-networked Alpha AXP WSs with PVM and HPF
389.6Fri Nov 04 1994 13:56 Project successfully finished ? 34 lines
389.7Wed Nov 09 1994 17:02 Prj not finished yet / final report to follow 66 lines
389.8Wed Mar 22 1995 16:13 Any news wrt final report ? 79 lines
389.9Wed Mar 29 1995 09:06 Expectation of final report:late April 95 36 lines
389.10Wed Jun 14 1995 12:23 Another request for final report 79 lines
389.11Wed Jun 28 1995 13:38 Final report expected 07/95 32 lines
389.12Wed Jun 28 1995 16:48 Update: testing session went very well 40 lines
389.13Mon Jul 10 1995 12:57 M.Annaratone has joined the Western Research Lab 50 lines
389.14Fri Oct 06 1995 10:50 Pointer to WWW / project completed 43 lines
389.15Fri Oct 06 1995 10:52 (.ps):Paper for CHEP conference in Rio 2768 lines
389.16Fri Oct 06 1995 11:44 (.ps): Final report 4219 lines
389.17Tue Oct 31 1995 15:21 INTRODUCTION of final report (hardcopy available on request) 76 lines
TOPIC 390.0 777/SU-006 [100] AcadofScience/Signal Integrity Investigations
390.1Wed Apr 27 1994 11:55 status of the project ? 219 lines
390.2Wed Jun 22 1994 14:50 Still waiting for a reply ! 44 lines
390.3Wed Jun 22 1994 14:53 Project delayed til Dec'94/already good results! 22 lines
390.4Mon Jan 30 1995 14:37 Current status and planed project end ? 32 lines
390.5Wed Mar 22 1995 10:24 Prj essentially completed/delivery of software codes 18 lines
390.6Wed Mar 22 1995 10:26 Project considered successfully completed 132 lines
TOPIC 391.0 780/AU-035 [50] Klagenfurt/Parallel Persistent Object STore (called PPOST)
391.1Fri Apr 15 1994 12:22 reminder of 1st milestone 26 lines
391.2Thu Jun 09 1994 09:55 prj ahead of time!/Prof.disappointed by alpha.... 74 lines
391.3Thu Jun 09 1994 16:58 Johann Nittmann to be set CC on reminder mails 37 lines
391.4Fri Sep 02 1994 14:56 reminder of 5th deliverable 38 lines
391.6Thu Mar 23 1995 16:17 Reminder for UPDATE 66 lines
391.7Thu May 04 1995 18:58 3rd request for status update 95 lines
391.8Tue May 09 1995 15:18 Sponsor's reaction and Kirsten's explanation 124 lines
391.9Thu Aug 10 1995 18:05 07/95: Another reminder for project update... 27 lines
391.10Wed Jan 31 1996 15:12 reminder project end 59 lines
TOPIC 392.0 790/IT-023 [50] Torino/Environment to develop Process Models based on ECMA PCTE
392.8Fri May 27 1994 16:39 reminder of 2nd milestone 31 lines
392.9Thu Jun 16 1994 15:52 Status update wrt delay in this part of the project 48 lines
392.10Thu Jun 16 1994 15:55 reports requested /delay okay 41 lines
392.11Mon Jun 20 1994 14:55 List of reports as ps.files/hardcopy in Karlsruhe available 26 lines
392.12Wed Jun 22 1994 10:56 ps.file report:An Initial Exp.w.Object Oriented Software process modeling 11174 lines
392.13Wed Jun 22 1994 11:20 Report(ps.file):Software Process Model Specification 10556 lines
392.14Wed Jun 22 1994 11:47 Report(ps.file)"Software Process Editor Design" 4797 lines
392.15Wed Jun 22 1994 12:09 Report(ps.file):"A Distributed Object Based System for Process Model Enaction" 3631 lines
392.16Fri Oct 07 1994 15:45 short update (extract from EERP quarterly) 17 lines
392.17Wed Feb 22 1995 16:16 reminder of MS 4 35 lines
392.18Mon Mar 13 1995 15:51 Reduction of milestones due to delivery problems requested 36 lines
392.19Mon Mar 13 1995 15:56 EERP supports reduction of milestones/any further delay ? 85 lines
392.20Wed Apr 19 1995 12:51 Pointer to WWW / no change of timeframe but in deliverables 31 lines
392.21Thu Jul 20 1995 11:33 Reminder Project end 42 lines
392.22Tue Sep 12 1995 17:42 Bad news:sponsor's group disbanded/no use for results 41 lines
392.23Wed Oct 11 1995 08:33 In spite of facts:prj completed/reports to come 85 lines
392.24Wed Nov 15 1995 18:49 Pointer to www page 23 lines
392.25Wed Nov 15 1995 18:50 EXTRACT of web page:E3 project overview 53 lines
392.26Wed Nov 15 1995 18:51 EXTRACT of web page " Published and Submitted Articles" 90 lines
392.27Wed Nov 15 1995 19:03 Thank you note to sponsor 25 lines
TOPIC 393.0 781.2/GY-067 [75] UKA/BIG (Berkom II, Items, Gigaswitch)
393.4Fri Apr 15 1994 11:56 Reminder of 2nd milestone 26 lines
393.5Wed Apr 27 1994 11:02 Sponsor interested in BERKOM II as well 150 lines
393.6Mon Jun 20 1994 16:05 Seibersdorf applies as BERKOM pilot user 102 lines
393.7Tue Aug 09 1994 17:41 Has MS 1 been met? 50 lines
393.9Fri Nov 04 1994 14:31 Hardcopy report for 2nd MS available/e-mail version requested 35 lines
393.10Fri Nov 04 1994 14:33 Project successfully completed ? 35 lines
393.12Mon Nov 07 1994 14:40 .ps report Torsten Braun:Multicast-Mechanismen fuer Transport... 27086 lines
393.13Tue Nov 08 1994 16:06 08.11.94:Letter signed and sent 8 lines
393.15Wed Jan 11 1995 09:31 Continuation of project expected/GIGAswitch ongoing 11 lines
393.16Mon Feb 27 1995 09:06 It's ok to publish BERKOM DRAFTS within DEC 81 lines
393.17Tue Mar 28 1995 17:00 Final rep. BERKOM II(.ps)+ short summary 66332 lines
393.18Wed Nov 15 1995 11:43 Network Eng.using EERP prj results-offering student internship 80 lines
TOPIC 394.0 784/BE-010 [100] IMEC/Two-Dimensional Dopant Profiling by Spreading Resistance
394.5Thu Jul 14 1994 16:08 Project finished ? 57 lines
394.6Wed Jul 20 1994 15:00 Project successfully finished / final report to come 232 lines
394.7Fri Apr 28 1995 10:08 Final report forwarded to EERP office:all MS achieved 51 lines
394.8Tue May 02 1995 16:54 EERP would appreciate short personal summary of sponosr 22 lines
394.9Thu Jun 01 1995 12:54 Final report available / see exstract of preface 53 lines
394.10Mon Sep 11 1995 17:37 Statement from sponsor will follow forthwith 107 lines
394.11Tue Sep 12 1995 16:41 Statement supports successfully completion 97 lines
394.12Tue Sep 12 1995 17:32 EERP's thank-you note to sponsor 19 lines
TOPIC 395.0 746.2/UK-058 [60] Manchester/Alpha AXP - SCI Project
395.1Mon Jun 27 1994 16:25 project finished? 55 lines
TOPIC 396.0 795/FR-045 [75] CITI2/BISANCE to Alpha/OSF1 Platform
396.1Mon Apr 18 1994 15:20 questions to sponsor wrt. project start 32 lines
396.2Wed Apr 20 1994 16:06 June 94 exspected start time 18 lines
396.3Wed Jun 22 1994 14:37 Update in Sep.94/ Alpha installed 14 lines
396.4Thu Oct 13 1994 11:23 Any news wrt status and starting ? 16 lines
396.5Mon Oct 17 1994 14:40 Prj started in June 94 / update to follow 13 lines
396.6Thu Mar 16 1995 09:46 Is J.Kreatsoulas interested in following-up ? 153 lines
396.7Wed Apr 26 1995 17:56 Rachel still available for EERP ? 65 lines
396.8Wed Apr 26 1995 17:59 Rachel will follow up with Prof.Strauss 26 lines
396.9Tue Sep 12 1995 17:36 Rachel's request to researcher for update 13 lines
396.10Fri Oct 06 1995 14:44 Status update from the researcher 82 lines
396.11Fri Oct 06 1995 17:15 Acknowledgement of EERP on WWW posting requested 13 lines
396.12Wed Nov 08 1995 15:23 Project data reqested from researcher 42 lines
396.13Tue Apr 30 1996 15:12 Reminder project end to Prof. Mugnier 100 lines
TOPIC 397.0 796/GY-070 [62] Karlsruhe/PVM/HeNCE for Speech Translation on Alpha Farms
397.3Fri Jun 17 1994 11:34 local contact in Karlsruhe: Ben Frommherz 10 lines
397.4Wed Aug 03 1994 15:59 Progress report "PVM/HeNCEfor..."(ps.version) 185 lines
397.5Tue Oct 11 1994 16:21 Presentation at SEL Research Award ceremony full success 17 lines
397.6Thu Oct 13 1994 09:08 Order Extension Approval given by Igor 103 lines
397.7Mon Oct 17 1994 13:08 University satisfied/order will be placed asap! 32 lines
397.8Thu Oct 20 1994 14:56 Prof Waibel enormously appreciated order extension! 32 lines
397.9Wed Nov 09 1994 17:54 wrt installation decision needed (Igor-Joachim) 57 lines
397.10Wed Nov 09 1994 17:59 Tape in German could be available through Uni KA 63 lines
397.11Wed Nov 09 1994 18:01 Meinrad technical support wrt CORBA 25 lines
397.12Wed Nov 09 1994 18:04 Meinrad needs to receive copies of all further reports ! 36 lines
397.13Tue Nov 22 1994 09:55 Still some problems to give JANUS demo 63 lines
397.14Mon Nov 28 1994 15:43 project finished ? 39 lines
397.18Tue Dec 06 1994 14:29 positive vote from Frank Severin 10 lines
397.19Tue Dec 06 1994 14:37 Deliverables section needed asap for extension approval 49 lines
397.20Wed Jan 25 1995 14:27 final report(.ps version)also hardcopy available a@KAR 2274 lines
397.21Mon Apr 24 1995 15:39 Any difference to Philipps voice dictations ? 106 lines
397.22Mon Apr 24 1995 15:44 Researcher focuses on spontaneous speech 24 lines
397.23Mon Apr 24 1995 15:49 Waibel's offer to collect data for German dictation JANUS 42 lines
TOPIC 399.0 797.1/FN-002 [60] Helsinki/GSM Integration into Corporate Da
399.3Tue Apr 12 1994 17:14 status report april 94 76 lines
399.5Fri Jul 01 1994 11:32 Q4/94 status report 116 lines
399.8Tue Jan 17 1995 18:01 status update:prj on time (extr.Q2/95 quarterly ) 31 lines
399.9Wed Feb 22 1995 16:24 pointer to WWW / infos available 13 lines
399.10Tue Apr 04 1995 16:55 status update / report will be requested by KTR 37 lines
399.11Thu Apr 13 1995 17:35 Request for techn.report to Heimo Laamanen 82 lines
399.12Tue May 02 1995 16:06 Pointer to technical report 16 lines
399.13Tue May 02 1995 16:59 report(.ps):Optimizing World-Wide Web for Weakly... 283 lines
399.14Thu Jul 20 1995 12:01 Reminder Project End 45 lines
399.15Fri Feb 16 1996 11:41 Project completed / reports already with EERP 65 lines
399.16Fri Feb 16 1996 11:42 Hardcopy reports available on request: 23 lines
399.17Fri Feb 16 1996 11:43 ABSTRACT of rep.:"Data Channel Serv.f.Wireless Teleph.Links 50 lines
399.18Fri Feb 16 1996 11:44 ABSTRACT rep:An Exp.of Dependability+Perf.of GSM Access... 37 lines
399.19Fri Feb 16 1996 11:46 Pointer to WWW 16 lines
399.20Mon Apr 22 1996 11:09 I:Status and pointer to TELEVENUE Kit 133 lines
TOPIC 400.0 761/FR-043 [100] INRIA/Operating System exploiting 64-bit Address Spaces
400.4Fri Apr 15 1994 13:06 reminder 2nd milestone / status update 26 lines
400.5Wed May 18 1994 10:05 PRL is closing/new sponsor to be found 35 lines
400.6Tue May 31 1994 16:22 Claudia F.wrt sponsors of french projects 78 lines
400.7Tue May 31 1994 16:24 if no new sponsor, EERP will monitor 58 lines
400.8Wed Jun 22 1994 15:23 reports available in Karlsruhe as follows: 20 lines
400.9Wed Aug 03 1994 13:14 Letter of notification been sent 61 lines
400.10Fri Aug 26 1994 09:35 Albert Mallet not in Edu/Res anymore/C.Petithory new contact 35 lines
400.11Fri Oct 21 1994 17:08 Project still active / Igor in direct contact with researcher 63 lines
400.12Fri Oct 21 1994 17:10 report.ps:"Garbage Collection and DSM Consistency" 4276 lines
400.13Fri Oct 21 1994 17:29 report.ps:Garbage Collection of Persistent Objects 3810 lines
400.14Tue Nov 15 1994 15:45 Meinrad Staudenmaier interested in work / Igor formal sponsor 98 lines
400.16Mon Nov 28 1994 10:27 list of references for the project Larchant: 113 lines
400.17Mon Nov 28 1994 10:31 planned visit:end of March/ Patrick+Meinrad available ? 35 lines
400.18Fri Dec 02 1994 09:57 Marc Shapiro to confirm date in March 95 21 lines
400.19Wed Mar 29 1995 09:55 31.03.95 project review at INRIA 101 lines
400.20Wed Mar 29 1995 10:12 .ps paper on Larchant (hardcopy on request through EERP office) 3851 lines
400.21Tue Apr 18 1995 13:33 Please ignore this input 0 lines
400.22Tue Apr 18 1995 13:40 Summary of project review by Igor Varsek 88 lines
400.23Tue Apr 18 1995 13:55 Reports (hard copy) available on request @ KAR 31 lines
400.24Thu May 04 1995 11:35 Larchant update 49 lines
400.25Thu May 04 1995 12:03 ABSTRACT of attatched .ps report:"Larchant:a distributed shared..." 3871 lines
400.26Thu May 04 1995 12:20 Igor looking for interested groups,taking on "godfathership" 64 lines
400.27Thu May 04 1995 12:27 Jon Hall's ALPHA, UNIX Software group interested? 78 lines
400.28Thu May 04 1995 12:31 Not interesting for Open VMS or Digital UNIX,perhaps Memory Channel Product 21 lines
400.29Thu May 04 1995 12:35 Asking the Memory Channel product mgr Paul Tourigny 81 lines
400.30Fri May 05 1995 15:01 Feedback information to Marc Shapiro 30 lines
400.31Fri May 05 1995 15:10 Commitments of "industrial uncles" 26 lines
400.32Wed May 17 1995 10:45 Igor Varsek now offical Uncle of project 24 lines
400.33Thu Jun 29 1995 11:12 Igor appointed as industrial advisor 1104 lines
400.34Thu Jun 29 1995 11:20 Interest request forwarded to Fred Glover,Unix Base Op. 21 lines
400.35Thu Jul 06 1995 09:55 answer to request on threads tracking support for OSF/1 35 lines
400.36Thu Jul 13 1995 10:24 .ps Draft Mousquetaires proposal with sponsor's role 1287 lines
400.37Mon Aug 28 1995 19:00 Registration no.of Mousquetaires proposal 14 lines
400.38Tue Oct 10 1995 17:10 Proposal rejected/ Igor's reply to Marc Shapiro 42 lines
400.39Tue Oct 10 1995 17:12 Comments reg rejection 53 lines
400.40Thu Nov 02 1995 13:11 New version of Mousquetaires proposal 48 lines
400.41Thu Nov 02 1995 13:14 Igor's response to Marc Shapiro 26 lines
400.42Wed Nov 15 1995 11:49 another version of Mousquetaire proposal 1558 lines
400.43Wed Nov 15 1995 13:06 .PS version of proposal 3580 lines
400.44Wed Nov 15 1995 14:19 PerDiS proposal 1573 lines
400.45Wed Nov 15 1995 15:23 PerDiS proposal (PostScript) 3611 lines
400.46Fri Nov 17 1995 15:44 PerDis Review/ Comments from B.Neidecker-Lutz 25 lines
400.47Tue Apr 30 1996 14:02 Reminder project end to Igor Varsek 82 lines
400.48Thu May 02 1996 14:13 Results might be very important BUT no short term benefit 51 lines
400.49Thu May 02 1996 14:17 Any details from researcher wrt to project end ? 88 lines
400.50Tue May 14 1996 18:57 Fallout of the contract:article on distributed garbage ... 36 lines
TOPIC 401.0 788/IR-009 [63] UnivCollege/Determine structure & Dynamics of Biomolecules from NMR & X-ray
401.8Fri May 20 1994 17:58 Report:"PVM as a framework..."available 11 lines
401.9Fri Jun 10 1994 14:37 new contract or amendment letter ? 77 lines
401.10Tue Jun 14 1994 11:26 Kieran's suggestion:amendment of the contract 43 lines
401.11Wed Jul 13 1994 18:30 Reminder of MS 1 to Kieran Carrick 34 lines
401.12Tue Aug 02 1994 15:44 Project currently on hold/new timescale to follow! 26 lines
401.14Thu Oct 20 1994 15:40 Prj funded by Irish Govt/with MasPar still a problem 69 lines
401.15Wed Nov 09 1994 18:14 new quotation/ Ben was asked for p'check 731 lines
401.16Wed Nov 09 1994 18:17 p'check 45 lines
401.17Wed Nov 09 1994 18:21 New quotation approved 32 lines
401.18Fri Nov 11 1994 08:57 Kieran will get updated deliverables section asap 27 lines
401.19Wed Nov 30 1994 16:54 Slight changes of configuration/order expected by 29-NOV-94 28 lines
401.20Mon Jan 23 1995 12:21 Project still holding ? 37 lines
401.21Thu Jan 26 1995 13:16 project ready to start/revison of milestones still to come 27 lines
401.22Wed Feb 01 1995 15:34 Deliverables supplied by customer(LaTeX.version) 163 lines
401.23Wed Feb 01 1995 16:01 New starting date Feb.95 / duration:12 months 34 lines
401.24Tue Feb 07 1995 12:28 Note from K.Carrick Feb/94 57 lines
401.25Tue Feb 14 1995 09:41 Kieran confused which sales credit rules apply 35 lines
401.26Tue Feb 14 1995 09:42 Igor refers to Lindsay 61 lines
401.27Fri Feb 24 1995 14:23 New starting time and new deliverables 167 lines
401.28Tue May 16 1995 17:38 Review meeting to be organized by Kieran Carrick 72 lines
401.29Tue May 30 1995 10:25 Abstract of hardcopy report on initial phase 22 lines
401.30Thu Feb 08 1996 11:47 reminder project end 106 lines
401.31Tue Jul 30 1996 13:09 2nd reminder project end 110 lines
401.32Fri Aug 02 1996 10:40 Kieran C.to contact UCD / R. Kaufmann to send report 27 lines
401.33Fri Aug 02 1996 10:51 rep.of review mtg 07/95 - confidential 225 lines
TOPIC 402.0 794/FR-046 [60] ONERA/PVM/HeNCE on Alpa AXP
402.1Thu Apr 21 1994 12:38 project started,project end ? 86 lines
402.2Thu Apr 21 1994 15:33 FR Team to give info of status 27 lines
402.3Tue Apr 26 1994 07:51 order exspected end April/ beginning May 94 30 lines
402.4Wed Apr 27 1994 18:03 status update by C.Fleury+comments from Igor 69 lines
402.7Mon Aug 08 1994 14:38 Project finished ? 35 lines
402.8Fri Aug 26 1994 16:41 John requested final report from the researchers ! 220 lines
402.9Tue Aug 30 1994 18:00 project delayed,techn.support needed to start the project 30 lines
402.10Wed Oct 26 1994 10:46 John asking for an update 20 lines
402.11Wed Oct 26 1994 10:47 Delivery in Sep94,invoice in Q2/95:any problems? 34 lines
402.12Thu Nov 03 1994 15:19 Research to start in November 32 lines
402.13Thu Nov 03 1994 15:47 Olivier Multon is new contact within Digital France 13 lines
402.14Wed Dec 21 1994 15:29 Slow progress due to delayed hardware delivery 59 lines
402.15Wed Mar 08 1995 15:29 Igor's suggestion to John::modification or termination 153 lines
402.16Wed Mar 08 1995 15:30 Draft for amendment letter needed 270 lines
402.17Wed Jun 14 1995 13:46 EERP needs acutal status 104 lines
402.18Mon Jul 10 1995 10:07 08/95 new project end / amended MS defined 83 lines
402.19Tue Jul 11 1995 10:36 J.Kreatsoulas now mgr of HPC expertese ctr, Maynard 40 lines
402.20Fri Jul 14 1995 11:29 Is JOhn still going to monitor prj although new role ? 110 lines
402.21Mon Sep 04 1995 17:42 John K. refers to Techn.Comp.Group@ILO or stand-in 35 lines
402.22Mon Sep 04 1995 17:52 Modifications to deliverables approved 113 lines
402.23Fri Nov 03 1995 16:51 Reminder project end / final report 293 lines
402.24Mon Nov 06 1995 09:44 End of November hopefully final rep. available 14 lines
402.25Wed Jan 31 1996 16:05 2nd reminder project end 52 lines
402.26Wed Apr 24 1996 16:52 *Note: no further investigation reg project results 10 lines
TOPIC 403.0 748/UK-051 [70] LPAC/NAG Port Project
403.2Mon May 09 1994 10:42 Marc D.to attend meeting 25.05.94? 49 lines
403.3Mon May 09 1994 10:43 David Beagle asked to attend LPAC meeting 47 lines
403.4Mon Jun 20 1994 16:49 Progress reports received @GEO,hardcopy available @ KAR 14 lines
403.5Wed Jun 22 1994 12:43 Questions wrt to project dates and milestones 21 lines
403.6Wed Jun 22 1994 12:44 project started Jan'92 / more reports to follow.... 24 lines
403.7Mon Jan 30 1995 15:39 reminder for project end 36 lines
403.8Wed Feb 08 1995 12:45 D.Beagle requested final report.... 21 lines
403.9Thu Jun 08 1995 15:14 3rd request for final report.... 33 lines
403.10Thu Jun 08 1995 15:16 David is going to contact LPAC 23 lines
403.11Tue Jul 25 1995 18:07 3rd excuse reg reminder from Jan95/final rep.being chased again 22 lines
403.12Tue Sep 12 1995 13:27 Prj end delayed due to delivery problems of upgrades 26 lines
403.13Tue Sep 12 1995 16:08 11/95 expected completion of project 25 lines
403.14Wed Feb 07 1996 14:03 Final report now available ? Prj completed ? 69 lines
403.15Wed Feb 21 1996 16:33 final rep.by 03/96 - still financial issue 58 lines
403.16Thu Feb 22 1996 11:23 Conditions for 'new' EERP 86 lines
TOPIC 404.0 798/GY-073 [60] Dresden/Mobile Computing & High Performance Network Support
404.2Mon Nov 28 1994 10:55 Transfer of EERP-allowances:action for Inge Urban @RTO 39 lines
404.3Mon Dec 19 1994 15:11 Still some open issues wrt booking problems 40 lines
404.4Mon Jan 23 1995 12:38 Reminder of MS 1 67 lines
404.5Mon Jan 23 1995 17:14 Lutz Heuser new reminder recipient as P.Tzelnic left DEC 25 lines
404.6Wed Feb 01 1995 09:33 Researcher promised update by February 95 26 lines
404.7Thu Feb 02 1995 16:43 Booking issues on EERP Dresden orders 44 lines
404.8Wed Feb 08 1995 11:06 First report : MS 1 met/ papers available 83 lines
404.9Wed Feb 08 1995 11:12 (.ps) paper:System Support for Mobile Distributed 4325 lines
404.10Wed Feb 08 1995 11:19 (.ps):A Quality of Service. Abstraction Tool for Advanced 2660 lines
404.11Wed Feb 08 1995 11:28 (.ps):Extending Group Communication Facilities toSupport Complex Distr 5995 lines
404.15Wed Jun 07 1995 11:42 Request of confirmation for admin of university 25 lines
404.16Wed Jun 07 1995 11:53 EERP funding may be used to purchase new equipment 32 lines
404.17Wed Jul 19 1995 12:21 Reminder MS 2 501 lines
404.18Wed Jul 19 1995 14:24 MS met / project on time / report to follow soon 22 lines
404.19Thu Jul 27 1995 13:44 .ps.gz report / see also next note for abstract 10691 lines
404.20Thu Jul 27 1995 16:37 "Design and Implementation..."report/see abstract+conclusion 93 lines
404.21Thu Jul 27 1995 16:43 Prof.Schill will add more material reg the EERP work 23 lines
404.22Mon Aug 07 1995 19:23 "Mobile Database Access" report / see abstract 50 lines
404.23Thu Feb 08 1996 16:01 Reminder MS 3 55 lines
404.24Wed Feb 14 1996 15:14 MS 3 achieved / 3 papers to follow 77 lines
404.25Thu Feb 15 1996 10:45 Different ps format needed as not printable 40 lines
404.26Thu Feb 15 1996 11:56 pointer to www.kar for details of abstract from reports 62 lines
404.27Tue Mar 05 1996 15:45 rep."Implementierungen zum X.400 Demonstrator" 16 lines
TOPIC 405.0 802/AU-037 [38] Leoben/Can Two-dimensional Oxidation be modeled with Stochastic Growth Models?
405.1Thu Jun 09 1994 09:48 project started/recently no software available 40 lines
405.2Wed Jul 13 1994 18:49 Reminder of 1st milestone 59 lines
405.4Thu Nov 24 1994 16:37 request of status update/prj finished ? 61 lines
405.5Mon Nov 28 1994 16:33 Project delayed til Feb.95 , expected result by then ? 42 lines
405.6Wed Mar 22 1995 16:50 Any news wrt final report ? 39 lines
405.7Thu Mar 23 1995 09:34 Report should be available in June 95 17 lines
405.8Thu Jul 06 1995 14:46 Jul 95: project end/ Sep 95: final report 55 lines
405.9Tue Oct 24 1995 19:49 Abstract of final report (German, hardcopy available) 40 lines
TOPIC 406.0 799/GY-072 [60] Siegen/Tools for Developing Parallel Object Oriented Apps on WS Farms
406.3Wed Feb 22 1995 17:11 reminder of MS 1 46 lines
406.4Thu Jul 13 1995 18:10 Reminder MS 2 276 lines
406.5Wed Jul 19 1995 11:39 2nd request for report / 09/95 tentative review mtg 66 lines
406.6Thu Jul 27 1995 12:13 Project start delayed by 8 months 105 lines
406.7Wed Aug 09 1995 13:15 MS 1 met/report available/see abstract: 24 lines
406.8Tue Aug 22 1995 13:38 MS 2 met / hardcopy available on request 13 lines
406.9Thu Feb 01 1996 16:29 MS 3 met: complete specific. available(hardcopy) 9 lines
406.10Wed Feb 14 1996 09:27 GY-072A signed:additional milestones ! 249 lines
TOPIC 407.0 805/CH-027 [50] Geneva/Computer Aided Translation Research
407.2Wed Dec 21 1994 11:03 Reminder of 1st update 63 lines
407.3Fri Jul 14 1995 14:49 Reminder MS 2 71 lines
407.4Tue Sep 12 1995 18:33 D.Gillot going to contact Prof.Wehrli for update soon 83 lines
407.5Fri Sep 15 1995 11:11 Report per fax received / online available as well ? 35 lines
407.6Fri Sep 15 1995 11:20 Delayed start in NOV 94 / status update of work done so far 168 lines
407.7Fri Sep 15 1995 11:28 Thank you note to researcher for update 13 lines
TOPIC 408.0 808/AU-038 [50] Vienna/Real-time Systems: Evaluation of New Approach for Worst Case Task Execution Times
408.1Wed Dec 21 1994 11:35 Reminder of 1st update 63 lines
408.2Thu Jul 27 1995 16:49 Reminder MS 2 36 lines
408.3Mon Aug 14 1995 20:16 Report sent by researcher /office needs to be identified 61 lines
408.4Fri Sep 01 1995 14:35 In May 95 report had been sent to R.Hanslik-Kupsa 56 lines
408.5Fri Sep 01 1995 15:30 Report requested from Rudi Hanslik-Kupsa 48 lines
408.6Thu Nov 02 1995 19:40 ABSTRACT of 2nd progress rep.:Comp.Maximum Task... 45 lines
408.7Wed Nov 08 1995 10:07 Results interesting for Jeremy Dion @WRL ? 22 lines
TOPIC 409.0 786/SW-017 [50] C2M2/Computational Fluid Dynamics (CFD) on Alpha AXP Farms
409.1Wed Jul 13 1994 19:05 Reminder of 1st milestone 58 lines
409.2Wed Sep 28 1994 09:37 John Kreatsoulas will give status update! 25 lines
409.3Mon Oct 17 1994 12:43 Status report to follow soon ! 33 lines
409.4Thu Apr 06 1995 15:04 Reminder PROJECT END 48 lines
409.5Thu Sep 07 1995 15:13 Another request for important information 77 lines
TOPIC 410.0 804/SW-018 [100] Uppsala/3D Graphics Porting & Support for Protein Crystallography Environment
410.3Thu Oct 13 1994 13:53 Reminder of first status update 33 lines
410.4Mon Oct 17 1994 13:12 Prj on hold til fall 95/order period needs to be extended 34 lines
410.7Thu Mar 16 1995 09:36 Is J.Kreatsoulas interested to follow -up ? 153 lines
TOPIC 411.0 814/AU-039 [50] Vienna/Dopant Profiling by Voltage Contract Scanning Electron Microscopy (VCSEM)
411.1Fri Aug 05 1994 16:09 Reminder of first milestone! 27 lines
411.2Mon Aug 08 1994 12:45 Wolfgang Werner will follow up ! 16 lines
411.3Thu Nov 24 1994 11:07 Reminder status update (MS 2) 317 lines
411.4Fri Jan 20 1995 15:32 MS met so far,small delay for activity 2.2 195 lines
411.5Thu Feb 09 1995 11:16 Sponsor impressed / prj might continue another year 69 lines
411.6Thu Feb 09 1995 11:21 Igor's reply wrt EERP in general issue 65 lines
411.7Wed Apr 05 1995 12:28 Is comprehensive report now available ? 74 lines
411.8Thu Apr 06 1995 12:39 Copy of report should be available soon .... 21 lines
411.9Thu Jun 01 1995 11:24 Comprehensive report available ( see abstract) 28 lines
411.10Thu Jul 27 1995 18:12 W.Werner's contractor status been approved 25 lines
411.11Fri Jul 28 1995 17:58 Trip report from Wolfgang Werner 96 lines
411.12Fri Jul 28 1995 18:05 Technical status update from Wolfgang Werner 67 lines
411.13Thu Aug 17 1995 13:01 Reminder Project End 40 lines
411.14Wed Jan 31 1996 10:22 Final report should be available soon 16 lines
411.15Wed Jan 31 1996 10:29 EERP still waiting for final report 36 lines
411.16Thu Feb 08 1996 17:30 ABSTRACT of final report/hardcopy available on request 36 lines
411.17Thu Feb 08 1996 18:43 Thank you note to Wolfgang Werner 26 lines
411.18Thu Feb 08 1996 18:45 Request of final statement from sponsor 55 lines
411.19Wed Feb 14 1996 14:39 Statement from L.Richardson(sponsor) 23 lines
TOPIC 412.0 811/UK-060 [55] Imperial/SuperJANET Shared Image Resource for Synchronous Applications (SIRSA)
412.3Tue Oct 18 1994 16:24 Steve Viner is Bryan Hall's successor 31 lines
412.4Fri Dec 16 1994 14:48 Problems:Jon Ford seeking for support from EERP 114 lines
412.5Wed Jan 25 1995 10:01 Reminder of current status/MS 1 29 lines
412.7Tue Jan 31 1995 16:13 Obviously prj hasn't started yet / reply from Jon Ford 35 lines
412.8Tue Jan 31 1995 16:18 Mike Chamberlain able to support project ? 350 lines
412.9Tue Feb 07 1995 12:17 01.02.95: Latest configuration 3254 lines
412.10Tue Feb 07 1995 12:22 comments on new configuration 43 lines
412.11Tue Feb 07 1995 12:32 Still open issues wrt SPfee and deliverables 29 lines
412.12Tue Feb 07 1995 12:36 Tony Dimmer trying to take actions on open issues 64 lines
412.13Tue Feb 07 1995 12:40 Just formal acceptance of sponsorship missing... 97 lines
412.14Wed Feb 08 1995 08:51 01-FEB-95 new starting date 66 lines
412.15Wed Feb 08 1995 14:13 Sponsor has confirmed commitment 92 lines
412.16Thu Feb 09 1995 08:06 SP fee slightly higher as assumed:any problems ? 135 lines
412.17Tue Sep 05 1995 16:47 Reminder MS 1 72 lines
412.18Tue Oct 10 1995 17:40 All prj responsibilities with Mike Chamberlain 20 lines
412.19Tue Nov 07 1995 18:40 Reminder to Mike Chamberlain (new techn sponsor) 97 lines
412.20Thu Feb 15 1996 19:15 M.Chamberlain not aware of new responsibility... 140 lines
412.21Fri Mar 22 1996 14:38 T.Dimmer returning action to M.Chamberlain 34 lines
412.22Fri Mar 22 1996 14:55 ETG disappointed about sponsor commitment 206 lines
412.23Fri Mar 22 1996 14:58 Mike now will take action and try to follow-up 429 lines
412.24Fri Mar 22 1996 15:01 T.Dimmer also giving assistance wrt to collect results 38 lines
412.25Tue Mar 26 1996 14:22 Stewart Bryant will look into the project progress 76 lines
412.26Wed Mar 27 1996 16:24 Thank you note to Tony Dimmer 60 lines
412.27Fri Mar 29 1996 17:22 1st estimation of project by S.Bryant 48 lines
412.28Fri Mar 29 1996 17:27 07/95 :Interim Report (postscript) 0 lines
TOPIC 413.0 810/AU-040 [50] Joanneum/Meta Info Approach to Intelligent Retrieval of Large Data Sets
413.1Tue Feb 14 1995 14:10 actions around sponsorship fee 133 lines
413.2Tue Feb 14 1995 14:11 request on collection in installments 14 lines
413.3Tue Feb 14 1995 14:12 Approval of SP fee collection 19 lines
413.4Wed Feb 22 1995 17:54 Reminder of MS 1 33 lines
413.5Fri Sep 01 1995 16:27 Update:new set of tasks/written plan to follow-soon 27 lines
413.6Tue Oct 24 1995 17:55 Interim report available on request from L.Kotsch 15 lines
413.7Fri Nov 03 1995 11:32 New project plan: data, milestones etc. requested 81 lines
413.8Mon Nov 06 1995 09:28 Sponsor requests mtg to finalize redirected workplan 42 lines
413.9Wed May 08 1996 13:15 Additional request for project data 87 lines
413.10Wed May 08 1996 13:21 Project started 09/94 should be finished by 09/97 112 lines
TOPIC 414.0 801/GY-074 [54] ABB/Shop Floor Framework SW for Manufacturing Applications
414.1Fri Sep 02 1994 10:26 Status update 82 lines
414.4Tue Nov 22 1994 09:11 Project not cancelled yet ,conf. scheduled 52 lines
414.5Tue Nov 22 1994 09:22 Continuation refers to data persistance from Basestar eng. 76 lines
414.6Tue Nov 22 1994 09:28 Collection of sponsorship fee 253 lines
414.7Wed Nov 23 1994 15:17 prj delayed: start probably spring/summer 95 64 lines
414.8Mon Nov 28 1994 10:39 ABB heavily relies on BASESTAR persistance features 50 lines
414.9Mon Dec 19 1994 11:58 Deadline for updated work plan met 32 lines
414.11Wed Mar 08 1995 14:43 Mtg scheduled to do "stock-taking"+decide on actions 47 lines
414.12Fri Mar 31 1995 18:57 Prj cancelled / refund of entire net allowance to Digital 71 lines
414.13Fri Mar 31 1995 18:59 F.Severin to look after booking of credit note 95 lines
414.15Tue May 30 1995 16:24 report on business model and action net/see abstract: 34 lines
414.16Wed May 31 1995 11:53 Still feedback from PCS needed 49 lines
TOPIC 415.0 812.2/UK-058A [50] Manchester/Modular Architecture...
415.2Thu Jan 12 1995 15:16 Kirsten confused about received reports 28 lines
415.3Thu Jan 12 1995 15:22 reports belong to UK-58A/Alberto clarifies confusion 23 lines
415.4Thu Jan 12 1995 15:24 Following reports in hardcopy available @KAR: 22 lines
415.6Mon Apr 03 1995 10:08 Copy of signed application form filed in Karlsruhe 10 lines
415.7Wed Jun 14 1995 14:13 Reminder project end 45 lines
415.9Wed Jul 26 1995 12:54 Will project be delayed ? 60 lines
415.10Fri Nov 17 1995 17:25 3rd request to receive status update 168 lines
415.11Fri Nov 17 1995 17:29 Delay til 06/96 BUT prj very important for DEC 33 lines
415.12Fri Nov 17 1995 17:35 New milestone schedule 17 lines
415.13Thu Jan 04 1996 14:25 Delay accepted by EERP management 86 lines
TOPIC 416.0 806/SU-007 [50] Moscow/Supercomputing in MSU/Edu-Scientific Data Center based on Alpha
416.1Thu Jan 12 1995 13:33 Vladimir Roganov new technical support 73 lines
416.2Thu Mar 23 1995 16:37 Reminder MS 1 69 lines
416.3Thu Jun 08 1995 15:29 new project start APR 95/ delay due to custom clearance of equipment 72 lines
TOPIC 417.0 821/IT-025 [50] CNUCE/Advanced Information Servers for Multimedia Networking
417.1Fri Nov 04 1994 16:08 Project delay wrt Kubota cards (extr EERP mr Oct) 21 lines
417.2Thu Nov 10 1994 09:47 new quotation needed for order without Kubota 77 lines
417.3Thu Nov 10 1994 09:50 Chiara will send needed information asap 19 lines
417.5Thu Jan 12 1995 14:18 short update:researcher ready / new AQS needed 23 lines
417.6Thu Jan 12 1995 14:19 new AQS expected 136 lines
417.7Thu Feb 02 1995 16:37 No changes wrt ms / amendment letter could be issued ... 69 lines
417.8Wed Feb 08 1995 12:32 short update:perhaps some delay wrt new configuration 15 lines
417.9Mon Feb 27 1995 07:47 Number needed to fax copy of letter 46 lines
417.10Mon Feb 27 1995 07:48 Letter signed by Researcher 13 lines
417.11Fri Jun 09 1995 17:25 project on time ? start date ? 36 lines
417.12Fri Jun 09 1995 18:36 Sponsor failed to contact researcher/ no response... 60 lines
417.13Wed Jun 21 1995 19:40 Chiara G. trying to get status update 113 lines
417.14Fri Feb 16 1996 16:23 M.Actis-Dato will try to help 46 lines
417.15Mon Mar 18 1996 16:29 M.Actis not very optimistic wrt prj update 438 lines
TOPIC 418.0 822/AU-041 [50] TU Vienna/Surface Characterization of Al(Cu) Alloys
418.1Mon Jun 12 1995 11:53 Reminder MS 1 61 lines
418.2Wed Aug 02 1995 15:16 Prj on time,MS met / report for EERP to follow 68 lines
418.3Wed Aug 02 1995 15:31 Report MS 1 on first results 79 lines
418.4Thu Dec 21 1995 15:13 Status update: project ahead of time 97 lines
418.5Tue Apr 30 1996 15:55 Reminder project end 79 lines
TOPIC 419.0 824/AU-042 [50]TUVienna/STARPULS - Data Reduction and Ana
419.3Tue Nov 22 1994 11:28 no order period extension request 28 lines
419.4Mon Jun 12 1995 15:26 Reminder MS 1 62 lines
419.5Fri Feb 02 1996 14:49 Reminder MS 2 62 lines
419.6Tue Feb 13 1996 17:13 J.Nittmann to give status/R.Hanslik doesn't know 38 lines
419.7Thu Feb 15 1996 11:02 Johann can't supervise the project anymore 17 lines
419.8Thu Feb 15 1996 11:24 Request for update to researcher 61 lines
419.9Fri Mar 08 1996 15:41 Prj delayed /unforseeable problems encountered 127 lines
419.10Fri Mar 08 1996 15:46 Request of revised prj plan to researcher 39 lines
TOPIC 420.0 813/P-005 [50] Lisbon/Parallel Distributed Prolog and Applications (PADIPRO)
420.1Tue Dec 06 1994 14:27 Send any update to Gavan Duffy ! 58 lines
420.2Mon Dec 12 1994 14:40 Project description sent on to Gavan Duffy 24 lines
420.3Mon Jun 12 1995 16:26 Reminder MS 1 / New reminder recipient ? 79 lines
420.4Wed Jun 14 1995 12:54 A.Casal will try to help:J.Sousa+J.Seixas left DEC 48 lines
420.5Thu Jun 29 1995 18:18 MS 1 met / reports available on request 70 lines
420.6Tue Jul 11 1995 12:32 Could G. Duffy support A. Casal wrt technical issues? 51 lines
420.7Tue Aug 15 1995 17:37 G.Duffy willing to help while raising some questions 109 lines
420.8Tue Aug 15 1995 17:44 Now EERP Country Coordinator to contact Gavan Duffy 41 lines
420.9Thu Apr 25 1996 16:27 Up to now no reply to 3rd reminder from 11/96 624 lines
TOPIC 421.0 820/HL-016 [58] Utrecht/Real-time Monitoring Experiments on WAN using ATM
421.1Wed Jan 25 1995 14:02 Adapted milestones + status update 137 lines
421.2Wed Jan 25 1995 14:15 new project duration: 15 months 43 lines
421.3Wed Jul 19 1995 16:17 Reminder MS 1 45 lines
421.4Tue Jul 25 1995 18:53 MS partly met / pointer to ftp account for report 91 lines
421.5Thu Jul 27 1995 16:05 report rt95_atm/ see abstract and conclusion : 49 lines
421.6Fri Jul 28 1995 12:38 (.ps)report:Distributed Data Acquistion System By ATM Networks 6049 lines
421.7Wed Feb 07 1996 15:01 Reminder project end 60 lines
421.8Thu Jun 13 1996 15:36 2nd REMINDER project end 83 lines
TOPIC 422.0 815/BE-011 [33] Louvain/World Ocean Modeling on a Small Parallel Computer
422.1Wed Jan 11 1995 11:09 EERP has also impact on "regular business"... 31 lines
422.2Thu Apr 06 1995 12:35 Reminder MS 1 74 lines
422.3Wed Jun 07 1995 14:59 M.Vanderstraeten should be able to help 32 lines
422.4Wed Jun 07 1995 15:04 Reminder MS1 to Michel Vanderstraeten 23 lines
422.5Thu Jun 29 1995 11:32 Despite problems: researcher willing to upgrade system 48 lines
422.6Wed Jul 05 1995 10:31 Will still Lucas get a status update ? 85 lines
422.7Mon Jul 10 1995 14:59 First research report available/ see abstract: 21 lines
422.8Thu Aug 10 1995 16:20 Update perhaps 10/95 due to very long term planning... 148 lines
422.9Wed Sep 06 1995 14:15 Reminder MS 2 39 lines
422.10Wed Apr 24 1996 16:37 *Note: no further monitoring of project 10 lines
TOPIC 423.0 809/FN-004 [27] Tampere/ATM FASTER Project
423.1Tue Jan 17 1995 18:03 status update:project on track 42 lines
423.2Thu Apr 06 1995 16:25 Did project finish in time ? 60 lines
423.3Tue Jul 11 1995 14:59 new contact for project? 60 lines
423.4Tue Jul 11 1995 15:44 Is T.Savolainen able to help wrt status ? 242 lines
423.5Thu Aug 03 1995 16:24 Request is now with A.Huttunen (new project mgr) 19 lines
423.6Wed Apr 24 1996 16:43 *Note: No further follow-up 11 lines
TOPIC 424.0 797.2/FN-003 Nokia/GSM Integration into Corporate Data Networks
424.1Tue Jan 17 1995 18:06 status update:extract of Q2/95 quarterly 40 lines
424.2Tue Apr 04 1995 16:36 1st pafs finished / final analysis to follow 38 lines
424.3Thu Jul 20 1995 11:10 Reminder Project End 50 lines
424.4Tue Sep 19 1995 10:52 Pointer to WWW/prj completed/ reports will be send 61 lines
424.5Tue Sep 19 1995 16:32 EERP's mail address 31 lines
424.6Thu Oct 26 1995 16:33 Prj completed:reports available on request @KAR 23 lines
424.7Fri Oct 27 1995 09:34 ABSTRACT of rep.:"Data Channel Serv.f.Wireless Teleph.Links 50 lines
424.8Mon Oct 30 1995 17:54 ABSTRACT rep:An Exp.of Dependability+Perf.of GSM Access... 37 lines
TOPIC 425.0 818/IT-026 [50] Padova/Computationally Intensive FEM Algorithms for Construction
425.1Mon Dec 19 1994 16:48 KTR to forward Gerd Nanz @ CBT any result 8 lines
425.2Wed Dec 21 1994 08:29 Gerd just to receive results for his info / no further action 58 lines
425.3Thu Jan 12 1995 14:27 update:ordering and delivering ongoing 16 lines
425.4Wed Feb 08 1995 12:35 short note:possibly extension of ordering period needed 15 lines
425.5Mon Jun 12 1995 17:15 Reminder MS 1 70 lines
425.7Thu Jun 29 1995 14:43 Any need to postpone milestones ? 42 lines
425.8Mon Jul 10 1995 14:38 MS 1 met / report to follow / no delay wrt timeframe 40 lines
425.10Tue Jun 11 1996 15:51 Progress report also available online ? 37 lines
425.11Thu Jun 13 1996 11:02 M.Actis-Dato will request online reports from researcher 51 lines
TOPIC 426.0 816/SU-008 [50] MEPhI/High Accuracy & High Performance Computing in Modeling
426.1Mon Jul 17 1995 15:51 Reminder MS 1 63 lines
426.2Thu Jul 27 1995 18:21 Sergei Osipov is investigating 57 lines
426.3Mon Jul 31 1995 18:37 Equipment has been delivered 15 lines
426.4Wed Apr 24 1996 17:13 *Note:no further monitoring of project progress 11 lines
TOPIC 427.0 827/GY-076 [50] Kaiserslautern/MHEG Gateway for GLASS
427.1Thu Feb 23 1995 12:26 Reminder of MS 1 70 lines
427.2Tue Mar 14 1995 13:32 pointer to report / MS 1 met 13 lines
427.3Wed Mar 29 1995 09:18 MS 1 report (ASII version) / MS met 296 lines
427.4Wed Apr 19 1995 16:48 Reminder MS 2 36 lines
427.5Thu Jul 13 1995 17:24 MS 2 met / pointer to URL on WWW 47 lines
427.7Fri Aug 04 1995 13:47 GLASSway server on the net soon,had been disconnected 27 lines
427.8Tue Mar 26 1996 14:14 Reminder project end 44 lines
TOPIC 428.0 832/AU-043 [50] Vienna/General-purpose SW for Constrained Global Optimization
428.1Thu Feb 09 1995 09:57 Angela Loh should receive any result out of this project 42 lines
428.2Mon Mar 13 1995 09:43 Demise of SIP:A.Loh no more technology recipient 34 lines
428.3Wed Jul 19 1995 17:45 Reminder MS 1 48 lines
428.4Mon Aug 14 1995 20:02 First report to follow shortly 24 lines
428.5Mon Aug 14 1995 20:03 MS partly met/some difficulties encountered wrt tools 65 lines
428.6Fri Jan 26 1996 15:45 Accomplishments of the first year (.ps version) 4357 lines
428.7Mon Jan 29 1996 10:00 Pointer to www and ABSTRACT of report 35 lines
TOPIC 429.0 812.1/UK-059A [50] Rutherford/Modular Architecture...
429.1Fri Feb 17 1995 15:48 hardcopy reports avaialble at EERP office: 22 lines
429.2Wed Jun 14 1995 14:15 Reminder project end 45 lines
429.3Wed Jul 26 1995 12:59 Will project be delayed ? 163 lines
429.4Fri Nov 17 1995 17:37 3rd request for update 168 lines
429.5Fri Nov 17 1995 17:39 Project delay til 06/96 BUT prj very important for DEC 33 lines
429.6Fri Nov 17 1995 17:40 New milestone schedule 16 lines
429.7Thu Jan 04 1996 14:22 Delay accepted by EERP management 81 lines
TOPIC 430.0 807/CH-029 [20] CERN/Upgrading Event Distribution in NA48 to PCI-based WSs
430.1Wed Feb 22 1995 15:56 Need actual project start.... 65 lines
430.2Mon Mar 13 1995 11:54 01-SEP-1994 formal start of project 17 lines
430.3Thu Apr 06 1995 13:06 Reminder MS 1 288 lines
430.4Sat Jul 01 1995 15:12 Apr.96 new project end 247 lines
430.5Thu Aug 10 1995 18:10 EERP needs new milestone schedule to approve extension 71 lines
430.6Mon Sep 04 1995 16:06 Confusion wrt success and related EERP project 101 lines
430.7Mon Sep 04 1995 16:17 Final time schedule soon /confusion clarified 50 lines
430.8Fri Nov 17 1995 15:40 new completion date 05/96 21 lines
430.9Fri Nov 17 1995 15:41 new schedule(in words) should be available soon 180 lines
430.10Mon Feb 05 1996 13:41 Reminder status update 35 lines
430.11Fri Mar 22 1996 13:49 new prj end 06/96 : extension for MS approved 86 lines
TOPIC 431.0 828/CH-028 [40] Geneva/ATM Network Development on University & Observatory Sites
431.1Mon Mar 13 1995 15:21 Need project start and reminder recipient 38 lines
431.2Mon Mar 13 1995 15:23 P.Chevaux=reminder recipient/prj start:01-DEC-1994 24 lines
431.3Tue May 16 1995 15:45 First results 07/95 due to delayed equipment delivery 21 lines
431.4Wed Aug 16 1995 17:45 Small reminder 32 lines
431.5Fri Sep 01 1995 12:27 Hardware still missing/researcher close to panic mode 21 lines
431.6Fri Dec 08 1995 08:51 Request for ordering extension 204 lines
431.7Wed Feb 07 1996 17:50 summary of status after mtg with Galip Ozem 60 lines
431.8Wed Feb 07 1996 17:52 Reminder prj update as subject of extension 54 lines
431.9Tue May 14 1996 15:34 Status update / see also URLs for details 48 lines
TOPIC 432.0 833/AU-044 [50] Keppler/Interactive MM Teleservices over Euro-ISDN
432.1Fri Sep 01 1995 12:59 Software successfully used for MMC over ISDN test 72 lines
432.2Fri Dec 08 1995 08:29 extension proposal 113 lines
432.3Fri Dec 08 1995 08:30 Extension approved at 6.12.95 Ops Meeting 76 lines
432.4Mon Dec 18 1995 16:07 administrative issue 37 lines
432.5Wed Feb 07 1996 18:52 Reminder MS 1,2,3 109 lines
432.6Thu Apr 18 1996 16:29 Sponsor impressed / extension delayed due to late delivery 42 lines
TOPIC 433.0 768/SU-005 [75] NIITP/SW for Industrial Waste Processing Equipment and CAD
433.2Thu Apr 20 1995 11:03 Notification of sponsorship loss been sent 85 lines
TOPIC 434.0 834/GY-077 [50-60] Karlsruhe/Real-tim Unlimited Vocabulary Continuous Speech Recognition
434.1Wed Jul 12 1995 10:10 Interest in speech synthesis (DECtalk) EFT 52 lines
434.2Fri Oct 06 1995 11:04 Prof Waibel liked the articel/ important next steps 55 lines
434.3Fri Oct 06 1995 14:22 Order extension approved,subject to conditons see below 26 lines
434.4Mon Oct 09 1995 09:51 Prof.Waibel appreciates extension of order period 25 lines
434.5Fri Feb 02 1996 16:15 Reminder MS 1 37 lines
434.6Wed Feb 14 1996 14:44 Prof.Waibel will check on the report 11 lines
434.7Wed Feb 14 1996 15:01 Project delayed by 4-6 months 51 lines
434.8Wed Feb 14 1996 15:04 technical issue 161 lines
434.9Thu Feb 15 1996 10:55 issues with configuration 44 lines
434.10Wed Jul 03 1996 17:41 Reminder project end 62 lines
434.11Fri Aug 02 1996 10:29 Delay til 09/96 due to HW problems;but still progress 142 lines
434.12Fri Aug 02 1996 10:33 Technical comments on device issues 28 lines
TOPIC 435.0 826/GY-075 [40] GMD - Fokus/MHEG Engine for GLASS
435.2Thu Feb 08 1996 10:44 Reminder project end 84 lines
435.3Tue Jun 18 1996 09:38 Prj completed/technology transfer was of poor quality 55 lines
TOPIC 436.0 835/CH-030 [50] CERN/High Speed ATM Backbone
436.1Thu Feb 08 1996 13:38 Reminder MS 1 67 lines
436.2Thu Feb 08 1996 14:56 D.Gillot to give update/J.Shade not aware of status 44 lines
436.3Wed Jul 03 1996 16:44 P.Gaillot able to help wrt status ? 117 lines
TOPIC 437.0 841/GY-078 [45] Darmstadt/Modeling Heterogeneous Multimedia Mail
437.1Fri Jan 26 1996 15:39 EERP sent researcher's invoice to sales rep./CAS 27 lines
437.2Mon Mar 18 1996 12:30 Reminder MS 1 86 lines
437.3Wed Jun 12 1996 11:27 Prj on time/ ETG requested rep. in ASCII or.rtf file 69 lines
437.4Fri Aug 02 1996 14:38 M1 Report (ASCII Format) 363 lines
TOPIC 438.0 842.1/GY-079 [50]Karlsruhe/CARMA
438.1Wed Nov 29 1995 14:39 extension proposal for GY-079 84 lines
438.2Wed Nov 29 1995 14:41 extension considered APPROVED by operations committee 27 lines
438.3Wed Nov 29 1995 14:43 Configuration for AQS and add. agreement 34 lines
438.4Wed Nov 29 1995 14:45 Official request for extension of order period of GY-079 56 lines
438.5Wed Nov 29 1995 14:47 Confirmation of extension / copies of add. agreement to follow 27 lines
438.6Wed Nov 29 1995 14:57 29.11.95: GY-079A signed and sent 43 lines
438.7Fri Dec 01 1995 19:37 Copies arrived @RTO for signature/to be send to Prof.Kr�ger 22 lines
438.8Fri Dec 01 1995 19:41 Approval note to researcher and his reply 56 lines
438.9Fri Mar 08 1996 17:19 Reminder MS 1 / review mtg to be scheduled 130 lines
438.10Mon Mar 18 1996 10:14 Researchers are available for meeting 40 lines
438.11Thu Apr 25 1996 14:20 Project update:English abstract of report will follow 24 lines
438.12Tue Jun 11 1996 14:55 rep:"Flexible Monitoring of the GIGAswitch/ATM" 33 lines
TOPIC 439.0 843/GY-081 [45] IPK Berlin/Commercial Info Services on WWW in German Enterprises
439.1Tue Nov 07 1995 18:09 Don Young would like progress update (Internet Systems Eng) 19 lines
439.2Fri Dec 08 1995 09:52 Pointer to URL for further Information 81 lines
439.3Mon Dec 18 1995 16:29 ordering issue 90 lines
439.4Mon Feb 05 1996 17:50 Alta Vista on external pages/pointer to www page 62 lines
439.5Thu Mar 14 1996 18:45 Prj write up on digital web page / URL see below 174 lines
439.6Thu Mar 14 1996 18:47 e-version of forthcoming article in Digital Today 225 lines
TOPIC 440.0 842.2/GY-080 [50] Karlsruhe/CARMA
440.1Fri Mar 08 1996 17:20 Reminder MS 1 / review mtg to be scheduled 130 lines
440.2Mon Mar 18 1996 10:15 Researchers are available for meeting 40 lines
440.3Thu Apr 25 1996 14:21 Project update:English abstract of report will follow 24 lines
440.4Tue Jun 11 1996 14:48 rep:"Flexible Monitoring of the GIGAswitch/ATM" 33 lines
440.5Tue Jun 11 1996 14:49 .ps version:"Flexible Monitoring of the GIGAswitch/ATM" 2252 lines
TOPIC441.0Wed Feb 14 1996 17:09 GY/ECRC/ECLIPSE porting tp AXP 257 lines
441.1Wed Feb 14 1996 17:11 Loan Aggreement 154 lines
441.2Thu Feb 15 1996 10:49 Loan equipment still needed to complete work ? 84 lines
441.3Thu Feb 15 1996 10:50 Perhaps prematurely termination due to closure of ECRC 19 lines
441.4Tue Apr 30 1996 16:43 Project still active or terminated ? 205 lines
441.5Thu May 02 1996 14:06 Mr. Herold left ECRC / F. Severin able to help ? 40 lines
441.6Thu May 02 1996 14:08 Request been forwarded to new contact by F.Severin 225 lines
441.7Thu May 02 1996 14:48 Port completed / details on www page(URL see below) 42 lines
441.8Thu May 02 1996 15:12 Process of return needs to be set up 50 lines
441.9Wed May 08 1996 11:00 Will Alpha been purchased by ETG or returned 98 lines
441.10Tue May 14 1996 18:51 Alpha already purchased/J.Feyock will collect it from ECRC 19 lines

Conference rdvax::erp_proposals (ERP Proposals)

6 posts
TOPIC 308.0 Virginia...2056...Efficient Network-Parallel Biological Sequence Comparison
308.1Thu Jun 27 1996 06:11 Sponsor describes the impact.... 45 lines
TOPIC 326.0 Harvard ... 2112 ... Improve Branch Prediction in DEC-Alpha Microprocessors
326.1Thu Jun 27 1996 06:18 Follow up info from Sue for Kirsten 43 lines
326.2Thu Jun 27 1996 07:52 Kirsten requests steps for prj follow-up 80 lines
TOPIC 330.0 Brown ... 2107 ... Advanced C++ Semantic Analyzer
330.1Thu Jun 27 1996 06:45 Follow-up info from Sue for Kirsten 48 lines
330.2Thu Jun 27 1996 06:52 Igor requests a txt.file for prj follow-up 80 lines
TOPIC 340.0 2124 ... Arizona State U ... Phys Based Low Presssure Deposition and Etch Simulator
340.1Thu Jun 27 1996 07:49 Follow-up info from Sue for Kirsten 25 lines

Additional information

First Post:Thu Mar 17 1994
Last Post:Wed Sep 25 1996
# Topics:1
# Replies:1280
# We have note bodies for:0
Total memory used by this script: 767,936 (4,194,304)