Suggestions Please:

I have tried multiple environments and multiple ECP kits including 
VAXes with VMS 6.1 - Motif DW V1.2-3941206 - ECP 3.2-07 - ECP 4.0
ALPHAs with VMS 6.2-H3 - Motif DW V1.2-4960312 - ECP 3.2-07 - ECP 4.0

The data is CPD data using DECPS version V2.2-51. However, I get crashes
during intergration or looping forever while building a model. I got one
model to build, however, the model was incorrect and it showed queues on
the CI above 1000...

I have been using the capacity planner for years, and the last time I built
models was last November. Has something changed or expired since we hit
1997? Can anyone who monitors this notes file provide any clues?

David
T.RTitleUserPersonal
Name
DateLines
680.1BSS::JILSONWFH in the Chemung River ValleyWed Mar 12 1997 16:116
Zip the .CPD file(s) and your .MEMORY file and post a pointer to it.  Then 
we'll see what we can find.  I will be on vacation for a week starting on 
Friday.  If this si for a customer then IPMT it and make the same data 
available in the IPMT case.

Jilly
680.2Data you suggestedMSE1::ENOHolographic MemoryWed Mar 12 1997 17:3925
File MSEDV1::BANK1.ZIP contains two memory files I have tried to 
use and one days CPD files for the four systems.

File MSEDV1::BANK2.ZIP contains two memory files I have tried to 
use and two additional days CPD files for the four systems.

I am checking on an IPMT case number, however, I believe the customer
could not build a model so they requested we do it. We accepted 
since I never had a problem doing such plans in the past... This is
not just this one customer... I have additional customers with 8400s
who also cannot build models and have requested the same... I am very
concerned and puzzeled... I would rather have the customer use the 
data collector with ECP but I am not the customer..

The systems are mirrored BRS sites with one AlphaServer 8400 Model
5/350 with 4 CPUs and a AlphaServer 2100A 5/300 with 2 CPUs at each 
site connected VIA FDDI device type DEFPA. CI devices are CIPCA. 
SCSI controllers are KZPSA HS devices are HSJ40 Firmware V27J-0. 
All disks are RZ29B except for D635 and D1135 which are EZ31 and 
$1$DKA0, $1$DKA100, $2$DKA0, $2$DKA100 which are RZ28D. The ethernet 
controllers are DE435.

Let me known what you can find... 

David
680.3BSS::JILSONWFH in the Chemung River ValleyFri Mar 14 1997 10:0533
What I have so far.

This is a lot of data and you *will* need an Alpha to work on it to get any 
kind of reasonable performance.

For BANK1.ZIP I was able to reduce all nodes except RLIV00.  There appears 
to be either problems with the CPD data or the customer is using PREFER to 
change MSCP servers or REDUCE has a problem with the data.  I suspect this 
is the .CPD file you need to supply in the IPMT.  I was using 10:00-11:00
I am still trying to use a few different time periods.  With the size of 
this data I would not suggest using time periods any longer than 1 hour and 
30 minutes will probably be sufficient.

I haven't been able to get to BANK2.ZIP but this looks like the data is 
even bigger.

I will have one last update today before going on vacation.  

Jilly

Example of problems with RLIV00

REDUCE/BY_IMAGE/BEGIN=04-FEB:09:45/END=04-FEB:10:45 PSDC$RLIV00_1997FEB04.CPD
ECP-INFO,  Driver for CPD ...
ECP-WARNING,  Disk Server configuration has changed
.
.
could not find RLIV002$DUA1226
could not find RLIV002$DUA1226
ECP-WARNING,  Disk configuration has changed
ECP-WARNING,  Disk configuration has changed
ECP-WARNING,  Image deletion event missing for process: 22c03a91
ECP-ERROR,  Cannot allocate 34583520 bytes
680.4BSS::JILSONWFH in the Chemung River ValleyFri Mar 14 1997 14:4020
Last update before I go on vacation for a week.

This data is large by any stretch of the imagination.  I can't see how you 
could work with it without an Alpha workstation with at least 128 meg.  You 
*need* large working set and virtual address space.  

I was able to reduce 04-Feb 13:30-14:00 with little problems and I built a 
model that looks reasonable from the ECP_ENO.MEMORY;1 list (although I 
don't see the usefullness in your subclasses).

IMHO You need to spend a lot more time with the customer finding out 
*EXACTLY* what they want to model then look at the data with PSPA and find 
the best time period to model.  I suspect that they/you are falling into 
the trap of trying to create classes for every piece of work done on the 
system instead of just a handful of classes needed to answer the question 
at hand and are trying to model too long of a time period (ie > 1 hour).  I 
believe you can build a valid model out of this data but if you cannot 
after trying again then you need to IPMT this.

Jilly
680.5A brief analysis was done but very brief...MSE1::ENOHolographic MemoryTue Mar 25 1997 14:176
Yes the data set is very large... And I discovered that the tool will loop if disk 
configurations change which is the case for this customer... I use an Alpha 8400
with 2 GB memory and liberal working sets, but during the model build it still loops.

I have backed down to version 3.2, because version 4 kits simply crashes when I am 
attempting to do any model modification...