[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Conference netcad::hub_mgnt

Title:DEChub/HUBwatch/PROBEwatch CONFERENCE
Notice:Firmware -2, Doc -3, Power -4, HW kits -5, firm load -6&7
Moderator:NETCAD::COLELLADT
Created:Wed Nov 13 1991
Last Modified:Fri Jun 06 1997
Last Successful Update:Fri Jun 06 1997
Number of topics:4455
Total number of notes:16761

3147.0. "Add Failed-DECswitch 900EF" by ACISS2::BERNDT () Wed Jan 10 1996 13:29

    I am working with a Digital Field Engineer on a local account, who
    recently bought a DECswitch 900EF to add to their current config of Hub
    900, Concentrator and (2) DECswitch900EFs.
    
    Here is the problem from the FE:
    
    They can not add a 3rd Decswitch 900 to the FDDI ring, it
    comes up add failed. If I remove a Decswitch and then replace it with a new
    one it works fine. Colorado suggested taking the concentrator off the FDDI
    ring then adding the third switch, then bring the concentrator back on the 
    ring. This is not acceptable to the customer (they expect to add the
    new switch with the existing up and running). 
    
    Any known problems? Ideas?  Supposedly he is at the latest firmware
    revs and running Hubwatch 4.1. Thanks
    
    Ron Berndt @MWO   NPB SE  Home Office: 414-248-2584
    
T.RTitleUserPersonal
Name
DateLines
3147.1NETCAD::DOODYMichael DoodyWed Jan 10 1996 13:594
    Whats the FDDI lan interconnect look like? Which slots have A,B out the
    back and which ones have A or B out the front?
    
    -Mike
3147.2Heal Thyself?SWAM1::JACOMB_SCI know enough to be dangerous!!Wed Jan 10 1996 17:003
    Is Autohealing enabled?
    
    	-Scott