92.0. "cmp ops passdown april 97" by FABSIX::M_PROVENCHER () Mon Mar 24 1997 05:35

	cmp operations passdown for april, 1997
T.RTitleUserPersonal
Name
DateLines
91.1cmp passdown a shiftFABSIX::J_BLAISYou have readMon Mar 31 1997 20:4684
Note: We had a major back-up on the thickness tools, thickness.a5 had 6 (Six)
      lots backed up, thickness.a4 had 4+ backed up which caused 5+ hours of
      idle time on the polishing tools. contributors were a lot of ild3 lots
      that usually require a lot of repetitive 100% testing also 2 ILD3 lots
      were remarked for 100% post thickness measurement. There was a 
      consistent back-up by 1-6 lots through the whole shift. Another
      contributor was that we only have 2 thickness tools which were giving
      us trouble for pattern req which had to be re-taught. Also our 3rd
      thickness tool is still not available to us, we sure could of used it. 

 				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor	    Number Available
        ---------------     ----------------
        MQC-12K MONS           4   boxes 

        BREAKIN WAFERS         5   boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1   MQC      Needs MQC possible pad change too                   na
--------------------------------------------------------------------------------
CMP.A2   dwn      needs pad/carriers replaced -------------           na 
--------------------------------------------------------------------------------
CMP.B1   up running xd0836, xe0949.          04/01/97 9:00am    04/01/97 7:30am 
--------------------------------------------------------------------------------
CMP.B2   up idle, mqc pre-loaded ready to go      now           04/01/97 7:15am
--------------------------------------------------------------------------------
CMP.B3   up runing jd1135 sa only RR 3402@170s    now           04/01/97 7:30am
            runing yd0241 100% mea. on .a5 now
            MQC preread but not ran pre readings are in .a4 under cmp.b4 pre.
 	    we has a big back up on thickness tools so it would of been
	    impossible to run them, sorry.
 -------------------------------------------------------------------------------


CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 03/31/97 @  1:30 am 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 04/01/97 @  1:30 am

                                                        


Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
 jl1396@Films now eta 9:30pm		                                  
  

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
    lots                  na
  

Lots Processed

jl1212/
jd1106/24
jd1103/24
jl1256/24
jl1259/24
jl1257/24
jl1250/24
jd1278/6
jl1213/24
jl1160/23




         

# of carriers for strasbaugh/speedfam:
--------------------------------------
05  SPEEDFAM  
 7  STRASBAUGH
 3  PLATES F/S

  
91.2cmp passdown a shiftFABSIX::J_BLAISYou have readTue Apr 01 1997 20:5465
 				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor	    Number Available
        ---------------     ----------------
        MQC-12K MONS           4   boxes 

        BREAKIN WAFERS         4   boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1   up      running jd1233 need 100%mea 04/02/97 2:00pm          na
                 rr 2572@100 sec 
--------------------------------------------------------------------------------
CMP.A2   up       idle                       04/02/97 4:00pm          na 
--------------------------------------------------------------------------------
CMP.B1   up       idle                       04/02/97 4:00pm    04/02/97 12:00am
--------------------------------------------------------------------------------
CMP.B2   up running xd1115                   04/02/07 11:00am   04/01/97 9:40pm
            rr 4204@150 sec.
--------------------------------------------------------------------------------
CMP.B3   DWN   Wafer crash, pad/carriers (2) replaced will need full MQC       
               was running jd1135, it will need tup.
--------------------------------------------------------------------------------


CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 04/01/97 @  7:00 am 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 04/02/97 @  7:00 am

                                                        


Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
					jb1169 hold for eng.
  

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
31  lots              reduced in coming thickness for ild3...
  

Lots Processed

yd0241/11
jl1396/24 hot.




         

# of carriers for strasbaugh/speedfam:
--------------------------------------
 3  SPEEDFAM  
 7  STRASBAUGH
 3  PLATES F/S

  
91.3PASSDOWNFABSIX::D_CAUSEWed Apr 02 1997 08:3645
                             D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -UP/IDLE


CMP.A2 (Strasbaugh 6DS-SP) -UP/RUNNING JL1268 100% ING ON THK.A5 NEEDS T/U


CMP.B1 (Speedfam CMP-V) -UP/RUNNING JD1108 FIRST PASS RR 3466 180 SEC
                                    JD1175 FIRST PASS RR 3600 180 SEC


CMP.B2 (Speedfam CMP-V) - UP/RUNNING T/U ON XM1113 RR 3900 180 SECS

 
CMP.B3 (Speedfam CMP-V) - UP/RUNNING JL1196 100%ING ON THK.A4 NEEDS T/U 
                                     REM. RATE 3330 200 SEC 
                                     JL1222 100%ING ON THK.A4 NEEDS T/U
                                     REM. RATE 3532 200 SEC

 
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE

                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE

 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE
 

HOT lots in area:
----------------


BREAK IN WAFERS USED:20

MQC WAFERS USED:11 WAFERS USED

MQC WAFERS AVAIL:4 BOXES  

----------


91.4PASSDOWNFABSIX::D_CAUSESat Apr 05 1997 08:2344
                 

                            D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -UP/MQC PAD CHANGE RUNNING BREAKINS MQC WAFERS
                                   ARE BESIDE THE TOOL AND WERE READ ON A5


CMP.A2 (Strasbaugh 6DS-SP) -UP/IDLE


CMP.B1 (Speedfam CMP-V) -UP/RUNNING JL1172 RUNNING SEND AHEADS 180 SEC


CMP.B2 (Speedfam CMP-V) - UP/RUNNING JD1126 AND JL1152 SEND AHEADS 180 SEC

 
CMP.B3 (Speedfam CMP-V) - UP/RUNNING JL1201 NEEDS TOUCH UP

 
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE

                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE

 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE
 

HOT lots in area:
----------------


BREAK IN WAFERS USED:10

MQC WAFERS USED:8 WAFERS USED

MQC WAFERS AVAIL:4 BOXES  

----------


91.5passdown cmp b-shift 04/06/97FABSIX::M_PROVENCHERSun Apr 06 1997 07:43122
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 1                    mqcs

        BREAKIN WAFERS              35                   misc



CMP.A1 (Strasbaugh 6DS-SP) - dn/repair rotary union in process of being replaced
                                t: rr:  / t: rr:
CMP.A1 24h MQCS COMPLETED :  04/05/97 @  9:30 am
CMP.A1 24hr MQCS NEXT DUE :  04/06/97 @  9:30 am


CMP.A2 (Strasbaugh 6DS-SP) - up/idle (jd1240 pmd and jl1272 pmd premeasuring) 
			        t: rr:  / t: rr:
CMP.A2 24hr MQCS COMPLETED:  04/05/97 @  9:30 am
CMP.A2 24hr MQCS NEXT DUE :  04/06/97 @  9:30 am



CMP.B1 (Speedfam CMP-V)   - up/running jl1153 m1/
			               t:180  rr:/
CMP.B1 24hr MQCS COMPLETED: 04/05/97 @  4:00 pm
CMP.B1 24hr MQCS NEXT DUE : 04/06/97 @  4:00 pm 
CMP.B1 12hr MQCS COMPLETED: 04/06/97 @  6:00 am    
CMP.B1 12hr MQCS NEXT DUE : 04/06/97 @  6:00 pm 
			     

CMP.B2 (Speedfam CMP-V)   - up/running YD0238 m3 12w/JD1074 m3 23w
				       t:300 rr:2400/t:300 rr:2733   	
CMP.B2 24hr MQCS COMPLETED: 04/05/97 @  1:30 pm 
CMP.B2 24hr MQCS NEXT DUE : 04/06/97 @  1:30 pm
CMP.B2 12hr MQCS COMPLETED: 04/06/97 @  6:30 am  
CMP.B2 12hr MQCS NEXT DUE : 04/06/97 @  6:30 pm  
 
CMP.B3 (Speedfam CMP-V)   - up/running jl1213  dc1040 m2/jl1091  dc1044  m1
				t:160  rr:3502          / t: rr:
CMP.B3 24hr MQCS COMPLETED: 04/05/97 @  7:00 pm  
CMP.B3 24hr MQCS NEXT DUE : 04/06/97 @  7:00 pm 
CMP.B3 12hr MQCS COMPLETED: 04/06/97 @  6:00 am    
CMP.B3 12hr MQCS NEXT DUE : 04/06/97 @  6:00 pm 


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 04/05/97 @  9:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 04/06/97 @  9:00 pm 

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 04/05/97 @  9:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 04/06/97 @  9:00 pm 

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 04/05/97 @  9:00 pm 
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 04/06/97 @  9:00 pm 



Hot/B lots in area:
__________________
* jl1396 m1  *

Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* yd0238  m3 (cmp.b2)
  yd0238a m3 (cmp.b1) *
  
  
Down Equipment:
---------------
* none *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* jd1311 pmd (hotlot) #1 broke at cmp-scrub.a1 on spin station/stress fracture *

Hold Lots:
---------
* yd0238a on hold for pss, slow removal rate, range has become high. *
  
Monitor status:
--------------
4  boxes of 12K mqc wafers       
2� boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*20 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *
  "        " ILD3 t.d.c.o. per Kyle W.

Lots/wafers processed
--------------------
* jl1212  m2 22 wafers *
  JL1267 pmd 24 wafers
  jd1311 (Hotlot) PMD 23W
  JL1271 pmd 24 wafers
  

# of carriers for strasbaugh/speedfam:
--------------------------------------
  15  SPEEDFAM  
  11  STRASBAUGH
  2   PLATES F/S

91.6cmp passdown a shiftFABSIX::J_BLAISYou have readSun Apr 06 1997 20:5267
 				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor	    Number Available
        ---------------     ----------------
        MQC-12K MONS          2.5  boxes 

        BREAKIN WAFERS        1.5  boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1   up      idle, just passed MQC's     04/07/97 7:30pm          na
--------------------------------------------------------------------------------
CMP.A2   up      jd1240,jl1272               04/07/97 1:45pm          na 
--------------------------------------------------------------------------------
CMP.B1   up      jl1153,jl1274               04/07/97 4:00pm    04/07/97 6:00am 
--------------------------------------------------------------------------------
CMP.B2   up      jd1235,xd1115               04/07/97 4:15pm    04/07/97 3:15am
--------------------------------------------------------------------------------
CMP.B3   up      jl1396                      04/07/97 4:15pm    04/07/97 6:00am
--------------------------------------------------------------------------------


CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 04/05/97 @  9:00 pm 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 04/06/97 @  9:00 pm

                                                        


Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
jl1274,jl1396					yd0238a.
   

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
31  lots              reduced in coming thickness for ild3...
  

Lots Processed

xb0782/24
jd1074/23
jd1074/23
jl1212/22
yd0238/12
jl1213/24
jl1284d/6
jl1091/24



         

# of carriers for strasbaugh/speedfam:
--------------------------------------
13  SPEEDFAM  
11  STRASBAUGH
 2  PLATES F/S

  
91.7passdown cmp b-shift 04/07/97FABSIX::M_PROVENCHERMon Apr 07 1997 06:36134
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 1                    mqcs

        BREAKIN WAFERS              42                    misc



CMP.A1 (Strasbaugh 6DS-SP) - up/running jl1293 pmd 24w r/r 2402 t:100
                                        jl1273 pmd 24w r/r 2490 t:100
CMP.A1 24h MQCS COMPLETED :  04/06/97 @  7:30 pm
CMP.A1 24hr MQCS NEXT DUE :  04/07/97 @  7:30 pm


CMP.A2 (Strasbaugh 6DS-SP) - up/running jl1264 pmd 24w r/r 2240 t;100
CMP.A2 24hr MQCS COMPLETED:  04/06/97 @  1:30 pm
CMP.A2 24hr MQCS NEXT DUE :  04/07/97 @  1:30 pm



CMP.B1 (Speedfam CMP-V)   - up/running jl1093 m1/jd1107 m3 (first 300 sec)
			       t:200  rr:       /t:300 rr:
CMP.B1 24hr MQCS COMPLETED: 04/06/97 @  4:00 pm
CMP.B1 24hr MQCS NEXT DUE : 04/07/97 @  4:00 pm 
CMP.B1 12hr MQCS COMPLETED: 04/07/97 @  5:00 am     
CMP.B1 12hr MQCS NEXT DUE : 04/07/97 @  5:00 pm 
			     

CMP.B2 (Speedfam CMP-V)   - up/running jl1268 m1/jl1250 m1 
			      t:160 rr:         /t:160 rr:   	
CMP.B2 24hr MQCS COMPLETED: 04/06/97 @  4:00 pm 
CMP.B2 24hr MQCS NEXT DUE : 04/07/97 @  4:00 pm
CMP.B2 12hr MQCS COMPLETED: 04/07/97 @  3:00 am    
CMP.B2 12hr MQCS NEXT DUE : 04/07/97 @  3:00 pm  
 

CMP.B3 (Speedfam CMP-V)   - up/running jd1237 m1/ 
			      t:180  rr:2814    / t: rr:
CMP.B3 24hr MQCS COMPLETED: 04/06/97 @  4:00 pm  
CMP.B3 24hr MQCS NEXT DUE : 04/07/97 @  4:00 pm 
CMP.B3 12hr MQCS COMPLETED: 04/07/97 @  5:00 am    
CMP.B3 12hr MQCS NEXT DUE : 04/07/97 @  5:00 pm 


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 04/06/97 @  9:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 04/07/97 @  9:00 pm 

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 04/06/97 @  9:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 04/07/97 @  9:00 pm 

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 04/06/97 @  9:00 pm 
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 04/07/97 @  9:00 pm 



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* yd0238a m3 *
  XD1024  m3
  jd1230  m1
  xe1065  m1
  jd1107 m3 (b1)
    
Down Equipment:
---------------
* none *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* yd0238a on hold for pss, slow removal rate, range has become high. *
  jd1230 m1 
  jd1231 m1 both lots will need sort wafer # to slot#, 100% thick, and place on
            hold for e.bodensieck
  
Monitor status:
--------------
3  boxes of 12K mqc wafers       
4  boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*30+ lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *
  "        " ILD3 t.d.c.o. per Kyle W.

Lots/wafers processed
--------------------
* JL1240 pmd 24 wafers
  JL1272 pmd 24 wafers
  JL1274 pmd 24 wafers hotlot
  JL1273 pmd 24 wafers
  JD1235  m1 24 wafers
  jL1153  m2 17 wafers 
  jD1178  m2 24 wafers 
  XD1115  m3 24 wafers
  jL1396  m1 12 wafers hotlot 
  JL1090  m1 24 wafers
  jL1092  m1 24 wafers
  jL1117  m1 18 wafers
  
# of carriers for strasbaugh/speedfam:
--------------------------------------
  13  SPEEDFAM  
  11  STRASBAUGH
  2   PLATES F/S

91.8A shift CMP PassdownFABSIX::J_REISNERMon Apr 07 1997 20:57126
                                    CMP                                 
                                    ___
                           

CMP.A1 (Strasbaugh 6DS-SP) - down/needs pad change
CMP.A1 24h MQCS COMPLETED : 
CMP.A1 24hr MQCS NEXT DUE :  


CMP.A2 (Strasbaugh 6DS-SP) - up/idle
CMP.A2 24hr MQCS COMPLETED:  04/07/97 @  7:00 pm
CMP.A2 24hr MQCS NEXT DUE :  04/08/97 @  7:00 pm



CMP.B1 (Speedfam CMP-V)   - up/running XM1113 m2/jd1107 m3	       
CMP.B1 24hr MQCS COMPLETED: 04/06/97 @  4:00 pm
CMP.B1 24hr MQCS NEXT DUE : 04/07/97 @  4:00 pm 
CMP.B1 12hr MQCS COMPLETED: 04/07/97 @  7:30 pm     
CMP.B1 12hr MQCS NEXT DUE : 04/08/97 @  7:00 am 
			     

CMP.B2 (Speedfam CMP-V)   - up/idle 	
CMP.B2 24hr MQCS COMPLETED: 04/07/97 @  7:15 pm 
CMP.B2 24hr MQCS NEXT DUE : 04/08/97 @  7:15 pm
CMP.B2 12hr MQCS COMPLETED: 04/07/97 @  7:30 pm    
CMP.B2 12hr MQCS NEXT DUE : 04/08/97 @  7:30 am  
 

CMP.B3 (Speedfam CMP-V)   - up/mqc 1st MQC popped range chart. Offsets
                               adjusted. Needs 2nd set run (pre reading 
                               on Thickness.A5)
                            running XE1065 m1 needs TUP
CMP.B3 24hr MQCS COMPLETED:  
CMP.B3 24hr MQCS NEXT DUE : 
CMP.B3 12hr MQCS COMPLETED: 04/07/97 @  5:30 pm    
CMP.B3 12hr MQCS NEXT DUE : 04/08/97 @  5:30 am 


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 04/06/97 @  9:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 04/07/97 @  9:00 pm 

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 04/06/97 @  9:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 04/07/97 @  9:00 pm 

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 04/06/97 @  9:00 pm 
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 04/07/97 @  9:00 pm 



Hot/B lots in area:
__________________
* XE1198 *

Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* yd0238a m3 * will run tomorrow am
  XD1024  m3\
  jd1230  m1 \  Eric will send a note out on these lots
  jd1231  m1 - Eric is running
  YD0241 will polish tomorrow
  
 
    
Down Equipment:
---------------
* none *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* yd0238a on hold  *will run tomorrow am*

  
Monitor status:
--------------
3  boxes of 12K mqc wafers       
5  boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*30+ lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *
  "        " ILD3 t.d.c.o. per Kyle W.

Lots/wafers processed
--------------------
* JL1264/24 PMD
  JL1293/24 PMD
  JL1304/24 PMD
  JD1237/24 ILD1
  JL1250/24 ILD1
  JL1268/24 ILD1
  JL1300/24 PMD
  JL1117/18 ILD1
  JD1178/24 ILD2
  JL1269/21 PMD
  JL109324 ILD1
  JL1303/24 PMD

  
# of carriers for strasbaugh/speedfam:
--------------------------------------
  13  SPEEDFAM  
  11  STRASBAUGH
  2   PLATES F/S

        
91.9passdown cmp b-shift 04/08/97FABSIX::M_PROVENCHERTue Apr 08 1997 06:47136
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                11                    mqcs

        BREAKIN WAFERS              37                    misc



CMP.A1 (Strasbaugh 6DS-SP) - up/idle down at shift change (pad change) up at 
				     12:30 am

CMP.A1 24h MQCS COMPLETED :  04/08/97 @ 12:30 am
CMP.A1 24hr MQCS NEXT DUE :  04/09/97 @ 12:30 am


CMP.A2 (Strasbaugh 6DS-SP) - up/idle

CMP.A2 24hr MQCS COMPLETED:  04/07/97 @  7:00 pm
CMP.A2 24hr MQCS NEXT DUE :  04/08/97 @  7:00 pm



CMP.B1 (Speedfam CMP-V)   - up/running jd1177 m2/t:190 rr:3326
		                       jd1105 m3/t:350 rr:
CMP.B1 24hr MQCS COMPLETED: 04/07/97 @  5:00 pm
CMP.B1 24hr MQCS NEXT DUE : 04/08/97 @  5:00 pm 
CMP.B1 12hr MQCS COMPLETED: 04/08/97 @  4:30 am      
CMP.B1 12hr MQCS NEXT DUE : 04/08/97 @  4:30 pm 
		         	     

CMP.B2 (Speedfam CMP-V)   - up/running JD1106 M3/t:300 rr:
                                       JL1223 M2/t:160 rr:4374       	
CMP.B2 24hr MQCS COMPLETED: 04/07/97 @  7:00 pm 
CMP.B2 24hr MQCS NEXT DUE : 04/08/97 @  7:00 pm
CMP.B2 12hr MQCS COMPLETED: 04/08/97 @  7:00 am     
CMP.B2 12hr MQCS NEXT DUE : 04/08/97 @  7:00 pm  
 

CMP.B3 (Speedfam CMP-V)   - up/running xd1109 m3/t:350  rr:2400
                                       jl1224 m2/t:190 rr:
			       tool in mqc at shift change, failed 1st set of 
			       mqc (24hr). tool up at 11:00 pm
CMP.B3 24hr MQCS COMPLETED: 04/07/97 @ 11:00 pm  
CMP.B3 24hr MQCS NEXT DUE : 04/08/97 @ 11:00 pm 
CMP.B3 12hr MQCS COMPLETED: 04/08/97 @  4:30 am     
CMP.B3 12hr MQCS NEXT DUE : 04/08/97 @  4:30 pm 


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 04/07/97 @ 10:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 04/08/97 @ 10:00 pm 

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 04/07/97 @ 10:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 04/08/97 @ 10:00 pm 

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 04/07/97 @ 10:00 pm 
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 04/08/97 @ 10:00 pm 



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* jd1233 m1 1.34 days
  jd1106 m3 1.42 days
  xd1104 m1 1.53 days
  xd1024 m3 2.59 days eric b.lot
  jd1102 m3 1.14 days
  jl1252 m1 1.56 days
  yd0241 m4 1.68 days 
    
Down Equipment:
---------------
* none *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* yd0238a on hold for pss, slow removal rate, range has become high. *
  jd1230 m1 run 150 sec 100% thk and stp ht. on hold for/per e.bodensieck 
  jd1231 m1"                                                             "
  
Monitor status:
--------------
3  boxes of 12K mqc wafers       
4  boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*27 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *
  "        " ILD3 t.d.c.o. per Kyle W.

Lots/wafers processed
--------------------
*  JL1222  m2 24 wafers *
   XE1065  m1 24 wafers
   JD1247 pmd 24 wafers
   JL1270 pmd 24 wafers
   JL1294 pmd 24 wafers
   xm1113  m2 24 wafers 
   jd1107  m3 23 wafers
   XE1198  m2 21 wafers *HOT* 
   jl1228  m2 24 wafers
 
# of carriers for strasbaugh/speedfam:
--------------------------------------
  13  SPEEDFAM  
   9  STRASBAUGH
   2  PLATES F/S

91.10cmp passdown a shiftFABSIX::J_BLAISYou have readTue Apr 08 1997 21:1167
 				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor	    Number Available
        ---------------     ----------------
        MQC-12K MONS          2.0  boxes 

        BREAKIN WAFERS        1.5  boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1   up                                  04/08/97 12:00pm         na
--------------------------------------------------------------------------------
CMP.A2   up   running breakins/mqc                                    na 
--------------------------------------------------------------------------------
CMP.B1  Un Schld Down for wafer slip out+head 2 not rotating                    
--------------------------------------------------------------------------------
CMP.B2   up/MQC   running mqc's                   now            04/08/97 7:45am
--------------------------------------------------------------------------------
CMP.B3  Schld DWN  for pad and conditioner change. max life reached on pad.    
--------------------------------------------------------------------------------


CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 04/07/97 @  9:00 pm 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 04/08/97 @  9:00 pm

                                                        


Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
jd1311					jd1230,jd1231 Erib B. is working on them
   

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
29  lots              reduced in coming thickness for ild3...
  

Lots Processed

jd1105/24
jl1224/24
jd1177/24
jd1246/24
jl1306/24
jl1223/24
jl1228/23
yd0238a/11
xd1109/20


         

# of carriers for strasbaugh/speedfam:
--------------------------------------
13  SPEEDFAM  
09  STRASBAUGH
 2  PLATES F/S

  
91.11passdown cmp b-shift 04/09/97FABSIX::M_PROVENCHERWed Apr 09 1997 06:46132
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                24                    mqcs

        BREAKIN WAFERS              45                    misc



CMP.A1 (Strasbaugh 6DS-SP) - up/idle 
CMP.A1 24h MQCS COMPLETED :  04/09/97 @  1:00 am
CMP.A1 24hr MQCS NEXT DUE :  04/10/97 @  1:00 am


CMP.A2 (Strasbaugh 6DS-SP) - up/idle
                                tool down at shift change (pm monthly), which
				includes pad change. failed 1st set of mqc's
				passed 2nd set. up at 12:30 am
CMP.A2 24hr MQCS COMPLETED:  04/09/97 @ 12:30 pm
CMP.A2 24hr MQCS NEXT DUE :  04/10/97 @ 12:30 pm



CMP.B1 (Speedfam CMP-V)   - up/running xd1024 m3 touchup 
		                       
			       tool in mqc(24hr) at shift change. up at 11:30pm
CMP.B1 24hr MQCS COMPLETED: 04/08/97 @ 11:30 pm
CMP.B1 24hr MQCS NEXT DUE : 04/09/97 @ 11:30 pm 
CMP.B1 12hr MQCS COMPLETED: 04/08/97 @  4:30 am *      
CMP.B1 12hr MQCS NEXT DUE : 04/08/97 @  4:30 pm *
		         	     

CMP.B2 (Speedfam CMP-V)   - up/running JL1396 M2  t:160s *HOT*
                                       JL1274 M1  t:160s *HOT*
			       tool had to go down for overdue 24hr mqc's 
			       @ 8:30 pm. tool up at 9:30pm 	
CMP.B2 24hr MQCS COMPLETED: 04/08/97 @  9:30 pm 
CMP.B2 24hr MQCS NEXT DUE : 04/09/97 @  9:30 pm
CMP.B2 12hr MQCS COMPLETED: 04/08/97 @  7:00 am     
CMP.B2 12hr MQCS NEXT DUE : 04/08/97 @  7:00 pm  
 

CMP.B3 (Speedfam CMP-V)   - up/mqc
			       tool down/sched at shift change maint changed 
			       and calibrated the pad conditioner, pad change
			       breakin & mqc's. failed 1st set (uniformity)
			       running 2nd set
CMP.B3 24hr MQCS COMPLETED: in process  
CMP.B3 24hr MQCS NEXT DUE : n/a 
CMP.B3 12hr MQCS COMPLETED: 04/09/97 @  7:00 am     
CMP.B3 12hr MQCS NEXT DUE : 04/09/97 @  7:00 pm 


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 04/09/97 @  1:00 am 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 04/10/97 @  1:00 am 

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 04/09/97 @  1:00 am 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 04/10/97 @  1:00 am 

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 04/09/97 @  1:00 am 
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 04/10/97 @  1:00 am 



Hot/B lots in area:
__________________
* JL1396 M2  *
  JL1274 M1  *

Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* lots  *
    
Down Equipment:
---------------
* cmp.b3 2nd set of mqc's *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
--------------                                                             
  
Monitor status:
--------------
3  boxes of 12K mqc wafers       
3  boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*25 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *
  "        " ILD3 t.d.c.o. per Kyle W.

Lots/wafers processed
--------------------
*  YD0241  m3 11 wafers
   JD1106  M3 24 wafers
   jd1311  m1 23 wafers hotlot
   jd1230  m1 24 wafers
   jd1231  m1 24 wafers
   jl1266 pmd 24 wafers
   JL1225  M2 24 wafers
   JL1226  M2 24 wafers
   
    
# of carriers for strasbaugh/speedfam:
--------------------------------------
  13  SPEEDFAM  
   9  STRASBAUGH
   2  PLATES F/S

91.12cmp passdown a shiftFABSIX::J_BLAISYou have readWed Apr 09 1997 21:0670
 				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor	    Number Available
        ---------------     ----------------
        MQC-12K MONS          3.0  boxes 

        BREAKIN WAFERS        4.0  boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1   up           idle                   04/10/97 1:00am          na
--------------------------------------------------------------------------------
CMP.A2   up           idle                   04/10/97 1:00am          na 
--------------------------------------------------------------------------------
CMP.B1   up           idle                   04/09/97 11:00pm  04/09/97 9:30pm  
--------------------------------------------------------------------------------
CMP.B2   up   running xe1112 ild1            04/09/97 10:00pm  04/10/97 7:00am
              running xd1071 ild2              
--------------------------------------------------------------------------------
CMP.B3 UnSchld DWN  very low removal rate will need pad change/full MQC's       
		running jl1251 RR 3383@180 sec when tool is up.
--------------------------------------------------------------------------------


CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 04/08/97 @  9:00 pm 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 04/09/97 @  9:00 pm

                                                        


Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
      					                                        
   

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
23  lots              reduced in coming thickness for ild3...
  

Lots Processed

xb1024/18
jl1396/12
jd1108/11
jl1274/24
xm1194/11
xm1164/11
jl1227/24
jd1102/24




         

# of carriers for strasbaugh/speedfam:
--------------------------------------
13  SPEEDFAM  
09  STRASBAUGH
 2  PLATES F/S

  
91.13passdown cmp b-shift 04/13/97FABSIX::M_PROVENCHERSun Apr 13 1997 07:28130
<                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                28                    mqcs

        BREAKIN WAFERS              45                    misc



CMP.A1 (Strasbaugh 6DS-SP) - up/running JL1346 pmd 24w t:100 r/r:2590
                                        jd1307 pmd 24w t:100 r/r:2360
				tool down at shift change, due to pad change,
			        mqc's
				up at 10:00 pm 
CMP.A1 24h MQCS COMPLETED :  04/12/97 @ 10:00 pm
CMP.A1 24hr MQCS NEXT DUE :  04/13/97 @ 10:00 pm


CMP.A2 (Strasbaugh 6DS-SP) - up/running XD1205 pmd 23w t:90  r/r:2400
                                        JD1297 pmd 24w t:100 r/r:2210
CMP.A2 24hr MQCS COMPLETED:  04/12/97 @  1:00 pm
CMP.A2 24hr MQCS NEXT DUE :  04/13/97 @  1:00 pm



CMP.B1 (Speedfam CMP-V)   - up/running xe1198 ild3 t:400 rr:2250
                                   xm1113 opr#2003 t:180 rr:3209    
			       tool in mqc(24hr) at shift change. failed 1st
			       set of mqc passed 2nd set. up at 11:30 pm
CMP.B1 24hr MQCS COMPLETED: 04/12/97 @  11:30 pm 
CMP.B1 24hr MQCS NEXT DUE : 04/13/97 @  11:30 pm 
CMP.B1 12hr MQCS COMPLETED: 04/13/97 @   6:00 am       
CMP.B1 12hr MQCS NEXT DUE : 04/14/97 @   6:00 pm 
		         	     

CMP.B2 (Speedfam CMP-V)   - dn/unsch tool went down at 5:00 am for inverter era
			           in interval #5 (wafer slipped out of carrier
				   #1). carrier was replaced, and mqc's are in
				   process. no wafers lost. 
          JD1075 (see remarks and read the specs) ILD23 rr1683 T400s
          XB0782 M3 rr3629 t:300 this lot was on the tool when it went down
CMP.B2 24hr MQCS COMPLETED: in process when maint gives back tool
CMP.B2 24hr MQCS NEXT DUE : n/a
CMP.B2 12hr MQCS COMPLETED: 04/13/97 @  6:30 am      
CMP.B2 12hr MQCS NEXT DUE : 04/14/97 @  6:30 pm  
 

CMP.B3 (Speedfam CMP-V)   - up/running jd1237  m2 t:180 rr:2631 
CMP.B3 24hr MQCS COMPLETED: 04/12/97 @  5:30 pm
CMP.B3 24hr MQCS NEXT DUE : 04/13/97 @  5:30 pm
CMP.B3 12hr MQCS COMPLETED: 04/12/97 @  9:00 pm     
CMP.B3 12hr MQCS NEXT DUE : 04/13/97 @  9:00 am 


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 04/12/97 @  9:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 04/13/97 @  9:00 pm
 
CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 04/12/97 @  9:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 04/13/97 @  9:00 pm 

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 04/12/97 @  9:00 pm 
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 04/13/97 @  9:00 pm 



Hot/B lots in area:
__________________
*  *

Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* lots  *
    
Down Equipment:
---------------
* cmp.b4  *
  cmp.b2 24 hr mqc's, new carrier
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
--------------                                                             
  
Monitor status:
--------------
3  boxes of 12K mqc wafers       
3  boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*16 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *
  "        " ILD3 t.d.c.o. per Kyle W.

Lots/wafers processed
--------------------
* JD1289 pmd 23 wafers
  JL1322 pmd 24 wafers
  JD1298 pmd 24 wafers
  JD1214 pmd 24 wafers
  JL1270  m1 24 wafers
  jd1246  m1 24 wafers 
    
# of carriers for strasbaugh/speedfam:
--------------------------------------
  13  SPEEDFAM  
   9  STRASBAUGH
   2  PLATES F/S

91.14cmp passdown a shifFABSIX::J_BLAISYou have readSun Apr 13 1997 20:5873
 				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor	    Number Available
        ---------------     ----------------
        MQC-12K MONS          3.0  boxes 

        BREAKIN WAFERS        3.0  boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1   up  running jl1319                  04/13/97 9:00pm          na
--------------------------------------------------------------------------------
CMP.A2   up           idle                   04/14/97 7:45pm          na 
--------------------------------------------------------------------------------
CMP.B1   up  running jl1119                  04/13/97 12:00pm  04/14/97 7:40pm  
--------------------------------------------------------------------------------
CMP.B2   up  running jd1177,jl1269           04/14/97  8:30am  04/14/97 8:30am
--------------------------------------------------------------------------------
CMP.B3   up/MQC  running  MQC,xm1194, xd1021    running        04/14/97 6:30pm
--------------------------------------------------------------------------------


CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 04/12/97 @  11:00pm 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 04/03/97 @  11:00pm

                                                        


Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
      					                                        
   

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
 15 lots              reduced in coming thickness for ild3...
  

Lots Processed

xe1243/24
jl1329/23
jd1307/24
jl1346/24
xd1205/23
jd1237/24
xb0782/22
jd1297/24
jl1331/23
jl1117/17
xm1113/24
xe1198/21
jd1308/24 hot




         

# of carriers for strasbaugh/speedfam:
--------------------------------------
13  SPEEDFAM  
09  STRASBAUGH
 2  PLATES F/S

  
91.15passdown cmp b-shift 04/14/97FABSIX::M_PROVENCHERMon Apr 14 1997 07:03136
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                26                    mqcs

        BREAKIN WAFERS              42                    misc



CMP.A1 (Strasbaugh 6DS-SP) - up/running JL1317 t:100 r/r:2350
				tool down at 11 pm for pad change (failed mqc's)
				up at 3am
CMP.A1 24h MQCS COMPLETED :  04/14/97 @  3:00 am
CMP.A1 24hr MQCS NEXT DUE :  04/15/97 @  3:00 am


CMP.A2 (Strasbaugh 6DS-SP) - up/running JL1328 t:100 r/r:2260 
                                tool crash at 11:30pm came back up at
				at 5am
CMP.A2 24hr MQCS COMPLETED:  04/14/97 @  5:00 am
CMP.A2 24hr MQCS NEXT DUE :  04/15/97 @  5:00 am



CMP.B1 (Speedfam CMP-V)   - up/running jl1252 m2 t:180 rr:
			               jd1296 m1 t:180 rr: 
CMP.B1 24hr MQCS COMPLETED: 04/14/97 @   3:00 pm 
CMP.B1 24hr MQCS NEXT DUE : 04/15/97 @   3:00 pm 
CMP.B1 12hr MQCS COMPLETED: 04/14/97 @   3:00 am       
CMP.B1 12hr MQCS NEXT DUE : 04/14/97 @   3:00 pm 
		         	     

CMP.B2 (Speedfam CMP-V)   - up/mqc (Jd1232 m2 /JD1311 M3 on tool)  
			       tool placed into mqc early, due to one carrier 
			       being over agressive on removal.this was noticed
			       on touch ups and send aheads on a different lot 
			       tool in mqc at 4 am. failed for high removal 
                               (carrier 1 and 5 were high) 
			       range (447) running offset prog. and 2nd set of
			       mqc's 
CMP.B2 24hr MQCS COMPLETED: in process
CMP.B2 24hr MQCS NEXT DUE : n/a
CMP.B2 12hr MQCS COMPLETED: 04/14/97 @ 12:30 am      
CMP.B2 12hr MQCS NEXT DUE : 04/14/97 @ 12:30 pm  
 

CMP.B3 (Speedfam CMP-V)   - up/running jd1312 m1 t:180 rr:3243
CMP.B3 24hr MQCS COMPLETED: 04/14/97 @  8:30 pm
CMP.B3 24hr MQCS NEXT DUE : 04/15/97 @  8:30 pm
CMP.B3 12hr MQCS COMPLETED: 04/14/97 @  7:00 am      
CMP.B3 12hr MQCS NEXT DUE : 04/14/97 @  7:00 pm 


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 04/14/97 @ 12:00 am 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 04/15/97 @ 12:00 am
 
CMP-SCRUB.A2 (On-track scrubber) - dn/unsched robot problems down at 5:30 am 
				      tool was down @11pm back up @ 2am
CMP-SCRUB.A2 24hr MQCS COMPLETED: 04/14/97 @ 12:00 am 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 04/15/97 @ 12:00 am 

CMP-SCRUB.A3 (On-track scrubber) - up/idle tool went down briefly @3:30 back up 
				      @ 4am
CMP-SCRUB.A3 24hr MQCS COMPLETED: 04/14/97 @ 12:00 am 
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 04/15/97 @ 12:00 am 



Hot/B lots in area:
__________________
* jd1311 m3 (next available tool)  *

Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* none  *
    
Down Equipment:
---------------
*cmp.b2 mqc's *
 cmp-scrub.a2 robot problems
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* jl1330 pmd 1 wafer (crash cmp.a2) *

Hold Lots:
--------------                                                             
* none *

Monitor status:
--------------
2  boxes of 12K mqc wafers       
2  boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*16 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *
  "        " ILD3 t.d.c.o. per Kyle W.

Lots/wafers processed
--------------------
* jl1191  m1 24 wafers * 
  JD1177  M3 24 wafers 
  JL1269  M1 21 wafers
  JL1319 pmd 24 wafers
  JL1354 pmd 24 wafers
  JL1330 pmd 23 wafers
  jd1230  m2 24 wafers
  jd1247  m1 24 wafers
  xm1164  m1 11 wafers 
  xd1021  m1 24 wafers  
   
# of carriers for strasbaugh/speedfam:
--------------------------------------
   8  SPEEDFAM  
   7  STRASBAUGH
   2  PLATES F/S

91.16cmp passdown a shiftFABSIX::J_BLAISYou have readMon Apr 14 1997 21:1273
 				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor	    Number Available
        ---------------     ----------------
        MQC-12K MONS          3.0  boxes 

        BREAKIN WAFERS        3.0  boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1   up  running jl1339, jl1355          04/15/97 3:00am          na
--------------------------------------------------------------------------------
CMP.A2   up           idle                   04/15/97 5:00am          na 
--------------------------------------------------------------------------------
CMP.B1   up  running  jd1174,jd1172          04/15/97 3:00am   04/15/97 3:00am  
--------------------------------------------------------------------------------
CMP.B2   up  running  jd1232,jd1176          04/15/97 10:00am  04/14/97 10:00pm
--------------------------------------------------------------------------------
CMP.B3   up/MQC running xm1194               04/14/97  8:00pm  04/15/97 6:45pm
--------------------------------------------------------------------------------


CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 04/14/97 @  11:00pm 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 04/15/97 @  11:00pm

                                                        


Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
      					                                        
   

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
 15 lots              reduced in coming thickness for ild3...
  

Lots Processed

jl1337/24
jl1252/24
jl1340/24
jl1296/24
jl1338/24
jl1332/23
jl1343/24
jl1320/24
jd1312/24
jl1328/24
jd1248/24
jl1317/24
xd1021/24




         

# of carriers for strasbaugh/speedfam:
--------------------------------------
13  SPEEDFAM  
09  STRASBAUGH
 2  PLATES F/S

  
91.17passdown cmp b-shift 04/15/97FABSIX::M_PROVENCHERTue Apr 15 1997 06:22128
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                13                    mqcs

        BREAKIN WAFERS              37                    misc



CMP.A1 (Strasbaugh 6DS-SP) - up/idle  
				
CMP.A1 24h MQCS COMPLETED :  04/15/97 @  4:00 am 
CMP.A1 24hr MQCS NEXT DUE :  04/16/97 @  4:00 am


CMP.A2 (Strasbaugh 6DS-SP) - up/idle  
                               
CMP.A2 24hr MQCS COMPLETED:  04/15/97 @  5:00 am
CMP.A2 24hr MQCS NEXT DUE :  04/16/97 @  5:00 am



CMP.B1 (Speedfam CMP-V)   - up/idle
CMP.B1 24hr MQCS COMPLETED: 04/15/97 @   5:00 am 
CMP.B1 24hr MQCS NEXT DUE : 04/16/97 @   5:00 am 
CMP.B1 12hr MQCS COMPLETED: 04/15/97 @   3:00 am       
CMP.B1 12hr MQCS NEXT DUE : 04/15/97 @   3:00 pm 
		         	     

CMP.B2 (Speedfam CMP-V)   - up/running xd1168 m3 running t:350 rr:
                                       jl1271 m2 running t:160 rr:
CMP.B2 24hr MQCS COMPLETED: 04/14/97 @ 10:00 am
CMP.B2 24hr MQCS NEXT DUE : 04/15/97 @ 10:00 am
CMP.B2 12hr MQCS COMPLETED: 04/14/97 @ 10:30 am      
CMP.B2 12hr MQCS NEXT DUE : 04/15/97 @ 10:30 pm  
 

CMP.B3 (Speedfam CMP-V)   - up/running xm1194 m2 rr2277 t179
                                       jd1233 m2 rr2719 t170   
CMP.B3 24hr MQCS COMPLETED: 04/14/97 @ 10:00 pm
CMP.B3 24hr MQCS NEXT DUE : 04/15/97 @ 10:00 pm
CMP.B3 12hr MQCS COMPLETED: 04/14/97 @ 10:00 pm      
CMP.B3 12hr MQCS NEXT DUE : 04/15/97 @ 10:00 am 


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 04/15/97 @  1:30 am 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 04/16/97 @  1:30 am
 
CMP-SCRUB.A2 (On-track scrubber) - 
CMP-SCRUB.A2 24hr MQCS COMPLETED: 04/15/97 @  1:30 am 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 04/16/97 @  1:30 am 

CMP-SCRUB.A3 (On-track scrubber) - up/idle (tool was down til 5:00 am). 
CMP-SCRUB.A3 24hr MQCS COMPLETED: 04/14/97 @ 12:00 am 
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 04/15/97 @ 12:00 am 



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* none  *
    
Down Equipment:
---------------
* cmp-scrub.a3 down until 5:00 am *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
--------------                                                             
* none *

Monitor status:
--------------
3  boxes of 12K mqc wafers       
3  boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*7 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *
  "        " ILD3 t.d.c.o. per Kyle W.

Lots/wafers processed
--------------------
* JD1232  m2 22 wafers
  JD1311  M3 23 wafers
  JD1176  M3 21 wafers
  jl1356 pmd 24 wafers
  jl1355 pmd 24 wafers
  jl1354 pmd 24 wafers
  jl1321 pmd 24 wafers
  jl1339 pmd 24 wafers
  jd1174  m3 24 wafers
  jd1172  m3 24 wafers
  JD1175  M3 20 wafers
  
  
   
# of carriers for strasbaugh/speedfam:
--------------------------------------
   8  SPEEDFAM  
   7  STRASBAUGH
   2  PLATES F/S

91.18a-shift passdown 4-15FABSIX::B_SAVAGEAUTue Apr 15 1997 20:5913
CMP PASSDOWN   4-15 A-SHIFT

CMP.A1 STATUS MQC   (running breakins)
CMP.A2 STATUS IDLE
CMP.B1 STATUS IDLE
CMP.B2 STATUS Down  (transformer blew while running product)
                     2 lots in process JD1289 ILD1
                                       XD1024 ILD2
CMP.B3 STATUS Running JD1286 ILD1 
CMP.B4 STATUS ENG

The remaining tools in room are up.
 
91.19FABSIX::M_CADIEUXKADOUThu Apr 17 1997 08:5252
                            CMP D SHIFT PASSDOWN



       
CMP.A1(Strasbaugh 6DS-SP)-UP/RUNNING-1     -JL1363(PMD) RUNNING FIRST PASS
                                            REM.RATE=2435 RUNTIME=100
                                            NEEDS 100% AND TOUCH-UP

CMP.A2(Strasbaugh 6DS-SP)-UP/RUNNING-1     -JL1351(PMD) SA' RUN 100 SEC
                                            NEED EVALUATION

                                      
CMP.B1(Speedfam CMP-V)-UP/RUNNING-2        -**JD1312(HOT)**(ILD2) 
                                            NEEDS TOUCH-UP, READ ON.A4                      
                                            RUN TIME=180 REM.RATE=3474
                                           -XD1104(ILD2) NEEDS SCRUB AND FINAL
                                            MEASURED ON.A4 
                                            REM.RATE=3176 RUN TIME=170

CMP.B2(Speedfam CMP-V)-UP/RUNNING-1       -JD1246(ILD2) SA' READ ON.A5
                                           READY FOR FIRST PASS 
                                           RUN TIME=180
                                                      
                                                                                
CMP.B3 (Speedfam CMP-V)-UP/RUNNING-2       -XD1205(ILD1) SA'S READ ON.A4
                                            READY FOR FIRST PASS
                                            REM.RATE=3399 RUN TIME=180              
                                           -JL1161(ILD2) SA'S READ ON.A4
                                            READY FOR FIRST PASS
                                            REM.RATE=3166 RUN TIME=180       
                                            
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE 
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE 

 

HOT LOTS IN AREA:
----------------
**JD1312(ILD2)**RUNNING ON B1
----------------
MQC WAFERS USED: 24
-------------------
MQC WAFERS AVAIL:3.5
-------------------
LOTS ON HOLD=NONE 
-------------------

91.20FABSIX::M_CADIEUXKADOUFri Apr 18 1997 08:5146
                            CMP D SHIFT PASSDOWN



       
CMP.A1(Strasbaugh 6DS-SP)-UP/IDLE          -


CMP.A2(Strasbaugh 6DS-SP)-UP/RUNNING-2     -JD1238(PMD)FIRST PASS
                                            READ ON.A
                                            REM.RATE=2150 RUN TIME=100
                                      
CMP.B1(Speedfam CMP-V)-UP/IDLE    **HOT**  -JL1341(ILD1) IN SCRUB.A1
                                            NEEDS FINAL, ON.A5
                                            REM.RATE-4129 RUN TIME=170

CMP.B2(Speedfam CMP-V)-UP/MQC              -READ ON.A1, FAILED FIRST MQC
                                            READY TO RUN 
                                            ANNOTATION STILL OPEN:9696
                                                      
                                                                                
CMP.B3 (Speedfam CMP-V)-UP/RUNNING-2       -JL1186(ILD1) 100%ING ON.A4
                                            REM.RATE=3166 RUN TIME=180
                                           -JL1270(ILD2) ON SCRUB.A3
                                            NEED 100%ON.A5
                                            REM.RATE=2866 RUN TIME=180                                            
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE 
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE 

 

HOT LOTS IN AREA:
----------------
**JL1341**RUN ON .B1
------------------
MQC WAFERS USED: 4 BOXES
-------------------
MQC WAFERS AVAIL:12
-------------------
LOTS ON HOLD=NONE
-------------------

91.21FABSIX::M_CADIEUXKADOUSat Apr 19 1997 08:4553
    
                            CMP D SHIFT PASSDOWN



       
CMP.A1(Strasbaugh 6DS-SP)-UP/RUNNING-1     -JL1320(ILD1) 100%ING ON.A5
                                            NEEDS TOUCH-UPS, RUN TIME=6 MIN. 


CMP.A2(Strasbaugh 6DS-SP)-UP/RUNNING-1     -JL1389(PMD) SA'S READIN ON.A1
                                            RUN TIME=100       


CMP.B2(Speedfam CMP-V)-UP/RUNNING-2        -JD1297(ILD1) READY TO RUN
                                           -JD1287(ILD1 READY FOR FIRST PASS
                                            MEASURED ON.A4
                                            RUN TIME=180 REM.RATE=3570 
                                                      
                                                                                
CMP.B3 (Speedfam CMP-V)-UP/RUNNING-1       -JD1214(ILD1) SA' ON.A5
                                            RUN TIME=200
                                       



CMP.B4 (Speedfam CMP-V)

                                            
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE 
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE 

 

HOT LOTS IN AREA:
----------------
   NONE
------------------
MQC WAFERS USED:18
-------------------
MQC WAFERS AVAIL:2.5
-------------------
LOTS ON HOLD=JL1331
             JL1147
             JL1191
             JL1015
-------------------

    
91.22passdown cmp b-shift 04/20/97FABSIX::M_PROVENCHERSun Apr 20 1997 07:06141
<                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                31                    mqcs

        BREAKIN WAFERS              67                    misc



CMP.A1 (Strasbaugh 6DS-SP) - up/running Jl1394 pmd t:165 sec rr:1900 
CMP.A1 24h MQCS COMPLETED :  04/19/97 @ 11:00 pm 
CMP.A1 24hr MQCS NEXT DUE :  04/20/97 @ 11:00 pm 


CMP.A2 (Strasbaugh 6DS-SP) - up/mqc  
CMP.A2 24hr MQCS COMPLETED:  in process 
CMP.A2 24hr MQCS NEXT DUE :  n/a



CMP.B1 (Speedfam CMP-V)   - sched/dn/to be shipped out
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a 
CMP.B1 12hr MQCS COMPLETED: n/a       
CMP.B1 12hr MQCS NEXT DUE : n/a 
		         	     

CMP.B2 (Speedfam CMP-V)   - up/running jd1312  m3 t:400  rr:2100
				       jd1307  m1 t:160  rr:4125 
			       tool down at 9pm, due to crash on secondary pad,
			       up at 2:30 am. down at 3:00 am, multihead problem
			       up at 3:30 am	
CMP.B2 24hr MQCS COMPLETED: 04/20/97 @  2:30 am 
CMP.B2 24hr MQCS NEXT DUE : 04/21/97 @  2:30 am 
CMP.B2 12hr MQCS COMPLETED: 04/20/97 @  2:30 am       
CMP.B2 12hr MQCS NEXT DUE : 04/20/97 @  2:30 pm  
 

CMP.B3 (Speedfam CMP-V)   - up/running jl1341 m2 (hotlot)  
CMP.B3 24hr MQCS COMPLETED: 04/19/97 @ 10:30 pm 
CMP.B3 24hr MQCS NEXT DUE : 04/20/97 @ 10:30 pm
CMP.B3 12hr MQCS COMPLETED: 04/20/97 @  7:00 pm      
CMP.B3 12hr MQCS NEXT DUE : 04/20/97 @  7:00 am  


CMP.B4 (Speedfam CMP-V)   - up/ENG
                               A barrel of 12% solids was hooked up to previous
                               pad to run MQC so the tool could be handed over 
                               to production.
			       tool down at shift change for pad change, failed
			       particles. up at 2:30 am
			       This tool can be used in an emergency, if b2,or
			       b3 are down for a good chunk of time. per Matt 
			       VanHanehem
			       please keep to up/eng, per b.tower 
CMP.B4 24hr MQCS COMPLETED: 04/20/97 @  2:30 am
CMP.B4 24hr MQCS NEXT DUE : 04/21/97 @  2:30 am
CMP.B4 12hr MQCS COMPLETED: 04/20/97 @  2:30 am
CMP.B4 12hr MQCS NEXT DUE : 04/20/97 @  2:30 pm


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 04/20/97 @  3:00 am  
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 04/21/97 @  3:00 am  
 
CMP-SCRUB.A2 (On-track scrubber) - 
CMP-SCRUB.A2 24hr MQCS COMPLETED: 04/20/97 @  3:30 am  
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 04/21/97 @  3:30 am  

CMP-SCRUB.A3 (On-track scrubber) - up/idle  
CMP-SCRUB.A3 24hr MQCS COMPLETED: 04/20/97 @  3:00 am  
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 04/21/97 @  3:00 am  



Hot/B lots in area:
__________________
* jd1312 m3 cmp.b2 *
  jl1341 m2 cmp.b3
Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
*16 lots *
    
Down Equipment:
---------------
* cmp.b1 *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* jd1312 m3 (hotlot) #8 cmp.b2 *

Hold Lots:
--------------                                                             
* none *

Monitor status:
--------------
1�  boxes of 12K mqc wafers       
1�  boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
* 33 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see t.d.c.o. regarding 1 pass lot processing *

Lots/wafers processed
--------------------
* jl1377  m1 24 wafer *
  JL1371 pmd 24 wafers
  JL1372 pmd 22 wafers
  JL1374 pmd 24 wafers
  JL1390 pmd 24 wafers
  JL1391 pmd 24 wafers
  JL1392 pmd 24 wafers
  JL1393 pmd 24 wafers
  JL1394 pmd 24 wafers
  jl1332  m1 23 wafers
  jl1319  m1 24 wafers
   
# of carriers for strasbaugh/speedfam:
--------------------------------------
12   SPEEDFAM  
11   STRASBAUGH
 0   PLATES F/S

91.23Cmp Passdown A ShiftFABSIX::J_BLAISYou have readSun Apr 20 1997 20:5773
 				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor	    Number Available
        ---------------     ----------------
        MQC-12K MONS          2.0  boxes 

        BREAKIN WAFERS        2.0  boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1   up                                  04/20/97 11:00pm         na
--------------------------------------------------------------------------------
CMP.A2   up                                  04/20/97 10:00pm         na 
--------------------------------------------------------------------------------
CMP.B1   Schld  Down                                na		      na
--------------------------------------------------------------------------------
CMP.B2   up  running jd1460b,xd1021          04/21/97 2:30am   04/21/97 6:00am 
--------------------------------------------------------------------------------
CMP.B3   up  running jd1296,jl1255           04/21/97 10:30pm  04/21/97 5:40am
--------------------------------------------------------------------------------


CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 04/20/97 @   2:00am 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 04/21/97 @   2:00am

                                                        


Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
      					                                        
   

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
26  lots             new expanded range on cmos6 lite.       
  

Lots Processed

jl1008/17
xe1291/24
jd1239/16
jl1321/24
jl1330/23
jd1312/23 
jl1341/12
xd1020/17
jd1307/24
jd1248/24
jl1394/24
jl1393/24
jl1269/21




         

# of carriers for strasbaugh/speedfam:
--------------------------------------
13  SPEEDFAM  
09  STRASBAUGH
 2  PLATES F/S

  
91.24passdown cmp b-shift 04/21/97FABSIX::M_PROVENCHERMon Apr 21 1997 06:24136
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                16                    mqcs

        BREAKIN WAFERS              44                    misc



CMP.A1 (Strasbaugh 6DS-SP) - up/idle
CMP.A1 24h MQCS COMPLETED :  04/21/97 @  2:30 am  
CMP.A1 24hr MQCS NEXT DUE :  04/22/97 @  2:30 am 


CMP.A2 (Strasbaugh 6DS-SP) - up/idle  
CMP.A2 24hr MQCS COMPLETED:  04/20/97 @  3:00 pm 
CMP.A2 24hr MQCS NEXT DUE :  04/21/97 @  3:00 pm



CMP.B1 (Speedfam CMP-V)   - sched/dn/to be shipped out
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a 
CMP.B1 12hr MQCS COMPLETED: n/a       
CMP.B1 12hr MQCS NEXT DUE : n/a 
		         	     

CMP.B2 (Speedfam CMP-V)   - up/running Jd1075 M3  t:300 rr:2111
                                       yd0257 m1  @ start up
CMP.B2 24hr MQCS COMPLETED: in process * 
CMP.B2 24hr MQCS NEXT DUE : n/a *
CMP.B2 12hr MQCS COMPLETED: 04/21/97 @  6:00 am       
CMP.B2 12hr MQCS NEXT DUE : 04/21/97 @  6:00 pm  
 

CMP.B3 (Speedfam CMP-V)   - dn/unsched loud vibration followed by two loud 
			       bangs. possible belt slippage? witnessed by 
			       maint tool down at 3:30 am  
CMP.B3 24hr MQCS COMPLETED: 04/20/97 @ 11:00 pm 
CMP.B3 24hr MQCS NEXT DUE : 04/21/97 @ 11:00 pm 
CMP.B3 12hr MQCS COMPLETED: 04/20/97 @  7:00 pm  (not performed for obvious  
CMP.B3 12hr MQCS NEXT DUE : 04/20/97 @  7:00 am   reasons).


CMP.B4 (Speedfam CMP-V)   - up/ENG
                               A new barrel was installed near the end of day 
			       shift. passed all mqc's with flying colors
			       (particles, and dev/rate).
			       This tool can be used in an emergency, if b2,or
			       b3 are down for a good chunk of time. per Matt 
			       VanHanehem
			       please keep to up/eng, per b.tower 
CMP.B4 24hr MQCS COMPLETED: 04/21/97 @  2:30 am
CMP.B4 24hr MQCS NEXT DUE : 04/22/97 @  2:30 am
CMP.B4 12hr MQCS COMPLETED: 04/20/97 @  8:30 pm
CMP.B4 12hr MQCS NEXT DUE : 04/21/97 @  8:30 am


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 04/21/97 @  3:00 am  
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 04/22/97 @  3:00 am  
 
CMP-SCRUB.A2 (On-track scrubber) - 
CMP-SCRUB.A2 24hr MQCS COMPLETED: 04/21/97 @  3:30 am  
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 04/22/97 @  3:30 am  

CMP-SCRUB.A3 (On-track scrubber) - up/idle  
CMP-SCRUB.A3 24hr MQCS COMPLETED: 04/21/97 @  3:00 am  
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 04/22/97 @  3:00 am  



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
*14 lots *
    
Down Equipment:
---------------
* cmp.b1 *
  cmp.b3 
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* jd1296 m2 #2,#15 (broke on receive cassette cmp.b3) *

Hold Lots:
--------------                                                             
* none *

Monitor status:
--------------
3  boxes of 12K mqc wafers       
3  boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*26 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see t.d.c.o. regarding modified single pass lot processing *

Lots/wafers processed
--------------------
* XD1021  m3 24 wafers
  jl1255  m1 24 wafers
  JD1460b M1  6 wafers (HOTLOT)
  XM1164  M3 11 wafers
  xm1194  m3 10 wafers
  jl1189  m1 24 wafers
  jd1296  m2 22 wafers
  jl1349  m1 24 wafers
   
# of carriers for strasbaugh/speedfam:
--------------------------------------
12   SPEEDFAM  
11   STRASBAUGH
 0   PLATES F/S

91.25cmp passdown a shiftFABSIX::J_BLAISYou have readMon Apr 21 1997 20:4658
 				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor	    Number Available
        ---------------     ----------------
        MQC-12K MONS          2.0  boxes 

        BREAKIN WAFERS        2.0  boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1   up       idle                       04/22/97 2:40am          na
--------------------------------------------------------------------------------
CMP.A2   up       idle                       04/22/97 8:55am          na 
--------------------------------------------------------------------------------
CMP.B1   Schld  Down                                na		      na
--------------------------------------------------------------------------------
CMP.B2   up  running xe1366,jd1075           04/22/97 6:40am   04/22/97 7:30am 
--------------------------------------------------------------------------------
CMP.B3   up      idle                        04/21/97 11:30pm  04/22/97 7:30am
--------------------------------------------------------------------------------
CMP.B4 up-eng running jl1352                 04/22/97 2:30am   04/22/97 7:30am
--------------------------------------------------------------------------------

CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 04/21/97 @   2:00am 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 04/22/97 @   2:00am

                                                        


Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
     xe1366,xe1334                      yd0257,xb1443                           
   

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
26  lots             new expanded range on cmos6 lite.       
  

Lots Processed

jd1247/24
jd1289/23
jd1114/21
jl1146/24
jl1361/24
jl1362/24
jl1146/24
jd1308/24


91.26passdown cmp b-shift 04/22/97FABSIX::M_PROVENCHERTue Apr 22 1997 06:57139
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                21                    mqcs

        BREAKIN WAFERS              61                    misc



CMP.A1 (Strasbaugh 6DS-SP) - up/idle
CMP.A1 24h MQCS COMPLETED :  04/22/97 @  3:30 am  
CMP.A1 24hr MQCS NEXT DUE :  04/23/97 @  3:30 am 


CMP.A2 (Strasbaugh 6DS-SP) - up/idle  
CMP.A2 24hr MQCS COMPLETED:  04/22/97 @  9:00 am 
CMP.A2 24hr MQCS NEXT DUE :  04/23/97 @  9:00 am



CMP.B1 (Speedfam CMP-V)   - sched/dn/to be shipped out
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a 
CMP.B1 12hr MQCS COMPLETED: n/a       
CMP.B1 12hr MQCS NEXT DUE : n/a 
		         	     

CMP.B2 (Speedfam CMP-V)   - up/running jd1285 m2
                                       jd1299 m1 @start up  
CMP.B2 24hr MQCS COMPLETED: in process
CMP.B2 24hr MQCS NEXT DUE : in process
CMP.B2 12hr MQCS COMPLETED: 04/22/97 @  6:30 am       
CMP.B2 12hr MQCS NEXT DUE : 04/22/97 @  6:30 pm  
 

CMP.B3 (Speedfam CMP-V)   - up/running 
                                  mqc after pad changes 1st and secondary pad. 
				  carriers 1,3,4,5 changed. failed 1st set of
				  mqc's, (head 4 only) for deviation. carrier
				  4 replaced 2nd set in passed tool down at
				  @ 12:00 am up at 5:30 am
CMP.B3 24hr MQCS COMPLETED: 04/22/97 @  5:30 am
CMP.B3 24hr MQCS NEXT DUE : 04/23/97 @  5:30 am
CMP.B3 12hr MQCS COMPLETED: 04/22/97 @  5:30 am
CMP.B3 12hr MQCS NEXT DUE : 04/22/97 @  5:30 am


CMP.B4 (Speedfam CMP-V)   - up/ENG
                               A new barrel was installed during day 
			       shift. 
			       This tool can be used in an emergency, if b2,or
			       b3 are down for a good chunk of time. per Matt 
			       VanHanehem
			       please keep to up/eng, per b.tower 
CMP.B4 24hr MQCS COMPLETED: 04/22/97 @  5:00 am 
CMP.B4 24hr MQCS NEXT DUE : 04/23/97 @  5:00 am 
CMP.B4 12hr MQCS COMPLETED: 04/22/97 @  5:00 am 
CMP.B4 12hr MQCS NEXT DUE : 04/22/97 @  5:00 pm 


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 04/22/97 @  2:00 am  
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 04/23/97 @  2:00 am  
 
CMP-SCRUB.A2 (On-track scrubber) - 
CMP-SCRUB.A2 24hr MQCS COMPLETED: 04/22/97 @  2:30 am  
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 04/23/97 @  2:30 am  

CMP-SCRUB.A3 (On-track scrubber) - up/idle  
CMP-SCRUB.A3 24hr MQCS COMPLETED: 04/22/97 @  2:00 am  
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 04/23/97 @  2:00 am  



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* lots *
    
Down Equipment:
---------------
* cmp.b1 *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
--------------                                                             
* none *

Monitor status:
--------------
3  boxes of 12K mqc wafers       
3  boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
* 28 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see t.d.c.o. regarding modified single pass lot processing *

Lots/wafers processed
--------------------
* jl1352 m1 24 wafers
  jd1075 m3 24 wafers, 
  xe1366 m1 23 wafers (hotlot)
  jd1075 m3 24 wafers
  jl1148 m2 24 wafers
  jl1149 m2 24 wafers
  xe1026 m1 24 wafers
  JD1286 m2 24 wafers
  XE1344 m2 23 wafers (hotlot)
  
   
# of carriers for strasbaugh/speedfam:
--------------------------------------
 6   SPEEDFAM  
11   STRASBAUGH
 0   PLATES F/S

91.27Cmp Passdown A ShiftFABSIX::J_BLAISYou have readTue Apr 22 1997 20:4372
 				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor	    Number Available
        ---------------     ----------------
        MQC-12K MONS          4.0  boxes 

        BREAKIN WAFERS        6.0  boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1   up       idle                       04/23/97 3:00am          na
--------------------------------------------------------------------------------
CMP.A2   up       idle                       04/23/97 10:00am         na 
--------------------------------------------------------------------------------
CMP.B1   Schld  Down                                na		      na
--------------------------------------------------------------------------------
CMP.B2   up  running  jd1285,jl1316          04/23/97 7:30am   04/23/97 7:00am 
--------------------------------------------------------------------------------
CMP.B3   up   running jd1295                 04/23/97 5:20am   04/23/97 7:30am
--------------------------------------------------------------------------------
CMP.B4 up-eng           idle                 04/23/97 4:00am   04/23/97 7:30am
--------------------------------------------------------------------------------

CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 04/22/97 @   2:00am 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 04/23/97 @   2:00am

                                                        


Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
                                     xb1342 Jd1230*,Jd1231*
						* Eric B working it.

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
26  lots             new expanded range on cmos6 lite.       
  

Lots Processed

jl1259/24
jl1353/20
jl1318/24 
jd1299/24
jl1365/23
jl1149/24
jl1395/24
jd1399/24
xe1334/23
jd1377/24
jl1257/24
jl1267/24
jl1148/24
xe1026/24
jd1232/22
jl1397/24
jl1155/24
jl1339/12






91.28passdown cmp b-shift 04/23/97FABSIX::M_PROVENCHERWed Apr 23 1997 05:56138
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                21                    mqcs

        BREAKIN WAFERS              52                    misc



CMP.A1 (Strasbaugh 6DS-SP) - up/idle
CMP.A1 24h MQCS COMPLETED :  04/23/97 @  4:00 am  
CMP.A1 24hr MQCS NEXT DUE :  04/24/97 @  4:00 am 


CMP.A2 (Strasbaugh 6DS-SP) - up/idle  
CMP.A2 24hr MQCS COMPLETED:  04/23/97 @  9:00 am 
CMP.A2 24hr MQCS NEXT DUE :  04/24/97 @  9:00 am



CMP.B1 (Speedfam CMP-V)   - sched/dn/to be shipped out today 
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a 
CMP.B1 12hr MQCS COMPLETED: n/a       
CMP.B1 12hr MQCS NEXT DUE : n/a 
		         	     

CMP.B2 (Speedfam CMP-V)   - up/mqc/idle at 6:30 am
CMP.B2 24hr MQCS COMPLETED: in process
CMP.B2 24hr MQCS NEXT DUE : in process
CMP.B2 12hr MQCS COMPLETED: 04/23/97 @  4:30 am       
CMP.B2 12hr MQCS NEXT DUE : 04/23/97 @  4:30 pm  
 

CMP.B3 (Speedfam CMP-V)   - up/mqc
			       on tool jl1264 m1 t: rr:
				       jd1249 m2 t: rr: 
CMP.B3 24hr MQCS COMPLETED: 04/22/97 @  5:30 am 
CMP.B3 24hr MQCS NEXT DUE : 04/23/97 @  5:30 am  
CMP.B3 12hr MQCS COMPLETED: 04/22/97 @  9:30 pm 
CMP.B3 12hr MQCS NEXT DUE : 04/23/97 @  9:30 am 


CMP.B4 (Speedfam CMP-V)   -up/eng tool down at 2:30 am head not homeing over 
				  polish table. up at 3:15 am 
			       This tool can be used in an emergency, if b2,or
			       b3 are down for a good chunk of time. per Matt 
			       VanHanehem
			       please keep to up/eng, per b.tower 
CMP.B4 24hr MQCS COMPLETED: 04/22/97 @  5:00 am late in process at 7:00am
CMP.B4 24hr MQCS NEXT DUE : 04/23/97 @  5:00 am "                       "
CMP.B4 12hr MQCS COMPLETED: 04/22/97 @  5:00 am "                       "
CMP.B4 12hr MQCS NEXT DUE : 04/22/97 @  5:00 pm "                       "


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 04/23/97 @  2:30 am  
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 04/24/97 @  2:30 am  
 
CMP-SCRUB.A2 (On-track scrubber) - 
CMP-SCRUB.A2 24hr MQCS COMPLETED: 04/23/97 @  2:30 am  
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 04/24/97 @  2:30 am  

CMP-SCRUB.A3 (On-track scrubber) - up/idle  
CMP-SCRUB.A3 24hr MQCS COMPLETED: 04/23/97 @  2:30 am  
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 04/24/97 @  2:30 am  



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* lots *
    
Down Equipment:
---------------
* cmp.b1 *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
--------------                                                             
* jd1231 m2  *

Monitor status:
--------------
4  boxes of 12K mqc wafers       
3  boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*13 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see t.d.c.o. regarding modified single pass lot processing *

Lots/wafers processed
--------------------
* jl1363  m1 23 wafers *
  jl1156  m2 24 wafers
  jl1350  m1 23 wafers
  jl1150  m2 24 wafers
  jl1263  m1 24 wafers 
  jd1231  m2 24 wafers
  jd1295  m1 24 wafers
  JL1373 PMD 24 wafers
  JL1324 PMD 24 wafers
  jl1007  m2 24 wafers
  JD1285  m2 22 wafers
  JL1316  m1 24 wafers
  JL1301  m1 24 wafers
  jl1293  m1 24 wafers
   
# of carriers for strasbaugh/speedfam:
--------------------------------------
 6   SPEEDFAM  
11   STRASBAUGH
 0   PLATES F/S

91.29Cmp Passdown A ShiftFABSIX::J_BLAISYou have readWed Apr 23 1997 20:5557
 				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor	    Number Available
        ---------------     ----------------
        MQC-12K MONS          4.0  boxes 

        BREAKIN WAFERS        4.0  boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1   up       idle                       04/24/97 4:00am          na
--------------------------------------------------------------------------------
CMP.A2   up       idle                       04/24/97 2:00pm          na 
--------------------------------------------------------------------------------
CMP.B1   Schld  Down                                na		      na
--------------------------------------------------------------------------------
CMP.B2   up  running jl1364,jl1184           04/24/97 2:00pm   04/24/97 4:00am 
--------------------------------------------------------------------------------
CMP.B3   up   running jl1193,jl1317          04/23/97 5:20am   04/24/97 6:20am
--------------------------------------------------------------------------------
CMP.B4  un-Schld Down, system freezes up.    04/24/97 12:00pm  04/23/97 7:30am
--------------------------------------------------------------------------------

CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 04/23/97 @   2:00am 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 04/24/97 @   2:00am

                                                        


Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
                                      xe1291,jd1231
					

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
17  lots             new expanded range on cmos6 lite.       
  

Lots Processed

jl0889a/18
jl1375/24
jl1151/24
jl1410/24
jd1249/24
jl1007/23
jd1460b/6
jl1264/19

91.30FABSIX::M_CADIEUXKADOUThu Apr 24 1997 08:4756
                            CMP D SHIFT PASSDOWN



       
CMP.A1(Strasbaugh 6DS-SP)-DOWN/VERIFY-U    -BREAKING IN NEW PAD
                                            READ ON.A1 
                                           -JL1387(ILD1) RAN FOR 6 MIN.
                                            STILL @12K

CMP.A2(Strasbaugh 6DS-SP)-UP/RUNNING-1     -JD1326(ILD1) RUNNING 3RD 3 MIN. RUN
                                            NEEDS 100% AND TOUCH-UP        


CMP.B2(Speedfam CMP-V)-UP/MQC              -RUNNING FIRST MQC
                                            READ ON.A1
                                           -XE1112(ILD2) NEEDS TOUCH-UPS
                                            100%ED ON.A5
                                            REM.RATE=2851 RUN TIME=235
                                           -YE0233(ILD2) NEEDS TOUCH-UPS
                                            100%ING ON.A4
                                            REM.RATE=2767 RUN TIME=255
                                                      
                                                                                
CMP.B3 (Speedfam CMP-V)-UP/MQC             -SECOND MQC READING ON.A5
                                            FAILED FIRST RUN FOR RANGE
                                            READ ON.A5, PARTICLES PASSED
                                           -JD1298(ILD2) NEEDS 100% 
                                            AND TOUCH-UP R.R=2898 RUN TIME=250                                             


CMP.B4 (Speedfam CMP-V)DOWN/REPAIR         -UNLOAD FLIPPER DROPPING WAFERS
                                           -NEEDS FULL BREAKIN AND MQC
                                            READ ON.A1
                                            
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE 
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (On-track scrubber) - DOWN/REPAIR

 

HOT LOTS IN AREA:
-------------------
   NONE
-------------------
MQC WAFERS USED:18
-------------------
MQC WAFERS AVAIL:4.5
-------------------
LOTS ON HOLD:
NONE
___________________

91.31PASSDOWNFABSIX::D_CAUSEFri Apr 25 1997 08:3950
                 

                            D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -UP/MQC CARRIERS AND PAD CHANGED 2 LOTS RUNNING
                                   JL1413 ONLY SEND AHEADS HAVE BEEN RUN
                                   JL1416 WAFERS NEED T/U READ 100% ON .A4


CMP.A2 (Strasbaugh 6DS-SP) -UP/MQC  PAD AND CARRIER CHANGE AFTER ENG AND
                                    REPAIR OF LEFT SEND ELEVATOR


CMP.B1 (Speedfam CMP-V) -GONE TO AZ.


CMP.B2 (Speedfam CMP-V) - UP/RUNNING-1   -JD1246(ILD3)  READING ON.A5
                                          NEEDS TOUCH-UPS REM.RATE=2320   

 
CMP.B3 (Speedfam CMP-V) - UP/RUNNING RAN 1ST PASS ON LOT JL1320 AND JL1329.
                                     NEEDS 100% 

CMP.B4 (Speedfam CMP-V)- UP/RUNNING  HOT LOT JD1460B ILD3 RAN 1ST 300SECONDS
                                     READING ON .A4
 
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE

                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE

 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - DOWN
 

HOT lots in area:
----------------


BREAK IN WAFERS USED:15

MQC WAFERS USED:8 WAFERS USED

MQC WAFERS AVAIL:4 BOXES  

----------


91.32FABSIX::M_CADIEUXKADOUSat Apr 26 1997 08:3745
                            CMP D SHIFT PASSDOWN



       
CMP.A1(Strasbaugh 6DS-SP)-UP/IDLE          -


CMP.A2(Strasbaugh 6DS-SP)-UP/IDLE          -


CMP.B2(Speedfam CMP-V)-UP/RUNNING-2        -JL1321(ILD1) 100%ING ON.A1
                                            R.R.=3858 RUN TIME=200
                                           -JL1162(ILD1) READY TO RUN        
                                                                                
CMP.B3 (Speedfam CMP-V)-UP/RUNNING-1      -**XE1334(ILD2) HOT LOT**
                                            100%ING ON .A4
                                            R.R.=3480  TIME=212                         


CMP.B4 (Speedfam CMP-V)DOWN                -REPLACED CARRIERS, DUE TO HIGH STD
                                            ON PRODUCT
                                           -JL1332(ILD2) SA ALREADY RUN
                                            READ ON.A4                                              
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE 
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (On-track scrubber) - UP/IDLE

 

HOT LOTS IN AREA:
-------------------
  **XE1334(ILD2)**RAN ON.B3
-------------------
MQC WAFERS USED:10
-------------------
MQC WAFERS AVAIL:3
-------------------
LOTS ON HOLD:
NONE
___________________

91.33passdown cmp b-shift 04/27/97FABSIX::M_PROVENCHERSun Apr 27 1997 06:41144
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 2                    mqcs

        BREAKIN WAFERS              32                    misc



CMP.A1 (Strasbaugh 6DS-SP) - up/running jl1412 pmd t:110 rr:
CMP.A1 24h MQCS COMPLETED :  04/26/97 @  9:30 pm   
CMP.A1 24hr MQCS NEXT DUE :  04/27/97 @  9:30 pm 


CMP.A2 (Strasbaugh 6DS-SP) - up/running JL1437 pmd t: 110 r/r: 2128  
CMP.A2 24hr MQCS COMPLETED:  04/26/97 @  3:00 pm 
CMP.A2 24hr MQCS NEXT DUE :  04/27/97 @  3:00 pm



CMP.B1 (Speedfam CMP-V)   - dn/external 
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a 
CMP.B1 12hr MQCS COMPLETED: n/a       
CMP.B1 12hr MQCS NEXT DUE : n/a 
		         	     

CMP.B2 (Speedfam CMP-V)   - up/running Jd1288 M2 t:160 rr:4178
			               		 
CMP.B2 24hr MQCS COMPLETED: 04/26/97 @  5:00 pm
CMP.B2 24hr MQCS NEXT DUE : 04/27/97 @  5:00 pm
CMP.B2 12hr MQCS COMPLETED: 04/27/97 @  5:00 am       
CMP.B2 12hr MQCS NEXT DUE : 04/27/97 @  5:00 pm  
 

CMP.B3 (Speedfam CMP-V)   - up/running jd1325 m1/t:185 rr:3404   
CMP.B3 24hr MQCS COMPLETED: 04/26/97 @  4:00 pm 
CMP.B3 24hr MQCS NEXT DUE : 04/27/97 @  4:00 pm  
CMP.B3 12hr MQCS COMPLETED: 04/27/97 @  4:00 am  
CMP.B3 12hr MQCS NEXT DUE : 04/27/97 @  4:00 pm 


CMP.B4 (Speedfam CMP-V)   -up/eng running jd1399 m1/t:185 rr:
				          jd1377 m1/t:185 rr:
			       This tool can be used in an emergency, if b2,or
			       b3 are down for a good chunk of time. per Matt 
			       VanHanehem
			       please keep to up/eng, per b.tower 
CMP.B4 24hr MQCS COMPLETED: 04/26/97 @  7:00 pm 
CMP.B4 24hr MQCS NEXT DUE : 04/27/97 @  7:00 pm 
CMP.B4 12hr MQCS COMPLETED: 04/27/97 @  7:00 am 
CMP.B4 12hr MQCS NEXT DUE : 04/27/97 @  7:00 pm 


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 04/26/97 @  5:30 pm  
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 04/27/97 @  5:30 pm  
 
CMP-SCRUB.A2 (On-track scrubber) -   
				   tool down at 1:30 am for heatlamp failure
				   up @ 2:30 am 
CMP-SCRUB.A2 24hr MQCS COMPLETED: 04/26/97 @  5:30 pm  
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 04/27/97 @  5:30 pm  

CMP-SCRUB.A3 (On-track scrubber) - up/idle  
CMP-SCRUB.A3 24hr MQCS COMPLETED: 04/26/97 @  5:30 pm  
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 04/27/97 @  5:30 pm  



Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* few  *
    
Down Equipment:
---------------
* cmp b1 (external) *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
--------------                                                             
* jd1297 on hold for eng, per pss, high std_dev  *

Monitor status:
--------------
1  boxes of 12K mqc wafers       
3  boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*18 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see t.d.c.o. regarding modified single pass lot processing *

Lots/wafers processed
--------------------
* jl1371  m1 24 wafers
  jl1372  m1 21 wafers
  jl1332  m2 23 wafers
  jl1390  m1 24 wafers 
  jl1393  m1 24 wafers 
  jl1394  m1 24 wafers 
  jd1297  m2 24 wafers
  jl1391  m1 24 wafers
  JD1247  m3 24 wafers
  XE1025 pmd 24 wafers
  JD1381 pmd 24 wafers
  JD1384 pmd 24 wafers
  JL1418 pmd 24 wafers
  JL1437 pmd 24 wafers
  XE1065  m3 24 wafers
  JD1239  m1 23 wafers  
  jl1255  m2 24 wafers
  jl1412 pmd 24 wafers
       
   
# of carriers for strasbaugh/speedfam:
--------------------------------------
18  SPEEDFAM  
 7  STRASBAUGH
 4  PLATES F/S

91.34Cmp Passdown A ShiftFABSIX::J_BLAISYou have readSun Apr 27 1997 20:3369
 				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor	    Number Available
        ---------------     ----------------
        MQC-12K MONS          1.5  boxes 

        BREAKIN WAFERS        5.0  boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1   up       idle                       04/27/97 9:00pm          na
--------------------------------------------------------------------------------
CMP.A2   up      MQC currently running....                            na 
--------------------------------------------------------------------------------
CMP.B1   Schld  Down                                na		      na
--------------------------------------------------------------------------------
CMP.B2   up       idle                       04/28/97 5:00pm   04/28/97 5:00am 
--------------------------------------------------------------------------------
CMP.B3   up      running jl1349,jl1352       04/28/97 5:00am   04/28/97 5:00am
--------------------------------------------------------------------------------
CMP.B4   up/MQC  running jl1218              04/27/97  7:00pm  04/28/97 7:30am
--------------------------------------------------------------------------------

CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 04/27/97 @   7:00pm 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 04/28/97 @   7:00pm

                                                        


Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
                                                      
					

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
 4  lots             new expanded range on cmos6 lite.       
  

Lots Processed

jl1330/23
jl1361/24
jd1377/23
jl1365/23
jd1325/24
jl1415/24
jd1288/24
jl1412/24
jl1300/24
jl1394/24
jd1239/23
jl1390/24
jl1255/24
jl1393/24
jl1437/24
xd1200/20
jd1399/24
jl1257/24
jd1406/24


91.35passdown cmp b-shift 04/28/97FABSIX::M_PROVENCHERMon Apr 28 1997 06:15134
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                24                    mqcs

        BREAKIN WAFERS              38                    misc



CMP.A1 (Strasbaugh 6DS-SP) - up/running JL1428 pmd T:110 rr:2230
CMP.A1 24h MQCS COMPLETED :  04/28/97 @  1:30 am   
CMP.A1 24hr MQCS NEXT DUE :  04/29/97 @  1:30 am 


CMP.A2 (Strasbaugh 6DS-SP) - up/running JL1439 pmd T:110 rr:2100
CMP.A2 24hr MQCS COMPLETED:  04/27/97 @ 10:00 pm 
CMP.A2 24hr MQCS NEXT DUE :  04/28/97 @ 10:00 pm



CMP.B1 (Speedfam CMP-V)   - dn/external 
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a 
CMP.B1 12hr MQCS COMPLETED: n/a       
CMP.B1 12hr MQCS NEXT DUE : n/a 
		         	     

CMP.B2 (Speedfam CMP-V)   - up/idle       		 
CMP.B2 24hr MQCS COMPLETED: 04/27/97 @  5:00 pm
CMP.B2 24hr MQCS NEXT DUE : 04/28/97 @  5:00 pm
CMP.B2 12hr MQCS COMPLETED: 04/28/97 @  5:00 am        
CMP.B2 12hr MQCS NEXT DUE : 04/28/97 @  5:00 pm  
 

CMP.B3 (Speedfam CMP-V)   - up/idle
					tool went down for pad change on both
                                        primary, and 2nd pad, failed 1st set of
					mqc's for uniformity, change id/od 
					ran 2nd set, up at 4:00 am 
CMP.B3 24hr MQCS COMPLETED: 04/28/97 @  4:00 am 
CMP.B3 24hr MQCS NEXT DUE : 04/29/97 @  4:00 am  
CMP.B3 12hr MQCS COMPLETED: 04/28/97 @  4:00 am  
CMP.B3 12hr MQCS NEXT DUE : 04/28/97 @  4:00 pm 


CMP.B4 (Speedfam CMP-V)   -up/eng running jd1307 m2 t:185 rr:3715
				  tool failed for particles, scrubbed tool,
			 	  ran 2nd set, tool passed up at 2:30 am
			       This tool can be used in an emergency, if b2,or
			       b3 are down for a good chunk of time. per Matt 
			       VanHanehem
			       please keep to up/eng, per b.tower 
CMP.B4 24hr MQCS COMPLETED: 04/28/97 @  2:30 am 
CMP.B4 24hr MQCS NEXT DUE : 04/29/97 @  2:30 am 
CMP.B4 12hr MQCS COMPLETED: 04/28/97 @  6:00 am 
CMP.B4 12hr MQCS NEXT DUE : 04/28/97 @  6:00 pm 


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 04/27/97 @  7:00 pm  
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 04/28/97 @  7:00 pm  
 
CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 04/27/97 @  7:00 pm  
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 04/28/97 @  7:00 pm  

CMP-SCRUB.A3 (On-track scrubber) - up/idle  
CMP-SCRUB.A3 24hr MQCS COMPLETED: 04/27/97 @  7:00 pm  
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 04/28/97 @  7:00 pm  


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* zb0246 sti lot on hold for eng *
    
Down Equipment:
---------------
* cmp b1 (external) *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
--------------                                                             
* xb1369 sti lot on hold for eng  *
  zb0246 sti lot "             "

Monitor status:
--------------
2  boxes of 12K mqc wafers       
5  boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*4 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see t.d.c.o. regarding modified single pass lot processing *

Lots/wafers processed
--------------------
* jl1349  m2 24 wafers *
  jl1352  m2 24 wafers
  jl1218  m2 24 wafers
  jd1287  m2 23 wafers
  JL1256  m1 24 wafers
  jl1267  m2 24 wafers
  
   
# of carriers for strasbaugh/speedfam:
--------------------------------------
18  SPEEDFAM  
 7  STRASBAUGH
 4  PLATES F/S

91.36Cmp Passdown A ShiftFABSIX::J_BLAISYou have readMon Apr 28 1997 20:2357
 				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor	    Number Available
        ---------------     ----------------
        MQC-12K MONS          2.5  boxes 

        BREAKIN WAFERS        5.0  boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1   up       idle                       04/29/97 1:30am          na
--------------------------------------------------------------------------------
CMP.A2   up       idle                       04/28/97 8:00pm          na 
--------------------------------------------------------------------------------
CMP.B1   Schld  Down                                na		      na
--------------------------------------------------------------------------------
CMP.B2   up       idle                       04/29/97 7:00pm   04/29/97 7:00am 
--------------------------------------------------------------------------------
CMP.B3   up       idle                       04/29/97 3:45am   04/29/97 7:00am
--------------------------------------------------------------------------------
CMP.B4   up  Was down most of the day for slurry pump problems up at ~7:00pm  
	     will need full MQC's
--------------------------------------------------------------------------------

CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 04/28/97 @   7:00pm 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 04/29/97 @   7:00pm

                                                        


Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
					XB1369,ZB0246 (STI LOTS)		

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
 5  lots             new expanded range on cmos6 lite.       
  

Lots Processed

jl1294/24
jd1469/24
jd1285/22
jl1089/24
jd1386/23
jl1439/24
jl1428/24
JD1286/24

91.37passdown cmp b-shift 04/29/97FABSIX::M_PROVENCHERTue Apr 29 1997 06:20134
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                12                    mqcs

        BREAKIN WAFERS              31                    misc



CMP.A1 (Strasbaugh 6DS-SP) - dn/unsched (tool down at @5 am due to exposed 
				         wiring in the harness)
CMP.A1 24h MQCS COMPLETED :  04/28/97 @ 11:30 am   
CMP.A1 24hr MQCS NEXT DUE :  04/29/97 @ 11:30 am 


CMP.A2 (Strasbaugh 6DS-SP) - up/idle 
CMP.A2 24hr MQCS COMPLETED:  04/28/97 @  7:00 pm 
CMP.A2 24hr MQCS NEXT DUE :  04/29/97 @  7:00 pm



CMP.B1 (Speedfam CMP-V)   - dn/external 
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a 
CMP.B1 12hr MQCS COMPLETED: n/a       
CMP.B1 12hr MQCS NEXT DUE : n/a 
		         	     

CMP.B2 (Speedfam CMP-V)   - up/running JL1373 M1 t:160/jl1220 m1   
CMP.B2 24hr MQCS COMPLETED: 04/28/97 @  7:00 pm
CMP.B2 24hr MQCS NEXT DUE : 04/29/97 @  7:00 pm
CMP.B2 12hr MQCS COMPLETED: 04/29/97 @  7:00 am        
CMP.B2 12hr MQCS NEXT DUE : 04/29/97 @  7:00 pm  
 

CMP.B3 (Speedfam CMP-V)   - up/idle
CMP.B3 24hr MQCS COMPLETED: 04/29/97 @  4:00 am 
CMP.B3 24hr MQCS NEXT DUE : 04/30/97 @  4:00 am 
CMP.B3 12hr MQCS COMPLETED: 04/29/97 @  7:00 am  
CMP.B3 12hr MQCS NEXT DUE : 04/29/97 @  7:00 pm 


CMP.B4 (Speedfam CMP-V)   -up/eng running jl1293 m2 t:190 rr:
			       This tool can be used in an emergency, if b2,or
			       b3 are down for a good chunk of time. per Matt 
			       VanHanehem
			       please keep to up/eng, per b.tower 
CMP.B4 24hr MQCS COMPLETED: 04/29/97 @  1:30 am  
CMP.B4 24hr MQCS NEXT DUE : 04/30/97 @  1:30 am 
CMP.B4 12hr MQCS COMPLETED: 04/29/97 @  6:00 am 
CMP.B4 12hr MQCS NEXT DUE : 04/29/97 @  6:00 pm 


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 04/28/97 @  7:00 pm  
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 04/29/97 @  7:00 pm  
 
CMP-SCRUB.A2 (On-track scrubber) - up/idle
					tool down at 1:00 am, maint looking at
					it. up at 2:00 am
CMP-SCRUB.A2 24hr MQCS COMPLETED: 04/28/97 @  7:00 pm  
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 04/29/97 @  7:00 pm  

CMP-SCRUB.A3 (On-track scrubber) - up/idle  
CMP-SCRUB.A3 24hr MQCS COMPLETED: 04/28/97 @  7:00 pm  
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 04/29/97 @  7:00 pm  


Hot/B lots in area:
__________________
* none *

Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* zb0246 sti lot on hold for eng *
    
Down Equipment:
---------------
* cmp b1 (external) *

  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
--------------                                                             
* xb1369 sti lot on hold for eng  *
  zb0246 sti lot "             "
  xb1213 sti lot "             "
Monitor status:
--------------
4�  boxes of 12K mqc wafers       
5   boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*6 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see t.d.c.o. regarding modified single pass lot processing *

Lots/wafers processed
--------------------
* xd1382 pmd 23 wafers *
  jl1427 pmd 24 wafers
  jl1263  m2 24 wafers
  jl1259  m2 24 wafers
  jl1414 pmd 24 wafers
  jl1419 pmd 24 wafers
  jl1363  m2 23 wafers
  jl1438 pmd 24 wafers
  JD1308  M3 13 wafers
   
# of carriers for strasbaugh/speedfam:
--------------------------------------
18  SPEEDFAM  
 7  STRASBAUGH
 4  PLATES F/S

91.38Cmp Passdown A ShiftFABSIX::J_BLAISYou have readTue Apr 29 1997 20:4167
 				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor	    Number Available
        ---------------     ----------------
        MQC-12K MONS           5   boxes 

        BREAKIN WAFERS         3   boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1   up       idle                       04/30/97 2:30pm          na
--------------------------------------------------------------------------------
CMP.A2   up       MQC running                **/**/97                 na 
--------------------------------------------------------------------------------
CMP.B1   Schld  Down                                na		      na
--------------------------------------------------------------------------------
CMP.B2   up    running xe1366                04/30/97 7:00pm   04/30/97 7:00am 
--------------------------------------------------------------------------------
CMP.B3   up       idle                       04/30/97 4:20am   04/30/97 7:30am
--------------------------------------------------------------------------------
CMP.B4   up    running jl1364 @tup           04/30/97 1:20 am  04/30/97 7:30am
--------------------------------------------------------------------------------

CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 04/29/97 @   7:30pm 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 04/30/97 @   7:30pm

                                                        


Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
XE1366 					XB1213,ZB0246 (STI LOTS)		

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
13  lots             new expanded range on cmos6 lite.       
  

Lots Processed

xe1335/24
jl1420/24
xe1199/19
jl1465/24
jl1373/23
xe1366/23
jl1370/24
jl1411/24
xe1334/23
jd1404/22
jl1375/24
jl1350/23
jl1220/24
jl1214/24
jl1304/24
jl1293/24
jl1417/21
jl1362/24
jl1438/24
jl1353/19
91.39PASSDOWNFABSIX::D_CAUSEWed Apr 30 1997 08:3351
                 

                            D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -UP/RUNNING  **HOT LOT**  JD1472 READY FOR TOUCHUP
                                        RR= LS-1989  RS-2898 100% READ ON .A5


CMP.A2 (Strasbaugh 6DS-SP) -UP/RUNNING  JD1403 100%ING ON .A5
                                        100 SEC RR= LS-2411  RS-2477

CMP.B1 (Speedfam CMP-V) -GONE TO AZ.


CMP.B2 (Speedfam CMP-V) - UP/RUNNING  JL1139 ILD2 SEND AHEADS READ ON THK.A1
                                      180 SEC "USE DEC TIN14" TO MEASURE
                                      JD1309 ILD2 100% ON THK.A5
                                      180 SEC RR-3330     

 
CMP.B3 (Speedfam CMP-V) - UP/RUNNING RAN 1ST PASS ON LOT JD1326   RR =2316.
                                      100% READ ON .A4

CMP.B4 (Speedfam CMP-V)- UP/VERIFY   FAILED 24 HOUR MQC'S WEEKLY PM COMPLETE
                                     AND NEW PAD CUNNING FULL BREAKIN AND MQC
                                     WAFERS PRE-READ ON THK.A1
 
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE

                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE

 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE
 

HOT lots in area:1
----------------


BREAK IN WAFERS USED:20

MQC WAFERS USED:17 WAFERS USED

MQC WAFERS AVAIL:4.5 BOXES  

----------


91.40PASSDOWNFABSIX::D_CAUSEThu May 08 1997 08:3247
                 

                            D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -UP/RUNNING  JL1490 M1 WILL NEED 100% AND T/U
                                        JL1517 PMD SA READ ON THK.A5 100 SEC


CMP.A2 (Strasbaugh 6DS-SP) -UP/ENG    RUNNING TESTS WITH 18% SLURRY

CMP.B1 (Speedfam CMP-V) -GONE TO AZ.


CMP.B2 (Speedfam CMP-V) - UP/RUNNING  JD1378 100%ING ON THK.A5 RR=3572 TIME 210
                                      JL1410 RUNNING SEND AHEADS 180 SEC

 
CMP.B3 (Speedfam CMP-V) - UP/RUNNING  JL1423 SEND AHEADS READING ON THK.A1 
                                      RUN FOR 200 SEC...  JL1418 NEEDS FINAL 

CMP.B4 (Speedfam CMP-V)- UP/MQC       EVALUATEING ON THK.A4 JD1283 M3 NEEDS T/U
 
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE

                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE

 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - DOWN/REPAIR  STILL DROPPING WAFERS IN SPIN
                                               STATION
 
 

HOT lots in area:2 
----------------


BREAK IN WAFERS USED:20

MQC WAFERS USED: 5 WAFERS USED
  

----------


91.41PASSDOWNFABSIX::D_CAUSEFri May 09 1997 08:4247
                 

                            D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -UP/RUNNING JL1519 SEND AHEADS READ ON THK.A5
                                       TIME:100 SECS

CMP.A2 (Strasbaugh 6DS-SP) -UP/MQC    NEEDS EVALUATION ON THK.A5

CMP.B1 (Speedfam CMP-V) -GONE TO AZ.


CMP.B2 (Speedfam CMP-V) - UP/RUNNING  JL0697 FIRST PASS TIME: 230 RR=3222
                                      JL1489 SEND AHEADS DONE ON .A5 185 SEC

 
CMP.B3 (Speedfam CMP-V) - UP/RUNNING  XE1026 FIRST PASS RR=4482
                                      XE1025 SEND AHEADS RUN READINGS ON .A5
                                      RUN FOR 170 SECS 

CMP.B4 (Speedfam CMP-V)- UP/RUNNING   JL1419 NEEDS FINAL MEASUREMENTS
                                      TIME=200  RR=3450
 
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE

                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE

 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE
 
 

HOT lots in area:
----------------


BREAK IN WAFERS USED:15

MQC WAFERS USED: 10 WAFERS USED
  

----------