89.0. "cmp ops passdown - feb '97" by FABSIX::M_PROVENCHER () Wed Jan 29 1997 06:12

	cmp operations passdown for february, 1997
T.RTitleUserPersonal
Name
DateLines
89.1passdown cmp b-shift 02/02/97FABSIX::M_PROVENCHERSun Feb 02 1997 05:34114
                                CMP                                          
                                ___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 5                   mqcs

        BREAKIN WAFERS              51                   misc



CMP.A1 (Strasbaugh 6DS-SP) -up/idle
CMP.A1 24hr MQCS COMPLETED: 02/01/97 @ 12:00 pm
CMP.A1 24hr MQCS NEXT DUE : 02/02/97 @ 12:00 pm

CMP.A2 (Strasbaugh 6DS-SP) -up/mqc breakin and mqc's in process
			       (down at 8:00 pm - up for mqc @ 4:00 am) 
CMP.A2 24hr MQCS COMPLETED: in process
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V)   - up/running  xe0600 m3/ jl0849 m2 
CMP.B1 24hr MQCS COMPLETED: 02/01/97 @ 12:30 pm
CMP.B1 24hr MQCS NEXT DUE : 02/02/97 @ 12:30 pm
CMP.B1 12hr MQCS COMPLETED: 02/01/97 @  8:30 pm 
CMP.B1 12hr MQCS NEXT DUE : 02/02/97 @  8:30 am
			     

CMP.B2 (Speedfam CMP-V)   - up/running jd0731 m3/
CMP.B2 24hr MQCS COMPLETED: 02/01/97 @  3:00 pm
CMP.B2 24hr MQCS NEXT DUE : 02/02/97 @  3:00 pm
CMP.B2 12hr MQCS COMPLETED: 02/02/97 @  5:00 am
CMP.B2 12hr MQCS NEXT DUE : 02/02/97 @  5:00 pm
		            

CMP.B3 (Speedfam CMP-V)   - up/idle
CMP.B3 24hr MQCS COMPLETED: 02/01/97 @  3:00 pm
CMP.B3 24hr MQCS NEXT DUE : 02/02/97 @  3:00 pm
CMP.B3 12hr MQCS COMPLETED: 02/02/97 @  5:00 am
CMP.B3 12hr MQCS NEXT DUE : 02/02/97 @  5:00 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/01/97 @ 10:30 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 01/02/97 @ 10:30 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/01/97 @ 10:30 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/02/97 @ 10:30 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/01/97 @ 10:30 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/02/97 @ 10:30 pm



Hot/B lots in area:
__________________
* none *
  
Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* xe0834 m1 1.75 days (on hold for eric b.) *
  
Down Equipment:
--------------
* cmp.a2 breakin/mqc *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* xe0834 (hold for eric b.) *  

Monitor status:
--------------
4   boxes of 12K mqc wafers       
2   boxes of 50K breakin wafers (more on order)  

Number of product lots in room:
------------------------------
*3 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see t.d.c.o. located between cmp.b1, and cmp.b2 *

Lots/wafers processed
--------------------
* jl0943 pmd 24 wafers *
  jl0923 pmd 24 wafers
  jl0820  m2 24 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
17  SPEEDFAM  
12  STRASBAUGH
 2  PLATES F/S

89.2CMP PASSDOWN A SHIFTFABSIX::J_BLAISA Fatal error has occurred and will Terminate You!Sun Feb 02 1997 19:28100
CMP PASSDOWN                                                                 
                                   
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used        Number Available
        ---------------         -----------        ----------------
        MQC-12K MONS                19                    5 boxes 

        BREAKIN WAFERS              20                    3 Boxes    
                                                      



CMP.A1 (Strasbaugh 6DS-SP) - up/MQC                  
CMP.A1 24hr MQCS COMPLETED: RUNNING NOW       
CMP.A1 24hr MQCS NEXT DUE :                   

CMP.A2 (Strasbaugh 6DS-SP) - up/running JD0933/24 PMD
CMP.A2 24hr MQCS COMPLETED: 02/02/97 @ 7:30 am 
CMP.A2 24hr MQCS NEXT DUE : 02/03/97 @ 7:30 am



CMP.B1 (Speedfam CMP-V)   - up/running JL0851/23 ILD2
CMP.B1 24hr MQCS COMPLETED: 01/02/97 @  2:00 PM
CMP.B1 24hr MQCS NEXT DUE : 02/03/97 @  2:00 PM
CMP.B1 12hr MQCS COMPLETED: 02/02/97 @  4:00 PM 
CMP.B1 12hr MQCS NEXT DUE : 02/03/97 @  4:00 AM 

CMP.B2 (Speedfam CMP-V)   - DOWN/ LOAD CUP ALIGNMENT PROBLEM, EE WORKING IT.
RUNNING LOTS, JL0842/24 ILD2, JL0925/23 ILD2

CMP.B2 24hr MQCS COMPLETED: 02/02/97 @ 5:00 pm 
CMP.B2 24hr MQCS NEXT DUE : 02/03/97 @ 5:00 pm
CMP.B2 12hr MQCS COMPLETED: 02/02/97 @ 5:00 PM 
CMP.B2 12hr MQCS NEXT DUE : 02/03/97 @ 5:00 AM 

CMP.B3 (Speedfam CMP-V)   - up/Running  XD0830/24 ILD2 HOT
CMP.B3 24hr MQCS COMPLETED: 02/02/97 @  6:00 PM
CMP.B3 24hr MQCS NEXT DUE : 02/03/97 @  6:00 PM
CMP.B3 12hr MQCS COMPLETED: 02/02/97 @  7:30 PM
CMP.B3 12hr MQCS NEXT DUE : 02/03/97 @  7:30 AM



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/01/97 @ 10:20 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/02/97 @ 10:20 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/01/97 @ 10:20 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/02/97 @ 10:20 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/01/97 @ 10:20 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/02/97 @ 10:20 pm



Hot/B lots in area:     Hot lots coming to area:    Static Lots in area:
__________________      -----------------------     -------------------
      none               XD0830/ILD2, JL0925/ILD2     XE0834  HOLD FOR ERIC.B
  

       
  
                      Open annotations:
Down Equipment         lot#/tool/ooc#        Scrap lots:      Hold Lots: 
--------------        -----------------      ----------       ---------
 CMP.B2                     None                None            XE0834
 
  

Number of product lots in room:
------------------------------
7  lots 

New specs/revs posted:
---------------------
* please see t.d.c.o. located between cmp.b1, and cmp.b2 *

Lots/wafers processed
--------------------

JL0881/24 ILD1
XE0600/24 ILD3
JL0849/24 ILD2
JD0854/24 PMD
JL0907/24 ILD1
JL0850/24 ILD2
JL0857/24 ILD2


# of carriers for strasbaugh/speedfam:
--------------------------------------
12  SPEEDFAM  
 3  STRASBAUGH
 2  PLATES F/S

89.3passdown cmp b-shift 02/03/97FABSIX::M_PROVENCHERMon Feb 03 1997 06:00119
                                CMP                                          
                                ___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 5                   mqcs

        BREAKIN WAFERS              20                   misc



CMP.A1 (Strasbaugh 6DS-SP) -up/idle
CMP.A1 24hr MQCS COMPLETED: 02/02/97 @  9:00 pm
CMP.A1 24hr MQCS NEXT DUE : 02/03/97 @  9:00 pm

CMP.A2 (Strasbaugh 6DS-SP) -dn unsched/ failed two sets of mqc's pad change 
					breakins and mqc's in process tool down
					at 5:30 am
CMP.A2 24hr MQCS COMPLETED: 02/02/97 @  7:30 am
CMP.A2 24hr MQCS NEXT DUE : 02/03/97 @  7:30 am



CMP.B1 (Speedfam CMP-V)   - up/idle 
CMP.B1 24hr MQCS COMPLETED: 02/02/97 @  4:00 pm
CMP.B1 24hr MQCS NEXT DUE : 02/03/97 @  4:00 pm
CMP.B1 12hr MQCS COMPLETED: 02/03/97 @  4:30 pm 
CMP.B1 12hr MQCS NEXT DUE : 02/03/97 @  4:30 am
			     

CMP.B2 (Speedfam CMP-V)   - up/running xe0757 m3/
CMP.B2 24hr MQCS COMPLETED: 02/02/97 @  4:30 pm
CMP.B2 24hr MQCS NEXT DUE : 02/03/97 @  4:30 pm
CMP.B2 12hr MQCS COMPLETED: 02/03/97 @  3:30 am
CMP.B2 12hr MQCS NEXT DUE : 02/03/97 @  3:30 pm
		            

CMP.B3 (Speedfam CMP-V)   - up/running xd0593 m2
CMP.B3 24hr MQCS COMPLETED: 02/02/97 @  5:30 pm
CMP.B3 24hr MQCS NEXT DUE : 02/03/97 @  5:30 pm
CMP.B3 12hr MQCS COMPLETED: 02/03/97 @  4:30 am
CMP.B3 12hr MQCS NEXT DUE : 02/03/97 @  4:30 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/02/97 @ 10:30 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 01/03/97 @ 10:30 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/02/97 @ 10:30 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/03/97 @ 10:30 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/02/97 @ 10:30 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/03/97 @ 10:30 pm



Hot/B lots in area:
__________________
* none *
  
Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* xe0834 m1 2.75 days (on hold for eric b.) *
  
Down Equipment:
--------------
* cmp.a2 pad change after 2 failed mqc's *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* xe0834 (hold for eric b.) *  

Monitor status:
--------------
4   boxes of 12K mqc wafers       
2   boxes of 50K breakin wafers (more on order)  

Number of product lots in room:
------------------------------
*2 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see t.d.c.o. located between cmp.b1, and cmp.b2 *

Lots/wafers processed
--------------------
* jd0933 pmd 24 wafers *
  jl0940 pmd 24 wafers
  jl0925  m2 23 wafers (hotlot)
  xd0830  m2 24 wafers (hotlot)
  jl0842  m2 24 wafers
  jl0851  m2 23 wafers
  

# of carriers for strasbaugh/speedfam:
--------------------------------------
16  SPEEDFAM  
10  STRASBAUGH
 3  PLATES F/S

89.4Cmp Passdown A ShiftFABSIX::J_BLAISYou have readMon Feb 03 1997 19:4795
CMP PASSDOWN                                                                 
                                   
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used        Number Available
        ---------------         -----------        ----------------
        MQC-12K MONS                17                    5 boxes 

        BREAKIN WAFERS              25                    2 Boxes    
                                                      



CMP.A1 (Strasbaugh 6DS-SP) - up/idle                 
CMP.A1 24hr MQCS COMPLETED: 02/02/97 @ 9:00PM   
CMP.A1 24hr MQCS NEXT DUE : 02/03/97 @ 9:00PM 

CMP.A2 (Strasbaugh 6DS-SP) - up/idle    
CMP.A2 24hr MQCS COMPLETED: 02/03/97 @ 9:40 am 
CMP.A2 24hr MQCS NEXT DUE : 02/04/97 @ 9:40 am



CMP.B1 (Speedfam CMP-V)   - up/running  JL0938 
CMP.B1 24hr MQCS COMPLETED: 02/03/97 @  2:15 PM
CMP.B1 24hr MQCS NEXT DUE : 02/04/97 @  2:15 PM
CMP.B1 12hr MQCS COMPLETED: 02/03/97 @  2:00 PM 
CMP.B1 12hr MQCS NEXT DUE : 02/04/97 @  2:00 AM 

CMP.B2 (Speedfam CMP-V)   -up/idle
CMP.B2 24hr MQCS COMPLETED: 02/03/97 @ 4:45 pm 
CMP.B2 24hr MQCS NEXT DUE : 02/04/97 @ 4:45 pm
CMP.B2 12hr MQCS COMPLETED: 02/03/97 @ 11:00 AM
CMP.B2 12hr MQCS NEXT DUE : 02/03/97 @ 11:00 PM

CMP.B3 (Speedfam CMP-V)   - up/idle 
CMP.B3 24hr MQCS COMPLETED: 02/03/97 @  7:00 PM
CMP.B3 24hr MQCS NEXT DUE : 02/04/97 @  7:00 PM
CMP.B3 12hr MQCS COMPLETED: 02/03/97 @  7:00 PM
CMP.B3 12hr MQCS NEXT DUE : 02/04/97 @  7:00 AM



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/02/97 @ 10:20 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/03/97 @ 10:20 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/02/97 @ 10:20 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/03/97 @ 10:20 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/02/97 @ 10:20 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/03/97 @ 10:20 pm



Hot/B lots in area:     Hot lots coming to area:    Static Lots in area:
__________________      -----------------------     -------------------
      none                   none                      xe0806  FSG splits
  

       
  
                      Open annotations:
Down Equipment         lot#/tool/ooc#        Scrap lots:      Hold Lots: 
--------------        -----------------      ----------       ---------
 None                       None                None        xe0806  FSG splits
  

Number of product lots in room:
------------------------------
4  lots 

New specs/revs posted:
---------------------
* please see t.d.c.o. located between cmp.b1, and cmp.b2 *

Lots/wafers processed
--------------------

XE0834/18 ILD1
XD0894/24 PMD
XD0593/21 ILD2
XE0757/23 ILD3



# of carriers for strasbaugh/speedfam:
--------------------------------------
12  SPEEDFAM  
 3  STRASBAUGH
 2  PLATES F/S

89.5passdown cmp b-shift 02/04/97FABSIX::M_PROVENCHERTue Feb 04 1997 05:33114
                                CMP                                          
                                ___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 5                   mqcs

        BREAKIN WAFERS              39                   misc



CMP.A1 (Strasbaugh 6DS-SP) -up/idle
CMP.A1 24hr MQCS COMPLETED: 02/03/97 @  9:00 pm
CMP.A1 24hr MQCS NEXT DUE : 02/04/97 @  9:00 pm

CMP.A2 (Strasbaugh 6DS-SP) -up/mqc failed first set of mqc's for unif 10.1 and
                               13.0 2nd set in process
CMP.A2 24hr MQCS COMPLETED: 02/03/97 @  :30 am
CMP.A2 24hr MQCS NEXT DUE : 02/04/97 @  :30 am



CMP.B1 (Speedfam CMP-V)   - up/idle tool was scrubbed at 5 am
CMP.B1 24hr MQCS COMPLETED: 02/03/97 @  2:00 pm
CMP.B1 24hr MQCS NEXT DUE : 02/04/97 @  2:00 pm
CMP.B1 12hr MQCS COMPLETED: 02/03/97 @ 11:30 pm 
CMP.B1 12hr MQCS NEXT DUE : 02/04/97 @ 11:30 am
			     

CMP.B2 (Speedfam CMP-V)   - up/idle
CMP.B2 24hr MQCS COMPLETED: 02/03/97 @  5:00 pm
CMP.B2 24hr MQCS NEXT DUE : 02/04/97 @  5:00 pm
CMP.B2 12hr MQCS COMPLETED: 02/04/97 @  2:00 am
CMP.B2 12hr MQCS NEXT DUE : 02/04/97 @  2:00 pm
		            

CMP.B3 (Speedfam CMP-V)   - up/idle
CMP.B3 24hr MQCS COMPLETED: 02/03/97 @  7:00 pm
CMP.B3 24hr MQCS NEXT DUE : 02/04/97 @  7:00 pm
CMP.B3 12hr MQCS COMPLETED: 02/04/97 @  7:00 am
CMP.B3 12hr MQCS NEXT DUE : 02/04/97 @  7:00 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/03/97 @ 10:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/04/97 @ 10:00 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/03/97 @ 10:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/04/97 @ 10:00 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/03/97 @ 10:00 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/04/97 @ 10:00 pm



Hot/B lots in area:
__________________
* none *
  
Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* xe0806 m1 0.50 days (on hold for eric b.) *
  
Down Equipment:
--------------
* a2 in 2nd set of mqc's. 1st set failed unif 10.1 and 13.0 *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* jl0947 pmd 2 wafers on cmp.a2 *

Hold Lots:
---------
* xe0806 (hold for eric b.) *  

Monitor status:
--------------
4   boxes of 12K mqc wafers       
4   boxes of 50K breakin wafers (more on order)  

Number of product lots in room:
------------------------------
* zero lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see t.d.c.o. located between cmp.b1, and cmp.b2 *

Lots/wafers processed
--------------------
* jl0938 pmd 24 wafers
  jl0947 pmd 22 wafers
  xd0914 pmd 23 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
16  SPEEDFAM  
 8  STRASBAUGH
 3  PLATES F/S

89.6CMP PASSDOWN A SHIFTFABSIX::J_BLAISYou have readTue Feb 04 1997 19:5695
CMP PASSDOWN                                                                 
                                   
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used        Number Available
        ---------------         -----------        ----------------
        MQC-12K MONS                17                    4 boxes 

        BREAKIN WAFERS              25                    2 Boxes    
                                                      



CMP.A1 (Strasbaugh 6DS-SP) - up/idle                 
CMP.A1 24hr MQCS COMPLETED: 02/03/97 @ 9:00PM   
CMP.A1 24hr MQCS NEXT DUE : 02/04/97 @ 9:00PM 

CMP.A2 (Strasbaugh 6DS-SP) - up/VERIFY  
CMP.A2 24hr MQCS COMPLETED: BREAKING IN NOW WILL NEED MQC'S
CMP.A2 24hr MQCS NEXT DUE : NA                



CMP.B1 (Speedfam CMP-V)   - up/running  JD0917/24 ILD3 HOT
CMP.B1 24hr MQCS COMPLETED: 02/04/97 @  7:10 PM
CMP.B1 24hr MQCS NEXT DUE : 02/05/97 @  7:10 PM
CMP.B1 12hr MQCS COMPLETED: 02/04/97 @  7:55 AM 
CMP.B1 12hr MQCS NEXT DUE : 02/04/97 @  7:55 PM 

CMP.B2 (Speedfam CMP-V)   -up/running XE0806/24 ILD ENG LOT (FSG SPLITS)
CMP.B2 24hr MQCS COMPLETED: NEEDS PAD CHANGE BECAUSE OF THE FSG SPLITS
USES A DIFFERENT OXIDE WHICH CONTAMINATES THE PAD (BOTH PADS).

CMP.B2 24hr MQCS NEXT DUE : NA                
CMP.B2 12hr MQCS COMPLETED: NA
CMP.B2 12hr MQCS NEXT DUE : NA

CMP.B3 (Speedfam CMP-V)   - up/RUNNING XE0756/19 ILD3 (TUP)
CMP.B3 24hr MQCS COMPLETED: 02/03/97 @  7:00 PM
CMP.B3 24hr MQCS NEXT DUE : NOW                                  
CMP.B3 12hr MQCS COMPLETED: 02/04/97 @  7:30 PM
CMP.B3 12hr MQCS NEXT DUE : 02/05/97 @  7:30 AM



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/03/97 @ 10:20 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/04/97 @ 10:20 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/03/97 @ 10:20 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/04/97 @ 10:20 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/03/97 @ 10:20 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/04/97 @ 10:20 pm



Hot/B lots in area:     Hot lots in the area        Static Lots in area:
__________________      -----------------------     -------------------
      none              JD0917 ILD3                    XB0782  STI LOT
  

       
  
                      Open annotations:
Down Equipment         lot#/tool/ooc#        Scrap lots:      Hold Lots: 
--------------        -----------------      ----------       ---------
 None                       None                None          XB0782 STI LOT.
  

Number of product lots in room:
------------------------------
8  lots 

New specs/revs posted:
---------------------
* please see t.d.c.o. located between cmp.b1, and cmp.b2 *

Lots/wafers processed
--------------------

JL0672/24 ILD1
JD0936/22 PMD
XM0803/21 ILD1


# of carriers for strasbaugh/speedfam:
--------------------------------------
12  SPEEDFAM  
 3  STRASBAUGH
 2  PLATES F/S

89.7passdown cmp b-shift 02/09/97FABSIX::M_PROVENCHERSun Feb 09 1997 05:41118
                                CMP                                          
                                ___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 1                   mqcs

        BREAKIN WAFERS              32                   misc



CMP.A1 (Strasbaugh 6DS-SP) -dn/waiting for parts
CMP.A1 24hr MQCS COMPLETED: 02/08/97 @  8:30 am
CMP.A1 24hr MQCS NEXT DUE : when it comes up

CMP.A2 (Strasbaugh 6DS-SP) -up/idle
CMP.A2 24hr MQCS COMPLETED: 02/08/97 @  8:30 am
CMP.A2 24hr MQCS NEXT DUE : 02/09/97 @  8:30 am



CMP.B1 (Speedfam CMP-V)   - up/running jl0672 m2/jl0874 m2
CMP.B1 24hr MQCS COMPLETED: 02/08/97 @ 10:00 am
CMP.B1 24hr MQCS NEXT DUE : 02/09/97 @ 10:00 am
CMP.B1 12hr MQCS COMPLETED: 02/08/97 @  9:00 pm 
CMP.B1 12hr MQCS NEXT DUE : 02/09/97 @  9:00 am
			     

CMP.B2 (Speedfam CMP-V)   - up/running jd0934 m1/xd0913 m1 
CMP.B2 24hr MQCS COMPLETED: 02/08/97 @  6:00 pm
CMP.B2 24hr MQCS NEXT DUE : 02/09/97 @  6:00 pm
CMP.B2 12hr MQCS COMPLETED: 02/09/97 @  7:00 am
CMP.B2 12hr MQCS NEXT DUE : 02/09/97 @  7:00 pm
		            

CMP.B3 (Speedfam CMP-V)   - up/running xd0778 m3/jd0860 m2
CMP.B3 24hr MQCS COMPLETED: 02/08/97 @  1:00 pm
CMP.B3 24hr MQCS NEXT DUE : 02/09/97 @  1:00 pm
CMP.B3 12hr MQCS COMPLETED: 02/08/97 @  8:00 pm
CMP.B3 12hr MQCS NEXT DUE : 02/09/97 @  8:00 am



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/08/97 @ 11:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/09/97 @ 11:00 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/08/97 @ 11:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/09/97 @ 11:00 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/08/97 @ 11:00 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/09/97 @ 11:00 pm



Hot/B lots in area:
__________________
* none *
  
Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *
  
Down Equipment:
--------------
* cmp.a1 (waiting for parts) *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *  

Monitor status:
--------------
3   boxes of 12K mqc wafers       
3   boxes of 50K breakin wafers (more on order)  

Number of product lots in room:
------------------------------
*9  lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *

Lots/wafers processed
--------------------
* jl0981 pmd 24 wafers *
  jl0908  m1 24 wafers  
  jl0952  m1 22 wafers
  jl0901  m1 24 wafers 
  jd0872  m2 24 wafers
  jd0859  m2 23 wafers
  jl0610  m2 23 wafers 
  xd0830  m3 24 wafers 

# of carriers for strasbaugh/speedfam:
--------------------------------------
17  SPEEDFAM  
 4  STRASBAUGH
 9  PLATES F/S

89.8Cmp Passdown A SHIFTFABSIX::J_BLAISYou have readSun Feb 09 1997 19:36101
CMP PASSDOWN                                                                 
                                   
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used        Number Available
        ---------------         -----------        ----------------
        MQC-12K MONS                17                    2 boxes 

        BREAKIN WAFERS              25                    1 Box      
                                                      



CMP.A1 (Strasbaugh 6DS-SP) - DOWN for rotary union                 
CMP.A1 24hr MQCS COMPLETED: 
CMP.A1 24hr MQCS NEXT DUE :                   

CMP.A2 (Strasbaugh 6DS-SP) - up/mqc     
CMP.A2 24hr MQCS COMPLETED: Running now after pad change
CMP.A2 24hr MQCS NEXT DUE :                   



CMP.B1 (Speedfam CMP-V)   - up/running XE0919/20 ILD1 HOT 
CMP.B1 24hr MQCS COMPLETED: 02/09/97 @  1:18 pm
CMP.B1 24hr MQCS NEXT DUE : 02/10/97 @  1:18 pm
CMP.B1 12hr MQCS COMPLETED: 02/09/97 @  8:00 am 
CMP.B1 12hr MQCS NEXT DUE : 02/09/97 @  8:00 pm 

CMP.B2 (Speedfam CMP-V)   -up/running JD0870/22 ILD1, JL0939/23 ILD1
CMP.B2 24hr MQCS COMPLETED: 02/09/97 @  7:30 pm
CMP.B2 24hr MQCS NEXT DUE : 02/10/97 @  7:30 pm
CMP.B2 12hr MQCS COMPLETED: 02/09/97 @  3:30 pm
CMP.B2 12hr MQCS NEXT DUE : 02/10/97 @  3:30 am

CMP.B3 (Speedfam CMP-V)   - up/RUNNING) XD0892/24 ILD1
CMP.B3 24hr MQCS COMPLETED: 02/09/97 @  6:00 PM
CMP.B3 24hr MQCS NEXT DUE : 02/10/97 @  6:00 PM                  
CMP.B3 12hr MQCS COMPLETED: 02/09/97 @  7:00 pm
CMP.B3 12hr MQCS NEXT DUE : 02/10/97 @  7:00 AM



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/08/97 @ 11:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/09/97 @ 11:00 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/08/97 @ 11:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/09/97 @ 11:00 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/08/97 @ 11:00 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/09/97 @ 11:00 pm



Hot/B lots in area:     Hot lots in the area        Static Lots in area:
__________________      -----------------------     -------------------
      none                 xe0919/20 ild1                 none
  

       
  
                      Open annotations:
Down Equipment         lot#/tool/ooc#        Scrap lots:      Hold Lots: 
--------------        -----------------      ----------       ---------
 None                       None                None            None
  

Number of product lots in room:
------------------------------
14 lots 

New specs/revs posted:
---------------------
                                                          

Lots/wafers processed
--------------------
XD0778/24 ILD3
JL0883/24 ILD2
JL0962/24 PMD
JL0901/24 ILD1
JD0934/24 ILD1
XD0913/24 ILD1
JD0860/23 ILD2
JL0672/24 ILD2
JL0874/24 ILD2
JD0859/23 ILD2
JL0969/24 PMD
XE0835/23 PMD


# of carriers for strasbaugh/speedfam:
--------------------------------------
12  SPEEDFAM  
 3  STRASBAUGH
 2  PLATES F/S

89.9passdown cmp b-shift 02/10/97FABSIX::M_PROVENCHERMon Feb 10 1997 05:52125
                                CMP                                          
                                ___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 9                   mqcs

        BREAKIN WAFERS              46                   misc



CMP.A1 (Strasbaugh 6DS-SP) -dn/down for rotary union
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : when it comes up

CMP.A2 (Strasbaugh 6DS-SP) -up/
				down at 12:00midnite (carrier changes), due to
			        wafers slipping out of the rightr carrier. the
    				count was greater than 300 wafers, so both were
				changed. up at 1:30. down for crash at 3:30 am  
CMP.A2 24hr MQCS COMPLETED: in process 
CMP.A2 24hr MQCS NEXT DUE : n/a  



CMP.B1 (Speedfam CMP-V)   - up/running jl0907 m2/
			    down at 9pm for low vac/up at 10:30pm
CMP.B1 24hr MQCS COMPLETED: 02/09/97 @  1:30 pm
CMP.B1 24hr MQCS NEXT DUE : 02/10/97 @  1:30 pm
CMP.B1 12hr MQCS COMPLETED: 02/09/97 @  8:00 pm 
CMP.B1 12hr MQCS NEXT DUE : 02/10/97 @  8:00 am
			     

CMP.B2 (Speedfam CMP-V)   - up/running (info not available) 
CMP.B2 24hr MQCS COMPLETED: 02/09/97 @  7:30 pm
CMP.B2 24hr MQCS NEXT DUE : 02/10/97 @  7:30 pm
CMP.B2 12hr MQCS COMPLETED: 02/10/97 @  4:00 am
CMP.B2 12hr MQCS NEXT DUE : 02/10/97 @  4:00 pm
		            

CMP.B3 (Speedfam CMP-V)   - up/running jl0912 m2/jl0888 m2
CMP.B3 24hr MQCS COMPLETED: 02/09/97 @  6:00 pm
CMP.B3 24hr MQCS NEXT DUE : 02/10/97 @  6:00 pm
CMP.B3 12hr MQCS COMPLETED: 02/08/97 @  :00 pm
CMP.B3 12hr MQCS NEXT DUE : 02/09/97 @  8:00 am



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/09/97 @ 11:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/10/97 @ 11:00 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/09/97 @ 11:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/10/97 @ 11:00 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/09/97 @ 11:00 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/10/97 @ 11:00 pm



Hot/B lots in area:
__________________
* none *
  
Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *
  
Down Equipment:
--------------
* cmp.a1 (waiting for rotary union) *
  cmp.a2 (breakin after crash & carrier changes)
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* none *  

Monitor status:
--------------
3   boxes of 12K mqc wafers       
1   box   of 50K breakin wafers (more on order)  

Number of product lots in room:
------------------------------
*11  lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *

Lots/wafers processed
--------------------
*  jl0939  m1 23 wafers *
   jd0870  m1 22 wafers
   xe0919  m1 20 wafers (hot lot)
   jl0923  m1 24 wafers
   jl0943  m1 24 wafers
   jl0910  m1 24 wafers
   jl0649  m2  6 wafers
   jl0898  m2 24 wafers *
   jl0881  m2 24 wafers *

# of carriers for strasbaugh/speedfam:
--------------------------------------
17  SPEEDFAM  
 2  STRASBAUGH
 7  PLATES F/S

89.10CMP passdown "B" ShiftFABSIX::J_REISNERMon Feb 10 1997 20:0698
CMP PASSDOWN                                                                 
                                   
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used        Number Available
        ---------------         -----------        ----------------
        MQC-12K MONS                17                    2 1/2 boxes 

        BREAKIN WAFERS              25                    2 Box      
                                                      



CMP.A1 (Strasbaugh 6DS-SP) - DOWN for rotary union                 
CMP.A1 24hr MQCS COMPLETED: 
CMP.A1 24hr MQCS NEXT DUE :                   

CMP.A2 (Strasbaugh 6DS-SP) - DOWN for pad/carrier change
CMP.A2 24hr MQCS COMPLETED:        
CMP.A2 24hr MQCS NEXT DUE :                   



CMP.B1 (Speedfam CMP-V)   - up/running JD0935 - NEEDS TOUCH UP           
CMP.B1 24hr MQCS COMPLETED: 02/09/97 @  6:30 pm
CMP.B1 24hr MQCS NEXT DUE : 02/10/97 @  6:30 pm
CMP.B1 12hr MQCS COMPLETED: 02/09/97 @  8:30 PM 
CMP.B1 12hr MQCS NEXT DUE : 02/10/97 @  8:30 AM 

CMP.B2 (Speedfam CMP-V)   -DOWN/ pad change - pad step low 
CMP.B2 24hr MQCS COMPLETED:                   needs MQC's
CMP.B2 24hr MQCS NEXT DUE : 
CMP.B2 12hr MQCS COMPLETED: 
CMP.B2 12hr MQCS NEXT DUE : 

CMP.B3 (Speedfam CMP-V)   - MQC/RUNNING JL0942 (at Thickness .A5 for 100%) 
CMP.B3 24hr MQCS COMPLETED: 
CMP.B3 24hr MQCS NEXT DUE :                
CMP.B3 12hr MQCS COMPLETED: 02/10/97 @  7:00 AM
CMP.B3 12hr MQCS NEXT DUE : 02/10/97 @  7:00 PM



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/09/97 @ 11:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/10/97 @ 11:00 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/09/97 @ 11:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/10/97 @ 11:00 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/09/97 @ 11:00 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/10/97 @ 11:00 pm



Hot/B lots in area:     Hot lots in the area        Static Lots in area:
__________________      -----------------------     -------------------
      none                     none                         none
  

       
  
                      Open annotations:
Down Equipment         lot#/tool/ooc#        Scrap lots:      Hold Lots: 
--------------        -----------------      ----------       ---------
CMP.B2                   None                None             None
CMP.A2

Number of product lots in room:
------------------------------
11 lots 

New specs/revs posted:
---------------------
                                                          

Lots/wafers processed
--------------------
JL0938/24 ILD2
JL0881/24 ILD2
JL0898/24 ILD2
JL0888/24 ILD2
JL0970/24 PMD
JL0975/24 PMD
JL0912/23 ILD2
xd0915/23 ILD1



# of carriers for strasbaugh/speedfam:
--------------------------------------
12  SPEEDFAM  
 3  STRASBAUGH
 2  PLATES F/S

89.11passdown cmp b-shift 02/11/97FABSIX::M_PROVENCHERTue Feb 11 1997 05:14120
                                CMP                                          
                                ___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                18                   mqcs

        BREAKIN WAFERS              43                   misc



CMP.A1 (Strasbaugh 6DS-SP) -dn/down for rotary union
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : when it comes up

CMP.A2 (Strasbaugh 6DS-SP) -up/idle
				down at 8:pm after pad change. maint had tool 
				to check load cup problem. up at 4:am  
CMP.A2 24hr MQCS COMPLETED: 02/11/97 @  4:00 am
CMP.A2 24hr MQCS NEXT DUE : 02/12/97 @  4:00 am



CMP.B1 (Speedfam CMP-V)   - up/idle
CMP.B1 24hr MQCS COMPLETED: 02/10/97 @  1:30 pm
CMP.B1 24hr MQCS NEXT DUE : 02/11/97 @  1:30 pm
CMP.B1 12hr MQCS COMPLETED: 02/10/97 @  8:30 pm 
CMP.B1 12hr MQCS NEXT DUE : 02/11/97 @  8:30 am
			     

CMP.B2 (Speedfam CMP-V)   - up/running xe0597 m1
			      down at 8:pm for pad changes, failed first set 
                              of mqc's/changed id/od, and offsets, passed 2nd
			      set.
CMP.B2 24hr MQCS COMPLETED: 02/11/97 @  4:30 am
CMP.B2 24hr MQCS NEXT DUE : 02/12/97 @  4:30 am
CMP.B2 12hr MQCS COMPLETED: 02/11/97 @  8:00 pm
CMP.B2 12hr MQCS NEXT DUE : 02/12/97 @  8:00 am
		            

CMP.B3 (Speedfam CMP-V)   - up/running jd0854 m1/ 
CMP.B3 24hr MQCS COMPLETED: 02/10/97 @  9:00 pm
CMP.B3 24hr MQCS NEXT DUE : 02/11/97 @  9:00 pm
CMP.B3 12hr MQCS COMPLETED: 02/10/97 @  9:00 pm
CMP.B3 12hr MQCS NEXT DUE : 02/11/97 @  9:00 am



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/10/97 @ 11:30 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/11/97 @ 11:30 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/10/97 @ 11:30 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/11/97 @ 11:30 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/10/97 @ 11:30 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/11/97 @ 11:30 pm



Hot/B lots in area:
__________________
* none *
  
Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *
  
Down Equipment:
--------------
* cmp.a1 (waiting for rotary union) *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* xe0614 m2 per M_Broomfield *  

Monitor status:
--------------
3   boxes of 12K mqc wafers       
4   boxes of 50K breakin wafers (more on order)  

Number of product lots in room:
------------------------------
*2  lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *

Lots/wafers processed
--------------------
* jd0935 pmd 24 wafers *
  jd0960 pmd 21 wafers
  jd0937 pmd 24 wafers
  jd0929 pmd 24 wafers
  jl0942  m1 24 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
17  SPEEDFAM  
 2  STRASBAUGH
 7  PLATES F/S

89.12cmp passdown a shiftFABBIT::J_BLAISYou have readTue Feb 11 1997 19:31100
CMP PASSDOWN                                                                 
                                   
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used        Number Available
        ---------------         -----------        ----------------
        MQC-12K MONS                 7                    3 boxes 

        BREAKIN WAFERS              30                    3 Boxes    
                                                      



CMP.A1 (Strasbaugh 6DS-SP) down for rotary union                 
CMP.A1 24hr MQCS COMPLETED: 
CMP.A1 24hr MQCS NEXT DUE :                   

CMP.A2 (Strasbaugh 6DS-SP) - down  wafers keep sticking. EE still working it.
			     RUNNING JL0979/24 PMD	
CMP.A2 24hr MQCS COMPLETED:  
CMP.A2 24hr MQCS NEXT DUE :                   



CMP.B1 (Speedfam CMP-V)   - Verify/MQC after scratches were found resulting in 
				       a pad and carrier change. FSG Lot got
				       scratched.

CMP.B1 24hr MQCS COMPLETED:  will be running..
CMP.B1 24hr MQCS NEXT DUE : 
CMP.B1 12hr MQCS COMPLETED: 
CMP.B1 12hr MQCS NEXT DUE : 

CMP.B2 (Speedfam CMP-V)   -up/running XD0593/21 ILD3 
CMP.B2 24hr MQCS COMPLETED: 02/11/97 @  4:00 am
CMP.B2 24hr MQCS NEXT DUE : 02/12/97 @  4:00 am
CMP.B2 12hr MQCS COMPLETED: 02/11/97 @  5:20 pm
CMP.B2 12hr MQCS NEXT DUE : 02/12/97 @  5:20 am

CMP.B3 (Speedfam CMP-V)   - up/RUNNING XE0614/20 ILD1 
CMP.B3 24hr MQCS COMPLETED: 02/10/97 @  9:00 PM
CMP.B3 24hr MQCS NEXT DUE : 02/11/97 @  9:00 PM                  
CMP.B3 12hr MQCS COMPLETED: 02/11/97 @ 10:00 AM
CMP.B3 12hr MQCS NEXT DUE : 02/11/97 @ 10:00 PM



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/10/97 @ 11:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/11/97 @ 11:00 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/10/97 @ 11:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/11/97 @ 11:00 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/10/97 @ 11:00 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/11/97 @ 11:00 pm



Hot/B lots in area:     Hot lots in the area        Static Lots in area:
__________________      -----------------------     -------------------
      none                   none                         none
  

       
  
                      Open annotations:
Down Equipment         lot#/tool/ooc#        Scrap lots:      Hold Lots: 
--------------        -----------------      ----------       ---------
 None                       None                None            None
  

Number of product lots in room:
------------------------------
9 lots 

New specs/revs posted:
---------------------
                                                          

Lots/wafers processed
--------------------
JD0936/22 ILD1
XE0597/22 ILD1
JD0854/24 ILD1
JD0929/24 PMD
JD1032/24 PMD
JL0909/24 ILD2



# of carriers for strasbaugh/speedfam:
--------------------------------------
 7  SPEEDFAM  
 1  STRASBAUGH
 2  PLATES F/S

89.13passdown cmp b-shift 02/12/97FABSIX::M_PROVENCHERWed Feb 12 1997 05:52119
                                CMP                                          
                                ___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                26                   mqcs

        BREAKIN WAFERS              38                   misc



CMP.A1 (Strasbaugh 6DS-SP) -dn/down for rotary union
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : when it comes up

CMP.A2 (Strasbaugh 6DS-SP) -up/running jl0968 pmd/jl0971 pmd
				down at 8:pm. maint had tool til 4 am  
				to check back pressure problem.up at 5:30 am  
CMP.A2 24hr MQCS COMPLETED: 02/12/97 @ 5:30 am 
CMP.A2 24hr MQCS NEXT DUE : 02/13/97 @ 5:30 am



CMP.B1 (Speedfam CMP-V)   - up/running xd0869 m2/
			       tool was down at 8:00 pm for pad/carrier change
			       failed 1st set of mqc's passed 2nd set up at
			       11:00 pm
CMP.B1 24hr MQCS COMPLETED: 02/11/97 @ 11:00 pm
CMP.B1 24hr MQCS NEXT DUE : 02/12/97 @ 11:00 pm
CMP.B1 12hr MQCS COMPLETED: 02/12/97 @ 11:00 pm 
CMP.B1 12hr MQCS NEXT DUE : 02/13/97 @ 11:00 am
			     

CMP.B2 (Speedfam CMP-V)   - up/mqc (running xd0895 m2/xd0864 m2)
CMP.B2 24hr MQCS COMPLETED: in process
CMP.B2 24hr MQCS NEXT DUE : n/a
CMP.B2 12hr MQCS COMPLETED: 02/12/97 @  6:00 am
CMP.B2 12hr MQCS NEXT DUE : 02/13/97 @  6:00 pm
		            

CMP.B3 (Speedfam CMP-V)   - up/mqc after pad change tool was down all night  
CMP.B3 24hr MQCS COMPLETED: in process failed first set
CMP.B3 24hr MQCS NEXT DUE : n/a
CMP.B3 12hr MQCS COMPLETED: 02/12/97 @  8:00 pm
CMP.B3 12hr MQCS NEXT DUE : 02/13/97 @  8:00 am



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/12/97 @  3:00 am 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/13/97 @  3:00 am

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/12/97 @  3:00 am 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/13/97 @  3:00 am

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/12/97 @  3:00 am
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/13/97 @  3:00 am



Hot/B lots in area:
__________________
* none *
  
Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* none *
  
Down Equipment:
--------------
* cmp.a1 (waiting for rotary union) *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* xe0614 m2 *  

Monitor status:
--------------
1   boxes of 12K mqc wafers       
2   boxes of 50K breakin wafers (more on order)  

Number of product lots in room:
------------------------------
*15 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *

Lots/wafers processed
--------------------
* jl0979 pmd 24 wafers *
  jl0982 pmd 24 wafers
  xd0780  m3 11 wafers
  xd0539  m3 22 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
 7  SPEEDFAM  
 1  STRASBAUGH
 2  PLATES F/S

89.14Cpm Passdown A ShiftFABSIX::J_BLAISYou have readWed Feb 12 1997 20:0696
CMP PASSDOWN                                                                 
                                   
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used        Number Available
        ---------------         -----------        ----------------
        MQC-12K MONS                 7                    1 boxes 

        BREAKIN WAFERS              25                    2 Boxes    
                                                      



CMP.A1 (Strasbaugh 6DS-SP) UP/MQC
CMP.A1 24hr MQCS COMPLETED: RUNNING
CMP.A1 24hr MQCS NEXT DUE :                   

CMP.A2 (Strasbaugh 6DS-SP) - DOWN
CMP.A2 24hr MQCS COMPLETED:  
CMP.A2 24hr MQCS NEXT DUE :                   



CMP.B1 (Speedfam CMP-V)   -up/running JD0959/24 PMD, JD0985/24 PMD 
CMP.B1 24hr MQCS COMPLETED:  02/11/97 @ 11:00 PM
CMP.B1 24hr MQCS NEXT DUE :  02/12/97 @ 11:00 PM
CMP.B1 12hr MQCS COMPLETED:  02/12/97 @  8:00 AM
CMP.B1 12hr MQCS NEXT DUE :  02/12/97 @  8:00 PM

CMP.B2 (Speedfam CMP-V)   - JL0973/24 ILD1, JL0880/24 ILD2 
CMP.B2 24hr MQCS COMPLETED: 02/12/97 @  6:00 am
CMP.B2 24hr MQCS NEXT DUE : 02/13/97 @  6:00 am
CMP.B2 12hr MQCS COMPLETED: 02/12/97 @  5:00 pm
CMP.B2 12hr MQCS NEXT DUE : 02/13/97 @  5:00 am

CMP.B3 (Speedfam CMP-V)   - up/RUNNING JL0972/23 PMD , JL0971/24 PMD 
CMP.B3 24hr MQCS COMPLETED: 02/12/97 @ 10:00 PM
CMP.B3 24hr MQCS NEXT DUE : 02/13/97 @ 10:00 PM                  
CMP.B3 12hr MQCS COMPLETED: 02/11/97 @ 10:40 AM
CMP.B3 12hr MQCS NEXT DUE : 02/12/97 @ 10:40 PM



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/11/97 @ 11:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/12/97 @ 11:00 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/11/97 @ 11:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/12/97 @ 11:00 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/11/97 @ 11:00 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/12/97 @ 11:00 pm



Hot/B lots in area:     Hot lots in the area        Static Lots in area:
__________________      -----------------------     -------------------
      none                   none                        XE0614/20 ILD2
  

       
  
                      Open annotations:
Down Equipment         lot#/tool/ooc#        Scrap lots:      Hold Lots: 
--------------        -----------------      ----------       ---------
 None                       None                None          XE0614/20 ILD2
  

Number of product lots in room:
------------------------------
  lots 

New specs/revs posted:
---------------------
                                                          

Lots/wafers processed
--------------------
JD0931/24
XD0864/24
XD0895/24
XD0780/11
JL0982/24
XE0869/22
JL0968/24 


# of carriers for strasbaugh/speedfam:
--------------------------------------
 7  SPEEDFAM  
 1  STRASBAUGH
 2  PLATES F/S

89.15PASSDOWNFABSIX::D_CAUSEThu Feb 13 1997 07:3933
                             D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -UP/RUNNING JD0986 100%ING ON .A5
                                       JL0983 FIRST PASS
    
CMP.A2 (Strasbaugh 6DS-SP) -DOWN/EXTERNAL REPS WILL BE WORKING ON IT TODAY

CMP.B1 (Speedfam CMP-V) - UP/RUNNING JD0933 100%ING ON .A4 NEEDS TU

CMP.B2 (Speedfam CMP-V) - UP/MQC PARTICLES PASSED AND LOGGED NEEDS EVAL
                                 ON THK.A5  

CMP.B3 (Speedfam CMP-V) - UP/RUNNING XD0894 SA COMPLETE READY TO RUN
 
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT lots in area:
----------------

BREAK IN WAFERS USED:30

MQC WAFERS USED:13 WAFERS USED
MQC WAFERS AVAIL:2.5 BOXES  

----------


89.21PASSDOWNFABSIX::D_CAUSEFri Feb 14 1997 07:3735
                             D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -UP/RUNNING JD0920 SEND AHEADS
    
CMP.A2 (Strasbaugh 6DS-SP) -DOWN/EXTERNAL REPS WORKING ON THIS AGAIN

CMP.B1 (Speedfam CMP-V) - UP/RUNNING YE0218 NEEDS 100% AND TU READ ON .A4
                                     JD1032 **HOT LOT** READY TO RUN

CMP.B2 (Speedfam CMP-V) - UP/RUNNING XD0832 100%ED ON THK.A5
                                     XD0582 FIRST PASS

CMP.B3 (Speedfam CMP-V) - UP/MQC 2000A RANGE FOR SEND AHEADS CHECKING MQC'S
                                 LOT XD0585 ONLY SEND AHEADS HAVE BEEN RUN
 
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT lots in area:1
----------------
**JD1032**

BREAK IN WAFERS USED:30

MQC WAFERS USED:15 WAFERS USED
MQC WAFERS AVAIL:2.5 BOXES  

----------


89.22passdownFABSIX::D_CAUSESat Feb 15 1997 08:1133
                             D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -DOWN/UNSCHEDULED FAILED 24HR MQC NEEDS PAD CHANGE
                                   JL0977 HAS BEEN STARTED RECCOMEND 100%

CMP.A2 (Strasbaugh 6DS-SP) -DOWN/WORK CONTINUES ON THE GEARBOX

CMP.B1 (Speedfam CMP-V) - UP/RUNNING JL0994 100%ING ON THK.A4 NEEDS TU

CMP.B2 (Speedfam CMP-V) - UP/RUNNING XD0947 100%ED ON THK.A5 NEEDS TU
                                     XD0599 NEEDS DRG AND FINAL 

CMP.B3 (Speedfam CMP-V) - DOWN/MONTHLY PM
 
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE  
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT lots in area:
----------------

BREAK IN WAFERS USED:20

MQC WAFERS USED:15 WAFERS USED
MQC WAFERS AVAIL:2 BOXES  

----------


89.23passdown cmp b-shift 02/16/97FABSIX::M_PROVENCHERSun Feb 16 1997 06:29122
                                CMP                                          
                                ___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                 6                   mqcs

        BREAKIN WAFERS              41                   misc



CMP.A1 (Strasbaugh 6DS-SP) -up/running jl1120 pmd hot lot
CMP.A1 24hr MQCS COMPLETED: 02/15/97 @  2:00 pm
CMP.A1 24hr MQCS NEXT DUE : 02/16/97 @  2:00 pm

CMP.A2 (Strasbaugh 6DS-SP) -dn/ gear box upgrade  
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : when tool comes back up



CMP.B1 (Speedfam CMP-V)   - up/running jl0953 m2/
CMP.B1 24hr MQCS COMPLETED: 02/16/97 @  3:00 am
CMP.B1 24hr MQCS NEXT DUE : 02/17/97 @  3:00 am
CMP.B1 12hr MQCS COMPLETED: 02/16/97 @  7:30 am 
CMP.B1 12hr MQCS NEXT DUE : 02/16/97 @  7:30 pm
			     

CMP.B2 (Speedfam CMP-V)   - up/running jl0970 m1/jl0837b m2
CMP.B2 24hr MQCS COMPLETED: 02/15/97 @  5:00 pm
CMP.B2 24hr MQCS NEXT DUE : 02/16/97 @  5:00 pm 
CMP.B2 12hr MQCS COMPLETED: 02/16/97 @  6:00 am
CMP.B2 12hr MQCS NEXT DUE : 02/16/97 @  6:00 pm
		            

CMP.B3 (Speedfam CMP-V)   - up/running jd0860 m3/ xd0804 m3   
CMP.B3 24hr MQCS COMPLETED: 02/15/97 @  5:00 pm
CMP.B3 24hr MQCS NEXT DUE : 02/16/97 @  5:00 pm
CMP.B3 12hr MQCS COMPLETED: 02/16/97 @  1:00 am
CMP.B3 12hr MQCS NEXT DUE : 02/16/97 @  1:00 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/15/97 @ 11:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/16/97 @ 11:00 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/15/97 @ 11:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/16/97 @ 11:00 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/16/97 @ 11:00 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/17/97 @ 11:00 pm



Hot/B lots in area:
__________________
* jd1120 pmd cmp.a1 *
  
Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* jd0928 m1 2.86 days on hold high thk range (pre cmp) *
  jd0930 m1 1.56 days on hold for e. bodensieck
  
Down Equipment:
--------------
* cmp.a2 (gear box upgrade) *
  
Open annotations:
 lot#/tool/ooc#
----------------
* #4544 *
  #4545
  #4565 (per pss)

Scrap lots:
----------
* none *

Hold Lots:
---------
* jd0928 m1 2.86 days on hold high thk range (pre cmp) *
  jd0930 m1 1.56 days on hold for e. bodensieck *  

Monitor status:
--------------
�   box of 12K mqc wafers       
3   boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*13 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *

Lots/wafers processed
--------------------
* jl1002 pmd 24 wafers *
  jl1003 pmd 24 wafers
  jl0976  m1 24 wafers
  xd0805  m1 22 wafers
  xe0579  m2 11 wafers
  jl0908  m2 23 wafers
  jl0901  m2 24 wafers
  

# of carriers for strasbaugh/speedfam:
--------------------------------------
 15  SPEEDFAM  
 6  STRASBAUGH
 5  PLATES F/S

89.24CMP PASSDOWN A SHIFTFABSIX::J_BLAISYou have readSun Feb 16 1997 19:46102
CMP PASSDOWN                                                                 
                                   
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used        Number Available
        ---------------         -----------        ----------------
        MQC-12K MONS                12                    1 boxes 

        BREAKIN WAFERS              20                    2 Boxes    
                                                      



CMP.A1 (Strasbaugh 6DS-SP) DOWN FOR A PAD CHANGE, MQC'S FAILED.
CMP.A1 24hr MQCS COMPLETED: 02/16/97 @  6:45 pm           
CMP.A1 24hr MQCS NEXT DUE :                                      

CMP.A2 (Strasbaugh 6DS-SP) - UP/MQC              
CMP.A2 24hr MQCS COMPLETED:  RUNNING NOW.
CMP.A2 24hr MQCS NEXT DUE :                   



CMP.B1 (Speedfam CMP-V)   -up/running JD0935/24 ILD1, JL0981/24 ILD1  
CMP.B1 24hr MQCS COMPLETED:  02/16/97 @  3:00 am
CMP.B1 24hr MQCS NEXT DUE :  02/17/97 @  3:00 am
CMP.B1 12hr MQCS COMPLETED:  02/16/97 @  8:00 AM
CMP.B1 12hr MQCS NEXT DUE :  02/16/97 @  8:00 PM

CMP.B2 (Speedfam CMP-V)   - JL0960/21 ILD1
CMP.B2 24hr MQCS COMPLETED: 02/16/97 @  7:00 pm
CMP.B2 24hr MQCS NEXT DUE : 02/17/97 @  7:00 pm
CMP.B2 12hr MQCS COMPLETED: 02/16/97 @  7:00 PM
CMP.B2 12hr MQCS NEXT DUE : 02/17/97 @  7:00 AM

CMP.B3 (Speedfam CMP-V)   - up/RUNNING JD0897/24 ILD2 
CMP.B3 24hr MQCS COMPLETED: 02/16/97 @  7:00 PM
CMP.B3 24hr MQCS NEXT DUE : 02/17/97 @  7:00 PM                  
CMP.B3 12hr MQCS COMPLETED: 02/16/97 @  7:00 PM
CMP.B3 12hr MQCS NEXT DUE : 02/17/97 @  7:00 AM



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/15/97 @ 11:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/16/97 @ 11:00 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/15/97 @ 11:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/16/97 @ 11:00 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/15/97 @ 11:00 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/16/97 @ 11:00 pm



Hot/B lots in area:     Hot lots in the area        Static Lots in area:
__________________      -----------------------     -------------------
      none                   none                  JD0928/20 ILD1,JD0930/24 ILD1
  

       
  
                      Open annotations:
Down Equipment         lot#/tool/ooc#        Scrap lots:      Hold Lots: 
--------------        -----------------      ----------       ---------
 None                       None                None          JD0928, JD0930
  

Number of product lots in room:
------------------------------
8 lots 

New specs/revs posted:
---------------------
                                                          

Lots/wafers processed
--------------------
XE0579/11 ILD2
JD0860/23 ILD3
XD0804/24 ILD3
JD1120/23 PMD
JL1003/24 PMD
JL0970/23 ILD1
JL0953/24 ILD2
JL0837B/12 ILD2
JD0934/24 ILD2
JL0980/23 PMD
JL0962/24 ILD1
XE0903/24 PMD HOT
JL0980/23 PMD


# of carriers for strasbaugh/speedfam:
--------------------------------------
 7  SPEEDFAM  
 1  STRASBAUGH
 2  PLATES F/S

89.25passdown cmp b-shift 02/17/97FABSIX::M_PROVENCHERMon Feb 17 1997 05:20122
                                CMP                                          
                                ___
                        monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                14                   mqcs

        BREAKIN WAFERS              36                   misc



CMP.A1 (Strasbaugh 6DS-SP) -up/running jd0991 pmd/jd0992 pmd (up at 11:30 pm)
CMP.A1 24hr MQCS COMPLETED: 02/16/97 @ 11:30 pm
CMP.A1 24hr MQCS NEXT DUE : 02/17/97 @ 11:30 pm

CMP.A2 (Strasbaugh 6DS-SP) -up/running jl0998 pmd/jl1005 pmd (up at 10:00 pm)  
CMP.A2 24hr MQCS COMPLETED: 02/16/97 @ 10:00 pm
CMP.A2 24hr MQCS NEXT DUE : 02/17/97 @ 10:00 pm



CMP.B1 (Speedfam CMP-V)   - up/mqc pad change due to end of pad life. running
                                   breakin,mqc, after pm.(down at 2:30 am)
CMP.B1 24hr MQCS COMPLETED: in process
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: 02/16/97 @  9:00 pm 
CMP.B1 12hr MQCS NEXT DUE : 02/17/97 @  9:00 am
			     

CMP.B2 (Speedfam CMP-V)   - up/idle
CMP.B2 24hr MQCS COMPLETED: 02/16/97 @  7:00 pm
CMP.B2 24hr MQCS NEXT DUE : 02/17/97 @  7:00 pm 
CMP.B2 12hr MQCS COMPLETED: 02/17/97 @  5:00 am
CMP.B2 12hr MQCS NEXT DUE : 02/17/97 @  5:00 pm
		            

CMP.B3 (Speedfam CMP-V)   - up/idle    
CMP.B3 24hr MQCS COMPLETED: 02/16/97 @  7:00 pm
CMP.B3 24hr MQCS NEXT DUE : 02/17/97 @  7:00 pm
CMP.B3 12hr MQCS COMPLETED: 02/17/97 @  1:30 am
CMP.B3 12hr MQCS NEXT DUE : 02/17/97 @  1:30 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/16/97 @ 11:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/17/97 @ 11:00 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/16/97 @ 11:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/17/97 @ 11:00 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/16/97 @ 11:00 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/17/97 @ 11:00 pm



Hot/B lots in area:
__________________
* none *
  
Hot lots coming to area:
-----------------------
* none *

Static Lots in area:
-------------------
* jd0928 m1 3.86 days on hold high thk range (pre cmp) *
  jd0930 m1 2.56 days on hold for e. bodensieck
  
Down Equipment:
--------------
* cmp.b1 (mqc after pad change) *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* jd0928 m1 3.86 days on hold high thk range (pre cmp) *
  jd0930 m1 2.56 days on hold for e. bodensieck *  

Monitor status:
--------------
�   box of 12K mqc wafers       
3   boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*6 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *

Lots/wafers processed
--------------------
* jl0997 pmd 24 wafers *
  jl0975  m1 24 wafers 
  jd0960  m1 21 wafers
  jl0981  m1 24 wafers 
  jl0935  m1 24 wafers
  jl0978  m1 22 wafers
  jd0897  m2 23 wafers
  jl0923  m2 24 wafers
  

# of carriers for strasbaugh/speedfam:
--------------------------------------
 12  SPEEDFAM  
 6  STRASBAUGH
 5  PLATES F/S

89.26CMP Passdown "A" ShiftFABSIX::J_REISNERMon Feb 17 1997 20:05105
CMP PASSDOWN                                                                 
                                   
                                Monitor wafer usage
                                -------------------

	Type of monitor	     Number Available
        ---------------         -----------     
        MQC-12K MONS             1/2 box 

        BREAKIN WAFERS            1 Box    
                                                      



CMP.A1 (Strasbaugh 6DS-SP) Down for sticking carrier
CMP.A1 24hr MQCS COMPLETED:
CMP.A1 24hr MQCS NEXT DUE :                                      

CMP.A2 (Strasbaugh 6DS-SP) -Running JD1028  
CMP.A2 24hr MQCS COMPLETED:  02/16/97 @  10:00 PM 
CMP.A2 24hr MQCS NEXT DUE :  02/17/97 @  10:00 PM                  



CMP.B1 (Speedfam CMP-V)   -up/running JD0929/JL117A(HOT LOT)
CMP.B1 24hr MQCS COMPLETED:  02/18/97 @  1:30 pm
CMP.B1 24hr MQCS NEXT DUE :  02/18/97 @  1:30 pm
CMP.B1 12hr MQCS COMPLETED:  02/17/97 @  8:00 AM
CMP.B1 12hr MQCS NEXT DUE :  currently running, needs 12 hour MQC when 
                               finished



CMP.B2 (Speedfam CMP-V)   - Running JL0979/XE0919-HOT-2 wafers need touch-up)
CMP.B2 24hr MQCS COMPLETED: 02/16/97 @  7:00 pm   
CMP.B2 24hr MQCS NEXT DUE : DUE - Were running and were trashed when tool
                                  alarmed for no slurry
CMP.B2 12hr MQCS COMPLETED: 02/17/97 @  7:45 PM
CMP.B2 12hr MQCS NEXT DUE : 02/18/97 @  7:45 AM



CMP.B3 (Speedfam CMP-V)   - up/RUNNING JD0928
CMP.B3 24hr MQCS COMPLETED: 02/16/97 @  10:00 PM
CMP.B3 24hr MQCS NEXT DUE : 02/17/97 @  10:00 PM                  
CMP.B3 12hr MQCS COMPLETED: 02/16/97 @  01:15 AM
CMP.B3 12hr MQCS NEXT DUE : 02/17/97 @  01:15 AM



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/16/97 @ 11:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/17/97 @ 11:00 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/16/97 @ 11:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/17/97 @ 11:00 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/16/97 @ 11:00 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/17/97 @ 11:00 pm



Hot/B lots in area:     Hot lots in the area        Static Lots in area:
__________________      -----------------------     -------------------
      none                JL117A, XE0919                  none
  

       
  
                      Open annotations:
Down Equipment         lot#/tool/ooc#        Scrap lots:      Hold Lots: 
--------------        -----------------      ----------       ---------
 CMP.A1                  CMP.A1/#4829          None               none
  

Number of product lots in room:
------------------------------
12 lots 

New specs/revs posted:
---------------------
                                                          

Lots/wafers processed
--------------------
JL0998/24 PMD
JD0992/24 PMD
JD0991/24 PMD
JL0997/24 PMD
JL0943/24 ILD2
JL1004/24 PMD
JL1005/24 PMD
JD0935/24 ILD1
JD0937/24 ILD1



# of carriers for strasbaugh/speedfam:
--------------------------------------
 7  SPEEDFAM  
 1  STRASBAUGH
 2  PLATES F/S

89.27passdown cmp b-shift 02/18/97FABSIX::M_PROVENCHERTue Feb 18 1997 05:51120
                                    CMP                                 
                                    ___
                            monitor wafer usage
                        -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                16                   mqcs

        BREAKIN WAFERS              39                   misc



CMP.A1 (Strasbaugh 6DS-SP) -up/running xd0989 pmd/jl1011 pmd
CMP.A1 24hr MQCS COMPLETED: 02/17/97 @ 11:00 pm
CMP.A1 24hr MQCS NEXT DUE : 02/18/97 @ 11:00 pm

CMP.A2 (Strasbaugh 6DS-SP) -up/mqc failed 24 hr mqc's, pad was changed, ran 
				   breakins, and mqc's. failed for high uniform-
				   -ity 22% left 11% right eeg checked d/f
				   (down at 11:00 pm)   
CMP.A2 24hr MQCS COMPLETED: n/a
CMP.A2 24hr MQCS NEXT DUE : n/a



CMP.B1 (Speedfam CMP-V)   - up/running jd1032 m2 hot lot/
CMP.B1 24hr MQCS COMPLETED: 02/17/97 @  1:30 pm
CMP.B1 24hr MQCS NEXT DUE : 02/18/97 @  1:30 pm
CMP.B1 12hr MQCS COMPLETED: 02/17/97 @  8:30 pm 
CMP.B1 12hr MQCS NEXT DUE : 02/18/97 @  8:30 am
			     

CMP.B2 (Speedfam CMP-V)   - up/running xd0864 m3/jl0910 m2
CMP.B2 24hr MQCS COMPLETED: 02/17/97 @  10:00 pm
CMP.B2 24hr MQCS NEXT DUE : 02/18/97 @  10:00 pm 
CMP.B2 12hr MQCS COMPLETED: 02/18/97 @  7:00 am
CMP.B2 12hr MQCS NEXT DUE : 02/18/97 @  7:00 pm
		            

CMP.B3 (Speedfam CMP-V)   - up/running jl0972 m1/
CMP.B3 24hr MQCS COMPLETED: 02/17/97 @ 11:30 pm
CMP.B3 24hr MQCS NEXT DUE : 02/18/97 @ 11:30 pm
CMP.B3 12hr MQCS COMPLETED: 02/18/97 @  1:30 am
CMP.B3 12hr MQCS NEXT DUE : 02/18/97 @  1:30 pm



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/17/97 @ 11:30 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/18/97 @ 11:30 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/17/97 @ 11:30 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/18/97 @ 11:30 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/17/97 @ 11:30 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/18/97 @ 11:30 pm



Hot/B lots in area:
__________________
* jl1032 m2 hotlot *
  
Hot lots coming to area:
-----------------------
* jl1101 pmd *

Static Lots in area:
-------------------
* jd0930 ild1 *
  
Down Equipment:
--------------
* cmp.a2 failed mqc's *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* jd0928 ild1 for eric bodensieck post measure *
  jd0929 ild1 for eric bodensieck post measure  

Monitor status:
--------------
1   box of 12K mqc wafers       
2   boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
* 11 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *

Lots/wafers processed
--------------------
* jd1028 pmd 24 wafers
  xm0948 pmd 24 wafers
  jd0928  m1 20 wafers
  jd0929  m1 24 wafers
  jl1117a m1  6 wafers (hot lot)
  xe0919  m3 19 wafers  

# of carriers for strasbaugh/speedfam:
--------------------------------------
 12  SPEEDFAM  
 6  STRASBAUGH
 5  PLATES F/S

89.28Cmp Passdown A ShiftFABSIX::J_BLAISYou have readTue Feb 18 1997 19:4299
CMP PASSDOWN                                                                 
                                   
                                Monitor wafer usage
                                -------------------

	Type of monitor		Number used        Number Available
        ---------------         -----------        ----------------
        MQC-12K MONS                 7                    1 boxes 

        BREAKIN WAFERS              15                    2 Boxes    
                                                      



CMP.A1 (Strasbaugh 6DS-SP) Down for PAd Change...
CMP.A1 24hr MQCS COMPLETED: 
CMP.A1 24hr MQCS NEXT DUE :                                      

CMP.A2 (Strasbaugh 6DS-SP) -DOWN for table alignment... 
CMP.A2 24hr MQCS COMPLETED:  
CMP.A2 24hr MQCS NEXT DUE :                   



CMP.B1 (Speedfam CMP-V)   -up/running 
CMP.B1 24hr MQCS COMPLETED:  02/18/97 @  7:30 pm
CMP.B1 24hr MQCS NEXT DUE :  02/19/96 @  7:30 pm
CMP.B1 12hr MQCS COMPLETED:  02/18/97 @  7:30 pm
CMP.B1 12hr MQCS NEXT DUE :  02/19/97 @  7:30 am

CMP.B2 (Speedfam CMP-V)   -up/running JL0910/22 ILD2,JL0939/23 ILD2 
CMP.B2 24hr MQCS COMPLETED: 02/17/97 @ 10:00 pm
CMP.B2 24hr MQCS NEXT DUE : 02/18/97 @ 10:00 pm
CMP.B2 12hr MQCS COMPLETED: 02/18/97 @  7:30 pm
CMP.B2 12hr MQCS NEXT DUE : 02/19/97 @  7:30 am

CMP.B3 (Speedfam CMP-V)   - up/RUNNING  JD0930/24 ILD1 
CMP.B3 24hr MQCS COMPLETED: 02/17/97 @ 11:00 PM
CMP.B3 24hr MQCS NEXT DUE : 02/18/97 @ 11:00 PM                  
CMP.B3 12hr MQCS COMPLETED: 02/18/97 @  1:30 am
CMP.B3 12hr MQCS NEXT DUE : now                



CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/17/97 @ 11:00 pm 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/18/97 @ 11:00 pm

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/18/97 @ 11:00 pm 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/18/97 @ 11:00 pm

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/17/97 @ 11:00 pm
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/18/97 @ 11:00 pm



Hot/B lots in area:     Hot lots in the area        Static Lots in area:
__________________      -----------------------     -------------------
      none                   none                         none
  

       
  
                      Open annotations:
Down Equipment         lot#/tool/ooc#        Scrap lots:      Hold Lots: 
--------------        -----------------      ----------       ---------
 None                       None                None            None
  

Number of product lots in room:
------------------------------
13 lots 

New specs/revs posted:
---------------------
                                                          

Lots/wafers processed
--------------------
XD0864/24 ILD3
JD1118/22 PMD
XD0989/23 PMD
JL1011/24 PMD
JL0972/23 ILD1
JL0982/24 ILD1
JD01031/24 ILD1
JD0870/22 ILD2
JD0928/20 ILD1
JD0929/24 ILD1


# of carriers for strasbaugh/speedfam:
--------------------------------------
 7  SPEEDFAM  
 1  STRASBAUGH
 2  PLATES F/S

89.29PASSDOWN D SHIFTFABSIX::D_CAUSEWed Feb 19 1997 07:3832
                             D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -UP/RUNNING JD1029 100%ED ON A4 READY FOR TU

CMP.A2 (Strasbaugh 6DS-SP) -DOWN/WORK CONTINUES ON THE GEARBOX

CMP.B1 (Speedfam CMP-V) - UP/RUNNING JL0973 & JL0965 FIRST PASS NEED 100% AND 
                                     TOUCHUP

CMP.B2 (Speedfam CMP-V) - UP/RUNNING JL0942 100%ED ON THK.A5 NEEDS TU 

CMP.B3 (Speedfam CMP-V) - UP/RUNNING XD0895 FIRST 400 SEC DONE 
 
CMP-SCRUB.A1 (On-track scrubber) - UP/RUNNING XE0834 NEEDS DRG AND FINAL
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/RUNNING JL1014 NEEDS DRG AND FINAL
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT lots in area:
----------------

BREAK IN WAFERS USED:20

MQC WAFERS USED:20 WAFERS USED
MQC WAFERS AVAIL:3.5 BOXES  

----------


89.30PASSDOWNFABSIX::D_CAUSEFri Feb 21 1997 07:3835
                             D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -DOWN/UNSCHEDULED FAILED MQC NEEDS PAD CHANGE
                                 AND FULL MQC 

CMP.A2 (Strasbaugh 6DS-SP) -UP/RUNNING JL1042 NEEDS 100% AND TOUCH UP

CMP.B1 (Speedfam CMP-V) -DOWN/ UNSCHEDULED CRASH AT 7:20 PAD BEING CHANGED
                               WILL NEED FULL MQC LOT JL1019 NEEDS TU

CMP.B2 (Speedfam CMP-V) - DOWN/ UNSCHEDULED INFRENODE AND VACUUM ERRORS
                                RUNNING VERIFY WAFERS AND MQC'S JD0984
                                HAS 2 RUNS FOR TOUCH UP 

CMP.B3 (Speedfam CMP-V) - UP/RUNNING JL0974 SA READING ON .A4 
 
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT lots in area:
----------------

BREAK IN WAFERS USED:20

MQC WAFERS USED:26 WAFERS USED
MQC WAFERS AVAIL:2.5 BOXES  

----------


89.31passdown cmp b-shift 02/23/97FABSIX::M_PROVENCHERSun Feb 23 1997 05:46115
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                14                   mqcs

        BREAKIN WAFERS              32                   misc



CMP.A1 (Strasbaugh 6DS-SP) -dn/maint (down all night) when it comes up it will
			       need breakins and mqc's, new pad installed 
CMP.A1 24hr MQCS COMPLETED: n/a
CMP.A1 24hr MQCS NEXT DUE : when tool comes up

CMP.A2 (Strasbaugh 6DS-SP) -up/running xe0949 pmd (eng lot see remark op#1983)
CMP.A2 24hr MQCS COMPLETED: 02/23/97 @ 4:30 am
CMP.A2 24hr MQCS NEXT DUE : 02/24/97 @ 4:30 am



CMP.B1 (Speedfam CMP-V)   - up/idle
CMP.B1 24hr MQCS COMPLETED: 02/22/97 @ 11:00 pm
CMP.B1 24hr MQCS NEXT DUE : 02/23/97 @ 11:00 pm
CMP.B1 12hr MQCS COMPLETED: 02/22/97 @ 11:00 pm 
CMP.B1 12hr MQCS NEXT DUE : 02/23/97 @ 11:00 am
			     

CMP.B2 (Speedfam CMP-V)   - up/running xe0614 m3/jd0935 m2
CMP.B2 24hr MQCS COMPLETED: 02/22/97 @  9:30 pm
CMP.B2 24hr MQCS NEXT DUE : 02/23/97 @  9:30 pm 
CMP.B2 12hr MQCS COMPLETED: 02/22/97 @  8:30 pm
CMP.B2 12hr MQCS NEXT DUE : 02/23/97 @  8:30 am
		            

CMP.B3 (Speedfam CMP-V)   - up/idle
CMP.B3 24hr MQCS COMPLETED: 02/22/97 @  5:00 pm
CMP.B3 24hr MQCS NEXT DUE : 02/23/97 @  5:00 pm
CMP.B3 12hr MQCS COMPLETED: 02/23/97 @  5:30 am
CMP.B3 12hr MQCS NEXT DUE : 02/23/97 @  5:30 pm


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/23/97 @  1:00 am 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/24/97 @  1:00 am

CMP-SCRUB.A2 (On-track scrubber) - up/idle
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/23/97 @  1:00 am 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/24/97 @  1:00 am

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/23/97 @  1:00 am
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/24/97 @  1:00 am



Hot/B lots in area:
__________________
* none *
  
Hot lots coming to area:
-----------------------
* none * there is another ild1/2 rework lot coming though, check remarks

Static Lots in area:
-------------------
* jd0957 E.Bodensieck lot for post step height see remark op3079 and mail 
         message that eric sent. *
  
Down Equipment:
--------------
* cmp.a1 down to maint, robot problems *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* xb0950 sti lot *
  
Monitor status:
--------------
2   boxes of 12K mqc wafers       
4   boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
* 3 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *

Lots/wafers processed
--------------------
* jl0957  m1 24 wafers *
  jl0977  m1 24 wafers
  jl0995  m1 24 wafers
  xd0833  m3 24 wafers (rework from films)  

# of carriers for strasbaugh/speedfam:
--------------------------------------
 18  SPEEDFAM  
  1  STRASBAUGH
  8  PLATES F/S

89.32exit Cmp Passdown a ShiftFABSIX::J_BLAISYou have readSun Feb 23 1997 19:2890
CMP PASSDOWN                                                                 
                                   
                                Monitor wafer usage
                                -------------------

	Type of monitor		Number used        Number Available
        ---------------         -----------        ----------------
        MQC-12K MONS                 7                    3 boxes 

        BREAKIN WAFERS              15                    5 Boxes    
                                                      



CMP.A1 (Strasbaugh 6DS-SP) -up/idle    
CMP.A1 24hr MQCS COMPLETED: 02/23/97 @ 2:45 pm
CMP.A1 24hr MQCS NEXT DUE : 02/24/97 @ 2:45 pm 

CMP.A2 (Strasbaugh 6DS-SP) -up/idle   
CMP.A2 24hr MQCS COMPLETED:  02/23/97 @ 4:30 am
CMP.A2 24hr MQCS NEXT DUE :  02/24/97 @ 4:30 am                 



CMP.B1 (Speedfam CMP-V)   -up/running jl0980, jl0962
CMP.B1 24hr MQCS COMPLETED:  02/22/97 @ 11:00 pm
CMP.B1 24hr MQCS NEXT DUE :  02/23/97 @ 11:00 pm
CMP.B1 12hr MQCS COMPLETED:  02/23/97 @  8:30 am
CMP.B1 12hr MQCS NEXT DUE :  02/23/97 @  8:30 pm

CMP.B2 (Speedfam CMP-V)   -up/running jl1000
CMP.B2 24hr MQCS COMPLETED: 02/22/97 @  9:30 pm
CMP.B2 24hr MQCS NEXT DUE : 02/23/97 @  9:30 pm
CMP.B2 12hr MQCS COMPLETED: 02/23/97 @  8:30 am
CMP.B2 12hr MQCS NEXT DUE : 02/23/97 @  8:30 pm

CMP.B3 (Speedfam CMP-V)   - up/RUNNING  yd0238a
CMP.B3 24hr MQCS COMPLETED: 02/23/97 @  7:00 PM
CMP.B3 24hr MQCS NEXT DUE : 02/24/97 @  7:00 PM                  
CMP.B3 12hr MQCS COMPLETED: 02/23/97 @  7:30 pm
CMP.B3 12hr MQCS NEXT DUE : 02/24/97 @  7:30 am



CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 02/23/97 @  1:00 am 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 02/24/97 @  1:00 am




Hot/B lots in area:     Hot lots in the area        Static/Hold Lots in area:
__________________      -----------------------     -------------------------
      none                   none                      xb0950/24
  

       
  
                      Open annotations:
Down Equipment         lot#/tool/ooc#        Scrap lots:    lots in room:    
--------------        -----------------      ----------     ------------- 
 None                       None                None          5 lots
  



New specs/revs posted:
---------------------
                                                          

Lots/wafers processed
--------------------
jd0957/24
jl0998/24
jd0935/24
jd0960/21
xe0614/20
jd0934/24
jl1001/24
xe0949/23 
jl1003/24



# of carriers for strasbaugh/speedfam:
--------------------------------------
18  SPEEDFAM  
 1  STRASBAUGH
 8  PLATES F/S

89.33passdown cmp b-shift 02/24/97FABSIX::M_PROVENCHERMon Feb 24 1997 05:31114
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                11                   mqcs

        BREAKIN WAFERS              28                   misc



CMP.A1 (Strasbaugh 6DS-SP) -up/idle 
CMP.A1 24hr MQCS COMPLETED: 02/23/97 @ 3:00 pm
CMP.A1 24hr MQCS NEXT DUE : 02/24/97 @ 3:00 pm

CMP.A2 (Strasbaugh 6DS-SP) -up/idle
CMP.A2 24hr MQCS COMPLETED: 02/23/97 @ 7:00 pm
CMP.A2 24hr MQCS NEXT DUE : 02/24/97 @ 7:00 pm



CMP.B1 (Speedfam CMP-V)   - up/running jl0981 m1 at touch up/
CMP.B1 24hr MQCS COMPLETED: 02/23/97 @ 11:30 pm
CMP.B1 24hr MQCS NEXT DUE : 02/24/97 @ 11:30 pm
CMP.B1 12hr MQCS COMPLETED: 02/23/97 @ 11:30 pm 
CMP.B1 12hr MQCS NEXT DUE : 02/24/97 @ 11:30 am
			     

CMP.B2 (Speedfam CMP-V)   - up/running jd1118 m2 (Hotlot) at touch up/
CMP.B2 24hr MQCS COMPLETED: 02/23/97 @ 10:00 pm
CMP.B2 24hr MQCS NEXT DUE : 02/24/97 @ 10:00 pm 
CMP.B2 12hr MQCS COMPLETED: 02/23/97 @  8:30 pm
CMP.B2 12hr MQCS NEXT DUE : 02/24/97 @  8:30 am
		            

CMP.B3 (Speedfam CMP-V)   - up/idle
CMP.B3 24hr MQCS COMPLETED: 02/23/97 @  7:00 pm
CMP.B3 24hr MQCS NEXT DUE : 02/24/97 @  7:00 pm
CMP.B3 12hr MQCS COMPLETED: 02/24/97 @  5:30 am
CMP.B3 12hr MQCS NEXT DUE : 02/24/97 @  5:30 pm


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/24/97 @  1:00 am 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/25/97 @  1:00 am

CMP-SCRUB.A2 (On-track scrubber) - up/idle down at @ 10:00 pm up at @ 2:00 am
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/24/97 @  3:00 am 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/25/97 @  3:00 am

CMP-SCRUB.A3 (On-track scrubber) - dn/unsched at 5:00 am. eeg on it now.
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/24/97 @  1:00 am
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/25/97 @  1:00 am



Hot/B lots in area:
__________________
* jd1118 m2 (cmp.b2) *
  
Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* none *
  
Down Equipment:
--------------
* cmp-scrub.a3 *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* xb0950 sti lot *
  
Monitor status:
--------------
3   boxes of 12K mqc wafers       
3   boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
* 2 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *

Lots/wafers processed
--------------------
* jl0980  m1 23 wafers *
  jl1000  m1 24 wafers
  yd0238a m1 12 wafers
  jl0994  m1 23 wafers
  jl0962  m2 24 wafers  

# of carriers for strasbaugh/speedfam:
--------------------------------------
 18  SPEEDFAM  
  0  STRASBAUGH
  8  PLATES F/S

89.34CMP Passdown "A" Shift FABSIX::J_REISNERMon Feb 24 1997 19:3986
CMP PASSDOWN                                                                 
                                   
                                 
                  

	Type of monitor        Number Available
        ---------------         -----------        
        MQC-12K MONS            2 boxes 

        BREAKIN WAFERS          5 1/2 Boxes    
                                                      



CMP.A1 (Strasbaugh 6DS-SP) -up/idle    
CMP.A1 24hr MQCS COMPLETED: 02/24/97 @ 5:10 pm
CMP.A1 24hr MQCS NEXT DUE : 02/25/97 @ 5:10 pm 

CMP.A2 (Strasbaugh 6DS-SP) -up/idle   
CMP.A2 24hr MQCS COMPLETED:  02/23/97 @ 7:45 pm
CMP.A2 24hr MQCS NEXT DUE :  02/24/97 @ 7:45 pm                 



CMP.B1 (Speedfam CMP-V)   -up/running JL0978 needs 100%
CMP.B1 24hr MQCS COMPLETED:  02/23/97 @ 11:30 pm
CMP.B1 24hr MQCS NEXT DUE :  02/24/97 @ 11:30 pm
CMP.B1 12hr MQCS COMPLETED:  02/24/97 @ 08:10 am
CMP.B1 12hr MQCS NEXT DUE :  02/24/97 @ 08:10 pm

CMP.B2 (Speedfam CMP-V)   -up/running JL0975 - 100% / JL0997 running
CMP.B2 24hr MQCS COMPLETED: 02/23/97 @ 10:20 pm
CMP.B2 24hr MQCS NEXT DUE : 02/24/97 @ 10:20 pm
CMP.B2 12hr MQCS COMPLETED: 02/24/97 @  8:45 am
CMP.B2 12hr MQCS NEXT DUE : 02/24/97 @  8:45 pm

CMP.B3 (Speedfam CMP-V)   - up/RUNNING JD0856 
CMP.B3 24hr MQCS COMPLETED: 02/23/97 @  7:45 PM
CMP.B3 24hr MQCS NEXT DUE : 02/24/97 @  7:45 PM                  
CMP.B3 12hr MQCS COMPLETED: 02/24/97 @  1:00 pm
CMP.B3 12hr MQCS NEXT DUE : 02/25/97 @  1:00 am



CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 02/24/97 @  1:00 am 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 02/25/97 @  1:00 am




Hot/B lots in area:     Hot lots in the area        Static/Hold Lots in area:
__________________      -----------------------     -------------------------
      none                   none                         XB0950 - STI lot   
  

       
  
                      Open annotations:
Down Equipment         lot#/tool/ooc#        Scrap lots:    lots in room:    
--------------        -----------------      ----------     ------------- 
 None                       None                None          6 lots
  



New specs/revs posted:
---------------------
                                                          

Lots/wafers processed
--------------------
JD1118/16  
XD0915/23  
JL0981/24  
JL0976/24 
YD0238/12
JL1002/24


# of carriers for strasbaugh/speedfam:
--------------------------------------
18  SPEEDFAM  
 0  STRASBAUGH
 8  PLATES F/S

89.35passdown cmp b-shift 02/25/97FABSIX::M_PROVENCHERTue Feb 25 1997 05:48114
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                11                   mqcs

        BREAKIN WAFERS              28                   misc



CMP.A1 (Strasbaugh 6DS-SP) -up/idle 
CMP.A1 24hr MQCS COMPLETED: 02/24/97 @ 5:00 pm
CMP.A1 24hr MQCS NEXT DUE : 02/25/97 @ 5:00 pm

CMP.A2 (Strasbaugh 6DS-SP) -up/idle
CMP.A2 24hr MQCS COMPLETED: 02/24/97 @ 10:00 pm
CMP.A2 24hr MQCS NEXT DUE : 02/25/97 @ 10:00 pm



CMP.B1 (Speedfam CMP-V)   - up/running jd0992 m1
CMP.B1 24hr MQCS COMPLETED: 02/24/97 @ 11:30 pm
CMP.B1 24hr MQCS NEXT DUE : 02/25/97 @ 11:30 pm
CMP.B1 12hr MQCS COMPLETED: 02/24/97 @ 11:30 pm 
CMP.B1 12hr MQCS NEXT DUE : 02/25/97 @ 11:30 am
			     

CMP.B2 (Speedfam CMP-V)   - up/running xd0947 m2/jl0979 m2
CMP.B2 24hr MQCS COMPLETED: 02/24/97 @ 10:00 pm
CMP.B2 24hr MQCS NEXT DUE : 02/25/97 @ 10:00 pm 
CMP.B2 12hr MQCS COMPLETED: 02/25/97 @  1:30 am
CMP.B2 12hr MQCS NEXT DUE : 02/25/97 @  1:30 pm
		            

CMP.B3 (Speedfam CMP-V)   - up/running xd0599 m2/ jl0982 m2
CMP.B3 24hr MQCS COMPLETED: 02/2/97 @  7:00 pm
CMP.B3 24hr MQCS NEXT DUE : 02/2/97 @  7:00 pm
CMP.B3 12hr MQCS COMPLETED: 02/2/97 @  5:30 am
CMP.B3 12hr MQCS NEXT DUE : 02/2/97 @  5:30 pm


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/25/97 @  3:00 am 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/26/97 @  3:00 am

CMP-SCRUB.A2 (On-track scrubber) - up/idle 
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/25/97 @  3:00 am 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/26/97 @  3:00 am

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/25/97 @  3:00 am
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/26/97 @  3:00 am



Hot/B lots in area:
__________________
* none *
  
Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* none *
  
Down Equipment:
--------------
* none *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* xb0950 sti lot *
  
Monitor status:
--------------
2   boxes of 12K mqc wafers       
4   boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
* 6 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *

Lots/wafers processed
--------------------
* jl0997 m1 24 wafers *
  jl1011 m1 24 wafers
  jd0856 m2 24 wafers
  jl0975 m2 24 wafers
  jl0978 m2 22 wafers

# of carriers for strasbaugh/speedfam:
--------------------------------------
 18  SPEEDFAM  
  0  STRASBAUGH
  8  PLATES F/S

89.36Cmp Passdown A ShiftFABSIX::J_BLAISYou have readTue Feb 25 1997 19:4982
				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor		Number used        Number Available
        ---------------         -----------        ----------------
        MQC-12K MONS                 7                    3 boxes 

        BREAKIN WAFERS              20                    6 Boxes    
                                                      



CMP.A1 (Strasbaugh 6DS-SP) -up/mqc
CMP.A1 24hr MQCS COMPLETED: running
CMP.A1 24hr MQCS NEXT DUE : 

CMP.A2 (Strasbaugh 6DS-SP) -up/idle   
CMP.A2 24hr MQCS COMPLETED:  02/24/97 @ 10:00 pm
CMP.A2 24hr MQCS NEXT DUE :  02/25/97 @ 10:00 pm                



CMP.B1 (Speedfam CMP-V)   -up/running jl0968/23 jl1014/24 hot
CMP.B1 24hr MQCS COMPLETED:  02/24/97 @ 11:30 pm
CMP.B1 24hr MQCS NEXT DUE :  02/25/97 @ 11:30 pm
CMP.B1 12hr MQCS COMPLETED:  02/25/97 @  4:30 pm
CMP.B1 12hr MQCS NEXT DUE :  02/26/97 @  4:30 am

CMP.B2 (Speedfam CMP-V)   -up/running jl0649b/12
CMP.B2 24hr MQCS COMPLETED: 02/24/97 @ 10:00 pm
CMP.B2 24hr MQCS NEXT DUE : 02/25/97 @ 10:00 pm
CMP.B2 12hr MQCS COMPLETED: 02/25/97 @  2:30 pm
CMP.B2 12hr MQCS NEXT DUE : 02/26/97 @  2:30 am

CMP.B3 (Speedfam CMP-V)   - up/RUNNING xe0555/24,  jl0972/23
CMP.B3 24hr MQCS COMPLETED: 02/24/97 @ 10:00 PM
CMP.B3 24hr MQCS NEXT DUE : 02/25/97 @ 10:00 PM                  
CMP.B3 12hr MQCS COMPLETED: 02/25/97 @  5:30 pm
CMP.B3 12hr MQCS NEXT DUE : 02/26/97 @  5:30 am



CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 02/25/97 @  1:00 am 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 02/26/97 @  1:00 am




Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
      jl1014                                  xb0950 
  

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
 7 lots
  

Lots/wafers processed
--------------------
xd0947/22
xd0599/19
jl0979/24
jl0982/24
jd1130/24
jd0992/24
xm0948/24
jd1017/24
jd1121/24 hot
xe0834/15


# of carriers for strasbaugh/speedfam:
--------------------------------------
18  SPEEDFAM  
 0  STRASBAUGH
 8  PLATES F/S

89.37passdown cmp b-shift 02/26/97FABSIX::M_PROVENCHERWed Feb 26 1997 05:57126
                                    CMP                                 
                                    ___
                            monitor wafer usage
                            -------------------

	Type of monitor		Number used		Comments
        ---------------         -----------             --------
        MQC-12K MONS                29                   mqcs

        BREAKIN WAFERS              74                   misc



CMP.A1 (Strasbaugh 6DS-SP) -up/idle(failed 24 hr mqc's. pad was changed on tool.
                                    passed 2nd set of mqc's. down at 12:30 am
				    up at 5:30 am
CMP.A1 24h MQCS COMPLETED : 02/26/97 @  5:30 am
CMP.A1 24hr MQCS NEXT DUE : 02/27/97 @  5:30 am

CMP.A2 (Strasbaugh 6DS-SP) -up/idle(failed 24 hr mqc's. pad was changed on tool)
                                    passed 2nd set of mqc's. down at 1:00 am
				    up at 5:30 am
CMP.A2 24hr MQCS COMPLETED: 02/26/97 @  5:00 am
CMP.A2 24hr MQCS NEXT DUE : 02/27/97 @  5:00 am



CMP.B1 (Speedfam CMP-V)   - up/mqc's (tool shut down twice during night for 
			             invertor era. pad was changed by maint, 
				     and wafers sensors were checked. failed 1st
				     set of mqc's. adjustments were made and 
 				     2nd set in process.) tool down at 11:30 pm
				     tool should be up by 7:30 am.
CMP.B1 24hr MQCS COMPLETED: n/a
CMP.B1 24hr MQCS NEXT DUE : n/a
CMP.B1 12hr MQCS COMPLETED: n/a 
CMP.B1 12hr MQCS NEXT DUE : n/a
			     

CMP.B2 (Speedfam CMP-V)   - up/running jd0916 m1/jd1028 m1
			       tool went sched.down for a pad change, due to 
			       low step height failed 1st set of mqc's, 
			       adjustments made to id/od, and offsets. 2nd set
			       passed.(tool down at 11:30 pm/ up at 4:00 am) 
CMP.B2 24hr MQCS COMPLETED: 02/26/97 @  4:00 am
CMP.B2 24hr MQCS NEXT DUE : 02/27/97 @  4:00 am 
CMP.B2 12hr MQCS COMPLETED: 02/26/97 @  4:00 am
CMP.B2 12hr MQCS NEXT DUE : 02/26/97 @  4:00 pm
		            

CMP.B3 (Speedfam CMP-V)   - up/running jd1031 m1/xe0555 m3
CMP.B3 24hr MQCS COMPLETED: 02/26/97 @ 12:00 am
CMP.B3 24hr MQCS NEXT DUE : 02/27/97 @ 12:00 am
CMP.B3 12hr MQCS COMPLETED: 02/26/97 @ 12:00 am
CMP.B3 12hr MQCS NEXT DUE : 02/26/97 @ 12:00 pm (noon)


CMP-SCRUB.A1 (On-track scrubber) - up/idle
CMP-SCRUB.A1 24hr MQCS COMPLETED: 02/26/97 @  1:30 am 
CMP-SCRUB.A1 24hr MQCS NEXT DUE : 02/27/97 @  1:30 am

CMP-SCRUB.A2 (On-track scrubber) - up/idle 
CMP-SCRUB.A2 24hr MQCS COMPLETED: 02/26/97 @  1:30 am 
CMP-SCRUB.A2 24hr MQCS NEXT DUE : 02/27/97 @  1:30 am

CMP-SCRUB.A3 (On-track scrubber) - up/idle
CMP-SCRUB.A3 24hr MQCS COMPLETED: 02/26/97 @  1:30 am
CMP-SCRUB.A3 24hr MQCS NEXT DUE : 02/27/97 @  1:30 am



Hot/B lots in area:
__________________
* none *
  
Hot lots coming to area:
-----------------------
* none * 

Static Lots in area:
-------------------
* none *
  
Down Equipment:
---------------
*  cmp.b1 pad change after tool shut down (x2) *
  
Open annotations:
 lot#/tool/ooc#
----------------
* none *

Scrap lots:
----------
* none *

Hold Lots:
---------
* xb0950 sti lot *
  
Monitor status:
--------------
2   boxes of 12K mqc wafers       
4   boxes of 50K breakin wafers  

Number of product lots in room:
------------------------------
*4 lots (when this passdown was sent out) *

New specs/revs posted:
---------------------
* please see strasbaugh t.d.c.o. per eric bodensieck *

Lots/wafers processed
--------------------
* jl0649b m1 12 wafers *
  jl0972  m2 23 wafers
  jl0968  m2 23 wafers
  jl1014  m1 24 wafers (hot lot)

# of carriers for strasbaugh/speedfam:
--------------------------------------
 14  SPEEDFAM  
  0  STRASBAUGH
  8  PLATES F/S

89.38Cmp Passdown A ShiftFABSIX::J_BLAISYou have readWed Feb 26 1997 19:5062
				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitor		Number used        Number Available
        ---------------         -----------        ----------------
        MQC-12K MONS                 7                    2.5 boxes 

        BREAKIN WAFERS              25                    2   boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1    up       idle  	             02/27/97 5:30am   	   NA
CMP.A2    up       jl1008                    02/27/97 5:00am       NA
CMP.B1    up	   jl0870, jl1006	     02/27/97 7:00am    02/27/97 6:20am 
CMP.B2    up	   jl1005                    02/27/97 4:00am 	02/27/97 6:00am 
CMP.B3    up       jl0971		     02/26/97 12:00am   02/27/97 7:30am 

 


CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 02/25/97 @  1:00 am 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 02/26/97 @  1:00 am




Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
                                      xd0913, ze0244 
  

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
 15 lots
  

Lots/wafers processed
--------------------
xe0555/24
jd1031/24
jd0916/23
jd1031/23
jd1028/24
xd1023/24
jl1039/24
jl1004/24
xd0946/24
jl1045/24


# of carriers for strasbaugh/speedfam:
--------------------------------------
18  SPEEDFAM  
 0  STRASBAUGH
 8  PLATES F/S

89.39PASSDOWNFABSIX::D_CAUSEThu Feb 27 1997 07:4834
                             D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -UP/RUNNING JD1034 NEEDS 100% AND TU

CMP.A2 (Strasbaugh 6DS-SP) -DOWN/FAILED 24 HR MQC NEEDS FULL MQC LOT JD1016
                                 100% ON THK.A4 NEEDS TU

CMP.B1 (Speedfam CMP-V) -UP/RUNNING XE0903 NEEDS 100% AND TOUCHUP

CMP.B2 (Speedfam CMP-V) - UP/RUNNING JD1032 LOT HAS BAD READINGS ON BOTH
                          UV1050'S WILL NEED ADJUSTMENT AND REDO 100%
                          JL1013 FINISHED POLISHING NEEDS DRG AND FINAL

CMP.B3 (Speedfam CMP-V) - UP/MQC
 
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT lots in area:
----------------

BREAK IN WAFERS USED:20

MQC WAFERS USED:16 WAFERS USED
MQC WAFERS AVAIL:4.5 BOXES  

----------


89.40PASSDOWNFABSIX::D_CAUSESat Mar 01 1997 07:3532
                             D SHIFT PASSDOWN


       
CMP.A1 (Strasbaugh 6DS-SP) -UP/RUNNING JL1079 NEEDS 100% AND TU

CMP.A2 (Strasbaugh 6DS-SP) -UP/RUNNING JL1057 READY TO RUN

CMP.B1 (Speedfam CMP-V) -UP/RUNNING YE0227 WILL NEED 100% AND TOUCHUP

CMP.B2 (Speedfam CMP-V) - UP/RUNNING JD1029 AND JD0961 FIRST PASS 

CMP.B3 (Speedfam CMP-V) - UP/RUNNING JD0933 FIRST PASS AND JD0985 SEND AHEADS
                                     ARE DONE
 
CMP-SCRUB.A1 (On-track scrubber) - UP/IDLE
                                        
CMP-SCRUB.A2 (On-track scrubber) - UP/IDLE
 
CMP-SCRUB.A3 (ONTRACK SCRUBBER) - UP/IDLE 

HOT lots in area:
----------------

BREAK IN WAFERS USED:30

MQC WAFERS USED:12 WAFERS USED
MQC WAFERS AVAIL:1.5 BOXES  

----------


89.41CMP 03/04/97FABSIX::S_MCREYNOLDSTue Mar 04 1997 07:0164
				   CMP PASSDOWN

        Monitor wafer usage
        -------------------

	Type of monitors       Number Available
        ---------------       ----------------
        MQC-12K MONS             2 boxes 

        BREAKIN WAFERS           4 boxes    
                                                      

			                         24hr MQC           12hr MQC
Tool    Status     Processing/Comments           Next Due           Next Due 
------  ------   ----------------------      ----------------   ---------------
CMP.A1    up      IDLE                        03/05/97 8:15am      NA

CMP.A2    up	  RUNNING JL1082 pmd          03/06/97 12:00am     NA      

CMP.B1    up      RUNNING XD0947 m3/jd0856 m3 03/05/97  2:15am  03/04/97 7:15pm 

CMP.B2    up	  running JL1037 m1/JL0997 m2 03/04/97 10:30am 	03/04/97 7:00am 

CMP.B3   Eng      running JL0980 m2           03/05/97  2:15am  03/04/97 7:15pm 

 


CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 (On-track scrubbers) - up/idle
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS COMPLETED: 03/03/97 @ 11:30 pm 
CMP-SCRUB.A1, SCRUB.A2, SCRUB.A3 24hr MQCS NEXT DUE : 03/04/97 @ 11:30 pm




Hot lots/ B Lots in the area:        Static/Hold Lots in area:
_____________________________        _________________________
                                        ze0245 yd0241
  

       
lots in room:       New specs/revs posted:    
-------------       ---------------------
    12
  

Lots/wafers processed
--------------------
JL1003 M@  24w
JL1067 PMD 24w
JL1081 PMD 24w
JL1083 PMD 24w
JL0889 M1   6w  HOT
JL0995 m2  24w




# of carriers for strasbaugh/speedfam:
--------------------------------------
16  SPEEDFAM  
 7  STRASBAUGH
 5  PLATES F/S