60.0. "CMP-SINK.A1 EE/PE PASSDOWNS" by FABSIX::B_JUBINVILLE () Thu Nov 09 1995 21:33

    
    
       This note is dedicated for passdowns for CMP-SINK.A1 only.
T.RTitleUserPersonal
Name
DateLines
60.1CMP-SINK.A1 PE/EE PASSDOWNSSUBPAC::SADINFreedom isn't free.Sun Nov 05 1995 12:38112
          <<< ASDG::DISK$SYS_DATA:[NOTES$LIBRARY]FILMS_ONLY.NOTE;1 >>>
                                -< Films Only! >-
================================================================================
Note 72.0                          CMP-SINK.A1                         6 replies
ASDG::POIRIER                                         4 lines   2-MAR-1994 16:02
--------------------------------------------------------------------------------
    This note will be used for both Process and Equipment Engineering
    passdowns for:
    
                          CMP-SINK.A1
================================================================================
Note 72.1                          CMP-SINK.A1                            1 of 6
SUBPAC::LANDRY                                       16 lines   6-JUN-1994 16:48
                                -< 6/6 update >-
--------------------------------------------------------------------------------
    
    All,
    
    	ALL drains and incoming DI water has been hooked up at this time. 
    All that is left to do is make the CDA connections, which falls under
    our jurisdiction.  I have left two fittings in my office desk draw.
    One fitting is a "standard" 1/2" Swagelock cap.  This fitting is what
    the contractors left us with at their termination point.  The other
    fitting is a "flanged" plastic (Mylar or something equivalent) with a
    3/4" NPT termination.  We need to get a fitting(s) to reduce this down
    to 1/2" Swagelock termination.  Then is just a matter of procuring some
    1/2" poly tubing and attaching them to the their respective termination
    points.  This appears to be the only item left prior to us getting it
    signed off (excluding any room safety issues).  
    
    						Doc 
================================================================================
Note 72.2                          CMP-SINK.A1                            2 of 6
SUBPAC::LANDRY                                       13 lines  16-JUN-1994 16:13
                                -< 6/16 Update >-
--------------------------------------------------------------------------------
    The system still needs to have the CDA connection made.  This is an EE
    job and not for the sub-contractors.  Gathering the proper fittings at
    this time.
    
    Also, the system needs the exhaust work performed.
    
    All electrical is done.
    
    All GCW drain connections are complete.
    
    The DI input has been installed.
    
                                                           Doc
================================================================================
Note 72.3                          CMP-SINK.A1                            3 of 6
SUBPAC::TOOKER                                       21 lines   8-JUL-1994 11:05
                         -< Hook-Up Status For 7/8/94 >-
--------------------------------------------------------------------------------
                CMP_SINK.A1 Tool Hook-Up Status For 7/8/94



COMPLETED ITEMS:
----------------

    *  DI Water connection 

    *  All GCW drain connections

    *  Eelectrical connections


OPEN ITEMS:
-----------

    *  CDA final connection

    *  All exhaust work

================================================================================
Note 72.4                          CMP-SINK.A1                            4 of 6
SUBPAC::TOOKER                                       13 lines  26-JUL-1994 09:23
                          -< CMP-SCRUB.A1 punch list >-
--------------------------------------------------------------------------------

                CMP-SINK.A1 Tool Hook-Up Status As Of  7/25/94


PUNCH LIST ITEMS
----------------

             ITEM                                      RESPONSIBLE PERSON
   --------------------------------------------------------------------------

  1) Complete exhaust work.                            D. Atkinson/NEEVCO

  2) Install CDA pressure gauge.                       D. Atkinson/KSI
================================================================================
Note 72.5                          CMP-SINK.A1                            5 of 6
SUBPAC::BJUBINVILLE                                   5 lines   1-AUG-1994 16:20
                                -< n2 line ran >-
--------------------------------------------------------------------------------
    
    
      I hooked up the N2 for this sink.
    
    BJ
================================================================================
Note 72.6                          CMP-SINK.A1                            6 of 6
SUBPAC::BJUBINVILLE "NFD Fire - Rescue"               4 lines  11-MAY-1995 03:54
                              -< N2 gun repaired >-
--------------------------------------------------------------------------------
    
         Repaired severed N2 line on the gun end.
    
                                               BJ