| <<< ASDG::DISK$SYS_DATA:[NOTES$LIBRARY]FILMS_ONLY.NOTE;1 >>>
-< Films Only! >-
================================================================================
Note 72.0 CMP-SINK.A1 6 replies
ASDG::POIRIER 4 lines 2-MAR-1994 16:02
--------------------------------------------------------------------------------
This note will be used for both Process and Equipment Engineering
passdowns for:
CMP-SINK.A1
================================================================================
Note 72.1 CMP-SINK.A1 1 of 6
SUBPAC::LANDRY 16 lines 6-JUN-1994 16:48
-< 6/6 update >-
--------------------------------------------------------------------------------
All,
ALL drains and incoming DI water has been hooked up at this time.
All that is left to do is make the CDA connections, which falls under
our jurisdiction. I have left two fittings in my office desk draw.
One fitting is a "standard" 1/2" Swagelock cap. This fitting is what
the contractors left us with at their termination point. The other
fitting is a "flanged" plastic (Mylar or something equivalent) with a
3/4" NPT termination. We need to get a fitting(s) to reduce this down
to 1/2" Swagelock termination. Then is just a matter of procuring some
1/2" poly tubing and attaching them to the their respective termination
points. This appears to be the only item left prior to us getting it
signed off (excluding any room safety issues).
Doc
================================================================================
Note 72.2 CMP-SINK.A1 2 of 6
SUBPAC::LANDRY 13 lines 16-JUN-1994 16:13
-< 6/16 Update >-
--------------------------------------------------------------------------------
The system still needs to have the CDA connection made. This is an EE
job and not for the sub-contractors. Gathering the proper fittings at
this time.
Also, the system needs the exhaust work performed.
All electrical is done.
All GCW drain connections are complete.
The DI input has been installed.
Doc
================================================================================
Note 72.3 CMP-SINK.A1 3 of 6
SUBPAC::TOOKER 21 lines 8-JUL-1994 11:05
-< Hook-Up Status For 7/8/94 >-
--------------------------------------------------------------------------------
CMP_SINK.A1 Tool Hook-Up Status For 7/8/94
COMPLETED ITEMS:
----------------
* DI Water connection
* All GCW drain connections
* Eelectrical connections
OPEN ITEMS:
-----------
* CDA final connection
* All exhaust work
================================================================================
Note 72.4 CMP-SINK.A1 4 of 6
SUBPAC::TOOKER 13 lines 26-JUL-1994 09:23
-< CMP-SCRUB.A1 punch list >-
--------------------------------------------------------------------------------
CMP-SINK.A1 Tool Hook-Up Status As Of 7/25/94
PUNCH LIST ITEMS
----------------
ITEM RESPONSIBLE PERSON
--------------------------------------------------------------------------
1) Complete exhaust work. D. Atkinson/NEEVCO
2) Install CDA pressure gauge. D. Atkinson/KSI
================================================================================
Note 72.5 CMP-SINK.A1 5 of 6
SUBPAC::BJUBINVILLE 5 lines 1-AUG-1994 16:20
-< n2 line ran >-
--------------------------------------------------------------------------------
I hooked up the N2 for this sink.
BJ
================================================================================
Note 72.6 CMP-SINK.A1 6 of 6
SUBPAC::BJUBINVILLE "NFD Fire - Rescue" 4 lines 11-MAY-1995 03:54
-< N2 gun repaired >-
--------------------------------------------------------------------------------
Repaired severed N2 line on the gun end.
BJ
|