Title: | system management communications forum |
Moderator: | CHEST::THOMPSON |
Created: | Fri Mar 21 1986 |
Last Modified: | Thu Jul 08 1993 |
Last Successful Update: | Fri Jun 06 1997 |
Number of topics: | 490 |
Total number of notes: | 2018 |
In a recent note (174.4 written 13-Sep-88), I said that I would soon be giving details of forthcoming hardware (and software) moves - so here they are. The changes will occur in several stages in order to minimise the impact on ADG, and are designed to try and meet the following objectives: 1. To increase the power in the Order Fulfilment Integration Cluster. This currently consists of 2 x 11/785 for which 2 x 8700 replacements had been ordered. These 8700s have now been cancelled and we must do what we can with the equipment we currently have. 2. To make more efficient use of our processors. 3. To eliminate the use of the RDGEnn series node names. The intention to do this was announced back in May, prior to our move to The Crescent - at last its now going to happen! 4. To make more efficient use of our disk space. First, for the benefit of those who have recently joined us and are not sure of the configurations that we currently operate, I will describe them briefly: CLUSTER NODE TYPE USAGE ------- ---- ---- ----- SUPPRT VULCAN 8250 Support of all released HEAD 8530 software ADG FOOT 8530 Development of software RDGE00 11/785 on the version of VMS RDGE28 11/785 currently used by I.S. Operations. FUTURS CHEST 8530 Development of software RDGE43 11/785 on the next version of VMS to be used by I.S. Operations. <standalone> STOPIT 8700 End User Engineering system In addition to the above, there is an Order Fulfilment Integration cluster which currently consists of 2 x 11/785s. The purpose of this cluster is for integration testing of the component products of Order Fulfilment. No development or support work is done on this cluster. None of the HARDWARE moves described in this note will affect the SUPPRT cluster. The table below shows the machine moves that will take place, using the existing node names as an aid to clarity: CLUSTER NODE TYPE ------- ---- ---- ADG STOPIT 8700 RDGE28 11/785 URIAH 11/785 HEEP 11/785 FUTURS CHEST 8530 RDGE00 11/785 RDGE43 11/785 O.F. FLAT 8700* INTEGRATION FOOT 8530 * System on loan from I.S. Computer Resources. Using the new node names, the clusters will appear as shown below: CLUSTER NODE TYPE ------- ---- ---- ADG FOOT 8700 INCH 11/785^ YARD 11/785 MILE 11/785 FUTURS CHEST 8530 CRATE 11/785^ COFFIN 11/785^ O.F. URIAH 8530 INTEGRATION HEEP 8700 ^System due to be upgraded to 8700 (delivery scheduled for October/November 1988) The schedule for these changes is currently as follows: i) New 8700 installation (ex FLAT) starts Mon 19th Sept. ii) New 8700 replaces 8530 (FOOT) in ADG cluster Sat 24th Sept. iii) 8530 (FOOT) replaces 11/785 (URIAH) in O.F. cluster Sat 24th Sept. iv) 11/785 (URIAH) boots into ADG cluster on new root Sat 24th Sept. v) 8700 (STOPIT) workload moves to ADG cluster on or by Sat 1st Oct. vi) 8700 (STOPIT) replaces 11/785 (HEEP) in O.F. cluster Sat 1st Oct. vii) 11/785 (HEEP) boots in FUTURS cluster on new root Sat 1st Oct. As each new or moved processor joins a cluster its node name will be changed to remove the Reading node names (RDGEnn). The Reading node names associated with PDP systems (RDGE03, RDGE39) will be dealt with separately. Objective 4 (to make more efficient use of our disk space) is being dealt with by a separate, but parallel exercise to ensure that all projects are on the correct cluster (SUPPRT/ADG/FUTURS) or alternatively either archived or deleted. This project is being run by our Sandwich Student (Steve Green) under the direction of Jerry Thompson. Steve G. is currently compiling a list of all projects and the people responsible for them, and will be in touch with those people in the near future. A possible spin-off from this exercise that is currently under consideration is the creation of a project database and associated software/proceedures to try to ensure that we keep on top of this situation in the future.
T.R | Title | User | Personal Name | Date | Lines |
---|---|---|---|---|---|
175.1 | Wot, no software changes? | FOOT::RUSSELL | Speak softly, and carry a beagle. | Thu Sep 15 1988 14:47 | 8 |
Ummm, sounds good(-ish), Steve. But, what about the VMS V5 updgrades? Wot's 'appening about that, then, eh? Peter. | |||||
175.2 | More info on the way... | FOOT::CAITHNESS | Colin CAITHNESS, @UCG, 781-4335 | Mon Sep 19 1988 15:56 | 4 |
I'm attending a meeting tomorrow to finalise the software upgrades, I'll let you know ASAP. Colin. | |||||
175.3 | FOOT::RUSSELL | Life is short, then you die. (W. Allen) | Thu Sep 22 1988 12:30 | 10 | |
Two things, chaps and chapesses... a) wot abaht V5, then, eh? Where's the update promised in .2?? b) when will the network node changes be made for the clusters' new names, and will it be a *full* network update - there seem's to be quite a lot of systems moving over the pond this weekend... Peter. | |||||
175.4 | EASE and VMS V5.0 coming soon! | FOOT::CAITHNESS | Colin CAITHNESS, @UCG, 781-4335 | Fri Sep 30 1988 13:40 | 19 |
Okay, here's a minor update... FUTURS will be the VMS V5.0 machine (no surprises there!). The plan is to upgrade FUTURS to V5 and EASE at the same time, as EASE comes pre-built within the V5 environment. There is no fixed date as yet, except that it will be within the October/November timeframe. There is a UK IS technical forum next week to determine the actual dates, so we should know by the following week. The VMS V4.7 layered product upgrade will also be going ahead, again in the October/November timeframe. And once again, firm dates for the upgrades will be determined at next weeks forum. These layered product upgrades will not effect any applications based at The Crescent, as the recent questionnaire showed. That's all for now, more information soon (around 10th-12th October). Colin. | |||||
175.5 | SUPPRT cluster hardware changes | NECK::THOMPSON | Mon Oct 03 1988 13:55 | 31 | |
Glad tiding peeps - the SUPPRT cluster will shortly (in the next month-ish) be getting its NEW disc drives installed. The changes will be PRESENT SUPPRT DEVICES NEW SUPPRT DEVICES $21$DUA0: RA81 Systemdisk RA81 (No size change, but now shadowed) $21$DUS1: RA81 Userdisk RA82 (Shadowable) $21$DUS2: RA81 Userdisk RA82 (Shadowable) $21$DUS5: RA81 Userdisk RA82 (Shadowable) $21$DUS10: RA81 Userdisk RA82 (Shadowable) none RA82 (Floating Shadow volume) none RA82 (Floating Shadow volume) $21$DJA4 RA60 Userdisk NO replacement Which will mean 1)There will be enough space (just) to load all applications supported from the Crescent on the Support cluster i.e. move all supported environments off ADG and FUTURS clusters. 2)It will be possible to keep the cluster running 24 hours a day, 7 days a week with NO SHUTDOWN FOR BACKUPS. Watch the login notices for more news. |