|
This is to advise you of a modification that has been made to the Level II
Internal Assessment Procedure E2-UKXPR-A1.
This is purely a cosmetic change altering a heading in the Deficiency Statement
template from: "Corrective Action Suggestion" to "Possible Solution
Suggestion"
I have attached the latest version of the Procedure for your information.
All current versions of Level II Procedures are published on VTX.
Regards
Irene Thornton.
Author: Bob McKean
Date: 16-Apr-1992
Posted-date: 01-Jul-1992
Subject: INTERNAL ASSESSMENTS PROCEDURE
E2-UKXPR-A1 15th April 1992 Page 1 of 10
Document ID: Internal Assessments
Number E2-UKXPR-A1
Revision B
Issued 30th June 1992
Abstract: This document describes the process by which the
Quality System used in each part of the business
will be assessed.
Applicability: Digital Product Services personnel.
Author: Bob McKean @REO
Business Competence Manager
Status: Approved
Review By Date: 15th April 1993
Revision History: Revision A 1st August 1991
Revision B 15th April 1992
Cosmetic change 30th June 1992
Approval: DPS Business Management Team
E2-UKXPR-A1 15th April 1992 Page 2 of 10
CONTENTS
1.0 Introduction
2.0 Definitions
3.0 Responsibilities
4.0 Process Flow
5.0 Process Notes
6.0 Quality Records
7.0 Procedural Cross-References
8.0 Assessment Criteria
Appendix
A Report Format
E2-UKXPR-A1 15th April 1992 Page 3 of 10
1.0 Introduction
Formal Internal Assessments are carried out in each
part of the business twice yearly in order to
verify the effectiveness of the Quality System.
Each section of the standard is assessed at least
once over a two year period, in each part of the
business.
This document outlines the assessment process and
associated responsibilities.
Each assessment will usually take place over a two
day period. Trained personnel are used to conduct
these assessments, the Assessment Team will usually
comprise of a Lead Assessor and an Assessor.
All members of the Assessment Team are independent
of the location being assessed.
2.0 Definitions
2.1 Quality System
The standards, policies and procedures that ensure
our services meet their intended application.
The system must meet all the requirements of ISO
9001-1987
2.2 Assessment
A physical sampling check of the Quality System
that provides evidence of the following:
- the Quality Systems ability to meet the standard.
- that practice and process are the same.
- that the Quality System is effectively meeting
the customer requirements as defined in the service
terms and conditions.
3.0 Responsibilities
3.1 It is the responsibility of the Business QMR to
ensure a yearly Assessment Schedule exists which
details the dates of the Assessments in each part
of the business. This schedule is to be available
on VTX.
E2-UKXPR-A1 15th April 1992 Page 4 of 10
3.2 It is the responsibility of QMRs at all levels in
the organisation to ensure personnel are aware of
forthcoming Assessments. The local QMR must be
available as a resource to the Assessment Team when
it is on site, and must maintain records associated
with assessments.
3.3 It is the responsibility of the Hosting Manager to
provide facilities and material to support the work
of the Assessment Team and to ensure availability
of personnel as requested by the assessors.
The Hosting Manager also has responsibility to take
appropriate actions in support of the findings
detailed in the Assessment Report.
3.5 It is the responsibility of the Lead Assessor to
provide leadership and direction to the Assessment
Team and to produce the Assessment Report.
E2-UKXPR-A1 15th April 1992 Page 5 of 10
4.0 Process Flow
1----------------------+
| Assessment Schedule |
| developed. |
| Assessment Teams |
| assigned. |
+-----------+----------+
|
2-----------+----------+
| Courtesy Call to |
| Hosting Manager and |
| QMR |
| VTX checked for |
| mandated assessment |
| areas |
+-----------+----------+
|
3-----------+----------+
| On-site Assessment |
| Team meeting |
| Previous report |
| consulted |
| Scope Decision made |
+----------+-----------+
|
4----------+-----------+
| Opening Meeting |
| Scope clarified |
+----------+-----------+
|
5----------+-----------+
| Assessment conducted |
| Report produced |
+----------+-----------+
|
6----------+-----------+
| Closing Meeting |
| Assessment Report |-->Copy to ISOHQ for
| issued | reference
+----------+-----------+
|
7----------+-----------+
| Appropriate action |
| taken by Hosting |-->Corrective Actions
| Manager |
+----------------------+
E2-UKXPR-A1 15th April 1992 Page 6 of 10
5.0 Process Notes
5.1 The Business QMR develops an annual schedule of
assessments and publishes it on VTX. Lead Assessors
and Assessors are assigned to each assessment.
5.2 Prior to going to site the Lead Assessor must make
a courtesy call to the Hosting Manager and the
local QMR at least one week prior to the Assessment
visit to ensure facilities and materials are
available in support of the Assessment.
The Lead Assessor must also take input from VTX
prior to arrival as to which assessment areas are
mandated by the Business.
5.3 During the on-site Assessment Team meeting the Lead
Assessor determines the scope of the assessment,
the previous Assessment Report must be consulted so
that verification of actions can take place during
the course of the Assessment.
The Lead assessor must also consult the local QMR
to determine which areas of the standard have yet
to be covered in the current two year cycle.
5.4 An opening meeting takes place with the Hosting
Manager and his staff to state the scope, the
process to be followed, and to define the
supportive resource needed during the Assessment.
No meeting minutes are required.
5.5 The Assessment is conducted in line with Assessment
training and Business direction.
An Assessment Report is produced using the proforma
in the appendix. The report must be short and to
the point and may be hand written.
5.6 At the end of the Assessment a closing meeting is
held with the Hosting Manager and his staff to
issue the Assessment Report and to explain the
content.
No meeting minutes are required.
A copy of the Assessment Report must be sent to the
Business QMR by the Lead Assessor.
5.7 The Hosting Manager and his staff must discuss and
action the Assessment Report content and record
actions taken.
The Assessment Team must leave the location with no
report writing or other outstanding activity
attached to them.
E2-UKXPR-A1 15th April 1992 Page 7 of 10
6.0 Quality Records
6.1 - Assessment Reports
6.2 Retention Period
Retention period for the Assessment Report is 24
months.
7.0 Procedural Cross-Reference
E2-UKXPR-A8 Management Review-Quality System
E2-UKXPR-A4 Corrective Action
8.0 Assessment Criteria
- Business Assessment Schedule available and current.
- Assessment Reports available.
- Reports produced to standard format.
E2-UKXPR-A1 15th April 1992 Page 8 of 10
Appendix A
Assessment Report
Issued to:
Location:
Assessors:
Issue date:
Scope:
This area of the report is used to define the areas
covered by the Assessment.
E2-UKXPR-A1 15th April 1992 Page 9 of 10
General Comment
This area of the report is used to record
identified strengths of the team being assessed,
and also to record observations of general interest
made by the Assessment Team during the Assessment.
E2-UKXPR-A1 15th April 1992 Page 10 of 10
Deficiency Statement
Assessment Area:
This area of the report defines the section and
description of the part of the ISO Standard which
is relevant to the subject under assessment and
also the local/UK relevant process/standard/policy.
e.g. ISO 9001/1987 4.1.3 Management Review
and/or Quality Manual section 5.6 Management
Review-Quality System.
Criteria:
This section of the report states the words of the
standard/policy/procedure against which the
deficiency is being recorded.
e.g. The quality system adopted....shall be
reviewed at appropriate intervals....
Deficiency Statement:
This section of the report is the statement of what
was found to be deficient.
e.g. No evidence could be supplied of reviews
having taken place.
Possible Solution Suggestion:
This section of the report states possible
solutions which could be considered by the
receiving Management Team. It is based on the
experience and knowledge gained by the Assessment
Team when assessing other similar areas at other
locations.
To Distribution List:
andrea allam @uvo,
fran audoire @uvo,
NAME: Adam Bird <BIRDA AT A1_KERNEL @THESUN @UVO>,
NAME: Rusty Broad <BROADR AT A1_KERNEL @THESUN @UVO>,
NAME: Jodie Carter <CARTERJ AT A1_KERNEL @THESUN @UVO>,
NAME: Lisa-Marie Carter <CARTERL AT A1_KERNEL @THESUN @UVO>,
NAME: Sue Cooper <COOPERS AT A1_KERNEL @THESUN @UVO>,
NAME: Kevin Gant <GANT AT A1_KERNEL @THESUN @UVO>,
jo harris @uvo,
chrissie hudd @uvo,
NAME: David Humble <HUMBLED AT A1_KERNEL @THESUN @UVO>,
helen jepson @uvo,
chris lewington @uvo,
NAME: Clare Lounton <LOUNTONM AT A1_KERNEL @THESUN @UVO>,
NAME: Julie North <NORTHJ AT A1_KERNEL @THESUN @UVO>,
julie phillips @uvo,
rachael purver @uvo,
helen ross @uvo,
caroline stanley @uvo,
NAME: Jane Stickley <STICKLEYJ AT A1_KERNEL @THESUN @UVO>,
NAME: Frank Briggs <BRIGGS AT A1_KERNEL @THESUN @UVO>,
david lounton @uvo,
NAME: Maureen Coll <COLL AT A1_KERNEL @THESUN @UVO>,
christine easton @uvo,
sandra newman @uvo,
joanne howell @uvo,
NAME: MARILYN FROST <FROST AT A1_KERNEL @THESUN @UVO>,
GALLICHAN AT A1_KERNEL @THESUN @UVO,
NAME: Carrina Gregory <GREGORY AT A1_KERNEL @THESUN @UVO>,
NAME: Dawn Laundy <LAUNDY AT A1_KERNEL @THESUN @UVO>,
NAME: Tina Linehan <LINEHAN AT A1_KERNEL @THESUN @UVO>,
NAME: Lorraine Sayer <SAYER AT A1_KERNEL @THESUN @UVO>,
NAME: Tom Scuffham <SCUFFHAM AT A1_KERNEL @THESUN @UVO>,
NAME: Peter Stevenson @UVO <STEVENSON AT A1_KERNEL @THESUN @UVO>,
NAME: Mike Roe <ROE AT A1_KERNEL @THESUN @UVO>,
NAME: Dympna Barr <BARRD AT A1_KERNEL @THESUN @UVO>,
NAME: Sarah Brook <BROOK AT A1_KERNEL @THESUN @UVO>,
andrea dyos @uvo,
lynne fox @uvo,
NAME: Lisa Gilbert <GILBERT AT A1_KERNEL @THESUN @UVO>,
lynne hales-owen @uvo,
darrell jenkins @uvo,
_kernel::jezzard AT A1_KERNEL @THESUN @UVO,
david milne @uvo,
larraine rose @uvo,
trevor rose @uvo,
jenny stewart @uvo,
tracey stoyle @uvo,
steve taylor @uvo,
andy terry @uvo,
Judy Slade @uvo,
_kernel::hodgkins AT A1_KERNEL @THESUN @UVO,
NAME: ANNA MOYNIHAN <MOYNIHAN AT A1_KERNEL @THESUN @UVO>,
gary withall @uvo,
NAME: Lee Farrant <FARRANTL AT A1_KERNEL @THESUN @UVO>,
alan james @uvo,
steve edmunds @uvo,
rory odonnell @uvo,
ralph nicholson @uvo,
steve smith @uvo,
owen davies @uvo,
paul weeks @uvo,
NAME: Mick Magee <MAGEE AT A1_KERNEL @THESUN @UVO>,
bill arthur @uvo,
graham baxter @uvo,
frances hanafin @uvo,
debbie oram @uvo,
ewan smith @uvo,
brian anthony @uvo,
colin banks @uvo,
andy hobbs @uvo,
sally lewis @uvo,
duncan mccombe @uvo,
bill silk @uvo,
richard luckman @uvo,
chris tyler @uvo,
norman bland @uvo,
nigel day @uvo,
steve wibrew @uvo,
richard hough @uvo,
paul belcher @uvo,
dave brett @uvo,
liz clatworthy @uvo,
daryl horsnell @uvo,
simon lowther @uvo,
ken robb @uvo,
ian martin @uvo,
theo bartley @uvo,
bruce muir @uvo,
andrea batten @uvo,
clive brooker @uvo,
lawrence roe @uvo,
lynne romain @uvo,
mark west @uvo,
heather waterman @uvo,
dave clark @uvo,
NAME: Bruce Millar <MILLAR AT A1_KERNEL @THESUN @UVO>,
ian mcgaughrin @uvo,
brian adams @uvo,
nigel garnett @uvo,
john travell @uvo,
roland scott @uvo,
norman pettet @uvo,
mike ayling @uvo,
richard hoblin @uvo,
NAME: Andrew Hopkins <HOPKINS AT A1_KERNEL @THESUN @UVO>,
dave wrighton @uvo,
NAME: Helen Milne <MILNEH AT A1_KERNEL @THESUN @UVO>,
NAME: Janet Howells <HOWELLS AT A1_KERNEL @THESUN @UVO>,
alison mcvittie @uvo,
NAME: Helen Cory <CORY AT A1_KERNEL @THESUN @UVO>,
avril nicholson @uvo,
liz anderton @ubo,
rhoda walsh @ubo,
alison osmond @uvo,
HELEN WAKELEN @UVO,
NAME: Simon Lobar @UVO <LOBAR AT A1_KERNEL @THESUN @UVO>,
NAME: IRENE THORNTON <THORNTONI AT A1_KERNEL @THESUN @UVO>,
jason bell @reo,
sean deadman @reo,
steve allen @uvo,
julie lammin @uvo
|