[Search for users] [Overall Top Noters] [List of all Conferences] [Download this site]

Conference smaug::ibm_requests

Title:IBM System Work Requests
Notice:PLEASE READ ALL OF NOTE 1.* and 2.1 BEFORE PARTICIPATING HERE !)
Moderator:FREE::WOOO
Created:Mon Sep 25 1989
Last Modified:Tue Jun 03 1997
Last Successful Update:Fri Jun 06 1997
Number of topics:931
Total number of notes:3385

930.0. "Data needed on Lab Equipment to be moved to Crosspoint" by FREE::WOO (Greg Woo, DTN 226-7929, N1RZR) Thu May 29 1997 17:09

Hi Ron, Charlie,

We need physical planning data for the following systems and their peripheral
devices and cabinets.

    EDSCLU
    QUATLU
    ARRACK
    BUFCAL

This physical planning data must include ...

   1)  model numbers of the systems

   2)  the physical dimensions of the equipment   W x D x H

   3)  the BTU output of the equipment  (for A/C loading purposes)

   4)  the number/type of electrical connections required
       (how many outlets,  what types of receptacles)

   5)  the number/type of network connections needed (FDDI, T/R, ETH, and
       UTP, ThinWire, etc.)

   6)  include count and type of display monitors in peripheral descriptions
       and remember we'll need the BTU output estimates for the monitors as
       well.      


If possible, we'd like this list completed by Wednesday as well.

Thanks, Greg
T.RTitleUserPersonal
Name
DateLines
930.1Serial numbers needed too!FREE::WOOGreg Woo, DTN 226-7929, N1RZRFri May 30 1997 14:253
While you're reviewing these systems, we need to record equipment serial numbers
too. We should get S/N's for the monitors as well I suppose ... and for any
other device that has an asset tag.
930.2EDS LAB Equipment to Cross pointsFREE::DOUCETMon Jun 02 1997 17:1961
Greg,
    
    Here is the information you have requested for the lab equip belonging
    to EDS.
    
    Closed RoN                               
    
Currently nodes ARRACK and Bufcal are located on a 6 foot table (lower lab)
Node EDSClU and QUATLU Take up a 6 feet of Floor Space (IBM_raise lab)
The total approx BTU figure is 18,073/hr


============================================================================

Node: BUFCAL

DEC 3000/400  AB24201YCP	W/20in, H/5in , D/17.5in
SZ12A-XA  AB104023N6		W/20in, H/3.8in , D/17.5in
VT330 TA84908977

1/utp , 3/ac, MIN/MAX BTU/hr 784.3/1631, 205 vt, 275 EXP Box     btu 2111 
==========================================================================
Node ARRACK

DEC 3000/300 ML233P231		W/16in, H/3.8 , D/17.3in
SZ12-B-XA s/n AB10200LIU	W/20in, H/3.8in , D/17.5in
RZ55-FA AB950050WU
VT319-DA HK14018956


1/utp , 3/ac, MIN/MAX BTU/hr 784.3/1631 ,275 EXP Box ,400 monitor
								 btu 2581	
=========================================================================

Node EDSCLU
AXP 2000 4/200 NI51200Q2T      W/19in H/24in, W/26in
SW500-AC CX51200473            W/24in H/44in, W/36in
PCXBV-PV  7C50486050 (monitor)
VT330 ME02911404 

1/utp 3/ac    MAX BTU/hr  4095/hr CPU, 4778/hr Storage Works 275/monitor
								btu 9148
=========================================================================
Node Quatlu
655QS-F2 WF95106834		W/21in H/26in, W/18in
VT220 TA648E0349
 
1/utp 2/ac   MAX BTU/hr  2978/hr CPU, 205/hr VT220
								btu 3183
=========================================================================
INFORSERVER

SEADB-SS IR63904617		W/7in H/18in, W/18in !On top of EDSclu


1/bnc 1/ac  MAX  BTU/hr 1050/hr					btu 1050




Total BTU 18,073