[Search for users]
[Overall Top Noters]
[List of all Conferences]
[Download this site]
Title: | DECmcc user notes file. Does not replace IPMT. |
Notice: | Use IPMT for problems. Newsletter location in note 6187 |
Moderator: | TAEC::BEROUD |
|
Created: | Mon Aug 21 1989 |
Last Modified: | Wed Jun 04 1997 |
Last Successful Update: | Fri Jun 06 1997 |
Number of topics: | 6497 |
Total number of notes: | 27359 |
4821.0. "Cost and Hop Analysis" by LASCPM::PALASE () Mon Apr 05 1993 15:40
I tried to get a response to this note in the DECNET notes conference
but I did not get any replies. If someone knows of a better place
to post this note, post a reply to this note. I accessed the WANDESIGN
notes conference but it did not seem very active so I did not post a note.
Problem:
I need a tool to assist me in doing a Cost/hop analysis. For example,
the tool would allow me to set cost and hop info at each node. The tool
would then implement the Decnet Phase IV routing algorithm and
calculate all possible paths between two nodes. We have a fairly
complex WAN and it would be very difficult to do this without some
automated tool. Any suggestions?
Thanks for the comments.
Frank Palase
T.R | Title | User | Personal Name | Date | Lines
|
---|