Title: | *OLD* ALL-IN-1 (tm) Support Conference |
Notice: | Closed - See Note 4331.l to move to IOSG::ALL-IN-1 |
Moderator: | IOSG::PYE |
Created: | Thu Jan 30 1992 |
Last Modified: | Tue Jan 23 1996 |
Last Successful Update: | Fri Jun 06 1997 |
Number of topics: | 4343 |
Total number of notes: | 18308 |
Is there a pointer to instructions (check list) of things one need to do when converting from a one node ALL-IN-1 2.4 system to a 3900/4000 VAXcluster ALL-IN-1 2.4 system? The installation guide does not address this situation.
T.R | Title | User | Personal Name | Date | Lines |
---|---|---|---|---|---|
1451.1 | NCBOOT::HARRIS | oooppps | Fri Sep 18 1992 16:26 | 11 | |
this was recently done at my customer site. as far as ALL-IN-1 went, it wasn't that big a problem. just had to make sure the NETWORK.DAT got populated with the cluster alias as location. there were also some homegrown ALL-IN-1 monitor procedures that had to be changed to deal with the clsuter alias. also, i have been told (by an ex-digit) that if you have group conferencing, then things can be confusing if you turn cluster alias on after you install gpc. ann |