| Title: | *OLD* ALL-IN-1 (tm) Support Conference | 
| Notice: | Closed - See Note 4331.l to move to IOSG::ALL-IN-1 | 
| Moderator: | IOSG::PYE | 
| Created: | Thu Jan 30 1992 | 
| Last Modified: | Tue Jan 23 1996 | 
| Last Successful Update: | Fri Jun 06 1997 | 
| Number of topics: | 4343 | 
| Total number of notes: | 18308 | 
    Is there a pointer to instructions (check list) of things one need to
    do when converting from a one node ALL-IN-1 2.4 system to a 3900/4000
    VAXcluster ALL-IN-1 2.4 system?  The installation guide does not address 
    this situation.
| T.R | Title | User | Personal Name | Date | Lines | 
|---|---|---|---|---|---|
| 1451.1 | NCBOOT::HARRIS | oooppps | Fri Sep 18 1992 15:26 | 11 | |
|     this was recently done at my customer site.  as far as ALL-IN-1 went,
    it wasn't that big a problem.  just had to make sure the NETWORK.DAT
    got populated with the cluster alias as location.  there were also some
    homegrown ALL-IN-1 monitor procedures that had to be changed to deal
    with the clsuter alias.
    
    also, i have been told (by an ex-digit) that if you have group
    conferencing, then things can be confusing if you turn cluster alias on
    after you install gpc.
    
    	ann
 | |||||